Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
kitchen & wc
meeting room
store
view from The Street
St MARY'S CHURCH EAST BERGHOLT
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
partition abutts arcade columns
Project
The Priory Church of St Mary Bungay Client
Friends of St Mary's Bungay view up through meeting room roof
Cad File
Scale
Mac 6
1:100 @ A1 March 2010
Drawn By / D a t e
Checked By / Date
BD March 2010
Title
floor plan and views of St Marys Church, East Bergholt D r a w i n g N o.
R e v N o.
1005/sk/02 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
kitchen & wc
meeting room
EAST BERGHOLT
WCs up cupbds
cupbds
south aisle
vestry organ
sink
choir vestry
kitchen & tower access
bell chamber over ladder to ringing chamber switches
priory ruins altar
up
up u p
nave
views in & out from St Marys Street meeting room
font
chapel north aisle
up
porch orc chamber mberr over m ov
ST MARYS 1
WCs up
vestry organ
cupbds
cupbds
south aisle
sink
choir vestry
store & tower access
bell chamber over ladder to ringing chamber switches
priory ruins altar
up
nave
up up
views in & out from St Marys Street meeting room
TRANSPARENCY
store
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
Project
The Priory Church of St Mary Bungay Client
font
chapel north aisle
kitchen up
Friends of St Mary's Bungay Cad File
Scale
Mac 6
1:100 @ A1 March 2010
Drawn By / D a t e
Checked By / Date
BD March 2010
porch orc chamber mberr over m ov
Title
ST MARYS 2
comparative strategies D r a w i n g N o.
R e v N o.
1005/sk/03 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
up
vestry organ
cupbds
cupbds
south aisle
sink
choir vestry bell chamber over
ladder to ringing chamber switches
priory ruins up
altar
up
south aisle
nave
font
chapel north aisle
up
porch chamber over
Rev Date
0 metres
5
Revision
Drawn By
up 10
approximate scale
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
Project
The Priory Church of St Mary Bungay south aisle
nave
Client
north aisle
Friends of St Mary's Bungay Cad File
Scale
Mac 6
1:100 @ A1 March 2010
Drawn By / D a t e
Checked By / Date
BD March 2010
Title
floor plan and typical section D r a w i n g N o.
R e v N o.
1005/sk/01 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
view 1 up
vestry
cupbds
FEMALE WC
cupbds
south aisle
C H
organ
view 2
MALE WC
sink
KITCHEN choir vestry
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
bell chamber over
ladder to ringing chamber switches
1200
view 5 PANTRY
view 3
priory ruins up u p
altar
nave
up
view 3
MEETING
view 4
view 2 view 4
font
chapel north aisle view 1
view 5
up
DESIGN OPTION 1
porch chamber over
view 1 0 metres me met m etres es
5
up 10
app app pproxim oximate ate sca scale le e approximate
DESIGN OPTION 2
up cupbds
south aisle
vestry
cupbds
FEMALE WC
sink
choir vestry bell chamber over
Rev Date
view 2
organ
view 3
MALE WC 1200
view 5
view 3
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
priory p rio oryy ruins ru uiinss
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
altar
up
MEETING
nave
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
up Drawing Status
PRELIMINARY view 2
view 4
Project
The Priory Church of St Mary Bungay
view 5 C
KITCHEN
Client
H
font
chapel north aisle 1200
view 4
Revision
ladder to ringing chamber switches
view 1
Friends of St Mary's Bungay Cad File
Scale
Mac 7
1:100 @ A1 ST/Apr 2010
Drawn By / D a t e
Checked By / Date
Title
Design Options 1 & 2 up
porch chamber over
D r a w i n g N o.
R e v N o.
1005/SK/04 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
5
5
770
31m
768
00m
92m
769
771
NOTES
23m
2
452
23m
e Th a y w ad
Bro
452
771
5
766 767 2
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Clare Castle
452
452
Motte & Baileys TIN MAL G LA
Po n
NE
Hall
d
Visitor Centre former goods shed
NE
TH
ER
G
AT E
ST
RE
ET
Car Park
Former Rail Bridge
Foot Bridge C
lift
on
451 Dr ive
w Ne
t Cu gate
ay ilw a R
cemetary Sluice
Pond
t er S Riv
d tle an sm Di
BM
45
.6
7m
m
10 92
sF ar
A
451
remains of priory church (Augustinian founded 1248)
our
2
450
remains of cloister existing church
00m
2
former in rmary
Clare Priory
450
00m
proposed extension Pond
44.2m
Drain
Stable House retreat cottages
Foot Bridge
Priory Farm
w Ne
AD RO
Cu
t
N HE AS
Rev Date
449
Revision
Drawn By
449 44.8m
our
t er S Riv
Pond
BM 45 .32m
Drain
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
ed
Sp illw ay
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
ra
ss
Drawing Status
G
FOR APPROVAL
in Dra
Project
Drain
n w
448
Extension to the Church e
at Clare Priory
448
Client
Dr ain
ay ew us Ca
Parish Church at Clare
s Priory Lodge
Cad File
Scale
Drawn By / D a t e
Mac 7 2019
1:1000
ST Mar 10
Checked By / Date
Title
Location Plan 2
447
37m
2
771
37m
D r a w i n g N o.
R e v N o.
5
769
A/2019/A/01
31m
00m
92m
771
766
770
768
5
5
767
447
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability what soever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
remains of original priory church
cloister Existing covered link to priory to be taken down new sewerage treatment plant
Existing porch taken down to ground level and paved floor taken up and replaced with new stone paving to provide as near as possible level access new
drain foul
Trench 2 see archaelogical report
Junction 1
Clare Priory
see drawing no A/2019/BR/24
existing church
Trench 1 see archaelogical report
3
7 Tre nch
Trench 3
6
see archaelogical report
9
8 10 7 9 6
Existing exposed mediaeval wall
ath vel p ng gra
see drawing no A/2019/BR/25
16
5
proposed extension 14
5
Suggested outline of mediaeval stair footing (0008) existi
Junction 2
8 6
10
12
4 3
9 8
10 3
Trench 5
rwp
see archaelogical report new soakaway
3
4
5
5
6
6
7
10
rwp
3
Trench 4 see archaelogical report
rwp in r dra wate
ace
surf new
A
out-buildings
Stable-house
n w
existing trees to be retained
Rev Date
Revision
Drawn By
e Inkpen Downie Architecture & Design Ltd
s Drain
Pond
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR CONSENT Project
Extension to the Church at Clare Priory Client
Parish Church at Clare Cad File
Mac 7 2019
Scale
Drawn By / D a t e
1:200
ST Nov 09
Checked By / Date
Title
Site Plan D r a w i n g N o.
R e v N o.
A/2019/BR/01 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
EXISTING BUILDING
A
B
C
D
E
C
F
G
H
A
1
1 RAMP
cupboard
RAMP
D
B
C
D
E
F
G
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
H
A
1
1
D
ENTRANCE
steps
NOTES
stair
MEETING
LOBBY
adapted wc
new floating raised floor steps
sliding folding doors
sliding folding doors
proposed new stud walls
niche
2
medieval build
SACRISTY
3
3 floor to extension raised above level of existing to cope with future flooding
2
2 EXISTING BUILDING
storage
2
A
SACRISTY A 3
3
H
B
2950
5
5
6
6
5
2950
2838
5A ALTAR
Meeting/ Reconcilliation Room
F
5900
2950
H
B
TABERNACLE
5900
5A 6
4
SANCTUARY
5
F
3A 4
E
2950
E
4
2838
5900
SANCTUARY
5900
3A 4
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
TABERNACLE
6
ALTAR
Choir / Organ Loft
top light
AMBO
AMBO PLANT
7
7
PRESIDENTIAL CHAIR
C PROPOSED EXTENSION
7
7
top light
Mezzanine level Plan
A C1
C1 2838
B
C
2950
5900
GROUND FLOOR PLAN
2838
D
2950
E
F
G
B
5900
C
2950
D
2950
5900
E
F
G
F
G
5900
ROOF PLAN A
B
C
D
E
H
1
1
2
2
Rev Date
Revision
Drawn By
SACRISTY A 3
3
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
4
5900
3A 4
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
2950
SANCTUARY
FOR INFORMATION
H
Project
5
5
2838
2950
Extension to the Church at Clare Priory 5900
5A 6
6 Choir / Organ Loft
Client
The Parish Church at Clare Priory Cad File
Scale
Drawn By / D a t e
Mac 4
1:50
JI Dec 2008
Checked By / Date
7
7
Title
GF, Drainage & Foundation Plan Mezzanine level Plan C1
D r a w i n g N o.
R e v N o.
2838
B
C 5900
FOUNDATION & DRAINAGE PLAN
FIRST FLOOR PLAN
2950
D
2950
E 5900
F
G
A/2019/BR/04 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e. 5900
NOTES
1350
8 7 6
10
6
9
5
8
5 5900
16
4
14
3
12
3
10
5900
8
6
10 UP 10 R at 162.50
UP 4 R at 162.50
2950
7
9
650
1350
8
500
10 9
6 5
8 2950
hinged openable timber screen with metal gause backing and concealed steel frame steel frame to provide access for cleaning windows and to light fittings and speakers concealed behind.
5 5900
16 3
4
3
4
5
5
6
6
7
340
14
3
12
5900
5900
5900
Rev Date
3
Revision
Drawn By
ROOF PLAN
10
9
10
Inkpen Downie Architecture & Design Ltd 2 Balkerne House UP 10 R at 162.50
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk UP 4 R at 162.50
650
2950
8
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
500
BUILDING REGULATIONS Project
Extension to the Church hinged openable timber screen with metal gause backing and concealed steel frame steel frame to provide access for cleaning windows and to light fittings and speakers concealed behind.
2950
at Clare Priory Client
Parish Church at Clare 3
5
4
5
6
6
7
Cad File
Scale
Drawn By / D a t e
Mac 7 2019
1:50
ST Dec 2009
Checked By / Date
340
3
Title 5900
5900
5900
Roof Plan &
ROOF STRUCTURE PLAN
Roof Structure Plan D r a w i n g N o.
R e v N o.
A/2019/BR/08 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
7
WEST
6
5
4
3
2
1
GRID NORTH
A
B
C
D
E
F
G
H
glazing ventilation
5A light weight glazed connection to roof
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
zinc roof finishes on timber structure structure exposed to centre section timber principle and secondary roof structure timber columns Timber vertical screening glazing Timber vertical screening
Proposed floor level to be set above existing (approx 300mm). This enables new structure to float over existing structure without disturbance to fabric. See Engineers proposals.
glazing Floating slab
A
Section on AA Read this section in conjunction with fig 8 and trenches 2, 5 and 6.
Existing footing depth not known
Section on BB
Footing to staircase
See engineers Proposals. New structure to be supported on piled foundations. Piles to be positioned to avoid archaeological remains
2
3
3A
4
Phase 2
Phase 3 CLA 037 SAM (26290)
Read this section in conjunction with FIGURE 2 SCC archaeological Evaluation Report CLA 037 SAM (26290)
H 1
low level opening to modern section of wall
Phase 1
5
6
G
F
E
D
C
B
A
7 C1
reinstate opening as niche
stone bench with glass balustrade
ramp to proposed raised floor area
low level opening to modern section of wall
Section on CC
Read this section in conjunction with FIGURE 5 SCC archaeological Evaluation Report CLA 037 SAM (26290)
Read this section in conjunction with FIGURE 4 SCC archaeological Evaluation Report CLA 037 SAM (26290)
Section on DD
section taken through ramp
Read this section in conjunction with FIGURE 3 SCC archaeological Evaluation Report CLA 037 SAM (26290) Rev Date
G H
G
F
E
D
C
F
E
D
C
B
C1
B
Revision
A
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
C1 glazing
Drawn By
glazing
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
Project
Extension to the Church at Clare Priory Client
Parish Church at Clare Cad File
Scale
Drawn By / D a t e
Mac 4
1:100
Dec 2008
Checked By / Date
Title
Section on FF
Sections AA to FF
Section on EE D r a w i n g N o.
R e v N o.
A/2019/BR/11 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
zinc roof finishes on timber structure
Stone coping
Brick
timber vertical screening
glazing
4140
timber vertical screening 4240
Stone face work
Steel framed glazing and doors
Steps in stone to match facings
East Facing Elevation Timber boards between vertical timber shading blades
Zinc Roofing Zink rainwater goods Rev Date
Revision
Drawn By
Stone facework
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
2565
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status 1590
FOR INFORMATION Project
Extension to the Church
2600
2600
at Clare Priory Glazing
Client
Parish Church at Clare 1350
3360
3310
Cad File
Scale
Drawn By / D a t e
Mac 7 2019
1:50
ST Nov 09
Checked By / Date
Title
East & West Elevations D r a w i n g N o.
West Facing Elevation
R e v N o.
A/2019/BR/18 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Ventilation to plant room constructed in brick and tile
South Facing Elevation Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
Extension to the Church at Clare Priory Client
Parish Church at Clare Cad File
Scale
Drawn By / D a t e
Mac 7 2019
1:50
ST Nov 09
Checked By / Date
Title
South Elevation D r a w i n g N o.
R e v N o.
A/2019/BR/19 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
roof structure to centre section exposed internally timber principle and secondary roof structure timber columns
Rev Date
Timber vertical screening
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
Extension to the Church at Clare Priory Client
Parish Church at Clare Cad File
Mac 7 2019
Scale
Drawn By / D a t e
N/A
JI
Checked By / Date
Title
3D Roof Structure D r a w i n g N o.
R e v N o.
A/2019/BR/21 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
E
H
F
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
D
G
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability what soever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
B1
New lead flashing
TABERNACLE
top light
Existing cast iron gutter
NOTES
C SANCTUARY
C
AMBO
Stainless steel roof glazing structure
ALTAR
top light
Roof glazing
B1
Detail 16 (scale 1:5) A1
A1
Gutter Lead flashing
B2
A2
A2
A3
A3
7
SECTION THROUGH ROOF GLAZING
SACRISTY
PLAN 1:200 16
Cast iron gutter.
E B2 F
Double glazing.
G
D H
zinc finishes to roof facias and soffittes
zinc finishes to roof facias and soffittes
Ventilation to roof void.
8
10
9
H/W vertical blades with chamfered edge profile, held with stainless steel connectors. Timber obtained from sustainable sources and to be of a suitable variety so as not to require a finish treatment. (intention is to allow to weather to a silver patination)
Structural steel bracket to support roof glazing Insulation to wrap around ventilated gutter.
4
H/W vertical blades with chamfered edge profile, held top and bottom with stainless steel connectors. Timber obtained from sustainable sources and to be of a suitable variety so as not to require a finish treatment. (intention is to allow to weather to a silver patination)
3
3
Stainless steel lattice beam to be constructed before the arches for structural security. Double glazing in steel sections.
Double glazing in steel sections.
Vertical external shading
Main structural column
Main structural column
1590
Double glazing in steel sections
1590
Circular steel section
Choir / Organ Loft
Glazed roof cover
Main structural column
Section on B2 see detail 3A 200
200
200
200
200
200
200
200
200
200
Make up of floor. Extension:- 40mm Masonry Slabs on 20mm mortar bed on 80mm screed on rigid insulation on insitu reinforced suspended concrete slab on piles. Underfloor heating pipes in screed. Pile placed to avoid archaeology. Where slab approaches existing building slab thickness and reinforcement increased to allow cantelever over existing footing without bearing on historic fabric.
Make up of floor. Existing Church:- 40mm Masonry Slabs on 20mm mortar bed on 75mm concrete topping on Polystyrene infill blocks between prestressed beams bearing on block sleeper walls. Sleeper walls @ centres to be determined laid on existing floor. Whole assembly to form light weight unit capable of being removed without damage to existing historic fabric. New floor to be stopped short of edge to allow continuous perimeter ventilation.
2
Rev Date
Revision
Drawn By
strip out existing parquet flooring Make up of floor. Ramp:- 60mm Stone Slabs bearing on block sleeper walls. Sleeper walls cut to match ramp gradient and have sufficient distance from the existing building walls. Insulation to be dropped on the aluminium shaped sheet between the sleeper walls. Slabs to cantilever over the sleeper wall and to be stopped short of edge to allow continuous perimeter ventilation.
6
Make up of floor. New bridging floor to be built on exiting historic footing. Expansion capacity built on either side of the arches.
2600
00
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION
5
Project concrete topping
13
Extension to the Church
1
150 75
12
at Clare Priory Client
void
Parish Church at Clare
void
void Cad File
Mac 7 2019
Scale
Drawn By / D a t e
1:20
ST Aug 09
Checked By / Date
Title
Section on A1
Section on A2
Section on A3
Section on B1
Detail Sections A2 & A3 & B1 & B2 Detail 16 D r a w i n g N o.
R e v N o.
A/2019/BR/30 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability what soever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
existing church wall new formed stone arches centre to the existing windows New level up concrete on existing footing Existing floor level
11
3D view for stone arches Corner detail
suggested outline of medieval footing
trench 1
trench 6 trench 2
medieval footing found in trench 6
suggested outline of medieval footing medieval footing found in trench 3
trench 3
Section on HH (through proposed arches) Stone shapes for arches
E
H
F
D
G
TABERNACLE
C SANCTUARY
AMBO
C
ALTAR
top light
top light
B1
B1 A1
B2
A2
A2
A3
A3
Rev Date
Revision
Drawn By
SACRISTY
Choir / Organ Loft
A1
PLAN 1:200
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
E B2 F
G
D
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
H
FOR INFORMATION
Make up of floor. Existing Church:- 40mm Masonry Slabs on 20mm mortar bed on 75mm concrete topping on Polystyrene infill blocks between prestressed beams bearing on block sleeper walls.
Project
Extension to the Church proposed stone arches on elevation
1200
1200
1200
1200
1200
at Clare Priory
1200
Client
Parish Church at Clare FLOOR VOID EXISTING FLOOR LEVEL
Cad File
180 180
2040
Mac 7 2019
2400
Scale
Drawn By / D a t e
1:20
ST Aug 09
Title
trench 6 trench 1
Detail Sections DD & HH trench 2
suggested outline of medieval footing
D r a w i n g N o.
trench 3
Section on DD (through proposed existing church floor)
Checked By / Date
R e v N o.
A/2019/BR/31 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability what soever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
E
H
F
D
G
TABERNACLE
C SANCTUARY
AMBO
C
ALTAR
top light
top light
B1
Make up of floor. Extension:- 40mm Masonry Slabs on 20mm mortar bed on 80mm screed on rigid insulation on insitu reinforced suspended concrete slab on piles. Underfloor heating pipes in screed. Pile placed to avoid archaeology. Where slab approaches existing building slab thickness and reinforcement increased to allow cantelever over existing footing without bearing on historic fabric.
B1 A1
B2
A2
A2
A3
SACRISTY
insulation to perimeter
PLAN 1:200 FLOOR VOID
E B2
EXISTING FLOOR LEVEL trench 6
A3
Choir / Organ Loft
proposed stone arches on elevation
A1
Section on GG (through proposed extension floor)
void
G
F
D H
trench 1
zinc roof finish
100
100
zinc facia
insect mesh
stainless steel gutter lining
60
60
ventilation gap
60
ventilation gap
Rev Date
Revision
Drawn By
50
50
60
60
50
150
stainless steel gutter lining
150
stainless steel gutter lining
perforated strip
ventilation gap
perforated strip
perforated strip
ventilation gap
50
Detail 8 (scale 1:5)
Detail 9 (scale 1:5)
Detail 10 (scale 1:5)
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
H/W vertical blade
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
Extension to the Church at Clare Priory Client
Parish Church at Clare Cad File
Mac 7 2019
Scale
Drawn By / D a t e
1:20/1:5
ST Aug 09
Checked By / Date
Title
Detail 11
(scale 1:5)
Detail 12
(scale 1:5)
Detail 13 (scale 1:5)
Detail Section on GG & Details 8 to 13 D r a w i n g N o.
R e v N o.
A/2019/BR/32 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
H
E F
D
G
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
TABERNACLE
C SANCTUARY
AMBO
C
NOTES
ALTAR
top light
top light
B1
B1 A1
B2
A2
A2
A3
A3
SACRISTY
Choir / Organ Loft
A1
PLAN 1:200 E B2 F
G
D H
lead flashing
80 rafter
1000
rafter
째
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
BUILDING REGULATIONS Project
Extension to the Church at Clare Priory 150
Client
Parish Church at Clare Cad File
Scale
Drawn By / D a t e
Mac 7 2019
1:20
ST Nov 2009
Checked By / Date
Title void
Section on CC
Section on CC D r a w i n g N o.
R e v N o.
A/2019/BR/34 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
1
construct stainless steel lattice beam on existing wall for structural security reasons.
2
3
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability what soever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
4
construct concrete foundation above existing footing.
5
2400
7
10
8
construct arches.
11
6
slide the stone arch pieces into the existing flint wall above the newly built footings.
2400
2400
construct columns in the existing flint wall.
secure middle arch with steel straps to the concrete footings & remove existing flint wall section in middle arch.
9
12
secure side arches with cross straps & fill the void under the middle arch with concrete.
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
13
remove existing flint wall section in side arches.
14
fill the remaining void with concrete above existing footing.
15
Extension to the Church
remove temporary straps and steel lattice beam & construct floor finish.
at Clare Priory Client
Parish Church at Clare Cad File
Mac 7 2019
Scale
Drawn By / D a t e
1:50
ST Nov 09
Checked By / Date
Title
Stone Arches Structural Build-up Sequence D r a w i n g N o.
2400
2400
2400
R e v N o.
A/2019/BR/28 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
Dorma HSW-GP Panel System
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability what soever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
75
NOTES
75
14
3000
Detail 14
Make up of floor. Existing Church:- 40mm Masonry Slabs on 20mm mortar bed on 75mm concrete topping on Polystyrene infill blocks between prestressed beams bearing on block sleeper walls.
180 180
2040
15
proposed stone arches on elevation
1200
FLOOR VOID EXISTING FLOOR LEVEL
Elevation
1200
1200
180 180
1200
1200
1200
2040 2400 trench 6
Detail 15
130 65 80
130 65 80
7
Section
Plan Rev Date
Revision
Drawn By
Arches: 2040mm overall opening width. Panel width x height = 1200mm x 3000mm HSW-GP Panel Fully glazed without rails. Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
Extension to the Church at Clare Priory Client
Parish Church at Clare Cad File
Mac 7 2019
Scale
Drawn By / D a t e
1:20/1:2
ST Nov 09
Checked By / Date
Title
Sliding Wall Detail D r a w i n g N o.
R e v N o.
A/2019/BR/36 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
25
12.5
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability what soever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
75
50
75
75
NOTES
28
50
Detail 3 (scale 1:2)
200
50
Detail 4 (scale 1:2)
Detail 2 (scale 1:2) 144 x 32
Detail 7
(scale 1:2)
50
Detail 1 (scale 1:2)
40mm masonry slabs Seperation on floor finish to prevent cracking Steel angle to prevent cracking on the floor finish 20mm mortar bed Underfloor heating pipes in 80mm screed 100mm rigid insulation DPM Reinforced suspended concrete slab on piles Underfloor void
Victorian period flint wall
Rev Date
Revision
Drawn By
Glazed curtain wall Sealant Timber 44mm thick section cut to shape of the flint wall Aluminium L section fixed to the glazing frame 50
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION
DPC
Project
Extension to the Church at Clare Priory Client
Parish Church at Clare Cad File
Mac 7 2019
Scale
Drawn By / D a t e
1:2
ST Aug 09
Checked By / Date
Title
Detail 5 (scale 1:2)
Detail 6 (scale 1:2)
Details 1 to 7 D r a w i n g N o.
R e v N o.
A/2019/BR/33 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
27
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
100
10
100
25
75
110
NOTES
Detail 17 Detail 18 stone lintel
F Detail 19 4100
350
18
470
lead flashing
350
17
350
28 61
220
325
ARCH
blockwork coursing
19
350
280
C
20
280 220
35
325
68
325
22
470
48
B
Revision
Drawn By
34
Rev Date
92
Inkpen Downie Architecture & Design Ltd
31
280
325
A Tel 01206 577 244 arch@inkpendownie.co.uk
59
325
2 Balkerne House
Balkerne Passage
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
280
44
325
BUILDING REGULATIONS Project
350
Extension to the Church at Clare Priory
280
77.5
21
Client
16
Parish Church at Clare .00
째
120
470
60
Cad File
Scale
Drawn By / D a t e
Mac 7 2019
1:20 / 1:5
ST Nov 2009
Checked By / Date
Title
470
Apse Details Exterior Elevation & Section DD D r a w i n g N o.
R e v N o.
A/2019/BR/37
ELEVATION
F
SECTION ON FF
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
2950
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
2950
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
500
23
22
hinged openable timber screen with metal gause backing and concealed steel frame steel frame to provide access for cleaning windows and to light fittings and speakers concealed behind.
24
340
Brick sleeper walls under the floor
100
310
INTERIOR APSE ELEVATION
Rev Date
Revision
Drawn By
PLAN ON BB Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
75 25 100 10
340
Project
Extension to the Church
140
100
BUILDING REGULATIONS
at Clare Priory Client
3
Parish Church at Clare
PLAN ON AA
PLAN ON CC
Cad File
Scale
Drawn By / D a t e
Mac 7 2019
1:20
ST Nov 2009
Checked By / Date
Title
Apse Details Plans & Interior Elevation D r a w i n g N o.
R e v N o.
A/2019/BR/38 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
cavity tray brick outer leaf full cavity insulation
conc block inner leaf
stone outer leaf
stone outer lintel
concrete lintel
steel fixed light
timber lining
01 typical head
Typical window in brick work
04 typical head
Typical window in ashlar work
AN.2.2 special brick
02 typical reveal
AN.1.2 special brick
05 typical reveal Rev Date
Revision
Drawn By
steel sill welded to frame
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
cavity tray
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
stone cill
BUILDING REGULATIONS Project
Extension to the Church stone sub-cill
at Clare Priory Client
Parish Church at Clare
03 typical cill
06 typical cill
Cad File
Scale
Drawn By / D a t e
Mac 7 2019
1:50/1:5
ST Aug 2009
Checked By / Date
Title
Typical Fixed Window Details D r a w i n g N o.
R e v N o.
A/2019/BR/35 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
Detail 20
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Scale 1:2
NOTES
Detail 22 Scale 1:2
500
Detail 24 Scale 1:5
Detail 21 Scale 1:2
Detail 22 Scale 1:5
Detail 23 Scale 1:2
Detail 20 Scale 1:5
Detail 21 Scale 1:5
.00
째
Rev Date
120
60
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR APPROVAL Project
140
340
Extension to the Church at Clare Priory
100
100
Client
Detail 23
Parish Church at Clare Cad File
Scale
Drawn By / D a t e
Mac 7 2019
1:5/1:2
ST Aug 2009
Checked By / Date
Title
Apse Window Details
Scale 1:5 D r a w i n g N o.
R e v N o.
A/2019/A/39 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
NOTES
CURTAIN WALL SYSTEM IMAGES
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Draw ing S ta tus
FOR INFORMATION Project
Extension to the Church at Clare Priory Client
Parish Church at Clare Cad File
Mac 7 2019
Scale
Drawn By / D a t e
N/A
ST Nov 09
Checked By / Date
Tit le
Curtain Wall System Images D r a w i n g N o.
R e v N o.
A/2019/BR/40 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
This detail is a variation on the Wright Style Standard Details for SR Series Drawing no: INK001-D
800
1860
180
Plan
1520
BN65M BN65M GL15 Bead
5050TDN H10166F 5050ZDN D45F
D81 D80
D81 D80
BN65M
H10166F
GL15 Bead
GL15 Bead
5050TDN D45F
5050ZDN
D81 D80
H10167
5
24
5
50
H10023
18
10
20
50
20
50
10
50
20
50 60
2040
Plan Detail
18
5
24
5
140
40
GD6404FS WRHT9014F SR60140-2
GD6024R OL6013
GLASS SUPPORT
60
H10090
GLAZING BLOCK WZxxxx SCREW
50
4140
ASUL6009
5050ZDN Rev Date
Revision
Drawn By
10
H10166F D45
50
5050TDN
20
BN65M
GL15 Bead D81 D80
50
D80 D81 20
Balkerne Passage
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
FOR APPROVAL Project
GL15 Bead
BN65M 50
2 Balkerne House
Tel 01206 577 244 arch@inkpendownie.co.uk Drawing Status
50
2040
Inkpen Downie Architecture & Design Ltd
5050L
Extension to the Church at Clare Priory
8
Client
Parish Church at Clare
Section Detail
Cad File
Scale
Drawn By / D a t e
Mac 7 2019
1:10/1:2
ST Mar 2010
Checked By / Date
Title
Entrance Door Details D r a w i n g N o.
R e v N o.
A/2019/A/41 Section
Elevation
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
WHITE BRICK IMAGES
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
NOTES
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Draw ing S ta tus
FOR APPROVAL Project
Extension to the Church at Clare Priory Client
Parish Church at Clare Cad File
Mac 7 2019
Scale
Drawn By / D a t e
N/A
ST Mar 10
Checked By / Date
Tit le
White Brick Images D r a w i n g N o.
R e v N o.
A/2019/A/42 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
1087.5
Stone
The wall to be constructed on a level surface created by paving slabs. Mortar to be lime putty mortar if possible. 1040
ELEVATION
SECTION
Inkpen Downie Architecture & Design Ltd 2 Balkerne House Balkerne Passage Tel 01206 577 244 arch@inkpendownie.co.uk Client Project
Parish Church at Clare Clare Priory Extension
D r a w i n g N o.
A/2019/BR/50
Revision
Colchester CO1 1PA Fax 01206 563 377 www.inkpendownie.co.uk
2019 T i t l e Sample Brick Wall S c a l e 1:20
Project no.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor is responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the project on the site shown. It was prepared for a purpose agreed with the client and will have a commensurate degree of accuracy. It is not a record "as built". This drawing is not intended for use by any other person or for any other purpose than that specified here. Inkpen Downie Architecture & Design Limited accept no liability whatsoever if this drawing is used by any other person or for any other purpose.
1084
3988
WC
Kitchen
GF02
GF01 803 100
40
337
32
40a
1155
11
OAD
30
A
1305
845
825
820
830
530
1200
4249
.5
TR AUL HAIN
Metres
1223
16
918.8
Storage
1171.5
2291
GF05
420
920
NOTES
A
2979
Study GF08
Lobby
Lobby
GF04
GF10 858
160
800
798 2733
80 970
1703
2919
100
3105
80
1807
60
1753
40
3134
20
805.3
0
19
20
43.0m
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
1095
1799
S
OS MAP Scale 1:1250
3907
E
2467
N W
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
800
19
1029
780
Storage
Music Room
GF06
GF09
4510
125
Entrance
1343
566
942 GF12
1360
1130
930
850
2005
367
1295
1355
340
1359
1939
1289
941 180
1208
4048
961
300
1277 1187
100
2130
2171
3191 1672
3640
1474
GF13
350
4354
3848
1084
1130
730
330 4404
2181
60
Tran sport )
5563
GF07
Living Room
3911
900
48.5m
400
GROUND FLOOR PLAN
2190
450
2015
2318
2091
2130 190
1894
1810
860
Bathroom
A
A
2085
FF10
Bathroom FF02 1850
120
SECTION AA
1768
750
Lobby 809
952
Storage
1955
FF09
Bedroom
FF01
2368
1728
1440
FF08 4036
Bedroom
Bedroom
FF04
FF03 A 26 Aug 09 Rev Date
OS Map added
ST
Revision
Drawn By
3145
4650
Bedroom FF06
Storage
Storage
FF05
FF07
Inkpen Downie Architecture & Design Ltd Balkerne Passage
3271
Tel 01206 577 244 arch@inkpendownie.co.uk
FIRST FLOOR PLAN
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
SURVEY
1323
1002
2 Balkerne House
Project
40 Hainault Road
280
906
REAR ELEVATION (to garden)
872
800
flagstone floor random sizes around 200mm x 600mm
1543
Client
1725
electric board 1288
973
A
975
meter main fuses
2163
225
967
blocked door
existing GF floor joists 140x90 @ 330CC
2974
1454
3485 1980
1496
865
515
gas boiler
500
2680
scaffold board
pressure vessel
existing GF floor joists 100x100 @ 500CC
A
heating controls fixed to u/s floor
100x90 330CC
2070
sump 750mm deep
1707
1299
1369
1441
don
Living Room
4973
60a
GF03
2691
Kitchen 6
2770 3641
GF11
1529
48
3986
Storage
800
STAT ION RO AD
(Lon
290
994
40b
42
210
100 3696
Cad File
Scale
Mac 7/819
1:50/1:1250 ST/Mar 09
Drawn By / D a t e
Checked By / Date
BD/Mar09
Title
Existing Floor Plans, OS Map 270
BASEMENT FLOOR PLAN
Section & Elevation D r a w i n g N o.
R e v N o.
6561
A/819/S/01
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
B
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
new timber shelves to be used as emergency exit through the openable roof light
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
new roof light new lightwell rebuild this wall
NOTES
900
shelves
heating controls fixed to u/s floor
A
existing scaffold board and posts to be removed. new adequate support to structural engineers design
C
A
new lowered floor
re-site existing gas boiler & pressure vessel to ground floor
SWITCH 1 Gang switch
new cupboard under the stairs move existing electric board, meter & main fuses
new interior tanking detail all around the basement
new timber shelves
ELECTR
SWITCHES
294 294 294
SD interlinked smoke detector
new cupboard doors to existing opening
ELECTRICAL KEY
2 Gang switch
C
3 Gang switch
new boxing
4 Gang switch new cupboard
Two Way One Gang Switch
BASEMENT FLOOR PLAN
Two Way Two Gang Switch Three Way One Gang Switch
B move existing as meter and other equipment onto the new lining
provide guarding around the roof light to comply with approved Doc K2/3
Three Way Two Gang Switch
2 layers of plaster board all around
new roof light
POWER
new timber staircase & balustrades on either side
D ROA LT NAU HAI
outline of the basement and the new light well
Switched Socket Outlet
allow for removing & resiting the existing RWP and hand pipe as required
re-site the existing boiler to ground floor storage
2
Twin Switched Socket Outlet
3
Tripple Switched Socket Outlet
POWER
ply Sup 5 amp
5 amp Switched Socket Outlet blocked door F
Floor Socket
Storage GF05
Electrical wiring
Study GF08 fire door 30mins
fire door 30mins
Living Room
Lobby interlinked smoke GF10
detector
fire door 30mins
r Wate
ly upp al S Ga ctric r Ele e fo site n li d n ume ed o pres check to be pply s Su
SD
fire door 30mins
COMMUNICATIONS & FITTINGS SD
Smoke Detector
HD
GF07
SITE PLAN @ 1/200
Heat Detector Electric Extract Fan
Storage GF11
GROUND FLOOR PLAN
TV
Living Room
Television Aerial Socket
GF13
Music Room
T
Telephone Socket
GF09 ASDL
ASDL Socket
S
COMMU
Speaker Socket Wall mounted speaker Ceiling mounted speaker
C Rev Date
Revision
Drawn By
900
B A
294 294 294
SD
Inkpen Downie Architecture & Design Ltd 3
2 Balkerne House 3
D
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
LIGHTING & ELECTRICAL LAYOUT
TENDER
E
LIGHT FITTINGS KEY
Repairs and Alterations to
LIGHTS A
provide guarding around the roof light to comply with approved Doc K2/3
B
openable rooflight
Ceiling (Surface Mounted) Delta Light Xilo 111 JAC C
Delta Light PUK 4
REAR ELEVATION
Wall (Surface Mounted) Delta Light Orbit
allow for temporary removal and refixing of all existing pipes and services disturbed by the work.
Client
Cad File
Scale
Mac 7/819
1:50 / 1:200 ST/Jul 10
Checked By / Date
BD/May 10
Title
Proposed Site Plan, Floor Plans, Elevation Lighting and Electrical Layout D r a w i n g N o.
E
Drawn By / D a t e
Wall (Surface Mounted) Helmut Grasser Lighting Sikion
D
40 Hainault Road
Wall (Surface Mounted)
lead upstand C
Project
Ceiling (Recessed) Aurora AU-HCD352 Satin Silver
R e v N o.
A/819/T/01 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
2130
B new timber shelves to be used as emergency exit through the openable roof light
2091
2318
C
975
existing floor level 1465
2300
existing floor level
490
new interior tanking detail all around the basement
new lowered floor 210.4
new cupboard under the stairs move existing electric board, meter & main fuses
120
new glazed cupboard doors to be fitted on the existing opening
239239239
interlinked smoke detector SD
new cupboard doors to existing opening
2218
new timber staircase
A
1504
900
re-site existing gas boiler & pressure vessel to ground floor
new ceiling under the existing joists
blocked door on ground floor level
new lowered floor
existing scaffold board and posts to be removed. new adequate support to structural engineers design
NOTES new shelves to be used as a ladder on emergency fire exit through the rooflight new cupboard/storage retain existing floor level in this section
new floor level reuse existing flagstones
120
shelves
heating controls fixed to u/s floor
rebuild existing wall new opening into existing blocked up window opening
450
190
rebuild this wall
form new lightwell
existing floor joists to be repaired
new space saver staircase to comply with approved Doc K1.
new lightwell
C
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
new roof light
new roof light
A
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
new ceiling under the joists
proposed lowered floor level
DRAINAGE CHANNEL
DRAINAGE CHANNEL
DRAINAGE CHANNEL
DRAINAGE CHANNEL
new boxing
BASEMENT FLOOR PLAN
SECTION BB
SECTION AA
new cupboard
BUILDING REGULATIONS NOTES
B q p the new lining
provide guarding around the roof light to comply with approved Doc K2/3
re-site the existing boiler to ground floor storage
new timber staircase & balustrades on either side
new opening into existing blocked up window opening
allow for removing & resiting the existing RWP and hand pipe as required
underpinning to existing walls to structural engineers design
2300
new roof light outline of the basement and the new light well
2218
2 layers of plaster board all around
1.2 Provide continuous damp proof membrane over slab. DPM to be Delta MS-20 and installed completely in accordance with the manufacturers specifications and recommendations.
5.2 The rise to be max 210.5mm and the going to be min 294mm.
1.4 50mm Kingspan K3 Floorboard with underfloor heating in 75mm mesh reinforced screed on top.
490
1.5 A new concrete chamber to be constructed under the new staircase to accomodate the new tanking pump.
DRAINAGE CHANNEL
DRAINAGE CHANNEL
2. NEW WALLS BELOW GROUND
Study
SD
fire door 30mins
GF07
Storage GF11
Living Room GF13
Music Room GF09
Delta MS-500 Minimum 12.5mm plasterboard Vertical 50mm x 25m treated timber battens fixed with size 12 screws into Delta-plugs 62.5mm Kingspan Kooltherm K17 insulated dry-lining board between timber battens Floor build-up: Flagstones Underfloor heating in 75mm screed 50mm Kingspan Koolterm K3 floor insulation Delta MS-20 Concrete slab to accomodate 125mm x 75mm void for drainage channel
DETAIL
1:10
6.2 Internal doors as per notes on drawing. 6.3 All internal doors opening to the lobby & stair area to be 30min fire doors. 6.4 All fire doors to have 3 hinges and an intumescent strip. 6.5 Centre pane U value of new roof light to be maximum 1.2W/msq/deg C
2.3 Exposed courses of outer leaf to 225mm below finished ground level to be executed in face brickwork. Brick strength to engineers calculations.
7.1 New hexagonal rooflight to be openable and to have trickle ventilation.
3. DRAINAGE BELOW GROUND 3.1 Drainage for the tanking system pump to be installed in accordance with the manufacturers specifications and recommendations. 3.2 Pipes bends and fittings generally to be proprietary plastics system to BSEN1401-1 class SN4, with flexible joints, kitemark certified installation to be in complete accordance with BSEN 752, manufacturers instructions and recommendations. 3.3 Before starting work, check invert levels and positions of existing drains, sewers, inspection chambers and manholes against drawings , report discrepancies, protect existing drains to be retained and maintain normal operation.
7.2 Provide a minimum of 5000 square mm equivalent ventilation area in the new cellar. 8. HEATING 8.1 Re-site the existing boiler from the basement to the ground floor storage room. 8.2 Extend the existing heating system into the repaired basement area. 8.3 The contractor is to design and install the installation generally to comply with BS5449, BS 5410 or BS6880, BS6700, BS7074-1, BS8000, BS EN 832. and all relevant water regulations and by-laws. 8.4 Balance and commission the system on completion and provide a full set of as installed drawings, operation and maintenance instructions.
9. ELECTRICAL, LIGHTING & POWER 9.1 Extend the existing electric system to the repaired basement area.
3.4 Drains generally to be 100dia laid to a min fall of 1 in 40 for branches and 1 in 80 for main runs. Or 150mm dia laid to a fall of 1 in 60 for branches and 1 in 150 for main runs.
