Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
LOCATION PLAN 1:2500 N
NOTES
W
E S
'SS R'S R R OR O OR O TOR OO EEAA O CT LO R REA ACT ACTO AC FLOAR ARE DF ARE TTR N D G NTR NT N ND N ON O UN NG CO R OU KKIN RKI R GR OR O WO W
ESS CE CES CCE AACC AC 'SS R'S E R ORSI TOR C S SID CTO CT AACT RACTHI RA HIS H TR TRA TR NTRM TTH NT ON OM O CO RO C R FR FRO RS IIT ITO CE ISIT A VIIS VIS VI RAN RA R TR Y N NTR ENT EN ARY ENT AAR RARFFFF RA O AFF OR AF POR TAF MP STA STA EM EM D TTEM TE N ND A AN
G E O R G E
BU Y
S
O
T R E
ED SH
E T
RD YA
D RD AR AR YA Y O E TTO SE E US US CE C NT NT AN AN AN RA R T TA NTTR NS EN E ON N CO AIIN MA IN M E AN RA CR
ING AT AT RA ER OP REA AR A D
ES RES R OR STO
ND ND UN O E OU
TE ITE SIIT SIT E RYY D AARY F CE V ID RA VID CE R BBYY OF RAR O NCE N O OR OV ENC PO SSS AALL FFE PO RO POR FEN PRO PR MP ESS T N VVA G VAL C OV CES N ON NT O OVANG TEEMCC TE TEM O EEN ENT M TI T TIO A EM ACC AC TING ME TI L & EM SSTTIN REM STI R E EL PLE XXIS NE N LLA EXI EX LAC A PAN PAN EP COM REPN O ON
FA F
A RAAC OR S NTTRST E ES S TIE TI TI ITI R IL CO OR LIT LI FO AC CIL CILI
PO ARE 'S MP FAAR OR L CO ELLF ACTCEE WE 'S & W NC ANC NT RAN NTR ON TRA O OR E TR CO NTR C E ENT CT AG CT A
PAVEME P PA PAV PAVEMEN VEMENT V VE EM EME ME ENT E T
F
O TO S EESS EESSIME CES T TIM ACCLLL AALL
FE FENCE EN NC TO NC O
D
Y OUNDARY OUND BOUNDARY B NG BO ING TIIN ST STI ST IS X XIS XISTI EXISTING EX E EXI
F
RESAATT STO AR & TT& CLLEE XIT T CLE EEXI EPT EP E KEP FIR E B
n
w
e
s
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
CONTRACTOR'S GROUND FLOOR WORKING AREA 1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
7
3
1 3 2
1 3 2
7 3
CONTRACTOR'S ACCESS FROM THIS SIDE
UP
7 3
7 3
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
TEMPORARY VISITORS AND STAFF ENTRANCE
GEORGE
STREET Rev Date
Revision
Drawn By
MAIN ENTRANCE TO YARD IN CONSTANT USE EX
FD 1
TI
NG
Inkpen Downie Architecture & Design Ltd
BO UN DA RY
2 Balkerne House
FE NC E
BUOY SHED YARD
CRANE OPERATING AREA
IS
TO
FIRE EXIT & STORES ACCESS TO BE KEPT CLEAR AT ALL TIMES
NT
CONTRACTOR'S COMPOUND FOR STORAGE & WELFARE FACILITIES
ME
CONTRACTOR'S ENTRANCE STORES
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
BUILDING REGULATIONS Project
VE PA
FD
PROVIDE TEMPORARY SITE ACCESS BY REMOVAL OF EXISTING FENCE PANEL & REPLACEMENT ON COMPLETION
Trinity House Harwich Alterations to Buoy Shed & Main Office Building Client
Trinity House Light Service Cad File
Scale
Mac 7
1:250/1:2500ST / Nov 08
Drawn By / D a t e
Checked By / Date
Title
Site Plan and Location Plan n
e
SITE PLAN 1:250
D r a w i n g N o.
w
s
R e v N o.
A/704/BR/01 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
NOTES
10
9
8
7
6
SFW.02
SFW.03
4
SFW.04
SFW.05
3
2
1
SFW.06
570
SFW.01
5
EL
G C02/D03
C04/D02
SFW.07
SFW.08
C07/D01
F
switch pane
l
TEST ROOM R & D SUPPORT
ELECTRONICS LAB.
LIGHTS LABORATORY
C04/D01
C03/D02
C02/D04
C03/D01
concrete slab to plant room
C08/D01
1500
C11/D01
C05/D01
E
D C012/D01
EA
D
C
C013/D01
C012/D01 C013/D01
ROOF ACCESS LADDER
ROOF ACCESS LADDER
SLAB 12.370 C014/D01
C014/D01
SERVER
Rev Date
Revision
Drawn By
1
1
B
B
CR
E AN
G IN AT ER P O
AR
C06/D01
C
C06/D02
SLAB 12.370
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
2
C01/D01
C010/D01
C02/D01
C02/D02
1500
C01/D02
C09/D01
C06/D01
PLANT AREA
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
A Draw ing S ta tus
BUILDING REGULATIONS Project
Trinity House, Buoy Shed Meeting Room Client
Trinity House Lighthouse Service Cad File
Mac 7
Scale
Drawn By / D a t e
1:200
ST 22/02/2008
Checked By / Date
Tit le
Proposed Second Floor Plan D r a w i n g N o.
R e v N o.
A/704/BR/02 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
D
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
C
NOTES
1 C13
Existing Technical Library
B
B Details to Spec. L10/56 toughened glass EX 150 x 90mm SW EX 150 x 90mm SW
C14
detail 1 scale 1:10
Existing Server Room
detail 2 scale 1:10
air conditioning unit to be resited new metal stud partition resite existing door & frame EX 50 x 22mm SW
C013/D01
C12
ROOF ACCESS LADDER
air conditioning unit to be retained
fire-resistant glazing pilkington pyrodur or similar
C014/D01
C012/D01
570
Lobby
2 C06/D01
100mm metal stud partition
Rev Date
dis tan ce
Library
14 m.
Drawn By
Inkpen Downie Architecture & Design Ltd
skirting trunking pendock tk casing system or similar
150mm metal stud partition to give thermal insulation and 1hr fire resistance
Meeting Room
Revision
Storage
form new opening in existing metal stud partition
5600
A
line existing structure with 150mm metal stud partition to give thermal insulation and 1hr fire resistance
A 5600
Fir ee sc ap et rav el
Existing door
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Draw ing S ta tus
BUILDING REGULATIONS Project
Storage 1 hour fire resisting glazing opening in for cleaning
Trinity House, Buoy Shed Meeting Room Client
Trinity House Lighthouse Service 3900
9016 Cad File
Mac 7
Scale
Drawn By / D a t e
1:50
ST Apr 2008
Checked By / Date
Tit le
Storage 1067
2050
2050
Proposed Floor Plan
1067 D r a w i n g N o.
R e v N o.
A/704/BR/03
PLAN
B
detail 1
detail 2
Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
B
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
detail 5 detail 5 scale 1:20
ventilation louvre
NOTES
ply timber structure
extract duct retain existing control panel accessible
detail 6 scale 1:20
retain existing light fitting structure
retain existing light fitting structure move existing cables to accommodate the new door
detail 6
skirting trunking
Library
ventilation duct & louvre dado trunking
Meeting Room Storage
SECTION A-A
D
C
B
A
detail 3 Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
detail 3 scale 1:20
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Draw ing S ta tus
skirting trunking timber cill skirting trunking pendock tk casing system or similar
BUILDING REGULATIONS
air conditioning unit to be resited
dado trunking
Project
fire resisting timber windows
Trinity House, Buoy Shed
Server Room
timber cill 30mm thick
service pipes
Meeting Room Client
Meeting Room
Trinity House Lighthouse Service Cad File
Mac 7
detail 4 scale 1:20
Scale
Drawn By / D a t e
Checked By / Date
1:50 / 1:20 ST Nov 08
Tit le
detail 4
Proposed Sections D r a w i n g N o.
SECTION B-B 3
2
1
R e v N o.
A/704/BR/04 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
NOTES
retain existing light fitting structure
resite infra-red smoke detector targets
D
C
B
A
SECTIONAL ELEVATION C-C New internal partition walls to be:
New floors to be:
Electrical Installation:
On the outside: Two layers of board each side of 146mm Gypframe 146 AS 50 AcouStuds at 600mm centres. 150mm Isowool APR 1200 in the cavity. (GypWall, SoundBloc A206A243 system reference)
Meeting Room: Carpet tiles finish.
Include: - Small power for general use - Fluorescent lighting with CAT3 diffusers for I.T. installations. - Power for stand alone air conditioning unit.
