Sebnem Tuncel MacDonald 2006 - 2010 Industrial Projects

Page 1





Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

LOCATION PLAN 1:2500 N

NOTES

W

E S

'SS R'S R R OR O OR O TOR OO EEAA O CT LO R REA ACT ACTO AC FLOAR ARE DF ARE TTR N D G NTR NT N ND N ON O UN NG CO R OU KKIN RKI R GR OR O WO W

ESS CE CES CCE AACC AC 'SS R'S E R ORSI TOR C S SID CTO CT AACT RACTHI RA HIS H TR TRA TR NTRM TTH NT ON OM O CO RO C R FR FRO RS IIT ITO CE ISIT A VIIS VIS VI RAN RA R TR Y N NTR ENT EN ARY ENT AAR RARFFFF RA O AFF OR AF POR TAF MP STA STA EM EM D TTEM TE N ND A AN

G E O R G E

BU Y

S

O

T R E

ED SH

E T

RD YA

D RD AR AR YA Y O E TTO SE E US US CE C NT NT AN AN AN RA R T TA NTTR NS EN E ON N CO AIIN MA IN M E AN RA CR

ING AT AT RA ER OP REA AR A D

ES RES R OR STO

ND ND UN O E OU

TE ITE SIIT SIT E RYY D AARY F CE V ID RA VID CE R BBYY OF RAR O NCE N O OR OV ENC PO SSS AALL FFE PO RO POR FEN PRO PR MP ESS T N VVA G VAL C OV CES N ON NT O OVANG TEEMCC TE TEM O EEN ENT M TI T TIO A EM ACC AC TING ME TI L & EM SSTTIN REM STI R E EL PLE XXIS NE N LLA EXI EX LAC A PAN PAN EP COM REPN O ON

FA F

A RAAC OR S NTTRST E ES S TIE TI TI ITI R IL CO OR LIT LI FO AC CIL CILI

PO ARE 'S MP FAAR OR L CO ELLF ACTCEE WE 'S & W NC ANC NT RAN NTR ON TRA O OR E TR CO NTR C E ENT CT AG CT A

PAVEME P PA PAV PAVEMEN VEMENT V VE EM EME ME ENT E T

F

O TO S EESS EESSIME CES T TIM ACCLLL AALL

FE FENCE EN NC TO NC O

D

Y OUNDARY OUND BOUNDARY B NG BO ING TIIN ST STI ST IS X XIS XISTI EXISTING EX E EXI

F

RESAATT STO AR & TT& CLLEE XIT T CLE EEXI EPT EP E KEP FIR E B

n

w

e

s

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

CONTRACTOR'S GROUND FLOOR WORKING AREA 1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

7

3

1 3 2

1 3 2

7 3

CONTRACTOR'S ACCESS FROM THIS SIDE

UP

7 3

7 3

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

TEMPORARY VISITORS AND STAFF ENTRANCE

GEORGE

STREET Rev Date

Revision

Drawn By

MAIN ENTRANCE TO YARD IN CONSTANT USE EX

FD 1

TI

NG

Inkpen Downie Architecture & Design Ltd

BO UN DA RY

2 Balkerne House

FE NC E

BUOY SHED YARD

CRANE OPERATING AREA

IS

TO

FIRE EXIT & STORES ACCESS TO BE KEPT CLEAR AT ALL TIMES

NT

CONTRACTOR'S COMPOUND FOR STORAGE & WELFARE FACILITIES

ME

CONTRACTOR'S ENTRANCE STORES

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

BUILDING REGULATIONS Project

VE PA

FD

PROVIDE TEMPORARY SITE ACCESS BY REMOVAL OF EXISTING FENCE PANEL & REPLACEMENT ON COMPLETION

Trinity House Harwich Alterations to Buoy Shed & Main Office Building Client

Trinity House Light Service Cad File

Scale

Mac 7

1:250/1:2500ST / Nov 08

Drawn By / D a t e

Checked By / Date

Title

Site Plan and Location Plan n

e

SITE PLAN 1:250

D r a w i n g N o.

w

s

R e v N o.

A/704/BR/01 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .

Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.

NOTES

10

9

8

7

6

SFW.02

SFW.03

4

SFW.04

SFW.05

3

2

1

SFW.06

570

SFW.01

5

EL

G C02/D03

C04/D02

SFW.07

SFW.08

C07/D01

F

switch pane

l

TEST ROOM R & D SUPPORT

ELECTRONICS LAB.

LIGHTS LABORATORY

C04/D01

C03/D02

C02/D04

C03/D01

concrete slab to plant room

C08/D01

1500

C11/D01

C05/D01

E

D C012/D01

EA

D

C

C013/D01

C012/D01 C013/D01

ROOF ACCESS LADDER

ROOF ACCESS LADDER

SLAB 12.370 C014/D01

C014/D01

SERVER

Rev Date

Revision

Drawn By

1

1

B

B

CR

E AN

G IN AT ER P O

AR

C06/D01

C

C06/D02

SLAB 12.370

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

2

C01/D01

C010/D01

C02/D01

C02/D02

1500

C01/D02

C09/D01

C06/D01

PLANT AREA

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

A Draw ing S ta tus

BUILDING REGULATIONS Project

Trinity House, Buoy Shed Meeting Room Client

Trinity House Lighthouse Service Cad File

Mac 7

Scale

Drawn By / D a t e

1:200

ST 22/02/2008

Checked By / Date

Tit le

Proposed Second Floor Plan D r a w i n g N o.

R e v N o.

A/704/BR/02 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.


D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .

D

Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.

C

NOTES

1 C13

Existing Technical Library

B

B Details to Spec. L10/56 toughened glass EX 150 x 90mm SW EX 150 x 90mm SW

C14

detail 1 scale 1:10

Existing Server Room

detail 2 scale 1:10

air conditioning unit to be resited new metal stud partition resite existing door & frame EX 50 x 22mm SW

C013/D01

C12

ROOF ACCESS LADDER

air conditioning unit to be retained

fire-resistant glazing pilkington pyrodur or similar

C014/D01

C012/D01

570

Lobby

2 C06/D01

100mm metal stud partition

Rev Date

dis tan ce

Library

14 m.

Drawn By

Inkpen Downie Architecture & Design Ltd

skirting trunking pendock tk casing system or similar

150mm metal stud partition to give thermal insulation and 1hr fire resistance

Meeting Room

Revision

Storage

form new opening in existing metal stud partition

5600

A

line existing structure with 150mm metal stud partition to give thermal insulation and 1hr fire resistance

A 5600

Fir ee sc ap et rav el

Existing door

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Draw ing S ta tus

BUILDING REGULATIONS Project

Storage 1 hour fire resisting glazing opening in for cleaning

Trinity House, Buoy Shed Meeting Room Client

Trinity House Lighthouse Service 3900

9016 Cad File

Mac 7

Scale

Drawn By / D a t e

1:50

ST Apr 2008

Checked By / Date

Tit le

Storage 1067

2050

2050

Proposed Floor Plan

1067 D r a w i n g N o.

R e v N o.

A/704/BR/03

PLAN

B

detail 1

detail 2

Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.


D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .

B

Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.

detail 5 detail 5 scale 1:20

ventilation louvre

NOTES

ply timber structure

extract duct retain existing control panel accessible

detail 6 scale 1:20

retain existing light fitting structure

retain existing light fitting structure move existing cables to accommodate the new door

detail 6

skirting trunking

Library

ventilation duct & louvre dado trunking

Meeting Room Storage

SECTION A-A

D

C

B

A

detail 3 Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

detail 3 scale 1:20

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Draw ing S ta tus

skirting trunking timber cill skirting trunking pendock tk casing system or similar

BUILDING REGULATIONS

air conditioning unit to be resited

dado trunking

Project

fire resisting timber windows

Trinity House, Buoy Shed

Server Room

timber cill 30mm thick

service pipes

Meeting Room Client

Meeting Room

Trinity House Lighthouse Service Cad File

Mac 7

detail 4 scale 1:20

Scale

Drawn By / D a t e

Checked By / Date

1:50 / 1:20 ST Nov 08

Tit le

detail 4

Proposed Sections D r a w i n g N o.

SECTION B-B 3

2

1

R e v N o.

A/704/BR/04 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.


D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .

Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.

NOTES

retain existing light fitting structure

resite infra-red smoke detector targets

D

C

B

A

SECTIONAL ELEVATION C-C New internal partition walls to be:

New floors to be:

Electrical Installation:

On the outside: Two layers of board each side of 146mm Gypframe 146 AS 50 AcouStuds at 600mm centres. 150mm Isowool APR 1200 in the cavity. (GypWall, SoundBloc A206A243 system reference)

Meeting Room: Carpet tiles finish.

Include: - Small power for general use - Fluorescent lighting with CAT3 diffusers for I.T. installations. - Power for stand alone air conditioning unit.

Library: Carpet tiles finish. Lobby: Carpet tiles finish.

Between New Library and Meeting Room, New Server Wall: One layer of board each side of 70mm Gypframe 'C' Studs at 600mm centres. 50mm Isowool APR 1200 in the cavity. (GypWall, WallBoard A206139 system reference)

Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Draw ing S ta tus

BUILDING REGULATIONS New ceilings to be:

New doors and windows to be:

Mechanical Installation

In Meeting Room: Line existing curved metal sheet clad roof with CasoLine Curve, Gypframe MF5 ceiling section 300 x 300 centres, or Gypframe MF7C Curved Support Channel structure. Gyproc SoundBloc 12.5mm thickness board, radius 40000. Acoustic / thermal insulation: Isowool Modular Roll 150mm.

Fire doors meet BS476 Pt 22 standards to give 1 hours fire resistance to balcony, 1/2 hours fire resistance to corridor. Windows with multi-laminated glass providing both 1 hours fire resistance and acoustic insulation.

Include: - Extend existing force ventilation system including heating and cooling to meeting room and library area. - Provide stand alone air conditioning unit heat exchanger to be situated in plant room below.

Project

Trinity House, Buoy Shed Meeting Room Client

Trinity House Lighthouse Service Cad File

Mac 7

Scale

Drawn By / D a t e

1:50

ST 22/02/2008

Checked By / Date

Tit le

In the Library: CasoLine, Gypframe MF5 ceiling section centres 600mm, Gypframe MF8 Strap Hanger or Gypframe GA1 Steel Angle centres 1200mm. Gyproc SoundBloc 12.5mm thickness board. Acoustic / thermal insulation: Isowool Modular Roll 150mm.

Proposed Elevation and Notes D r a w i n g N o.

R e v N o.

A/704/BR/05 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. 132

132

counter

EJ 132

A

HANDRAIL B

A2 Reception

BARRIER SAFETY PLYWOOD

HANDRAIL A

A8 Mail Room

132

BARRIER SAFETY PLYWOOD

NOTES

BARRIER SAFETY PLYWOOD

LIFT

EJ EJ BARRIER SAFETY PLYWOOD

UP

132

132

A31

A9 Disabled wc

Cleaners 132

Existing Office Area

B14 Lobby

HANDRAIL A

DOWN

BARRIER SAFETY PLYWOOD

C11

132

HANDRAIL B

CERAMIC WALL TILES

C10

BARRIER SAFETY PLYWOOD

B1

Upper Part Entrance

IPS 2400 HIGH ARMITAGE EVOLVE ACCESS FACILITY

C08

BARRIER SAFETY PLYWOOD

Stair A

Drain

TEMPORARY SCREEN

132

HANDRAIL B

EJ

73

EJ

TEMPORARY DUST PROOF SCREEN

BARRIER SAFETY PLYWOOD

45

45

EDGE OF SLAB IN RISER NOT SHOWN

BARRIER SAFETY PLYWOOD

BARRIER SAFETY PLYWOOD

THIS SCREEN TO BE TAKEN DOWN AFTER INSERTION OF NEW FLOOR FROM BELOW.

1320

UP Stair

EDGE OF SLAB IN RISER NOT SHOWN

A1 Lobby

132

BARRIER SAFETY PLYWOOD

73

EDGE OF SLAB IN RISER NOT SHOWN

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

636

A7 Cash Office

EJ

A14 Lobby

EJ 132

C12

CONTRACTORS ACCESS VIA MAIN STAIR

EJ 132

EJ

TEMPORARY SCREEN

B15 Lobby

CERAMIC WALL TILES

CERAMIC WALL TILES

OFFICE BUILDING GROUND FLOOR PLAN

TEMPORARY DUST PROOF SCREEN

A15

A3

Showers

B6 K

Disabled wc

EJ

1 3 2

1 3 2

ROOF ACCESS LADDER

1 3 2

1 3 2

R&D Resear

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

IPS 2400 HIGH

B3 Marketing Manager

OFFICE BUILDING FIRST FLOOR PLAN 1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

TEMPORARY DUST PROOF SCREEN

C14

1 3 2

SERVER

7

3

1 3 2

C13

B5 Male wc

B4

CONTRACTOR'S GROUND FLOOR WORKING AREA 7 3

CONTRACTOR'S ACCESS FROM THIS SIDE

UP

7 3

1 3 2

7 3

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

TEMPORARY VISITORS AND STAFF ENTRANCE

1

B

BUOY SHED SECOND FLOOR PLAN

GEORGE

STREET

MAIN ENTRANCE TO YARD IN CONSTANT USE

EX

IS

TI

NG

FD 1

BD

A 01.12.2008 site plan scale to 1:300 & additional area for the contractor's compound & additional dust proof screed on GF buoy shed

ST

Revision

Drawn By

NC

TEMPORARY DUST PROOF SCREEN

B 12.01.2009 temporary access from George Street omitted

Rev Date

FE E

BUOY SHED YARD

CRANE OPERATING AREA

BO UN DA RY

TO

FD

NT

ME

VE PA

CONTRACTOR'S ENTRANCE STORES

CONTRACTOR'S COMPOUND FOR STORAGE & WELFARE FACILITIES FIRE EXIT & STORES ACCESS TO BE KEPT CLEAR AT ALL TIMES PROVIDE TEMPORARY ACCESS BY REMOVAL OF EXISTING FENCE PANEL & REPLACEMENT ON COMPLETION

n

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION Project

e

Trinity House Harwich w

s

Alterations to Buoy Shed & Main Office Building Client

CONTRACTOR'S COMPOUND FOR STORAGE & WELFARE FACILITIES

Trinity House Light Service Cad File

Scale

Mac 7

1:300/1:100 ST / Nov 08

Drawn By / D a t e

Checked By / Date

Title

Site Plan D r a w i n g N o.

A/704/CT/01

R e v N o.