9.2 The contractor is to design and install the Installation to be completed in accordance with BS 7671, BS EN 60335, BS EN 60439, BS EN 60669.
3.5 Pipes generally to be laid at a min depth of 600mm and laid on 100mm depth and then surrounded with granular fill. Pipes at shallower depths to be bedded and surrounded in granular fill and spanned with a PC concrete paving slab. Shallow pipes under building or parking area to be surrounded in concrete.
9.3 Reasonable provision to be made for the design, installation, inspection and testing of the installation in order to protect persons from fire and injury.
3.6 Pipes passing through walls to be spanned with 1 course PC lintel with 50mm clearance all round pipe, opening to be bridged with a rigid sheet material. 3.7 New inspection chambers up to 1000mm deep to be proprietary 450 dia plastics chambers with preformed channels, bedded on concrete and surrounded in pea shingle to manufacturers instructions. 3.8 New chambers in excess of 1000mm to be constructed of pre-cast concrete rings to BS 5911, 1000 diam to 1500 deep and 1200 diam up to 3000 deep. Chambers to be built off an in-situ conc base 150mm thick. Channels to be formed of proprietary channel fittings set in weak concrete benching floated to a smooth finish falling to the channel. Provide metal step irons to all chambers in excess of 1000 deep. Provide proprietary pre-cast concrete cover slab.
provide guarding around the roof light to comply with approved Doc K2/3
6.1 All glazing including double glazing to windows and internal single glazing to screens and doors etc to be glazed using safety glass.
7. VENTILATION
2.5 Minimum 12.5mm plasterboard on treated timber battens and 50mm insulation between the battens.
DRAINAGE CHANNEL
6. GLAZING, ROOFLIGHT & DOORS
2.2 New wall to the lightwell to be reinforced concrete blockwork to structural engineer's specification
2.4 Proprietary tanking system on the walls to be Delta MS-500 and installed completely in accordance with the manufacturers specifications and recommended details.
75
detector
75
GF10
fire door 30mins
fire door 30mins
Living Room
SECTION CC
fire door 30mins
Lobby interlinked smoke
2.1 Rebuild the existing rear elevation brick wall to structural engineers specifications and recommendations.
20 50
GF08
GROUND FLOOR PLAN
5.1 New staircase to be a space saving staircase to comply with Building Regulations Part K1 alternating tread stair description.
new timber staircase
Storage GF05
5. NEW STAIRCASE
1.1 Build up new concrete slab lowered floor with underpinning to structural engineers design and specification.
1.3 Damp proof membranes should link with wall tanking system to form an impervious barrier.
new lowered floor reuse existing flagstones
blocked door
1. NEW FOUNDATIONS AND FLOOR BUILD UP
3.9 Provide proprietary cast-iron access cover to all new chambers, strength to suit anticipated traffic loading & type to accomodate finishes where set in paved areas.
9.4 Installation to be carried out by a competent electrician who will provide an appropriate BS 7671 electrical installation certificate for the work. 9.5 The installation is to include the following: general lighting and small power electrical wiring for heating installation
A 11/05/10 minor amendments for building regulations application Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
9.6 Ensure all wall mounted switches and sockets are fitted at heights to satisfy the requirements in M1 Dwellings clause 8.3 diagram 29.
BUILDING REGULATIONS
9.7 Provide a full set of as-installed drawing operation and maintenance instructions.
Project
9.8 Make provision for a minimum of one per four fixed light fittings to be high efficiency light fittings (i.e. light fittings only capable of accepting lamps having a luminous efficacy greater than 40 lumens per circuit watt e.g. fluorescent tubes or compact fluorescent lamps not GLS tungsten lamps with bayonet cap or Edison screw bases).
Repairs and Alterations to 40 Hainault Road Client
4. INTERNAL WALLS & FLOORS
openable rooflight lead upstand
REAR ELEVATION
4.1 New basement partition wall next to the staircase to be stud partition: 50 x 75 softwood stud partitions at min 600 centers with plasterboard either side.
Cad File
Scale
Mac 7/819
1:50 / 1:10 ST/Mar 10
4.2 Existing timber suspended floor over existing cellar area to have all struts and props and later insertions and repairs removed, defective timbers are to be replaced and original structure to be repaired and strengthened in accordance with structural engineers recommendations. Lorr to be upgraded to type C in accordance with B Regs, section 5 part E. 22mm timber boarding Min mass per unit area 15kg/m3. Plaster Board to ceiling Min mass per unit area 10kg/m3. Screw fixed. An absorbant layer of mineral wool Min mass per unit area 10kg/m3 laid in the cavity.
Title
4.3 All new floor joists to be supported in accordance with structural enginners recommendations. Provide lateral restraint straps to floors where to floor joists are parallel to walls, straps to be 1.5 meters long 30 x 5mm galvanised mild steel, fixed to top of joists with noggins in between.
Drawn By / D a t e
Checked By / Date
BD/May 10
Proposed Floor Plan, Sections, Elevation Details and Building Regulation Notes D r a w i n g N o.
A/819/BR/01
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
2091
2130
D
lead sheet roof covering on 25mm sawn timber boarding with penny gaps
2318
2 layers of plaster board all around existing floor joists to be repaired
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
450
2000
190
NOTES
new ceiling under the existing joists
2300 120
new glazed cupboard doors to be fitted on the existing opening
existing floor level
490
210.4
new lowered floor
306
2218
new timber staircase
proposed lowered floor level
E
DRAINAGE CHANNEL
E
SECTION AA Glidevale FV250 Fascia ventilators
306
306
DRAINAGE CHANNEL
new ceiling under the joists new roof light form new lightwell
BUILDING REGULATIONS NOTES
rebuild existing wall new opening into existing blocked up window opening
D
1504
1.2 Provide continuous damp proof membrane over slab. DPM to be Delta MS-20 and installed completely in accordance with the manufacturers specifications and recommendations. 1.3 Damp proof membranes should link with wall tanking system to form an impervious barrier.
existing floor level
1.4 50mm Kingspan K3 Floorboard with underfloor heating in 75mm mesh reinforced screed on top.
120
1465
975
new shelves to be used as a ladder on emergency fire exit through the rooflight new cupboard/storage retain existing floor level in this section
new floor level reuse existing flagstones
LIGHTWELL ROOF STRUCTURE PLAN @ 1:10
1. NEW FOUNDATIONS AND FLOOR BUILD UP 1.1 Build up new concrete slab lowered floor with underpinning to structural engineers design and specification.
1.5 A new concrete chamber to be constructed under the new staircase to accomodate the new tanking pump. DRAINAGE
DRAINAGE
CHANNEL
CHANNEL
2. NEW WALLS BELOW GROUND 2.1 Rebuild the existing rear elevation brick wall to structural engineers specifications and recommendations.
SECTION BB
lead roof cover under the existing timber boarding
2.2 New wall to the lightwell to be reinforced concrete blockwork to structural engineer's specification 2.3 Exposed courses of outer leaf to 225mm below finished ground level to be executed in face brickwork. Brick strength to engineers calculations. Glidevale FV250 Fascia ventilator
2.4 Proprietary tanking system on the walls to be Delta MS-500 and installed completely in accordance with the manufacturers specifications and recommended details. 2.5 Minimum 12.5mm plasterboard on treated timber battens and 50mm insulation between the battens.
2300
underpinning to existing walls to structural engineers design new timber staircase
3.3 Before starting work, check invert levels and positions of existing drains, sewers, inspection chambers and manholes against drawings , report discrepancies, protect existing drains to be retained and maintain normal operation.
490
new lowered floor reuse existing flagstones
DRAINAGE CHANNEL
SECTION CC
DRAINAGE CHANNEL
3.4 Drains generally to be 100dia laid to a min fall of 1 in 40 for branches and 1 in 80 for main runs. Or 150mm dia laid to a fall of 1 in 60 for branches and 1 in 150 for main runs. 3.5 Pipes generally to be laid at a min depth of 600mm and laid on 100mm depth and then surrounded with granular fill. Pipes at shallower depths to be bedded and surrounded in granular fill and spanned with a PC concrete paving slab. Shallow pipes under building or parking area to be surrounded in concrete. 3.6 Pipes passing through walls to be spanned with 1 course PC lintel with 50mm clearance all round pipe, opening to be bridged with a rigid sheet material. 3.7 New inspection chambers up to 1000mm deep to be proprietary 450 dia plastics chambers with preformed channels, bedded on concrete and surrounded in pea shingle to manufacturers instructions. 3.8 New chambers in excess of 1000mm to be constructed of pre-cast concrete rings to BS 5911, 1000 diam to 1500 deep and 1200 diam up to 3000 deep. Chambers to be built off an in-situ conc base 150mm thick. Channels to be formed of proprietary channel fittings set in weak concrete benching floated to a smooth finish falling to the channel. Provide metal step irons to all chambers in excess of 1000 deep. Provide proprietary pre-cast concrete cover slab. 3.9 Provide proprietary cast-iron access cover to all new chambers, strength to suit anticipated traffic loading & type to accomodate finishes where set in paved areas. 4. INTERNAL WALLS & FLOORS 4.1 New basement partition wall next to the staircase to be stud partition: 50 x 75 softwood stud partitions at min 600 centers with plasterboard either side. 4.2 Existing timber suspended floor over existing cellar area to have all struts and props and later insertions and repairs removed, defective timbers are to be replaced and original structure to be repaired and strengthened in accordance with structural engineers recommendations. Lorr to be upgraded to type C in accordance with B Regs, section 5 part E. 22mm timber boarding Min mass per unit area 15kg/m3. Plaster Board to ceiling Min mass per unit area 10kg/m3. Screw fixed. An absorbant layer of mineral wool Min mass per unit area 10kg/m3 laid in the cavity. Insert two rows of solid noggings between existing joists. 4.3 All new floor joists to be supported in accordance with structural enginners recommendations. Provide lateral restraint straps to floors where to floor joists are parallel to walls, straps to be 1.5 meters long 30 x 5mm galvanised mild steel, fixed to top of joists with noggins in between. 5. NEW STAIRCASE 5.1 New staircase to be a space saving staircase to comply with Building Regulations Part K1 alternating tread stair description. 5.2 The rise to be max 210.5mm and the going to be min 294mm.
6. GLAZING, ROOFLIGHT & DOORS 6.1 All glazing including double glazing to windows and internal single glazing to screens and doors etc to be glazed using safety glass.
min.25
2218
3.2 Pipes bends and fittings generally to be proprietary plastics system to BSEN1401-1 class SN4, with flexible joints, kitemark certified installation to be in complete accordance with BSEN 752, manufacturers instructions and recommendations.
10.00째
new opening into existing blocked up window opening
min.150
3. DRAINAGE BELOW GROUND 3.1 Drainage for the tanking system pump to be installed in accordance with the manufacturers specifications and recommendations.
6.2 Internal doors as per notes on drawing. 6.3 All internal doors opening to the lobby & stair area to be 30min fire doors.
DPC Rev Date
Revision
Drawn By
6.4 All fire doors to have 3 hinges and an intumescent strip. 6.5 Centre pane U value of new roof light to be maximum 1.2W/msq/deg C 7. VENTILATION 7.1 New hexagonal rooflight to be openable and to have trickle ventilation. 7.2 Provide a minimum of 5000 square mm equivalent ventilation area in the new cellar.
LIGHTWELL SECTION DD Inkpen Downie Architecture & Design Ltd
8. HEATING 8.1 Re-site the existing boiler from the basement to the ground floor storage room.
2 Balkerne House
Balkerne Passage
8.2 Extend the existing heating system into the repaired basement area.
Tel 01206 577 244 arch@inkpendownie.co.uk
8.3 The contractor is to design and install the installation generally to comply with BS5449, BS 5410 or BS6880, BS6700, BS7074-1, BS8000, BS EN 832. and all relevant water regulations and by-laws.
Drawing Status
8.4 Balance and commission the system on completion and provide a full set of as installed drawings, operation and maintenance instructions. 9. ELECTRICAL, LIGHTING & POWER 9.1 Extend the existing electric system to the repaired basement area. 9.2 The contractor is to design and install the Installation to be completed in accordance with BS 7671, BS EN 60335, BS EN 60439, BS EN 60669.
CO1 1PA
TENDER lead roof cover timber boarding with penny gaps
Project
Repairs and Alterations to
min 25mm continuous air path Glidevale FV250 Fascia ventilator
40 Hainault Road Client
9.3 Reasonable provision to be made for the design, installation, inspection and testing of the installation in order to protect persons from fire and injury. 9.4 Installation to be carried out by a competent electrician who will provide an appropriate BS 7671 electrical installation certificate for the work.
Colchester
Fax 01206 563 377 www.inkpendownie.co.uk
DPC
9.5 The installation is to include the following: general lighting and small power electrical wiring for heating installation
Cad File
Scale
Mac 7/819
1:50 / 1:10 ST/Jun 10
Drawn By / D a t e
Checked By / Date
BD/May 10
Title
9.6 Ensure all wall mounted switches and sockets are fitted at heights to satisfy the requirements in M1 Dwellings clause 8.3 diagram 29.
Proposed Sections, Details and
9.7 Provide a full set of as-installed drawing operation and maintenance instructions.
Building Regulations Notes
9.8 Make provision for a minimum of one per four fixed light fittings to be high efficiency light fittings (i.e. light fittings only capable of accepting lamps having a luminous efficacy greater than 40 lumens per circuit watt e.g. fluorescent tubes or compact fluorescent lamps - not GLS tungsten lamps with bayonet cap or Edison screw bases).
D r a w i n g N o.
LIGHTWELL SECTION EE
R e v N o.
A/819/T/02 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
1.5mm dia stainless steel wire 30mm block board shelf
round cover
stainless steel support
clamp with side exit for wire 300
30
350
NOTES
75
TYPICAL SHELF ATTACHMENT DETAIL @ 1:2
350
300
900 900
timber balustrade timber staircase
400
350
470
350
DRAINAGE CHANNEL
holes on the partition wall
DRAINAGE CHANNEL
TYPICAL WALL SHELF ATTACHMENT DETAIL @ 1:2
SHELVES SECTION @ 1:10 DRAINAGE CHANNEL
210.4
210.4
TYPICAL WALL SHELF ATTACHMENT DETAIL @ 1:10
210.4
stone floor covering to spec clause M40/10
210.4
floor tiling to spec clause M40/05
SECTION ON GG @ 1:20
DRAINAGE CHANNEL
SECTION ON FF @ 1:20
G 242
242
242
242
242
9
7
5
431.4
3
1 Rev Date
70
11
900
840
12
8
6
4
2 338.6
LOW SHELF STRUCTURE PLAN @ 1:10
F
10
Revision
Drawn By
F
G
CUPBOARD SECTION @ 1:10 75
40
36
STAIRCASE PLAN @ 1:20
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
100
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
36
Drawing Status
TENDER Project 40
36
75
36 100
Repairs and Alterations to
FLOOR BUILD UP DETAIL @ 1:10
40 Hainault Road Client
Delta MS-500 Minimum 12.5mm plasterboard Vertical 50mm x 25m treated timber battens fixed with size 12 screws into Delta-plugs 50mm insulation between timber battens
1:50 / 1:10 ST/Jun 10
Drawn By / D a t e
Checked By / Date
BD/May 10
75
Title
75
Shelf, Cupboard and Staircase Details D r a w i n g N o.
DRAINAGE CHANNEL
UPPER SHELVES STRUCTURE PLAN @ 1:10
Scale
Mac 7/819
20 50
Floor build-up: Flagstones Underfloor heating in 75mm screed 50mm Kingspan Koolterm K3 floor insulation Delta MS-20 Concrete slab to accomodate 125mm x 75mm void for drainage channel
Cad File
TYPICAL SHELF ATTACHMENT DETAIL @ 1:2
R e v N o.
A/819/T/03 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Existing house
NOTES d air uil ep eb dR -R se nth air ali Pli ep oc ck ll R ir-L Bri pa Wa ew & Re -N ll nth air Wa Pli ep & R ll nth Wa Pli & nth Pli
NORTH
r ss r be m CL ce be am Ac am er ch m fro Ch Wat n tio 0m S 00 ec 60 22 sp vel No4 85 CL 80 m in rt le IL 0m inve 25
Steel & block shed 23
87
m ax
22
ss ce ber Ac am Ch Water S 8 No
& ve Le te Gra 63 87 cess ber Ac am er Ch Wat S No2
id Gr Ca
ttle
RW
m fro r Dia Gutte mm m 68 5m 12
le yc e Bic rag sto
mp e su ag drain l
90
m fro r Dia Gutte mm m 68 5m 12
r be m CL am ch m fro n tio 0m ec l 60 10 88 63 insp leve CL 81 m rt IL 0m inve 45 m ax
ss r ce be Ac am er Ch Wat S No3
21
08
58
RW
Brick & block shed
90
& G IN E RK AG PA OR ST
48
n sio ten Ex
GF
SV
P
No
BE
17
93
58
08
P
0
IL
cut
11 condition to site
44
laid
to fall min
RW
M
4
m fro Dia r mm tte 68 Gu RW 5mm 12
BE
condition to site cut
DR
OO
M
8 k stacV No st ub AA w ith
56 90 ss r 40 ce be 93 89 Ac am Ch ul CL 83 IL Fo No4
OM
ss r ce be 9280 Ac am 00 Ch ul CL 85 IL Fo No3
43 condition to site cut
cut condition to site
condition to site
19
cut
94
33
110
mm
laid
min to fall
0 nt 1:8 gradie
1
Dia Gutte mm m 89 0m RW m 15 fro
TH BA
90 94
m fro Dia r mm tte 89 Gu RW 0mm 15 r
RO
RW
OM
m fro r Dia Gutte mm m 68 5m 12
condition to site
RO
10
18
1 A
91
ss r 90 ce be Ac am CL 94 00 Ch ul IL 86 Fo o1 0 N
01 condition to site cut
94
23
90 94
UT
ILIT
Y
cut condition to site
11
cut cut
condition to site
0m
condition to site
m
m fro Dia r mm tte 68 Gu RW 5mm 12
91
ra
20
Lin
18
m
tel
to
96
11
10
00
M OM
95
99
93
cut
99
89 1
condition to site
D
CO 6
p ste to
SV
tee
P
0m
m
laid
to
in ll m fa
ient ad gr
80 1:
m fro Dia r mm tte 89 Gu RW 0mm 15
94 97
up
no
2
98
S AT
63
. ing en & op or do te ing pla ist le ex so se over -u Re and to
ing Br
M
O 90 DRO 94 R BE
k stac V st ub AA w ith 6 No
condition to site
4
10
98
EN
58
03
cut
4 k stacV No st ub AA w ith
93
98
Scr
ee
n6
58
90 97
68
ps ste
up
5 k stacV No st ub AA w ith
FA
ss r ce be Ac am er Ch Wat S 5 No
05
2
3
condition to site cut
Y M IL
RO
TE
S
MA
. ve sto g of rin bu nts nd od me wo ire grou e to requ ath abov tly ne ec with be nated dir ce laid termi air ide rdan and d an prov acco ve to in of sto ht up ct du fitted rer Boug tail. air be actu b. de sla el to To uf manaring lev be ound gr
OM
-S
UIT
GD
E k stac V st ub AA w ith 11 No Dia Gu mm m 89 0m RW m 15 fro
RW
tte
m fro r Dia Gutte mm m 68 5m 12
?? ?? 00? CL 84 IL
r
ss r ce be Ac am er Ch Wat S No7
ss r ce be 90 88 00 Ac am Ch ul CL 81 IL Fo No5
Timber framed shed
40 99 EN
3
KIT
CH
3 No
98
10
03
18
SIT
. ve sto g of rin bu nts nd od me wo ire grou e to requ ath abov ne
GD
4
13
tly ec with be nated dir ce laid termi air ide rdan and d an prov acco ve to in of sto ht up ct du fitted rer Boug tail. air be actu b. de sla el to To uf manaring lev be ound gr
06
40 99
ess Acc
8
TIN
G
01
Scr
RO
ee
n7
OM to
ing ist ex
me
ed ram rF be Tim F G
w ne ll Instaening op
rn Ba
d ze t gla igh l he ful
fra
r
Dia Gutte mm m 89 0m RW m 15 fro
?? ?? 22 CL 81 IL
ss r ce be Ac am er Ch Wat S 12 No
NK TA
11
?? ??90 CL 78 IL
40 96
9
OIL
04
ild
40 ss r 81 96 ce be 18 Ac am YCL 40 Ch ul IT IL 90 Fo TIL U No7
r
ce be ?? Ac am er ?? ?? Ch Wat ?? S 11 CLIL No
10
Bu
B
n3
7
RE
m fro Dia r tte mm Gu 110 tter RW x Gu Bo
ss
ee
90 97
Scr
29
C
CE AN TR EN
0 condition to site
C
ON
5
cut
10
condition to site cut
n s tha les
GD
ps ste
88
C 86
@
W
40 93
08
3 91
mp
48
03
48
12
IL
92
C
condition to site
93
0m n 15 rgi ma
l tai De
k stac V st ub AA w ith 10 No cut
13
OM
le ng shi
p to
W
condition to site
RO
Ste m fro r Dia Gutte mm m 68 5m 12
ST
cut
G
RW
k stac V st ubith AA w 2 No
condition to site
TIN
EN
cut
SIT
CH
RE
O k 9 stac V No st ub AA w ith
G
80 1:
KIT
SIN ES DR OM RO
ient ad gr
2
condition to site
M
cut
OO
in ll m fa
r
condition to site cut
to
ss r ce be Ac am Ch ul Fo 0 No8 1:2
ce be Ac am er Ch Wat S 8 40 No 93 71 CL 88 IL
DR
laid
ss
BE
Steel framed open sided shed
ss r ce be ???? Ac am 00 Ch ul CL 77 IL Fo No6
B 00 25 ns
ES lo fe Gal Sa 0 mm 55 5 o Ec nk 46 ed t Ta H1 x nd Bu Outle 25 n 14 Tita ttom x W Bo 450 L2
Line and remains of original enclosing wall as evidenced on site. Wall intact between these points. Wall reduced to footings between these points
5
gra dient 1:80
cut
TH BA
4
97
0m inve 25 m ax 110 mm
GD
RE
15
1 No
Fo No2 fall to 80 laid 1: m ient m fro r 0m ad Dia Gutte 11 gr mm m 68 5m m in 12
OO
condition to site
SV
10
96
38
DR
80 92 20 CL 85 IL
cut
16
94
ss r ce be Ac am er Ch Wat S 9 No
7
G
14
d uil r be m CL am ch m fro yB aAcircess ber CL 93880000 spectioln600m F D Chamul IL m in rt leve 45
Brick shed
7
90 94
ss r ce be 9230 Ac am 96 Ch ul CL 86 Fo o9 IL N
ing
80 88 40 ly Gul ul IL 93 CL Fo No1
Line and remains of original enclosing wall as evidenced on site. Wall reduced to plinth between these points.
LE YC BIC
Sewage treatment plant with out flow to new pond see drainage Building regulations notes.
?? ?? CL 7455 IL
ss
ss r ce be Ac am er Ch Wat S No6
r
ce be Ac am er Ch Wat S 13 No
Rev A
?? ?? 22 CL 81 IL
090608
Rev Date
Amended for Buildings Regulations Application
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Open sided steel barn
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
TENDER Project
Bacons Farm Barn Chappel Conversion & Extension Client
Pond fed directly by surface water and by out flow from sewage treatment plant via reed bed.
Cad File
Scale
Drawn By / D a t e
Mac 3-609
1: 200
090122 JI
Checked By / Date
Title
Site Plan
th Pa
D r a w i n g N o.
A/609/T/03
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
(
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
Plinth & Wall Repair- Rebuild
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Plinth & Wall Repair-Localised Repair Plinth & Wall Repair-New Brick Plinth
Access Chamber S Water No3
8971 8990
9000 9608
9048
21 16 9140
9608
9048
9190
9100
9808
BUILDING REGULATIONS NOTES
23 8758
CL 8810 IL 8163 450mm inspection chamber max invert level 600mm from CL
Grate Level 8763 Access Chamber S Water No2
8600
22 RW 68mm Dia from 125mm Gutter
9125
9008
9060
Access Chamber S Water No4 CL 8500 IL 8022 250mm inspection chamber max invert level 600mm from CL
NOTES
9210 9170
RE
9743 9843 15
9440
14 9340
9743 9340
9148
9358 9358 9340
9240
9148 Access Chamber S Water No8
9210
Gully Foul IL 8880 No1 CL 9340
RW 68mm Dia from 125mm Gutter
9843 457
9843
17
9400 9438
444
IL 9056
Access Chamber CL 9300 Foul IL 8800 No2 250mm inspection chamber max invert level 600mm from CL
RW 68mm Dia from 125mm Gutter
Dairy Building Oil fired boiler with wood burning stove and aga all serving a thermal storage system to provide hot water and heating. Dairy building to be heating using underfloor heating.
0 11
RW 68mm Dia from 125mm Gutter
110mm laid to fall min gradient 1:80
mm laid to min fall
9340
0 1:8 nt die gra
9438
EN-SUITE GF11
4.575 x 4.475 - 20.48 sq M
2.800 x 2.160 - 6 sq M
100
RW 100
9433
BATHROOM GF10 GD 13
Build up No 3 Plaster on 12.5mm plaster board between studs on 38 x 38mm s/w battens. Mineral wool insulation packed into void. 12.5mm ply fixed direct to existing frame overlaid with 12. 5 mm plaster board with all joints taped and filled 25 x 50 mm battens over laid with polythene all joints overlapped & taped with existing boarding re fixed.
140
140
cut to site condition
cut to site condition
cut to site condition
GD 14
Build up No 2
100
BEDROOM 2 GF08
timber open screen
GD 24
Build up No 2a
cut to site condition
WC GF12 1.090 x 1.862 - 2.03sq M
Build up no 2
COMMON ENTRANCE GF01
LOBBY GF02 3.500 x 1.800 - 6.30sq M
Extract to kitchen mounted in void and accessed via stair for period maintenance.
5.218 x 2.945 - 15.37sq M
GD 17
9640
COATS
9790
B
Build up No 4
GD 18
10034 0 00
6
7
Duct to carry heating pipes from back boiler to heat store
10043
Build up No 4
5 9863
HALLWAY & STEPS GF13
9858
GD 20
5
6 9863
9640
3
4 9868
RW 89mm Dia from 150mm Gutter
9320
Build up No 3
2.624 x 1.979 - 5.20 sq M
GD 27
440
GD 26
RW
STORE GF22
4.088 x 4.648 - 19.00 sq M
1.914 x 1.290- 2.47 sq M
Hearth of non combustible material and to stand a minimum of 12mm above any combustable material. Omit insulation from beneath hearth area and lay hearth direct to concrete slab
BATHROOM GF24
3.490? x 5.530 - 11.25 sq M
2.250 x 1.670 - 3.75 sq M
MASTER BEDROOM GF17
5.380? x 9.651 - 45.86 sq M
5.970 x 5.806? - 28.57 sq M
LOBBY GF20
GD 22
DRESSING ROOM GF18
Duct to carry heating pipes from back boiler to heat store
327 32
FAMILY ROOM GF15
KITCHEN GF14
777
GD 28
Boiler Flue Termination through roof
UTILITY GF21 4.200 x 3.342 - 14.04 sq M
RW 89mm Dia from 150mm Gutter
EN-SUITE GF19
1.914 x 1.604- 3.07 sq M
2.250 x 2.700 - 6.07 sq M
GD 29
cut to site condition
mezzanine over
RW 89mm Dia from 150mm Gutter
9340
GD 23
RW
1
9458
RW
10181 9340 A 9101 9423
stub stack with AAV No 8
Screen 4 take down existing and modern frame to this opening and replace with full height glazed frame
GD 07
Screen 5 Glazed H/W screen with steel frame and HW louvres hinged at top for occasional lifting for cleaning
Wood burning stove GF Timber Framed Barn with back boiler
FFL 9490
RW
Install new full height glazed frame to existing opening
GD 06
Wood burning stove with back boiler
GD 05
Thermal store
Screen 7
RW 68mm Dia from 125mm Gutter
FFL 9790
stub stack with AAV No9
air duct to provide air directly to wood buring stove. To be fitted in accordance with requirements of manufacturer of stove and laid beneath ground bearing slab. Bought up and terminated above ground level to detail.
stub stack with AAV No 10
stub stack with AAV No 11
RW 89mm Dia from 150mm Gutter
Barn & Extension Oil fired boiler with wood burning stove all a thermal storage system to provide hot water and heating. Ground floor to be heated using underfloor heating and 1st floor using radiators.
Access Chamber Foul CL 9490 No10 IL 8600
FFL 9940
RW 89mm Dia from 150mm Gutter
450 337
WC GF23
stub stack with AAV No 6
1801
GD 30 GD 30
cut to site condition
9940
9940
insulated flue contained within false work made up of 75 x 75mm RA steel angle framework elded construction with formed metal bearing rails @ 600mm vertical centres supporting rib lath formed radius and plastered. Framework in turn supports brakets @ min 2000mm centres to support flue. Framework bolted down to brick plinth wall and braced back to timber frame at mid rail wall plate & collar.
9470
Wood burning stove no 2
91
6.767 x 1.289 - 8.05 sq M
Step
GD 21 2015
9790
440
Access Chamber Foul CL 9340 No4 IL 8389
2 9703
9858
min gr adien t 1:80
FFL 9490
FFL 9940
9423
cut to site condition
Mezzanine above measures 3.660 x 5.621 - 18.15 sq M Wood burning stove no 1
A
1 9458
HALLWAYGF16
take down existing and modern frame to this opening and replace with half height glazed frame
Re-use existing door & opening. Bring steps up to and over sole plate
10181
2
Build up No 1
9310
stub stack with AAV No 5
air duct to provide air directly to wood buring stove. To be fitted in accordance with requirements of manufacturer of stove and laid beneath ground bearing slab. Bought up and terminated above ground level to detail.
3 9703
7.044 x 7.055?- 45.07sq M
m lai d to fa ll
3.464 x 3.451 - 11.96 sq M
GD 25 cut to site condition
Screen 6
SITTING ROOM GF03
110m
BEDROOM 5 GF25 GD 04
RW
GD 03
4 9868
5.040 x 1216 - 6.13sq M
Hearth of non combustible material and to stand a minimum of 12mm above any combustable material. Omit insulation from beneath hearth area and lay hearth direct to concrete slab.
RW
Duck boarded floor set at height of centre winder.
9310
cut to site condition
08 9813
Timber frame windows fitted in front of existing timber frame
Access door ? hatch to void.
Screen 3
GD 16
8
Boiler
cut to site condition
GD 19
cut to site condition
stub stack with AAV No 4
B
10043
9248
9340
cut to site condition
FFL 9790 SVP No3
GF E
20 GD 02
3 steps 10000
cut to site condition
Access to tee
min gradient 1:80 110mm laid to fall
9620
FFL 9640
7
4.786 x 3.636- 17.40 sq M
Extract duct taken under floor and up through stud work to cooker hood.
min gradient 1:80 110mm laid to fall
10034
BEDROOM 4 GF26 RW
9108 GD 01
11
3.482 x 2.733 - 9.52sq M
9300
FFL 9340
8
Build up No 5
Boiler
9993
UTILITY GF04 using s
10000
Access Chamber 1881 Foul CL 9640 No7 IL 9040
9813
RW
18
2 steps
10 9529
Support the rafters take down the entire frame to this section and replace in green oak 1881
d drainer. g machine.
9
9989
9
cut to site condition cut to site condition
RW 68mm Dia from 125mm Gutter
Access Chamber Foul CL 9280 No3 IL 8500
9240
11
10 9529 9993
3.283 x 1.338 - 4.40sq M
12 9188
D 9989
9220
9190 C D
ENTRANCE GF05
cut to site condition
C
D 09
9240
ramp @ less than 1:20
20 9320 9248
9340
Access Chamber S Water No11 CL ???? IL ????
Form new opening in block wall to align with opening in timber frame
cut to site condition
RW 110mm Dia from Box Gutter Gutter
9348 Widen existing opening with steel over
RW
Access Chamber Foul No8
9340 Lintel to Detail 9190
CL 9280 IL 8520
GD 15
9340
9108
9188
GF Dairy Building 13
Build up No 2a
RW 68mm Dia from Step to shingle margin 150mm 125mm Gutter
FFL 9490 18
12
Thermal store
9240
Access Chamber S Water No9
cut to site condition
IL 8696
Timber framed and glazed doors with side lights
3283 x 3.442 - 11.30 sq M
Build up No 1
RE
Screen 2
KITCHEN GF06
cut to site condition
stub stack with AAV No 2
9348
9433
9270
cut to site condition
13
19
GD 10
SVP No 7
1 step
9340
h/w screen overhanging floor and balustrade 900mm x 1200mm hatch access with pull down ladder
7.508 x 9.261 ? - 42.77sq M
FFL 9490
9340
PARKING & BICYCLE STORAGE GF27 4.817 x 15.986 - 77.00 sq M
SITTING / DINING ROOM GF07
9230 Access Chamber S Water No8 CL 9340 IL 8871
RW
Screen 1
3.131 x 3.250 - 10.18 sq M
Access Chamber Foul CL 9230 No9 IL 8696
Build up No 6 Plaster on 12.5mm plaster board on studs. 12.5mm ply fixed direct to existing frame overlaid with breather membrane. 25 x 50mm S/W battens fixed through shea direct to frame with a layer of Kontrol Duo i fixed in accordance with Building Regulatio manufacturers specification. 25 x 50mm S/W fixed over to support the feather edged boa
Build up No 2A Plaster on 12.5mm plaster board on 25 x 50mm battens on existing brick/block work.
2.800 x 2.000 - 5.6 sq M
GD 12
Bicycle storage
Build up No 5 Plaster on 100mm block. 100mm cavity with fill insulation. 102mm brick external leaf.
Build up No 2 Plaster on 12.5mm plaster board on 25 x 50mm battens on Celotex insulation fixed direct to existing brickwork to Building Regulations specification and manufacturers requirements.
Build up no 2 RW
19
Build up No 4 Plaster on 12.5mm plaster board between on 38 x 38mm s/w battens. Mineral wool insulation packed into void.12.5mm ply fixe direct to existing frame overlaid with 12. 5 m plaster board with all joints taped and filled 25 x 50 mm battens over laid with polythen joints overlapped & taped battened out and covered in moisture resistant plaster board tiled.
Build up No 1 Plaster on 12.5mm plaster board between studs on 38 x 38mm s/w battens. 12.5mm ply fixed direct to existing frame overlaid with celotex rigid insulation to Building Regulations specification and manufacturers requirements. 25 x 50mm S/W battens fixed through sheathing direct to frame with a layer of Kontrol Duo insulation fixed in accordance with Building Regulations and manufacturers specification. 25 x 50mm S/W batten fixed over to support the feather edged boarding.
cut to site condition
BEDROOM 1 GF09
GD 11
9320
RW
Build up No 1
SVP No1
HEATING
RW 68mm Dia from 125mm Gutter
9790 9340 CL ???? IL 8400? Access CL ???? IL 7890 Chamber S Water No5
Access Chamber S Water No7
Access Chamber S Water No12
Access Chamber Foul CL 8890 No5 IL 8100
CL ???? IL 8122
8890
Rev A 9640
090608
Rev Date
Amended for Buildings Regulations Application
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
TENDER Access Chamber S Water No13
Project
CL ???? IL 8122
Bacons Farm Barn Chappel Conversion & Extension Client
Cad File
Scale
Drawn By / D a t e
Mac 7-609
1:50
ST/Apr 09
Checked By / Date
JI/
Title
Foundations & Drainage D r a w i n g N o.
Access Chamber Foul CL ???? No6 IL 7700
R e v N o.
A/609/T/04 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
17
100
GD 11
Build up no 2
100
BATHROOM GF10 GD 13
cut to site condition
Build up No 3 Plaster on 12.5mm plaster board between studs on 38 x 38mm s/w battens. Mineral wool insulation packed into void. 12.5mm ply fixed direct to existing frame overlaid with 12. 5 mm plaster board with all joints taped and filled 25 x 50 mm battens over laid with polythene all joints overlapped & taped with existing boarding re fixed.
140
140
GD 12
cut to site condition
cut to site condition
GD 14
Build up No 2
100
Screen 1
BEDROOM 2 GF08
19
SD
Smoke Detector
HD
Heat Detector
floor joists
9433
PARKING & BICYCLE STORAGE GF27
Storage Floor Dairy Building
4.817 x 15.986 - 77.00 sq M
cut to site condition
h/w screen overhanging floor and balustrade 900mm x 1200mm hatch access with pull down ladder
RW
rafters FIRE ALARM Mains powered automatic fire detection and alarm system to BS5839 part 6 Code of practice for the design and installation of fire detection and alarm systems in dwellings to at least Grade E type LD3 Standard.
P
timber open screen
3.131 x 3.250 - 10.18 sq M
Bicycle storage
cut to site condition
P
Build up No 6 Plaster on 12.5mm plaster board on studs. 12.5mm ply fixed direct to existing frame overlaid with breather membrane. 25 x 50mm S/W battens fixed through sheathing direct to frame with a layer of Kontrol Duo insulation fixed in accordance with Building Regulations and manufacturers specification. 25 x 50mm S/W batten fixed over to support the feather edged boarding.
Build up No 2A Plaster on 12.5mm plaster board on 25 x 50mm battens on existing brick/block work.
2.800 x 2.000 - 5.6 sq M
NOTES
Build up No 5 Plaster on 100mm block. 100mm cavity with full fill insulation. 102mm brick external leaf.
Build up No 2 Plaster on 12.5mm plaster board on 25 x 50mm battens on Celotex insulation fixed direct to existing brickwork to Building Regulations specification and manufacturers requirements.
RW
RW
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate RW degree o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
RW
22.1 sqm
2.800 x 2.160 - 6 sq M
Build up No 4 Plaster on 12.5mm plaster board between studs on 38 x 38mm s/w battens. Mineral wool insulation packed into void.12.5mm ply fixed direct to existing frame overlaid with 12. 5 mm plaster board with all joints taped and filled 25 x 50 mm battens over laid with polythene all joints overlapped & taped battened out and covered in moisture resistant plaster board and tiled.
Build up No 1 Plaster on 12.5mm plaster board between studs on 38 x 38mm s/w battens. 12.5mm ply fixed direct to existing frame overlaid with celotex rigid insulation to Building Regulations specification and manufacturers requirements. 25 x 50mm S/W battens fixed through sheathing direct to frame with a layer of Kontrol Duo insulation fixed in accordance with Building Regulations and manufacturers specification. 25 x 50mm S/W batten fixed over to support the feather edged boarding.
STORAGE AREA
EN-SUITE GF11
4.575 x 4.475 - 20.48 sq M cut to site condition
BEDROOM 1 GF09
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
B
9358
9438
STORAGE AREA
G
14
SITTING / DINING ROOM GF07
R
SD
GD 10
22 mm T &G chipboard floor on s/w joists to engineers specification with 50 x 100 stud walls lined with plaster board. Large face fixed hinged panel made up with framed ledged and braced s/w ex 30 x 100 with 18mm mdf panel with locking mechanism to give access to loft space.
R
7.508 x 9.261 ? - 42.77sq M
Screen 2 Timber framed and glazed doors with side lights
access hatch
BATHROOM FF02 3.624 x 1.914 - 6.94 sq M
Balustrade made up using plasterboard to both sides of 50 x 100mm stud work with ex 32 x 130 mm s/w capping rebated with 6 x 6 mm rebate to both sides at junction with plasterboard. Plaster board to be trimed with plasterers bead all round and to all exposed corners.
FD 01
HD
cut to site condition
3283 x 3.442 - 11.30 sq M
F
3.755 x 2.929 - 11.00 sq M
cut to site condition
GF Dairy Building
F
FD 02
SD
K
J
A
LANDING FF01
FD 03
cut to site condition
9490
BEDROOM FF03
900 x 1200 loft hatch with drop down extendable ladder. Loft hatch to be detailed to Finish flush with ceiling within bed room.
KITCHEN GF06
2.740? x 3.930? - 9.16 sq M
H
9348
Widen existing opening with steel over
ENTRANCE GF05
Form new opening in block wall to align with opening in timber frame
3.283 x 1.338 - 4.40sq M
12 9188
Build up No 2a
Build up No 2a
13 3.755 x 2.930 - 11.00 sq M
RW
18
Storage Floor New Extension
20
9108 GD 01
2 steps
GD 15
BEDROOM FF04
RW
GD 02
9248 Build up No 5
RW
Build up No 5
D
9529
10000
9340
9993
Support the rafters take down the entire frame to this section and replace in green oak 1881
3.500 x 1.800 - 6.30sq M
Extract to kitchen mounted in void and accessed via stair for period maintenance.