Library: Carpet tiles finish. Lobby: Carpet tiles finish.
Between New Library and Meeting Room, New Server Wall: One layer of board each side of 70mm Gypframe 'C' Studs at 600mm centres. 50mm Isowool APR 1200 in the cavity. (GypWall, WallBoard A206139 system reference)
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Draw ing S ta tus
BUILDING REGULATIONS New ceilings to be:
New doors and windows to be:
Mechanical Installation
In Meeting Room: Line existing curved metal sheet clad roof with CasoLine Curve, Gypframe MF5 ceiling section 300 x 300 centres, or Gypframe MF7C Curved Support Channel structure. Gyproc SoundBloc 12.5mm thickness board, radius 40000. Acoustic / thermal insulation: Isowool Modular Roll 150mm.
Fire doors meet BS476 Pt 22 standards to give 1 hours fire resistance to balcony, 1/2 hours fire resistance to corridor. Windows with multi-laminated glass providing both 1 hours fire resistance and acoustic insulation.
Include: - Extend existing force ventilation system including heating and cooling to meeting room and library area. - Provide stand alone air conditioning unit heat exchanger to be situated in plant room below.
Project
Trinity House, Buoy Shed Meeting Room Client
Trinity House Lighthouse Service Cad File
Mac 7
Scale
Drawn By / D a t e
1:50
ST 22/02/2008
Checked By / Date
Tit le
In the Library: CasoLine, Gypframe MF5 ceiling section centres 600mm, Gypframe MF8 Strap Hanger or Gypframe GA1 Steel Angle centres 1200mm. Gyproc SoundBloc 12.5mm thickness board. Acoustic / thermal insulation: Isowool Modular Roll 150mm.
Proposed Elevation and Notes D r a w i n g N o.
R e v N o.
A/704/BR/05 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. 132
132
counter
EJ 132
A
HANDRAIL B
A2 Reception
BARRIER SAFETY PLYWOOD
HANDRAIL A
A8 Mail Room
132
BARRIER SAFETY PLYWOOD
NOTES
BARRIER SAFETY PLYWOOD
LIFT
EJ EJ BARRIER SAFETY PLYWOOD
UP
132
132
A31
A9 Disabled wc
Cleaners 132
Existing Office Area
B14 Lobby
HANDRAIL A
DOWN
BARRIER SAFETY PLYWOOD
C11
132
HANDRAIL B
CERAMIC WALL TILES
C10
BARRIER SAFETY PLYWOOD
B1
Upper Part Entrance
IPS 2400 HIGH ARMITAGE EVOLVE ACCESS FACILITY
C08
BARRIER SAFETY PLYWOOD
Stair A
Drain
TEMPORARY SCREEN
132
HANDRAIL B
EJ
73
EJ
TEMPORARY DUST PROOF SCREEN
BARRIER SAFETY PLYWOOD
45
45
EDGE OF SLAB IN RISER NOT SHOWN
BARRIER SAFETY PLYWOOD
BARRIER SAFETY PLYWOOD
THIS SCREEN TO BE TAKEN DOWN AFTER INSERTION OF NEW FLOOR FROM BELOW.
1320
UP Stair
EDGE OF SLAB IN RISER NOT SHOWN
A1 Lobby
132
BARRIER SAFETY PLYWOOD
73
EDGE OF SLAB IN RISER NOT SHOWN
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
636
A7 Cash Office
EJ
A14 Lobby
EJ 132
C12
CONTRACTORS ACCESS VIA MAIN STAIR
EJ 132
EJ
TEMPORARY SCREEN
B15 Lobby
CERAMIC WALL TILES
CERAMIC WALL TILES
OFFICE BUILDING GROUND FLOOR PLAN
TEMPORARY DUST PROOF SCREEN
A15
A3
Showers
B6 K
Disabled wc
EJ
1 3 2
1 3 2
ROOF ACCESS LADDER
1 3 2
1 3 2
R&D Resear
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
IPS 2400 HIGH
B3 Marketing Manager
OFFICE BUILDING FIRST FLOOR PLAN 1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
TEMPORARY DUST PROOF SCREEN
C14
1 3 2
SERVER
7
3
1 3 2
C13
B5 Male wc
B4
CONTRACTOR'S GROUND FLOOR WORKING AREA 7 3
CONTRACTOR'S ACCESS FROM THIS SIDE
UP
7 3
1 3 2
7 3
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
TEMPORARY VISITORS AND STAFF ENTRANCE
1
B
BUOY SHED SECOND FLOOR PLAN
GEORGE
STREET
MAIN ENTRANCE TO YARD IN CONSTANT USE
EX
IS
TI
NG
FD 1
BD
A 01.12.2008 site plan scale to 1:300 & additional area for the contractor's compound & additional dust proof screed on GF buoy shed
ST
Revision
Drawn By
NC
TEMPORARY DUST PROOF SCREEN
B 12.01.2009 temporary access from George Street omitted
Rev Date
FE E
BUOY SHED YARD
CRANE OPERATING AREA
BO UN DA RY
TO
FD
NT
ME
VE PA
CONTRACTOR'S ENTRANCE STORES
CONTRACTOR'S COMPOUND FOR STORAGE & WELFARE FACILITIES FIRE EXIT & STORES ACCESS TO BE KEPT CLEAR AT ALL TIMES PROVIDE TEMPORARY ACCESS BY REMOVAL OF EXISTING FENCE PANEL & REPLACEMENT ON COMPLETION
n
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
e
Trinity House Harwich w
s
Alterations to Buoy Shed & Main Office Building Client
CONTRACTOR'S COMPOUND FOR STORAGE & WELFARE FACILITIES
Trinity House Light Service Cad File
Scale
Mac 7
1:300/1:100 ST / Nov 08
Drawn By / D a t e
Checked By / Date
Title
Site Plan D r a w i n g N o.
A/704/CT/01
R e v N o.
B
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
6
A24/D01
FEMALE
A26/D01 TOILETS
CHANGING 18352
25670
A24 A22
20000
20000
6090
34179 2150
1400
A19
A18
SOLAR WORKSHOP AREA
A23/D02
28439
82
82 3000
19362
FIRST AID
18100 EJ
EJ
20460
A22/D01
DISABLED TOILET
A29/D01
150
A22/D01
21159
721
FABRICATION WORKSHOP
30000
18100 10673
A20/D01
4397 27100 23270
10100 3430
EJ
A19/D01
7043
23808
26648
5900
A05/D01
A05/D02
GRIT RECYCLING
1400
A16
EJ
3400
28582
C
A12
59400
A13 OUTSTATION STORES 33100
15250 400
A11
2250 14723
66000 66173
1400
200
PAINT ( 5. 5m HIGH)
EJ
Rev Date
35618
SPRAY (6.5m HIGH)
TECHNICAL WORKSHOP
27100
27100
Revision
Drawn By
11650
A13/D01
2250
B 17900
3250
FILTERS
12000 30000
A09
A03/D01
4552
15250
A12/D01
A
2650 12100 5900
900
DRY (6.5m HIGH)
37910
30000
R TU 29887
GRIT BLASTER (6.5m HIGH)
LADDER
GA37VSD
4100
LE
130
PAINT SERVICES & PAINT STORE (3m HIGH)
3650
4601
1250
700
27100
81817
COMPRESSORS
PLANT STORAGE/CHARGING
A12/D021400
A10 28506
GA45
27100
A02
A14
A06/D01
5700
A05
12000
D
A10/D02
A10/D01
A03
5700
PLANT STORE
42600
A32
3650
56895
3650
A07
A06
CHANGING ROOM BELOW STAIRS
GFSH.04
GFSH.05
56502
399
GFSH.03
N
LOWER BUOY CRADLE AREA
33794
GFSH.06
D
455
1400
A08
A04
1400
A16/D01
3000
6m HIGH AREA WITH CRANE
FFL 03.550
776
26498
GFSH.07
44595
27100
A31/D01
A15
EXTENT OF HOOK TRAVEL
12
1
up
EXTENT OF CRANE TRACKS
EJ
A31 LIFTING STORE
27100
15
27 RISERS X 180 = 4860
14682 EJ
GFSH.08
TA B
58040
54000 8900 3000
A01/D01
E AN CR
49400 line of @rst Aoor above
1475
GRIT BLASTER (6.5m HIGH)
150
12100 11900
150
695
37422
C
GFSH.01
AR
EJ
1402
D
A01
G IN AT ER P O
18100
EA
A17
A18/D01
648
D
E
A17/D01
15466
29889
35300
A26
A24/D01
A25/D01
1400
10000
A25
1500 x 1500
F 36720
BATTERY CHARGING ROOM
A23
up
A27/D01
A25/D01
position to be con@rmed
GFSH.02
A20
1100
13720 A27/D01
3OOO kg capacity
23160
up
1400
VIEWING WINDOW
4400
A28/D01
2670
60000
EJ
A21/D01
39050
A29 AVERY BERKEL WEIGH SCALES
A30/D01
MALE TOILETS
DRIER
CHANGING
G
8500
A28
STORES
lift entry
ROOM
1000
18176
STORE-
KEEPER
33731
A27
R
A21 LAMPTEST
24000
24911
WASHE
1
3250
EJ
11718
19233 21774
12500
16600
2
51220
3655 1400
deep pit
2050
A30
3
C
30000
9100 5900 2810
9
29970
38523
location of 70
18000
in this area
A30/D02
5900
A23/D01 FIRE CONTROL PANEL
10482
2050 bulkhead
43711
400
2300
18500
5202
GFW.01
11950
20400
24000
6000 7500 10500
10100
19500
8900
3650
18100
GFW.03
9100
EJ
EJ
4
B
41950
GFW.02
30000
21450
26600
5
900
7
24000
8
15744
9
A
12000
10
A
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
A32/D01
18100
Drawing Status
CONSTRUCTION 4
GROUND FLOOR
3
Project
Trinity House, Harwich Alterations to Office & Buoy Shed Buildings Client
Trinity House Lighthouse Service Cad File
Scale
Drawn By / D a t e
Mac 7
1:200
ST/Nov 08
Checked By / Date
Title
Existing Ground Floor Plan D r a w i n g N o.