B

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

6

A24/D01

FEMALE

A26/D01 TOILETS

CHANGING 18352

25670

A24 A22

20000

20000

6090

34179 2150

1400

A19

A18

SOLAR WORKSHOP AREA

A23/D02

28439

82

82 3000

19362

FIRST AID

18100 EJ

EJ

20460

A22/D01

DISABLED TOILET

A29/D01

150

A22/D01

21159

721

FABRICATION WORKSHOP

30000

18100 10673

A20/D01

4397 27100 23270

10100 3430

EJ

A19/D01

7043

23808

26648

5900

A05/D01

A05/D02

GRIT RECYCLING

1400

A16

EJ

3400

28582

C

A12

59400

A13 OUTSTATION STORES 33100

15250 400

A11

2250 14723

66000 66173

1400

200

PAINT ( 5. 5m HIGH)

EJ

Rev Date

35618

SPRAY (6.5m HIGH)

TECHNICAL WORKSHOP

27100

27100

Revision

Drawn By

11650

A13/D01

2250

B 17900

3250

FILTERS

12000 30000

A09

A03/D01

4552

15250

A12/D01

A

2650 12100 5900

900

DRY (6.5m HIGH)

37910

30000

R TU 29887

GRIT BLASTER (6.5m HIGH)

LADDER

GA37VSD

4100

LE

130

PAINT SERVICES & PAINT STORE (3m HIGH)

3650

4601

1250

700

27100

81817

COMPRESSORS

PLANT STORAGE/CHARGING

A12/D021400

A10 28506

GA45

27100

A02

A14

A06/D01

5700

A05

12000

D

A10/D02

A10/D01

A03

5700

PLANT STORE

42600

A32

3650

56895

3650

A07

A06

CHANGING ROOM BELOW STAIRS

GFSH.04

GFSH.05

56502

399

GFSH.03

N

LOWER BUOY CRADLE AREA

33794

GFSH.06

D

455

1400

A08

A04

1400

A16/D01

3000

6m HIGH AREA WITH CRANE

FFL 03.550

776

26498

GFSH.07

44595

27100

A31/D01

A15

EXTENT OF HOOK TRAVEL

12

1

up

EXTENT OF CRANE TRACKS

EJ

A31 LIFTING STORE

27100

15

27 RISERS X 180 = 4860

14682 EJ

GFSH.08

TA B

58040

54000 8900 3000

A01/D01

E AN CR

49400 line of @rst Aoor above

1475

GRIT BLASTER (6.5m HIGH)

150

12100 11900

150

695

37422

C

GFSH.01

AR

EJ

1402

D

A01

G IN AT ER P O

18100

EA

A17

A18/D01

648

D

E

A17/D01

15466

29889

35300

A26

A24/D01

A25/D01

1400

10000

A25

1500 x 1500

F 36720

BATTERY CHARGING ROOM

A23

up

A27/D01

A25/D01

position to be con@rmed

GFSH.02

A20

1100

13720 A27/D01

3OOO kg capacity

23160

up

1400

VIEWING WINDOW

4400

A28/D01

2670

60000

EJ

A21/D01

39050

A29 AVERY BERKEL WEIGH SCALES

A30/D01

MALE TOILETS

DRIER

CHANGING

G

8500

A28

STORES

lift entry

ROOM

1000

18176

STORE-

KEEPER

33731

A27

R

A21 LAMPTEST

24000

24911

WASHE

1

3250

EJ

11718

19233 21774

12500

16600

2

51220

3655 1400

deep pit

2050

A30

3

C

30000

9100 5900 2810

9

29970

38523

location of 70

18000

in this area

A30/D02

5900

A23/D01 FIRE CONTROL PANEL

10482

2050 bulkhead

43711

400

2300

18500

5202

GFW.01

11950

20400

24000

6000 7500 10500

10100

19500

8900

3650

18100

GFW.03

9100

EJ

EJ

4

B

41950

GFW.02

30000

21450

26600

5

900

7

24000

8

15744

9

A

12000

10

A

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

A32/D01

18100

Drawing Status

CONSTRUCTION 4

GROUND FLOOR

3

Project

Trinity House, Harwich Alterations to Office & Buoy Shed Buildings Client

Trinity House Lighthouse Service Cad File

Scale

Drawn By / D a t e

Mac 7

1:200

ST/Nov 08

Checked By / Date

Title

Existing Ground Floor Plan D r a w i n g N o.

R e v N o.

A/704/CT/11 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

A

B

8

7

8000

6

11000

5

41519

8000

22000

4

8000

8000

11000

3

11000

8000

22000

8000

FFW.02

1750

3069 205

30030

11630

30323

KITCHENETTE

24435

B03

MESSING

B03/DO1

B02/DO1

B04

25000

DISABLED TOILET

B05/DO2

B05

TOILET

11000

23020

81715

MANAGER

B09

26333 51685

CUPBOARD

17215

7974

B04/DO1

B05/DO1

17242

250 2080

B01/DO3

ELECTRIC

13610

8000

FFW.09

GENERAL OFFICE B08/DO1

1557

26485

B01/DO1

3965

down

B02/DO2

22470

15030

B02

15000

FFL 08.410

1100 high handrailing to stair well

22000

FFW.08

1970

B08

12295

B01

89980

5700

B10

FFL 08.410

15000

FFW.10

B06/DO1

down 27 15

10000

B11 B07/DO1

B07

FFW.11

MEETING

up 13830

B16/DO1

B16

B12/DO1 B13/DO1

RACKS

26945

VOID

12

1

255

15301

AR

EA

B06

1600

480

E AN CR

G IN AT ER P O

B06/DO2

22604

refuge

B10/DO1

12984

15301

2420

B09/DO1

22604

FFW.09

18000

250

5700

15000

73445

8000

B03/DO2 +6.790

STORES

11000

FFW.07

FFW.06

FFW.05

1

13610

+9.850 B01/DO2

1800 x 1750 breakthrough size

FFW.04

9700

17500

2050

lift entry

150

1300

lift control cabinet

18000

FFW.03

5700

1805

2300

400

FFW.01

2

59820

9

39240

10

C

57902 5150

31470

0

B12

10100

59540

B14/DO1

130

1250

B13/DO2

(6.5m HIGH)

5700

1400

B14

B13

SIGNS & LABELS

T MOBILE COMMS ROOM

FFL 08.410

40000

PLANT 1 B15/DO1

C

0 0 0 8 3 Ă˜

TU GRIT BLASTER (6.5m HIGH)

B15/DO1

R

6 2 2 5 0

UPPER BUOY CRADLE AREA

A02

N

TA B

LE

B14/DO1

DRY (6.5m HIGH)

SPRAY (6.5m HIGH)

PAINT SERVICES & PAINT STORE (3m HIGH)

B15 PAINT (5. 5m HIGH)

PLANT 2 Rev Date

Revision

Drawn By

FFL 08.410

FILTERS 5700

5700

6 2 4 3 7

GRIT RECYCLING

LADDER

B

MEZZANINE

Inkpen Downie Architecture & Design Ltd A

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION Project

FIRST FLOOR

Trinity House, Harwich Alterations to Office & Buoy Shed Buildings Client

Trinity House Lighthouse Service Cad File

Scale

Drawn By / D a t e

Mac 7

1:200

ST/Nov 08

Checked By / Date

Title

Existing First Floor Plan D r a w i n g N o.

R e v N o.

A/704/CT/12 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

A 10

B 9

8

7

6

SFW.02

5

SFW.03

4

SFW.04

3

SFW.05

2

1

SFW.06

5700

SFW.01

C

C02/D03

G

LAMP TEST ROOM

C04/D02

EL

SFW.07

C07

SFW.08

28120

18000

E

1000

C12 22

15001

15000

C11

18000 481

1600

C06/D02

2080

E AN CR

G IN AT ER P O

A

LIGHT RANGE

down

C06/D01

12

D

22 RISERS X 180 = 3960

11

C012/D01

280

579

04

C013/D01

15662

TECHNICAL LIBRARY

ROOF ACCESS LADDER

C13 515

29340

19269

15002

SLAB 12.370

18880

29835

C08/D01

C06 E AR

C10

C05/D01

5700

2079

CUPBOARD

15000

C06/D03

C03/D02

31000

27285

C03/D01 ELECTRIC

12411

DARK ROOM

C03/D03

12100

C06

C09

C010/D01

10000

70699

C01/D01

12.370

C09/D01

LIGHTS LABORATORY

2080 250

PLANT AREA

C08

ELECTRONICS LAB.

77416 C04/D01

C02/D01

C01/D02

C05

TEST ROOM

00

C014/D01

C14 concrete slab roof to rooms below

32980

2080

down

18940

C03

F

SECURE STORE 38820

553

73445

PLANT AREA

C04

80984

74504

57715

C02

4169

C01

SLAB 12.370

SERVER C

5700

Rev Date

Revision

Drawn By

B

5700

16100

C07/D01

1300

38950

R & D SUPPORT

A

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION Project

Trinity House, Harwich Alterations to Office & Buoy Shed Buildings Client

Trinity House Lighthouse Service Cad File

Scale

Drawn By / D a t e

Mac 7

1:200

ST/Nov 08

Checked By / Date

Title

Existing Second Floor Plan D r a w i n g N o.

R e v N o.

A/704/CT/13 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


search Director B8

D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .

Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.

CERAMIC WALL TILES

CERAMIC WALL TILES

NOTES

EJ

CERAMIC WALL TILES

ARMITAGE EVOLVE ACCESS FACILITY

Disabled wc

Kitchenette

B6

B7

Lobby B15

IPS 2400 HIGH CERAMIC WALL TILES

take down existing partition between office and upper part of lobby area, make good finishes EJ

EJ

PLYWOOD SAFETY BARRIER

IFT

EJ

HANDRAIL B

Lobby B14

DOWN HANDRAIL A

PLYWOOD SAFETY BARRIER

Stair A

PLYWOOD SAFETY BARRIER

300

EJ EJ

Existing Office Area B1

Upper Part Entrance

extend existing suspended ceiling and M&lighting instalations into extended office area.

1320

UP

PLYWOOD SAFETY BARRIER

insert new timber floor to structural engineers specification, including - two layers plasterboard and skim coat finish to underside - 22mm chipboard flooring - proprietary Kingspan access floor to match existing - contract carpet to match existing - skirting to match existing

HANDRAIL B provide dado trunking with twin 13A socket outlet and port for cat5 IT connection every 1000mm include for wiring IT cabling back to server room

A12 Jan 09 dado trunking added Rev Date

BD

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Draw ing S ta tus

CONSTRUCTION Project

Trinity House, Harwich Alterations to Main Office Building Client

Trinity House Lighthouse Service Cad File

Scale

Drawn By / D a t e

Mac 7

1:50

ST/Nov 08

Checked By / Date

Tit le

Proposed First Floor Plan Extension of Existing Office into Lobby Area D r a w i n g N o.

A/704/CT/21

R e v N o.

A

Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.


A3

D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .

Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.

CERAMIC WALL TILES

NOTES

EJ ELECTRICAL & LIGHTING KEY LIGHTS Recessed Down Lighter

Pendant CERAMIC WALL TILES

Disabled wc A9

E

ARMITAGE EVOLVE ACCESS FACILITY IPS 2400 HIGH

Drain

EJ

Mail Room A8 HANDRAIL A

include for the following in lobby area: - new luminaires lighting instalation - new ceiling mounted air curtain - resite access controls from outer doors to inner lobby doors including renewal of ironmongery.

A Lobby A1

45

45

Reception A2

Emergency Lighting

HANDRAIL B

UP

Stair A ceiling joists 44mm x 145mm

Rev Date

Drawn By

new light fittings to match with the existing upper entrance ceiling luminaires

counter 636

Revision

Inkpen Downie Architecture & Design Ltd

Cash Office A7

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Draw ing S ta tus

CONSTRUCTION Project

Trinity House, Harwich Alterations to Main Office Building Client

Trinity House Lighthouse Service

EJ

Cad File

Scale

Drawn By / D a t e

Mac 7

1:50

ST/Nov 08

Checked By / Date

Tit le

Proposed Ground Floor Ceiling Plan Extension of Existing Office into Lobby Area D r a w i n g N o.

R e v N o.

A/704/CT/22 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.


D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .

Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.

NOTES

ELECTRICAL & LIGHTING KEY LIGHTS Recessed Down Lighter

Pendant

E

Emergency Lighting

retain existing light fittings

retain and adapt existing suspended ceiling. extend existing ceiling height from the existing office area

Existing Office Area B1

Upper Part Entrance

retain existing light fittings

new light fittings to match with the existing

keep existing ceiling height of lobby area Rev Date

Revision

Drawn By

take down existing partition between office and upper part of lobby area form new structure to fix the vertical part of the suspended ceiling. Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Draw ing S ta tus

retain existing light fittings

CONSTRUCTION Project

Trinity House, Harwich Alterations to Main Office Building Client

Trinity House Lighthouse Service Cad File

Scale

Drawn By / D a t e

Mac 7

1:50

ST/Nov 08

Checked By / Date

Tit le

Proposed First Floor Ceiling Plan Extension of Existing Office into Lobby Area D r a w i n g N o.

R e v N o.

A/704/CT/23 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.


D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .

Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.

NOTES

Control Room C1

2700

200

13.690

RS@177mm mm = 280

12.300 SSL

detail 1

detail 1 scale 1:10 12.300 retain & adapt existing suspended ceiling

LA

retain existing raised access floor panels

aluminium cap channel

B1

retain & adapt existing suspended ceiling existing raised access floor panels to be retained carpet floor finish

detail 2 8.400

new raised access floor panels to be match with the existing

120

RS@177mm mm = 280

new raised access floor panels to be match with the existing

aluminium cap

2490

Technical Services Area 2

movement joint to manufacturers standard details and recommendations

chipboard

remove existing air curtain and replace with new ceiling mounted unit

Rev Date

protect and retain existing entrance screen

Drawn By

Inkpen Downie Architecture & Design Ltd

2715

Lobby A1

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

detail 2 scale 1:10

2281

Reception A2

Revision

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Draw ing S ta tus

CONSTRUCTION Project

4.500

two layers of plaster board plaster board ceiling joists 44 x 145 aluminium cap two layers of plaster board

Trinity House, Harwich Alterations to Main Office Building Client

Trinity House Lighthouse Service Cad File

Scale

Mac 7

1:50 / 1:10 ST/Nov 08

Drawn By / D a t e

Checked By / Date

Tit le

Proposed Section & Details

retain & adapt existing suspended ceiling

Extension of Existing Office into Lobby Area D r a w i n g N o.

R e v N o.

A/704/CT/24 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.


A3

D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .

Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.

CERAMIC WALL TILES

NOTES

EJ

CERAMIC WALL TILES

Disabled wc A9 ARMITAGE EVOLVE ACCESS FACILITY IPS 2400 HIGH

Drain

EJ

A

Mail Room A8 HANDRAIL A

Lobby A1

45

45

Reception A2 HANDRAIL B

UP

Stair A

Revision

Drawn By

636

counter

Rev Date

Inkpen Downie Architecture & Design Ltd

Cash Office A7

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Draw ing S ta tus

CONSTRUCTION Project

Trinity House, Harwich Alterations to Main Office Building Client

Trinity House Lighthouse Service

EJ

Cad File

Scale

Drawn By / D a t e

Mac 7

1:50

ST/Nov 08

Checked By / Date

Tit le

Existing Ground Floor Plan Extension of Existing Office into Lobby Area D r a w i n g N o.

R e v N o.

A/704/CT/25 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.


search Director B8

D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .

Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.

CERAMIC WALL TILES

CERAMIC WALL TILES

NOTES

EJ

CERAMIC WALL TILES

ARMITAGE EVOLVE ACCESS FACILITY

Disabled wc

Kitchenette

B6

B7

Lobby B15

IPS 2400 HIGH CERAMIC WALL TILES

EJ

EJ

PLYWOOD SAFETY BARRIER

IFT

EJ

HANDRAIL B

Lobby B14

DOWN HANDRAIL A

PLYWOOD SAFETY BARRIER

Upper Part Entrance

1320

Stair A UP

PLYWOOD SAFETY BARRIER

PLYWOOD SAFETY BARRIER

Existing Office Area B1

300

HANDRAIL B Rev Date

Revision

Drawn By

EJ EJ Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Draw ing S ta tus

CONSTRUCTION Project

Trinity House, Harwich Alterations to Main Office Building Client

Trinity House Lighthouse Service Cad File

Scale

Drawn By / D a t e

Mac 7

1:50

ST/Nov 08

Checked By / Date

Tit le

Existing First Floor Plan Extension of Existing Office into Lobby Area D r a w i n g N o.

R e v N o.

A/704/CT/26 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.


D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .

ELECTRICAL & LIGHTING KEY

Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.