5.218 x 2.945 - 15.37sq M
Re-use existing door & opening. Bring steps up to and over sole plate SD
GD 17
9640
COATS
9790
SD
L
B
Build up No 4
GD 18
08 8
9310
10043
Build up No 4
10034 00
9813
5
6
7
Duct to carry heating pipes from back boiler to heat store
9863
cut to site condition
4
Steps
GD 24 cut to site condition
A
9458
9423
HALLWAYGF16 6.767 x 1.289 - 8.05 sq M
090812 090608
Rev Date
O
Steps
GD 30 GD 30
Steps
Rev B Rev A
Added smoke alarm information and above ground drainage. Amended position of columns on receipt of Engineers information. Amended for Buildings Regulations Application
Revision
Drawn By
9101
SD
cut to site condition
SD
BEDROOM 5 GF25
L
O
3.464 x 3.451 - 11.96 sq M
GD 04
3.
GD 21 cut to site condition
GD 22
9940
insulated flue contained within false work made up of 75 x 75mm RA steel angle framework elded construction with formed metal bearing rails @ 600mm vertical centres supporting rib lath formed radius and plastered. Framework in turn supports brakets @ min 2000mm centres to support flue. Framework bolted down to brick plinth wall and braced back to timber frame at mid rail wall plate & collar.
Build up No 3
DRESSING ROOM GF18
Duct to carry heating pipes from back boiler to heat store
Inkpen Downie Architecture & Design Ltd GD 25
2 Balkerne House
2.250 x 1.670 - 3.75 sq M
327
E D
SD
HD
SD
450 337
FAMILY ROOM GF15
KITCHEN GF14
MASTER BEDROOM GF17
5.380? x 9.651 - 45.86 sq M
5.970 x 5.806? - 28.57 sq M
STORE G
4.088 x 4.648 - 19.00 sq M
1.914 x 1.290- 2.
Hearth of non combustible material and to stand a minimum of 12mm above any combustable material. Omit insulation from beneath hearth area and lay hearth direct to concrete slab
440
9940
Wood burning stove no 2
440
9790
cut to site condition
2015
7.044 x 7.055?- 45.07sq M
Mezzanine above measures 3.660 x 5.621 - 18.15 sq M
SD
N
10181
Extract duct taken under floor and up through stud work to cooker hood.
E D
GF Extension
RW
SITTING ROOM GF03 Wood burning stove no 1
4.786 x 3.636- 17.40 sq M
RW
GD 04
1
take down existing and modern frame to this opening and replace with half height glazed frame
GD 20
BEDROOM 4 GF26
2 9703
Screen 6
9858
HALLWAY & STEPS GF13 9868
3
C
L
GD 03
5.040 x 1216 - 6.13sq M
Hearth of non combustible material and to stand a minimum of 12mm above any combustable material. Omit insulation from beneath hearth area and lay hearth direct to concrete slab.
RW
Duck boarded floor set at height of centre winder.
cut to site condition
9
Timber frame windows fitted in front of existing timber frame
Access door ? hatch to void.
Screen 3
GD 16
d drainer. g machine.
1.090 x 1.862 - 2.03sq M
COMMON ENTRANCE GF01
LOBBY GF02
3.482 x 2.733 - 9.52sq M
1st Floor Barn
WC GF12 Build up no 2
SD
UTILITY GF04 using ps
GD 19
cut to site condition
1 step
9989
cut to site condition
cut to site condition
D 09
3 steps
Build up No 1
11 10
cut to site condition
cut to site condition
C
GD 30 SD
CO1 1PA
PRELIMINARY
LOBBY GF20 BATHROOM GF24
3.490? x 5.530 - 11.25 sq M
Project
2.624 x 1.979 - 5.20 sq M cut to site condition
GD 27
WC GF2 EN-SUITE GF19
Colchester
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
777
See detailed drawings for information about mezzanine
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
GD 26
1.914 x 1.604- 3
Bacons Farm Barn Chappel
2.250 x 2.700 - 6.07 sq M
mezzanine over
cut to site condition
Steps
RW
GD 23
R GD 07
Client
RW
Glazed H/W screen with steel frame and HW louvres hinged at top for occasional lifting for cleaning
G
GD 28
Conversion & Extension
A M
GF Timber Framed Barn
UTILITY GF21
SD
4.200 x 3.342 - 14.04 sq M
C
WC GF23
Cad File
Scale
Drawn By / D a t e
Mac 3-609
1: 50
090122 JI
Checked By / Date
1.914 x 1.604- 3.07 sq M
Title GD 29
M
cut to site condition
H
Screen 5 Build up No 1
Screen 4 take down existing and modern frame to this opening and replace with full height glazed frame
Build up No 1
RW
1.914 x 1.290- 2.47 sq M
Boiler Flue Termination through roof
cut to site condition
STORE GF22
G F Plan & F F Barn Plan RW GD 05
Install new full height glazed frame to existing opening
D r a w i n g N o.
GD 06
Screen 7
J
A/609/BR/05 K
N
B
R e v N o.
B
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
H
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
G
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Frame Repair- Remove timber Frame Repair-Repair or replace timber
RW
NOTES
cut to site condition
Frame Repair-Add new timber
Refer to engineers drawing for the sizes of the timber
Frame Repair-Softwood RW
RW
cut to site condition
cut to site condition
cut to site condition
Roof Plan 1:100 Boiler flues Stove flues
P
This area to be joisted out to provide storage. See sections.
cut to site condition
cut to site condition
P
R
R F
F Build up No 5
existing timber rafters
A
RW
additional timber rafters
Remove modern purlin
RW
K
J
RW
Hatched area to have ceiling joists to be boarded at with plaster board. Remaining area to be plastered underside of the roof.
cut to site condition
cut to site condition
cut to site condition
3 steps
cut to site condition
1 step
N Allow to replace all indicated timber rafters in this area 38mm x 38mm softwood to either side of the existing oak rafters cut to site condition
All new members of historic frame is to be green oak
O
O
C
38mm x 38mm softwood to either side of the rafters
L
cut to site condition
RW
cut to site condition
RW
cut to site condition
L
Rev Date
Revision
Drawn By
cut to site condition
50mm x 50mm softwood to either side of the existing oak rafters
E D
Step cut to site condition
cut to site condition
Inkpen Downie Architecture & Design Ltd cut to site condition
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
38mm x 38mm softwood to either side of the existing oak rafters
E D
RW
CO1 1PA
Drawing Status
TENDER
cut to site condition
38mm x 38mm softwood to either side of the existing oak rafters
Colchester
Fax 01206 563 377 www.inkpendownie.co.uk
Project
Bacons Farm Barn Chappel 50mm x 50mm softwood to either side of the existing oak rafters
50mm x 50mm softwood to either side of the existing oak rafters
Conversion & Extension cut to site condition
cut to site condition
Client
RW RW
RW
N H
G
B
Cad File
Scale
Mac 7-609
1:50 / 1:100 ST/Jun 09
Drawn By / D a t e
Checked By / Date
JI/
Title
C
A M
M
Roof Structure Plan 1:50
Roof Structure Plan & Roof Plan D r a w i n g N o.
50mm x 50mm softwood to either side of the existing oak rafters
R e v N o.
A/609/T/08 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
J
K
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)
Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)
WF 01 WF 02
Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)
Screen 5
WG 01
WF 03
Howarth Timber side hung casement narrow module 488mm x 900mm (W x H)
Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)
WG 02
WG 03
Howarth Timber narrow module H-Bar lookalike escape window 915mm x 1200mm (W x H)
Screen 4
Howarth Timber Horizontal Bar narrow module window 488mm x 1200mm (W x H)
BATHROOM WG 04 WG 05
Screen 7
FFL
9640 FFL
9340 8890
PROPOSED SOUTHEAST ELEVATION Southeast Elevation
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk WF 05
WF 06
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION
WF 07
Project
Bacons Farm Barn Chappel Conversion & Extension
DPC Howarth Timber side hung casement narrow module 488mm x 900mm (W x H)
Howarth Timber side hung casement narrow module 488mm x 750mm (W x H)
WG 12
BATHROOM
Existing ground level to be lowered
Howarth Timber side hung casement narrow module 488mm x 750mm (W x H)
WG 13
WG 28
Client
WG 14 9743 9608
WG 11 FFL
9248 9048
9008
9358
9438
FFL
Cad File
Scale
Drawn By / D a t e
Mac 7-609
1: 50
ST/Apr 09
Checked By / Date
8758
Title
Elevations Southeast & Northwest D r a w i n g N o.
Northwest Elevation
A/609/BR/11
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)
STORE
WC
WG 06 Howarth Timber narrow module H-Bar lookalike escape window 915mm x 1200mm (W x H)
WG 07 9640
Howarth Timber Horizontal Bar narrow module window 488mm x 1200mm (W x H)
WG 08
FFL FFL
9490
9008
8890
Northeast Elevation
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
WF 08
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
Bacons Farm Barn Chappel
WG 24
Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)
WG 25 WG 18
WG 19
WG 20
WG 21
WG 22
Client
WG 23 Howarth Timber Horizontal Bar narrow module window 488mm x 1200mm (W x H)
WG 09
Howarth Timber narrow module H-Bar lookalike escape window 915mm x 1200mm (W x H)
WG 10 9813
9743 FFL 9101
9008
Conversion & Extension
Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)
WG 26
FFL
Cad File
Scale
Drawn By / D a t e
Mac 7-609
1: 50
ST/Apr 09
Checked By / Date
Title
Elevations Northeast & Southwest
Southwest Elevation
D r a w i n g N o.
A/609/BR/12
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
rafters purlins Hardwood window 2640mm x 620mm(W x H) Section details to match with the Howarth Timber windows in the building
Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)
Howarth Timber side hung casement narrow module 488mm x 900mm (W x H)
Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)
Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)
Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)
BATHROOM
Section on DD
ensure window is located in relation to timber frame to provide 450mm min escape route.
Howarth Timber side hung casement narrow module 488mm x 750mm (W x H)
Howarth Timber side hung casement narrow module 488mm x 750mm (W x H)
Section on LL Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
rafters purlins
Bacons Farm Barn Chappel Conversion & Extension
2391.4
Client
BATHROOM
Cad File
Scale
Drawn By / D a t e
Mac 3-609
1: 50
Jan 2009
Checked By / Date
Title
Frame Repairs Sections DD, EE & LL D r a w i n g N o.
A/609/BR/14
Section on EE
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)
WF 04 WF 09
ensure window is located in relation to timber frame to provide 450mm min escape route.
600
WG 15
WG 16
WG 17
STORE
WC
FFL
9490 9248
Section on NN
1337.7
STORAGE
2522.6
578.9
Section on AA
Howarth Timber Horizontal Bar narrow module window 488mm x 1200mm (W x H)
PARKING BICYCLE STORAGE
WG 09
STORE
Howarth Timber narrow module H-Bar lookalike escape window 915mm x 1200mm (W x H)
WC
Rev Date
Revision
Drawn By
WG 10
9101
9008 8758
Section on CC
Section on FF
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
Bacons Farm Barn Chappel Conversion & Extension STORAGE
UTILITY
BATHROOM
BEDROOM 5
Howarth Timber narrow module H-Bar lookalike escape window 915mm x 1200mm (W x H)
Howarth Timber Horizontal Bar narrow module window 488mm x 1200mm (W x H)
Client
PARKING BICYCLE STORAGE
BEDROOM 5
Cad File
Scale
Drawn By / D a t e
Mac 3-609
1: 50
Jan 2009
Title
Frame Repairs Sections AA, BB, CC, FF, NN & OO
9008
D r a w i n g N o.
A/609/BR/15
Section on BB
Checked By / Date
Section on OO
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
STORAGE AREA
remove existing failed plate. insert new. cut foot of studs and tennon into new plate. 10000
9490
9940
10043
9348 9188
PLinthe
Section on KK
Section on GG
WG 27 Rev A
090608
Rev Date
Amended for Buildings Regulations Application
Revision
Drawn By
Section on RR Section on JJ Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
Project
Bacons Farm Barn Chappel Conversion & Extension
STORAGE AREA
Client
Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)
Timber or steel beam supported on the block to take floor and ceiling joists and stud walls
Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)
BEDROOM 2
Cad File
Scale
Drawn By / D a t e
Mac 3-609
1: 50
Jan 2009
Checked By / Date
Title
Frame Repairs Sections GG, HH, JJ, KK, PP & RR D r a w i n g N o.
Section on HH
ensure window is located in relation to timber frame to provide 450mm min escape route.
A/609/BR/16
Section on PP
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
STRUCTURAL REPAIRS KEY:
Frame Repair- Remove timber
Plinth Repair- Rebuild
Frame Repair-Repair or replace timber
Plinth Repair-Localised Repair
Frame Repair-Add new timber
Plinth Repair-New Brick Plinth
Frame Repair-Softwood
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
SECTION ON GG
SECTION ON AA
Strap around post after ply sheathing has been applied.
This wall is in ver
Possible repair or replacement to plate required subject condition once exposed
SECTION ON HH
Rev Date
SECTION ON EE
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd
ed ey Su
rv
Su
rv
ey ed di m en sio di m n en va sio rie d n fro va rie m 47 d fro 97 m to 26 48 19 17 to 26 80
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Strap around post after ply sheathing has been applied.
Project
Bacons Farm Barn Chappel Conversion & Extension Client
Cad File
Scale
Drawn By / D a t e
Mac 3-609
1: 50
Jan 2009
Checked By / Date
Title
Frame Repairs Sections D r a w i n g N o.
R e v N o.
A/609/BR/18
SECTION ON DD
SECTION ON CC
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. STRUCTURAL REPAIRS KEY:
Frame Repair- Remove timber Frame Repair-Repair or replace timber Frame Repair-Add new timber Frame Repair-Softwood
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g Plinth Repair-Localised Repairi s n o t i n t e n d e d f o r u s e b y a n y o t h e r p e r s o n o r f o r a n y o t h e r p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability Plinth Repair-New Brick Plinthw h a t s o e v e r i f t h i s d r a w i n g i s u s e d b y a n y o t h e r p e r s o n o r f o r a n y o t h e r p u r p o s e.
Plinth Repair- Rebuild
NOTES
SECTION ON LL
TYPICAL SCARF SOLE PLATE REPAIR
TYPICAL REPAIRS TO SHOULDER Once wall plate has been removed repair shoulder and tenons to top of post Pull sholder back against post using galvanised bolts and epoxy joint filling adhesive .
TYPICAL STUD SCARF AND SOLE PLATE JOINT REPAIR
TYPICAL POST SCARF AND SOLE PLATE SCARF
Allow for repairing tenons and re-pegging joints.
FRAME REPAIRS TYPICAL DETAILS
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
Bacons Farm Barn Chappel Conversion & Extension Client
remove existing failed plate. insert new. cut foot of studs and tennon into new plate.
Cad File
Scale
Drawn By / D a t e
Mac 3-609
1: 50
Jan 2009
Checked By / Date
Title
Frame Repairs Sections & Details D r a w i n g N o.
SECTION ON JJ
SECTION ON KK
SECTION ON MM
R e v N o.
A/609/BR/19 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
B
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
6 225
NOTES Main posts beams and joists to be in green sawn oak. Sections as architects details. Connections in accordance with Structural Engineers details.
225
75
A
Floor to be in 22 mm thick oak tounged and grooved boarding with edge mouldings, handrails and balustades in planned and fully dried joinery grade oak.
c
Ceiling to mezzanine and solid panels to balustrade in lime plaster on timber laths.
28
120
120 x 225
1
50
336
1
45
120 x 225
5 28
120 x 225
A
120 x 225
A
10
3
62
1110
120 x 225
44
23
1
Plan 1
1
B
Section on AA
3
110 44
2 22
5
2 225
4
A
6
30
c
225
4
120
194
Vertical section Balustrade and Post
5940 to be confirmed on site5940
2600 to be confirmed on site
180x 180
7
E
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
110
Balkerne Passage
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
PRELIMINARY Project
E
364
Elevation
Section on BB
Tel 01206 577 244 arch@inkpendownie.co.uk
Bacons Farm Barn Chappel Conversion & Extension 44
Client
81
7 Cad File
Scale
Drawn By / D a t e
Checked By / Date
Mac 3-609 1: 20, 1:10.1:2 090122 JI
Vertical section Balustrade and Post
Title
Mezzanine Assembly & Details D r a w i n g N o.
R e v N o.
A/609/ BR/25 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
170 Passivent stream line ventilator with side mounted nylon chain operation 2 No 1200mm long
HW frame
4
29
70
17
114
7
50
Passivent stream line ventilator with side mounted nylon chain operation 2 No 1200mm long
42
140
68
NOTES Hinge made up using 10mm thick stainless steel plate welded to steel frame and bolted to HW frame with pivot made from 15mm dia SS pin Nylon washers SS washers and grub screws.
10
1
193
1
60
94 32
7
16
34
3
2
7
50 x 50 x 6mm box section welded frame with 6mm x 60 x 60 steel flat sections welded to frame drilled and countersunk to take no 10 CS head machine screws with washer and nut to secure 25 x 125mm sawn louvre blades. Steel to be galvanised and painted black.
8
120
20
120
5
2 double glazed 24mm 6mm laminated inner skin & 6mm toughened outer skin.
8 site dim to centre to mid rail
40
70
H/W block 44 x 44 mm plan size with nylon pad to top screwed to cill in two locations to support louvred panel
170
9 4
5
6
3
10
9
Screen 5
Screen 4
Rev Date
Revision
Drawn By
See drawing A/609/BR/34 for dimensions and notes regarding section sizes to timber frame
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
4
6
5
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
10
11
12
13
PRELIMINARY Project
Bacons Farm Barn Chappel Conversion & Extension Client
Cad File
Scale
Mac 3-609 1 : 20 &1: 5
Drawn By / D a t e
Checked By / Date
090122 JI
Title
3 D View of Hinge
Screen Details Glazed Entrance & Louvred Screens D r a w i n g N o.
R e v N o.
A/609/ BR/30 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
12.5mm plaster board on 38x38 s/w battens (battens reduced to 38x25 where detail requires) Battens fixed to ply & existing frame
Final position of windows to be agreed on site. The windows provide a means of escape in some circumstances and require a 450mmwide openning.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
Keymer plain tiles fixed on 25 x 35mm treated sw battens to manufacturer's instructions Breather membrane Pro Clima SOLITEX taped and sealed in accordance with manufacturers instructions fixed to 25 x 50mm counter batten.
Duo Kontrol wrapped around batted and taped to celotex
Multifoil insulation, Kontrol Duo 25mm (IDA UK Ltd p.0870 950 6612) fixed to 25 x 50 mm treated s/w battens in accordance with manufacturers instructions. Over lap multi layer quilt with rigid wall insulation and seal together by taping.
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES Read this drawing in conjunction with building regulations notes.
Existing boarding repaired as nevessary and fixed to existing rafters in accordance with Structural Engineers requirements.
Trim counter battens as shown and over lap insulation and tape
External Wall
PLAN SECTION TYPICAL WALL & WINDOW DETAIL
Plywood sheathing (thickness & fixing details to structural engineer's specification
50mm Celotex GA3000 insulation above rafters Vapour barrier (seal vapour barrier to all exposed timber) 12.5mm plasterboard with skim coat
Fix breather flashing membrane to roof and leave sufficient material hanging down to over lapp vertical membrane. Take roof breather membrane over and lapp into gutter. Fix vertical breather membrane up and under flashing membrane.
50mm Celotex GA3000 insulation
Kontrol Duo
Fit sprocket and fascia timber after completing membrane overlaps make up fascia piece ex 50 x 150 rebated to master weather board and chamfered to top edge.
25 x 50mm treated SW batten planted over frame and nailed through to stud
Continouus tilting piece
Breather membrane - wrapped over structure including roof, to provide continuous unbroken membrane. All overlaps to be dimensioned and taped to manufacturer's instructions.
Metal Gutter on rafter brackets (Side Fixed)
25 x 50mm treated SW batten planted over frame and nailed through to stud Ex 50 x 38 screwed and glued to 25 x 100mm side panels cut to notch under and over feather edged boarding. Side panel to be grooved to take cement panel. Cement board to be drilled to take flues from appliance. Size of panel to be varied to suite dia of flue terminal and module of feather edged boarding. Mastic sealant
PLAN SECTION TYPICAL DETAIL THROUGH ROOF
Feather edge boarding as elsewhere
Mineral wool (Non combustable Material)
20 mm thick cemment board finished to match boarding External Wall
Existing structural timber frame wallplate and rafters
Plywood sheathing (thickness & fixing details to structural engineer's specification 50mm Celotex GA3000 insulation 25 x 50mm treated SW batten planted over frame and nailed through to stud
PLAN / VERTICAL SECTIONS & ELEVATION TYPICAL VENT DETAIL
Kontrol Duo 25 x 50mm treated SW batten planted over frame and nailed through to stud Breather membrane - wrapped over structure including roof, to provide continuous unbroken membrane. All overlaps to be dimensioned and taped to manufacturer's instructions. Feather edge boarding as elsewhere 12 5 mm pb with skim coat on 38 x 38 mm battens
Mid Rail - height to underside variable, with mid rails staggered from bay to bay. Detail shown as upper average height approx 1880mm above top of wall plate to plinth wall. (Lower average height aprox. 1750mm above top of wall plate to plinth wall). 000 x 00mm floor joists @ 000 ctrs as per SE specification & Drawings
12.5mm plasterboard with skim coat as per specification New First Floor Timber Frame Structure TO BE INDEPENDENT FROM EXISTING HISTORIC TIMBER FRAME 150 x150 oak timber posts supporting 260 x 250mm oak flitch beams to SE specification, fixing & joint details as Structural Engineers drawings. Spacing of posts in line with existing timber frame structure as shown on plans.
VERTICAL SECTIONS & ELEVATION LINEAR VENT DETAIL
Insulation to Plinth Wall Externally by external wall insulation continued below timber frame at thickness to suit, as shown. Existing windows to Dairy building to be replaced. Timber section sizes to match existing
PLAN SECTION DETAIL FOR WF09
25 x 50mm treated SW battens planted over frame and nailed through. Ensure ventilated cavity is maintained behind boarding with 25mm continuous air gap to top and bottom.
ex 25 x 225 sw window board
B
090327
added window details.
A
090205
amended detail to roof build up re-engineers proposal for strengthening of rafters.
Rev Date
Revision
Drawn By
Proprietary ventilation product or suitable perforated mesh to prevent insects entry to air gap. Fix insect mesh before insulation
skim coat on 12.5mm plaster board on 25 x 50mm sw batten on 50mm celotex on existing brick work.
Inkpen Downie Architecture & Design Ltd Insulation to Plinth Wall Internally by compressible perimeter insulation continued beyond floor level as shown, with solid timber skirting and bullnose timber shelf at setback in brickwork. Skirting SW 125 x 19mm to all external & internal walls. All timber to be painted or stained as per specification.
Bitumen based DPM
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status S/W skirting
New First Floor Timber Frame Structure 150 x150 oak timber posts set in galvanised shoe to Structural Engineers drawings & specification.
PRELIMINARY
New Brickwork Plinth and Repairs Generally, rebuild brickwork plinth to match existing bond and details Insert DPC & ensure DPC overlaps with DPM In any areas where not rebuilding plinth rake out joints to depth of 30mm and point into place. Treat brickwork prior to laying floor build up with chemical injection. Floor finish Floor finish in stone / ceramic tiling, client choice Chemical injection DPC
FFL
DPM turned up wall behaind insulation to overlap and be bonded to dpc. Perforated land drain
NEW EXTERNAL GROUND LEVEL
Screed Floor insulation laid on solid concrete base. 20mm compressible insulation to perimeter. perforated land drain to base of walls laid to take surface water away from buildings.
Min 80 mm screed with reinforcement/underfloor heating system on polythene 500 gauge separating layer
Conversion & Extension 'Breather gap' ventilated by open perpends at appropriate centres as agreed with Conservation Officer with
Client
perforated land drain Cad File
Floor board rigid insulation, Celotex GA3000 65mm to give U-value 0.21W/m2K
DPM polythene 1200 gauge on ground bearing insitu concrete slab.
Conservation Officer
VERTICAL SECTION TYPICAL DETAIL DAIRY BUILDING
Bacons Farm Barn Chappel
EXISTING INTERNAL FLOOR LEVEL
'Breather gap' between new concrete slab floor and plinth wall with ventilation detail as agreed with
VERTICAL SECTION DETAIL FOR WF09
Project
VERTICAL SECTION TYPICAL EAVES MIDRAIL AND PLINTH DETAIL
NEW EXTERNAL GROUND LEVEL
Scale
Mac 3-609 1: 5
Drawn By / D a t e
Checked By / Date
090122 JI
Title
Typical Sections Eaves Wall & Sole Plate Details D r a w i n g N o.
A/609/ BR/33
R e v N o.
C
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
for details see drawing no: A/609/BR/33
for details see drawing no: A/609/BR/33
for details see drawing no: A/609/BR/33
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
for details see drawing no: A/609/BR/33
for details see drawing no: A/609/BR/33
STORE
WC for details see drawing no: A/609/BR/33
9101
Section on CC for details to the staircase & handrail see drawing no: A/609/BR/25 hardwood skirting carpet floor finish on ply oak staircase plasterboard ceiling Rev Date
for details see drawing no: A/609/BR/33
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR APPROVAL Project
Bacons Farm Barn Chappel Conversion & Extension Client
for details see drawing no: A/609/BR/33
Cad File
Scale
Drawn By / D a t e
Mac 7-609
1: 20
ST May 2009
Checked By / Date
Title
Sections CC & EE D r a w i n g N o.
Section on EE
R e v N o.
A/609/BR/38 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
A
B C
Code 6 type lead sheet
A detail b
detail a
detail e
minimum fall between drips to be 1 in 80
detail d
detail c
detail f
SECTION CC 2050
2050
2050
2050
SECTION BB SOUTHWEST NORTHWEST ELEVATION ELEVATION
SECTION AA lead box gutter lead flashing lead gutter
C
B
(detail f)
Rev Date
(detail e)
A
Revision
Drawn By
A Inkpen Downie Architecture & Design Ltd 2 Balkerne House 1354 2050
2050
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
2050
PLAN 1:20
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
TENDER lead gutter
Project
standard roll 45 x 45 40mm overlap
detail b
welded stainless steel gutter
min 50mm
lead flashing
min 100 / max 225
lead gutter - min fall 1:80 Code 6
lead gutter - min fall 1:80 525
40
Bacons Farm Barn Chappel
lead flashing
min 100 / max 225
lead flashing
detail a
lead gutter - min fall 1:80 welded stainless steel gutter
Conversion & Extension Client
detail c
Cad File
Scale
Mac 7/609
1: 20 / 1:10 ST/Jun 09
Drawn By / D a t e
Checked By / Date
Title
Gutter Detail
detail e detail d
detail f
D r a w i n g N o.
R e v N o.
A/609/T/43 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
ELECTRICAL KEY
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
COMMUNICATIONS & FITTINGS
SWITCHES
SD
1 Gang switch
Smoke Detector RW
HD
2 Gang switch
NOTES
cut to site condition
3 Gang switch
Electric Extract Fan
4 Gang switch
Electric Extract Fan with light fitting TV
Two Way One Gang Switch RW
RW
Heat Detector
T
Two Way Two Gang Switch
ASDL
Two Way Three Gang Switch
Television Aerial Socket
F
F
F
F
F
Telephone Socket ASDL Socket cut to site condition
S
Three Way One Gang Switch 2
2
Speaker Socket
cut to site condition
2
cut to site condition
2
2
2
2
Wall mounted speaker
2
cut to site condition
2
cut to site condition
2
Three Way Two Gang Switch
cut to site condition
1 Gang switch - Pull cord
Ceiling mounted speaker
Three Way Three Gang Switch
cut to site condition
POWER
2
cut to site condition
3
2
Switched Socket Outlet
F
F
Twin Switched Socket Outlet
F
F
Tripple Switched Socket Outlet
GF03 Mezzanine Electrical Layout
2 5 amp
5 amp Switched Socket Outlet Floor Socket
2
5 amp
2
2
2
2
2
F
Barn First Floor Electrical Layout
5 amp Floor Socket Shaver Socket 2
purlins
Electrical wiring
sloping ceiling
2
2
sloping ceiling
2
Cooker Socket
2
2
2
RW
sloping ceiling
COMMUNICATIONS & FITTINGS
2 seperate switching spur outlets for the fridge freezer
sloping ceiling
2
RW
2
2
RW
2
2
2
sloping ceiling
sloping ceiling
cut to site condition
2
original beam
RW cut to site condition
RW
cut to site condition
sloping ceiling
2
2 seperate switching spur outlets
sloping ceiling
2 seperate switching spur outlets
2
2
sloping ceiling
2 2 seperate switching spur outlets for the boiler
cut to site condition
sloping ceiling
cut to site condition
2 3 steps
2
2
2
1 step
cut to site condition
cut to site condition
Rev Date
original beam
cut to site condition
Revision
Drawn By
cut to site condition
2
new mezzanine structure
2
2
sloping ceiling
Step
sloping ceiling
2 cut to site condition
2
2
2
F 2 cut to site condition
2
Inkpen Downie Architecture & Design Ltd 2
cut to site condition
2
2
2
2
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
2 seperate switching spur outlets for the fridge freezer
2
2
2
2
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
2
RW Drawing Status
TENDER
2 seperate switching spur outlets for the boiler
cut to site condition
2
2 seperate switching spur outlets
2
2
2
2
2
2
Project F
Bacons Farm Barn Chappel
2 seperate switching spur outlets 2
2
2
new mezzanine beam
cut to site condition
2
2
cut to site condition
2
2
Conversion & Extension Client
RW RW
RW
Cad File
Mac 7-609
Ground Floor Electrical Layout
Scale
Drawn By / D a t e
1: 50
ST Jun 09
Checked By / Date
Title
Ground Floor & First Floor Electrical Layout
2
2
D r a w i n g N o.
R e v N o.
A/609/T/46 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
G
G
ELECTRICAL KEY
LIGHTS
SWITCHES
A
Aurora 240V T2 Aluminium adjustable fluorescent cabinet light
B
Pendant
Pendant
L
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
1 Gang switch
2 Gang switch
louis poulsen Enigma 825
Delta Light Xilo C 411 T50
G
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
RW
3 Gang switch
B-C
NOTES M
C
G
Wall (Surface Mounted)
F
G
C
Wall (Surface Mounted)
E
5 amp
cut to site condition
D
F
E
E
D
P
Aurora AU-HCD352 Satin Silver
cut to site condition
D
5 amp
cut to site condition
5 amp
Ceiling (Recessed)
E
N
5 amp
P
B W
W cut to site condition
Delta Light Heli 1 white
Three Way Two Gang Switch
Wall (Surface Mounted) Delta Light Orbit
1 Gang switch - Pull cord
C
O
5 amp
5 amp
5 amp
5 amp
O
Three Way Three Gang Switch
U O
Wall (Surface Mounted)
Pendant Q
C
POWER
Delta Light Xilo CL 450
Delta Light Backspace 36
O P
5 amp
P
5 amp
P
B
5 amp Switched Socket Outlet
Wall (Surface Mounted) Aurora AU-BLL826
R
cut to site condition
P
F
Two Way Three Gang Switch
Wall (Recessed)
O
5 amp
C
Three Way One Gang Switch
Delta Light Visa
G
G
Two Way One Gang Switch
Wall (Surface Mounted) louis poulsen Oslo uplight
N
C
Delta Light Uniline Modules T16 Non Stop Down
F
F
RWD
4 Gang switch
Two Way Two Gang Switch
Delta Light Xilo W
RW
Uplight
cut to site condition
cut to site condition
E
cut to site condition
G
LIGHT FITTINGS KEY
F
N
Floor Socket
C
P E
D
C
E
Ceiling (Surface Mounted) Delta Light Xilo 111 JAC C
G
cut to site condition
C
R
5 amp
5 amp
S
Mounted) Low energy fluorescent with fitting
5 amp
J A A
O
O
O
GF03 Mezzanine Lighting Layout
Barn First Floor Lighting Layout
COMMUNICATIONS & FITTINGS
Pendant
Electric Extract Fan with light fitting louis poulsen PH 5 white
Delta Light Jeti Tower
A
O
Electrical wiring
T
Stand alone
J
5 amp Floor Socket
louis poulsen PH Artichoke dia 720 white
RCeiling (Surface
H M
5 amp
Pendant
B
Pendant U
purlins
V B
sloping ceiling
K
Delta Light Xilo CL 250
sloping ceiling
Wall (Surface Mounted) Delta Light Ober
V A 5 amp
H
U sloping ceiling
A
J
A
Wall (Surface Mounted)
W
RW
louis poulsen Io Wall/Ceiling
K 5 amp
RW
V
V
cut to site condition
D
N
cut to site condition
D
sloping ceiling
D
cut to site condition
D
3 steps
sloping ceiling
sloping ceiling
cut to site condition
sloping ceiling
cut to site condition
1 step
V
sloping ceiling
RW
A
V
louis poulsen Flindt 475 pendant
Pendant
5 amp
B
5 amp
F
5 amp
5 amp
V V
K
J
O
O V
R
D
D
C RW D
original beam
cut to site condition
V Rev Date
Q
D
D
D
D
D
sloping ceiling
Step D
D
5 amp
cut to site condition
5 amp
A
A
A
5 amp
5 amp
J
C
A
C cut to site condition
E
Q E
5 amp
H
2 Balkerne House
C
O
C
S
M
K
K
Drawing Status
Project
R
K A
O
5 amp
5 amp
5 amp
J
5 amp
F
C
B
Bacons Farm Barn Chappel
E
new mezzanine beam
J
H H
H
cut to site condition
5 amp
See detailed drawings for information about mezzanine E O
O
O
Conversion & Extension Client
cut to site condition
O
CO1 1PA
TENDER
cut to site condition
E
Colchester
Fax 01206 563 377 www.inkpendownie.co.uk
RW
H
O
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
F
L
A
Inkpen Downie Architecture & Design Ltd
cut to site condition
O
E D
Drawn By
E D
sloping ceiling
J
Revision
cut to site condition
D
new mezzanine structure
U
RW
L
cut to site condition
sloping ceiling
D
cut to site condition
D
L
sloping ceiling
original beam
H
RW RW
Cad File
RW
Mac 7-609
Ground Floor Lighting Layout C
A M
ST Jun 09
Checked By / Date
N
B
Ground Floor & First Floor Lighting Layout
M
5 amp
D r a w i n g N o. 5 amp
G
Drawn By / D a t e
1: 50
Title
T
H
Scale
R e v N o.
A/609/T/45 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
J
K
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.
NOTES
N Outline of existing kennel to be demolished
Conservatory
Roof Terrace
Dormer roof extended over glazed bay
+21.88 Roof Terrace
(Lowered by 350mm)
New rooflight FLOOR PLAN LOCATION POINT
Glass roof to belvedere access to roof terrace
Crab apple tree (dotted) to be removed
Lean-to extension to new garden wall
Lean-to roof over new extension
Rev Date
Revision
Drawn By
Telegraph pole moved
Drawing Status
SITE PLAN
PLANNING Project
Regency House Client
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50 1:100
ST/08.05.2007 BD/
Checked By / Date
Title
SITE GROUND / ROOF FLOOR PLANPLAN D r a w i n g N o.
R e v N o.
A/708/P/02 A/708/P/01 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.
NOTES
N Larder
Fireplace Existing cupboard & false wall removed
New bi-fold panelled doors
1800
Purpose made cast-iron grating covers to existing lightwell with fine mesh to underside to prevent debris getting into well. Covers to be removable for access.
+9.92
Kitchen
Up
Conservatory
+9.92
+10.50
Living Room +10.49
New double doors within existing opening
Up
Existing opening blocked double doors on hallside retained to form shallow cupboard
+10.50
Cupboard removed; electrical fuse board relocated under stairs
+9.92
Existing cellar door blocked
Ceiling Slope Up
FLOOR PLAN LOCATION POINT
Up
Original cellar door position reinstated Up
Wall removed
Window blocked
Pump and Gully
New service lift (50kg) & Enclosure
New glazed doors within existing window openings Opening widened to allow vehicular access through garage
Laundry +9.92
Lean-to removed
Hall
Opening blocked New partition
+9.91
WC +9.94
Up
New doorway & steps
Mrs Johnson's Study
Wrought iron railings & gate
Elec. cupd
Covered Run
Porch
Cloakroom
Manhole removed
Up
Bins New garden wall
Rev Date
Garage
Bins Enclosed
Existing rear wall of cottage removed at G. Floor level. New steel beam over
Dog Flap
Kennel
Revision
Drawn By
Kennel lined with acoustic insulation. Roof over kennel & run to be lined with acoustic insulation.
New garden wall
Lean to extension to form garage
North wing formerly Greyfriars North
Fireplace
Mr Johnson's Study
Existing WC partition removed
Drawing Status
PLANNING Project
Regency House Side opening, sectional sliding garage door Timber vertical boarding
GROUND FLOOR PLAN
Telegraph Pole Moved Client
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/08.05.2007 BD/
Checked By / Date
Title
GROUND FLOOR PLAN D r a w i n g N o.
R e v N o.
A/708/P/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.
NOTES
RWP
Bathroom
New door to ensuite bathroom
Doorway blocked
Bedroom +14.08
Cup'd
Original fireplace investigated and replacement installed Up
Balcony
RWP
Drawing Room
Up
+14.12
+12.42
Wall & staircase to North wing removed - New floor to hall
Porch Roof FLOOR PLAN LOCATION POINT
Up
RWP
Door opening raised to suit hall floor level
New lift & enclosure
Reinstate original door to bedroom from half landing
Hall Bedroom
RWP
+14.12
Bedroom +12.39
New door opening Up
Ensuite Bathroom Rev Date RWP
Revision
Drawn By
+12.45 Up
Skylight
Glass roof over porch
Up
Up
Balcony
Parapet
Lead roof over new bin enclosure
Drawing Status
PLANNING Project
Regency House Client
FIRST FLOOR PLAN
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/08.05.2007 BD/
Checked By / Date
Title
FIRST GROUND FLOOR FLOOR PLAN PLAN D r a w i n g N o.
R e v N o.
A/708/P/03 A/708/P/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.
3200 Min.
NOTES
Window Box
Cupbd SL
Up
Wardrobes
New balcony existing sash window replaced with french doors
Door repositioned to enable spiral staircase to be positioned to allow sufficient headroom over main stair
Existing balcony enclosed with glazed bay
Dressing Room
New spiral stair up to roof terrace
+17.71
New partition
Bedroom +17.74 Window Box
Bathroom WC
Cupbd
New rooflight in bathroom dotted
FLOOR PLAN LOCATION POINT
1350mm Headroom
Shower
New lift & enclosure
1700mm Headroom
Linen Store
Bathroom
New window
+15.12
New partitions
Up from first floor landing
Up 980mm
Up 540mm New opening Rev Date
Bedroom +14.58
SECOND FLOOR PLAN
Revision
Drawn By
Up
New window
Drawing Status
PLANNING Project
New fully glazed belvedere to roof terrace
Regency House Client
Roof Terrace +21.88
(Lowered by 350mm)
Spiral staircase 1200mm diameter; 1300mm min. stairwell 21 risers, 199mm = 4180mm
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/08.05.2007 BD/
Checked By / Date
Title
THIRD FLOOR PLAN
SECOND GROUND &FLOOR THIRDPLAN FLOOR PLANS D r a w i n g N o.
R e v N o.
A/708/P/04 A/708/P/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.
Existing shutters (full height) to be cut in half at upper midrail position
NOTES
New bottom rail to top shutter inserted & mouldings adapted (original panel dotted) Upper midrail altered to become top rail of bottom shutter
Fully glazed belvedere access to roof terrace
Existing railings
Floor of terrace lowered
GROUND FLOOR SHUTTER ALTERATIONS 1:20
22.23
350
22.20
Hipped slate roof extended to cover glazed bay
21.03
20.99
Curved lead dormer over central sash
20.59
20.20
Central sash window replaced with french doors
New glazed bay enclosure to balcony
Bedroom New balcony with cast iron railings as pattern on first floor
Dressing Room Lover floor level of former balcony to match internal F.F.L
17.74
17.41
17.42
Drawing Room
Cup'd
Bedroom
14.12
13.81
13.30
Existing shutters to be altered. See detail above. Rev Date
Living Room
9.80
Drawn By
Kitchen
11.10
New cast iron grating cover to cellar light well
Revision
Conservatory 10.49
10.50
9.92
9.87 9.97
Cellar
New bi-fold doors
Floor level lowered to existing kitchen F.F.L
New timber surround to range recess
New glazed doors within existing window opening through to new conservatory
Drawing Status
PLANNING
7.77
Arbitrary Datum 7.00m Arbitrary Datum 7.00m
Project
Arbitrary Datum 7.00m
Regency House Client
CROSS SECTION A-A
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/08.05.2007 BD/
Checked By / Date
Title
GROUND FLOOR PLAN CROSS SECTION A-A D r a w i n g N o.