R e v N o.
A/704/CT/11 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
A
B
8
7
8000
6
11000
5
41519
8000
22000
4
8000
8000
11000
3
11000
8000
22000
8000
FFW.02
1750
3069 205
30030
11630
30323
KITCHENETTE
24435
B03
MESSING
B03/DO1
B02/DO1
B04
25000
DISABLED TOILET
B05/DO2
B05
TOILET
11000
23020
81715
MANAGER
B09
26333 51685
CUPBOARD
17215
7974
B04/DO1
B05/DO1
17242
250 2080
B01/DO3
ELECTRIC
13610
8000
FFW.09
GENERAL OFFICE B08/DO1
1557
26485
B01/DO1
3965
down
B02/DO2
22470
15030
B02
15000
FFL 08.410
1100 high handrailing to stair well
22000
FFW.08
1970
B08
12295
B01
89980
5700
B10
FFL 08.410
15000
FFW.10
B06/DO1
down 27 15
10000
B11 B07/DO1
B07
FFW.11
MEETING
up 13830
B16/DO1
B16
B12/DO1 B13/DO1
RACKS
26945
VOID
12
1
255
15301
AR
EA
B06
1600
480
E AN CR
G IN AT ER P O
B06/DO2
22604
refuge
B10/DO1
12984
15301
2420
B09/DO1
22604
FFW.09
18000
250
5700
15000
73445
8000
B03/DO2 +6.790
STORES
11000
FFW.07
FFW.06
FFW.05
1
13610
+9.850 B01/DO2
1800 x 1750 breakthrough size
FFW.04
9700
17500
2050
lift entry
150
1300
lift control cabinet
18000
FFW.03
5700
1805
2300
400
FFW.01
2
59820
9
39240
10
C
57902 5150
31470
0
B12
10100
59540
B14/DO1
130
1250
B13/DO2
(6.5m HIGH)
5700
1400
B14
B13
SIGNS & LABELS
T MOBILE COMMS ROOM
FFL 08.410
40000
PLANT 1 B15/DO1
C
0 0 0 8 3 Ă˜
TU GRIT BLASTER (6.5m HIGH)
B15/DO1
R
6 2 2 5 0
UPPER BUOY CRADLE AREA
A02
N
TA B
LE
B14/DO1
DRY (6.5m HIGH)
SPRAY (6.5m HIGH)
PAINT SERVICES & PAINT STORE (3m HIGH)
B15 PAINT (5. 5m HIGH)
PLANT 2 Rev Date
Revision
Drawn By
FFL 08.410
FILTERS 5700
5700
6 2 4 3 7
GRIT RECYCLING
LADDER
B
MEZZANINE
Inkpen Downie Architecture & Design Ltd A
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
FIRST FLOOR
Trinity House, Harwich Alterations to Office & Buoy Shed Buildings Client
Trinity House Lighthouse Service Cad File
Scale
Drawn By / D a t e
Mac 7
1:200
ST/Nov 08
Checked By / Date
Title
Existing First Floor Plan D r a w i n g N o.
R e v N o.
A/704/CT/12 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
A 10
B 9
8
7
6
SFW.02
5
SFW.03
4
SFW.04
3
SFW.05
2
1
SFW.06
5700
SFW.01
C
C02/D03
G
LAMP TEST ROOM
C04/D02
EL
SFW.07
C07
SFW.08
28120
18000
E
1000
C12 22
15001
15000
C11
18000 481
1600
C06/D02
2080
E AN CR
G IN AT ER P O
A
LIGHT RANGE
down
C06/D01
12
D
22 RISERS X 180 = 3960
11
C012/D01
280
579
04
C013/D01
15662
TECHNICAL LIBRARY
ROOF ACCESS LADDER
C13 515
29340
19269
15002
SLAB 12.370
18880
29835
C08/D01
C06 E AR
C10
C05/D01
5700
2079
CUPBOARD
15000
C06/D03
C03/D02
31000
27285
C03/D01 ELECTRIC
12411
DARK ROOM
C03/D03
12100
C06
C09
C010/D01
10000
70699
C01/D01
12.370
C09/D01
LIGHTS LABORATORY
2080 250
PLANT AREA
C08
ELECTRONICS LAB.
77416 C04/D01
C02/D01
C01/D02
C05
TEST ROOM
00
C014/D01
C14 concrete slab roof to rooms below
32980
2080
down
18940
C03
F
SECURE STORE 38820
553
73445
PLANT AREA
C04
80984
74504
57715
C02
4169
C01
SLAB 12.370
SERVER C
5700
Rev Date
Revision
Drawn By
B
5700
16100
C07/D01
1300
38950
R & D SUPPORT
A
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
CONSTRUCTION Project
Trinity House, Harwich Alterations to Office & Buoy Shed Buildings Client
Trinity House Lighthouse Service Cad File
Scale
Drawn By / D a t e
Mac 7
1:200
ST/Nov 08
Checked By / Date
Title
Existing Second Floor Plan D r a w i n g N o.
R e v N o.
A/704/CT/13 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
search Director B8
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
CERAMIC WALL TILES
CERAMIC WALL TILES
NOTES
EJ
CERAMIC WALL TILES
ARMITAGE EVOLVE ACCESS FACILITY
Disabled wc
Kitchenette
B6
B7
Lobby B15
IPS 2400 HIGH CERAMIC WALL TILES
take down existing partition between office and upper part of lobby area, make good finishes EJ
EJ
PLYWOOD SAFETY BARRIER
IFT
EJ
HANDRAIL B
Lobby B14
DOWN HANDRAIL A
PLYWOOD SAFETY BARRIER
Stair A
PLYWOOD SAFETY BARRIER
300
EJ EJ
Existing Office Area B1
Upper Part Entrance
extend existing suspended ceiling and M&lighting instalations into extended office area.
1320
UP
PLYWOOD SAFETY BARRIER
insert new timber floor to structural engineers specification, including - two layers plasterboard and skim coat finish to underside - 22mm chipboard flooring - proprietary Kingspan access floor to match existing - contract carpet to match existing - skirting to match existing
HANDRAIL B provide dado trunking with twin 13A socket outlet and port for cat5 IT connection every 1000mm include for wiring IT cabling back to server room
A12 Jan 09 dado trunking added Rev Date
BD
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Draw ing S ta tus
CONSTRUCTION Project
Trinity House, Harwich Alterations to Main Office Building Client
Trinity House Lighthouse Service Cad File
Scale
Drawn By / D a t e
Mac 7
1:50
ST/Nov 08
Checked By / Date
Tit le
Proposed First Floor Plan Extension of Existing Office into Lobby Area D r a w i n g N o.
A/704/CT/21
R e v N o.
A
Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
A3
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
CERAMIC WALL TILES
NOTES
EJ ELECTRICAL & LIGHTING KEY LIGHTS Recessed Down Lighter
Pendant CERAMIC WALL TILES
Disabled wc A9
E
ARMITAGE EVOLVE ACCESS FACILITY IPS 2400 HIGH
Drain
EJ
Mail Room A8 HANDRAIL A
include for the following in lobby area: - new luminaires lighting instalation - new ceiling mounted air curtain - resite access controls from outer doors to inner lobby doors including renewal of ironmongery.