LIGHTS

D

C

Wall (Surface Mounted)

NOTES

Ceiling (Surface Mounted)

COMMUNICATIONS & FITTINGS SD

1

Pendant

HD

C13

E

Emergency Lighting

SWITCHES

C14

B TV

2 Gang switch Existing ceiling and light fittings to be retained in the server room and the corridor. Adapt existing ceiling grid to suit new partition arrangement Spec clause K45/13

ASDL

S

ASDL Socket Speaker Socket

Switched Socket Outlet C014/D01 C014/ //D D01 D

SD

3

3

3 ASDL

Telephone Socket

POWER

4

T

3 ASDL

3 ASDL

T

T

Twin Switched Socket Outlet Tripple Switched Socket Outlet

2

Four Switched Socket Outlet

3 ASDL

Rev Date

Revision

Drawn By

3 ASDL

T

T

New exposed grid ceiling system to match existing. Spec clause K40/10

Inkpen Downie Architecture & Design Ltd

E

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

SD

SD

E

New curved ceiling to Spec clause K10/50

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Draw ing S ta tus

TENDER

HD

Project

cable track all around the room

3 ASDL

Trinity House, Buoy Shed Meeting Room

E

Client

Trinity House Lighthouse Service Cad File

T

C06/D01

Television Aerial socket

4 Gang switch

2

C12

Electric Extract Fan

3 Gang switch

ROOF ACCESS LADDER

C012/D01

Heat Detector

1 Gang switch T

C013/D01

Smoke Detector

Mac 7

Scale

Drawn By / D a t e

1:50

ST Nov 2008

Checked By / Date

Tit le

Proposed Electrical Layout and ASDL 3

T

ASDL 3

T

ASDL 3

Ceiling Plan T

D r a w i n g N o.

R e v N o.

A/704/T/06 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.


D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .

D

Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.

C

NOTES

1 C13

B C14

C013/D01

C012/D01

C12

ROOF ACCESS LADDER C014/D01 C014/ //D D01 D

2 Rev Date

C06/D01

Revision

Drawn By

Radiator skirting trunking pendock tk casing system or similar

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Radiators

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Draw ing S ta tus

TENDER Project

Trinity House, Buoy Shed Meeting Room Client

Trinity House Lighthouse Service Cad File

Mac 7

Scale

Drawn By / D a t e

1:50

ST Nov 2008

Checked By / Date

Tit le

Proposed Mechanical Layout D r a w i n g N o.

R e v N o.

A/704/T/07 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.





Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e. UP

NOTES

EJ

EJ

EJ

9

EJ

lift entry

up up

EJ

EJ

EJ EJ

1

up

40

EJ EJ

e

n

EJ

E AN CR

Rev Date

Revision

Drawn By

A A

w

RE

s

G TIN RA PE O

LOWER BUOY CRADLE AREA

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

PLANNING

SITE PLAN

SCALE 1:250

Project

Trinity House, Harwich New Fabrication Shop Client

Trinity House Lighthouse Service Cad File

Scale

Mac 7/814

1:250/1:2000 ST/Jan 09

Drawn By / D a t e

Checked By / Date

BD/

Title

Site Plan and Location Plan

LOCATION PLAN SCALE 1:2000

D r a w i n g N o.

R e v N o.

A/814/PL/01 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

insulated sheet metal roofing with daylighting by translucent sheets to match main building

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

- all services to be brought via existing underground duct to new fabrication duct including to supply machinery - machinery from existing fabrication shop to be brought over and installed - mechanical and electrical installation in addition for supplies to machinery to include:

insulated cladding panels to match main building

space heating by unit heaters high bay lighting to provide general lighting mechanical ventilation and fume extract small power water

w 5.00 x h 6.00 metre main door opening

cavity walls with full fill cavity insulation fairface block inner leaf and glazed brick outer

piled slab foundation to structural engineers recommendation

PROPOSED NORTH WEST ELEVATION

E AN CR

E OP

EXTENT OF HOOK TRAVEL

PROPOSED NORTH EAST ELEVATION

FFL 03.550

TU

R

N

OWER BUOY CRADLE AREA

TA B

A08 A07 SPRAY (6.5m HIGH)

DRY (6.5m HIGH)

LOWER BUOY CRADLE AREA

RE

1000

A

A09

A

LADDER

A11

73.25째

FILTERS

PROPOSED SOUTH EAST ELEVATION

NG TI RA PE O

A03 GRIT RECYCLING

means of escape routes

NE A CR

A10

COMPRESSORS

PA ( 5. 5m

1 92 14

GRIT BLASTER (6.5m HIGH)

PAINT SERVICES & PAINT STORE (3m HIGH)

13 97 0

LE

EXTENT OF CRANE TRACKS

GRIT BLASTER (6.5m HIGH)

A02

PROPOSED SOUTH WEST ELEVATION

PROPOSED ROOF PLAN Rev Date

A

B

EXISTING BUOY SHED BUILDING

fabrication shop

NEW FABRICATION SHOP

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

12.00 x 18.00 metres

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

PLANNING Project

13 97 0

1 92 14

means of escape routes

Trinity House, Harwich

NE A CR

New Fabrication Shop

NG TI RA PE O

LOWER BUOY CRADLE AREA

A

73.25째

Client

Trinity House Lighthouse Service

RE 8680 7200

7200

1000

8680

A

A

B

Cad File

Scale

Mac 7/814

1:100

Drawn By / D a t e

ST/Jan 09

Checked By / Date

BD/

Title

8.68 metre clearance under crane beam

Proposed Fabrication Shop Plan, Roof Plan, Sections & Elevations D r a w i n g N o.

PROPOSED FLOOR PLAN

R e v N o.

A/814/PL/02 SECTION AA

SECTION BB

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

ET

A

TI

NEW FABRICATION SHOP

RT

EXISTING BUOY SHED BUILDING

NU

T IN S A

IN

I

FFL 12.370 FFL 12 12.3 370 0

TRINITY HOUSE

FFL L 08.410 08 08.4 8 410

FFL 03.550 FFL 03 550 0

NORTH WEST ELEVATION

Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

PLANNING Project

Trinity House, Harwich New Fabrication Shop Client

Trinity House Lighthouse Service Cad File

Scale

Mac 7/814

1:100

Drawn By / D a t e

Checked By / Date

ST/Jan 09

BD/

Title

Existing Buoy Shed Elevations GFD.07

& Proposed Fabrication Shop Elevations D r a w i n g N o.

SOUTH WEST ELEVATION

R e v N o.

A/814/PL/03 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.





Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

LOCATION PLAN 1:2500 N

NOTES

W

E S

'SS R'S R R OR O OR O TOR OO EEAA O CT LO R REA ACT ACTO AC FLOAR ARE DF ARE TTR N D G NTR NT N ND N ON O UN NG CO R OU KKIN RKI R GR OR O WO W

ESS CE CES CCE AACC AC 'SS R'S E R ORSI TOR C S SID CTO CT AACT RACTHI RA HIS H TR TRA TR NTRM TTH NT ON OM O CO RO C R FR FRO RS IIT ITO CE ISIT A VIIS VIS VI RAN RA R TR Y N NTR ENT EN ARY ENT AAR RARFFFF RA O AFF OR AF POR TAF MP STA STA EM EM D TTEM TE N ND A AN

G E O R G E

BU Y

S

O

T R E

ED SH

E T

RD YA

D RD AR AR YA Y O E TTO SE E US US CE C NT NT AN AN AN RA R T TA NTTR NS EN E ON N CO AIIN MA IN M E AN RA CR

ING AT AT RA ER OP REA AR A D

ES RES R OR STO

ND ND UN O E OU

TE ITE SIIT SIT E RYY D AARY F CE V ID RA VID CE R BBYY OF RAR O NCE N O OR OV ENC PO SSS AALL FFE PO RO POR FEN PRO PR MP ESS T N VVA G VAL C OV CES N ON NT O OVANG TEEMCC TE TEM O EEN ENT M TI T TIO A EM ACC AC TING ME TI L & EM SSTTIN REM STI R E EL PLE XXIS NE N LLA EXI EX LAC A PAN PAN EP COM REPN O ON

FA F

A RAAC OR S NTTRST E ES S TIE TI TI ITI R IL CO OR LIT LI FO AC CIL CILI

PO ARE 'S MP FAAR OR L CO ELLF ACTCEE WE 'S & W NC ANC NT RAN NTR ON TRA O OR E TR CO NTR C E ENT CT AG CT A

PAVEME P PA PAV PAVEMEN VEMENT V VE EM EME ME ENT E T

F

O TO S EESS EESSIME CES T TIM ACCLLL AALL

FE FENCE EN NC TO NC O

D

Y OUNDARY OUND BOUNDARY B NG BO ING TIIN ST STI ST IS X XIS XISTI EXISTING EX E EXI

F

RESAATT STO AR & TT& CLLEE XIT T CLE EEXI EPT EP E KEP FIR E B

n

w

e

s

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

7

3

1 3 2

1 3 2

1 3 2

7 3

UP

7 3

7 3

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

1 3 2

GEORGE

STREET Rev Date

Revision

Drawn By

MAIN ENTRANCE TO YARD IN CONSTANT USE EX

FD 1

TI

NG

Inkpen Downie Architecture & Design Ltd

BO UN DA RY

2 Balkerne House

CO1 1PA

BUILDING REGULATIONS

E TO

Project

NT

CONTRACTOR'S COMPOUND FOR STORAGE & WELFARE FACILITIES

ME

VE PA

CONTRACTOR'S ENTRANCE STORES

FIRE EXIT & STORES ACCESS TO BE KEPT CLEAR AT ALL TIMES

Colchester

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

NC

FD

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

FE

BUOY SHED YARD

CRANE OPERATING AREA

IS

Alterations to office accommodation at The Buoy Shed, George Street, Harwich. Client

Trinity House Light Service Cad File

Scale

Mac 7

1:250/1:2500ST / Nov 08

Drawn By / D a t e

Checked By / Date

Title

Site Plan and Location Plan n

e

SITE PLAN 1:250

D r a w i n g N o.

w

s

R e v N o.

A/917/BR/04 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

44 x 20 architrave 10

9

A

8

7

6

GFW.02

5

9

deep pit

2177

STORE-

DRIER

CHANGING

A29

A27

R

A28

STORES

lift entry

KEEPER

GFW.01

MALE TOILETS

140

A20 A23

A27/D01

3OOO kg capacity

up

up

A27/D01

AVERY BERKEL WEIGH SCALES

A30/D01

A25/D01

A25

1500 x 1500 position to be con@rmed

A26

A24/D01

A22/D01

A22/D01

A24 A22 DISABLED TOILET

A29/D01

FIRST AID

F VIEWING WINDOW

140

A23/D02

96 x 28 screwed and glued to 170 x 50 lining

A18

A19

SOLAR WORKSHOP AREA

FABRICATION WORKSHOP

A20/D01

A17

EJ

15

15

65

D

5400

A01

GFSH.01

CR

A

NE

G IN AT ER OP

AR

EA

D

27 RISERS X 180 = 4860 EJ

GFSH.08

12

1

line of @rst Aoor above

D

40

2650

890

GFSH.07

GFSH.06

78

GFSH.05

N R TU

A02

GRIT BLASTER (6.5m HIGH)

A05/D01 A05/D02

A12

A13 OUTSTATION

GRIT RECYCLING

G RI

570

detail 02 typical window mullion detail

SWITCHES single gang two way switch, plate pattern and manufacture to match existing double gang two way switch, plate pattern and manufacture to match existing

A13/D01

1472

EJ

2710

225

B

triple gang two way switch, plate pattern and manufacture to match existing

1790

325

FILTERS

1200

A09

A12/D01 A03/D01

455

590

detail 01 typical window cill, jamb, head detail

STORES

A11 225

LADDER

ST 125

PAINT ( 5. 5m HIGH)

A10

GA37VSD

COMPRESSORS 2710

SPRAY (6.5m HIGH)

A03

570

TE

GA45

DRY (6.5m HIGH)

new office

A06/D01

A05

PLANT STORE

exit

A12/D02

PAINT SERVICES & PAINT STORE (3m HIGH)

emergency Lighting

1525

1210

A

iluminated exit sign to match existing fittings in other areas

C

A10/D02

A10/D01

A07

A06

CHANGING ROOM BELOW STAIRS

A32

TA B

A08

A04

LOWER BUOY CRADLE AREA

E

EJ

PLANT STORAGE/CHARGING

GFSH.04

LE

70

1190

strip flourescent

44 x 20 architrave

TECHNICAL WORKSHOP

A14

GFSH.03

90

1210 300

A01/D01

A31

5690

28 x 32 stops fixed with screws

6m HIGH AREA WITH CRANE

FFL 03.550

EXTENT OF CRANE TRACKS

GRIT BLASTER (6.5m HIGH)

EJ

LIFTING STORE

A31/D01

new recessed flourescent integrated into ceiling grid to match fittings in other areas in manufacture and lamps

up

A15

EXTENT OF HOOK TRAVEL

A16

C

10 mm pyrostop fire resisting glazing or similar

EJ A19/D01

D

LIGHTS

E

A17/D01

EJ

EJ

ELECTRICAL & LIGHTING KEY

BATTERY CHARGING ROOM

A24/D01

A25/D01

FEMALE A26/D01 TOILETS CHANGING

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

EJ

A21/D01

A28/D01

GFSH.02

ROOM

100 WASHE

1200

A30

sealed double glazing unit

G

A21 LAMPTEST

+5.170

location of 70

in this area

1

EJ A23/D01 FIRE CONTROL PANEL

2050 bulkhead

2

GFW.03

365

A30/D02

3

C

94 x 32 fixed with screws and cups to lining

EJ

EJ

4

B

A

single gang one way switch, plate pattern and manufacture to match existing

265 590

A32/D01

1810

triple gang one way switch, plate pattern and manufacture to match existing 4

3

emergency lighting test key switch

ground floor plan 1:200 scale POWER plastic dado trunking system, pattern and manufacture to match existing elsewhere in building switched double socket outlet, plate pattern and manufacture to match existing

2

metal formwork to in-situ concrete slab over

FITTINGS SD

C

2

T

2

C

COMMUNICATIONS

suspended ceiling to spec K40/10

T

E SD

suspended ceiling to spec K40/10

new smoke detector, pattern and manufacture to match existing elsewhere in building and wired into existing fire alarm system

partition to spec K10/30

C

telephone socket, pattern and manufacture to match existing elsewhere in building and wired into existing telephone system computer outlet, pattern and manufacture to match existing elsewhere in building and wired into existing telephone system

dado trunking to accommodate telecom, IT and small power cabling

C

2

2

C

2

C

C

2

T

vinyl flooring with self coved skirting

ceiling plan and electrical layout

section A-A

C

4/05/10

B

16/02/10 electrical layout amended for new door position

A 16/02/10 alternative door location required by building inspector shown pyrostop glazing in lieu of pyrodur shown Rev Date

detail 01

partition to spec K10/30

amendments for as built drawing

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd

60/60 fire door to spec L20/30

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

60/60s fire door to spec L20/30

EJ

AS BUILT Project

1 hour fire resisting glazed panel to spec L10/56

new 1 hour fire resisting glazed panel to spec L10/56

Alterations to office accommodation at The Buoy Shed, George Street, Harwich Client

60/60s fire door to spec L20/30

Trinity House Lighthouse Service Cad File

partition to spec K10/30

Mac 6

Scale

Drawn By / D a t e

Checked By / Date

1:XX

BD/jan 2010

BD/jan 2010

Title

new ground floor office ground floor plan

elevation to bouy shed

plan & details D r a w i n g N o.

A/917/T/01

R e v N o.