R e v N o.
A/708/P/05 A/708/P/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.
NOTES
1100
Centre sash replaced with casement doors to match existing on first floor. New balcony with cast iron railings as pattern below.
F.F.L
Revision
Drawn By
900
Rev Date
Brick plinth & stone coping to match neighbouring property. Cast iron railings above.
New gate
Continuation of railings across entire frontage subject to agreement with neighbours
Drawing Status
PLANNING Project
Regency House Client
SOUTH GREEN ELEVATION
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/08.05.2007 BD/
Checked By / Date
Title
SOUTH GROUND GREEN FLOOR ELEVATION PLAN D r a w i n g N o.
R e v N o.
A/708/P/06 A/708/P/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.
NOTES
New glazed belverede access to roof terrace painted timber structure & 'heritage' patent glazing to roof. Glass to be self cleaning ie pilkinton activ.
Investigate boarded gablet continue hipped roof & slate of main roof if possible.
Cast metal conservation roof light Existing balcony enclosed with glazed bay
F.F.L
Timber framed double glazing in gable triangle of lean to extension both sides
Rev Date
Red brickwork with coursed pebble flintwork panels
Revision
Drawn By
Acoustic lining
New lean-to replacement of existing structures
New kennel & covered run behind new garden wall
New glazed doors within existing window opening
New lead canopy on carved brackets
New conservatory: * Painted timber frame * Powdercoated aluminium roof bars & rainwater goods * Double glazing throughout
Drawing Status
PLANNING Project
Regency House Client
WEST ELEVATION
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/08.05.2007 BD/
Checked By / Date
Title
WEST GROUND ELEVATION FLOOR PLAN D r a w i n g N o.
R e v N o.
A/708/P/07 A/708/P/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.
NOTES
Natural slate
New oriel window with curved lead roof
Curved lead roof over arched window
Existing dormer roof extended over bay Red brickwork Existing balcony enclosed to form glazed bay
New kennel & covered run with wrought iron railings
2.4 metres New glazed doors in widened opening door posts removable to allow vehicular access to garden
New lead canopy on carved brackets
SOUTH ELEVATION OF COTTAGE WING
Casement doors within blind window top section lights corridor
New sash window to bedroom
Corridor F.F.L 15.12 14.58
Natural slate lean-to roof
Rev Date
Revision
Drawn By
Drawing Status
9.89
PLANNING Wall & railings continued around boundary to match those on south green elevation
New fanlight over street door
NORTH ELEVATION TO LORNE ROAD
New casement window in existing opening
Wide board timber door
New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling
Project
Regency House Client
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/08.05.2007 BD/
Checked By / Date
Title
NORTH GROUND & FLOOR SOUTH PLAN ELEVATIONS D r a w i n g N o.
R e v N o.
A/708/P/08 A/708/P/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
take down existing brick kennel structure including floor slab and dog run enclosure, make good wall of adjoining structure line of boundary
line of boundary
NOTES
N new c.i. gutter
all existing paving materials in this area to be taken up and natural stone paving set-aside for reuse lay paving to area shown levels to match extng line of boundary
Arrangement of paving provisional to be confirmed before proceeding on the site.
line of boundary
01 REPLACEMENT OF EXISTING PAVING Marshalls natural stone paving Standard Yorkstone Diamond Sawn Paving Colour: Scoutmoor 02 REUSING EXISTING PAVING
adjust existing coping at junction to existing
extng plinth wall, coping removed, posts and chains removed and raised to match original. new stone coping to match existing and metal railings
Reuse existing back garden paving on defined areas
new conservatory
new lead slatestrip off finishes from extng dormer structure and extend, re-lay deck to flat top to pitch from side for svp to side and lay new lead roof finish,lay new slates to lower sloping section rwp
existing lead flat area
remove existing roof light make good sarking felt and slates remove timber cladding from existing vertical abutment and clad with slate hanging on battens and Tyvek or similar breathable membrane
03 NEW PAVING New quarry tile paving in kennel and run to be continue on the walls to 1000mm height
all existing paving materials in this area to be taken up and natural stone paving set-aside for reuse lay new stone terrace to area shown. with pockets left out for planting to be agreed with the employer, levels to be determined and agreed on site
new c.i. gutter new inset mh cover
new motorised sliding rooflight
Roof Terrace all existing paving materials in this area be708/04 seetodrg taken up and natural stone paving set-aside for line of extng rear wall of reuse lay new stone paving to area shownterrace levels to match extng
new c.i. gutter
curved lead roof to centre sash of venetian window rwp
lead chute outlet from terrace
new lead flashings at abutments
new lead rolls to hips
strip off extng timber boarding and reclad existing dormer cheeks with slate hanging
line of existing hip, remodel this area to form vertical abutment with tile hanging at junction to rear roof slope
renew lead valley flashing
New Diamond Sunpipe renew lead roll to short length of hip
resite existing rear wall of terrace to align with existing vertical abutment and clad with slate hanging on battens and Tyvek or similar breathable membrane cut and trim extng roof structure to structural engineers spec continuous lead flashing at abutment, and lead coping detail to terrace upstand
reform back gutter and stepped flashing to existing chimney stack
Crab apple tree (dotted) to be removed new inset mh cover
new c.i. gutter
new lead slate for svp
new inset mh cover
extng plinth wall, rake out loose mortar joints, (sound cement mortar may be left in place) and repoint in a lime putty mortar repair/ replace stone coping and install new iron railings
M L K J I H G
18/04/08 04/04/08 27/03/08 05/03/08 16/08/07 18/07/07 03/07/07
F
04/06/07
E
29/05/07
new c.i. gutter new lead slate for svp
new inset mh cover
Location of garden wall is changed Kennel to be omitted & Additional note about paving Kennel proposal to be retained Kennel to be omitted & smaller bins encl. Parapet repairs & Remove garden gate on SG Elev Paving materials defined Scale to 1/50 & Remove two sun pipes & Re-shape skylight over the porch Re-shape skylight on the roof terrace & Re-locate sunpipes Re-shape skylight over the porch
ST ST ST ST ST ST BD ST ST
D
22/05/07
New skylight to the porch & Reshape skylight over the entrance
ST
C
21/05/07
Change on skylight to the roof terrace
ST
B
18/05/07
Conservation sun-pipe system
ST
A
09/05/07
Enlarging existing balcony
Rev Date
ST
Revision
Drawn By
new lead slate for svp cranked over in roof space
Provisionally Repair stone parapet
new c.i. gutter
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
existing flat roof to be refurbished see drg 708/03
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk new lead roof to bin-store
all existing paving materials in this area to be taken up and natural stone paving set-aside for reuse lay new stone paving to area shown levels to match extng
new slate roof over garage extension new inset mh covers
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
new c.i. gutter
Regency House new metal gate and gateway with york-stone threshold with bullnose nosing
SITE PLAN
extng plinth wall, rake out loose mortar joints, (sound cement mortar may be left in place) and repoint in a lime putty mortar repair/ replace stone coping and install new iron railings
extng telegraph pole all existing paving materials in this area to be taken up and natural stone paving set-aside for reuse lay new stone paving to area shown levels to match extng
extng telegraph pole resited
Client
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/12.06.2007 BD/
Checked By / Date
Title
GROUND FLOOR SITE / ROOF PLANPLAN D r a w i n g N o.
A/708/C/01 A/708/C/02
R e v N o.
M
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
F
NOTES 01 REPLACEMENT OF EXISTING SOLID FLOORS
E
areas indicated thus to be broken up and carted away
kitchen ventilation new svp
lay a new floor of: 150mm blinded hardcore 1200 gauge polythene dpm 75mm insulation 150mm concrete 50mm sand cement screed
provisionally new 100 diam rwp & gulley extng door and frame and brick soldier course removed and opening bricked up
extng aga to be retained
extng window removed, opening extended to ground level and new door and frame with fanlight fitted
02 DRAINAGE BELOW GROUND
N
02.1 Pipes bends and fittings generally to be Hepworth or similar proprietary clay system system to BS EN 295-1 and Kitemark certified, or AgrĂŠment certified, with flexible joints, installation to be in complete accordance with BSEN 752, manufacturers instructions and recommendations.
retain extng cupboard
RWP
02.2 Before starting work, check invert levels and positions of existing drains, sewers, inspection chambers and manholes against drawings , report discrepancies, protect existing drains to be retained and maintain normal operation.
DG30
Purpose made cast-iron grating covers to existing lightwell with fine mesh to underside to prevent debris getting into well. Covers to be removable for access.
Fireplace extng timber floor cut and trimmed to new dwarf wall below built off new foundation
WG07
new timber steps and balustrade to match main stair
Kitchen
+10.50
GF03
A
Up DG09
new 100 diam stub stack
11.5 Pipes passing through walls to be spanned with 1 course P C lintel with 50mm clearance all round pipe, opening to be bridged with a rigid sheet material.
GF04 +9.92
new opening with bi-fold panelled doors
WG06
02.4 Pipes generally to be laid at a min depth of 600mm and laid on 100mm depth and then surrounded with granular fill. Pipes at shallower depths to be bedded and surrounded in granular fill and spanned with a PC concrete paving slab. Pipes under building to be surrounded in concrete.
new conservatory
+9.92
retain existing dwarf wall
A
11.3 Drains generally to be 100dia laid to a min fall of 1 in 40
DG10
GF02
new mh 02.6 Manhole and inspection chamber up to 1000mm deep and with max 2 branches each side of the main channel to be proprietary 450 dia plastics chambers with preformed channels, bedded on concrete and surrounded in pea shingle to manufacturers instructions.
DG12 DG08
DG07
Existing opening blocked new double doors on hallside to form shallow cupboard Up
GF01 +10.49
new double doors within existing opening
+10.50
+9.92 Ceiling Slope
GF05
new shelving to existing alcoves
DG06
extng canopy to back door removed and new canopy fitted
Up
DG13
drainage hole for lift shaft to the cellar
WG05
new 100 diam 1:40 drain connections
cupboard removed; electrical fuse board relocated
Up
02.8 Manholes over 1m deep to be fitted with step irons.
03.1 Provide new Grade A fire alarm system rated a minimum of L2 in accordance with BS 5839-6 and Mechanical and Electrical Engineers drawings and specification. 03.2 New shaft for serviice lift to be constructed and fire stopped to provide 30 minutes fire resistance. Service lift doors at each floor level to be rated FD30S to BS 5588
RWP
DG16
new blockwork lift shaft new svp & boxing
U
Laundry +9.92
GF06
tumble dryer duct route
door and frame removed opening infilled
extng timber floor cut and trimmed, new 150mm block partition constructed off extng foundation & pinned to underside of beam over dry lining flush with plaster over to this side
existing screens removed and fielded paneling and architrave to match door linings applied to underside of lintel
+9.94
+10.01
door and frame removed opening infilled
100mm step up
new FD30S door to opening
DG02
DG03
Mrs Johnson's Study
WG03
GF08
GF13
Cloakroom
new wall to be built on the existing foundation
DG28
GF12
insulated dry lining +10.11 U value 0.35 new gulley
DG22
DG01 WG02
WG01
RWP
Up
airbrick terminator
new bin store DG23
D new timber step to match hall
F
GF15 +9.97
new door opening & steps down
DG21
N M L K J I H G F E D
Revision
Drawn By
C
New garden wall
Existing rear wall of cottage removed at G. Floor level. New steel beam over DG26
extng manhole resited
D
elec. meter
extng mh CL 10.00 IL 9.10 remove extng interceptor (trap)
new i.c. new rwp & gulley
extng telegraph pole
DG25
side opening, sectional sliding garage door - timber vertical boarding 2710
+10.01
890
iam 0d 10 r tng e ex sew e d to um ion es ct pr nne co
extng elec.pole to be resited
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
New drainage: ACO MultiDrain MD System or equivalent. 150mm stainless steel grill
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
Existing brick pier
CONSTRUCTION Project
Regency House
DG24
existing pavement line
Drawn By
P O
extng door and frame removed and built into new svp new wall opening m.g. plaster reveals
+10.01
new garden wall
ST
S R
17/06/08 Ramp is added to the garage. Levels change. M&E ST info added. Lift shaft drainage hole to cellar. DG18 location change. 09/06/08 DG21 position to original. Back of the garden wall to ST be red brick. 04/06/08 Additional notes. Flint walls shown. DG21 location ST provisionally changed. 09/04/08 Garden wall location change ST 04/04/08 Kennel removed & Additional note about garden wall ST location 27/03/08 Kennel proposal to be retained ST 04/03/08 New sash to GW01 & size change in bins enc & kennelST removed & elec. pole moved & omit DG17&DG20 8/11/07 Amendments to building inspector's requirements BD 19/09/07 Replacement of existing floor to GF05 & GF10 ST 23/08/07 Floor and ceiling note change on kennel ST 14/08/07 Smaller lift shaft ST 13/08/07 Add column in GF03 boxing ST 17/07/07 Kennel run detail change ST 22/06/07 Drains & build regs notes added ST/BD 20/06/07 Add room & door & window nos. ST 01/06/07 215mm brick wall to the garage ST 29/05/07 Reshape skylight over the porch & Enlarge lift size ST 22/05/07 New skylight to the porch & Reshape skylight over ST the entrance 21/05/07 Partitions are removed in entrance area ST 18/05/07 Lift enclosure size ST 11/05/07 Garage walls with insulation ST
Rev Date
new door opening
gas meter
E remove existing casement window & new sash window to match with the left side original window
GROUND FLOOR PLAN
new rwp & gulley
ST ST
C B A
insulate between joists to give U value 0.35 two layers plasterboard and skim to ceiling to give 1 hour fire resistance
Porch
Up
new rwp & gulley
GF14
140mm step up
plaster this side & make good plaster to beam soffit
C
new i.c.
Garage
Up
DG04
B
DG19
DG18
existing skylight resited & opening remodeled
Revision
WG13
new DG29 elec. GF11 cupd
GF10
Rev Date
new rwp & gulley
+10.11
WC
Dec/08 Kitchen and laundry layouts added 11/08/08 Insulation addition to porch area & bins enclose layout changed & flint panelling finish detail changed & garage door width changed & omit larder W 07/07/08 Garage & bins enclosed levels changed. Lift rotation changed.
boiler flues
new rwp & gulley
existing door & frame resited
new svp stub stack
Y X
extract fan
190mm step up
DG05
T
new i.c.
new 1:40 100 diam drain
GF09
Hall
02.12 Existing drains to be retained are to have traps cleaned out, grilles and covers replaced where missing and left free running.
WG12
new mh
Mr Johnson's Study GF07
New service lift (50kg) & Enclosure
02.10 Wastes are to terminate in a square hopper fitted with an open metal grid and separate sealed connection for waste pipes into a back inlet. All gullies connecting into foul drainage are to be fitted with a trap.
V
Pump and Gully
extng 150 diam connection to sewer
remove gas fire and immeadiate surround and, retain overmantle and fire place surround
B
1000 1000
North wing formerly Greyfriars North
Fireplace
WG04
DG15
existing wall removed plaster made good including fluted beading at corner
02.9 Rainwater pipes to terminate in a proprietary shoe over a rainwater gully with square hopper fitted with a metal grating.
03 FIRE PROTECTION MEASURES
extng window and frame and brick soldier course removed and opening bricked up
DG14
Up
02.7 Manholes in excess of 1.2m deep or with more branches to be 1200x675 in class 'B' engineers bricks in cement mortarbuilt off 150mm concrete base, channels to proprietary fittings set in weak concrete and floated to a smooth finish in mortar. Cover to be 100mm reinforced concrete with proprietary access cover to BS EN 124 , inset to take infill with paving material fabricated from welded and galvanized mild steel, sized: to minimum building regulations.
drain new 1:40 100 diam
Living Room
Client
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/12.06.2007 BD/
Checked By / Date
Title
GROUND FLOOR PLAN D r a w i n g N o.
A/708/C/02
R e v N o.
Y
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
new steel column to structural engineers specification
NOTES
F
03. RAINWATER GOODS 03.1 Rainwater goods generally to be cast iron to BS 460 with spigot and socket connections. Provide Swan Neck offsets to suit suit roof overhang in each individual situation
E new stepped lead flashing to abutment to conservatory
03.2 Rainwater system design and installation to be in accordance with BS 6367 and manufacturers instructions and recommendations. 04. SANITARY PIPEWORK 04.1 Pipework to generally be plastics to BS 5255, BSEN 1329-1, BSEN 1451-1, BSEN 1455-1 or BSEN 1566-1plastics grade to be appropriate to internal / external exposure. Exposed (external pipework) to be cast iron
new cast aluminium ogee eaves gutter
provisionally new rwp
04.2 Installation to be a primary ventilated stack system designed in accordance with BSEN 12056 and manufacturers specification and recommendations.
extng rwp new svp & boxing
extng bathroom fittings & finishes stripped out and renewed
DF05
new bulkhead to existing alcove to match otherside including continuation of plaster cornice new door to ensuite bathroom
Bathroom Bathroom FF07
door and frame removed and opening infilled
DF09
new partitions to extng bathroom area
Balcony
04.5. Main stacks to be vented to at least 900mm above any opening. To be taken above existing eaves level, and finished with a perforated metal or wire bird cage.
+14.08
Cup'd
extng floor boards to be taken up in this room and floor structure leveled using new joists fixed alongside and stitched with nails to existing, floor to be relaid on completion
DF08
FF08 Up
A
WF02
FF06
DF04
04.4 Min. 32mm dia. traps with 75mm depth of seal to new wash hand basins. Min. 40mm dia. traps with 75mm depth of seal to all sinks, showers and baths. Min. 75mm dia. traps with 50mm depth of seal to all WCs. Min. 40mm pipework to wash hand basin, bath and sink connections.
Bedroom
DF14
new cupboard
A
04.3 Min. 100mm dia. stacks with min. 450mm between invert of drain and lowest connection, with min. 200mm dia. radius curve to connection with invert.
remove extng shelves
05 EXISTING FLAT ROOF TO PORCH/ SINGLE STOREY AREA 05.1 existing parapet to be carefully taken down to roof level, existing stone copings and string courses to be set-aside and reused. 05.2 parapet to be rebuilt in new bricks in a lime mortar and re-using existing stone elements supplemented by repacements in matching stone
WF03
extng door moved
Cup'd
05.3 existing asphalt roof finishes to be scabbled up, carted away and existing roof deck made good and overlaid with 18mm wbp plywood
DF07
FF05
Drawing Room
05.4 joints in ply wood to be prepared to roof system manufacturer's recommendations lay vapour barrier followed by proprietary tapered warm roof insulation to give a max U value of 0.25 W/ m sq/ deg C lay agrement approved high performance roof system with insurance backed guarentee of 30 years
new rwp Up
+14.12
+12.42 DF03 DF06
new shelving to existing alcoves
remove extng wall, insert steel to struct eng spec, box out and reinstate plaster cornice
Up
new lead canopy to back door
WF04
05.5 provide lead cover flashings to roof system manufacturer's details and lead sheet association recommendations at all abutments including , parapet, roof lights and first floor walls of house 06 GLAZING/ GUARDING OF GLAZING 06.1 New glazing details to be submitted to and approved by the conservation officer before proceeding 06.2 replacement windows, or new windows within existing historic elements to be single glazed if required by the conservation officer. Windows, including rooflights not required to be single glazed by the conservation officer shall be double glazed with Low E soft coated glass and 16mm cavity to give a maximum U value of 1.8 W/m sq /deg C 06.3 new or altered roof lights to be glazed with safety glass and guarded to the requirements of approved document N of the building regulations
FF01
DF10
form pier including fluted beading to external angles
extng rwp
Hall
new svp & boxing
+14.12 DF12
Bedroom
New oriel window with curved lead roof
WF05
O
door and frame raised to suit hall floor level
N M L K J I H
WF06
new rwp
FF02
FF09
Bedroom
new rwp
+12.39
DF02
+12.45
DF13
WF07
DF01
extng rwp
G F E D C B A
B
FF03
form new door opening and sloping bulkhead over
Up
new ensuite bathroom
new svp & boxing
extng cupboards removed
remove stair and reinstate floor over this area
B
18/07/08 Bath size changed in FF07. Shower size changed in FF03. Lift rotation changed. Garden wall location change Kennel to be omitted & smaller bins encl. amendments to building inspector's requirements Smaller lift shaft Add column in FF07 boxing New bathroom layout FF03 Proposed fireplace removed, building regs and construction notes added 21/06/07 Reorganise bathroom layout 20/06/07 Add room & door & window nos. 29/05/07 Reshape skylight over the porch & Enlarge lift size 22/05/07 New skylight over the porch, on the balcony 18/05/07 Lift enclosure size 16/05/07 Moving the existing door of the bedroom 09/05/07 Enlarging existing balcony
18/03/08 04/03/08 08/11/07 14/08/07 13/08/07 18/07/07 22/06/07
Rev Date
remove stair and insert floor over this area
Revision
ST ST ST BD ST ST ST ST/BD ST ST ST ST ST ST ST Drawn By
fall
Balcony FF10
Up
fall
extng rwp
C
existing roof to be cut and trimmed and existing raisedskylight to be moved 200mm.
C
new skylight to match extng extend extng flat roof and parapet over porch
fall
lead chute thro parapet
fall
new lead flashing to abutment extng rwp & hopper
07 GUARDING OF ROOF TERRACES 07.1 Guarding of existing roof terraces to be retained as existing. Where terrace level is being increased by addition of warm roof insulation, then the perimeter parapet or balustrade wiill be raised by the same ammount, with the agreement of the conservation officer. 07.2 where terrace level is being altered then it will be adjusted to acheive perimeter guarding complying with approved document K of the building regs
reinstate original door to bedroom from half landing cut and trim extng floor to new blockwork lift enclosure
FF04
remove existing wardrobes and make good WF01
1000
1000 DF11
open up and plaster existing alcoves to each side of chimney breast
lead chute thro parapet
D
new rwp & hopper new lead roof over new bin enclosure
Inkpen Downie Architecture & Design Ltd
new svp & boxing
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk new slate roof
D
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION new rwp
F
E
Regency House garden wall with brick coping detail
FIRST FLOOR PLAN
Project
new cast iron ogee eaves gutter Client
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/12.06.2007 BD/
Checked By / Date
Title
FIRST GROUND FLOOR FLOOR PLAN PLAN D r a w i n g N o.
A/708/C/03 A/708/C/02
R e v N o.
O
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
take down existing partition on this line and construct new partition in 100 x 50mm regularised studwork off steel work inserted into depth of floor to structural engineers specification
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
new steel column for new partition to structural engineers specification
NOTES
F'
F
E
allow for taking down existing ceiling over staircase and landing area to expose existing roof structure and reinstate on completion
extng main stair
WS03
svp
Cupbd
remove existing cupboard
DS04
walk-in shower with 40 trapped waste
Up
remove existing rooflight over and make good finishes
A
32 trapped waste from whb's
WS02
extend and adapt extng landing balustrade
WS04
40 trapped waste from bath
take out existing stair to roof terrace and replace with new spiral stair
strip out finishes sufficient to insert stiffening to roof structure to structural engineers specification and reinstate on completion
SF08
Bathroom
SF05
raised platform to this area at 200mm above floor level
WS08
SF06
Greyfriars North
DS02
strip out extng flat roof area below existing dormer and extend dormer over in cluding flat lead roof with vaulted area and new windows to dormer cheeks and front
DS01
Bedroom +17.74
DS03
WC WS01
Regency House
+17.71
resite existing door and frame, infill existing opening
A
strip out existing bathroom fittings and finishes from this area, insert temporary supports to roof and remove partitions
SF11
SF09
SF07
existing partitions reconfigured in 100 x 50 reglarised sw at 600 max centres with sound absorbant quilt between
SF10
Dressing Area
Light Tube
Cupbd DS05
Wardrobe retain existing fireplace
DS08
svp svp
existing floor cut and trimmed around new block work lift shaft which extends through ceiling over
WS05
+15.12 +15.12
remove existing cupboards form new opening, cut and trim existing floor and insert new steps
infill existing roof access and form new 900 x 600 hinged access hatch
SF04
DS09
new svp
existing hatch
existing bathroom fittings cupboards and partitions stripped out of this area and new partitions constructed of 75 x 50 regularised studwork at 600 mm centres with accoustic absorbant quilt between, sheathed with 9,5mm ply one side for robustness, and 12,5mm plasterboard and skim both sides
LOCATION PLAN 1:500
SF04 Bathroom Bathroom
DS09
new linen cupboard with 4 No slatted shelves of ex 75 x 25mm slats on ex 50 x 50 framing,
B
G
1000 1000
New lift & enclosure 32 connection from whb 100 connection from WC through roof-space
DS07
Up from first floor landing
B Up 980mm
SF01
DS06
SF02
Up 540mm New opening
WS06
SF03 +14.58
16/07/08 11/07/08 15/04/08 26/03/08 05/03/08 19/09/07
M L K J I H
10/09/07 14/08/07 13/08/07 18/07/07 17/07/07 20/06/07
G
12/06/07
F E D C B A
04/06/07 30/05/07 24/05/07 21/05/07 18/05/07 11/05/07
Bathroom SF08 layout amended Spiral staircase & lift positions are changed. SF08 Bathroom layout is changed Railings to roof terrace to be match with existing Balcony to be omitted - WS08 Additional partition wall in SF04 & boxing around the pipes in SF08 Additional Location Plan Cancelation of lift access to dressing room & lift size Railing notes & column for partition New bathroom layout SF04 Note change on SF04 new partitions Add room & door & window nos, building regs and construction notes added. Re-size WC and hall, re-position staircase to the roof (255mm to the south), re-size roof terrace & skylight Enlarge staircase well on to the roof Enlarge lift size & terrace level change Remove proposed window Staircase to the roof Lift enclosure size Removing proposed new window, blocking existing window
Rev Date
Bedroom WS07
T S R P O N
Revision
BD ST ST ST ST ST ST ST ST ST ST ST/BD ST ST ST ST ST ST ST Drawn By
Up
C
C new lintols inserted and existing blind window opened up to match existing
F
SECOND FLOOR PLAN
remove stair and insert floor over this area
F'
TF02
Roof Terrace +21.88
(Lowered by 350mm) Up
Storage space
TF01
provide leadlined chutes through existing roof space to discharge over roof slope below provide removeable protective grille at terrace outlet
THIRD FLOOR PLAN
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION E
+22.23
Balkerne Passage
Project
remove existing balustrade including reval of lead coping and flashings to terrace surround
A
2 Balkerne House
D
F
retain existing railings
renew lead cladding and coping to vertical side sand top of terrace surround adapt and extend existing metal balustrade panels to provide enclosure to all four sides of terrace
Inkpen Downie Architecture & Design Ltd new svp & boxing
Tel 01206 577 244 arch@inkpendownie.co.uk
D
strip off existing mineralised felt flat roof finish take up existing deck and reform to new level including step, lay new roof finish as specified for porch roof (see drg 708/03)
existing window and cill removed and opening infilled with brickwork
resite & reuse existing railings
Regency House
take down existing roof access enclosure cut and trim existing roof structure to structural engineers sopecification and re-align rear (west) wall of roof terrace to give clearance for new stair
Client
new electrically operated sliding rooflight over stair and storage area to give access to terrace
Cad File
new railings to be match with existing Staircase by specialist manufacturer: 1390mm diameter to give 600mm clear width; 1450mm min. stairwell 22 risers, 190mm = 4180mm - newels: 2 no 89 diam stainless steel poles supporting s/s angle tread brackets - treads: float glass - balustrades: curved and flat 10mm transparent acrylic panels bolted into edge of tread panels - handrail: 42mm diam stainless steel fixed to top of balustrade panel
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/12.06.2007 BD/
Checked By / Date
Title
SECOND GROUND &FLOOR THIRDPLAN FLOOR PLANS D r a w i n g N o.
A/708/C/04 A/708/C/02
R e v N o.
T
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Existing shutters (full height) to be cut in half at upper midrail position
NOTES Contemporary Styled Roof Access Skylight, Electrically Operated. Manufacturer's recommendations and details
Strip out existing roof cover Retain the structure to this point
New bottom rail to top shutter inserted & mouldings adapted (original panel dotted) Upper midrail altered to become top rail of bottom shutter
Retain existing railings
Contemporary Styled Roof Access Skylight, Electrically Operated.
Existing railings
22.23 Hipped slate roof extended to cover glazed bay
22.20
350
TERRACE
New slate cover wall
350
GROUND FLOOR SHUTTER ALTERATIONS 1/20
22.23
New railings to be match with the existing
Retain existing roof and parapet structure
New railings to be match with the existing Retain existing roof and parapet structure
18mm Plywood over the existing joists
Existing railings from other side of terrace resite
Renew lead cladding
Resite & reuse existing railings
Floor of terrace lowered
Decking Protection layer Membrane Rigid insulation Vapour barrier 18mm Plywood
New slate cover wall
Floor of terrace lowered New structure
STORAGE SPACE
22 21 20 19
Retain existing slate roof
21.03
18 17
20.99
Curved lead dormer over central sash
16 15
20.59
14
ROOF SPACE
13
20.20
Retain existing structure
12 11 10
8
Bedroom
New glazed bay enclosure to balcony
New studwork New ceiling partitions Connection with existing roof structure
9
7 6
1445
5 4
Bathroom
3
Lover floor level of former balcony to match internal F.F.L
2
17.74
1
17.41
17.42
Existing roof structure
Retain existing brick wall
ROOF TERRACE SECTION 1/20
New floor Existing floor joists New steel beam to Structural Engineers details and recommendations
Drawing Room
Cup'd
Bedroom
L K J I H G F E D
14.12
13.81
13.30
Existing shutters to be altered. See detail above.
New stairs & balustrade Match with existing balustrade detail in Main Hall
Living Room
04/06/08 15/04/08 26/03/08 05/03/08 13/08/07 17/07/07 13/07/07 29/06/07 04/06/07
C B
Additional notes. Amendments on notes. ST Roof terrace access shape & detail is changed ST Railings to roof terrace to be match with existing ST Balcony to be omitted WS08 ST New glass railings on roof terrace ST Renew lead cladding on terrace roof ST Remove proposed door & retain existing window ST Roof detail & Details and notes on section AA ST Enlarge staircase well on to the roof & Angle change ST on west side of the roof 01/06/07 Change on skylight to the roof & staircase ST 21/05/07 Change on skylight to the roof & staircase ST
A
11/05/07 Change on skylight to the roof
Rev Date
ST
Revision
Drawn By
Kitchen
11.10
Conservatory New cast iron grating cover to cellar light well
9.80
+10.50
10.49
9.92
9.87
Inkpen Downie Architecture & Design Ltd
9.97
2 Balkerne House
Cellar
7.77
Arbitrary Datum 7.00m Arbitrary Datum 7.00m
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk New bi-fold doors
retain existing dwarf wall
Floor level lowered to existing kitchen F.F.L
new heigher ceiling to this area to level with GF03
New timber surround to range recess
New glazed doors within existing window opening through to new conservatory
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
New Floor: Screed 75mm Insulation 75mm Concrede 125mm DPM Hardcore 150mm
CONSTRUCTION Project
Arbitrary Datum 7.00m
Regency House Client
CROSS SECTION A-A
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50/ 1:20 1:50
ST/12.06.2007 BD/
Checked By / Date
Title
CROSS GROUND SECTION FLOOR PLAN A-A D r a w i n g N o.
A/708/C/05 A/708/C/02
R e v N o.
L
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Plaster
NOTES 29
NEW TIMBER STAIRS SECTION 1/10
Tread
38
Wedge
Skirting board
22.23
180
Curved lead roof over arched window
540
180
250
180
250
Existing dormer roof extended over bay
20.99
Existing balcony enclosed to form glazed bay Kingspan Kooltherm Insulated Dry-lining Board under existing rafters 17.74
Strip out the current ceiling finish New insulation & finish under the current rafters
17.42
New timber stairs
+15.12
Bedroom
1880
Hall
Bedroom
2230
Corridor
3300
3300
2320
Steel lintels to structural engineers details
+14.58
Reinstate original door to bedroom from half landing
9.80
9.87
F E D C B A
3410
04/06/08 Notes amended. New flint wall screen to west elev. Cottage SF bedroom roof amended 05/03/08 DG20 to be omitted 13/07/07 New floor insulation thickness to 75mm 02/07/07 Stair detail & Details and notes on section BB 04/06/07 Angle change on west side of the roof 21/05/07 Entrance to the bedroom in Cottage
Rev Date
Elec. cupd
10.50
+9.92
9.92
Garage +9.92
1910
Existing stairs removed
2270
WC
Opening blocked
2210
Hall
Revision
ST ST ST ST ST ST Drawn By
New flint paneling 2250
3350 10.49
Ensuite Bathroom
+12.45
+12.39
Mr Johnson's Study
New door
1980
Bedroom 13.81
2200
+14.14
2480
+14.14
Opening blocked Expose toe of existing foundation and agree support for new leaf of brickwork
+9.91
Inkpen Downie Architecture & Design Ltd 2 Balkerne House New Floor: Screed 75mm Insulation 75mm Concrede 125mm DPM Hardcore 150mm
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
Arbitrary Datum 7.00m Arbitrary Datum 7.00m
Arbitrary Datum 7.00m
Regency House Client
CROSS SECTION B-B
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50/ 1:10 1:50
ST/12.06.2007 BD/
Checked By / Date
Title
CROSS GROUND SECTION FLOOR PLAN B-B D r a w i n g N o.
A/708/C/06 A/708/C/02
R e v N o.
F
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
New skylight to be match with the existing
New roof cover Manufacturer's details and recommendations
Bedroom
New roof structure over the porch
13.83
The hole on the ceiling to be shaped as circle
Existing brickwork
Curved lead roof over arched window
Cloakroom
Existing dormer roof extended over bay
30.6
Ensuite Bathroom
0째
New timber boards fixed to timber structure Match with the brickwork on the left
Porch Opening blocked
Walls in this area to be plastered
Existing balcony enclosed to form glazed bay
PORCH CEILING SECTION 1/20
Casement doors within blind window top section lights corridor
2230
Existing window opening blocked Corridor F.F.L 15.12
Bedroom
Balcony
WG11
Enlarge the existing balcony over the porch 13.83
New window 1980
WG10
Ensuite Bathroom
10.49
9.87
A
18/05/07 Entrance door in porch area is moved
Porch Garage
Drawn By
New door Expose toe of existing foundation and agree support for new leaf of brickwork
+10.01
9.92
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk Existing door to be moved to the new front brick wall Brick wall to be plastered
Arbitrary Datum 7.00m Arbitrary Datum 7.00m
ST
Revision
Opening blocked
+10.11 9.80
New flint paneling
L K J I H G F E D C B
11/08/08 Levels amended for garage & porch. Porch ceiling ST detail amended. 09/06/08 Notes amended. New flint wall screen to west elev. ST Porch ceiling detail amended 14/04/08 Brick garden wall location change ST 05/03/08 DG20 & kennel & covered run to be omitted ST 13/07/07 New floor insulation thickness to 75mm & slab 150mm ST 10/07/07 Timber step in Cloakroom ST 03/07/07 Details and notes on the section CC ST 02/07/07 Porch ceiling detail ST 25/06/07 Roof to Porch & New skylight shape ST 18/06/07 Retain existing window position in entrance area ST 04/06/07 Angle change on west side of the roof ST 22/05/07 New skylight over the porch ST 21/05/07 Wall in porch area is plastered ST
M
Rev Date
New timber step 10.50
+12.45
New floor
1910
3090
Entrance Partitions removed
New skylight
New door to WC
155
3050
Mrs Johnson's Study
New panel to match the door linings
3100
Cloakroom Continuation of railings across entire frontage subject to agreement with neighbours
2170
13.83
N
14.58
New Floor: Screed 75mm Insulation 75mm Concrede 125mm DPM Hardcore 150mm Arbitrary Datum 7.00m
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
Regency House Client
CROSS SECTION C-C
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50/ 1:20 1:50
ST/12.06.2007 BD/
Checked By / Date
Title
CROSS GROUND SECTION FLOOR PLAN C-C D r a w i n g N o.
A/708/C/07 A/708/C/02
R e v N o.
N
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Curved lead roof over arched window
Existing dormer roof extended over bay
Existing balcony enclosed to form glazed bay
Casement doors within blind window top section lights corridor
Take down and rebuild existing brick parapet Use existing bricks in good condition
Existing window opening blocked Corridor F.F.L
New stone coping on whole parapet
15.12
Renew stone 14.58
Enlarge the existing balcony over the porch
13.83
I H G
Existing brick wall
Renew stone
WG08
New brick wall Same pattern with the existing.
WG09
New brick raised pillar
Garage
F E D C B A
09/06/08 Notes amended. Garden wall pillar height change. ST 14/04/08 Height of garden wall changed ST 04/03/08 New sash window to WG01 & Smaller bins encl. & ST DG20 to be omitted 17/08/07 Balcony parapet notes ST 13/07/07 New floor insulation thickness to 75mm & slab 150mm ST 02/07/07 New brickwork on the elevation ST 26/06/07 Retain study window & renew cloakroom window ST 04/06/07 Angle change on west side of the roof ST 01/06/07 215mm brick wall to the garage ST
Rev Date
Revision
Drawn By
Existing pillar
Bins Enclosed +9.89
+9.91
Inkpen Downie Architecture & Design Ltd 2 Balkerne House Wall & railings continued around boundary to match those on south green elevation
New fanlight over street door
New garden wall Remove existing casement window & new sash window to match with the left side original window
Arbitrary Datum 7.00m
New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling
New RWP Match with the left side existing
Existing door to be moved and re-used on the front new brick wall
New Floor: Screed 75mm Insulation 75mm Concrede 125mm DPM Hardcore 150mm
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
Regency House Client
CROSS SECTION D-D
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/12.06.2007 BD/
Checked By / Date
Title
CROSS GROUND SECTION FLOOR PLAN D-D D r a w i n g N o.
A/708/C/08 A/708/C/02
R e v N o.
I
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Existing brick arch
New lintels to engineer's spec. Frame to be match with the other door frames
New casement doors within blind window top section lights corridor
New railings to be match with the existing
For roof space storage area layout see drawing no: A/708/C/16
Existing skylight to be moved 200mm.
G
Use existing stone coping where applicable. Replace damaged coping with matching profile on outside.
Corridor Glazing bar to be at the same level with the existing
Replace old brick coping with new stone coping all the way round parapet
+15.12
New roof cover Manufacturer's details and recommendations
+14.74
kingspan insulated dry-lining board under the rafters
Take down and rebuild existing brick parapet Use existing bricks in good condition
New stone cill 150
Purlin
+13.83
Bathroom & Dressing Area
Purlin
r
Purlin
lift
Pr
inc
ipa
a lR
2301
fte
BOILER KITCHEN
2520
Roof Space
Existing structure
Walk-in shower
Floor Level +17.71
Lift shaft line
+15.12
L I F T
(Some details approximate)
Datum 16.00m
Hall
3300
Bathroom
New door to the bathroom to be match with the existing cupd. door
3290
Corridor Existing skylight to be moved 200mm. +14.74
PARTIAL SECTION G-G
+13.83
S H A F T
2480
New stone cill
Bedroom +14.12
+14.08
Bedroom Lintels to engineer's spec.
New door DG04
New bi-fold doors +12.39
New brick arch
N M L K J I H G F E
11/08/08 26/03/08 04/03/08 17/08/07 13/08/07 13/07/07 02/07/07 26/06/07 12/06/07 04/06/07
Parapet detail changed. Notes amended. ST Railings to roof terrace to be match with existing ST New sash window to WG01 ST Parapet notes on detail & Lift pit cancelation ST New glass railings to roof terrace ST New casement door detail 1/20 & New floor ins. dim. ST Details & notes on section EE ST Re-shape arch on Section GG ST Re-size dressing area and bathroom ST Roof terrace arrangement change ST
D C B A
01/06/07 25/05/07 22/05/07 18/05/07
Partial Section GG & Hole size change on chimney Lift size & hole to the chimney Roof light Lift enclosure size
+10.50
2230 +9.92
Laundry New stairs
Revision
ST ST ST ST Drawn By
3330
3410
WC 2000
Cloakroom
Existing partition 2210
3090
Rev Date
155
Hall
Lintels to engineer's spec.