A Lobby A1
45
45
Reception A2
Emergency Lighting
HANDRAIL B
UP
Stair A ceiling joists 44mm x 145mm
Rev Date
Drawn By
new light fittings to match with the existing upper entrance ceiling luminaires
counter 636
Revision
Inkpen Downie Architecture & Design Ltd
Cash Office A7
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Draw ing S ta tus
CONSTRUCTION Project
Trinity House, Harwich Alterations to Main Office Building Client
Trinity House Lighthouse Service
EJ
Cad File
Scale
Drawn By / D a t e
Mac 7
1:50
ST/Nov 08
Checked By / Date
Tit le
Proposed Ground Floor Ceiling Plan Extension of Existing Office into Lobby Area D r a w i n g N o.
R e v N o.
A/704/CT/22 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
NOTES
ELECTRICAL & LIGHTING KEY LIGHTS Recessed Down Lighter
Pendant
E
Emergency Lighting
retain existing light fittings
retain and adapt existing suspended ceiling. extend existing ceiling height from the existing office area
Existing Office Area B1
Upper Part Entrance
retain existing light fittings
new light fittings to match with the existing
keep existing ceiling height of lobby area Rev Date
Revision
Drawn By
take down existing partition between office and upper part of lobby area form new structure to fix the vertical part of the suspended ceiling. Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Draw ing S ta tus
retain existing light fittings
CONSTRUCTION Project
Trinity House, Harwich Alterations to Main Office Building Client
Trinity House Lighthouse Service Cad File
Scale
Drawn By / D a t e
Mac 7
1:50
ST/Nov 08
Checked By / Date
Tit le
Proposed First Floor Ceiling Plan Extension of Existing Office into Lobby Area D r a w i n g N o.
R e v N o.
A/704/CT/23 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
NOTES
Control Room C1
2700
200
13.690
RS@177mm mm = 280
12.300 SSL
detail 1
detail 1 scale 1:10 12.300 retain & adapt existing suspended ceiling
LA
retain existing raised access floor panels
aluminium cap channel
B1
retain & adapt existing suspended ceiling existing raised access floor panels to be retained carpet floor finish
detail 2 8.400
new raised access floor panels to be match with the existing
120
RS@177mm mm = 280
new raised access floor panels to be match with the existing
aluminium cap
2490
Technical Services Area 2
movement joint to manufacturers standard details and recommendations
chipboard
remove existing air curtain and replace with new ceiling mounted unit
Rev Date
protect and retain existing entrance screen
Drawn By
Inkpen Downie Architecture & Design Ltd
2715
Lobby A1
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
detail 2 scale 1:10
2281
Reception A2
Revision
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Draw ing S ta tus
CONSTRUCTION Project
4.500
two layers of plaster board plaster board ceiling joists 44 x 145 aluminium cap two layers of plaster board
Trinity House, Harwich Alterations to Main Office Building Client
Trinity House Lighthouse Service Cad File
Scale
Mac 7
1:50 / 1:10 ST/Nov 08
Drawn By / D a t e
Checked By / Date
Tit le
Proposed Section & Details
retain & adapt existing suspended ceiling
Extension of Existing Office into Lobby Area D r a w i n g N o.
R e v N o.
A/704/CT/24 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
A3
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
CERAMIC WALL TILES
NOTES
EJ
CERAMIC WALL TILES
Disabled wc A9 ARMITAGE EVOLVE ACCESS FACILITY IPS 2400 HIGH
Drain
EJ
A
Mail Room A8 HANDRAIL A
Lobby A1
45
45
Reception A2 HANDRAIL B
UP
Stair A
Revision
Drawn By
636
counter
Rev Date
Inkpen Downie Architecture & Design Ltd
Cash Office A7
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Draw ing S ta tus
CONSTRUCTION Project
Trinity House, Harwich Alterations to Main Office Building Client
Trinity House Lighthouse Service
EJ
Cad File
Scale
Drawn By / D a t e
Mac 7
1:50
ST/Nov 08
Checked By / Date
Tit le
Existing Ground Floor Plan Extension of Existing Office into Lobby Area D r a w i n g N o.
R e v N o.
A/704/CT/25 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
search Director B8
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
CERAMIC WALL TILES
CERAMIC WALL TILES
NOTES
EJ
CERAMIC WALL TILES
ARMITAGE EVOLVE ACCESS FACILITY
Disabled wc
Kitchenette
B6
B7
Lobby B15
IPS 2400 HIGH CERAMIC WALL TILES
EJ
EJ
PLYWOOD SAFETY BARRIER
IFT
EJ
HANDRAIL B
Lobby B14
DOWN HANDRAIL A
PLYWOOD SAFETY BARRIER
Upper Part Entrance
1320
Stair A UP
PLYWOOD SAFETY BARRIER
PLYWOOD SAFETY BARRIER
Existing Office Area B1
300
HANDRAIL B Rev Date
Revision
Drawn By
EJ EJ Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Draw ing S ta tus
CONSTRUCTION Project
Trinity House, Harwich Alterations to Main Office Building Client
Trinity House Lighthouse Service Cad File
Scale
Drawn By / D a t e
Mac 7
1:50
ST/Nov 08
Checked By / Date
Tit le
Existing First Floor Plan Extension of Existing Office into Lobby Area D r a w i n g N o.
R e v N o.
A/704/CT/26 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
ELECTRICAL & LIGHTING KEY
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
LIGHTS
D
C
Wall (Surface Mounted)
NOTES
Ceiling (Surface Mounted)
COMMUNICATIONS & FITTINGS SD
1
Pendant
HD
C13
E
Emergency Lighting
SWITCHES
C14
B TV
2 Gang switch Existing ceiling and light fittings to be retained in the server room and the corridor. Adapt existing ceiling grid to suit new partition arrangement Spec clause K45/13
ASDL
S
ASDL Socket Speaker Socket
Switched Socket Outlet C014/D01 C014/ //D D01 D
SD
3
3
3 ASDL
Telephone Socket
POWER
4
T
3 ASDL
3 ASDL
T
T
Twin Switched Socket Outlet Tripple Switched Socket Outlet
2
Four Switched Socket Outlet
3 ASDL
Rev Date
Revision
Drawn By
3 ASDL
T
T
New exposed grid ceiling system to match existing. Spec clause K40/10
Inkpen Downie Architecture & Design Ltd
E
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
SD
SD
E
New curved ceiling to Spec clause K10/50
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Draw ing S ta tus
TENDER
HD
Project
cable track all around the room
3 ASDL
Trinity House, Buoy Shed Meeting Room
E
Client
Trinity House Lighthouse Service Cad File
T
C06/D01
Television Aerial socket
4 Gang switch
2
C12
Electric Extract Fan
3 Gang switch
ROOF ACCESS LADDER
C012/D01
Heat Detector
1 Gang switch T
C013/D01
Smoke Detector
Mac 7
Scale
Drawn By / D a t e
1:50
ST Nov 2008
Checked By / Date
Tit le
Proposed Electrical Layout and ASDL 3
T
ASDL 3
T
ASDL 3
Ceiling Plan T
D r a w i n g N o.
R e v N o.
A/704/T/06 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .
D
Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.
C
NOTES
1 C13
B C14
C013/D01
C012/D01
C12
ROOF ACCESS LADDER C014/D01 C014/ //D D01 D
2 Rev Date
C06/D01
Revision
Drawn By
Radiator skirting trunking pendock tk casing system or similar
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Radiators
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Draw ing S ta tus
TENDER Project
Trinity House, Buoy Shed Meeting Room Client
Trinity House Lighthouse Service Cad File
Mac 7
Scale
Drawn By / D a t e
1:50
ST Nov 2008
Checked By / Date
Tit le
Proposed Mechanical Layout D r a w i n g N o.
R e v N o.
A/704/T/07 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e. UP
NOTES
EJ
EJ
EJ
9
EJ
lift entry
up up
EJ
EJ
EJ EJ
1
up
40
EJ EJ
e
n
EJ
E AN CR
Rev Date
Revision
Drawn By
A A
w
RE
s
G TIN RA PE O
LOWER BUOY CRADLE AREA
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
PLANNING
SITE PLAN
SCALE 1:250
Project
Trinity House, Harwich New Fabrication Shop Client
Trinity House Lighthouse Service Cad File
Scale
Mac 7/814
1:250/1:2000 ST/Jan 09
Drawn By / D a t e
Checked By / Date
BD/
Title
Site Plan and Location Plan
LOCATION PLAN SCALE 1:2000
D r a w i n g N o.
R e v N o.