C

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. 10

9

8

7

6

5

4

3

FFW.02 FFW.03

175

130 +9.850

FFW.08

1163

KITCHENETTE

B08 B02 B05/DO1

B01/DO1 ELECTRIC CUPBOARD

B04/DO1 B02/DO1

B04 DISABLED TOILET

B09

B08/DO1

MANAGER

ELECTRICAL & LIGHTING KEY

B10

B05/DO2

B05

FFL 08.410

TOILET

disabled refuge space

B01/DO3

B02/DO2

NOTES GENERAL OFFICE

1500

FFL 08.410

down

FFW.09

MESSING

970

B01

FFW.07

FFW.06

B03

B03/DO1

STORES

1100 high handrailing to stair well

15

FFW.05

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

B03/DO2 +6.790

B01/DO2

1800 x 1750 breakthrough size lift entry

FFW.04

1

307

FFW.01

lift control cabinet

2

B10/DO1

CR

AN

E

G IN AT ER OP

A

A RE

refuge down

B06

B06/DO1

48

B06/DO2

suspended ceiling to spec K40/10 inserted at height to minimise alterations to existing services

27

B11

15

1000

VOID

12

1

FFW.10 B07/DO1

LIGHTS

disabled refuge space

B09/DO1

FFW.09

up

new recessed flourescent integrated into ceiling grid to match fittings in other areas in manufacture and lamps

B12/DO1 B13/DO1

B12 upper part of double height space

B13

B13/DO2

SIGNS & LABELS

strip flourescent

T MOBILE COMMS ROOM

E

FFL 08.410

emergency Lighting

B14/DO1

(6.5m HIGH)

C

new boiler enclosure

new office

existing office

exit

6225

TU

UPPER BUOY CRADLE AREA

A02

GRIT BLASTER (6.5m HIGH)

PAINT SERVICES & PAINT STORE (3m HIGH)

SPRAY (6.5m HIGH)

DRY (6.5m HIGH)

SWITCHES

B15/DO1

R

Ă˜3800

N

TA B

LE

B14/DO1

iluminated exit sign to match existing fittings in other areas

existing plant room converted to new office

PAINT (5. 5m HIGH)

single gang two way switch, plate pattern and manufacture to match existing

existing metal formwork to in-situ concrete slab over

double gang two way switch, plate pattern and manufacture to match existing

GRIT RECYCLING

3510

LADDER

B

MEZZANINE

FILTERS

570

A

existing plant room partitioned to provide space for resited boiler plant

section A-A

1 hour fire resisting glazed panel to spec L10/56 in new opening in existing blockwork details as drawing A/917/T/01

existing glazed panel

triple gang two way switch, plate pattern and manufacture to match existing single gang one way switch, plate pattern and manufacture to match existing

first floor plan 1:200 scale

triple gang one way switch, plate pattern and manufacture to match existing emergency lighting test key switch

POWER

B06/DO1

27

plastic dado trunking system, pattern and manufacture to match existing elsewhere in building

B

switched double socket outlet, plate pattern and manufacture to match existing

2

FITTINGS

B07/DO1

up

SD

new smoke detector, pattern and manufacture to match existing elsewhere in building and wired into existing fire alarm system

COMMUNICATIONS T

B13/DO1

existing office

C

telephone socket, pattern and manufacture to match existing elsewhere in building and wired into existing telephone system computer outlet, pattern and manufacture to match existing elsewhere in building and wired into existing telephone system

box in existing pipework

2

C

30/30s rated fire door and frame to spec L20/30

T

E

B14/DO1

T

B13/DO2

30/04/10

as built amendments

16/02/10

studs & insulation to wall between buoy shed and new office increased

Rev Date

Revision

Drawn By

C

C

new office

exit

2

new suspended ceiling to spec K40/10

B A

2

SD SD

E

fnew 1 hour fire resisting glazed panel to spec L10/56

existing block wall lined with partition to spec K10/30

Inkpen Downie Architecture & Design Ltd

T

C

2 Balkerne House

2

2

2

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

C

C

T

new partition to spec K10/40

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

exit

B15/DO1

Drawing Status

AS BUILT Project

new boiler enclosure SD

Alterations to office accommodation at

E existing louvre panels to outside air

The Buoy Shed, George Street, Harwich new partition to spec K10/30

Client

exit

Trinity House Lighthouse Service Cad File

Mac 6 SD

existing louvre panels to outside air

first floor plan

Drawn By / D a t e

Checked By / Date

1:XX

BD/jan 2010

BD/jan 2010

Title

E door and frame to spec L20/30

Scale

Option 1 new first floor office plan & details

ceiling plan and electrical layout

D r a w i n g N o.

A/917/T/02

R e v N o.

B

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.





Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

RAMP

DOWN

DOWN

NOTES

EXISTING MEZZANINE FLOOR PLAN C=1.32 S=4.22 H=4.36

C=1.32 S=3.58 H=3.73

H=2.72

USB=4.08

USB=5.18

USB=5.18

USB=5.18

TRAILER

STAIRS

H=1.98

Rev Date

Revision

Drawn By

UP

UP

INSPECTION PIT

H=1.98

USB=8.12

H=1.98

Inkpen Downie Architecture & Design Ltd

RAMP

H=5.12

TH=0.06

COPY RAFTERS

C=1.32 S=3.58 H=3.73

C=1.32 S=4.22 H=4.36

USB=5.18

C=1.32 S=4.22 H=4.36

2 Balkerne House

WORKSHOP USB=7.37

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

C=1.09 H=3.22

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

TRAILER

FOR INFORMATION

USB=2.78 C=1.05 S=2.44 H=2.54

USB=6.73

USB=6.00

C=1.05 S=2.44 H=2.54

Project

Alterations to the Chauffeurs Garage

USB=2.78 Client

H=1.92 H=1.97 C=1.32 S=3.12 H=3.22

H=1.96

H=1.94 SHOWER

Felixstowe Port

H=2.0 TH=0.02 WC

H=2.0

H=2.05 TH=0.04

H=1.94

Cad File

Scale

Drawn By / D a t e

Checked By / Date

Mac 7/725

1:50

ST/Mar 2008

JI/

Title

Existing Floor Plans H=1.98

WC

CH=3.2 D r a w i n g N o.

H=2.03 TH=0.05

C=1.05 S=2.44 H=2.54

C=1.35 S=2.44 H=.2.54

EXISTING GROUND FLOOR PLAN

C=1.05 S=2.44 H=.2.54

H=1.05 S=2.44 H=2.54

H=2.07 C=2.18 S=2.44 H=2.52

C=1.08 S=2.44 H=2.54

H=2.07 C=2.18 S=2.44 H=2.52

C=1.08 S=2.44 H=2.54

C=1.05 S=2.44 H=2.54

H=2.07 C=2.18 S=2.44 H=2.52

R e v N o.

A/725/S/04 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

11.49

8.29

8.07 7.33

5.62

5.94

5.72 5.03 4.09

3.9

4.05

4.2

4.35 3.82

3.97

3.06

2.9

12.64

11.32

12.54

11.69

11.49

11.42

11.18 10.51

Rev Date

Revision

Drawn By

9.62

8.18

8.43

8.18

7.08

6.04

7.36

6.26

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

4.63

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status 3.06

3

3 INSPECTION PIT

1.75

2.87

FOR INFORMATION Project

Alterations to the Chauffeurs Garage Client

Felixstowe Port Cad File

Scale

Drawn By / D a t e

Checked By / Date

Mac 7/725

1:100

ST/Mar 2008

JI/

Title

Existing Elevations & Sections D r a w i n g N o.

R e v N o.

A/725/S/05 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Handrail and balustrade to be returned back round to wall and fixed through insulation to existing brick work

A

Profiled Cladding on z purlins on masonary

INSULATION STRATEGY 9" solid brick walls to be faced with pre-insulated plaster board. British Gypsum Drilyner MF system Therma Line Super 60mm thick on MF10 channel to achieve 0.35W/m2K. Plaster Board to be dry lined.

Existing truss removed and replaced with new portal frames to support existing purliins (to allow sufficient head room to provide access to stairs)

remove existing steel column & cut panels

B

Line around existing steel columns and generally follow White Book Construction Details

3500

Use therma line Basic VC 22 mm thick directly bonded to window and door reveals.

FF 02 Office

INSULATION STRATEGY 9" solid brick walls to be faced with pre-insulated plaster board. British Gypsum Drilyner MF system Therma Line Super 60mm thick on MF10 channel to achieve 0.35W/m2K. Plaster Board to be dry lined.

DN 8 R

Use therma line Basic VC 22 mm thick directly bonded to window and door reveals.

FF 03 Stair

CH

FD03

BLOCK PARTITIONS To be constructed using A) 100mm block B) 140mm block See Engineers drawings / specification for requirements. Block partitions to be finished fair faced for painting.

FD07

FD01

FVP01

CH : Coat Hooks

FD02

form new opening for new window to office

Balustrade formed in block work with 44 x 144 H/W 19mm Rebated Hand rail mounted on top. Screwed and plugged and pelleted to block work @ 600mm centres.

Block work taken to level of existing truss

FF 05 Office

FF 04 Lobby

FF 08 Corridor

Board out to top of ceiling joists using T &G Chip board to provide base for air cooling / ventilation units.

NOTES

LIGHTWEIGHT PARTITIONS 70mm stud 2 layers of 12.5mm wall board and 50mm isowool between studs. over all thickness of 122mm. 60 Mins Fire resistance and 50 Rw /dB Sound insulation.

FD04

Ceiling above FF 01 & FF 02 to be Plaster board on timber ceiling joists See St E Engineers Drawings & Spec for details to sizes of joists etc.

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

Line around existing steel columns and generally follow White Book Construction Details

DN 8 R

CH

FF 01 Office

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

STAIR Minimum width:- 1000mm, Minimum Going:- 280mm, Maximum Rise:-170mm All steel construction with 45mm dia hand rail and steel balustrade. Closed treads, radiused half landing and equal flights.

FD05 CH

FF 06 Office

FD06

1200

FF 07 Storage

A

PROPOSED MEZZANINE FLOOR PLAN

B

A

B

DN 8 R

remove existing steel column & cut panels

GD02

GF 01 Office

GF 05 Office

GF 10 Stair

CH

GF 07 Office

DN 8 R

GVP02

CH

GD03

GD10

CH

DX01

GD14

INSPECTION PIT

take out existing door & lintel over and extend window opening to suit new glazed aluminium door and frame

Rev B

02-05-08

Amended make up of wall which partitions offices at 1st F Level

Rev A

28-04-08

Amended size of FF01 & FF02. New office FF05. New ST storage FF07. Various amendments on door positions. Part of the existing steel structure is removed on north east side of the building. Revision Drawn By

Rev Date

GF 11 Lobby GD16 GF 14 Cleaner

GD12

GD06

GVP01 GD15

Inkpen Downie Architecture & Design Ltd Existing Brick Work

remove existing door & frame brick up the opening & form new opening for new door

C

GF 02 Simulators form new opening for new door

remove existing door & frame form new opening for new door remove existing door & frame make good

inspection chamber existing below ground drainage

form new opening for new door

Proposed Block Work

gro un dd rain ag e

GF 12 Seminar

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR INFORMATION Project

Alterations to the Chauffeurs Garage

inspection chamber

Client

CH GD08 remove existing door & frame brick up existing opening

GF 06 M WC

GD05

SO 2080x912 DL 2040x838

PROPOSED GROUND FLOOR PLAN

be low

GD07

600

CH

GD09

CH

GD11

GF 08 Kitchen

CH

GD17

GF 09 Locker

GD13

GF 13 Lobby

Cad File

take out door and frame and insert concrete cill, reduce opening in brickwork to match existing insert new aluminium window

new below ground drainage

GF 04 F WC

new below ground drainage

GF 03 Ad WC

w

remove existing door & frame brick up existing opening

GD04

SO 2080x974 DL 2040x900

ne

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Felixstowe Port

SO 2080x912 DL 2040x838

GD01

C

Remove existing steel columns and mezzanine floor

DX02

take out door and frame and lintol over and infill opening in brickwork to match existing

Propopsed Brick Work

remove existing door & frame brick up existing opening

2 Balkerne House

GF 15 Office

brick up existing opening

remove existing door & frame form new opening for new door GD18

Mac 7/725

Scale

Drawn By / D a t e

Checked By / Date

1:50

ST/Mar 2008

JI/

Title

Proposed Floor Plans D r a w i n g N o.

A/725/T/100

DX03 take out door and frame and insert concrete cill, reduce opening in brickwork to match existing insert new aluminium window

A

take out door and frame and reduce opening in brickwork to match existing insert new aluminium door and frame

R e v N o.

B

inspection chamber Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.

B

existing below ground drainage


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

DN 8 R

NOTES DN 8 R

PROPOSED ROOF PLAN

Rev A

28-04-08

Rev Date

Amended size of FF01 & FF02 on Section CC. New ventilation cowls are shown on roof plan.

ST

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

CO1 1PA

Drawing Status

FF 06 Office 300mm insulation

door system support to hangers to suit existing site conditions. details to the door manufacturers recommendations

Colchester

Fax 01206 563 377 www.inkpendownie.co.uk

NEW STEEL STAIRS SECTION

suspended ceiling

FOR INFORMATION Project

Alterations to the Chauffeurs Garage 280

Client

169

5173

280

4000

5190

280

Cad File

Mac 7/725 1350

inspection pit to be filled in

GF 12 Seminar

2700

GF 02 Simulators

2700

2700

Felixstowe Port

tanking

Scale

Drawn By / D a t e

Checked By / Date

1:50

ST/Mar 2008

JI/

Title

Proposed Roof Plan & DN 8 R

Long Section D r a w i n g N o.

PROPOSED SECTION CC

A/725/T/101 DN 8 R

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

remove asbestos cladding from former windows and then sheet out inside and outside with 18mplywood and then overclad with profiled aluminium sheeting

renew rainwater goods in powder coated aluminium

insert colour coated aluminium louvred panels in existing window frame

insert colour coated aluminium louvred panels in existing window frame

renew gutters and rain water pipes in powder coated aluminium

glass to be removed from existing windows and then sheeted out inside and outside with 18mplywood and then overclad with profiled aluminium sheeting

- strip off existing roof felt shingle roo all existing roof slopes, carry out loca existing timber sarking, including rem replacement of rotten sections of tim - overlay with 12mm wbp sheathing - lay new PVC single ply roofing me proprietary flashings at all edges jun upstands in accordance with system manufacturers specification

remove existing aerial and support

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

renew rainwater goods in powder coated aluminium

renew rainwater goods in powder coated aluminium

remove existing flue and make good brickwork on completion

take down existing chimney and make good roof on completion form joint profiles in roof finish at centres to suit two per roll width

W02

W03 W05

W04

NORTH EAST ELEVATION

return over cladding to gable brickwork 1000mm along north east elevation

insert colour coated aluminium louvred panels in existing window frame

W06

glass to be removed from existing windows and then sheeted out inside and outside with 18mplywood and then overclad with profiled aluminium sheeting

remove existing vents and ridge, make good roof deck

W08

take out existing windows & lintol over and fit new two storey aluminium window with insulated spandrel panel

line of new floor behind

renew gutters and rain water pipes in powder coated aluminium

W07

insert colour coated aluminium louvred panels in existing window frame

remove existing cladding and replace to match new gable cladding

renew rainwater goods in powder coated aluminium

remove asbestos cladding from former windows and then sheet out inside and outside with 18mplywood and then overclad with profiled aluminium sheeting

remove existing aerial and support

11.49 Rev A

take out existing timber windows and fit new aluminium windows

renew gutters and rain water pipes in powder coated aluminium

8.07

- strip off existing roof felt shingle roof finish from all existing roof slopes, carry out local repairs to existing timber sarking, including removal and replacement of rotten sections of timber and - overlay with 12mm wbp sheathing plywood - lay new PVC single ply roofing membrane with proprietary flashings at all edges junctions and upstands in accordance with system manufacturers specification take down existing chimney stack and make good roof deck

8.29 W19

7.33

W20

W21

28-04-08

Rev Date

New roof ventilation cowls are shown. Position of the grills are ST amended. Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

W22

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

form joint profiles in roof finish at centres to suit two per roll width

renew gutters and rain water pipes in powder coated aluminium

5.72

5.94

FOR INFORMATION Project

Alterations to the Chauffeurs Garage

5.03 4.09

3.9

4.05

W10

4.2

4.35

Client

W11 W12

W13

W14

W15

W16

3.82

W17

3.97

Felixstowe Port

W18

Cad File

Mac 7/725

3.06

2.9

Scale

Drawn By / D a t e

Checked By / Date

1:50

ST/Mar 2008

JI/

Title

Proposed Long Elevations take out door and frame and lintol over and infill opening in brickwork to match existing

SOUTH WEST ELEVATION

take out door and frame and insert concrete cill, reduce opening in brickwork to match existing insert new aluminium window

take out door and frame and reduce opening in brickwork to match existing insert new aluminium door and frame

take out door and frame and insert concrete cill, reduce opening in brickwork to match existing insert new aluminium window

D r a w i n g N o.