2320
new floor joists sitting on the existing brick walls
Cloakroom
NEW CASEMENT DOORS SECTION D-D' SECTION 1/20
+17.71
Existing brick arch
Casement doors within blind window top section lights corridor
Bedroom
new DPC
Hall
Kitchen +10.50
+9.92
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Remove existing casement window & new sash window to match with the left side original window
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk New Floor: Screed 75mm Insulation 75mm Concrede 125mm DPM Hardcore 150mm
New Floor: Screed 75mm Insulation 75mm Concrede 125mm DPM Hardcore 150mm
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
Regency House Client
CROSS SECTION E-E
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/12.06.2007 BD/
Checked By / Date
Title
CROSS GROUND SECTION FLOOR PLAN E-E PARTIAL SECTION G-G D r a w i n g N o.
A/708/C/09 A/708/C/02
R e v N o.
N
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Contemporary Styled Roof Access Skylight, Electrically Operated.
645
New railings to be match with the existing
23 22 21 20
Roof Space
retain existing ceiling joists
19 18
New staircase to the roof
17
1968
16 15 14
Purlin
13
Extend and adapt existing landing balustrade
Purlin
7 6 5
Purlin
4
Roof Space
Hall
+17.71
2000
2
New steel beam to Structural Engineers details and recommendations
Remove existing wall
Existing skylight to be moved 200mm.
Hall
Cupboard
+14.74
PARTIAL SECTION F'-F'
+14.12
2300
New trimmers to Structural Engineers details and recommendations
3290
1
Dressing Area
storage
3
+17.71
r
te
af
lR
ipa
inc
Pr
3300
8
Hall
2560
9
new floor joists
1600
4180
New staircase to the roof
10
3300
Bathroom
+14.08
+13.83
New floor joists
2200
3100
Entrance
New bi-fold doors
B A
3410
New fanlight over street door
Partitions removed
H G F E D C
Remove existing wall
2720
Dressing Area
2560
11
3280
12
Hall +10.50
26/03/08 13/08/07 17/07/07 03/07/07 18/06/07 12/06/07
Railings to roof terrace to be match with existing New glass railings to roof terrace Change of notes for staircase Details & notes on section FF and F'F' Retain existing window position in entrance area Re-size WC and hall, re-position staircase to the roof (255mm to the south), re-size roof terrace & skylight 07/06/07 Door to the balcony + window over the entrance door 04/06/07 Roof terrace arrangement change
Rev Date
Revision
ST ST ST ST ST ST ST ST Drawn By
Kitchen +10.50
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
Regency House Client
CROSS SECTION F-F
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/12.06.2007 BD/
Checked By / Date
Title
CROSS GROUND SECTION FLOOR PLAN F-F PARTIAL SECTION F'-F' D r a w i n g N o.
A/708/C/10 A/708/C/02
R e v N o.
I
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
F.F.L
New stone coping on whole parapet
Take down and rebuild existing brick parapet
Renew stone in bad condition
D C B A
28/07/08 Garden railings to be confirmed by client & conservation officer 05/03/08 Balcony to be omitted 16/08/07 Remove garden gate & Renew parapet & Notes 02/07/07 Remove proposed door & retain existing window Revision
Drawn By
900
Rev Date
ST ST ST ST
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Brick plinth & stone coping to match neighbouring property. Cast iron railings above.
SOUTH GREEN ELEVATION
New metal railings Exact design to be confirmed with the client and the conservation officer
Investigate the parapet renew necessary points
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
Regency House Client
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/12.06.2007 BD/
Checked By / Date
Title
SOUTH GROUND GREEN FLOORELEVATION PLAN D r a w i n g N o.
A/708/C/11 A/708/C/02
R e v N o.
D
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
remove haunching and replace missing chimney pots with pots to match existing and in cluding weather proof or gas cowls as appropriate, renew flaubnching on completion
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
CONFIRM COSTS OF ALL ADDITIONAL REPAIR WORK SHOWN HERE AS REV E BEFORE POROCEEDING ON SITE
remove bricks as necessary and remove remnants of mild steel angle window box supports
take down existing shutters and reduce in height to align bottom edge with window cill
remove and rebed loose bricks, rake out and repoint panel between lead flashing and cill level in lime putty mortar to match existing adjacent areas
F.F.L
insert temporary supports as necessary carefully remove brick work around existing cast iron balcony brackets and remove loose rust scale from built-in part of bracket
Take down and rebuild existing brick parapet
New stone coping on whole parapet
coat exposed iron with a proprietary bituminous rust inhibitor and over coating ( submit details of paint to be used before proceeding) replace bricks and harden up round bracket with cement lime sand mortar and slate slips, and point joints in lime putty mortar to match existing on completion note that this procedure should be carried out to a single bracket at a time
900
Renew stone in bad condition
Brick plinth & stone coping to match neighbouring property. Cast iron railings above.
New metal railings Exact design to be confirmed with the client and the conservation officer
Investigate the parapet renew necessary points
SOUTH GREEN ELEVATION o e s
balustrade end to be bracketed and fixed to brickwork with a chemical fixing at handrail level
PLAN OF BALCONY
E
11/09/08 Additional repair work shown.
BD
D
28/07/08 Garden railings to be confirmed by client & conservation officer 05/03/08 Balcony to be omitted 16/08/07 Remove garden gate & Renew parapet & Notes 02/07/07 Remove proposed door & retain existing window
ST ST ST
C B A
Rev Date
joints between balcony slabs built into outerleaf of house wall and spanning between cast-iron brackets
remove later mild-steel bracket repairs including drilling out bolts fitted through stone slabs
line of cast iron brackets below
remove remnants of existing stanchions including cleaning out lead from stone sockets and prepare for new balustrade.
Revision
ST
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
extng rwp
extng rwp
865
carefully emove existing iron railings including removing all fixing keep on site as pattern for new railings and carrt-away on completion
872
Drawing Status
963
fix new railings to match existing in pattern, section size and overall dimensions include chemically fixed brackets to bottom of balusters as detail raillings to be galvanised and then finished in black gloss paint
175 125
remove former cement repairs from existing stonework obtain specialist stone masons recommendations and carry out repairs accordingly using pieced in stone, pinned and resin bonded and plastic repair techniques report/agree extent of repairs before proceeding
3mm flat bar and gusset with split tube upper edge welded to base of balustrade stanchion
CONSTRUCTION
c/s chemical anchor into stone
Regency House
Project
existing slab Client
new balustrade fixed and leaded into socket to match existing
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1:50,1:20 & 1:10 ST/Aug 08
Checked By / Date
BD/
DETAIL AT BALUSTRADE FIXING SOUTH GREEN ELEVATION Title
280
6820 check all dims on site
280
D r a w i n g N o.
R e v N o.
A/708/C/11E Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
New railings to be match with the existing
Strip out boarded gablet, continue plane to main roof, vertical slate cover
purpose designed cowl to mechanical engineers spec.
Existing balcony enclosed with glazed bay
purpose designed cowl to mechanical engineers spec.
+17.71 Floor Level
Provisionally New cast iron gutter
New cast iron gutter
New cast iron gutter New unequal sash window in existing opening New stone cill
+15.12 Floor Level
Remove existing RWP
Clean existing brick face Timber framed double glazing in gable triangle of lean to extension both sides See joinery detail drawings: drawing no: A/708/C/WG08 & 09 New cast iron gutter
Ra
fte
r
Remove existing RWP
New unequal sash window in existing opening
Provisionally Remove existing RWP
N M L K J I H G F E D
kitchen vent metal grill or terracotta air brick
+12.39 Floor Level
C B A
07/07/08 Garage window revised. M&E info added. ST 09/06/08 DG21 to original location ST 04/06/08 New flint wall screen to the cottage. Provisional ST location change of DG21. 09/04/08 Garden wall location change ST 26/03/08 Railings to roof terrace to be match with existing ST 05/03/08 Kennel & DG17 to be omitted ST 05/10/07 Amendments on cottage window heights and positionsST 13/08/07 New glass railings to roof terrace ST 18/07/07 Note change for the roof terrace ST 03/07/07 Remove sunpipes & New RWP and gutters ST 04/06/07 Roof terrace arrangement change & sunpipes ST location change 22/05/07 Parapeth for the roof light & Lift sharf size ST 21/05/07 Angle of the garage roof ST 18/05/07 Conservation sun-pipe system ST
Rev Date
Revision
Drawn By
Red brickwork with coursed pebble flintwork panels
+9.92 Floor Level
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
New RWP boiler flues New lean-to replacement of existing structures Carry on flint paneling on demaged brick wall (Wall details to be approved by the conservation officer before proceeding on site.)
New RWP
New RWP New lead canopy on carved brackets Remove existing RWP
New door opening
extract fan metal grill or terracotta air brick
Existing window blocked
New conservatory: * Painted timber frame * Powdercoated aluminium roof bars & rainwater goods * Double glazing throughout
Provisionally New RWP
Provisionally Remove existing RWP
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
Regency House Client
WEST ELEVATION
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/12.06.2007 BD/
Checked By / Date
Title
WEST GROUND ELEVATION FLOOR PLAN D r a w i n g N o.
A/708/C/12 A/708/C/02
R e v N o.
O
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
purpose designed cowl to mechanical engineers spec.
New cast iron gutter
New oriel window with curved lead roof
purpose designed cowl behind the chimney to mechanical engineers spec. (not visible)
New brick raised pillar
Curved lead roof over arched window Existing pillar Existing dormer roof extended over bay
New red brick garden wall
New lead canopy on carved brackets
Existing balcony enclosed to form glazed bay
SOUTH ELEVATION OF COTTAGE WING O 11/08/08 Garage door width amended. Profiled brick detail changed on both sides of the garage door. Flint panelling finish detail amended on South Elev. N 28/07/08 Garden railings & gate to be confirmed by the client & conservation officer M 03/07/08 Levels changed. Garden railings added. Brick & flint wall to South Elev. M&E info added. L 09/06/08 Red brick garden wall to south elev. K 04/06/08 Height of existing pier on garden wall raised. J 14/04/08 Height of garden wall change I 05/03/08 New sash window to WG01 & DG20 to be omitted H 16/08/07 Garden wall height adjustment G 03/07/07 Rain water pipes & renew gutters F 26/06/07 Retain study window & renew cloakroom window E 04/06/07 Angle change on west side of the roof D 29/05/07 Garage door dimensions & Roof angle to 30째 Lower brick wall to the bins enclosure C 24/05/07 Proposed window removed on South Elevation B 15/05/07 Balcony over the porch, removed window at Cottage. A 09/05/07 Changes on windows, roof access, kennel
Remove existing RWP Casement doors within blind window top section lights corridor
Take down and rebuild existing brick parapet Use existing bricks in good condition
Existing window opening blocked
New cast iron gutter
Corridor F.F.L
New stone coping on whole parapet
15.12
14.58
Enlarge the existing balcony over the porch Natural slate lean-to roof
Rev Date
Revision
ST
ST ST ST ST ST ST ST ST ST ST ST ST ST ST Drawn By
New RWP Match with the left side existing
Renew stone in bad condition
New brick raised pillar
2264
Inkpen Downie Architecture & Design Ltd
+10.01
2 Balkerne House Existing pillar
+9.97
10.01
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Wall & railings continued around boundary to match those on south green elevation
New metal railings and gate Exact design to be confirmed with the client and the conservation officer
New fanlight over street door
NORTH ELEVATION TO LORNE ROAD
remove existing casement window & new sash window to match with the left side original window
Wide board timber door
New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling
Project
Regency House Client
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/12.06.2007 BD/
Checked By / Date
Title
NORTH GROUND & FLOOR SOUTH PLAN ELEVATIONS D r a w i n g N o.
A/708/C/13 A/708/C/02
R e v N o.
O
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.
Outline of existing kennel to be demolished
NOTES
ADJACENT BUILDING
BW Ht 0.72
Slabs
FB
BW Ht1.86
IC CL 9.76 IL 7.21
Unidentified H7
Trellis Ht1.82
0.1Dia.
BRW BRW BW Ht1.80
Existing cupboard & false wall removed
Grass Lawn
Light Well for Basement
New bi-fold panelled doors
Cupboard removed; electrical fuse board relocated under stairs
CPS
IC CL 9.89 IL 9.54
Existing cellar door blocked
Up
0.1Dia.
Up
FLOOR PLAN
Porch
Up
Up
Existing WC partition removed
LOCATION POINT
Up
Wall removed
BW Ht1.80 Slabs
0.1Dia. Window blocked IC CL 9.91 IL 9.65
ADJACENT BUILDING Eaves 13.84
Pump and Gully
Ridge 14.64
New glazed doors within existing window openings
Staircase removed
Crab apple tree (dotted) to be removed
Lean-to removed
External Wall Line BW Ht 0.62
At Higher Level Opening blocked Existing partitions removed
Rev Date
New doorway & steps
Revision
Drawn By
Existing door to be moved to the front
IC CL 9.89 IL 9.57
0.1Dia.
Existing rear wall of cottage removed at G. Floor level. New steel beam over
No. 2 0.1Dia.
Up
IC (Trap)
Up
CL 10.00 IL 9.10
Holly H5
Up Up
TP
0.15Dia.
Eaves 14.74 Ridge 17.66 Drawing Status
FOR COMMENT Project
Regency House
Telegraph Pole Moved
EP
WV
(DEMOLISH) GROUND FLOOR PLAN
WV
Client
Cad File
Mac 7 - 708 Kerbstone
Scale
Drawn By / D a t e
1: 50
ST/04.06.2007 BD/
Checked By / Date
Title
(DEMOLISH) GROUND FLOOR PLAN GROUND FLOOR PLAN D r a w i n g N o.
R e v N o.
A/708/SK/15 A/708/SK/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.
NOTES
Up
D'
FLOOR PLAN LOCATION POINT
Flank / Stack Wall
Roof Space No Safe Access
Sloping Principal Rafter
Sloping Principal Rafter
SECTION D-D'
Purlin
al R
af
te r
Purlin
Sloping Principal Rafter
Sloping Principal Rafter
Sloping Principal Rafter
Purlin
Hatch
ci p
r te af
pa ci in
Approximate Line of Inner Eave Pr in
R al
Pr
in g
ip inc Pr
o Sl
ng pi
r te af lR
Purlin
Sl op
Approximate Line of Inner Eave
(Some details approximate)
Purlin
Purlin
Drawn By
D
Approximate Line of Inner Eave
Revision
Datum 16.00m
Rev Date Up
Drawing Status
FOR COMMENT Project
Regency House Client
ROOF STRUCTURE PLAN
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/04.06.2007 BD/
Checked By / Date
Title
ROOF GROUND STRUCTURE FLOOR PLAN PLAN D r a w i n g N o.
R e v N o.
A/708/SK/14 A/708/SK/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
/ Stack Wall
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
G
NOTES
1000
new lift & enclosure
1000
1010
h =1900mm step up 270mm
Sloping Principal
5200
Purlin
1500
1520
power points
step up 270mm
2150
ceiling mounted compact fluorescent luminance switched by motion detector
1347
Storage
Roof Space
3000
access to the mechanical equipment
infill existing roof access and form new 900 x 600 hinged access hatch
doors to be vertical boarding ledged braced battened
retain existing ceiling joists
3500
917
insulation below the rafters Celotex TB3000 - 40.0mm or similar
900
1010
h =1600mm
insulation between the rafters Celotex GA3000 - 60.0mm or similar provide power for cupboard lighting to be fitted by others
Purlin 1059
1059
Sl op in g
600
1059
Storage
cupboard fit out at later stage by others Pr in ci p
Hatch
new floor joists new water cylinders
Purlin
allow for 38mm dia plain copper tube heating coil with thermostatic control and connected into the heating system
Purlin
Purlin
F
Purlin ipa
lR
af
te
Dressing Area
r
0
inc
144
Pr
1407
PLAN 1 : 20
2020
fter
fter
fter
expansion vessel
Roof Space
storage
+17.71
SECTION FF
1 : 20
retain existing roof structure
New steel beam to Structural Engineers details and recommendations
Remove existing wall
Rev Date
insulation between the rafters Celotex GA3000 60.0mm or similar
Revision
Drawn By
insulation below the rafters Celotex TB3000 40.0mm or similar
provide power for cupboard lighting to be fitted by others
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
cupboard fit out at later stage by others
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION
allow for 38mm dia plain copper tube heating coil with thermostatic control and connected into the heating system
Project
new water cylinders full: 400kg each.
Regency House
Roof Space
insulation 300mm mineral wool 2020
Client
1700
BOILER KITCHEN
storage
lift
Scale
Drawn By / D a t e
Checked By / Date
Mac 7 - 708
1: 20
ST/Jul 08
BD/
Title
Floor Level 270
Cad File
+17.71
ROOF SPACE LAYOUT D r a w i n g N o.
SECTION GG
1 : 20
new floor joists sitting on the existing brick walls
A/708/C/16
R e v N o.
C
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
R2
6
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
5
7
4
8
3
150
NOTES
2
9 20
21
22
19
10
1450
1
150 18 11
TF02
Roof Terrace 17
12
+21.88 +22.23
16
13
(Lowered by 350mm) 14
Storage space
Up
R1
15
level to be agreed
TF01
PLAN
Renew lead cladding
150
100
etain existing roof and parapet structure
TERRACE 952
22.23
1400
120 50
350
200 X
150
127
500
X
22
22
21
21
20
20
580
ROOF SPACE Retain existing structure
19
19 21.03
Roof Space
Rev Date
18
Revision
Drawn By
18 Existing roof structure
17
17
16
193
20.99
16
15
15
14
14
13
13
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
20.20
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
12
12
11
11
Drawing Status
10
10
CONSTRUCTION
9
9
8
8
Project
Bedroom
7
2560
3775 check on site
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Regency House
7 Hall
6
6
5
5
4
4
3
3
2
2
1
1
Client
Cad File
Scale
Drawn By / D a t e
Checked By / Date
Mac 7 - 708
1: 20
ST/Jun 2008
BD/
Title 17.74
2000
ROOF TERRACE ACCESS SYSTEM D r a w i n g N o.
SECTION R1
SECTION R2
R e v N o.
A/708/C/19 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
D2
New skylight to Existing opening this area to be blocked Existing door to be moved to the front
NOTES
On the ceiling: new timber boards fixed to timber structure Match with the brickwork on the left See detail on: A/708/SK/07-J
New floor to this area
Porch +10.11
Red brick
Lead roof min.150
New doorway & steps
Existing stairs to be removed Walls in this area to be plastered
Plaster New brick wall Same pattern with the existing.
New RWP
Bins Enclosed
dimension to be checked on site after the mechanical equipment installation
Remove existing casement window & new sash window to match with the left side original window
New Floor: Natural stone paving 50mm Screed 50mm Concrede 150mm DPM Hardcore 150mm
Manhole removed
D1
Garage D1
+9.97
DPC
+10.01
Quarry tiles floor cover
DPC
+9.97
D3 2320
D3
Garage
min.150
Bins Enclosed
min.150
gas meter & mechanical equipment closure
2454
Wide board timber door
Up
1958
Existing brick wall
New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling
Quarry tiles up to 1000 1000mm on the walls
Cloakroom
New garden wall 1:40 gradient floor Existing brick wall
SECTION D3-D3
Bins
New roof structure over the porch
Corridor
New stone coping all the way round parapet
BINS ENCLOSED PLAN
+15.12 New skylight to be match with the existing
D2 +14.74
New stone coping on whole parapet +14.58 New brick parapet Match with the existing Renew stone in bad condition
170
Enlarge the existing balcony over the porch
+13.83
2480
F E D C B A
12/05/09 additional gutter & downpipe 11/08/08 parapet detail changed & levels changed & bins doors and partitions changed 05/03/08 New sash window to GW01 & Smaller bins encl. 23/08/07 Note change on plan 13/08/07 Floor covers, lintels, additional notes 28/06/07 Roof cover manufacturer's detail
Rev Date
Take down and rebuild existing brick parapet Use existing bricks in good condition
New RWP Match with the left side existing
downpipe alternative position
New brick wall Same pattern with the existing.
ST ST ST ST Drawn By
Bedroom
Circular opening on the ceiling
downpipe prefered position
Revision
ST ST
Lead roof New brick wall Same pattern with the existing.
Existing brick wall
Walls in this area to be plastered
+12.39
Inkpen Downie Architecture & Design Ltd
New brick arch Match with existing
Lead roof min.150
64 126
2 Balkerne House
lintel to structural engineers details
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
Alumasc Heritage Cast Aluminium Rectangular downpipe 72mm x 72mm product code: RW33 New wide board timber doors
1958
New Floor: Natural stone paving 50mm Screed 50mm Concrede 150mm DPM Hardcore 150mm
New Floor: Natural stone paving 50mm Screed 50mm Concrede 150mm DPM Hardcore 150mm +9.97
DPC min.150
1000
Quarry tiles floor cover
min.150
DPC
Quarry tiles up to 1000mm on the walls
Bins Enclosed
Garage
Bins Enclosed
Alumasc Heritage Cast Aluminium Rectangular Shoe 75mm x 75mm +9.97
SECTION D1-D1
Porch
Existing stairs to be removed
Natural stone door threshold
Project
Regency House Client
Elec. Cupd Cad File
Mac 7 - 708 +10.11
Scale
Drawn By / D a t e
1: 20 50
ST/12.06.2007 BD/
Checked By / Date
+10.11 Title
+9.92
BINS GROUND ENCLOSED FLOOR PLAN DETAIL
+10.01
Remove existing casement window & new sash window to match with the left side original window
1:40 gradient floor
Existing door to be moved and re-used on the front new brick wall + Make good
2210
2454
Existing door to be moved and re-used on the front new brick wall
CONSTRUCTION 2020
Plaster
Existing opening to be blocked new door opening height 1960
Alumasc Heritage Cast Aluminium Gutter Victorian Ogee, product code: OG01
existing door opening height 1960
New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling
SECTION D2-D2
New Floor: Natural stone paving 50mm Screed 75mm Insulation 75mm Concrede 125mm DPM Hardcore 150mm
D r a w i n g N o.
A/708/C/20 A/708/C/02
R e v N o.
F
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
F3
PLAN
Entrance F1 The hole on the ceiling to be reshaped as ellipse
1/5
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
New frame Match / continue existing entrance door frame
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
F1
Existing skylight to be moved 200mm.
Mrs Johnson's Study
852
NOTES
Cloakroom
1294
EXISTING DOOR FRAME
NEW WINDOW
New fanlight over street door
1/5
130
SECTION
Up
New lintel to structural engineers details New frame Match with existing entrance door frame
240
F3
1/20
45
60
ENTRANCE PLAN
F2 64
F2
New timber cill Existing door frame
Existing roof structure
Existing skylight to be moved 200mm.
Replace old brick coping with new stone coping all the way round parapet
Balcony
Renew roof cover
Existing skylight to be moved 200mm.
+14.74
Existing concrete steps Take down and rebuild existing brick parapet Use existing bricks in good condition 13.83
+13.83
+13.83 B A
05/03/08 New sash window to GW01 13/08/07 Change on door & window frame details
Rev Date
ST ST
Revision
Drawn By
The hole on the ceiling to be reshaped as ellipse
The hole on the ceiling to be reshaped as ellipse
Inkpen Downie Architecture & Design Ltd
New fanlight over street door
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
3100
3090
3050
3100
Drawing Status
CONSTRUCTION Project
Entrance Entrance
2200
Regency House
Mrs Johnson's Study
Client
Partitions removed
Cloakroom
Partitions removed
Cad File
Mac 7 - 708 +10.50
+10.50
Scale
Drawn By / D a t e
1: 20 50 / 1:5
ST/12.06.2007 BD/
Checked By / Date
Title
ENTRANCE GROUND FLOOR DOORPLAN & WINDOW DETAIL D r a w i n g N o.
A/708/C/21 A/708/C/02
SECTION F1-F1
1/20
ELEVATION F2-F2
1/20
SECTION F3-F3
1/20
R e v N o.
B
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
NEW ORIEL WINDOW DETAIL 1235
Plaster
1370 275
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
DPM
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
1325
820
275
NOTES
Fixed window DPC 264
Fixed windows
135
Cast iron weight for lower sash
째 343
Sash window
Glazing bar
Brick wall Stile of lower sash
PLAN 1:2
1712 642
535
42 106
535
45
PLAN 1:10
28
36
390
5
STRUCTURE PLAN 1:10
Ply formers
Weight for upper sash
Timber cill
Existing brick wall 35mm wide timber lathes
Lintel to structural engineers details
Ply formers Wedge Lead roof cover on sawn timber boarding DPM
93
50mm insulation
Plaster board
124 Lead cover
Ply former 42
Bead Top rail Continue existing roof line
Bead
Ply former
20
45
12
45
20
B A
19/08/08 Joinery details amended 14/08/07 Lead flashing & timber board sizes
Rev Date
Drawn By
45
1380
55
ST ST
Revision
35
Meeting rails
1980
Inkpen Downie Architecture & Design Ltd 2 Balkerne House 20
Ensuite Bathroom
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
45
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
Bottom rail
CONSTRUCTION
95
Project
Ply former
Sill bead
18
Timber cill
Regency House
50mm insulation fixed under ply
Client
66
600
Window board
Ply formers
28
Plaster 146
95 Cad File
WEST SIDE ELEVATION 1:10
SOUTH SIDE ELEVATION 1:10
Mac 7 - 708
Scale
Drawn By / D a t e
1:10 1: 50/ 1:2
ST/12.06.2007 BD/
Checked By / Date
Silicone T i t l e mastic sealant
ORIEL GROUND WINDOW FLOORDETAIL PLAN
Insulation fixed under ply Plaster
SECTION 1:10
SECTION 1:2
Ply former 35mm wide timber lathes
D r a w i n g N o.
A/708/C/22 A/708/C/02
R e v N o.
B
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
100mm insulation & 50mm ventilation gap between ply
REV C Steel T columns
connection detail is to be checked with structural engineer
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
REV C ply formers fixed to the steel column DPC
Casement openable windows
Casement fixed windows Sash windows
75mm insulation in new wall structure
min.150
700
Lover floor level of former balcony to match internal F.F.L
New floor
BALCONY ENCLOSED PLAN 1:20
SECTION 1:20
SOUTH ELEVATION 1:20
REV C timber lintels fixed to the steel column
Breathable sarking membrane
WEST ELEVATION 1:20
New slate roof cover
50mm ventilation gap
REV D 18mm ply formers to be positioned on top of the timber lintels and each side of the fin and through bolted.
Ply formers
Breathable sarking membrane
New slate roof cover
Lead sheet roof cover on 35mm wide timber lathes with penny holes to allow ventilation
Breathable sarking membrane
New roof structure
Ply formers
Cast iron gutter
Cast iron gutter
Lead
Plaster board 150mm insulation between rafters
Bead
Plaster board 150mm insulation between rafters
Vapour barrier Plaster board under rafters
Top rail
Vapour barrier
150 mm insulation
New timber lintel to Structural engineers details
Soffit lining Existing brick wall
100mm rigid insulation
New timber lintel to Structural engineers details
Draft stripping all round the opening lights
Top rail
REV D Form cap to top of the posts with 6mm plate with 6mm fin welded to top of cap. The fin to take 2no 38mm wide x 150mm dp timbers positioned each side of the fin and through bolted.
Stile
Bottom rail Bead Timber cill
MIDDLE SASH WINDOW SECTION 1:5 REV F insulation and boxing to metal T section
Cast iron weight for lower sash Stile of lower sash
Single glazed window
Bead
TYPICAL SASH WINDOW SECTION 1:5
Silicone mastic sealant
New timber beam to Structural engineers details
Plaster board 30mm insulation between battens 75mm insulation between new wall structure
Weight for upper sash
PLAN 1:5
REV D Form Ts using 2no 100x50x8 angles welded back to back
Drawn By
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Bottom rail Drip
Project
Regency House
Timber cill
REV F bull-nose cill section
Slate roof cover
Timber column to structural engineers details
Revision
Top rail
Meeting rails
Timber cill
REV C Steel T column to support the roof, lintels and Existing roof structure ply formers above the sash windows
Rev Date
ST ST ST
Inkpen Downie Architecture & Design Ltd
Bottom rail
Lead flashing
Glazing bar
B A
2 Balkerne House
150
Meeting rails
ST ST
Head
Soffit lining Single glazed window boxing & insulation to metal T section
BD
19/08/08 Joinery details amended 24/07/08 Additional information from the structural engineer re: T columns & lintel junctions 23/07/08 Steel structural column addition to support the roof above sash windows 15/08/07 Lead arch above middle window detail change 13/08/07 150mm insulation on new roof
Bead
DPC
Draft stripping all round the opening lights
09/12/08 insulartion added to metal T section
E D C
Bead
Gutter Diamond expanded metal mesh
F
Client
Cad File
CASEMENT WINDOW SECTION 1:5
Mac 7 - 708
Scale
Drawn By / D a t e
1: 20 50 / 1:5
ST/12.06.2007 BD/
Checked By / Date
Title
BALCONY GROUND FLOOR ENCLOSED PLANDETAIL D r a w i n g N o.
A/708/C/23 A/708/C/02
R e v N o.
F
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
KENNEL DETAIL
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
215
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
36 29
152.5
Neighbour's wall Drainage channel & trap with pull-box inside, accessible to clean
Lead flashing
NOTES 50 Insulation 75mm
C2
Slate roof cover new rwp & gulley
1902.5 900
337.5
Breathable sarking membrane
215
665
215 894
DG27
C1
75 x 150
C1 Kennel GF17
Kennel lined with acoustic insulation. Roof over kennel to be lined with acoustic insulation.
10 Rafter Tilting fillet
Sound Breaker Bars
Acoustic lining H & H Group Hi-Clinic in between frame fixed to the rafters details to manufacturers recommendations Acoustic insulation to manufacturers recommendations
Two layers plaster board
675
Dog flap to manufacturers details
New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling
0
Acoustic insulation to manufacturers recommendations
88
.0
3째
1800
DETAIL
215
DG26
1/5
Cast iron gutter
25x125mm SW fascia board
150
2025
102.5
456
Covered Run GF16
50
Two layers plaster board Head
3779.5
Silicone mastic sealant 25mm rebated al round draft stripping
PLAN
Wide board timber door
1/20 C2
Interior
Exterior
Neighbour's wall Natural slate roof stepped lead flashing with the approval of the neighbour
B A
23/08/07 Floor note change 14/08/07 Lintels & under floor heating
Rev Date
Ra
fte
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling
CO1 1PA
Drawing Status
Project
New wrought iron railings over 150mm brick wall
2000
Regency House Client
Dog flap Drainage channel & trap with pull-box inside, accessible to clean 1:50 gradient slope
200
1000 Quarry tiles up to 1000mm on the walls DPM up to 170mm
Kennel
170
170
1000 170
Quarry tiles up to 1000mm on the walls
Kennel
DPM up to 170mm
Colchester
Fax 01206 563 377 www.inkpendownie.co.uk
CONSTRUCTION
Plaster
Two layers Plasterboard
Dog flap to manufacturers details
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling
Structural frame
Drawn By
r
Acoustic lining H & H Group Hi-Clinic Acoustic lining H & H Group Hi-Clinic
ST ST
Revision
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 20 50 / 1:5
ST/12.06.2007 BD/
Checked By / Date
Title
KENNEL GROUNDDETAIL FLOOR PLAN New Floor: Quarry tiles Screed min 50mm Concrede 150mm DPM Hardcore 150mm
SECTION C1-C1
1/20
New Floor: Quarry tiles Elec. Underfloor Heating in min. 75mm Screed Insulation 75mm Concrede 100mm DPM Hardcore 150mm
SECTION C2-C2
1/20
New Floor: Quarry tiles Elec. Underfloor Heating in min. 75mm Screed Insulation 75mm Concrede 100mm DPM Hardcore 150mm
New Floor: Quarry tiles Screed min 50mm Concrede 150mm DPM Hardcore 150mm
D r a w i n g N o.
A/708/SK/24 A/708/C/02
R e v N o.
B
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
NEW ENTRANCE CANOPY DETAIL
SHUTTER DETAIL
New canopy to existing door DG13
New shutters to existing window WF03
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
132
85 54 89
Existing window
New shutters
316
PLAN 1:10 1344
85
60
160
60
85
WEST ELEVATION 1:10
ELEVATION FROM INSIDE 1:10
Existing brick wall Lead cover
Ply
B A
15/08/07 Canopy size change 14/08/07 Shutter hinge detail & slimmer canopy
Rev Date
ST ST
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 80
Existing window
2 Balkerne House
Balkerne Passage
140
Tel 01206 577 244 arch@inkpendownie.co.uk
2020 30 1512 40 12
CO1 1PA
CONSTRUCTION Project
Regency House
50x140 mm SW 535 575
Client
30x40 mm SW
54
30 28
Colchester
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
610
80
140
40
85
25
Cad File
40
50
52
Mac 7 - 708
132
NORTH ELEVATION 1:10
Scale
Drawn By / D a t e
1:10 1: 50/ 1:5
ST/12.06.2007 BD/
Checked By / Date
Title
Brick wall Plaster Existing door frame
SECTION 1:5
Parliament hinge 100x100
New timber shutters
ENTRANCE GROUND FLOOR CANOPY PLAN DETAIL WINDOW SHUTTER DETAIL D r a w i n g N o.
PLAN 1:5
A/708/C/25 A/708/C/02
R e v N o.
B
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
TYPICAL SHELF DETAIL
GRATING COVER DETAIL
Shelves in rooms: GF01, FF05 (20 shelves in total)
New stainless steel grating cover to cellar light well F. H. Brundle Open Steel Flooring Panels
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
Manufacturers Fixing Details
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
499
151
NOTES
1135
PLAN 1:10 163
30 30
17
30 30
13
559
49
548
151 102
9
PLAN 1:10
SW moulding tongued and grooved + glued to shelf
30 20x30 SW bearers placed + screwed to wall
ELEVATION 1:5
1379
591
SECTION 1:5
1379
7
581
162
581
300
300
PANEL PLAN 1:10
A
04/03/08 Note amendment
Arch crown height = 2440
ST
Revision
Drawn By
1369
1369
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
75
CONSTRUCTION
215
300
Arch springer height = 1890
300
Rev Date
Project
650
556 Additional 1 brick course
Regency House
Manufacturers fixing details Stainless steel panels to be cut to size and shaped to suit the geometry
Existing wall Client
Existing wall
Cad File
Mac 7 - 708 Ground level
Scale
Drawn By / D a t e
1:10 1: 50/ 1:5
ST/12.06.2007 BD/
Checked By / Date
Title in every 1000mm
SECTION 1:10
ELEVATION 1:10
Existing window
SECTION 1:10
SECTION 1:5
TYPICAL GROUNDSHELF FLOORDETAIL PLAN GRATING COVER DETAIL D r a w i n g N o.
A/708/C/26 A/708/C/02
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
Bedroom
+14.58
svp
600
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
new rwp
1980
Ensuite Bathroom
Cupboard +12.45
600 existing floor joists direction
heated towel rails
heated towel rails waste between floor joists
tile these walls to the ceiling tiled ceiling to this area
Garage
majestic 1100mm glass screen
floor mounted pillar supply bath filler centre waste
hudson reed wall shower
32 trapped waste from whb's
boxing for down pipe
Section BB 1:50
40 trapped waste from bath
majestic glass screen
trench heater 205mm wide 125mm deep, 2500mm long size to be confirmed with the mechanical engineer
shower head with pura modern slider kit ref a3212a tiled surface
tiled ceiling
FF03
855
200 new stud wall
+12.45
This drawing is to be read in conjunction with the document: "RH Bathware 20080715 97-2003 version.xls"
towel radiator
vertical boxing for the bath waste
New Ensuite Bathroom
600
Up
waste to be boxed under the ceiling of the garage
Bathroom
extend the boxing to take supply & waste pipes for the basins. create recesses on high level to take shelves & mirror in.
boxing to take the waste pipes in
towel radiator
SF08
2500
600
2210
new svp & boxing
NOTES
SF11
walk-in shower with 40 trapped waste
+17.71
existing floor joists direction
remove stair and insert floor over this area
205
600
900
1700
New Ensuite Bathroom
WC
existing floor joists direction
FF03
tile walls to ceiling
SF07 +17.71
Dressing Area
SF09
Cupboard
+17.71
SF10
tiled ceiling
Rev Date
1400 750
new svp & boxing
700
FF07 +14.08
existing floor joists direction
clear glass shower screen L1400mm x 750mm x H2000mm
whb m WC
waste to be concealed
2 Balkerne House
400
towel radiator
Project
svp
Regency House centre waste floor mounted pillar supply bath filler
WC
GF10
700
Client
Majestic Hinged Glass door LH Hung to fit 900x700 tray
+9.94
cupboard
step into the shower unit
Cad File
Mac 7 - 708
Bathroom
SF04 Up
tile these walls to the ceiling tiled ceiling to this area towel radiator
WC
Checked By / Date
BD/
600
n
105
GF10
Drawn By / D a t e
1:20 / 1:50 ST/July 08
BATHROOM & WC LAYOUTS
existing hatch
Bathroom
Scale
Title
+15.12
existing floor joists direction
FF07
CO1 1PA
CONSTRUCTION
svp
430
Colchester
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
new replica skirting new hatch to the roof space
stub stack
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
retain the existing skirting & box over
all the pipework, waste & supply pipes for this bathroom to remain concealed in the void beneath the floor. towel radiator
Inkpen Downie Architecture & Design Ltd
retain existing fire place
1000
755
Drawn By
70 1000
ceiling mounted shower head
Bathroom
Revision
D r a w i n g N o.
R e v N o.
A/708/C/27
D
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
roo/ng membrane dressed up terrace upstand llead facing on 12mm ply on 100 x50 sw line of 152 x 152 cranked steel below
NOTES
new light /tting locations on the wall opposite side
22
21 580
100 50
19 Roof Space
20
170
20
new light /tting location on the wall
Dimensions to be checked against as built before fabrication of the staircase
18
17
16
15
line of 2No 150 x 50 bolted together and to rear terrace wall
14 13
12
11
10
line of 2No 200x 50 bolted together
9
2560
8
7 Hall
6
5
200
170
1400
4
new terrace wall of 100 x 50mm sw framing with insulation between and 12mm ply sheathing to outer face 12.5mm plasterboard on vapour barrier to inside face
part plan of upstand
3
2
1
elevation of stair 1:50 scale
new light /tting location same location for the opposide side of this wall
150
100
lead 0ashing to lead sheet association recommended details
150 x 50 capping to terrace framing set at existing terrace wall height
new lead 0ashing and facing to lead sheet association recommended details 952
TERRACE
100 x 50 framing with 20mm ply to outside face 2No 200 x 50 bolted together with 20mm ply /xed to outside face
150
plasterboard and skim on 20mm ply sheathing
1400
350
200 high performance roof membrane dressed up terrace wall
150
slatted ipe decking on treated sw bearers
X
line of 152 x 152 crankked steel to each side of roof light shaft
X
vertical section thro side panel of roof light 127
500
lead 0ashing to lead sheet association recommended details
120 50
22
D Nov 08 1:20 plan of stair shown & light /tting positions shown
ST
C Nov 08 1:50 elevation of stair shown
BD
B
Rev Date
tile hanging on battens on Tyvek breather membrane on 12mm ply sheathing on 100x 50mm sw framing with insulation between plasterboard on vapour barrier to inside face
21
Oct 08 line of cranked steel shown
BD
Revision
Drawn By
20
Retain existing structure
lead 0ashing to lead sheet association recommended details
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
new light /ttings on the 0oor, equal distance from the pole.
19
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
18
CONSTRUCTION Project
Existing roof structure
17
Regency House 16
193
ROOF SPACE
200mm wide roo0ight upstand formed of 200 x 50mm sw framing with 20mm ply sheathing /xed to inside face
Client
15
vertical cross-section thro roof light
Cad File
Scale
Drawn By / D a t e
Checked By / Date
Mac7
1:10
BD 08/08
2008
Title
plan of stair 1:20 scale
Terrace access details D r a w i n g N o.
R e v N o.