A/814/PL/01 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
insulated sheet metal roofing with daylighting by translucent sheets to match main building
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
- all services to be brought via existing underground duct to new fabrication duct including to supply machinery - machinery from existing fabrication shop to be brought over and installed - mechanical and electrical installation in addition for supplies to machinery to include:
insulated cladding panels to match main building
space heating by unit heaters high bay lighting to provide general lighting mechanical ventilation and fume extract small power water
w 5.00 x h 6.00 metre main door opening
cavity walls with full fill cavity insulation fairface block inner leaf and glazed brick outer
piled slab foundation to structural engineers recommendation
PROPOSED NORTH WEST ELEVATION
E AN CR
E OP
EXTENT OF HOOK TRAVEL
PROPOSED NORTH EAST ELEVATION
FFL 03.550
TU
R
N
OWER BUOY CRADLE AREA
TA B
A08 A07 SPRAY (6.5m HIGH)
DRY (6.5m HIGH)
LOWER BUOY CRADLE AREA
RE
1000
A
A09
A
LADDER
A11
73.25째
FILTERS
PROPOSED SOUTH EAST ELEVATION
NG TI RA PE O
A03 GRIT RECYCLING
means of escape routes
NE A CR
A10
COMPRESSORS
PA ( 5. 5m
1 92 14
GRIT BLASTER (6.5m HIGH)
PAINT SERVICES & PAINT STORE (3m HIGH)
13 97 0
LE
EXTENT OF CRANE TRACKS
GRIT BLASTER (6.5m HIGH)
A02
PROPOSED SOUTH WEST ELEVATION
PROPOSED ROOF PLAN Rev Date
A
B
EXISTING BUOY SHED BUILDING
fabrication shop
NEW FABRICATION SHOP
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
12.00 x 18.00 metres
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
PLANNING Project
13 97 0
1 92 14
means of escape routes
Trinity House, Harwich
NE A CR
New Fabrication Shop
NG TI RA PE O
LOWER BUOY CRADLE AREA
A
73.25째
Client
Trinity House Lighthouse Service
RE 8680 7200
7200
1000
8680
A
A
B
Cad File
Scale
Mac 7/814
1:100
Drawn By / D a t e
ST/Jan 09
Checked By / Date
BD/
Title
8.68 metre clearance under crane beam
Proposed Fabrication Shop Plan, Roof Plan, Sections & Elevations D r a w i n g N o.
PROPOSED FLOOR PLAN
R e v N o.
A/814/PL/02 SECTION AA
SECTION BB
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
ET
A
TI
NEW FABRICATION SHOP
RT
EXISTING BUOY SHED BUILDING
NU
T IN S A
IN
I
FFL 12.370 FFL 12 12.3 370 0
TRINITY HOUSE
FFL L 08.410 08 08.4 8 410
FFL 03.550 FFL 03 550 0
NORTH WEST ELEVATION
Rev Date
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
PLANNING Project
Trinity House, Harwich New Fabrication Shop Client
Trinity House Lighthouse Service Cad File
Scale
Mac 7/814
1:100
Drawn By / D a t e
Checked By / Date
ST/Jan 09
BD/
Title
Existing Buoy Shed Elevations GFD.07
& Proposed Fabrication Shop Elevations D r a w i n g N o.
SOUTH WEST ELEVATION
R e v N o.
A/814/PL/03 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
LOCATION PLAN 1:2500 N
NOTES
W
E S
'SS R'S R R OR O OR O TOR OO EEAA O CT LO R REA ACT ACTO AC FLOAR ARE DF ARE TTR N D G NTR NT N ND N ON O UN NG CO R OU KKIN RKI R GR OR O WO W
ESS CE CES CCE AACC AC 'SS R'S E R ORSI TOR C S SID CTO CT AACT RACTHI RA HIS H TR TRA TR NTRM TTH NT ON OM O CO RO C R FR FRO RS IIT ITO CE ISIT A VIIS VIS VI RAN RA R TR Y N NTR ENT EN ARY ENT AAR RARFFFF RA O AFF OR AF POR TAF MP STA STA EM EM D TTEM TE N ND A AN
G E O R G E
BU Y
S
O
T R E
ED SH
E T
RD YA
D RD AR AR YA Y O E TTO SE E US US CE C NT NT AN AN AN RA R T TA NTTR NS EN E ON N CO AIIN MA IN M E AN RA CR
ING AT AT RA ER OP REA AR A D
ES RES R OR STO
ND ND UN O E OU
TE ITE SIIT SIT E RYY D AARY F CE V ID RA VID CE R BBYY OF RAR O NCE N O OR OV ENC PO SSS AALL FFE PO RO POR FEN PRO PR MP ESS T N VVA G VAL C OV CES N ON NT O OVANG TEEMCC TE TEM O EEN ENT M TI T TIO A EM ACC AC TING ME TI L & EM SSTTIN REM STI R E EL PLE XXIS NE N LLA EXI EX LAC A PAN PAN EP COM REPN O ON
FA F
A RAAC OR S NTTRST E ES S TIE TI TI ITI R IL CO OR LIT LI FO AC CIL CILI
PO ARE 'S MP FAAR OR L CO ELLF ACTCEE WE 'S & W NC ANC NT RAN NTR ON TRA O OR E TR CO NTR C E ENT CT AG CT A
PAVEME P PA PAV PAVEMEN VEMENT V VE EM EME ME ENT E T
F
O TO S EESS EESSIME CES T TIM ACCLLL AALL
FE FENCE EN NC TO NC O
D
Y OUNDARY OUND BOUNDARY B NG BO ING TIIN ST STI ST IS X XIS XISTI EXISTING EX E EXI
F
RESAATT STO AR & TT& CLLEE XIT T CLE EEXI EPT EP E KEP FIR E B
n
w
e
s
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
7
3
1 3 2
1 3 2
1 3 2
7 3
UP
7 3
7 3
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
1 3 2
GEORGE
STREET Rev Date
Revision
Drawn By
MAIN ENTRANCE TO YARD IN CONSTANT USE EX
FD 1
TI
NG
Inkpen Downie Architecture & Design Ltd
BO UN DA RY
2 Balkerne House
CO1 1PA
BUILDING REGULATIONS
E TO
Project
NT
CONTRACTOR'S COMPOUND FOR STORAGE & WELFARE FACILITIES
ME
VE PA
CONTRACTOR'S ENTRANCE STORES
FIRE EXIT & STORES ACCESS TO BE KEPT CLEAR AT ALL TIMES
Colchester
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
NC
FD
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
FE
BUOY SHED YARD
CRANE OPERATING AREA
IS
Alterations to office accommodation at The Buoy Shed, George Street, Harwich. Client
Trinity House Light Service Cad File
Scale
Mac 7
1:250/1:2500ST / Nov 08
Drawn By / D a t e
Checked By / Date
Title
Site Plan and Location Plan n
e
SITE PLAN 1:250
D r a w i n g N o.
w
s
R e v N o.