A/725/T/102

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

overclad existing roof lantern gable with aluminium cladding

metal over cladding to existing lantern gable

pressed metal corner flashing by cladding manufacturere

NOTES

line of new dropped ceiling behind

strip-off existing cladding from gable and reclad with profiled aluminium sheets fixed to pressed metal sections fixed to brickwork/ blockwork behind

form new opening for window match with left side window

overclad existing brickwork with sheet metal cladding

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

take down existing chimney stack pressed metal corner flashing by cladding manufacturere insulated spandrel panel faced to match window

pressed metal corner flashing by cladding manufacturere

line of new wall behind W23

W09 W01

SOUTH EAST ELEVATION

take out existing door & lintol over and extend window opening to suit new glazed aluminium door and frame

take out existing window & lintol over and extend window opening to suit new two storey aluminium window

line of new floor behind

line of new floor behind

extng gable doors track and gear removed and opening infilled in blockwork including forming new opening for new vehicle doors by inserting lintol to structural engineers specification

retain existing timber boards 9mm plywood

new insulated overhead sectional doors incorporating personnel door and vision panels retain existing timber boards

NORTH WEST ELEVATION

Bauder roof cover

9mm plywood Bauder roof cover

180 70

12mm ply to either side of the existing frame

new aluminium gutter

take out existing glazing retain existing window frames plywood on either side of the frame cladding outside

new aluminium gutter

metal liner

140

breathable membrane

cladding

LOUVRE DETAIL 1:10

BALUSTRADE DETAIL 1:10

CLADDING DETAIL 1:10

GUTTER DETAIL DETAIL 1:20

maintain an air path to vent above insulation

maintain an air path to vent above insulation

continuous ply board located to prevent insulation from blocking air path

continuous ply board located to prevent insulation from blocking air path

existing steel structure lead flashing new floor joists 9mm plywood

insulated spandrel panel faced to match window

Rev A

ceiling to spec. clause K10/245 ceiling to spec. clause K10/245

retain existing window frame & cill

Bauder roof cover

28-04-08

Rev Date

New roof ventilation cowls are shown. Position of the grills are ST amended. New window W23 to office. New storage room FF07. Revision Drawn By

retain existing timber boards

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

FLOOR - WINDOW DETAIL 1:20

FF 02 Office new steel beam

new steel column

FF 07 Storage

2073

rigid insulation fixed to brick wall & existing structure

remove existing steel beam & columns & plates

900

ventilation void

new steel beam between existing shallow columns to support floor joists suspended ceiling

suspended ceiling

1400

300mm insulation

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FF 05 Office

FF 06 Office

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

FF 03 Stair

FOR INFORMATION Project

retain existing column

Alterations to the Chauffeurs Garage GF 02 Simulators

GF 08 Kitchen

2700

suspended ceiling

2700

300mm insulation

GF 07 Office

GF 13 Lobby

GF 12 Seminar

GF 11 Lobby

GF 10 Stair

Client

Felixstowe Port Cad File

Mac 7/725

Scale

Drawn By / D a t e

Checked By / Date

1:50

ST/Mar 2008

JI/

Title

Proposed End Elevations &

SECTION AA

SECTION BB

Cross Sections D r a w i n g N o.

A/725/T/103

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


DOOR SCHEDULE

X

G/D10

G/D11

G/D12

G/D13

G/D14

G/D15

G/D16

G/D17

G/D18

F/D01

F/D02

F/D03

F/D04

F/D05 F/D06 F/D07

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

FD30S X

X

FD30S X

X

FD60S X

FD30S X

FD30S X

FD30S X

FD30S X

FD30S X

FD30S X

FD60S X

FD30S X

FD30S X

FD30S X

FD30S X

FD30S X

FD30S X

FD30S FD30S FD30S X X X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

NOTES

19mm dia stainless steel pull handle

X

170

X

3

3

3

3 1

3

3

3 1

3

3

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

3 1

lever handle dia 19mm with returned end utility meters

1

2

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

350

alarm

min to corner of wall

(shape indicative only)

light switches

Room Name

door notice - room name 54

X

capital and lower case with name in braille underneath text

door notice - fire door refrence 1200

3

Integral to Eoor Spring Magnetic hold open ** Dead Lock

230

vision panel

Overhead (Normal Duty)

Panic Bar Fail to Unlocked

X

X

X

Lever Handles Snib Turn Pull Handle Push Plate

Signs

G/D09

equal

X

Fail to Manual Fail to Open Large Handle Indicator Type Surface Mounted

Kick Plate Escutcheon Door Stops Door Mount Coat Hooks Threshold Weather Strip Air Transfer Grille

G/D08

X

X

Latches

Bolts

G/D07

X

Remote electrical operation Mortice Latch/Lock* X Key Pad Operation Bathoom Lock

Emergency Exit Device

G/D06

socket outlets

450

Locks

G/D05

1500

Metal Framed & Glazed With Glazed Side Screen Hinges Closer Floor Springs Top Centre Hold Open

G/D04

equal

X

Vision Panel(s) Timber Framed & Glazed

G/D03

minimum zone of visibility

X

G/D02

500

Fire Rating Solid Core Hard Wood Clear Finish Soft Wood Painted

G/D01

1000

TYPE

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

1200

ITEM Exterior Interior

DOOR NUMBERS DX01 DX02 DX03 X X X

450

SPEC REF

Felixstowe Port - Alterations to the Chauffeurs Garage

Overhead sectional door with an intigrated pass-door Pass-door to be used as an emergency door: lock on the outside & handle in the inside

Project

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

725

1230

Job Number

kick plate ffl

heights of switches

typical door set - out

1 2

2

2

2

2

2

2

2

2

2

2

2

2

2

WM

2

2

2

2

2

2

2

2 1 1

1 1

1 1

1 1

2

2

2

2

2

2

2

1 1 2

2 2

2

WM

2

2

2 1 1

1 1

1 1

2

2

2

2

2

2

WM

WM

2 1 1 2 2

2

FM

Weather bar & Draught Seal X X X X M & E INFORMATION Fire door keep closed Fire door keep locked shut This door to be kept locked shut when not in use Fire Exit Keep Clear Toilets

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2 1

1

2

2

2 2

2

2

2

2

1

*Mortice Latch Lock with internal slip-turn. ** Magnetic hold open device to fail in event of Dre alarm activation WM Wall Mounted FM Floor Mounted

Rev A

28-04-08

Rev Date 170

230

170

New door to storage: FD06 is revised. New screen: GVP02.

ST

Revision

Drawn By

230

Inkpen Downie Architecture & Design Ltd

2361

2 Balkerne House

2090

2137

2395

DX 02 External Door Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

972

TENDER DRAWINGS

846

Project

1000 1120

874

1100 1245

1000

Alterations to the Chauffeurs Garage Client

Felixstowe Port new door to existing opening SO 2080x974 DL 2040x900

GD 01 Internal Door

SO 2080x912 DL 2040x838

SO 2080x912 DL 2040x838

GD 04, 05, 08, 16 GD 02, 03, 06, 09, 10, 11, 12, 14, 15, 17, 18 Internal Door FD 01, 02, 03, 04, 05, 07 Internal Door

GD 07 Internal Door

new door to existing opening

GD 13 Internal Door

DX 03 External Door

DX 01 External Door

Cad File

SO 1440x912 DL 1400x838

FD 06 Internal Door

Mac 7/725

Scale

Drawn By / D a t e

Checked By / Date

1:20

ST/Apr 2008

JI/

Title

Door Schedule

GVP 01, GVP 02, FVP 01 Internal Screen A/725/T/105 D r a w i n g N o.

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


IC

pos ed

CL=3.00

IC

Replace door with new window & brick up with matching brick

pr

op

os

ed

proposed

New SWP

DX03

Remove door & frame Block up existing opening

DX04

Existing structure to remove

GD11

Existing structure

GF09 Male WC GF06 Kitchen Area for all users

New 140mm blockwork

GF08 Lobby

Remove existing wall

GD18

GD04

GF07 Lobby

Remove existing stair

16

Stair 1

GF05 Shipwork Classroom

New steel staircase supporting structure to SE details

GF15 Tug Office New window

GD15 GD14

GF11 Lobby

Stair 2

DX06

Form new door openings with precast lintels over

1

up

GD03

New window with lintel over

GD13

GD08

GD06

New beam to SE details

GF12 Cleaner

GD09 UP

GD05 Remove existing walls

Replace door with new window & brick up to sill level with matching brick

New blockwork wall

GF14 WC Adapted Toilet

New door opening

Brick infill matching existing brick

NOTES

DX05

GD15A

GF13 Female WC

GD12

GD19

GD07

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

Carry out alterations including removal and construction of new walls as indicated. All existing sanitary ware and associated plumbing to be removed and where indicated replaced with new to specification. All wall tiling to be removed and walls to be retiled to specification. Existing doors and frames to be removed and replaced with new.

UP

GROUND FLOOR PLAN

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

CL=3.08

CL=3.02

existing

pro

B

IC

New blockwork wall insulated & dry lined to internal face

GD10

Block up existing opening New steel staircase Going 280mm Rise 164.3mm

New blockwork wall

DX01 DX02

GF04 Gear Store

GF03 Gear Store UP

Inspection Pit to be filled in

UP

UP

UP

Stair 3

A GD01

A

GD02 Move existing staircase

GF16 Forklift School Rev A

25-04-08

Rev Date

Amended layout of ground floor with revised layout of corridor to adapted toilet and revised sanitary ware to Male toilet and insulation to block walls between offices and main work areas. Revision

Drawn By

New window opening

GF17 FLT Classroom

GVP01 Inkpen Downie Architecture & Design Ltd

GF02 Shipworking

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

GF01 Shipwork Container Stack

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

TENDER DRAWINGS D16

15 No Elephant Feet

Project

Alterations to 75 Park Garage D17

Remove walls

to Provide Training Facilities Client

Port of Felixstowe

GF18 FLT Office

Cad File

Scale

Drawn By / D a t e

Mac 4

1:50

ET/March 2008 JI/March 2008

Checked By / Date

Title

UP

Block up existing doors

UP

Ground Floor Plan

DX09 DX13 IC

DX12

DX11

DX10

D r a w i n g N o.

DX08

DX07

A/725/T/01

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.

IC

B


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

B Cavity barrier min every 20m to full hight of cladding providing min.30min integrity & 15 min fire insulation

MEZZANINE FLOOR PLAN

Existing structure New 140mm blockwork

FF03 WC

FD04

UP

FD03

FD09

FD08

FF11 Photocopy Room

FF05 Corridor FD01

Continuity in insulation

New opening and door

FD07

FD05

FD02

New Trisomet Composite Wall Panels

External wall to offices:- interiors to be lined with PB on 48mm gyproc metal stud system. Cavity to be fire stopped @ every 20m

New ceiling to SE details

New ceiling to SE details

FF04 Clean. New ceiling to SE details

New studwall - 70mm steel "C" studs @ 600mm centres, 50mm Isowool APR 1200, 2x12.5mm plasterboard each side

FF08 Office

FF07 Office

FF02 Office

External wall to offices:- interiors to be lined with PB on 48mm gyproc metal stud system. Cavity to be fire stopped @ every 20m

1

16

FF06 Lobby

Fire Break

UP

Cavity barrier min every 20m to full hieght of cladding providing min.30min integrity & 15 min fire insulation

Existing structure to remove

NOTES

New SWP

New blockwork wall with pre insulated plasterboard lining to office side Chipboarded Floor on timber joists

FD08A

Remove existing stair

New blockwork enclosure to provide protected route New blockwork wall with pre insulated plasterboard lining to office side

FF01 Office/Class Room Cavity barrier min every 20m to full hight of cladding providing min.30min integrity & 15 min fire insulation

New floor and ceiling to SE details

Existing party wall below roof level to be retained Move existing stair New blockwork walls UP

UP

UP

UP

A

A

Rev A

25-04-08

Rev Date

Existing party wall below roof level to be retained

FD10

Amended layout of mezzanine floor with inclusion of photocopy room and an additional office FF03 WC door FD06 is omitted. Revision

Drawn By

FVP01 Internal window

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FF09 Office

TENDER DRAWINGS Project

Aterations to 75 Park Garage New blockwork wall

FD10A

to Provide Training Facilities Client

Port of Felixstowe Cad File

Mac 4 UP

New floor and ceiling to SE details

UP

FF10 Office

Scale

Drawn By / D a t e

1:50

ET/March2008 JI/March 200

Title

Mezzanine Floor Plan D r a w i n g N o.

A/725/T/02 B

Checked By / Date

New stud wall lining

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

Read these drawings in conjunction with drawings A/725/T/04, 05, 10, 11 & with the specification clauses H43 A B C D & L10 Length of panels to be determined by cladding sub contractor who is to take into consideration handling issues at height ( Health & Safety). Cladding contractor to allow for replacement of gutters & RW downpipes to existing gullies. Cladding contractor to detail all junctions & conditions. Non standard details include:

B

C

Detail 5 - Roof to wall abutment. Detail 11 - Box gutter

1 10

A

A 6 10 4 10

E

S

W

12 11

N Rev A

28-04-08 Additional roof ventilation cowls. Roof light positions are rearranged.

Rev Date

ST

Revision

Drawn By

ROOF PLAN C 1 10

B Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

TENDER DRAWINGS Project

Alterations to 75 Park Garage to Provide Training Facilities Client

Port of Felixstowe Cad File

Scale

Drawn By / D a t e

Mac 7 - 708

1: 100

ST/March 2008 JI/March 2008

Checked By / Date

Title

Proposed Roof Ground Plan Floor and Mezzanine Floor Plan D r a w i n g N o.

R e v N o.

A/725/T/03 A/725/T/02 A /725/T/

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

Read these drawings in conjunction with drawings A/725/T/03, 05, 10, 11 & with the specification clauses H43 A B C D & L10

New beam & ceiling joists to structural engineers design

Chipboarded Floor on timber joists FFL

Existing Floor Level Structure to SE details

16

x2 80 /16 4.3

New Steel Stair

New beam & floor joists to structural engineers design

DATUM = 0.00m

SECTION AA SECTION AA

6 10

15 11

Rev A

28-04-08 Additional roof ventilation cowls and grills on elevs. Roof light positions are rearranged. Amended layout of mezzanine floor in Section AA.

Rev Date

1 10

Revision

ST

Drawn By

2400

13 11

Existing FL

First fl.