A/708/C/28
D
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
GROUND FLOOR
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
Door Number
DG01
DG04
Door Description
Entrance door
WC door
DG07
DG08
DG09
DG10
Kitchen door
Cupboard door
Living room door
Conservatory door
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
25 20 12 18 531
15 25 15 30
Entrance architrave under the old fanlight
15
Existing window
35
1070 Approximate dimension
40
2. Ironmongery to conservatory to be in accordance with Hilary Brightman drawing number 05/01/11 with the addition of Chubb security five lever mortice deadlock to each pair of external doors New door
2100 230
1870
530
25
25
1930
25
60
90
690
3280
Floor to ceiling height 3330
810
50
536
NOTES
1. Remove ironmongery from door no: XDS14 see in drawing no: A/708/S/04; and set aside for reuse.
+9.92
180
130
Notes
Retain existing entrance door New fanlight over Match with existing door frame Ironmongery: Retain existing ironmongery. Add new Chubb security 5 lever mortice lock with brass escutcheons. keyed alike to other external doors
Re-use existing door to the hallway from existing laundry (See in drawing no: A/708/S/02, door no:XDG04) Adjust the frame for the new opening on brick wall
Existing screens removed and fielded paneling and architrave to match door linings (DG06) applied to underside of lintel. See drawing 708/C/45
Ironmongery: - reuse existing hinges, latch, knob furniture - supply & fit brass mortice bolt & release (A & H Brass cat no: 1711/1 or similar)
Existing entrance door frame PLAN 1:5
New double doors within existing opening. Match with DG07 Ironmongery: - 2 pairs 100mm brass finial butt hinges - 2 victorian knob bolt locking cat no: 4291/3 - horizontal mortice latch and dead bolt with key operation - 1 facetted glass knob furniture with P.B.base and matching escutcheons. to be supplied by the employer
New double doors within existing opening. See detail drawing no: A/708/C/DG07 Ironmongery: - 2 pairs 100mm brass finial butt hinges - 2 victorian knob bolt locking cat no: 4291/3 - horizontal mortice latch and dead bolt with key operation - 2 facetted glass knob furniture with P.B.base and matching escutcheons to be supplied by the employer
SECTION 1:5
New bi-fold doors. Match with the existing frame detail on the left side wall See drawing number A/708/C/39 for door and ironmongery details.
New glazed double doors within existing window opening Retain existing fan light See detail drawing no: A/708/C/DG10 Ironmongery: - 3 pairs 75mm brass butt hinges - 2 victorian bolts - mortice sash lock to suit narrow style key operation - brass lever furniture and matching escutcheons to be supplied by employer
GROUND FLOOR Door Number
DG11
DG12
DG16
DG17
DG18
DG19
DG20
DG21
DG22
DG23
DG24
DG25
Door Description
Larder door
Kitchen door
Lift door
Laundry door
Laundry door
Door to Garage
Garage door to the garden
Door to garden
Porch door
Bin enclosure doors
Door to bins enclosure
Garage door
dimension to be checked on site after the mechanical equipment installation 1022.5 1030
810
1010
R 1637
2100 1000
1945
2018
1890
1990
New door to kitchen New frame to match DG15 Ironmongery: Use existing door handle and decorative fingerplate from existing door no: XDG12, see in drawing no: A/708/S/02.
New lift door Match with the existing Study Omit this door door (DG15) Ironmongery: - 1 1/2 pairs brass butt hinges - mortice latch - brass knob furniture (1 knob only) to be supplied by employer
Re-use existing door and frame to garden (See in drawing no: A/708/S/02, door no:XDG21) & relocate. Ironmongery: Re-use existing ironmongery
New fire door within existing door opening Jeld-wen Smooth Atherton 1981 x 864 Check against available opening height and report before proceeding. Ironmongery: - 1 1/2 pairs 75mm brass butt hinges - horizontal mortice latch and dead bolt with key operation - brass knob furniture and matching escutcheons to be supplied by employer
GROUND FLOOR
New paneled door and frame to match existing door DG22 and size to suit structural opening. Ironmongery: - 1 1/2 pairs 75mm brass butt hinges - mortice latch - Chubb security 5 lever mortice lock with brass escutcheons. keyed alike to other external doors - 2 mild steel barrel bolts - brass knob furniture to be supplied by employer
Omit this door
FIRST FLOOR
Existing door to be moved and New wide board timber doors re-used on the front new brick wall New brick arch to be built at Ironmongery: - 1 pair galvanised M.S. tee hinges per leaf Ironmongery: - 1 black finish M.S. barrel bolt Re-use existing ironmongery Add new Chubb security 5 lever - 2 no black finish gate latches with ring handles mortice lock with brass escutcheons.keyed alike to other external doors
New wide board timber door New brick arch to be built at Ironmongery: - 1 pair galvanised M.S. tee hinges - 1 black finish M.S. barrel bolt - 2 no black finish gate latches with ring handles
Door Number
DG26
DG27
DG28
DG29
DF08
DF09
DF10
DF11
DF13
DF14
Door Description
Door to garden
Kennel door
Cupboard door
Cupboard door
Cupboard door
Bathroom door
Bedroom door
Lift door
Bathroom door
Cupboard door
70
1120
850
850
1130
20/01/09 - security locks to external doors added - locking deadbolts to new door latches added DG07, DG08, DG10, DG19 and DF10
BD
J
9/12/08
BD
860
250
Sloping 100
Floor to ceiling
1926
110 1820
220
6/11/08
G
15/08/08 Omitted doors: DG11, DG17, DG20 ST Additional notes: DG07, DG08, DS08 Size/design change: DG09, DG10, DG24, DG25, DG26 Ironmongery information added 14/04/08 DG26 size changed ST 04/03/08 DG27 & DG20 & DG17 to be omitted ST DG28 to be revised 17/08/07 No change on DF12 & DF09 Lift door cancelation ST 18/07/07 Re-use some existing doors & additional door details ST 03/07/07 New fire door (DG19) & Renew conservatory door ST 29/06/07 New kitchen door to the conservatory ST
F E
concealed cupboard
D C B A
Rev Date
Revision
BD
Drawn By
timber shelf
80
200
210
200
310
1880
1980
2116
2200
2065
2200
2065
2065
2200
100 220
105
490
220
2210
Floor to ceiling
3245 2200
135
DF14, DS04, DS05 omitted, DG18 amended, DG21 amended to replacement door, DS09 cut for heater ironmongery to be supplied by employer noted garage door by specialist supplier noted
H
930 710
100
Ironmongery: - 1 pair brass butt hinges per leaf - 2 brass ball catchers per leaf - 1 brass cupboard knob furniture per leaf supplied by the employer
Omit this door
1120
840
New door to wardrobe in Cloakroom New wide board timber door New brick arch to be built at Ironmongery: - 1 pair galvanised M.S. tee hinges - 1 black finish M.S. barrel bolt - 2 no black finish gate latches with ring handles
985 715 140
780
New partition
110
Notes
K
489
140
1224
This door and ironmongery to be omitted and door by specialist as AI number 15
ceiling
Omit this door
760
1990
2170
Notes
Approximate height of the current opening
810
Re-use existing door to old laundry (See in drawing no: A/708/S/02, door no:XDG29)
Current door moved
Ironmongery: Re-use existing ironmongery
Ironmongery: Re-use existing ironmongery
Reinstate original door to bedroom from half landing New door to the bathroom to be Match with the First Floor Bedroom door match with the existing cupd. door Ironmongery: Ironmongery: - 1 1/2 pairs 75mm brass butt hinges - 1 1/2 pairs 75mm brass butt hinges - mortice latch - horizontal mortice latch and dead bolt with key - glass knob furniture supplied by operation the employer - brass knob furniture and matching - brass mortice bolt & release escutcheons to be supplied by employer - mirror finger plate supplied by the employer
Re-use existing door to bedroom / relocate Ironmongery: Re-use existing ironmongery
Re-use existing door to first floor bedroom in cottage (See in drawing no: A/708/S/03, door no:XDF10) New frame to match with the existing Second Floor Bedroom door (DS01) Ironmongery: Re-use existing ironmongery
This door and frame to be omitted and cupboard to be carried out by paneling specialist
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION
SECOND FLOOR
Project
Door Number
DS01
DS02
DS03
DS04/ DS05
DS06
DS07
DS08
DS09
Door Description
Main bedroom door
Bathroom door
WC door
Bathroom cupboard/ drawer unit
Bedroom door
Bathroom door
Lift door
Cupboard door
Regency House Client
760 ceiling
760
Sloping
810
architrave by contractor to match remaining areas
835
850
850
Cad File
Notes
Door repositioned to enable spiral staircase to be positioned to allow sufficient headroom over main stair Add paneled lining to match door leaf and to suit wall thickness. Ironmongery: Re-use existing ironmongery
Ironmongery: Re-use existing ironmongery
Re-use existing second floor This door and frame to be omitted and Re-use existing WC door (See in small bedroom door and frame drawer units to be by paneling specialist,drawing no: A/708/S/04, door no:XDS06) (See in drawing no: A/708/S/04, architrave by main contractor New door frame door no:XDS02) Ironmongery: Ironmongery: - Re-use existing ironmongery Re-use existing ironmongery - add brass mortice bolt & release
Drawn By / D a t e
1: 50
ST/21.06.2007 BD/
Checked By / Date
DOOR FINISHES SCHEDULE SCHEDULE line of cupboard plinth behind cut opening in front of kick space heater grille
Re-use existing bathroom door and frame in second floor (See in drawing no: A/708/S/04, door no:XDS04)
Scale
Title 1850
DS04 opening width set out to suit towel rail
1850
1850
Mac 7 - 708 2320
1990
1990
1990
1850
135
Floor to ceiling
1800
drawer unit by paneling specialist
New bathroom door Match with the existing old WC door Ironmongery: - 1 1/2 pairs 75mm brass butt hinges - mortice latch - brass knob furniture supplied by employer - brass mortice bolt & release
New double doors New lift door Match with the Bathroom door DS07 Match with the existing WC door Ironmongery: Check dimensions on site before proceeding. - 2 pairs 75mm brass butt hinges Ironmongery: - 2 brass cupboard knobs suppled by - 1 1/2 pairs brass butt hinges the employer - mortice latch - 2 brass ball catchers per leaf - brass knob furniture (1 knob only) by employer
D r a w i n g N o.
A/708/C/30 A/708/C/02
R e v N o.
K
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Internal Finishes Schedule
Ground Floor
Number
Living Room
GF01
Landing
GF02
Kitchen
GF03
Conservatory
GF04
Entrance Hall
GF05
Main Entrance Hall
GF06
Mr Johnson's Study
GF07
Mrs Johnson's Study
GF08
Laundry
GF09
WC
GF10
Hall
GF11
Cloakroom
GF12
Walls
Ceilings
Plaster mouldings & picture rail
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- match existing ceiling moulding and continue round kitchen end of room - decorate as ceilings
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - 450 x 450 ceramic tiles on new concrete floor - wash down, sand, fill and make good extng with sand/ cement screed finish - prime exposed areas and apply 1 undercoat - include, taking off, refixing and piecing in new and 2 coats of eggshell paint s.w skirtings to match existing - sand down between coats
- 4 courses 100 x100 ceramic wall tiles to all kitchen work tops and to inside of fire place alcove around aga
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - 450 x 450 ceramic tiles on new concrete floor - wash down, sand, fill and make good extng with sand/ cement screed finish - prime exposed areas and apply 1 undercoat - include new s.w skirtings to match existing and 2 coats of eggshell paint kitchen area to existing solid walls - sand down between coats
- knot stop & prime all conservatory woodwork - wash down, sand, fill and make good - prime exposed areas and apply 1 undercoat and 2 coats of oil based paint - sand down between coats - prepare & paint extng staircase and balustrade, one undercoat and two eggshell - 2 coats clear eggshell laquer to handrail and treads
- strip existing coverings where applicable - rake out, fill and smooth cracks - one mist coat to new plaster - 2 coats of matt emulsion
- strip existing coverings where applicable - rake out, fill and smooth cracks - one mist coat to new plaster - 2 coats of matt emulsion
- retain existing floor boards - Oak Versailles Parquet panel floor by specialist on 9mm WBP plywood
- decorate new shelving to alcoves - knot stop & prime all new timber - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- retain existing floor boards - Oak Versailles Parquet panel floor by specialist on 9mm WBP plywood
- paint spindles to landing/ stair balustrade, and stair strings, 1primer, one undercoat and two eggshell - 2 coats clear eggshell laquer to handrail and treads
- remove existing moulding where wall removed to GF 06, match moulding and form new angles and piece in new lengths as necessary - decorate as ceilings
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- remove existing moulding where wall removed to GF 05, match moulding and form new angles and piece in new lengths as necessary - remove picture rail - decorate as ceilings
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - retain existing floor boards - wash down, sand, fill and make good extng - Oak Versailles Parquet panel floor by - prime exposed areas and apply 1 undercoat specialist on 9mm WBP plywood and 2 coats of eggshell paint - sand down between coats
include: - new ceiling with oval opening to rooflight to entrance porch incl decorations to timber lantern - paneled lining to u/s of beam where screens removed
- strip existing coverings where applicable - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion,
- match extng picture rail and continue across new dividing wall - decorate as ceilings
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - retain existing floor boards - wash down, sand, fill and make good extng - reclaimed oak boards by specialist on - prime exposed areas and apply 1 undercoat 9mm WBP plywood and 2 coats of eggshell paint - sand down between coats
- remove existing pelmets - remove gas fired back- boiler and fireplace, take delivery from employer and fit new fireplace to existing surround
- strip existing coverings where applicable - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion,
- match extng picture rail and continue across new dividing wall - decorate as ceilings
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- remove existing pelmets
- strip existing coverings where applicable - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion,
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - 450 x 450 ceramic tiles on new concrete floor - wash down, sand, fill and make good extng with sand/ cement screed finish - prime exposed areas and apply 1 undercoat - include new s.w skirtings to match existing and 2 coats of eggshell paint - sand down between coats
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- strip existing coverings where applicable - rake out, fill and smooth cracks - make good where wall removed - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - make good plaster after alteration work - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion,
- strip existing coverings where applicable - make good where wall removed - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - make good plaster after alteration work - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion,
- strip existing coverings where applicable - plaster after alteration work - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - plaster after alteration work - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - make good plaster after alteration work - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - make good plaster after alteration work - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - plaster after alteration work - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - make good plaster after alteration work - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - rake out and plaster new & existing brickwork - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion,
- strip existing coverings where applicable - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion,
n/a
- new sand cement screed - reclaimed oak boards by specialist on two layers 9mm WBP plywood
- retain existing floor boards - reclaimed oak boards by specialist on 9mm WBP plywood
- new sand cement screed - reclaimed oak boards by specialist on two layers 9mm WBP plywood
- form hardwood steps from cloak room to match floor
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- 450 x 450 ceramic tiles on new concrete floor - knot stop & prime all new timber - wash down, sand, fill and make good extng with sand/ cement screed finish - prime exposed areas and apply 1 undercoat - include new s.w skirtings to match existing and 2 coats of eggshell paint - sand down between coats
- strip existing coverings where applicable - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion,
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- new sand cement screed - knot stop & prime all new timber - wash down, sand, fill and make good extng - reclaimed oak boards by specialist on two - prime exposed areas and apply 1 undercoat layers 9mm WBP plywood and 2 coats of eggshell paint - sand down between coats
- strip out existing kitchen fittings, shelving etc, strip off tiled wall finishes
- new plasterboard ceiling including stepped detail as drg 708/07 skim coat finish - include circular opening to roof lantern - apply one mist coat, 2 coats of matt emulsion,
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - 450 x 450 ceramic tiles on new concrete floor - wash down, sand, fill and make good extng with sand/ cement screed finish - prime exposed areas and apply 1 undercoat - include new s.w skirtings to match existing and 2 coats of eggshell paint - sand down between coats
- include decorations to roof lantern
GF13
Garage
GF14
- strip existing coverings where applicable - plaster after alteration work - rake out, fill and smooth cracks apply one mist coat, 2 coats of matt emulsion,
- new plasterboard ceiling to give 1hr fire resistance skim coat finish - apply one mist coat, 2 coats of matt emulsion,
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
Bins Enclosure
GF15
- fairfaced brickwork generally, line inside of bin-store with 100 x 100 quarry tiles up to 1000 above floor level
- paint underside of bin enclosure roof with proprietary wood-stain opaque finish
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of exterior eggshell paint - sand down between coats
Number
Corridor
SF01
Landing
SF02
Bedroom
SF03
Bathroom
SF04
Hall
SF05
Bedroom
SF06
WC
SF07
Bathroom
SF08
Dressing Area
SF09
Cupboard
SF10 SF11
- strip existing coverings where applicable - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion,
Porch
Room Name
Sundries
- match existing ceiling moulding, make good where disturbed by alterations and continue round new pipe boxing and cupboard alterations - decorate as ceilings
- decorate as ceilings
n/a
Floor Finishes
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- strip existing coverings where applicable - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion,
- rake out and plaster existing brickwork - one mist coat to new plaster - 2 coats of matt emulsion
Skirtings
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- strip existing coverings where applicable - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion,
- strip existing coverings where applicable - strip existing coverings where applicable - remove existing wall tiling - rake out, fill and smooth cracks - make good where cupb'ds removed - one mist coat to new plaster - rake out, fill and smooth cracks - 2 coats of matt emulsion - one mist coat to new plaster - 2 coats of matt emulsion
Doors / frames / architraves/windows/ surrounds/ shutters
Second Floor
Room Name
Internal Finishes Schedule
n/a
- proprietory epoxy floor paint on sand cement screed on new concrete floor slab. - include coved quarry tile skirting
n/a
- Marshalls natural stone paving to external area (Standard Yorkstone Diamond Sawn Paving Colour: Scoutmoor) - quarry tiles to bIns store in cluding coved skirting tile
NOTES
Walls - strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - plaster after alterations - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper, one mist coat, 2 coats matt emulsion, - strip existing coverings where applicable - plaster after alterations - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper, one mist coat, 2 coats matt emulsion, - strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - 2 coats of matt emulsion,
- strip existing coverings where applicable - remove extng timber wainscotting and ceramic tiles - plaster after building alterations - rake out, fill and smooth cracks - 2 coats of matt emulsion, - strip existing coverings where applicable - remove extng timber wainscotting and ceramic tiles - plaster after building alterations - rake out, fill and smooth cracks - 2 coats of matt emulsion, - strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - 2 coats of matt emulsion,
Ceilings
Plaster mouldings & picture rail
Doors / frames / architraves/windows/ surrounds/ shutters
Skirtings
Floor Finishes
Sundries
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- retain existing floor boards and overlay with 3mm plywood to take carpet by employer
- prepare & paint extng staircase and balustrade at change in levels, one undercoat and two eggshell - 2 coats clear eggshell laquer to handrail and treads
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- retain existing floor boards and overlay with 3mm plywood to take carpet by employer
- prepare & paint extng staircase and balustrade at change in levels, one undercoat and two eggshell - 2 coats clear eggshell laquer to handrail and treads
- take down existing ceiling and ceiling joists - line underside of rafters with insulation backed plasterboard, skim coat finish - clean up and expose main timber elements - apply 1 mist coat, two full coats emulsion
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - take up existing floor boards infill stair opening - wash down, sand, fill and make good extng and lay new s.w. tongued & grooved floor, include, - prime exposed areas and apply 1 undercoat taking off, refixing and piecing in new s.w skirtings and 2 coats of eggshell paint to match existing, hardwood threshold - sand down between coats - overlay with 3mm plywood for carpet by employer
- strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - 1 mist coat, 2 coats of matt emulsion,
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- take up existing floor boards - knot stop & prime all new timber - wash down, sand, fill and make good extng - reclaimed oak boards by specialist on one - prime exposed areas and apply 1 undercoat layer of 18mm and one layer 9mm WBP plywood and 2 coats of eggshell paint - sand down between coats
- take delivery and fit new fire surround supplied by employer - prepare and paint new roof access hatch as new joinery generally
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- take up existing floor boards - reclaimed oak boards by specialist on one layer of 18mm and one layer 9mm WBP plywood
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- retain existing floor boards and overlay with 3mm plywood to take carpet by employer include for matching and piecing in new skirting to match existing after building alterations
- prepare & paint extng staircase and balustrade from first floor, one undercoat and two eggshell - 2 coats clear eggshell laquer to handrail and treads - decorate lantern and top landing new spiral stair - include for removal of existing window seat and make good.
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- take up existing floor boards - reclaimed oak boards by specialist on one layer of 18mm and one layer 9mm WBP plywood
- strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - 1 mist coat, 2 coats of matt emulsion,
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- take up existing floor boards - reclaimed oak boards by specialist on one layer of 18mm and one layer 9mm WBP plywood
- strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - 1 mist coat, 2 coats of matt emulsion,
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- take up existing floor boards - reclaimed oak boards by specialist on one layer of 18mm and one layer 9mm WBP plywood
- strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - 1 mist coat, 2 coats of matt emulsion,
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - plaster after building alterations - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion,
- match existing ceiling moulding and picture rail and reinstate after removal of cupboard - decorate as ceilings
n/a
- retain existing floor boards in clude for taking up and relaying as necessary fot alterations - include for matching and piecing in new skirting to match existing after building alterations
External Finishes EXTERNAL JOINERY: Includes doors, windows & shutters, gates, soffits and fascias, slate guards, timber roof lanterns: New timber: - prepare knot and prime to paint manufacturers recommendations - one coat undercoat - two coats gloss Previously painted timber: - wash down, remove all loose or flaking paint and sand down - patch prime bare wood - one coat undercoat - two coats gloss EXTERNAL METALWORK: Includes rainwater goods, gates and railings, support brackets to balconies, shutter catches and stays, brackets for rainwater goods ans slate guards : New metalwork: - degrease prepare prime to paint manufacturers recommendations including, self etching primer to galvanised surfaces - one coat undercoat - two coats gloss Previously painted matalwork: - wash down, remove all loose or flaking paint, chiop away loose rust and clean up with a wire brush and sand down - patch prime bare metal to paint manufacturer's recommendations - one coat undercoat - two coats gloss PAINTED BRICK AND RENDER: Includes area of main entrance porch: : - wash down, remove all loose or flaking paint rake out cracks and fill with lime mortar. - patch coat areas of filling - apply two coats of prorietary, water based breaqthable masonry paint
First Floor
Landing
FF01
Bedroom
FF02
Ensuite Bathroom
FF03
Main Hall
FF04
Drawing Room
FF05
Bedroom
FF06
Bathroom
FF07
Cupboard
FF08
Bedroom
FF09
- strip existing coverings where applicable - rake out, fill and smooth cracks - make good where wall removed - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - plaster after alterations - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper, one mist coat, 2 coats matt emulsion, - strip existing coverings where applicable - plaster after alterations - rake out, fill and smooth cracks - size and line surfaces with 1000 grade lining paper, one mist coat, 2 coats matt emulsion, - strip existing coverings where applicable - rake out, fill and smooth cracks - make good where wall removed - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - rake out, fill and smooth cracks - plaster former door opening - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - rake out, fill and smooth cracks - plaster after alterations - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable incl remove extng wall tiles - rake out, fill and smooth cracks - plaster after alterations - apply one mist coat, 2 coats of matt emulsion,
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber -new 3mm ply overlay on existing timber flooring - wash down, sand, fill and make good extng to take carpet by employer - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- prepare & paint extng staircase and balustrade, one undercoat and two eggshell - 2 coats clear eggshell laquer to handrail and treads
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber -new 3mm ply overlay on existing timber flooring - wash down, sand, fill and make good extng to take carpet by employer - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- take out existing cupboards and shelves and make good - open up former fireplace , take delivery from client and fit new fireplace and fire surround
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- take up existing floor boards - reclaimed oak boards by specialist on one layer of 18mm and one layer 9mm WBP plywood
- remove existing moulding where wall - strip existing coverings where applicable - plasterboard and skim to beam encasement removed to FF 06, match moulding and and piece in new lengths to beam encasement where wall removed - decorate as ceilings - rake out, fill and smooth cracks - size and line surfaces,1000 grade lining paper,one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - decorate as ceilings - rake out, fill and smooth cracks - size and line surfaces,1000 grade lining paper,one mist coat, 2 coats of matt emulsion,
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
-new 3mm ply overlay on existing timber flooring to take carpet by employer - include taking off existing skirtings and renew in section to match FF05
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
-sand down and retain existing floor, -piece in new s.w skirtings where existing opening blocked - seal floor with three coats proprietary polyurethane sealant, satin finish
- decorate new shelving to alcoves - knot stop & prime all new timber - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- strip existing coverings where applicable - match moulding and and piece in new - plasterboard and skim to new bulkhead to lengths around new bulkhead - decorate as ceilings right of chimney breast - rake out, fill and smooth cracks - size and line surfaces,1000 grade lining paper,one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - rake out, fill and smooth cracks - ,one mist coat, 2 coats of matt emulsion,
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
-take up existing floor boards and insert new joists alongside existing to provide level floor, relay existing boards include removing and refixing existing s.w skirtings -new 3mm ply overlay on existing timber flooring to take carpet by employer
- open up former fireplace , take delivery from client and fit new fireplace and fire surround
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - take up existing floor boards - wash down, sand, fill and make good extng - reclaimed oak boards by specialist on one - prime exposed areas and apply 1 undercoat layer of 18mm and one layer 9mm WBP and 2 coats of eggshell paint plywood - sand down between coats
n/a
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
- knot stop & prime all new timber - wash down, sand, fill and make good extng - prime exposed areas and apply 1 undercoat and 2 coats of eggshell paint - sand down between coats
-retain existing floor - knot stop & prime all new timber - wash down, sand, fill and make good extng -new 3mm ply overlay on existing timber - prime exposed areas and apply 1 undercoat flooring to take carpet by employer and 2 coats of eggshell paint - sand down between coats
- remove existing moulding where wall - strip existing coverings where applicable - plasterboard and skim to beam encasement removed to FF 06, match moulding and and piece in new lengths to beam encasement where wall removed - decorate as ceilings - rake out, fill and smooth cracks - size and line surfaces,1000 grade lining paper,one mist coat, 2 coats of matt emulsion, - match ceiling and picture rail mouldings and - strip existing coverings where applicable piece in new lengths to lift shaft and new - plasterboard and skim to new bulkheads bulkheads - rake out, fill and smooth cracks - decorate as ceilings - size and line surfaces,1000 grade lining paper,one mist coat, 2 coats of matt emulsion, - infill former stair opening and line new and exising ceiling area with 12.5mm plasterboard with skim coat finish - apply one mist coat, 2 coats of matt emulsion,
n/a
- strip existing coverings where applicable - strip existing coverings where applicable - rake out, fill and smooth cracks - rake out, fill and smooth cracks - plaster after alterations - ,one mist coat, 2 coats of matt emulsion, - apply one mist coat, 2 coats of matt emulsion, - strip existing coverings where applicable - rake out, fill and smooth cracks - plaster after alterations - size and line surfaces with 1000 grade lining paper and apply one mist coat, 2 coats of matt emulsion,
- strip existing coverings where applicable - decorate as ceilings - rake out, fill and smooth cracks - size and line surfaces,1000 grade lining paper,one mist coat, 2 coats of matt emulsion,
-retain existing floor, -piece in new s.w skirtings wherepartitions altered
C B A
02/09/08 areas of oak floor by specialist shown 04/04/08 GF16 Covered run & GF17 Kennel to be omitted 04/03/08 Amendments to floor on GF01 & GF08
Rev Date
Revision
BD ST ST Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
Regency House Client
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 50
ST/21.06.2007 BD/
Checked By / Date
Title
FINISHES SCHEDULE D r a w i n g N o.
A/708/C/31 A/708/C/02
R e v N o.
C
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Floor Level
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
ew stone cill
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Bedroom
NOTES
New unequal sash window in existing opening r fte Ra
Ensuite Bathroom
+12.39 Floor Level
new skin of brickwork and !int facing tied to existing wall with stainless steel ties at 225mm staggered vertical centres in each brick "pier" and at 900mm horizontal centres in top and bottom brick courses.
Garage new concrete strip approx 300 x 450 at same depth to underside as existing footing
+9.92
+10.01
Floor Level
+9.97
WEST ELEVATION boiler flues
New RWP
n-to of existing res
New lead canopy carved brackets
Remove existing RWP
Carry on flint paneling on demaged brick wall
(Wall details to be approved by the conservation officer before proceeding on site.)
Existing window blocked
approx depth extng foundation
SECTION FOR FLINT WALL PANELLING
extract fan metal grill or terracotta air brick
New door opening
SECTION THROUGH NEW GARAGE WINDOW Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
Regency House
GARAGE CORNER PLAN
Client
Cad File
3D CORNER DETAIL
Mac 7 - 708
Scale
Drawn By / D a t e
Checked By / Date
1:20
ST/Aug 08
BD/
Title
225
DAMAGED BRICK WALL FLINT PANEL COVER DETAIL D r a w i n g N o.
R e v N o.
A/708/C/33A Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
WG08 & 09
Garage Windows & Door Details
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
Timber framed double glazing in gable triangle of lean to extension both sides
G1
G3 G7
G7
G2
G2 flint & brick paneling on demaged brick wall (wall details to be approved by the conservation officer before proceeding on site)
lintel to structural engineers spec.
clean existing brick face
144
ft Ra
NOTES
Ra
height to be confirmed on site
44
DETAIL H
er
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
fte
r
All details to be approved by the conservation officer before proceeding on site
Garage GF14 1000
DETAIL A
G1
G5
G4
G5
G4
lead flashing
G1
1700
water tank
DPM
DETAIL B silicone mastic sealant
G2
G2
36
69
WBP ply
DETAIL A
86
DETAIL B
69
G6
cast iron gutter
13
27
G3
lintel to structural engineers spec.
25 15
G6
67
Nicholson Airtrak ventilator
PLAN
SECTION G4
SECTION G5
10
52
DETAIL H
69
55
69
32
SECTION G7
70
DETAIL C
144
75
217
69
25
DETAIL E
DETAIL D
18
Nicholson Airtrak ventilator ventilation gap
Bedroom
lead flashing 75
69
P.C.Henderson round the corner straight sliding top hung timber door
25
+14.58
DETAIL F breathable sarking membrane eg. Kingspan nilvent
G1
G2
DETAIL G
25
10
slate roof cover
insulation
DETAIL C
Ra
DETAIL G
fte
r Rev Date
Revision
Drawn By
rafter to structural engineers spec. water tank to take 1000 litres of water
28째
1000
Ensuite Bathroom Inkpen Downie Architecture & Design Ltd +12.45
DETAIL D 1000
DETAIL E
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR COMMENT Project
raised door head height to suit
Regency House
New drainage: ACO MultiDrain MD System or equivalent. 150mm stainless steel grill
Client
2070
2170
2254
Garage
New Floor: Floor slab 125mm Insulation 75mm DPM Hardcore 150mm
+9.97
+10.01
+9.97
DETAIL F
+10.01
existing floor level +9.91
Scale
Drawn By / D a t e
Checked By / Date
Mac 7 - 708
1: 20 1:5
ST/Jun 08
BD/Jun 08
Title
+10.11 +10.01
Cad File
WG08 and 09 GARAGE WINDOWS DG26 JOINERY DETAILS
100
D r a w i n g N o.
SECTION G1
SECTION G2
A/708/C/34 SECTION G6
SECTION G3
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
new inset mh cover
new inset mh cover
new inset mh cover
N
NOTES
Rev Date
new inset mh covers
all existing paving materials in this area to be taken up and natural stone paving set-aside for reuse lay new stone paving to area shown levels to match extng
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION
olls to hips
d roof to h of ndow
Cad File
Mac 7 - 708
Scale
1:25
Title
new slate roof over garage extension
Drawn By / D a t e
Checked By / Date
ST/Sept 08
BD/
BACK GARDEN LAYOUT D r a w i n g N o.
new c.i. gutter
Client
new c.i. gutter
new lead slate for svp cranked over in roof space
new c.i. gutter
Regency House
new inset mh cover
new conservatory
Crab apple tree (dotted) to be removed
Project
R e v N o.
A/708/C/37 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
resite existing existing vertica hanging on bat breathable me cut and trim ex engineers spec continuous lea coping detail to
renew lead val
strip off extng t existing dorme
new lead flash
new c.i. gutter
existing flat roof to be refurbished see drg 708/03
new lead roof to bin-store
new lead slate for svp isting flat roofreform to be back gutter and stepped furbished seeflashing drg 708/03 to existing chimney stack
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
Regency House Client
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
Checked By / Date
1:25
ST/Sept 08
BD/
Title
FRONT GARDEN LAYOUT D r a w i n g N o.
R e v N o.
A/708/C/38 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
g s
renew lead roll to short length of hip
New Diamond Sunpipe
line of existing hip, remodel this area to form vertical abutment with tile hanging at junction to rear roof slope
lead chute outlet from terrace
all existing paving materials in this area be708/04 seetodrg taken up and natural stone paving set-aside for line of extng rear wall of reuse lay new stone paving to area shownterrace levels to match extng
Roof Terrace
new motorised sliding rooflight
remove timber cladding from existing vertical abutment and clad with slate hanging on battens and Tyvek or similar breathable membrane
remove existing roof light make good sarking felt and slates
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
for svp
new c.i. gutter
new lead slatestrip off finishes f extend, re-lay de for svp to side and lay ne to lower sloping s existing lead flat area
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
DG10
Conservatory door
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
new timber architrave
69
New glazed double doors within existing window opening
new plastered surface
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
32
new plastered surface
44
19
59
NOTES
44
94
94
44
32
69
DETAIL A
69
PLAN 1
94
new timber architrave to match with existing
PLAN DETAIL A 1:2 32
DETAIL B
19
94
PLAN DETAIL B 1:2
32
existing timber panel
new timber panel match with existing CHECK DIMENSIONS ON SITE BEFORE PROCEEDING
PLAN 2 D1
new plastered surface cut existing window frame
115
32
new architrave
32
94
32
44
Existing window
PLAN 1
32
44
new timber cill
36
retain existing panel
Rev Date
Revision
Drawn By
3280
retain existing architrave
19
Floor to ceiling height 3330
retain existing timber panel on both sides
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk remove existing window cill
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
PLAN 2
FOR COMMENT New door
2100
Project
Regency House new timber architrave to match with existing
244
Client
new timber panel on both sides to match with existing Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
Checked By / Date
1: 10 1:2
ST/Jun 08
BD/Jun 08
Title
DG10 CONSERVATORY DOOR JOINERY DETAILS D r a w i n g N o.
+9.92
ELEVATION 1:10
R e v N o.
A/708/C/36 SECTION D1 1:10
SECTION DETAIL 1:2
44
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
DG07
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
Kitchen Door
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Hall GF06
135
135
new timber panelling match with existing DG06 CHECK DIMENSIONS ON SITE BEFORE PROCEEDING
PLAN 1:10
Kitchen GF02 existing boxing to be removed
new heigher ceiling level to match with GF03 existing ceiling height 427
427
427
427
new moulding to be match with existing & rest of the room existing moulding to be removed from this section
1511
existing brick wall 135
1241
135
135
new plasterboard bulkhead
new timber door frame to match with existing DG06 frame
new timber door to match with existing DG06
Rev Date
Revision
Drawn By
new timber panelling match with existing DG06 CHECK DIMENSIONS ON SITE BEFORE PROCEEDING
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status 2085
135
dimensions to be checked on site before proceeding
FOR COMMENT Project
110
Regency House Client 110
110
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
Checked By / Date
1: 10
ST/Jun 08
BD/Jun 08
Title
DG07 DOOR TO KITCHEN
220
2220
Tel 01206 577 244 arch@inkpendownie.co.uk
JOINERY DETAILS D r a w i n g N o.
ELEVATION 1:10
SECTION 1:10
R e v N o.
A/708/C/39 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
DG09
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
Living Room Door
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
85
NOTES
GF01
2260 542
85 62
542
62
85
62
Living Room
520
32
44
150
110
32
44
62
62
110
44
architrave to match existing doors
620
new timber panelling match with existing DG06 CHECK DIMENSIONS ON SITE BEFORE PROCEEDING
520
520
542
32
520
542
542
520
620
520
Kitchen
150
110
GF02
62
PLAN 1:10 150
DETAIL 1:5
62
110
32
150
62
44
542
Lever action flush bolt - A & H Brass cat no: 10524/2 or similar.
Confirm the patterns for the hinges with the ironmongery supplier. Glass knob furniture - A & H Brass cat no: 1619 or similar. Rev Date
150
Revision
Drawn By
150
110
Inkpen Downie Architecture & Design Ltd 2 Balkerne House 110
110
88
110
110
Mortice flush handle set - A & H Brass cat no: 4533 or similar.
110
88
110
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
Mortice flush handle set - A & H Brass cat no: 4533 or similar.
FOR COMMENT 220
220
Project
Regency House Client
ELEVATION TO KITCHEN 1:10
SECTION 1:10
ELEVATION TO LIVING ROOM 1:10 Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
Checked By / Date
1: 10
ST/Jun 08
BD/Jun 08
Title
DG09 DOOR TO KITCHEN JOINERY DETAILS D r a w i n g N o.
R e v N o.
A/708/C/39
C
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
B2
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
B4
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
stub stack
B1
NOTES
B1 new elec. B3 cupd
750
B3
+9.94
Up
DG04 PLAN B2
B4
825
808
100
marble upstand
marble top and 100mm high marble upstands on three sides of the wall
C Dec 08
Amended to Peter Bretton dimensions
B Nov 08
towel radiator removed & architrave around the door ST & panelling showed on plan & cupboard door size changed dado height changed & notes added ST
A Oct 08 Rev Date
SECTION B1-B1
SECTION B2-B2
SECTION B3-B3
BD
Revision
Drawn By
SECTION B4-B4
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
Regency House Client
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
Checked By / Date
1:20 / 1:5
ST/Sep 08
BD/
Title
BATHROOM LAYOUTS GF10 D r a w i n g N o.
A/708/C/40
R e v N o.
C
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
Champion Timber & Mouldings tel: 0800 068 2021
65
detail a
new svp & boxing
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
B3 48
B1
panelling mdf
NOTES
architrave around the shower screen & entrance
65
600
600
panelling to move B2 forward to conceal the waste pipe for the basin.
B2
detail e
65
new ensuite bathroom
detail d
detail b FF03
600
B4
+12.45
862
B4 detail d
detail e
tiling
175
detail c
65
900
1700
new s & box
B1
B3
PLAN SECTION B4-B4 F Nov 08 E D C B A
Oct 08 Oct 08 Oct 08 Oct 08 Sept 08
fan location shown on plan & shower moved to take up the thickness for the panelling & additional details panelling added for door reveal notes added panelling style changed panelling style changed panelling style changed
Rev Date
Revision
ST ST ST ST ST ST Drawn By
detail a Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
detail b
CONSTRUCTION Project
Regency House Client
detail c
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
Checked By / Date
1:20 / 1:5
ST/Sep 08
BD/
Title
SECTION B1-B1
SECTION B2-B2
SECTION B3-B3
BATHROOM LAYOUTS FF03 D r a w i n g N o.
A/708/C/41
R e v N o.
F
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
B3
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
B1
NOTES
1400
new svp & boxing
step up
750
tiling detail a
detail b
700
Bathroom FF07 DF09
B4
400
B4
detail a
B2
B2
architrave around the shower screen & entrance dado panelling
detail b
cupboard
DF08
FF08
SECTION B4-B4
Cup'd Up
B3
B1
PLAN
B Oct 08 A Sept 08
ceiling
Sloping
C Nov 08
additional notes & fan location & architrave around the shower unit & concealed cupboard & additional details cupboard size changed spec & size for shower, basin & towelrail changed
Rev Date
Revision
ST ST ST Drawn By
concealed cupboard timber shelf
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
Regency House Client
Cad File
Mac 7 - 708
SECTION B1-B1
SECTION B2-B2
SECTION B3-B3
Scale
Drawn By / D a t e
Checked By / Date
1:20
ST/Sep 08
BD/
Title
BATHROOM LAYOUTS FF07 D r a w i n g N o.
A/708/C/42
R e v N o.
C
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
25mm min vent gap above shower door
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
architrave by paneling specialist
NOTES
cupboard plinth & heater grille behind door
grill
architrave by paneling specialist
kickspace heater
SECTION B2-B2
SECTION B1-B1
existing fire place
SECTION B3-B3 Champion Timber & Mouldings tel: 0800 068 2021
B5
detail a 78
B6
provide panel in paneling for access to plumbing connections size/location to be agreed with plumbing sub-contractor
85
50
85
lift shaft
SECTION B4-B4
70
50
1000
1000
B4
detail a 100
B4
85
DS08
detail b
85
svp
+15.12
50
WS05
detail b
700
D Dec 08
general amendments following site meeting 2nd Dec BD
C Oct 08
new grill under DS09 & partition thickened on back of the shower & shower moved to take up the panelling thickness panelling removed in SF02 & notes added cupboard size reduced
B Oct 08 A Sept 08 Rev Date
Revision
ST
ST ST Drawn By
SF04
Bathroom
DS09
B2
50
B2
85
detail d detail c 600
tiling
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
new 175
SECTION B5-B5
existing hatch
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION
192
DS07
Inkpen Downie Architecture & Design Ltd
+15.12
Project
detail c Regency House
B3t
B3
g
DS06
Up 980mm
SF02
dado
Up 540
panelling
SF01
Client
architrave around the shower door
B1
B1 Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
Checked By / Date
1:20 / 1:5
ST/Sep 08
BD/
Title
WS07
PLAN B6
B5
corridor SF01
BATHROOM LAYOUTS
cut opening in door to match kick space heater grille
SF04 D r a w i n g N o.
detail d
+15.12
SECTION B6-B6
A/708/C/43
R e v N o.