A/917/BR/04 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
44 x 20 architrave 10
9
A
8
7
6
GFW.02
5
9
deep pit
2177
STORE-
DRIER
CHANGING
A29
A27
R
A28
STORES
lift entry
KEEPER
GFW.01
MALE TOILETS
140
A20 A23
A27/D01
3OOO kg capacity
up
up
A27/D01
AVERY BERKEL WEIGH SCALES
A30/D01
A25/D01
A25
1500 x 1500 position to be con@rmed
A26
A24/D01
A22/D01
A22/D01
A24 A22 DISABLED TOILET
A29/D01
FIRST AID
F VIEWING WINDOW
140
A23/D02
96 x 28 screwed and glued to 170 x 50 lining
A18
A19
SOLAR WORKSHOP AREA
FABRICATION WORKSHOP
A20/D01
A17
EJ
15
15
65
D
5400
A01
GFSH.01
CR
A
NE
G IN AT ER OP
AR
EA
D
27 RISERS X 180 = 4860 EJ
GFSH.08
12
1
line of @rst Aoor above
D
40
2650
890
GFSH.07
GFSH.06
78
GFSH.05
N R TU
A02
GRIT BLASTER (6.5m HIGH)
A05/D01 A05/D02
A12
A13 OUTSTATION
GRIT RECYCLING
G RI
570
detail 02 typical window mullion detail
SWITCHES single gang two way switch, plate pattern and manufacture to match existing double gang two way switch, plate pattern and manufacture to match existing
A13/D01
1472
EJ
2710
225
B
triple gang two way switch, plate pattern and manufacture to match existing
1790
325
FILTERS
1200
A09
A12/D01 A03/D01
455
590
detail 01 typical window cill, jamb, head detail
STORES
A11 225
LADDER
ST 125
PAINT ( 5. 5m HIGH)
A10
GA37VSD
COMPRESSORS 2710
SPRAY (6.5m HIGH)
A03
570
TE
GA45
DRY (6.5m HIGH)
new office
A06/D01
A05
PLANT STORE
exit
A12/D02
PAINT SERVICES & PAINT STORE (3m HIGH)
emergency Lighting
1525
1210
A
iluminated exit sign to match existing fittings in other areas
C
A10/D02
A10/D01
A07
A06
CHANGING ROOM BELOW STAIRS
A32
TA B
A08
A04
LOWER BUOY CRADLE AREA
E
EJ
PLANT STORAGE/CHARGING
GFSH.04
LE
70
1190
strip flourescent
44 x 20 architrave
TECHNICAL WORKSHOP
A14
GFSH.03
90
1210 300
A01/D01
A31
5690
28 x 32 stops fixed with screws
6m HIGH AREA WITH CRANE
FFL 03.550
EXTENT OF CRANE TRACKS
GRIT BLASTER (6.5m HIGH)
EJ
LIFTING STORE
A31/D01
new recessed flourescent integrated into ceiling grid to match fittings in other areas in manufacture and lamps
up
A15
EXTENT OF HOOK TRAVEL
A16
C
10 mm pyrostop fire resisting glazing or similar
EJ A19/D01
D
LIGHTS
E
A17/D01
EJ
EJ
ELECTRICAL & LIGHTING KEY
BATTERY CHARGING ROOM
A24/D01
A25/D01
FEMALE A26/D01 TOILETS CHANGING
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
EJ
A21/D01
A28/D01
GFSH.02
ROOM
100 WASHE
1200
A30
sealed double glazing unit
G
A21 LAMPTEST
+5.170
location of 70
in this area
1
EJ A23/D01 FIRE CONTROL PANEL
2050 bulkhead
2
GFW.03
365
A30/D02
3
C
94 x 32 fixed with screws and cups to lining
EJ
EJ
4
B
A
single gang one way switch, plate pattern and manufacture to match existing
265 590
A32/D01
1810
triple gang one way switch, plate pattern and manufacture to match existing 4
3
emergency lighting test key switch
ground floor plan 1:200 scale POWER plastic dado trunking system, pattern and manufacture to match existing elsewhere in building switched double socket outlet, plate pattern and manufacture to match existing
2
metal formwork to in-situ concrete slab over
FITTINGS SD
C
2
T
2
C
COMMUNICATIONS
suspended ceiling to spec K40/10
T
E SD
suspended ceiling to spec K40/10
new smoke detector, pattern and manufacture to match existing elsewhere in building and wired into existing fire alarm system
partition to spec K10/30
C
telephone socket, pattern and manufacture to match existing elsewhere in building and wired into existing telephone system computer outlet, pattern and manufacture to match existing elsewhere in building and wired into existing telephone system
dado trunking to accommodate telecom, IT and small power cabling
C
2
2
C
2
C
C
2
T
vinyl flooring with self coved skirting
ceiling plan and electrical layout
section A-A
C
4/05/10
B
16/02/10 electrical layout amended for new door position
A 16/02/10 alternative door location required by building inspector shown pyrostop glazing in lieu of pyrodur shown Rev Date
detail 01
partition to spec K10/30
amendments for as built drawing
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd
60/60 fire door to spec L20/30
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
60/60s fire door to spec L20/30
EJ
AS BUILT Project
1 hour fire resisting glazed panel to spec L10/56
new 1 hour fire resisting glazed panel to spec L10/56
Alterations to office accommodation at The Buoy Shed, George Street, Harwich Client
60/60s fire door to spec L20/30
Trinity House Lighthouse Service Cad File
partition to spec K10/30
Mac 6
Scale
Drawn By / D a t e
Checked By / Date
1:XX
BD/jan 2010
BD/jan 2010
Title
new ground floor office ground floor plan
elevation to bouy shed
plan & details D r a w i n g N o.
A/917/T/01
R e v N o.
C
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. 10
9
8
7
6
5
4
3
FFW.02 FFW.03
175
130 +9.850
FFW.08
1163
KITCHENETTE
B08 B02 B05/DO1
B01/DO1 ELECTRIC CUPBOARD
B04/DO1 B02/DO1
B04 DISABLED TOILET
B09
B08/DO1
MANAGER
ELECTRICAL & LIGHTING KEY
B10
B05/DO2
B05
FFL 08.410
TOILET
disabled refuge space
B01/DO3
B02/DO2
NOTES GENERAL OFFICE
1500
FFL 08.410
down
FFW.09
MESSING
970
B01
FFW.07
FFW.06
B03
B03/DO1
STORES
1100 high handrailing to stair well
15
FFW.05
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
B03/DO2 +6.790
B01/DO2
1800 x 1750 breakthrough size lift entry
FFW.04
1
307
FFW.01
lift control cabinet
2
B10/DO1
CR
AN
E
G IN AT ER OP
A
A RE
refuge down
B06
B06/DO1
48
B06/DO2
suspended ceiling to spec K40/10 inserted at height to minimise alterations to existing services
27
B11
15
1000
VOID
12
1
FFW.10 B07/DO1
LIGHTS
disabled refuge space
B09/DO1
FFW.09
up
new recessed flourescent integrated into ceiling grid to match fittings in other areas in manufacture and lamps
B12/DO1 B13/DO1
B12 upper part of double height space
B13
B13/DO2
SIGNS & LABELS
strip flourescent
T MOBILE COMMS ROOM
E
FFL 08.410
emergency Lighting
B14/DO1
(6.5m HIGH)
C
new boiler enclosure
new office
existing office
exit
6225
TU
UPPER BUOY CRADLE AREA
A02
GRIT BLASTER (6.5m HIGH)
PAINT SERVICES & PAINT STORE (3m HIGH)
SPRAY (6.5m HIGH)
DRY (6.5m HIGH)
SWITCHES
B15/DO1
R
Ă˜3800
N
TA B
LE
B14/DO1
iluminated exit sign to match existing fittings in other areas
existing plant room converted to new office
PAINT (5. 5m HIGH)
single gang two way switch, plate pattern and manufacture to match existing
existing metal formwork to in-situ concrete slab over
double gang two way switch, plate pattern and manufacture to match existing
GRIT RECYCLING
3510
LADDER
B
MEZZANINE
FILTERS
570
A
existing plant room partitioned to provide space for resited boiler plant
section A-A
1 hour fire resisting glazed panel to spec L10/56 in new opening in existing blockwork details as drawing A/917/T/01
existing glazed panel
triple gang two way switch, plate pattern and manufacture to match existing single gang one way switch, plate pattern and manufacture to match existing
first floor plan 1:200 scale
triple gang one way switch, plate pattern and manufacture to match existing emergency lighting test key switch
POWER
B06/DO1
27
plastic dado trunking system, pattern and manufacture to match existing elsewhere in building
B
switched double socket outlet, plate pattern and manufacture to match existing
2
FITTINGS
B07/DO1
up
SD
new smoke detector, pattern and manufacture to match existing elsewhere in building and wired into existing fire alarm system
COMMUNICATIONS T
B13/DO1
existing office
C
telephone socket, pattern and manufacture to match existing elsewhere in building and wired into existing telephone system computer outlet, pattern and manufacture to match existing elsewhere in building and wired into existing telephone system
box in existing pipework
2
C
30/30s rated fire door and frame to spec L20/30
T
E
B14/DO1
T
B13/DO2
30/04/10
as built amendments
16/02/10
studs & insulation to wall between buoy shed and new office increased
Rev Date
Revision
Drawn By
C
C
new office
exit
2
new suspended ceiling to spec K40/10
B A
2
SD SD
E
fnew 1 hour fire resisting glazed panel to spec L10/56
existing block wall lined with partition to spec K10/30
Inkpen Downie Architecture & Design Ltd
T
C
2 Balkerne House
2
2
2
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
C
C
T
new partition to spec K10/40
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
exit
B15/DO1
Drawing Status
AS BUILT Project
new boiler enclosure SD
Alterations to office accommodation at
E existing louvre panels to outside air
The Buoy Shed, George Street, Harwich new partition to spec K10/30
Client
exit
Trinity House Lighthouse Service Cad File
Mac 6 SD
existing louvre panels to outside air
first floor plan
Drawn By / D a t e
Checked By / Date
1:XX
BD/jan 2010
BD/jan 2010
Title
E door and frame to spec L20/30
Scale
Option 1 new first floor office plan & details
ceiling plan and electrical layout
D r a w i n g N o.
A/917/T/02
R e v N o.