Inkpen Downie Architecture & Design Ltd

14 11

2 Balkerne House F/W03

F/W02

F/W01

16 Stair 1

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

11 11

Tanking

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

G/W01

1

TENDER DRAWINGS Project

BOARDED INSPECTION PIT

Alterations to 75 Park Garage

Inspection pit to be filled in

to Provide Training Facilities DATUM = 0.00m

DATUM = 0.00m

Client

SECTION BB SECTION BB

NORTHEAST EAST ELEVATION FACE NORTH

Port of Felixstowe Cad File

Scale

Drawn By / D a t e

Mac 7 - 708

1: 100

ST/March 2008 JI/March 2008

Checked By / Date

Title

ProposedSections Existing Sectionsand andNorth NorthEast East Elevation D r a w i n g N o.

R e v N o.

A/725/T/04 A/725/S/02 A /725/T/

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

Read these drawings in conjunction with drawings A/725/T/03, 04, 10, 11 & with the specification clauses H43 A B C D & L10

6 10 17.14

1 10

17.14

17.14

15 11 6 10 11.5

2 10

12.64

11.5 10.77

1 10

5 10

11 11 5.53

14 11

5.68

5.53

5.26

F/W13

8 11

14 11 5.53

5.26

9.15

15 11

9 11

2 10

7 10

F/W11

10 11

F/W10

F/W09

5.26

5.26

14 11

8.3

11 11

F/W12

7 10

F/W08

11A 11

F/W07

5.26

5.26

F/W06

F/W05

6.17

F/W04

5.26

5.26

5.53

5.52

5.25

4.55 4.18

4.18

G/W09

G/W14 3.11

G/W12

3.11

G/W11

G/W10

RWP

G/W08

G/W13 G/W07

G/W06

G/W05

3.1

3.1

RWP

RWP

G/W04

G/W03

G/W02

3.19

3.1

2.99

RWP

DATUM = 0.00m

SOUTH WESTELEVATION FACE SOUTH WEST

SOUTH EAST EAST FACE SOUTH ELEVATION

1 10

17.14

Rev A 14.05

28-04-08 Additional roof ventilation cowls and grills on elevs. FW/14 new window to office FF10. Roof light positions are rearranged.

Rev Date

Revision

ST

Drawn By

12.64

11.5

14 11

2 10

11A 11

11A 11

5.54

3.02

5.7 5.26

RWP

7.44

F/W14 RWP 5.27

5.27

4.19

4.19

RWP 5.29

5.3

11A 11

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

14 11

Drawing Status

5.52

TENDER DRAWINGS Project

Alterations to 75 Park Garage

3.21

3.16

7.56

7.43

11A 11

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

8.3

7.43

11 11

1 10

15 11

3.11

RWP

RWP

3.21

3.11

RWP

to Provide Training Facilities Client

Port of Felixstowe DATUM = 0.00m

NORTH WESTELEVATION FACE NORTH WEST

Cad File

Scale

Drawn By / D a t e

Mac 7 - 708

1: 100

ST/March 2008 JI/March 2008

Checked By / Date

Title

Existing Elevations Proposed Elevations D r a w i n g N o.

R e v N o.

A/725/T/05 A/725/S/03 A /725/T/

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

DOOR SCHEDULE Job Number 725 Project Felixstowe Port - Alterations to the Chauffeurs Garage

DX06

DX07

DX08

DX09

DX10

DX11

DX12

DX13

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

3 Overhead (Normal Duty) Integral to Eoor Spring Magnetic hold open ** Dead Lock Remote electrical operation Mortice Latch/Lock* X Key Pad Operation Bathoom Lock

Latches Emergency Exit Device

Panic Bar Fail to Unlocked Fail to Manual Fail to Open Large Handle Indicator Type Surface Mounted

Bolts Lever Handles Snib Turn Pull Handle Push Plate

X X

3

X

X

3

X

3

X

3

X

6

X

1

X

3

X

G/D01

G/D02

G/D03

G/D04

G/D05

G/D06

G/D07

G/D08

G/D09

G/D10

G/D11

G/D12

G/D13 G/D14 G/D15

G/D15A G/D16 G/D17

G/D18

G/D19 F/D01

F/D02

F/D03

F/D04

F/D05

F/D07

F/D08

F/D08A

F/D09

F/D10

X FD60S X

X FD30S X

X FD60S X

X FD30S X

X FD30S X

X

X FD30S X

X

X FD30S X

X

X

X FD30S X

X X FD30S FD30S X X

X

X

X FD30S X

X FD30S X

X FD30S X

X

X

X FD30S X

X

X

X X FD60S X X

X

X

X FD60S X

X

X FD60S X

X FD30S X

X FD30S X

X FD30S X

X FD30S X

X FD30S X

X

X

X

X X

X X

X X

X X

X

X X

X

X X

X

X

X

X X

X

X X

X

X

X X

X X

X X

X

X

X X

X X

X X

X X

X X

X

3

X

Megadoor System 800 to manufacturers details and recommendations

Locks

DX05

X

X

Overhead sectional door to manufacturers details and recommendations

Metal Framed & Glazed With Glazed Side Screen Hinges Closer Floor Springs Top Centre Hold Open

DX04

X

Overhead sectional door to manufacturers details and recommendations

Exterior Interior Fire Rating Solid Core Hard Wood Clear Finish Soft Wood Painted Vision Panel(s) Timber Framed & Glazed

DOOR NUMBERS DX01 DX02 DX03

Overhead sectional door to manufacturers details and recommendations

TYPE

Overhead sectional door to manufacturers details and recommendations

ITEM

3 1

3 1

3 1

3 1

3 1

Kick Plate Escutcheon Door Stops Door Mount Coat Hooks Threshold Weather Strip Air Transfer Grille

2

2

2

2

2

4

2

X

X

Signs

X X

X X

X X

X X

3 1

3

3 1

3

3

3 1

3

3 1

3 1

X X

3 1

3 1

3

3

3 1

3 1

3 1

3

X

X

X

X

X

X X

2

2

2

2

2 WM

2

X

X

X

X

X

X

X

X

X

X

X

2

2

3 1

3 1

3 1

3 1

X

X

X

X

X

2

2

2

2

1 1 2

2

2

2

1 1 2

WM

2 WM

2

2

2

2

2

2

2

2

2

2

1 1 2 WM

2 WM

2

2

2

2

2

2

2

2

2

2

2

1 1 2 WM

2

2 2

2

WM

2

1

2

WM

2 WM

2 WM

2

2

2

2

WM

2 FM

2 2 FM

2

2

2

2

2

2

2

2

2

2

2

2

2

FM

2

WM

2

2

2

3 1

X

X X

3 1

FM

WM

X X

Fire door keep closed Fire door keep locked shut This door to be kept locked shut when not in use Fire Exit Keep Clear Toilets

3

X

1

2

X X

3 1

X

X

WM Weather bar & Draught Seal X X X X M & E INFORMATION

X

X

1 1

2

2

2

2

2 1

2 1

2

2

2

2

2

2 1

1

*Mortice Latch Lock with internal slip-turn. ** Magnetic hold open device to fail in event of Dre alarm activation WM Wall Mounted FM Floor Mounted Rev A

25-04-08

Rev Date

2 Balkerne House 170

230

equal

1230

capital and lower case with name in braille underneath text

door notice - fire door refrence 1200

1500

door notice - room name 54 equal

minimum zone of visibility

light switches

Room Name

1000

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

FOR INFORMATION Project

Alterations to 75 Park Garage to Provide Training Facilities Client

Felixstowe Port 500

socket outlets

450

1200

min to corner of wall

(shape indicative only)

ST Drawn By

Drawing Status

utility meters

alarm

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

vision panel lever handle dia 19mm with returned end

350

WC door F/D06 is omitted. New doors: G/D15A & F/D08A Revisions on G/D16 Revision

Inkpen Downie Architecture & Design Ltd

19mm dia stainless steel pull handle

450

SPEC REF

Cad File

kick plate ffl

Mac 7/725

Scale

Drawn By / D a t e

Checked By / Date

1:20

ST/Apr 2008

JI/

Title

heights of switches

typical door set - out

Door Schedule 01 D r a w i n g N o.

A/725/T/07

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

GF02

Timber Doors and frames to be factory painted to (nbs M60/112 )

Fair faced Block to be cleaned and painted Existing painted steel work to be painted (nbs M60116). (nbsM60/118) Existing painted steel work to be painted Galvanized steel work to be cleaned (nbs M60/118)

Timber Doors and frames to be factory painted to (nbs M60/112 )

Tiling or other special finishes

ed

Floor Finishes

DX03

GF09 Male WC

Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115 )

N/A

Mega Door to be self finish

Shipwork Container Stack

GF03

GF08 Lobby

GROUND FLOOR PLAN GD05

GD18 GD09

GF07 Lobby

Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115 )

N/A

16

Shipworking

GF12 Cleaner GD13

GD08

GF15 Tug Office

GD15 GD14

GF11 Lobby

GD06

N/A

GF14 WC Adapted Toilet

GD12

GD19

GD07

GD15A

GF13 Female WC

GD04

Stair 2

DX06

1

Stair 1

GD10

GD03

Sectional Doors to be self finish. GF05 Shipwork Classroom

Galvanized steel work to be cleaned

Gear Store

DX05 GD11

GF06 Kitchen Area for all users

N/A

NOTES

DX04

UP

Fair faced Block to be cleaned and painted Existing painted steel work to be painted (nbs M60116). (nbsM60/118) Existing painted steel work to be painted Galvanized steel work to be cleaned (nbs M60/118) Galvanized steel work to be cleaned

Skirtings

os

Doors / frames / architraves/windows/ surrounds/ shutters

op

Bespoke Mouldings or Fittings

pr

Ceilings

UP

Ground Floor

Internal Finishes Schedule

Shipworking

GF01

Walls

d

Shipwork Container Stack

Number

propose

Room Name

Fair faced Block to be cleaned and painted Clean existing Plaster - 2 coats of (nbs M60116). eggshell to (nbs M60/113 ) colour:- white

Timber Doors and frames to be factory painted to (nbs M60/112 )

Existing Painted M60/112 Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115 )

N/A

Gear Store DX01 DX02

Gear store

GF04

Existing Painted M60/112

Fair faced Block to be cleaned and painted Clean existing Plaster - 2 coats of (nbs M60116). eggshell to (nbs M60/113 ) colour:- white

GF05

Kitchen

GF06

Clean existing Plaster Paint 1 Primer 2 coats of eggshell (nbs M60119)

Lobby

GF07

Clean existing Plaster Paint 1 Primer 2 coats of eggshell (nbs M60117)

Plaster board to be plastered. Primed & painted to (nbs M60/113 )

GF08

Fair faced Block existing to be cleaned and painted (nbs M60/116 ) and new to be primed & painted (nbs M60/117)

Plaster board to be plastered. Primed & painted to (nbs M60/113 ) Clean existing Plaster - 2 coats of eggshell to (nbs M60/113 ) colour:- white

Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115 )

Timber Doors and frames to be factory painted to (nbs M60/112 )

Fair faced Block to be cleaned and painted Plaster board to be plastered. Primed & painted to (nbs M60/113 ) (nbs M60116).

Shipwork Classroom

N/A

new S/W for painting M60/112

Lino to (nbs M50/150 )

Proprietry Coved skirting

Lino to Vinyl tospec (nbs M50/150 M50/152 )

GF04 Gear Store

GF03 Gear Store

Gear store

UP

N/A

UP

Stair 3 GD01

Timber Doors and frames to be factory painted to (nbs M60/112 )

UP

UP

GD02

GF16 Forklift School

Shipwork Classroom GF17 FLT Classroom

Clean existing Plaster - 2 coats of eggshell to (nbs M60/113 ) colour:- white

Kitchen units as specification

Tiling to 1/2 height 1200 mm above coved skirting all round to spec M40/110

GVP01

GF02 Shipworking

Kitchen

GF01 Shipwork Container Stack

Timber Doors and frames to be factory painted to (nbs M60/112 )

D16

15 No Elephant Feet

Lobby

Male WC

GF09

new S/W for painting M60/112

Timber Doors and frames to be factory painted to (nbs M60/112 )

Female WC

GF12

GF13

Clean existing Plaster Paint 1 Primer 2 coats of eggshell (nbs M60117)

UP

Lobby

DX09 DX13

Vinyl to (nbs M50/152 )

Tiling to 1/2 height 1200 mm above coved skirting all round to spec M40/110

Vinyl to (nbs M50/152 )

Tiling to 1/2 height 1200 mm above coved skirting all round to spec M40/110

Timber Doors and frames to be factory painted to (nbs M60/112 )

new S/W for painting M60/112 Timber Doors and frames to be factory painted to (nbs M60/112 )

Clean existing Plaster - 2 coats of eggshell to (nbs M60/113 ) colour:- white

UP

Lino to (nbs M50/150 )

Proprietry Coved skirting

Fair faced Block to be cleaned and painted Plaster board to be plastered. Primed & (nbs M60116). painted to (nbs M60/113 )

Fair faced Block to be cleaned and painted (nbs M60116).

Existing Concrete floor to be steam cleaned and finished in

IC

Fair faced Block to be cleaned and painted Clean existing Plaster - 2 coats of (nbs M60116). eggshell to (nbs M60/113 ) colour:- white Clean existing Plaster Paint 1 Primer 2 coats of eggshell (nbs M60117)

Clean existing Plaster Paint 1 Primer 2 coats of eggshell (nbs M60117)

Cleaners

D17

GF18 FLT Office

new S/W for painting M60/112

Proprietry Coved skirting

GF11

Lobby

Timber Doors and frames to be factory painted to (nbs M60/112 )

GF10

Lobby

Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115 )

Existing Concrete floor to be steam cleaned and finished in

DX12

DX11

DX10

DX08

DX07

IC

B

Male WC

lobby

Lino to (nbs M50/150 )

Proprietry Coved skirting

Vinyl to (nbs M50/152 )

Tiling to 1/2 height 1200 mm above coved skirting all round to spec M40/110

Vinyl to (nbs M50/152 )

Tiling to 1/2 height 1200 mm above coved skirting all round to spec M40/110

Female WC

Vinyl to (nbs M50/152 )

Tiling to 1/2 height 1200 mm above coved skirting all round to spec M40/110

Adapted WC

Timber Doors and frames to be factory painted to (nbs M60/112 )

Clean existing Plaster - 2 coats of eggshell to (nbs M60/113 ) colour:- white

Timber Doors and frames to be factory painted to (nbs M60/112 )

Clean existing Plaster - 2 coats of eggshell to (nbs M60/113 ) colour:- white

Timber Doors and frames to be factory painted to (nbs M60/112 )

Clean existing Plaster - 2 coats of eggshell to (nbs M60/113 ) colour:- white

Timber Doors and frames to be factory painted to (nbs M60/112 )

new S/W for painting M60/112

Timber Doors and frames to be factory painted to (nbs M60/112 )

N/A

Proprietry Coved skirting

Cleaners

Fair faced Block to be cleaned and painted (nbs M60116).

Adapted WC

GF14

Clean existing Plaster Paint 1 Primer 2 coats of eggshell (nbs M60117)

Proprietry Coved skirting

Fair faced Block to be cleaned and painted (nbs M60116).

Tug Office

GF15

Clean existing Plaster Paint 1 Primer 2 coats of eggshell (nbs M60117)

Vinyl to (nbs M50/152 )

Tug Office

Fair faced Block to be cleaned and painted (nbs M60116).

Forklift School

GF16

Classroom

GF17

Office

GF18

Fair faced Block to be cleaned and painted Existing painted steel work to be painted (nbs M60116). (nbs ) Existing painted steel work to be painted Galvanized steel work to be cleaned (nbs M60/118) Galvanized steel work to be cleaned

Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115 )

N/A

Forklift School

Sectional Doors to be self finish.