D
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
B4
ng main stair
svp
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
B1
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
600
tiling
SF11
NOTES
980
Cupbd
ceiling
Sloping
detail b
Sloping
DS04
min.500
ceiling
walk-in shower with 40 trapped waste
Up
WS04
32 trapped waste from whb's
cupboard details to match with the dressing room fittings & to be agreed with the client
40 trapped waste from bath
B3
B3
SF08
Cupboard 2500
Bathroom SF05 450 200
+17.71
SECTION B1-B1 B2
B2 75
300
125
75
600
DS02
mirror on both sides of the cupboard doors
SF09 SF10 tile inside the cupboad confirm the tile to be used with the client before proceed
980
800
Cupbd
DS05
1445
Dressing Area
C Oct 08 B Oct 08 A Sept 08
new plan detail for the cupboard & rised platform widened partition next to the shower removed. cupboard doors DS04 & DS05 amended & notes added cupboard size changed & notes added
Rev Date
Revision
ST ST ST Drawn By
Wardrobe
SECTION B2-B2
200
PLAN
detail a 1:5
width of the specified basins to be checked with the client. cupboards width to be match with the width of the basin stands.
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
New lift & Drawing Status
B4
CONSTRUCTION
B1 661
Project
detail a 800
250
625
800
Client
625
Cad File
Mac 7 - 708
check this height in accordance with the height of the taps
Scale
Drawn By / D a t e
Checked By / Date
1:20 / 1:5
ST/Sep 08
BD/
Title
275 Dressing Area 1029
detail b 1:5
position of the cupboards must not be lower than the taps height.
Regency House
BATHROOM LAYOUTS SF08 D r a w i n g N o.
A/708/C/44 SECTION B3-B3
SECTION B4-B4
R e v N o.
C
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
re*ected ceiling plan
NOTES
paneling and moulding to match adjacent door linings 375
38
6 varies 70 - 75
head )xing detail
170
170
50 x 50 hardwood screwed to u/s lintol
305
2100
paneling and moulding to match adjacent door linings
timber Tuscan column by specialist
skirting to match existing
column notched to seat on hardwood screwed to plinth hardwood pro)led at end to match column base
bd
A jan 09 dimensions added head )xing detail amended
plan of base )xing
DG01
varies 2195 - 2200
2100 height of column
section B
elevation to hall
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
50 x 50 hardwood screwed to plinth which is in turn screwed to timber *ooring
Up
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
DG03
DG02
A
CONSTRUCTION
plinth to be produced by column manufacturer
Project
B
400
Regency House hardwood *oor
Client
19
section A
415
base )xing detail
Cad File
Scale
Drawn By / D a t e
Checked By / Date
Mac 7 - 708
1:20
BD/Nov 08
BD/
Title
entrance hall column details
*oor plan
D r a w i n g N o.
R e v N o.
A/708/C/45
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
take down existing brick kennel structure including floor slab and dog run enclosure, make good wall of adjoining structure
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
trough stone by others include electrical connection and water supply line of boundary
line of boundary
NOTES
N
Arrangement of paving provisional to be confirmed before proceeding on the site. 01 REPLACEMENT OF EXISTING PAVING
proposed new flint wall
600
line of boundary
Marshalls natural stone paving Standard Yorkstone Diamond Sawn Paving Colour: Scoutmoor
line of boundary
02 REUSING EXISTING PAVING
retain existing flint wall
adjust existing coping at junction to existing
Extng plinth wall, coping removed, posts and chains removed . Take down brickwork to ground level and rebuild raised to match original Fit new stone coping to match existing Metal railings by specialist
Reuse existing back garden paving on defined areas
03 NEW PAVING
check the fall to the existing drain to determine the level of this area
2000
steps up
New quarry tile paving in bins enclosed to be continue on the walls to 1000mm height
new gulley
600
new inset mh cover
2000
600
proposed new flint wall
600 337.5
renew existing RWP discharge in 100 diam. clay pipework
neighbours wall
215
600
drain new 1:40 100 diam
all existing paving materials in this area to be taken up and natural stone paving set-aside for reuse lay new stone paving to area shown levels to match extng
all existing paving materials in this area to be taken up and natural stone paving set-aside for reuse lay new stone terrace to area shown. with pockets left out for planting to be agreed with the employer, levels to be determined and agreed on site
300
new conservatory
proposed new flint wall
m drain ge new 100 dia isting draina with the ex to connect
Crab apple tree (dotted) to be removed
S1
S1
150
Ă˜ 1400 new 1200mm deep hole for olive tree fill the hole with top soil
all existing paving materials in this area to be taken up and natural stone paving set-aside for reuse lay new stone paving to area shown levels to match extng
450
SECTION S1 S1
new inset mh cover
new 1:40 100 diam drain new inset mh cover
1:10
S2
new rwp & gulley
new rwp & gulley
new inset mh cover
new gulley
Rev Date
Revision
Drawn By
foundation detail for the pergola to structural engineers recommendations
Provisionally cost to be confirmed Remove coping stones. Take down wall to ground level and rebuild. Replace coping as necessary on completion of the brickwork. Install new iron railings. Omit repointing and repair
900
pergola
600
Inkpen Downie Architecture & Design Ltd new rwp & gulley Up
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
S2
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION
new inset mh covers
Project
Regency House
100
Client Ra
225
all existing paving materials in this area to be taken up and natural stone paving set-aside for reuse lay new stone paving to area shown levels to match extng
75 70 75
DETAIL 1:10
fte
r
Cad File
Scale
Drawn By / D a t e
Checked By / Date
Mac 7 - 708
1: 50
ST/Oct 08
BD/
Title
125 x 125 mm timber column
GARDEN PLAN D r a w i n g N o.
50 135
Provisionally cost to be confirmed Take this wall down to pavement level & rebuild. Omit repointing & repairs.
50 x 150 mm timber pergola
175
SITE PLAN
new metal gate and gateway with york-stone threshold with bullnose nosing
150
check and supply maximum slab size available to this area.
R e v N o.
A/708/C/46
metal shoe
SECTION S2
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
GF06
GF06
Adjust back 0ll to hit points of parquet.
EQ Dimension 1
Adjust back 0ll to hit points of parquet.
EQ
EQ Dimension 1
EQ
Rev Date
Cloakroo GF12
Cloakroo GF12
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
C/L of Hall
C/L of Hall
Regency House Client
Up
Up
Cad File
Scale
Drawn By / D a t e
Checked By / Date
Mac 7 - 708
1:20
ST/Dec 08
BD/
Title
entrance hall timber floor pattern for the columns
Floor Plan Alternative -1
Floor Plan Alternative -2
D r a w i n g N o.
R e v N o.
A/708/C/47 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
300
NOTES
225
2100
285
297
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd
300
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
Regency House
400 410
Client
Cad File
Scale
Drawn By / D a t e
Mac 7-708
1:5
BD/jan 2009
Checked By / Date
Title
manufacturers column data D r a w i n g N o.
R e v N o.
A/708/C/48 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
C2
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Hinges for the Porch cupboards to be brass butt cupboard hinges. Knobs to be supplied by the client.
water softener
C1
Porch
C1
Up
+10.11
PORCH M&E CUPBOARD PLAN
softwood framing 25mm blockboard shelves
ledged and braced softwood doors to be painted but hinged light switch power point
power point & light switch
C 25.03.09 Hinges are shown and specified Rev Date
ST
Revision
Drawn By
1695
190
Inkpen Downie Architecture & Design Ltd
recessed led down light by the client
1960
2220
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
water softener
timber framed glass doors with magnetic catches (4ea)
Regency House Client
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
Checked By / Date
1: 10
ST/Feb 09
BD/
Title
GF13 - PORCH 680
SECTION C2
SECTION C1
475
M & E CUPBOARDS D r a w i n g N o.
R e v N o.
A/708/C/49
C
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
C4
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
new doors to match with existing
NOTES
Hinges for the Garage and Cloakroom cupboards to be brass butt cupboard hinges. Use the knobs on the existing doors for the cloakroom cupboards. Supply matching knobs for the new doors.
25mm blockboard on softwood framing 600
C3
25mm blockboard on softwood framing
sliding doors 575
575
existing kitchen doors to be reused
C3
575
Cloakroom
1980
Garage GARAGE M&E CUPBOARD PLAN
CLOAKROOM WARDROBE PLAN
C4 Henderson Double Top sliding door gear or similar solid core door lipped all edges veneer faced for painting
new doors to match existing suspended ceiling 30mm blockboard shelf
580
25mm blockboard upstand
150
10mm x 10mm channel
ventilation grills 300mm x 100mm with approx 50% free area. metal grills to be painted as door
Existing doors from kitchen
side to side hanging rail
1981
950
2120
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION
1060
Project
Regency House
1100
860 sliding doors
3245
4 adjustable shelves inset metal strip peg system
A&H Brass Jedo Flush Pull handle 115mmx42mm
345
C 25.03.09 Additional ventilation grills shown on garage cupboards ST & Hinges and pull handles are shown and specified Rev Date
bottom shelf Client
1980
Cad File
350
Mac 7 - 708
150mm upstand
Scale
Drawn By / D a t e
1: 10 & 1:5 ST/Feb 09
Checked By / Date
BD/
Title
GF12-CLOAKROOM & GF14-GARAGE
1220
CLOAKROOM WARDROBE ELEVATION SECTION C3
SECTION C4
CUPBOARDS D r a w i n g N o.
R e v N o.
A/708/C/50
C
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Up
DF01
600
DF02
extng rwp
extng rwp
900
fall
fall
Up
Balcony
extng rwp & hopper
lead chute thro parapet
50
fall
lead chute thro parapet
fall
FF10
Brundle stainless steel woven mesh or similar. Aperture size to be no larger than 19mm. Tel: 020 8525 7100
Colours for the materials to be agreed with the client.
Inkpen Downie Architecture & Design Ltd 2 Balkerne House Balkerne Passage Tel 01206 577 244 arch@inkpendownie.co.uk
P r o j e c t Regency House D r a w i n g N o. A/708/C/51
Colchester CO1 1PA Fax 01206 563 377 www.inkpendownie.co.uk
Pr o j e c t n o . 708
Client
Scale RevisionC
Title
1:50 First Floor Balcony
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor is responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the project on the site shown. It was prepared for a purpose agreed with the client and will have a commensurate degree of accuracy. It is not a record "as built". This drawing is not intended for use by any other person or for any other purpose than that specified here. Inkpen Downie Architecture & Design Limited accept no liability whatsoever if this drawing is used by any other person or for any other purpose.
Marshalls Conservation textured concrete paving or similar
Pentland Pebbles Decorative Garden Aggregate or similar
C
MAIL CUPBOARD
NEW BALUSTRADE BELOW SPIRAL STAIRCASE
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
25mm oak top with 50mm thick bull nose on the exposed edges
NOTES new post section: - match with the existing central post design. - to have section thicker than the existing post.
25mm blockboard shelves 1000
softwood framing 50 these dimensions to be checked on site
PLAN
new balustrade section to match with existing design new oak handrail to be stained and polished to match with oak flooring. retain existing central post
new door to match with opposite side cupboard doors
900
C
1170
SECTION CC
262
existing opening on brick wall
600
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
100
SECTION AA
top of the cupboard to be in oak to be stained and polished to match with the flooring.
half newel post
B
new balustrade & handrails to match with the existing design
new door to match with the opposite side cupboard doors
check this dimension on site
remove existing post 700
new oak handrail to be stained and polished to match with oak flooring.
A
24.03.09 Additional notes.
Rev Date
ST
Revision
Drawn By
630
3090
25mm blockboard adjustable height shelf
DETAIL SCALE 1:5
wall finish line
new post 100mmx 100mm Inkpen Downie Architecture & Design Ltd
spiral staircase post
2 Balkerne House
Balkerne Passage
Cloakroom
SECTION BB
Tel 01206 577 244 arch@inkpendownie.co.uk
CO1 1PA
Drawing Status
870
B
Colchester
Fax 01206 563 377 www.inkpendownie.co.uk
CONSTRUCTION
810
Project
Regency House 755
450 Client
PLAN A
A
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
Checked By / Date
1: 10
ST/Mar 09
BD/
155
Title
ELEVATION
these dimensions to be checked on site spiral staircase line
Balustrade and Mail Cupboard Details D r a w i n g N o.
R e v N o.
A/708/C/52
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
13.81
13.30
Li 11.10
grill on the floor floor void
10.49
Rev Date
Revision
Drawn By
air brick
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
9.87
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION
9.97
Project
Regency House Client
Cad File
Scale
Drawn By / D a t e
Checked By / Date
Mac 7 - 708
1:10
ST/May 09
BD/
Title
Living Room Ventilation D r a w i n g N o.
A/708/C/53
R e v N o.
C
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
NOTES
new handrail to match existing acrylic sheet to match existing
stainless steel fixings to match existing
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd
ELEVATION
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Draw ing S ta tus
CONSTRUCTION 82.8
Project
Regency House
Client
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 10
ST/May 09
Checked By / Date
BD/May 09
Tit le
Roof Terrace Balustrade Details
PLAN
Plan, Elevation & 3D Views D r a w i n g N o.
R e v N o.
A/708/C/54 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
L1
L2
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
Purlin
Purlin
tie blockwork into new wall to structural engineers specification
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
1000
DG16
1000
opening to suit DG16
GF09
Laundry
550
Roof Space
890
+9.92
L1 +17.71
GROUND FLOOR PLAN
+17.71
All dimensions to be checked on site before proceeding. All lift details to the lift manufacturer's standard details and recommendations.
2325
2325
new blockwork lift shaft
L2
access door
700
2000
Hall GF06
700 50
NOTES
provisional stop level of the lift car be confirmed with the lift manufacturer.
Roof Space
+17.71
+17.71
L1
L2
1000 cut and trim extng floor to new blockwork lift enclosure
1000
DF11
door and frame raised to suit hall floor level
Bathroom
890
2442
tie blockwork into new wall to structural engineers specification
2442
lintel to suit structural engineers detail opening height to suit DS08
Bathroom
DS08 FF02
Hall
+15.12
Bedroom
+14.12
+12.39
L2 new svp
+15.12
400
FF04
L1
& boxing
FIRST FLOOR PLAN
L1
lintel to suit structural engineers detail opening height to suit DF11
Check the alignment of existing wall face before proceeding
2730
+14.12
2730
L2
1000 1000
Rev Date
opening to suit DS08
Bedroom
720
890
DS08
1000
SF04
+12.39
+12.39
2 Balkerne House
Regency House
890
550
2470
2210
2210
720 2470
CO1 1PA
Project
1000
L1
Laundry
Laundry
1000
Client
Cad File
Scale
Drawn By / D a t e
Mac 7 - 708
1: 20
ST/12.06.2007 BD/
Checked By / Date
+9.92
350
pit
pit
350
+9.92
Slop
400
1000
Title
LIFT PLANS & SECTIONS D r a w i n g N o.
A/708/C/LIFT THIRD FLOOR PLAN
Colchester
Fax 01206 563 377 www.inkpendownie.co.uk
CONSTRUCTION
DG16
Roof Space
Balkerne Passage
Drawing Status
lintel to suit structural engineers detail opening height to suit DG16
SECOND FLOOR PLAN
Inkpen Downie Architecture & Design Ltd Tel 01206 577 244 arch@inkpendownie.co.uk
svp
tie blockwork into new wall to structural engineers specification
Drawn By
+15.12
existing floor cut and trimmed around new block work lift shaft which extends through ceiling over
L2
Revision
Bedroom
Bathroom
400
tie blockwork into new wall to structural engineers specification
SECTION L1
SECTION L2
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
GARDEN RAILINGS 69 55 55 55 55
55 81 85 55 55 55
NOTES
Ø 50
130 line of boundary
110 110 110 110 110 110 110 110 110 110 110 110 110 110
130
124 110 110 110
136
Ø 75
line of boundary
1800
adjust existing coping at junction to existing
590
1050
gate
PLAN 1/10
1647
16
47
extng plinth wall, coping removed, posts and chains removed and raised to match original. new stone coping to match existing and metal railings
590
Roof Terrace 1647
+21.88
all existing paving materials in this area to be (Lowered by 350mm) taken up and natural stone paving set-aside for reuse lay new stone paving to area shown levels to match extng
75
1647 16
900
1800
25
75
1800
1360
1055 890
47
extng plinth wall, rake out loose mortar joints, (sound cement mortar may be left in place) and repoint in a lime putty mortar repair/ replace stone coping and install new iron railings
1800
590
1050
590
ELEVATION 1/10 Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
22
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
85.69°
PLAN DETAIL 1/5
R
12 33
Rev Date
130 10 40 55 22
50
dimensions are approximate to be checked on site before proceeding
30
Ø
1800
1800
level difference to be checked on site
16 83
CONSTRUCTION Project
1800
1800
1800
1800
590
1050
590
1800
1100
Regency House
SITE PLAN 1/50
new metal gate and gateway with york-stone threshold with bullnose nosing
Client
extng plinth wall, rake out loose mortar joints, (sound cement mortar may be left in place) and repoint in a lime putty mortar repair/ replace stone coping and install new iron railings
Cad File
Mac 7 - 708
Scale
Drawn By / D a t e
1: 10 / 1:2
ST/12.06.2007 BD/
Checked By / Date
Title
GARDEN RAILINGS DETAIL
REMOVABLE RAILINGS DETAIL
D r a w i n g N o.
A/708/C/Railing
R e v N o.
B
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
Alumasc Heritage cast aluminium gutter, 106 x 54 Victorian Ogee section.
50 x 54 painted timber moulding.
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
timber top
NOTES silicone mastic sealant
lead weathering
ELEVATION WITH DETAIL 3 1:20
ELEVATION WITH DETAIL 7 1:20
ALTERNATIVE DETAIL 3 1:2
DETAIL 5 1:2 ALTERNATIVE DETAIL 7 1:2
sealed double glazing to spec. L10/17
DETAIL 1
1300
Twinfix Glazing rafter gasket system
dimensions to be confirmed on site
5 78
DETAIL 5
DETAIL 6 50 x 54 painted timber moulding.
Alumasc Heritage cast aluminium gutter, 106 x 54 Victorian Ogee section.
DETAIL 3 fixed windows
DETAIL 4 150
dimensions to be confirmed on site
lead roof cover
205
1300
dimensions to be confirmed on site
DETAIL 7
dimensions to be confirmed on site
12mm MDF lining on 38 x 9mm sw battens. 69 x 9mm planted on face of MDF
DETAIL 2 PLAN 1:10
32 x 18mm sw bead John Cullen Cowled Starlight
SECTION 1:10
Rev Date
sealed double glazing to spec. L10/17
Revision
Drawn By
Twinfix Glazing rafter gasket system
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
DETAIL 6 1:2
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION DRAWING Project
Repairs to Fire Damage at Hoole Hall Finchingfield lead flashing Client
Cad File
Scale
Drawn By / D a t e
Mac 7
1:10 1:2
ST Apr 08
Checked By / Date
Title
Roof Lantern Detail
DETAIL 4 1:2 DETAIL 1 1:2
DETAIL 2 1:2
D r a w i n g N o.
R e v N o.
A/713/G/28E Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
' R Q R W V F D O H G L P H Q V L R Q V R I I G U D Z L Q J V 8 V H Z U L W W H Q R U F D O F X O D W H G G L P H Q V L R Q V 7 K H F R Q W U D F W R U L V U H V S R Q V L E O H I R U F K H F N L Q J D O O G L P H Q V L R Q V E H I R U H R U G H U L Q J R U V W D U W L Q J Z R U N
%$7+5220
&83 '
7 K L V G U D Z L Q J K D V E H H Q S U R G X F H G I R U W K H F O L H Q W I R U W K H S U R M H F W R Q W K H V L W H V K R Z Q , W Z D V S U H S D U H G I R U D S X U S R V H D J U H H G Z L W K W K H F O L H Q W D Q G Z L O O K D Y H D F R P P H Q V X U D W H G H J U H H R I D F F X U D F \ , W L V Q R W D U H F R U G DV EXLOW 7 K L V G U D Z L Q J L V Q R W L Q W H Q G H G I R U X V H E \ D Q \ R W K H U S H U V R Q R U I R U D Q \ R W K H U S X U S R V H W K D Q W K D W V S H F L I L H G K H U H , Q N S H Q ' R Z Q L H $ U F K L W H F W X U H ' H V L J Q D F F H S W Q R O L D E L O L W \ Z K D W V R H Y H U L I W K L V G U D Z L Q J L V X V H G E \ D Q \ R W K H U S H U V R Q R U I R U D Q \ R W K H U S X U S R V H
87,/,7<
%('5220
127(6
678'<
%$7+5220 %('5220 .,7&+(1 %('5220 &255,'25
/,9,1* 5220 ',1,1* 5220
(;,67,1* *5281' )/225 3/$1
%('5220
/2&$7,21 3/$1 6&$/(
%('5220
(;,67,1* ),567 )/225 3/$1
G H
U H W H Q V
E W K U R Q R W H U Y R H F
U \ D G Q R X
(;,67,1* 1257+ (/(9$7,21
JDUGHQ
*UH
5HY 'DWH
5HYLVLRQ
'UDZQ %\
DW 7
1
IRUPHU IDUPKRXVH
DG 5R H\
:
( , Q N S H Q ' R Z Q L H $ U F K L W H F W X U H ' H V L J Q / W G
6
%DONHUQH +RXVH %DONHUQH 3DVVDJH &ROFKHVWHU &2 3$
7 H O ) D [ DUFK#LQNSHQGRZQLH FR XN ZZZ LQNSHQGRZQLH FR XN
(;,67,1* 6287+ (/(9$7,21
' U D Z L Q J 6 W D W X V
3/$11,1* 3 U R M H F W
OLVW
Q EDU HG
)LUVW )ORRU ([WHQVLRQ DW .QDYHV )DUPKRXVH 0DUNV 7H\ JH ORG FDUW
IRUPHU IDUP \DUG OLVWH DUQ G E
(;,67,1* ($67 (/(9$7,21
(;,67,1* :(67 (/(9$7,21
U H V F
H
Q W L Q O D Q S
J W
R E K W R X V R
\ D U G X Q
(;,67,1* 6,7( 3/$1 6&$/(
& O L H Q W
& D G ) L O H 6 F D O H 'UDZQ %\ ' D W H &KHFNHG %\ 'DWH
0DF
67 0D\
7 L W O H
([LVWLQJ 3ODQV (OHYDWLRQV 6LWH 3ODQ /RFDWLRQ 3ODQ ' U D Z L Q J 1 R
5 H Y 1 R
$ 3/ & R S \ U L J K W U H V H U Y H G E \ , Q N S H Q ' R Z Q L H $ U F K L W H F W X U H ' H V L J Q 7 K L V G U D Z L Q J V K D O O Q R W E H U H S U R G X F H G R U X V H G Z L W K R X W S U L R U S H U P L V V L R Q R I W K H S D U W Q H U V K L S
' R Q R W V F D O H G L P H Q V L R Q V R I I G U D Z L Q J V 8 V H Z U L W W H Q R U F D O F X O D W H G G L P H Q V L R Q V 7 K H F R Q W U D F W R U L V U H V S R Q V L E O H I R U F K H F N L Q J D O O G L P H Q V L R Q V E H I R U H R U G H U L Q J R U V W D U W L Q J Z R U N
QHZ WZR VWRUH\ H[WHQVLRQ
7 K L V G U D Z L Q J K D V E H H Q S U R G X F H G I R U W K H F O L H Q W I R U W K H S U R M H F W R Q W K H V L W H V K R Z Q , W Z D V S U H S D U H G I R U D S X U S R V H D J U H H G Z L W K W K H F O L H Q W D Q G Z L O O K D Y H D F R P P H Q V X U D W H G H J U H H R I D F F X U D F \ , W L V Q R W D U H F R U G DV EXLOW 7 K L V G U D Z L Q J L V Q R W L Q W H Q G H G I R U X V H E \ D Q \ R W K H U S H U V R Q R U I R U D Q \ R W K H U S X U S R V H W K D Q W K D W V S H F L I L H G K H U H , Q N S H Q ' R Z Q L H $ U F K L W H F W X U H ' H V L J Q D F F H S W Q R O L D E L O L W \ Z K D W V R H Y H U L I W K L V G U D Z L Q J L V X V H G E \ D Q \ R W K H U S H U V R Q R U I R U D Q \ R W K H U S X U S R V H
GHPROLVK H[LVWLQJ VLQJOH VWRUH\ H[WHQVLRQ
7(55$&(
127(6 %('5220 ',1,1* $5($
$
$
$
$
SURSRVHG ILUVW IORRU H[WHQVLRQ ZLOO PHUJH ZLWK WKH EXON RI WKH H[LVWLQJ IDUP KRXVH ZKHQ VHHQ IURP WKH SULYDWH ODQG EHKLQG
'5(66,1*
1(: .,7&+(1 (1 68,7(
1HZ GRRUV
&255,'25 87,/,7<
%('5220
%$7+5220
:&
/,9,1* 5220
/281*(
%('5220
%('5220
9,(: )520 35,9$7( /$1' 72 7+( :(67 352326(' *5281' )/225 3/$1
352326(' ),567 )/225 3/$1 OLQH RI H[LVWLQJ H[WHQVLRQ ZDOO
H[LVWLQJ WLPEHU ZLQGRZ WR EH UHSDLUHG SURSRVHG WZR VWRUH\ H[WHQVLRQ
SURSRVHG WZR VWRUH\ H[WHQVLRQ OLQH RI H[LVWLQJ H[WHQVLRQ URRI
OLQH RI H[LVWLQJ H[WHQVLRQ QHZ ZLQGRZV WR PDWFK ZLWK WKH H[LVWLQJ
DW
ULY
U S YH W R X R LQ ZV YLH
QG OD UP I D H
1(: %('5220
1(: '5(66,1* $5($
Q V
U
G H
U H H W
Y H R F H
E W K U Q R W R
U \ D G Q R X
1(: .,7&+(1
DQG DUP O DWH I LY U S HU XW RY V LQ R YLHZ
352326(' 1257+ (/(9$7,21
SURSRVHG WZR VWRUH\ H[WHQVLRQ
352326(' 6(&7,21 $ $
VODWHV WR PDWFK ZLWK H[LVWLQJ QHZ WLPEHU ZLQGRZV VHFWLRQ GHWDLOV DQG GLPHQVLRQV WR PDWFK ZLWK H[LVWLQJ WLPEHU FODGGLQJ WR PDWFK ZLWK H[LVWLQJ EDUQ EXLOGLQJV
OLQH RI H[LVWLQJ H[WHQVLRQ WHUUDFH
5HYLVLRQ
'UDZQ %\
1
IRUPHU IDUPKRXVH
DG 5R H\
EULFN WR PDWFK ZLWK H[LVWLQJ
5HY 'DWH
DW 7
H[LVWLQJ WLPEHU ZLQGRZV WR EH UHSDLUHG
JDUGHQ
*UH
SURSRVHG WZR VWRUH\ H[WHQVLRQ
:
( , Q N S H Q ' R Z Q L H $ U F K L W H F W X U H ' H V L J Q / W G
6
%DONHUQH +RXVH %DONHUQH 3DVVDJH &ROFKHVWHU &2 3$
7 H O ) D [ DUFK#LQNSHQGRZQLH FR XN ZZZ LQNSHQGRZQLH FR XN
352326(' 6287+ (/(9$7,21
' U D Z L Q J 6 W D W X V
3/$11,1* 3 U R M H F W
Q EDU HG
)LUVW )ORRU ([WHQVLRQ DW
OLVW
.QDYHV )DUPKRXVH 0DUNV 7H\
IRUPHU IDUP \DUG
OLQH RI H[LVWLQJ H[WHQVLRQ
DUQ G E
352326(' ($67 (/(9$7,21
OLVWH
ZHVW HOHYDWLRQ ZLQGRZV WR EH UHSODFHG WR PDWFK ZLWK H[LVWLQJ QHZ ZLQGRZV WR PDWFK ZLWK H[LVWLQJ QHZ GRXEOH GRRUV WR PDWFK ZLWK H[LVWLQJ
JH ORG FDUW
SURSRVHG WZR VWRUH\ H[WHQVLRQ
:(67 (/(9$7,21
V
H H U F
W J Q L W D Q O S Q
\ D U G X Q R E W K X R R V
& O L H Q W
& D G ) L O H 6 F D O H 'UDZQ %\ ' D W H &KHFNHG %\ 'DWH
0DF
67 0D\
7 L W O H
3URSRVHG 3ODQV (OHYDWLRQV 6LWH 3ODQ
352326(' 6,7( 3/$1 6&$/( ' U D Z L Q J 1 R
$ 3/
5 H Y 1 R
&
& R S \ U L J K W U H V H U Y H G E \ , Q N S H Q ' R Z Q L H $ U F K L W H F W X U H ' H V L J Q 7 K L V G U D Z L Q J V K D O O Q R W E H U H S U R G X F H G R U X V H G Z L W K R X W S U L R U S H U P L V V L R Q R I W K H S D U W Q H U V K L S
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
ALL CONTRACTORS TO CHECK DIMENSIONS ON SITE BEFORE COMMENCING ANY WORKS, MANUFACTURE OR CONSTRUCTION
Attic Landing
Bedroom 6
Lobby
Bedroom 7
Master Bedroom 1 Landing Stairway 1 Bedroom 2
Stairway 1
Bedroom 3
Dining Room Kitchen
Lobby
Hall
SECTION AA
Bathroom
Utility Room
SECTION BB
Rev Date
EAST ELEVATION
Revision
Drawn By
NORTH ELEVATION Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
Survey Project
Coggeshall Hall Fire Damage Repairs Client
Cad File
Mac7/912
Scale
Drawn By / D a t e
1:50 / 1:100 ST/May 09
Checked By / Date
BD/
Title
Existing Elevations & Sections D r a w i n g N o.
WEST ELEVATION
SOUTH ELEVATION
R e v N o.
A/912/S/12 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
100 x 25 oak plinth +ush with doors
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
640
NOTES
640 640
- strip out existing paneling and make good and decorate wall behind - hang new access panels on brass piano hinge and open using magnetic touch latches - eggshell paint *nish to spec M60/150
100 x 25 tongued and grooved oak planks to match +ooring on 125 x 25mm oak stiles top and bottom rails
100 x 25 oak plinth +ush with doors
ELEVATION
skirting to match existing
ELEVATION
SECTION 25mm block board door lipped all edges with sw moulding to match adjacent panel doors screwed and glued to face
50
internal dividers and shelves to be 25mm blockboard with oak veneer both faces and solid oak lippings to all edges
INSIDE FACE DOORS
ELEVATION WITH OUT DOORS
100 x 25 tongued and grooved oak planths on 50 x 25 oak battens
640
2100
640
chromed brass hanging rail
20
640
internal light operated by door switch
150
12mm ply on 50 x 50mm sw framing
mirror bonded to 9mm ply *xed between oak stiles & top and bottom rails, lapped and glued at corners
75 x 12 sw facing
magnetic touch latch
PLAN
9mm ply back panel housed in top and gables
1800
GABLE ELEVATION
2400
625
NEW UINDER STAIRS CUPBOARD room 10
100 x 25 sw fascia on 69 x 44 head section A
18.1.2010
Rev Date
cupboard details noted as provisional Revision
Drawn By
32mm block board doors lipped all edges on Henderson top hung sliding door gear
2260
PLAN 18 x sw 44 slats on 18 x 44 bearers
NEW WARDROBE room 12
silver anodised aluminium flush pull
- allow for +at packing this item with a max component size which may be manhandled through restricted opening of D11 - doors to be hung on 2 pairs stainless steel butt hinges per leaf and operated by magnetic touch latch - all oak to be *nished with wax and oil *nish to match oak +oor
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
Construction Project 100 x 25 sw fascia on 69 x 44 head section
Coggeshall Hall
ELEVATION
all surfaces to be eggshell paint *nish to spec M60/150
SECTION
Fire Damage Repairs Client
600
44 x44 timber framing plugged and screwed to wall
25mm lipped block board gables and divider scribed to wall
Cad File
Scale
Drawn By / D a t e
Mac7
1:20/1:5
ST/Sep 09
Checked By / Date
BD/Sep 09
Title
cuboards: under stair, utility &
94 x44 timber frame
master bedroom wardrobe
NEW UTILITY ROOM CUPBOARD room 02
NOTE: CUPBOARD DETAILS ARE PROVISIONAL PENDING EMPLOYER CONFIRMATION
D r a w i n g N o.
A/912/C/38
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Ordnance Survey OS Sitemap
007 6
95m
White House
5
6
25m
003 6
G4
Abberton
7
2 192 65m
2 192 65m
Pond Hay-Tor Montrose The Maltings
Und
Clairmont
G5
Lainston
Sparr owhaw k Cotta ge
B 1025
4
(Covered)
192
3
Reservoir
2
The Willow Grove
The Paddock
1
Hill Crest Cottag es
42.0m
192
Ashwold
4
Austons
191
15
11
Wa v Te er rra ce
White House
1 1
TCB
Shelter
191
42.3m Auston Cott
14 10
Fuschia Cottage
Myrtle Cottage
RO AD ScH hoou osl e
ON 3
s nd
19
26
25m
7
007 6
7
003 6
6
0
20
40
60
80
100
Willo w
Metres
LOCATION PLAN
&R eins tate d
T4
hed
n
ting
nsio
20
olis Dem
Exte Are a rebu to be ilt
New foun raft dati ons
nge
Clo
2 189 35m
5
Sho & W wer C
Gard d o o en r
aks
e anc
A 090714
Lou
Entr
Allotment Gardens
95m
Ash D
C
Bre a R o o kfast m
Rev Date
adjusted position of protective fencing following comments from client Revision
Drawn By
A
Roo m
Inkpen Downie Architecture & Design Ltd
Client Area
ing
Hall
e anc Entr
Rem part ove m od ition wall ern
D
C
Tree Oak
T5
Moonshadow
Crown Copyright 2008
T3
B
Out line
Oak Tree T5 T5
Hill Croft
16
on
without the prior permission of Ordnance Survey.
Fold ing Doo rs
Fold ing Doo rs
ley
40.5m
Exis
B
ty Utili ing
Olde Copse
Reproduction in whole or in part is prohibited
hen Kitc
Fold ing Win dow s Slid
ing
A
Slid
4
Gre
Willo w Willo w
T1
N
ing
190
Ives King:s her Cottag es
42.3m
Def
Slid
e Mulberry Cottag
1.52m RH
T9
Old
LD PE
Walnut Tree Cottage
RETREAT THE
Callir ius Cott age
2
Co ttag e Av
2 189 35m
T2
hid
(PH)
The Spinney
1
Idle Hours
1
Ash
Orc
The Langenhoe Lion
Garage
King:sher Cotts
yla
4
Thornhill Winstree Cott Southern Wood
THE
Glebe Lodge
RETREAT
190
2
LB
1.52m RH
3
House Wash
Bakery Cottage
1
B 1025
Corrie Cottage
Hawthorns
6
Cypress Lodge
7
Din
9000
Root Zone
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
Buildng Regulations 9000
Project
Pro
Sittin gR oom
Sto
re
p. S
S
Extension & Repairs White House, Abberton Contractors Area
Client
Cad File
G2
Store
Workshop
Mac 4
Cart-Lodge Heras fencing to be put in place by the contractor to define and contain the site and to protect the clients demise and the trees which are to be retained. The fencing is to be installed in the position shown on this drawing and in accordance with the specification contained in Arborilcultural Impact Assessment, staked to the ground and including all notices as required by the specification.
Scale
1:2500, 1:500
Checked By / Date
JI July 09
July 09
Title
Location Plan & Site set up D r a w i n g N o.
SITE ENTRANCE
Drawn By / D a t e
A-815-T-01
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
Soakaway No 1 New
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Soakaway No 2 New
Sur Water Ins C No1 New Sur Water Ins C No2 New
NOTES This drawing is to be read in conjunction with the other drawings with the specification and with the Structural Engineers information. The contractor must visit site when pricing the work to ascertain the extent of the works and the attendance required to carry them out.
Sur Water Ins C No3 New Sur Water Ins C No4 New RW Gully No 1 Existing. Leave as is and protect for duration of contract
Manhole No 1 (Extisting Retained)
RW Gully No 2 Existing. Leave as is and protect for duration of contract
Manhole No 2 (Extisting Grubed out)
RW Gully No 3 New
Foul Ins C No1 New
RW Gully No 4 New
Foul Ins C No2 New
RW Gully No 5 New
Foul Ins C No3 New
RW Gully No 6 New
Foul Ins C No4 New
Roding Eye New
Foul Ins C No5 New
Roding Eye New
Foul Ins C No6 New
Telephone Contractor to temporarily re-site the BT box (currently located in the hall) to allow the existing lean-to to be demolished.
Remove redundant maserator pipe
Replace existing down pipe including connections to bathroom. Remove ASBESTOS section of down pipe. Remove redundant pipe Remove and rebuild brick work Services - Drainage - Foul Break out existing gully and fit new connected to new underground rainwater system fit new shoe turned through 90 degrees or turn existing.
Services - Drainage - Surface Water Services - Electrical Services - Gas Services - Water
take off ridge tiles and top five courses of roof tiles and relay bed ridge tiles in lime mortar and fit flashings and soakers to junction with chimney stacks
S with AAV at 1st floor
Rebuild both stacks using new bricks to match the existing brick type profile and bond
Provide 2 new soakaways to position shown min 5000mm from any building. Electrical & Health & Safety The electrical supply is to be maintained throughout the works. It connects from a pole inside the site to the chimney stack. Both chimney stacks are to be taken down to roof level and rebuilt complete with new lead flashings pots cowls and haunching. The contractor is to provide safe access for the works and to replace the electrical connection from the stack to the meter.
provide 150mm dia pipe between soakaways to icrease capacity Soakaway No 1
1 all nf
in
80
Sur Water Ins C No1
VP S&
N
Planting bed framed using 50mm bull nose precast.
GARAGE See engineers details for foundations and slab. See Drawing No ))))))))) for details of superstructure.
Patio formed in paving slabs on 50m deep screed on 150mm deep DOT1 Roding Eye
100 x 200 paviers laid on 60mm bedding screed on well compacted DOT type 1 sub base 150mm thick. F
20mm shingle laid to a depth of 60mm on well compacted DOT type 1 sub base 200mm thick. Pre cast edging set in concrete with hauncing to both sides.
Roding Eye
Sur Water Ins C No3
RW Gully No 2
RW Gully No 4
RWP
RWP WG 04
Sliding Folding Windows
A
A
Washing Machine
Kitchen GF03
Tumble dryer
RW Gully No 1
WG 03
Utility GF04
5
Sliding Folding Doors
Sliding Folding Doors
0 B
Breakfast Room GF02
DG 06
Foul Ins C No1 DG 08 RW Gully No 6 S with AAV at 1st floor
Stairwell Stair 3 GF05
DG 01
un ul R g Fo stin Exi
to be
ed grub
out
Entrance GF01
C Screen 1
2625 check dim at setting out and confirm with CA
Existing Foul Run position to be identified Manhole No 1 (Extisting)
0
Cupboard GF07
Existing Entrance
Contractors electrician to provide an external 13 amp socket to brick pier and cable way & draw for use by the gate specialist.
WG 06
DG 03 WG 05
2
2590
Shower & WC GF09
Plant Room
Stair 1
SS with AAV
WG 01
E
E DG 04
Repair Type 1 Service Distribution. Run pipe work from Boiler room at high level and drop within cupboard under stairs into screed for distribution to extension Install new drainage laid to fall to connect with existing manhole. Allow to install new soil and vent pipe internally and connect to existing WC bath and basin at 1st floor level.
Repair Type 1 Repair Type 1 Sitting Room
Dining Room
Drawn By
RW Gully No 5
Bathroom 2
Hall
Toilet
Revision
Sur Water Ins C No2
RWP
597
327
D
Foul Ins C No4
Cloaks GF08
Rev Date
N
WG 02
D DG 09
Larder GF06
C
DG 02 Garden door
RW Gully No 1
327
Lay pavier margin on 50mm screed bedding on 150mm deep x 600mm wide concrete strip foundation and haunced to both sides.
new S & Vent Pipe to Foul Ins C No2 replace existing taken above roof and terminated with a bird cage. Remake connections to bathroom and to GF toilet.
300
RW
Willow
T2 T2
B
Entrance
Existing Foul manhole to be grubed out.
Foul Ins C No3
Entrance take down brick piers and widen existing entrance. Construct new 327mm sq brick piers (brick as for extension) to 26 courses above GL. Capped in tile creasing with brick on edge. Two main gate piers to be constructed around galvanised steel posts designed to support new 1800mm high timber gates with automatic / remote opening. Hinge plates to post to be sleeved as they pass through brick work with sufficient tolerance to prevent imparting any movement to the brickwork.Gates to be T&G & Vee boarded, framed ledged and braced with capping to top edge and hung on galvanised double strap field gate adjustable bands with field gate hook to bolt to steel posts. Pedestrian gate to match main gate in construction 1000mm x 1800 high.