B
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
RAMP
DOWN
DOWN
NOTES
EXISTING MEZZANINE FLOOR PLAN C=1.32 S=4.22 H=4.36
C=1.32 S=3.58 H=3.73
H=2.72
USB=4.08
USB=5.18
USB=5.18
USB=5.18
TRAILER
STAIRS
H=1.98
Rev Date
Revision
Drawn By
UP
UP
INSPECTION PIT
H=1.98
USB=8.12
H=1.98
Inkpen Downie Architecture & Design Ltd
RAMP
H=5.12
TH=0.06
COPY RAFTERS
C=1.32 S=3.58 H=3.73
C=1.32 S=4.22 H=4.36
USB=5.18
C=1.32 S=4.22 H=4.36
2 Balkerne House
WORKSHOP USB=7.37
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
C=1.09 H=3.22
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
TRAILER
FOR INFORMATION
USB=2.78 C=1.05 S=2.44 H=2.54
USB=6.73
USB=6.00
C=1.05 S=2.44 H=2.54
Project
Alterations to the Chauffeurs Garage
USB=2.78 Client
H=1.92 H=1.97 C=1.32 S=3.12 H=3.22
H=1.96
H=1.94 SHOWER
Felixstowe Port
H=2.0 TH=0.02 WC
H=2.0
H=2.05 TH=0.04
H=1.94
Cad File
Scale
Drawn By / D a t e
Checked By / Date
Mac 7/725
1:50
ST/Mar 2008
JI/
Title
Existing Floor Plans H=1.98
WC
CH=3.2 D r a w i n g N o.
H=2.03 TH=0.05
C=1.05 S=2.44 H=2.54
C=1.35 S=2.44 H=.2.54
EXISTING GROUND FLOOR PLAN
C=1.05 S=2.44 H=.2.54
H=1.05 S=2.44 H=2.54
H=2.07 C=2.18 S=2.44 H=2.52
C=1.08 S=2.44 H=2.54
H=2.07 C=2.18 S=2.44 H=2.52
C=1.08 S=2.44 H=2.54
C=1.05 S=2.44 H=2.54
H=2.07 C=2.18 S=2.44 H=2.52
R e v N o.
A/725/S/04 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
11.49
8.29
8.07 7.33
5.62
5.94
5.72 5.03 4.09
3.9
4.05
4.2
4.35 3.82
3.97
3.06
2.9
12.64
11.32
12.54
11.69
11.49
11.42
11.18 10.51
Rev Date
Revision
Drawn By
9.62
8.18
8.43
8.18
7.08
6.04
7.36
6.26
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
4.63
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status 3.06
3
3 INSPECTION PIT
1.75
2.87
FOR INFORMATION Project
Alterations to the Chauffeurs Garage Client
Felixstowe Port Cad File
Scale
Drawn By / D a t e
Checked By / Date
Mac 7/725
1:100
ST/Mar 2008
JI/
Title
Existing Elevations & Sections D r a w i n g N o.
R e v N o.
A/725/S/05 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Handrail and balustrade to be returned back round to wall and fixed through insulation to existing brick work
A
Profiled Cladding on z purlins on masonary
INSULATION STRATEGY 9" solid brick walls to be faced with pre-insulated plaster board. British Gypsum Drilyner MF system Therma Line Super 60mm thick on MF10 channel to achieve 0.35W/m2K. Plaster Board to be dry lined.
Existing truss removed and replaced with new portal frames to support existing purliins (to allow sufficient head room to provide access to stairs)
remove existing steel column & cut panels
B
Line around existing steel columns and generally follow White Book Construction Details
3500
Use therma line Basic VC 22 mm thick directly bonded to window and door reveals.
FF 02 Office
INSULATION STRATEGY 9" solid brick walls to be faced with pre-insulated plaster board. British Gypsum Drilyner MF system Therma Line Super 60mm thick on MF10 channel to achieve 0.35W/m2K. Plaster Board to be dry lined.
DN 8 R
Use therma line Basic VC 22 mm thick directly bonded to window and door reveals.
FF 03 Stair
CH
FD03
BLOCK PARTITIONS To be constructed using A) 100mm block B) 140mm block See Engineers drawings / specification for requirements. Block partitions to be finished fair faced for painting.
FD07
FD01
FVP01
CH : Coat Hooks
FD02
form new opening for new window to office
Balustrade formed in block work with 44 x 144 H/W 19mm Rebated Hand rail mounted on top. Screwed and plugged and pelleted to block work @ 600mm centres.
Block work taken to level of existing truss
FF 05 Office
FF 04 Lobby
FF 08 Corridor
Board out to top of ceiling joists using T &G Chip board to provide base for air cooling / ventilation units.
NOTES
LIGHTWEIGHT PARTITIONS 70mm stud 2 layers of 12.5mm wall board and 50mm isowool between studs. over all thickness of 122mm. 60 Mins Fire resistance and 50 Rw /dB Sound insulation.
FD04
Ceiling above FF 01 & FF 02 to be Plaster board on timber ceiling joists See St E Engineers Drawings & Spec for details to sizes of joists etc.
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Line around existing steel columns and generally follow White Book Construction Details
DN 8 R
CH
FF 01 Office
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
STAIR Minimum width:- 1000mm, Minimum Going:- 280mm, Maximum Rise:-170mm All steel construction with 45mm dia hand rail and steel balustrade. Closed treads, radiused half landing and equal flights.
FD05 CH
FF 06 Office
FD06
1200
FF 07 Storage
A
PROPOSED MEZZANINE FLOOR PLAN
B
A
B
DN 8 R
remove existing steel column & cut panels
GD02
GF 01 Office
GF 05 Office
GF 10 Stair
CH
GF 07 Office
DN 8 R
GVP02
CH
GD03
GD10
CH
DX01
GD14
INSPECTION PIT
take out existing door & lintel over and extend window opening to suit new glazed aluminium door and frame
Rev B
02-05-08
Amended make up of wall which partitions offices at 1st F Level
Rev A
28-04-08
Amended size of FF01 & FF02. New office FF05. New ST storage FF07. Various amendments on door positions. Part of the existing steel structure is removed on north east side of the building. Revision Drawn By
Rev Date
GF 11 Lobby GD16 GF 14 Cleaner
GD12
GD06
GVP01 GD15
Inkpen Downie Architecture & Design Ltd Existing Brick Work
remove existing door & frame brick up the opening & form new opening for new door
C
GF 02 Simulators form new opening for new door
remove existing door & frame form new opening for new door remove existing door & frame make good
inspection chamber existing below ground drainage
form new opening for new door
Proposed Block Work
gro un dd rain ag e
GF 12 Seminar
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FOR INFORMATION Project
Alterations to the Chauffeurs Garage
inspection chamber
Client
CH GD08 remove existing door & frame brick up existing opening
GF 06 M WC
GD05
SO 2080x912 DL 2040x838
PROPOSED GROUND FLOOR PLAN
be low
GD07
600
CH
GD09
CH
GD11
GF 08 Kitchen
CH
GD17
GF 09 Locker
GD13
GF 13 Lobby
Cad File
take out door and frame and insert concrete cill, reduce opening in brickwork to match existing insert new aluminium window
new below ground drainage
GF 04 F WC
new below ground drainage
GF 03 Ad WC
w
remove existing door & frame brick up existing opening
GD04
SO 2080x974 DL 2040x900
ne
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Felixstowe Port
SO 2080x912 DL 2040x838
GD01
C
Remove existing steel columns and mezzanine floor
DX02
take out door and frame and lintol over and infill opening in brickwork to match existing
Propopsed Brick Work
remove existing door & frame brick up existing opening
2 Balkerne House
GF 15 Office
brick up existing opening
remove existing door & frame form new opening for new door GD18
Mac 7/725
Scale
Drawn By / D a t e
Checked By / Date
1:50
ST/Mar 2008
JI/
Title
Proposed Floor Plans D r a w i n g N o.
A/725/T/100
DX03 take out door and frame and insert concrete cill, reduce opening in brickwork to match existing insert new aluminium window
A
take out door and frame and reduce opening in brickwork to match existing insert new aluminium door and frame
R e v N o.
B
inspection chamber Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
B
existing below ground drainage
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
DN 8 R
NOTES DN 8 R
PROPOSED ROOF PLAN
Rev A
28-04-08
Rev Date
Amended size of FF01 & FF02 on Section CC. New ventilation cowls are shown on roof plan.