Plaster board to be plastered. Primed & Clean existing Plaster painted to (nbs ) Paint 1 Primer 2 coats of eggshell (nbs M60117) Fair faced Block to be cleaned and painted (nbs M60116).

Timber Doors and frames to be factory painted to (nbs M60/112 )

Clean existing Plaster Plaster board to be plastered. Primed & Paint 1 Primer 2 coats of eggshell painted to (nbs ) (nbs M60117) Fair faced Block to be cleaned and painted (nbs M60116).

Timber Doors and frames to be factory painted to (nbs M60/112 )

new S/W for painting

Lino to (nbs M50/150 )

N/A

Classroom

new S/W for painting

Lino to (nbs M50/150 )

N/A

Office

Rev Date

Revision

Drawn By

B

FF01

new block work to be primed & painted (nbs M60/117 )

Ceilings

Plaster board to be plastered. Primed & painted to (nbs M60/113 )

Bespoke Mouldings or Fittings

Doors / frames / architraves/windows/ surrounds/ shutters Timber Doors and frames to be factory painted to (nbs M60/112)

Skirtings

Floor Finishes

Tiling or other special finishes FD06

FF02 Office

FF07 Office

Lino to (nbs M50/150)

N/A

FF04 Clean.

Office / Class Room

FD04

FD09 FD07

FD05

MEZZANINE FLOOR PLAN FF02

WC

FF03

Cleaners Cupboard

FF04

new block work to be primed & painted (nbs M60/117 )

Plaster board to be plastered. Primed & painted to (nbs M60/113 ) Walls to be finished in tile backer (for tiling) to (nbs ) Plaster board to be plastered. Primed & painted to (nbs M60/113 ) Walls to be finished in tile backer (for tiling) to (nbs )

Corridor

FF05

new block work to be primed & painted (nbs M60/117 )

Plaster board to be plastered. Primed & painted to (nbs M60/113 )

N/A Timber Doors and frames to be factory painted to (nbs M60/112)

new S/W for painting (nbs M60/112)

proprietory coved skirting nbs M60/770 Plaster board to be plastered. Primed & painted to (nbs M60/113 )

Timber Doors and frames to be factory painted to (nbs M60/112)

Plaster board to be plastered. Primed & painted to (nbs M60/113 )

Timber Doors and frames to be factory painted to (nbs M60/112)

Plaster board to be plastered. Primed & painted to (nbs M60/113 )

Timber Doors and frames to be factory painted to (nbs M60/112)

new S/W for painting (nbs M60/112)

Timber Doors and frames to be factory painted to (nbs M60/112)

new S/W for painting (nbs M60/112)

Timber Doors and frames to be factory painted to (nbs M60/112)

new S/W for painting (nbs M60/112)

Lino to (nbs M50/150)

vinyl to (nbs M50/152)

tiling to full height to (nbs M40/110 )

FD01

Office

FD03

FD08

FF11 Photocopy Room

FF05 Corridor

FD02

Office

FF08 Office

FF03 WC

new S/W for painting (nbs M60/112)

UP

First Floor

Internal Finishes Schedule

Office / Class Room

Walls

1

16

FF06 Lobby

UP

Number Room Name

Inkpen Downie Architecture & Design Ltd

FD08A

2 Balkerne House

FF01 Office/Class Room

WC

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status UP

proprietory coved skirting nbs M60/770

vinyl to (nbs M50/152)

tiling to full height to (nbs M40/110 )

Cleaners Cupboard

UP

UP

TENDER DRAWINGS

UP

A

Project N/A

Corridor Lino to (nbs M50/150) FD10

FVP01

Alterations to 75 Park Garage

N/A

Stair Enclosure

FF06

new block work to be primed & painted (nbs M60/117 )

Plaster board to be plastered. Primed & painted to (nbs M60/113 )

Stair Enclosure Lino to (nbs M50/150) FF09 Office

Office

FF07

new block work to be primed & painted (nbs M60/117 )

Plaster board to be plastered. Primed & painted to (nbs M60/113 )

Office Lino to (nbs M50/150) FD10A

Office

Office

Office

FF08

FF09

FF10

new block work to be primed & painted (nbs M60/117 )

new block work to be primed & painted (nbs M60/117 )

new block work to be primed & painted (nbs M60/117 )

Plaster board to be plastered. Primed & painted to (nbs M60/113 )

Plaster board to be plastered. Primed & painted to (nbs M60/113 )

Plaster board to be plastered. Primed & painted to (nbs M60/113 )

Timber Doors and frames to be factory painted to (nbs M60/112)

N/A

Office

new S/W for painting (nbs M60/112)

UP

UP

N/A new S/W for painting (nbs M60/112)

Drawn By / D a t e

NA

ST/March 2008 JI/March 2008

Checked By / Date

Title

Office Lino to (nbs M50/150)

Scale

Mac 7 - 708 B

N/A new S/W for painting (nbs M60/112)

Cad File

Office

Lino to (nbs M50/150)

Timber Doors and frames to be factory painted to (nbs M60/112)

Port of Felixstowe

FF10 Office

Lino to (nbs M50/150)

Timber Doors and frames to be factory painted to (nbs M60/112)

to Provide Training Facilities Client

N/A

Finishes Schedule D r a w i n g N o.

A /725/T/08

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

170

SO 2080x912 DL 2040x838

SO 2080x800 DL 2040x726

SO 2080x974 DL 2040x900

GD 07, 09, 13 Internal Door

GD 12, 18, 19 FD 04, 05 Internal Door

GD 14 Internal Door

new door to existing opening

new door to existing opening

GD 01, 02 Internal Door

230

GD 11 Internal Door

170

170

new door to suit site opening

GD 15A Internal Door

230

170

SO 2080x974 DL 2040x900

230

SO 2080x912 DL 2040x838

GD 03, 06, 08, 10, 16 FD 03 Internal Door

GD 04, 05, 15 FD 01, 02, 07, 08, 08A, 09, 10 Internal Door

170

230

new door to existing opening

GD 17 Internal Door

230

972 846 Rev A

25-04-08

WC door F/D06 is omitted. New doors: G/D15A & F/D08A Revisions on G/D16 Revision

ST Drawn By

874

1000

Rev Date

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

GVP 01, FVP 01 Internal Screen

new door to existing opening SO 2080x1074 DL 2040x1000

new door to existing opening

FOR INFORMATION Project

Alterations to 75 Park Garage to Provide Training Facilities Client

GX 01, 03, 05, 09, 12 External Door

DX 04, 06 External Door

DX 07 External Door

Felixstowe Port Cad File

Mac 7/725

Scale

Drawn By / D a t e

Checked By / Date

1:20

ST/Apr 2008

JI/

Title

Door Schedule 02 D r a w i n g N o.

A/725/T/09

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

Simulator Room

GF01

GF02

Walls New block work to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-

Ceilings

Bespoke Mouldings or Fittings

Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White

Doors / frames / architraves/windows/ surrounds/ shutters Timber Doors and frames to be factory painted to (nbs 112 )

Fair faced Brick to be cleaned and painted Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) (nbs 116). Colour:-White Existing painted steel work to be cleaned and painted (nbs 118)

Timber Doors and frames to be factory painted to (nbs 112 )

Skirtings

New S/W for painting (nbs M60/112

N/A

Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White

Timber Doors and frames to be factory painted to (nbs 112 )

Proprietry Coved skirting

GF04

Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White

Timber Doors and frames to be factory painted to (nbs 112 )

Proprietry Coved skirting

Female WC

New block work to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-

Office

GF05

New block work to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-

Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White

Timber Doors and frames to be factory painted to (nbs 112 )

New block work to be primed & painted (nbs 116 ) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs 117) Colour:-

Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White

Timber Doors and frames to be factory painted to (nbs 112 )

GF06

Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115)

Existing Concrete floor to be steam cleaned and covered using Vinyl (nbs M50/152)

Remove existing covering. Existing Concrete floor to be steam cleaned and covered using Vinyl (nbs M50/152)

New S/W for painting (nbs M60/112

Carpet to (nbs M50/170)

Proprietry Coved skirting

Remove existing covering. Existing Concrete floor to be steam cleaned and covered using Vinyl (nbs M50/152)

Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White

Timber Doors and frames to be factory painted to (nbs 112 )

GF07

Kitchen

GF08

New block work to be primed & painted (nbs 119) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs 119) Colour:-

Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White

Timber Doors and frames to be factory painted to (nbs 112 )

New block work to be primed & painted (nbs 116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs 117) Colour:-

Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White

Timber Doors and frames to be factory painted to (nbs 112 )

Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White

Timber Doors and frames to be factory painted to (nbs 112 )

Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White

Timber Doors and frames to be factory painted to (nbs 112 )

Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White

Timber Doors and frames to be factory painted to (nbs 112 )

Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White

Timber Doors and frames to be factory painted to (nbs 112 )

New S/W for painting (nbs M60/112

Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White

Timber Doors and frames to be factory painted to (nbs 112 )

Proprietry Coved skirting

Remove existing covering.

New S/W for painting (nbs M60/112

Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115 )

Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White

Timber Doors and frames to be factory painted to (nbs 112 )

Stair

GF10

New block/brick work to be primed & painted (nbs 116 ) Colour:PB to be dry lined or skim ccoated primed & painted to (nbs117) Colour:-

Lobby

GF11

New block/brick work to be primed & painted (nbs 116 ) Colour:PB to be dry lined or skim ccoated primed & painted to (nbs117) Colour:-

Seminar Room

GF12

Lobby

GF13

Cleaner Cupboard

GF14

Office

GF15

New block work to be primed & painted (nbs 116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs 117) Colour:New block/brick work to be primed & painted (nbs 116) Colour:PB to be dry lined or skim ccoated primed & painted to (nbs 117) Colour:New block work to be primed & painted (nbs 116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs 117) Colour:New block work to be primed & painted (nbs 116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs 117) Colour:-

DN 8 R

GF 01 Office

N/A

GF 05 Office

GF 10 Stair

GF 07 Office

DN 8 R

Tiling to 1/2 height 1200mm above coved skirting all round to (nbs M40/110 )

Tiling to 1/2 height 1200mm above coved skirting all round to (nbs M40/110 )

N/A

Adapted WC

GF 11 Lobby

Tiling to 1/2 height 1200mm above coved skirting all round to (nbs M40/110 )

GF 14 Cleaner

Female WC

Office

C

C Remove existing steel columns and mezzanine floor

Male WC

GF 12 Seminar

New S/W for painting (nbs M60/112

Office

GF09

Office

GF 02 Simulators

New block work to be primed & painted (nbs 116 ) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs 117) Colour:-

Locker

N/A

NOTES B

Simulator Room

New block work to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-

Male WC

Carpet to (nbs M50/170)

A

Tiling or other special finishes

Sectional Doors to be self finish.

GF03

Adapted WC

Floor Finishes

Carpet to (nbs M50/170)

Proprietry Coved skirting

Remove existing covering. Existing Concrete floor to be steam cleaned and covered using Vinyl (nbs M50/152)

Proprietry Coved skirting

Remove existing covering.

N/A

Tiling to 1/2 height 1200mm above coved skirting all round to (nbs M40/110 )

Tiling to 1/2 height 1200mm above coved skirting all round to (nbs M40/110 )

Existing Concrete floor to be steam cleaned and covered using Vinyl (nbs M50/152)

New S/W for painting (nbs M60/112

New S/W for painting (nbs M60/112

Vinyl (nbs M50/152)

N/A

Vinyl (nbs M50/152) N/A

Office

Kitchen

GF 03 Ad WC

Locker

Stair

GF 04 F WC

Ground Floor

Office

Number

Carpet to (nbs M50/170)

GF 08 Kitchen

GF 09 Locker

GF 13 Lobby

A

GF 15 Office

B

Lobby

Item New S/W for painting (nbs M60/112

GF 06 M WC

GROUND FLOOR Spec Clause

Colour

N/A

Seminar Room Vinyl (nbs M50/152) N/A

New S/W for painting (nbs M60/112

Carpet to (nbs M50/170)

Tiling to 1/2 height 1200mm above coved skirting all round to (nbs M40/110 )

N/A

Lobby

Cleaner Cupboard

Office

External Finishes Schedule

Internal Finishes Schedule

Room Name

Brick

As Existing

As Existing

Metal Cladding

H31/120

??????

J42

Grey

Rainwater Goods

R10/311

??????

Timber Doors & Frames

M60/111

??????

Over Head Sectional Door

L20/615

??????

Fascia's & Soffites

M60/110

??????

M60/110

??????

L1/330

??????

Roofs

Barge Boards

Windows

Rev A

28-04-08

Rev Date

Number

Ceilings

Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-

Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White

Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-

Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White

FF03

Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-

Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White

Lobby

FF04

Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-

Office

FF05

Office

First Floor

Internal Finishes Schedule

Room Name

Walls

Office

Stair

Office

FF01

FF02

FF06

Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-

Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White

Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White

Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-

Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White

Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White

Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White

Storage

FF07

Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-

Corridor

FF08

Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-

Bespoke Mouldings or Fittings

Doors / frames / architraves/windows/ surrounds/ shutters Timber Doors and frames to be factory painted to (nbsM60/112 )

Timber Doors and frames to be factory painted to (nbsM60/112 )

Skirtings

New S/W for painting (nbsM60/112 )

New S/W for painting (nbsM60/112 )

Floor Finishes

Carpet to (nbs M50/170)

Carpet to (nbs M50/170)

Tiling or other special finishes N/A

Grilles

L1/650

??????

Aluminium Doors & Frames

L20/370

??????

B

Office

New S/W for painting (nbsM60/112 )

Timber Doors and frames to be factory painted to (nbsM60/112 )

New S/W for painting (nbsM60/112 )

Timber Doors and frames to be factory painted to (nbsM60/112 )

New S/W for painting (nbsM60/112 )

Carpet to (nbs M50/170)

New S/W for painting (nbsM60/112 )

Carpet to (nbs M50/170)

Proprietry Coved skirting

Vinyl (nbs M50/152)

Timber Doors and frames to be factory painted to (nbsM60/112 )

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Stair

FF 02 Office

Timber Doors and frames to be factory painted to (nbsM60/112 )

ST Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

DN 8 R

Vinyl (nbs M50/152)

Timber Doors and frames to be factory painted to (nbsM60/112 )

Revision

Office A

N/A

FF cleaners room is omitted. New storage FF06. Carpet floors to offices on FF.

Vinyl (nbs M50/152)

Lobby

Carpet to (nbs M50/170)

DN 8 R

Drawing Status

TENDER DRAWINGS

FF 01 Office FF 08 Corridor

Office

FF 04 Lobby

FF 05 Office

Project

Alterations to 75 Park Garage

N/A

Office

to Provide Training Facilities Client

Storage

New S/W for painting (nbsM60/112 )

FF 03 Stair

N/A

FF 06 Office

Port of Felixstowe

Corridor

Cad File

Mac 7 - 708

Drawn By / D a t e

Checked By / Date

NA

ST/April 2008

JI/March 2008

Title

FF 07 Storage

MEZZANINE FLOOR

Scale

Finishes Schedule

A B

D r a w i n g N o.