T1
DG 07
900
997 Sur Water Ins C No4
Water stop cock and meter New Gas Supply. Contractor to excavate for and form duct at depth and specification to comply with requirements of Gas Supply Company. New meter to be located within boiler room.
Willow
Upright freezer
DG 05
Heating sub-contractor to carry out own builders work in existing house including stripping out redundant pipework and holes for service penetrations including flues etc. Main contractor to make good finishes as part of replacement / refurbishment of finishes following repairs.
Paving to
S & V (to terminate above roof) RW Gully No 3
Main Contractor to install new water main connection from existing water board stop cock in road to boiler room. final position to be agreed with heating sub-contractor. from this position provide separate supplies to terminate in stop cocks to:1) extension terminated in kitchen. 2) to existing house terminated in plant room. 3) to garage terminated in workshop.
The electrical meter and main distribution board is located on the north west elevation of the chimney stack at 1st floor level within the stair leading into the loft space and is to be retained. Separate distribution boards serving the Garage and Extension are required. Garage Distribution board to be located in the work shop. Extension Distribution board to be located in cupboard GF07.
min fall 1 in 80
100 x 200 paviers laid on 60mm bedding screed on well compacted DOT type 1 sub base 150mm thick.
mi
Soakaway No 2
Study
Ash
T3
Contractor to take down ceiling to lean to to allow for inspection of roof structure.
Inkpen Downie Architecture & Design Ltd
Contractor to strip tiles (setaside for re-use) from lean-to roof and remove existing roof structure.
Tel 01206 577 244 arch@inkpendownie.co.uk
2 Balkerne House
Take down existing brickwork and grub out existing floor slab and lay new slab and foundations to Engineers detail
Repair Type 3
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION
Repair Type 2
Stair 2
Balkerne Passage
Project RW Gully No 2
Front Entrance
Foul Ins C No6
TABLE 4.3
TABLE 4.2
Table 4.3 Typical Mortars
Foul Ins C No5
Sheltered
Rather weak limestone or brick work Very finely jointed brick or stone
New slab and foundations to Engineers detail
Rather weak sandstone
Sandstone of moderate durability
A1-A2
Exposed A3-A4
A5
A5
Table 4.2 Range of recommended mortar mixes for historic building fabric. Type A Lime : Sand A1 A2 A3 A4 A5
1 1 1 1 1
: : : : :
Type B
4 3 21 / 2 2 1
B1 B2 B3 B4 B5
Willow
Limestone or brick work of moderate durability
B1-B2
C1 A1-A2-A3 B1-B2
B3-B4
C2-C3 D8-D7-D6 D5-D4
B1-B2 C1-C2
C3 D8-D7-D6 D5-D4
Type C Hydraulic Lime : 1 : 1 : 1 :
T4 T4
Any of groups A-B-C
C3 D8-D7-D6 D5-D4-D3 D2
SPECIFICATION taken from Practical Building Conservation an English Heritage Technical Handbook Volume 2, Brick Terracotta and earth.
Lime : Sand :
D1 D2 D3 D4 D5 D6 D7 D8
1 : 1 : 1 : 1 : 1/2 : 1/4 : 1/8 : 1/10 :
1 2 2 3 3 3 3 3
: : : : : : : :
6 8 10 12 12 12 12 12
White House
Set-additive
1 : 4 : 1 / 2 brick dust 1 : 3 : 1 / 2 brick dust 1 : 3 : 1/10th low sulphate PFA 1 : 21 / 2 : 1 / 4 HTI 1 : 1 : 1 / 4 HTI Type E
Sand 4 3 21 / 2
C1 C2 C3
E1 E2 E3 E4
Masonary Cement : 1 : 1 : 1 : 1 :
Type D Lime mortar gauged with Portland cement finished mix Based on Lime : Sand Cement : Lime : Sand
Limestone sandstone or brickwork of good durability
Coarse Stuff 1 : 6 1 : 4 1 : 5 1 : 4 1 : 4 1 : 4 1 : 4 1 : 4
Sand 6 5 4 3 by adding cement to coarse stuff
Cement : Coarse Stuff 1 : 6 1 : 8 1 : 10 1 : 12 1 : 24 1 : 48 1 : 96 1 : 120
SPECIFICATION taken from Practical Building Conservation an English Heritage Technical Handbook Volume 2, Brick Terracotta and earth.
Abberton Client
Remove and rebuild lean to extension following opening up and inspection be CA. New slab and foundations to Engineers detail
Repairs
Cad File
Mac 4
Scale
Drawn By / D a t e
Checked By / Date
1: 100 @ A1 Aug 09
Title
Landscape & Drainage Plan Existing House, Extension & Garage For all repairs follow Engineers Requirements & Architects Specification. If there are any conflicts between the ER & AS refer to the CA for guidance. 1. Replace / Repair sole plate. 2. Take down brick work G to First Floor and replace with timber construction. 3. Repair Brick work
D r a w i n g N o.
A/815/T/02
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Kitchen by specialist. Contractor to allow for running waste and supply pipework to a position to be agreed with kitchen specailist for final connection by kitchen specialist. Contractor to complete plastering and floor finishes. (Floor finishes beneath units to be taken up to walls). Wall finishes to be completed once kitchen has been fitted. Contractor to fit out and plumb in Utility Room complete. Butler sink, Fridge/Frezzer washing machine and tumble dryer to be supplied by client to contractor to make final connections.
Lime render on SS lath on 25x50mm batten on panel vent sheathing on 240mm masonite studs with paneline boarding vapour barrier and service void formed using 25x50mm battens with 12.5mm PB and skim coat.
R
F
Timber boarding on 25x50mm batten on panel vent sheathing on 240mm masonite studs with paneline boarding vapour barrier and service void formed using 25x50mm battens with 12.5mm PB and skim coat.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Sur Water Ins C No3 S & V (to terminate above roof) RW Gully No 4
RW Gully No 3 RWP
RWP WG 04
Sliding Folding Windows
40mm thick Corian work top cut to over sail sink and grooved to drain into sink.
A
A
Washing Machine
Kitchen GF03
Tumble dryer
WG 03
Utility GF04
Upright freezer
B
Sliding Folding Doors
Sliding Folding Doors
DG 07
Breakfast Room GF02
B
Entrance
Existing Foul manhole to be grubed out.
Bespoke SW stair make up in joiners shop around hollow timber column with radiused ends as shown DG 05
DG 06
Foul Ins C No1 DG 08 RW Gully No 6 S with AAV at 1st floor
bed gru be
o1
Entrance GF01
C Carefully remove existing windows provide new HW surrounds and cills to match existing. Renovate and re-use existing steel frame and leaded glazing.
Painted brick with cavity. Brick tied back to timber frame through panel vent sheathing Existing Foul Run position on 150mm studs with insulation using warmcell with vapour barrier and 12.5mm plaster board and to be identified skim coat. Foul Ins C No3 Carefully remove existing door and frame and re-use new S & Vent Pipe to Foul Ins C No2 replace existing taken above roof and terminated with a DG 09 WG 06 bird cage. Remake connections to bathroom and to GF toilet.
Screen 1
Exis
n to l Ru Fou ting
Stairwell Stair 3 GF05
DG 01
Fair faced red brick
out
C
DG 02 Garden door
Cupboard GF07
WG 02
D
DG 03 WG 05
Cloaks GF08
Foul Ins C No4
D
RWP
Sur Water Ins C No2
Hall
Plant Room
Stair 1
Shower & WC GF09
SS with AAV
20 x 144mm SW shelves and 20 x 450mm SW shelves painted finish. Narrow shelf housed around 28 x 96mm Full Height SW upright see section for intervals. Deep shelves supported on 20 x 44 mm SW battens screwed to studs. Ends of Support battens cut at 300 with 10mm flat face at ends.
Lime render on SS lath on 25x50mm batten on panel vent sheathing on 240mm masonite studs with paneline boarding vapour barrier and service void formed using 25x50mm battens with 12.5mm PB and skim coat.
Fair faced red brick Lime render on brick with cavity. Brick tied back to timber frame through panel vent sheathing on 150mm studs with insulation using warmcell with vapour barrier and 12.5 mm moisture resistant tile backer boarding and tiling to wet areas and 12.5mm plaster board and skim coat to other areas.
RW Gully No 5
Bathroom 2
Toilet
Line 50 x 75 mm studs to both sides with 12.5mm ply prior to cladding in PB and skim coat. (See Sections)
Larder GF06
WG 01
E
E
Carefully remove existing windows provide new HW surrounds and cills to match existing. Renovate and re-use existing steel frame and leaded glazing. GF SANITARYWARE SCHEDULE:
DG 04
GF09 Shower & WC: replace extng sole plate on new dpc as indicated on struct eng sk03 - remove existing lathe and plaster wall finishes to 1000 above floor level, splice in new lenths of oak stud, morticed and tennoned into sole plate - reinstate plaster finishes and skirting on completion
Sitting Room
Dining Room
Basin: Bathstore Edwardian basin and pedestal without towel rail. With polished chrome standard shallow seal bottle trap. With basin pop up waste with lever. Taps: Bensham 3 tap hole basin mixer with pop up waste. WC: Bathstore, traditional series, Low level WC with chrome down pipe and universal white seat. Widen piers as indicated on drawing 815/16
Shower tray: Bathstore, 800x900 with white with easy clean waste. Shower screen: Atlas hinge door 900 with " special "side panel adjusted to fit return to structure.
Study
Rev Date
Revision
Drawn By
Shower handset: Hudson Reed Twin exposed thermostatic shower valve with traditional slider rail kit. Other accessories: Allow to fit soap dish toilet roll holder
Stair 2
Front Entrance Plant Room Sub Con to remove boiler and associated pipework and controls and leave room bare for M Con. M Con to thoroughly clean out to remove staining from coal, remove air vent and chop out brickwork to other penetrations. Repair brick using same bond treat interior walls with stain inhibiting primer and finish in white emulsion for Sub C to complete his works. Toilet. M Con to replace section of damp plaster with render up to 1000mm above FFL. Contractor to allow for removal and reinstatement of sanitary ware. For removal of existing floor finishes and preparation and laying of new tiled finish. For rubbing down and preparation of existing ceiling & wall finishes and redecoration using eggshell .
Rake out brickwork to fire place surround replace broken and spalled bricks as indicated on drawing A/815//T/16 and repoint in lime mortar. Follow repairs specification from structural engineers protect internal finishes provide structural support to timber frame and carry out repairs to sole plate in oak. Re-instate internal finishes where damaged by repairs to frame decorate one mist coat and one top coat in white emulsion making good to match existing finishes for final decoration by others.
Front Entrance Allow for works to install foul drainage from bathroom above including excavation of floor installation of foul drainage and reinstatement of floor finishes around down pipe. Allow for full height boxing in sw framing & plaster board with void packed with mineral wool insulation.
Study Support timber lintel to fire place, remove broken and spalled bricks and sufficient bricks to provide adequate bond. Re build piers to both sides in 13 & 1/2" piers repoint in lime mortar. Follow repairs specification from structural engineers protect internal finishes provide structural support to timber frame and carry out repairs to sole plate in oak. Re-instate and apply new internal finishes where damaged by repairs to frame or required by new work. Decorate with one mist coat and one top coat in white emulsion making good to match existing finishes for final decoration by others.
For repairs and re-building to this wall see also Engineers Details. Support timber structure at 1st floor level and chimney stack. Remove existing render, timber weathering board lead flashings etc. Advise CA and inspect timbers for infestation and to confirm extent of timber repairs required. Treat and repair as necessary. Demolish brick wall to GF and rebuild in oak to specification clause G20, timber cframe sections generally to match existing frame. Insulate new and existing frame using sheeps wool insulation between timber frame line with vapour permeable membrane batten with 25 x 50mm treated SW battens and finish using lime render on SS lath. Finish render in lime wash. Internally:- Batten inside frame reveals and fit new timber laths and render using lime plaster. Temporarily support existing stair while repair works are in progress and refix to new timber frame sections on completion, include for overhauling stair, replacing cracked or broken treads, risers and supports
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
TENDER DRAWING Project
White House Abberton Client
Cad File
Mac 4
Scale
Drawn By / D a t e
1: 25
JI/Jul08
Hall. MCon to remove roof and ceiling finishes and invite CA to inspect. Carefully remove existing stair, front door and windows and store for-incorporation into the works. Demolish structure including roof walls and floor. Grub out ready for new footings etc.
Title
Sitting Room. Take up and dispose of carpet and gripper rods etc. Sand floor to provide even colouration stain and finish in clear floor finish.
Existing House & Extension
Checked By / Date
G Floor Plan D r a w i n g N o.
A/815/T/04
R e v N o.
C
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
protect and retain existing wattle and daub panels in existing partition to either side and above doorway include fixing 44x 18 mm sw battens around panel perimeters to each face of timber frame to entrap panel existing approx 140 x90 original rafters
existing crown plate and collars - remove existing tank platform and redundant pipework supported on collars. - allow for constructing new raised tank platform to mech sub-contractors requirement, situated the other side of the chimney stack
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES existing 200 wide tie beams at attic floor level existing approx 100 x 75 purlin
roof in this area constructed off existing earlier crown- post roof
existing approx 190 x 75 collars
existing crown post repair broken curved brace to struct eng detail SK04
extng bridging beams bolted to u/s tiee at attic floor level
drill and screw fix existing unsupported rafter ends to 150 x 50 treated sw inserted along original crown post roof apex include for picking up and supporting existing gablet rafter.
existing approx 100 x 75 purlin carry-out spliced and bolted repair in oak to fractured purlin
drill and screw fix existing rafter ends to 150 x 50 treated sw inserted along main roof apex
provide packing between purlin and rafters to struct eng detail sk04, provisionally allow for 3 instances
roof in this area constructed off existing earlier crown- post roof
hatched area is boarded with wide sw planks on ceiling joists and between tie beams. fix loose boards, and infill where boards are missing or broken with new plain edge sw boards, thickness to match existing
F
provide support existing purlin to struct eng detail SK05
CLEANING AND INSULATION OF EXISTING ROOF SPACE - remove all rubbish and debris from existing roof space and cart-away from site, carefully vacume and remove all loose dust and dirt fix 300mm wide strip of 9mm ply to underside of rafters at all eaves situations - lay 225mm thermafleece sheeps wool insulation to entire roof space in two layers, first layer 100mm thick, second layer 125mm thick and at right angles to first layer. Where there are floor boards the insulation is to be laid on top.
cut out individual bricks from band of brick noggin between rafters and insert 215 x 65 x 102 terracotta airbricks with rectangular slot pattern
ATTIC PLAN A
A
Bedroom FF02 WF 04
B
B WF 03 WF 05 EN-SUITE SANITARYWARE SCHEDULE: DF 02
BATHROOM 3 SCHEDULE:
FF03 Basin: Bathstore Edwardian basin and stand. With polished chrome standard shallow seal bottle trap. With basin pop up waste with lever.
DF 01 SP
Taps: Bensham 3 tap hole basin mixer with pop up waste. WC: Bathstore, traditional series, Low level WC with chrome down pipe and universal white seat.
Bathroom 1 FF03
Basins: Bathstore Edwardian basin and stand. With polished chrome standard shallow seal bottle trap. With basin pop up waste with lever.
Lobby FF01
Taps: Bensham 3 tap hole basin mixer with pop up waste.
C
Bath: Bathstore, Cambridge with traditional resin feet 1720 x 780mm with double ended exposed bath waste with plug & chain.
C
WC: Bathstore, traditional series, Low level WC with chrome down pipe and universal white seat. Shower tray: Bathstore, 800x1200 with white with easy clean waste.
B
Taps: Bensham bath shower mixer.
Shower screen: Atlas slider door 1200.
A WF 01
Other accessories: Allow to fit soap dish. toilet roll holder.
WF 02
D
D
Mirror: Watertec 500 x 700 portrait. Fixed.
Shower handset: Hudson Reed Twin exposed thermostatic shower valve with victorian rigid riser kit with diverter and 8" Apron shower rose.
Rev Date
Revision
Drawn By
Other accessories: Allow to fit soap dish. toilet roll holder. Mirror: Watertec 500 x 700 portrait. Fixed.
SS with AAV
Inkpen Downie Architecture & Design Ltd
E
E
Bathroom 3
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
Bedroom
TENDER DRAWING Project
White House
Bedroom
Bedroom
Bedroom remove existing landing cupboard and make good finishes
reinstate internal finishes on completion of repairs to timber frame
Abberton Client
Cad File
Mac 4 Bathroom 4
Scale
Drawn By / D a t e
1: 50
JI/Jul08
Checked By / Date
Title
1st Floor Plan Existing House & Extension D r a w i n g N o.
FIRST FLOOR PLAN
A
A/815/T/05
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
RW
RW
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
RW
Plain Tile
NOTES Pan Tile
Roding Eye
Roding Eye
6932 Sur Water Ins C No3
6655 S & V (to terminate above roof) RW Gully No 4
RW Gully No 3 RWP
4144
2845
3252
Dormers
3252
Dormers
RWP 175
840
RW
96
Position of openings. Drop Brick work by one course and step DPC. See sections
e to be grubed out. No1 102 215
2362.5
327
RW
4144
Valley formed in standard valley tile
4918
2260 Contractor
1384/site dim
941 255
247
4
set out the position of this beam follow excavation so that
Line of existing wall
RW Gully No 5 (setting out datum)
19
Hall
Sur Water Ins C No2
RWP
=
1452
Foul Ins C No4
2513
=
Stair 1
743
1441
to set out on site worked back from outer face of existing wall to be demolished.
e to Foul Ins C No2 Rafter feet work shop fitted to fascia and fixed aken above to structure. See Detail ed with a e connections to GF toilet.
1742
1156
Foul Ins C No3 Rafter feet work shop fitted to fascia and fixed to structure. See Detail
1264/site dim
1073
Roof Plan
1227
1760
1703
327
2035
690
131
RW Gully No 6 Valley formed in tiles
Rafter feet work shop fitted to fascia and fixed to structure. See Detail
8566
2597
2597
RW
8288
1961
Ridge formed in Hogback
2238
Rev Date
Dormers
Dormers
Revision
Drawn By
Foundation & Drainage Plan See Engineers Drawings for pile layout. Set out in accordance with Architects drawings.
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
New rafter feet work shop fitted to fascia and fixed to new structure. See Detail
White House Abberton Client
Cad File Retain original purlin
Allow for all new rafters to existing roof but retain existing where possible
Mac 4
Scale
Drawn By / D a t e
1: 25
JI/Jul08
Checked By / Date
Title
Roof Plan, Roof Structure Foundations and drainage D r a w i n g N o.
Roof Structure Plan
R e v N o.
A/815/T/06 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
A
NOTES Ceiling to M60/10 Walls to M60/10 Floor - Carpet by client Skirting to M60/12 Architrave to M60/12 Door & Frame toBedroom M60/12 Joinery to M60/11 FF02 WF 04
EXTERNAL FINISHES
B Ceiling to M60/11 Walls to M60/11 & tiling to M40/8 Floor - M40/09 Skirting Take wall tiles down to floor tiles WF 05 Architrave to M60/12 Door & Frame to M60/12 Joinery to M60/11
Existing timber window surrounds and sill: M60/14 Existing Steel windows: M60/15 New windows doors and sliding folding doors: M60/13 Feather edged boarding: M60/18 New Rainwater goods: to be self finished. Existing Rainwater goods: M60/15 Lime wash to new and existing Render M60/17
WF 03
DF 02
All Walls to be tiled. M40/08 Height floor to underside of level ceiling, to fall with ceiling to corner.
DF 01 SP
Bathroom 1 FF03
Lobby FF01
C
B
Ceiling to M60/11 All Walls to be tiled M40/08 Walls to M60/11 Height: floor to 1350 above Floor - M50/155 FFL. Skirting M60/12 Architrave to M60/12 Door & Frame to M60/12 Joinery to M60/11
All Walls to be tiled. M40/05 Height floor to three tiles above worktop (approx) 1350
A WF 01
WF 02
D
A Kitchen units Specialist to confirm setting out of plinths to tiler to ensure boarders are equal
E
Bathroom 3
Equal
Sliding Folding Doors
Bedroom
Bedroom
Entrance
Bedroom
reinstate internal completion of rep frame
Bedroom
Equal
B
A
Wa W ashin ng g Washing Ma M achin ne e Machine
Kitchen GF03
Tu T umble e Tumble dry d yer dryer
Ceiling to M60/10 Walls to M60/11 Floor to M40/06 Skirting to M60/12 Architrave to M60/12 Door & Frame to M60/12 Joinery to M60/11
Utility GF04
Red Tile
Upright Up U pright freezer ffre eezerr
DG 07 Sliding Folding Doors
SS with AAV
Ceiling to M60/11 Walls to M60/11 Floor to M40/06 Coved Skirting to M40/06 Architrave to M60/12 Door & Frame to M60/12 WGJoinery 03 to M60/11
WG 04
Sliding Folding Windows
Breakfast Room GF02
DG 05
Black Tile
Floor tiling to M40/06
B
DG 06
DG 08 S with AAV at 1st floor Ceiling to M60/10 Walls to M60/10 Floor to M40/06 Entrance Skirting to M60/12 GF01 to M60/12 Architrave Door & Frame to M60/12 Joinery to M60/11 DG 02 Glazed Screen to M60/12 Garden door
DG 01
Bathroom 4
Screen 1
C
Ceiling to M60/11 Walls to M60/11 Floor to M40/06 Skirting to M40/06 Architrave to M60/12 Door & Frame to M60/12 Joinery to M60/11
D DG 09
Toilet Plant Room
Stair 1
WG 06
DG 03 WG 05
Ceiling to M60/10 Walls to M60/10 Floor to M40/06 Skirting to M60/12 Architrave to M60/12 Door & Frame to M60/12 Joinery to M60/11
Stairwell Stair 3 GF05
C
Shower & WC GF09
WG 02
D
Rev Date
Revision
Drawn By
All Walls to be tiled. M40/05 Height floor to top of shower cut to fall with ceiling to corner
Bathroom 2
Hall
Ceiling to M60/11 Walls to M60/11 Floor to M40/06 Skirting to M60/12 Architrave to M60/12 Door & Frame to M60/12 Joinery to M60/11
Cupboard GF07
Ceiling to M60/11 Walls to M60/11 Floor to M40/06 Skirting to M60/12 Architrave to M60/12 Door & Frame to M60/12 Joinery to M60/11
Cloaks GF08
Larder GF06
SS with AAV
WG to 01M60/11 Ceiling Walls to M60/11 Floor to M40/06 Coved Skirting to M40/06 Architrave to M60/12 Door & Frame to M60/12 Joinery to M60/11
E
DG 04
Inkpen Downie Architecture & Design Ltd
E
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
White House All new plaster and making good to be painted M60/10
Sitting Room
All new plaster and making good to be painted M60/10
Dining Room
Abberton Client
Study
Cad File
Mac 4 Stair 2
Scale
Drawn By / D a t e
1: 25
JI/Jul08
Checked By / Date
Title
Finishes G & 1st Floors Contractor to strip out carpet gripper rods etc and sand existing timber floor for finishing by others
Ground Floor
Front Entrance
Contractor to strip out existing carpet and gripper rods and leave clean for client to lay carpet on completion of contract
D r a w i n g N o.
R e v N o.
A/815/T/07 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
- take down to roof level and rebuild existing chimey stacks - use existing bricks supplemented by second hand bricks to spec clause F10/110 - fit new terracotta chimney pots to spec F30/940 in 1:1:6 cement mortar haunching, supplemented by terra-cotta cowls to prevent rain-entry - new lead flashings to spec H71/45 & 52
work to existing first floor windows to include: - removal of existing lead weathering, build out existing weather mould at window head to clear face of new render fit new lead dressing to be dressed up behind render and breather layer minimum 100mm - rout groove and extend cill in oak tongued and glued to existing using West epoxy glue - renew architraves in oak, thick ness to suit new render finish - redecorate on completion
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
REPAIRS TO EXISTING
new lead soakers to porch abutment dressed up behind new render and breather layer
protect and retain general areas of this roof slope, - remove and relay sufficient tiles to allow rebuilding and flashing chimney stacks, removing and re-bedding ridge tiles. - fix loose replace missing tiles on completion
Frame Repair- Remove timber
Plinth Repair- Rebuild
Frame Repair-Repair or replace timber
Plinth Repair-Localised Repair
Frame Repair-Add new timber
Plinth Repair-New Brick Plinth
Frame Repair-Softwood For repairs and re-building to this wall see also Engineers Details. Support timber structure at 1st floor level and chimney stack. Remove existing render, timber weathering board lead flashings etc. Advise CA and inspect timbers for infestation and to confirm extent of timber repairs required. Treat and repair as necessary. Demolish brick wall to GF and rebuild in oak to specification clause G20. Insulate new and existing frame using sheeps wool insulation between timber frame line with vapour permeable membrane batten with 25 x 50mm treated SW battens and finish using lime render on SS lath. Finish render in lime wash. Internally:- Batten inside frame reveals and fit new timber laths and render using lime plaster.
form continuous horizontal step in render at junction between panelvent sheathing at first floor and ground storey
Rebuild top six courses of plinth brickwork in 1:3 lime:sand and incorporating new damp proof course
1 - work to existing ground floor windows to include: - removal of existing lead weathering, fit new lead covered 150 x 35mm treated sw prentice board lead dressing to be dressed up behind render and breather layer minimum 100mm - renew architraves in oak, thickness to suit new render finish - redecorate on completion
Remove render finishes lead flashings and weatherings to entire elevation leaving existing timber frame including areas of brick noggin to ground floor Insulate between openstudwork with sheeps wool insulation Sheath at first floor level with 9.5mm panel vent sheathing sheathing include additional treated sw noggins where required Apply 1:3 lime sand render to spec M20/31 on metal lathing and treated sw battens, and finish with lime wash to spec clause M60/17
EAST ELEVATION Keymer Plain tile
Painted timber windows in line vent tiles to west roof slope at 750mm centres
strip off and relay existing roof slope to spec clause H65/06 reform valley/ junction to existing slope - new lead flashings to spec H71/45 & 52 to chimney stacks
protect and retain general areas of this roof slope, fix loose replace missing tiles on completion
Cast aluminium Alumasc 1/2 round Gutter protect and retain general areas of this roof slope, fix loose replace missing tiles on completion
2 Lime washed lime render Painted timber framed and glazed doors
3
5
4
6
16
new plain tiles on new rafters to spec clause H65/04
remove and replace extng asbestos svp
17
SOUTH ELEVATION brick up existing openings
Rev Date
Revision
Drawn By
WEST ELEVATION Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk approx line of existing chimney stack behind
protect and retain general areas of this roof slope, fix loose replace missing tiles on completion
CO1 1PA
Drawing Status
TENDER DRAWING
Carefully remove and re-use existing window allow for providing leaded lights to match other window
Project
12
work to existing windows to include: - removal of existing lead weathering, fit new lead covered 150 x 35mm treated sw prentice board lead dressing to be dressed up behind render and breather layer minimum 100mm - rout groove and extend cill in oak tongued and glued to existing using West epoxy glue - renew architraves in oak, thick ness to suit new render finish - redecorate on completion
Colchester
Fax 01206 563 377 www.inkpendownie.co.uk
White House 13
14
Abberton
Howarth timber Window (Escape) HI spec side hung horizontal bar L10/10 1200mm x 1200mm
Client
7
dismantle and reinstate existing rainwater pipe without offset at first floor level For repairs and re-building to this wall see also Engineers Details. Support timber structure at 1st floor level and chimney stack. Remove existing render, timber weathering board lead flashings etc. Advise CA and inspect timbers for infestation and to confirm extent of timber repairs required. Treat and repair as necessary. Demolish brick wall to GF and rebuild in oak to specification clause G20. Insulate new and existing frame using sheeps wool insulation between timber frame line with vapour permeable membrane batten with 25 x 50mm treated SW battens and finish using lime render on SS lath. Finish render in lime wash. Internally:- Batten inside frame reveals and fit new timber laths and render using lime plaster. Rebuild top six courses of plinth brickwork in 1:3 lime:sand and incorporating new damp proof course
Sandtoft Pantile
8
15
Cad File
Mac 4
Scale
Drawn By / D a t e
1: 50
ST/Aug09
Checked By / Date
Title
10
Re-Use Existing Window
11 9 Howarth timber window HI spec top hung horizontal bar 630mm x 750mm (W x H)
Elevations D r a w i n g N o.
A/815/T/14
R e v N o.
B
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
NORTH ELEVATION
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
F
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
6384 4420
Sliding Folding Windows
240
WG 04
A
A
Washing Machine
Kitchen GF03
2866
NOTES
Tumble dryer
WG 03
Utility GF04
2380
8017
Upright freezer 2380
Breakfast Room GF02
B
1358
Entrance
Sliding Folding Doors
B
1358
Sliding Folding Doors
DG 07
DG 05
DG 06
DG 08 S SP S with AAV at 1st floor
Stairwell Stair 3 GF05 729
DG 01
C
Rev Date
Revision
Drawn By
729
Screen 1
1795
Entrance GF01
C
Larder GF06
Cupboard GF07
DG 02 Garden door
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
WG 02
D 06
DG 03 WG 05
D
Cloaks GF08
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
White House Abberton 2105
Hall
Bathroom 2
Client
2107
Shower & WC GF09
E
SS with AAV
WG 01 Cad File
Mac 4
E
Scale
Drawn By / D a t e
1: 25
JI/Jul08
Checked By / Date
Title
G Floor Plan DG 04
Extension D r a w i n g N o.
A/815/T/09
R e v N o.
C
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
F
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
A
A
Bedroom FF02 FF SANITARYWARE SCHEDULE:
WF 04
B
B
FF03 Bathroom: Basin: Bathstore Edwardian basin and stand. x 2
WF 03 WC: Bathstore, traditional series, Low level WC exc seat.
WF 05
Shower tray:
DF 02
Shower screen:
DF 01 SP
Bathroom 1 FF03
Taps:
Lobby FF01
Shower handset: Shower valve:
C
Other accessories: Rev Date
Revision
Drawn By
Screen 1
C
Inkpen Downie Architecture & Design Ltd
WF 01
2 Balkerne House
WF 02
D
D
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
White House Abberton Client
SS with AAV
E
Cad File
Mac 4
E
Scale
Drawn By / D a t e
1: 25
JI/Jul08
Checked By / Date
Title
1st Floor Plan Extension D r a w i n g N o.
R e v N o.
A/815/T/10 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
POWER
Specification Clause
FITTINGS SD
Switched Socket Outlet
LIGHTS 2
HD
V90/510/A
Recessed Down Lighter
V90/510/B
Recessed Adjustable
3
V90/510/C
Recessed LED Up Lighter Floor Mounted
4
V90/510/D
Spot Light
V90/510/E
Wall Mounted uplighter
V90/510/F
Smoke Detector
Heat Detector Electric Extract Fan
Tripple Switched Socket Outlet FA
Four Switched Socket Outlet
C
Manual Fire Alarm
NOTES
CCTV
2
LED Strip Light P.I.R
V90/510/G
Twin Switched Socket Outlet
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
C
2
ELECTRICAL & LIGHTING KEY
PIR External Wall lights
Shaver Socket
CCTV Camera
Cooker Socket
Passive Infrared automatic opening doors
Twin Switched Socket Outlet - Exterior
Hot Air Hand Dryer
Speaker wiring
IR V90/510/H
Pendant
V90/510/J
Wall mounted light
Electrical wiring s
Spur Outlet
s
V90/510/K
Undercounter strip Lighting
V90/510/L
Wall (Surface Mounted)
V90/510/M
Ceiling (Fixed recessed shower light)
V90/510/N
Flourescent Strip
Rs
S&VP
Security
Switched Spur Outlet
C
Contact
Switched to Remote Spur Outlet
IR
Infrared Detector
RKP
Remote Key Pad
PSU
PSU Module
2
V90/510/O
TV
E
CPU
CP Unit
EX
Existing
CP
Call Point
C
Television Aerial socket
Emergency Lighting PTV
Private Television Aerial
CCTV
Closed Circuit Television Point
SWITCHES
2
Alarm T
1 Gang switch
S&VP
Distribution board for extension located at high level in cloak cupboard and fed through loft space in existing house
FM Radio
Wall mounted Exterior light
IR
2
RKP & DGP
COMMUNICATIONS FM
2
2
2
Telephone Socket ASDL
ASDL Socket
2 Gang switch S
3 Gang switch
Speaker Socket
4 Gang switch
Wall mounted speaker Ceiling mounted speaker
Two Way One Gang Switch TX
Telex
Two Way Two Gang Switch M
Modem
Two Way Three Gang Switch F
Three Way One Gang Switch
Fax
C
Three Way Two Gang Switch
Computer Outlet BB
1 Gang switch Dimmer
Broad Band Connection
Inc Co and Inc
TV/S
Pull Cord
Television + Satilite Aerial socket
F GROUND FLOOR
GARAGE
C P.I.R
C
F
FIRST FLOOR
2
2
2
Rs Rs
Tumble dryer
CP
2
WG 03
Utility GF04
2
Upright freezer
WF 04
C
B
B
B
Revision
Drawn By
WF 03
WF 05
C
TV
DF 02 DF 01
DG 08 SP
S with AAV at 1st floor
Stairwell Stair 3 GF05
DG 01
Entrance GF01
C
Larder GF06
SD
Bathroom 1 FF03
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
SD
C
C
Lobby FF01
2
2
TV/S
C
2
2
2
DG 06
2
DG 05
RKP
Rev Date
C
C
Entrance
2
Breakfast Room GF02
T
HD
Bedroom FF02
2
Sliding Folding Doors
B
Sliding Folding Doors
DG 07
C
A
IR
TV
2
Kitchen GF03
A
Washing Machine
Fitted Wardrobe by others
A
2
Rs Rs Rs
2
A
2
WG 04
Sliding Folding Windows 2 Fitted Wardrobe by others
C
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Screen 1
Drawing Status DG 02 Garden door
Cupboard GF07
C
coming telephone. ontractor to reinstate supply nd connect to sockets. DG 09 coming ASDL
D WG 06
DG 03 WG 05
A WF 01
WG 02
Hot water riser to 1st floor bathroom
Cloaks Cl C l GF08 G
B
FOR INFORMATION Project P.I.R
D
D
D
Underfloor heating manifold
WF 02
Pipe work to shower located behind access panel in wall
Abberton
C
Client
ASDL
C
Bathroom 2
T
Shower & WC GF09
Hall SD
SS with AAV
E
Stair 1
SS with AAV
WG 01
Distribution board for extension located at high level in cloak cupboard and fed through loft space in existing house
E
Bathroom E 3
Distribution board for extension located at high level in cloak cupboard and fed through loft space in existing house
DG 04 IR IR C
CPU
EX
C
IR
IR
PSU
C
EX C
C
EXTENSION
EX
Bedroom C
SD
GROUND FLOOR
C
Mac 7
Scale
Drawn By / D a t e
1: 50
ST/Aug09
Checked By / Date
Extension D r a w i n g N o.
EX
Bedroom
Incoming main and distribution board
R e v N o.
A/815/T/13
C
Study
Cad File
Services Layout
FIRST FLOOR
EX
EX
Dining Room
E
Title
RKP
EX
White House
Bedroom
C EX
Bedroom
reinstate internal finishes on completion of repairs to timber frame
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
TB 16.75
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
50.00째
NOTES
Read in conjunction with A/815/ /30 for reference to notes & specification.
2620
19 18
20
22
240
21
FFL 12.60
13
900
12 11 10
245 200
9
1100
8 7
6 5 4 3
1000
to Datum 10.00
2 1
SECTION ON AA
SECTION ON BB
SECTION ON CC
Doors aND WINDOWS
Rev Date
SECTION ON DD
Revision
Drawn By
SECTION ON EE
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
White House Abberton Client
Cad File
Mac 4
study/ lounge
- cut out and replace badly spalled soft areas of soft red bricks to fire places and piece in replacement bricks to match - rake out and repoint entire chimney breast in 1:3 lime putty sand mortar
Scale
Drawn By / D a t e
1: 50
JI/Jul08
Checked By / Date
Title
dining room
Sections AA to FF Extension D r a w i n g N o.
SECTION ON FF
SECTION ON GG
SECTION ON GG south
R e v N o.
A/815/T/16 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Trap door for internal access from mower store
NOTES Fixed glazed window set behind timber louvres
Timber weather boarding on 25 x 50mm sw batten on breather membrane on 50 x 150 sw studs Flooring moisture ply floor.
SW framed ledged and braced doors FD 03
S&VP
FD 04
GD 10
Distribution board for extension located at high level in cloak cupboard and fed through loft space in existing house
GD 11
50 x 150 sw studs
Timber weather boarding on sw studs Insitu cast piled raft
SW framed ledged and braced doors
S&VP
GD 12
Oak posts
Rev Date
Brick plinth
Revision
Drawn By
H65/77 Ridge tile
H65/04 Plain tile roof on battens on breather membrane on counterbatten on rafter 40.0
P10/320 Breather membrane to roofs
0째
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
R10/11 Gutters and R10/30 pipework allow for rafter brackets to same material and finish as gutters
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
2490
2200
White House Abberton Client
Cad File
Mac 7
Scale
Drawn By / D a t e
1: 50
ST/Aug09
Checked By / Date
Title
Garage Plan Elevations and Sections D r a w i n g N o.
R e v N o.
A/815/T/21 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
H65/79 Eaves with open soffite
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Airtrak RV roof void ventilator H65/77 Ridge tile H71/15 lead work to roof & cheeks on 22 X 144 timber boarding
1 H65/04 Plain tile roof on battens on breather membrane on counterbatten on rafter
12
K11/45 roof sheathing
P10/320 Breather membrane to roofs
NOTES Airtrak EA100/75 eaves ventilator
13
H71/53 lead work to window heads and prentice boards
18
19
G20/07 Engineered rafter with sprayed insulation to P10/142
P10/320 Breather membrane to roofs
K11/45 roof sheathing
19
2
R10/11 Gutters and R10/30 pipework allow for rafter brackets to same material and finish as gutters
Ventilation
7
20
Airtrak EA100/75 eaves ventilator
2 M20/50 Skim coat
Bring lead apron and flashing up over cheek and dress and fold lead over to weather.
H65/04 Pantile roof on battens on breather membrane on rafter
K11/45 Wall lining
H65/79 Eaves with open soffite
14 21 15
P10/310 Vapour control barrier. Fit 500mm wide strip to top of floor prior to installing 1st floor wall structure and tape to wall barrier to ensure good air seal.
0
K11/40 Plywood flooring
3
8
5
P10/321 Breather membrane to walls
New timber window board L10/42 New timber sub frames L10/10 Timber windows
Made to fit existing steel frames
M20/50 Skim coat Insulated cavity closer P10/310 Vapour control barrier. Fit 500mm wide strip to top of wall plate prior to installing 1st floor structure and tape to wall barrier to ensure good air seal.
Timber to brick tie Rev Date
Revision
Drawn By
K11/45 wall sheathing
16
G20/07 Engineered stud with sprayed insulation to P10/142
L10/15 Timber sliding folding doors M20/50 Skim coat K10/15 Plaster Board
m
PLAN SECTIONS
Inkpen Downie Architecture & Design Ltd
DPC taken across brick cavity & down inside face of brickwork.
M20/31 Lime sand render on ss lath
9
10
2 Balkerne House
11
M10/04 Levelling screed
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Vapour Barrier taken down over DPM and taped to DPM
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
240 J40/140 DPM / Gas Barrier taken up over DPC and taped to DPC using Gas tape 1
M20/31 Treated s/w drip bull nose F30/360 Gas resistant DPC and cavity tray. Step DPC down by one course at openings
4
Drawing Status
Perimeter insulation.
FOR INFORMATION
H21/15 timber weather boarding
P20/10 Skirting
Project
70
Q23/110 Shingle
White House
175 75
Q25/110/310 or Q25/130/325 pavings
P10/141 insulation to Ground Floor
Abberton
Q10/120 Stone edging
Client
17
F30/160 Air bricks with F30/171 telescopic ducts F30/110 concrete fill
6
F10/112-Brick
E 60-Precast beam and block floor see Engineer information see Foundations & Drainage for setting out of raft
read in conjunction with Engineers documents, drawings and specificaton
Cad File
Scale
Drawn By / D a t e
Mac 4
1: 50
JI/Jul08
Checked By / Date
Title
Sections AA to FF Extension D r a w i n g N o.
D30,E05,E10,E30 - Piled foundations see Engineer information
R e v N o.
A/815/T/30 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.