A /725/T/106

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

Section Through Upstand Detail To Brickwork (Cavity Wall)

Section Through Upstand Detail Beneath Door/Window Cill

Legend:

Section Through Detail To Perimeter Edge

Section Through Detail To Roof Ventilation

1

9

10

7

17

7

5 6

4

5

6

4

5

4

6

4

5

2

1 2

3

1

3

Section Through Detail To External Gutter

1

Section Through Detail To Vertical Cladding

5

21

Mechanical Fixing SPF Type Screw At 200mm Centres

4

Weld Area

5

Bauder Single-Ply Membrane

6

Bauder Pre-Formed Metal Angle

7

Bauder Pre-Formed Metal Flashing

8

Timber To Raise Upstand

9

Door/Window

10

Door/Window Cill

11

Bauder Euroglaze RooDight

12

Hit & Miss Ventilation (4000mm)

13

Extruded PVCu Kerb

14

Bauder Pre-Formed Metal Edge Trim

15

Fascia Board

16

External Gutter

17

Timber Batten

18

Soil Vent Pipe Beneath Deck

19

Suitable InCll

20

Jubilee Clip

21

Soil Vent Pipe

22

Cavity Bridge

23

Internal Corner Section

24

Bauder Single-Ply Chute/OverDow

25

Rainwater Outlet

26

Outlet Grille

27

Integral Membrane Flashing

28

Vertical Cladding

29

Termination Bar

30

Bauder Mastic Sealant

6

28

20

14 7

6

4

5 2

Bauder PF300MF Fleece

3

Section Through Change In Level Detail

17

1

15

3

2

All collar bases must be at least 300mm x 300mm and all uniform. If pipe exceeds 250mm diamater, additional Cxings required in the Celd sheet, and base of pipe.

30

4

2

Section Through Detail To Soil Vent Pipe

If vertical dimension of metal exceeds 100mm then provision should be made to allow for face Cxing restraint

5

1

14

Plywood Deck

2

4

When exceeding 500mm in height Dat metal to be Cxed every 500mm there after. If this detail does not exceed 500mm in height the additional Dat bar is not required

5

3

6 15 16

1

2

3

2

4

5

1

Rev Date 3

2

1

Revision

Drawn By

Title:

Bauder Single-Ply Sectional Details

Inkpen Downie Architecture & Design Ltd 2 Balkerne House Drawn By:

G.Page

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Date: Scale:

Drawing Status

N.T.S

Drawing No:

T5-T7

TENDER DRAWINGS Project

Alterations to the Chauffeurs Garage Client

Felixstowe Port Cad File

Scale

Drawn By / D a t e

Mac 7

1:5

ST Apr 08

Checked By / Date

Title

Bauder Standard Details D r a w i n g N o.

R e v N o.

A/725/T/109 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

DETAIL 2

DETAIL 3

Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels with 19mm sealing washers.

Fix the Gutter and Eaves Fashing with a Hxing in every trough

70

32

CP&P Gutter Support Bracket 1 metre spacing and either side of gutter joint

Rivets/Stitching Screws 3 per Gutter Support Bracket

Factory Applied Vapour Check CP&P Eaves Flashing Butt or lap jointed sealed with two runs of continuous high performance strip sealant, 9x3mm

NOTE: END LAP FASTENERS EVERY TROUGH

NOTES

Read these drawings in conjunction with drawings A/725/T/03, 04, 05, 11 & with the specification clauses H43 A B C D & L10

Loose Insulation

80

30

35 40, 60, 80, 100mm\Pthickness av

200

3

120

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

175

CP&P Cantilever Gutter Ref. CCG (degree of roof pitch must be speciHed)

DETAIL 1 CP&P Flashing to be stitched using sealed rivets or self drilling fasteners with sealing washers at not more than 450mm centres

NO SIDE LAP SEALANT REQUIRED

Continuous high performance strip sealant 3mm diameter bead

ProHled Filler Sealed top and bottom

Corus Panels & ProHles

60

CP&P Flashing to be stitched using sealed rivets or self drilling fasteners with sealing washers at not more than 400mm centres

Rail to be jointed with sleeve to insure continuous seal, high performance 6mm dia. strip sealant

Loose laid insulation

SALES AND TECHNICAL OFFICE TEWKESBURY TEL: 01684 856600

80

Y = 0.126 W/mK CP&P Gable Flashing Butt or lap jointed sealed with two runs of continuous high performance strip sealant, 9x3mm

CP&P Internal Iashing stitched to underside of the panel using rivets at a minimum of 450mm centres. Sealed using continuous high performance strip sealant, 6mm diameter bead

ProHled Filler Sealed top and bottom

STATED CALCULATION RESULTS ARE DEPENDeNT ON COMPONENTS BEING AS SHOWN

2

40mm core - 0.45

c

f = 0.95

c c

Corus UK Ltd.

Corus UK Ltd.

(Abutment to cladding detail) This detail is a variation on Corus Standard Details Drawing no: RDTRIS005-01-A

DETAIL 7

3 runs of continuous, high performance, PE Foam sealing tape, 10x5mm. Do NOT lay over the top of the end crown.

3 runs of continuous, high performance, PE Foam sealing tape, 10x5mm. Do NOT lay over the top of the end crown.

Purlin By othe rs

DETAIL 5

THESE VALUES ARE BASED ON S.S SCREWS AND PURLIN CENTRES AT 2 METRES

25

Continuous high performance Strip Sealant 6mm diameter bead

60mm Minimum

60

Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners sealing washers. for composite panels with 19mm

100mm core - 0.20

Purlin

tape , con 50x4 mm laid to tightn ens ess

80mm core - 0.25 Cleader

Y = 0.019 W/mK

STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN

Corus UK Ltd.

60mm core - 0.32

50x4 mm PE fo tape , cont am in laid to en uously sure tightn air ess

Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels sealing washers.

SALES OFFICE AMMANFORD TEL: 01269 850691

f = 0.97 PANEL 'U' VALUES (W/m K.)

150 10

Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels with 19mm sealing washers.

80

50x4mm PE foam tape, continuously laid to ensure air tightness

Lead Flashing / EP Cover Flashing

DETAIL 4

Extension plate standard 3 metre length (optional)

150

Continuous high performance

I

strip sealant 9x2 mm

80

25 120

um inim mM 60m Purlin By others

D

A

Grommet type stitch Hxings at

Stitch screws at maximum

rooIight overlaps the metal sheet

Grommet type stitch Hxings at

maximum 450mm centres, stitch

maximum 450mm centres, stitch

screws if the rooIight incorporates

screws if the rooIight incorporates

a metal strip along the underlap side

Fixed at 750 centres

10

CP&P End Wall Flashing butt or lap jointed and sealed with 2 runs of continuous, high performance strip sealant, 9x3mm.

c

D

Corus UK Ltd.

Continuous, high performance, strip sealant, 9x3mm.

80

a metal strip along the underlap side

Primary Fastener, 5.5mm diameter self-drilling, austenitic S.S. high-thread fastener for composite panels with 19mm sealing washer.

Continuous high performance strip sealant 9x2 mm

tape , cont inuo 50x4 usly mm PE fo laid am to tightn ensure ai r ess

450mm centres where the

CP&P Flashing to be stitched using sealed rivets or self drilling fasteners with sealing washers at not more than 450mm centres.

CP&P Internal Flashing stitched to underside of panel using rivets at 400mm centres (minimum). Seal using continuous, high performance, strip sealant, 10x5mm PE Foam Tape.

Rev A Continuous PVC expandable foam seal between insulation and internal Iashing

Rev Date

omitted detail as not applicable Revision

Drawn By

Y = 0.260 W/mK f = 0.837 STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN

c

Corus UK Ltd.

Inkpen Downie Architecture & Design Ltd

Self drill/tap screws that incorporate minimum 29mm diameter washers

Factory Assembled

2 Balkerne House

GRP roof light

Tel 01206 577 244 arch@inkpendownie.co.uk

DETAIL 6

Balkerne Passage

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status CP&P Flashing to be stitched using sealed rivets or self drilling fasteners with sealing washers at not more than 400mm centres

Site applied Fire rated canister insulation

Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels with 19mm sealing washers.

TENDER DRAWINGS

CP&P Ridge Flashing Butt or lap jointed sealed with two runs of continuous high performance strip sealant

Project

ProHled Filler Sealed top and bottom

Alterations to 75 Park Garage to Provide Training Facilities

Double, triple or four layer depending upon U-value requirement

Client

Port of Felixstowe CP&P Internal Flashing Butt or lap jointed sealed with two runs of continuous high performance strip sealant, 9x3mm

Continuous, high performance, 10x5mm PE Foam Tape sealant.

Cad File

Scale

Drawn By / D a t e

Mac 7

1:5

ST/March 2008 JI/March 2008

Checked By / Date

Title

Standard Roof Details Y = 0.009 W/mK f = 0.975 STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN

D r a w i n g N o. c

Corus UK Ltd.

A/725/T/10

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

DETAIL 8

DETAIL 9

DETAIL 11 I

Window Frame, by others

Structural Steelwork, by others

DETAIL 10

Sealant strip, continuous, high performance 6mm Ø beads. Trisomet Panel

NOTES

Window Frame, by others Panel

CP&P Trisomet Panel. (see brochure for current thickness.)

Sealant strips, continuous, high performance 10x5mm PE Foam Tape.

thickness

Structural Steelwork, by others

CP&P Sill Flashing

CP&P Iashing to be stitched using sealed rivets or self-drilling fasteners with sealing washers at not more than 400mm centres.

CP&P Drip Flashing

1000

1000mm panel

ProHled Filler, sealed top and bottom.

Seal between window and rail.

1000mm panel Window Frame, by others

CP&P Trisomet Panel. (see brochure for current thickness.)

Y = 0.721 W/mK f = 0.62

Primary Fastener. 5.5mmØ, self-drilling, austenitic S.S. high thread fastener with sealing washer for composite panels.

CP&P Iashing to be stitched using sealed rivets or self-drilling fasteners with sealing washers at not more than 400mm centres.

thickness

Seal with, continuous, high performance 10x5mm PE Foam Tape.

CP&P Drip Flashing Hxed to panel using a colour match rivet at 400mm centres

Panel

Sealant strip, continuous, high performance 6mm Ø beads.

CP&P Trisomet Panel. (see brochure for current thickness.)

CP&P 1.6mm Galv. support angle

Structural Steelwork, by others

20

55

55

A

STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN ASSUMING WINDOW 'U' VALUE INCLUDES THE WINDOW FRAME

c

CP&P Insultion retaining Iashing, 0.7mm standard white liner internal Hnish

Seal between support angle & panel with continuous, high performance 10x5mm. PE Foam Tape.

20

Primary Fastener. 5.5mmØ, self-drilling, austeniHc S.S. high thread fastener with sealing washer for composite panels.

Read these drawings in conjunction with drawings A/725/T/03, 04, 05, 10 & with the specification clauses H43 A B C D & L10

Loose laid insulation by others

Seal with, continuous, high performance 10x5mm PE Foam Tape.

Primary Fastener. 5.5mmØ, self-drilling, austeniHc S.S. high thread fastener with sealing washer for composite panels.

thickness

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

Y = 0.352 W/mK f = 0.73

CP&P sofHt Iashing

STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN ASSUMING WINDOW 'U' VALUE INCLUDES THE WINDOW FRAME

c

Corus UK Ltd.

Corus Panels & ProHles

Y = 0.204 W/mK

Corus UK Ltd.

f = 0.85 A STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN

c

Corus UK Ltd.

SALES AND TECHNICAL OFFICE TEWKESBURY TEL: 01684 856600

Y = 0.466 W/mK f = 0.73

SALES OFFICE AMMANFORD TEL: 01269 850691

A

STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN ASSUMING WINDOW 'U' VALUE INCLUDES THE WINDOW FRAME

c

DETAIL 11A

Corus UK Ltd.

DETAIL 12

(Abutment to cladding detail) This detail is a variation on Corus Standard Details Drawing no: RDTRIS018-01-A

DETAIL 15

3 runs of continuous, high performance, 10x5mm PE Foam Tape sealant.

Trisomet Panel 80mm core

Trisomet Panel Seal with continuous, high performance, 10x5mm PE Foam Tape.

Loose laid insulation by others 150

CP&P Insultion retaining Iashing, 0.7mm standard white liner internal Hnish

Seal between support angle & panel with continuous, high performance 10x5mm. PE Foam Tape.

10

Seal with continuous, high performance, 10x5mm PE Foam Tape.

TRISOMET PANEL

ROOFLIGHT

CP&P 1.6mm Galv. support angle

ROOFLIGHT

Foam Block Support

50x4mm PE foam tape, continuously laid to ensure air tightness

ROOFLIGHT ENDS MUST BE SUPPORTED BY AT LEAST 50mm

80

1000/32 External Sheet Factory curved

TRISOMET PANEL 150 x 150 box gutter

CP&P Extension plate 1.6mm Galv. standard 3m length

120

Purlin By others

Spigot for connection to RW pipe

Fixed at 750 centres

Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels with 19mm sealing washers.

Swanneck to down pipe at high level to bring pipe down to existing gully.

Continuous high performance Strip sealant 6mm diameter bead 80mm thick PUR or equivalent insulation, by others

Gutter to have end caps & over lapped connection properly sealed to prevent leakage

Y = 0.204 W/mK f = 0.85

Rev Date

Continuous R/A section tack welded to gutter & botted to easy support bracket

c

Corus UK Ltd.

c

Corus UK Ltd.

STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN

DETAIL 13

DETAIL 14

Drawn By

Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels with sealing washers.

Continuous, high performance, 10x5mm PE Foam Tape sealant.

Inkpen Downie Architecture & Design Ltd

Internal Lining Sheet 0.7mm thick Iat sheet, curved on site.

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

TENDER DRAWINGS

Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels sealing washers.

60

Top sheet cut back on site to aviod cold bridge Loose laid insulation

Revision

Trisomet Panel 60mm core

CP&P Internal Flashing to be butt or lap jointed and sealed with continuous, high performance sealant strips, 9x3mm.

Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels with 19mm sealing washers.

Continuous, high performance, 10x5mm PE Foam Tape sealant. Continuous, high performance, sealant CP&P Internal Iashing 10x5mm PE Foam Tape. stitched to underside of the panel using rivets at a minimum of 400mm centres. Sealed to panels using continuous high performance strip sealant, 10x5mm PE Foam Tape.

CP&P Internal Iashing stitched to underside of the panel using rivets at a minimum of 400mm centres. Sealed using continuous high performance strip sealant, 10x5mm PE Foam Tape.

Project

20mm Spacer Block sealed either side with a continuous high performance strip sealant 9x3mm against internal liner and a 6mm diameter bead against underside of the panel

Alterations to 75 Park Garage to Provide Training Facilities Client

Port of Felixstowe Y = zero (no calc) f = 0.97 (as panel)

CP&P Internal Corner Flashing Butt or lap jointed sealed with two runs of continuous high performance strip sealant, 9x3mm

60

Liner cut back on site and panels butted together to aviod cold bridge

Cad File

Scale

Drawn By / D a t e

Mac 7

1:5

ST/March 2008 JI/March 2008

Checked By / Date

Title

STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN

Standard Roof Details CP&P External corner Flashing to be butt or lap jointed and sealed with continuous, high performance sealant 10x5mm PE Foam Tape.

CP&P Flashing to be stitched using sealed rivets or self drilling fasteners with sealing washers at not more than 450mm centres AS SHOWN Y = 0.041 W/mK f = 0.96 STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN

WITHOUT TOP SKIN CUT BACK

AS SHOWN

Y = 0.248 W/mK

Y = 0.019 W/mK

f = 0.75 STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN BUT WITHOUT SITE CUTTING OF LINER

f = 0.939

c

Corus UK Ltd.

STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN

Flashing to be stitched using sealed rivets or self drilling fasteners with sealing washers at not more than 400mm centres

c

Y = 0.198 W/mK

R e v N o.

A/725/T/11

f = 0.744 STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN BUT WITHOUT SITE CUTTING OF LINER

Corus UK Ltd. D r a w i n g N o.

WITHOUT LINER CUT BACK

c

Corus UK Ltd.

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.