ST
Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
CO1 1PA
Drawing Status
FF 06 Office 300mm insulation
door system support to hangers to suit existing site conditions. details to the door manufacturers recommendations
Colchester
Fax 01206 563 377 www.inkpendownie.co.uk
NEW STEEL STAIRS SECTION
suspended ceiling
FOR INFORMATION Project
Alterations to the Chauffeurs Garage 280
Client
169
5173
280
4000
5190
280
Cad File
Mac 7/725 1350
inspection pit to be filled in
GF 12 Seminar
2700
GF 02 Simulators
2700
2700
Felixstowe Port
tanking
Scale
Drawn By / D a t e
Checked By / Date
1:50
ST/Mar 2008
JI/
Title
Proposed Roof Plan & DN 8 R
Long Section D r a w i n g N o.
PROPOSED SECTION CC
A/725/T/101 DN 8 R
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
remove asbestos cladding from former windows and then sheet out inside and outside with 18mplywood and then overclad with profiled aluminium sheeting
renew rainwater goods in powder coated aluminium
insert colour coated aluminium louvred panels in existing window frame
insert colour coated aluminium louvred panels in existing window frame
renew gutters and rain water pipes in powder coated aluminium
glass to be removed from existing windows and then sheeted out inside and outside with 18mplywood and then overclad with profiled aluminium sheeting
- strip off existing roof felt shingle roo all existing roof slopes, carry out loca existing timber sarking, including rem replacement of rotten sections of tim - overlay with 12mm wbp sheathing - lay new PVC single ply roofing me proprietary flashings at all edges jun upstands in accordance with system manufacturers specification
remove existing aerial and support
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
renew rainwater goods in powder coated aluminium
renew rainwater goods in powder coated aluminium
remove existing flue and make good brickwork on completion
take down existing chimney and make good roof on completion form joint profiles in roof finish at centres to suit two per roll width
W02
W03 W05
W04
NORTH EAST ELEVATION
return over cladding to gable brickwork 1000mm along north east elevation
insert colour coated aluminium louvred panels in existing window frame
W06
glass to be removed from existing windows and then sheeted out inside and outside with 18mplywood and then overclad with profiled aluminium sheeting
remove existing vents and ridge, make good roof deck
W08
take out existing windows & lintol over and fit new two storey aluminium window with insulated spandrel panel
line of new floor behind
renew gutters and rain water pipes in powder coated aluminium
W07
insert colour coated aluminium louvred panels in existing window frame
remove existing cladding and replace to match new gable cladding
renew rainwater goods in powder coated aluminium
remove asbestos cladding from former windows and then sheet out inside and outside with 18mplywood and then overclad with profiled aluminium sheeting
remove existing aerial and support
11.49 Rev A
take out existing timber windows and fit new aluminium windows
renew gutters and rain water pipes in powder coated aluminium
8.07
- strip off existing roof felt shingle roof finish from all existing roof slopes, carry out local repairs to existing timber sarking, including removal and replacement of rotten sections of timber and - overlay with 12mm wbp sheathing plywood - lay new PVC single ply roofing membrane with proprietary flashings at all edges junctions and upstands in accordance with system manufacturers specification take down existing chimney stack and make good roof deck
8.29 W19
7.33
W20
W21
28-04-08
Rev Date
New roof ventilation cowls are shown. Position of the grills are ST amended. Revision
Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
W22
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
form joint profiles in roof finish at centres to suit two per roll width
renew gutters and rain water pipes in powder coated aluminium
5.72
5.94
FOR INFORMATION Project
Alterations to the Chauffeurs Garage
5.03 4.09
3.9
4.05
W10
4.2
4.35
Client
W11 W12
W13
W14
W15
W16
3.82
W17
3.97
Felixstowe Port
W18
Cad File
Mac 7/725
3.06
2.9
Scale
Drawn By / D a t e
Checked By / Date
1:50
ST/Mar 2008
JI/
Title
Proposed Long Elevations take out door and frame and lintol over and infill opening in brickwork to match existing
SOUTH WEST ELEVATION
take out door and frame and insert concrete cill, reduce opening in brickwork to match existing insert new aluminium window
take out door and frame and reduce opening in brickwork to match existing insert new aluminium door and frame
take out door and frame and insert concrete cill, reduce opening in brickwork to match existing insert new aluminium window
D r a w i n g N o.
A/725/T/102
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
overclad existing roof lantern gable with aluminium cladding
metal over cladding to existing lantern gable
pressed metal corner flashing by cladding manufacturere
NOTES
line of new dropped ceiling behind
strip-off existing cladding from gable and reclad with profiled aluminium sheets fixed to pressed metal sections fixed to brickwork/ blockwork behind
form new opening for window match with left side window
overclad existing brickwork with sheet metal cladding
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
take down existing chimney stack pressed metal corner flashing by cladding manufacturere insulated spandrel panel faced to match window
pressed metal corner flashing by cladding manufacturere
line of new wall behind W23
W09 W01
SOUTH EAST ELEVATION
take out existing door & lintol over and extend window opening to suit new glazed aluminium door and frame
take out existing window & lintol over and extend window opening to suit new two storey aluminium window
line of new floor behind
line of new floor behind
extng gable doors track and gear removed and opening infilled in blockwork including forming new opening for new vehicle doors by inserting lintol to structural engineers specification
retain existing timber boards 9mm plywood
new insulated overhead sectional doors incorporating personnel door and vision panels retain existing timber boards
NORTH WEST ELEVATION
Bauder roof cover
9mm plywood Bauder roof cover
180 70
12mm ply to either side of the existing frame
new aluminium gutter
take out existing glazing retain existing window frames plywood on either side of the frame cladding outside
new aluminium gutter
metal liner
140
breathable membrane
cladding
LOUVRE DETAIL 1:10
BALUSTRADE DETAIL 1:10
CLADDING DETAIL 1:10
GUTTER DETAIL DETAIL 1:20
maintain an air path to vent above insulation
maintain an air path to vent above insulation
continuous ply board located to prevent insulation from blocking air path
continuous ply board located to prevent insulation from blocking air path
existing steel structure lead flashing new floor joists 9mm plywood
insulated spandrel panel faced to match window
Rev A
ceiling to spec. clause K10/245 ceiling to spec. clause K10/245
retain existing window frame & cill
Bauder roof cover
28-04-08
Rev Date
New roof ventilation cowls are shown. Position of the grills are ST amended. New window W23 to office. New storage room FF07. Revision Drawn By
retain existing timber boards
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
FLOOR - WINDOW DETAIL 1:20
FF 02 Office new steel beam
new steel column
FF 07 Storage
2073
rigid insulation fixed to brick wall & existing structure
remove existing steel beam & columns & plates
900
ventilation void
new steel beam between existing shallow columns to support floor joists suspended ceiling
suspended ceiling
1400
300mm insulation
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FF 05 Office
FF 06 Office
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
FF 03 Stair
FOR INFORMATION Project
retain existing column
Alterations to the Chauffeurs Garage GF 02 Simulators
GF 08 Kitchen
2700
suspended ceiling
2700
300mm insulation
GF 07 Office
GF 13 Lobby
GF 12 Seminar
GF 11 Lobby
GF 10 Stair
Client
Felixstowe Port Cad File
Mac 7/725
Scale
Drawn By / D a t e
Checked By / Date
1:50
ST/Mar 2008
JI/
Title
Proposed End Elevations &
SECTION AA
SECTION BB
Cross Sections D r a w i n g N o.
A/725/T/103
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
DOOR SCHEDULE
X
G/D10
G/D11
G/D12
G/D13
G/D14
G/D15
G/D16
G/D17
G/D18
F/D01
F/D02
F/D03
F/D04
F/D05 F/D06 F/D07
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FD30S X
X
FD30S X
X
FD60S X
FD30S X
FD30S X
FD30S X
FD30S X
FD30S X
FD30S X
FD60S X
FD30S X
FD30S X
FD30S X
FD30S X
FD30S X
FD30S X
FD30S FD30S FD30S X X X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
NOTES
19mm dia stainless steel pull handle
X
170
X
3
3
3
3 1
3
3
3 1
3
3
3 1
3 1
3 1
3 1
3 1
3 1
3 1
3 1
3 1
3 1
3 1
3 1
3 1
3 1
3 1
3 1
3 1
lever handle dia 19mm with returned end utility meters
1
2
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
350
alarm
min to corner of wall
(shape indicative only)
light switches
Room Name
door notice - room name 54
X
capital and lower case with name in braille underneath text
door notice - fire door refrence 1200
3
Integral to Eoor Spring Magnetic hold open ** Dead Lock
230
vision panel
Overhead (Normal Duty)
Panic Bar Fail to Unlocked
X
X
X
Lever Handles Snib Turn Pull Handle Push Plate
Signs
G/D09
equal
X
Fail to Manual Fail to Open Large Handle Indicator Type Surface Mounted
Kick Plate Escutcheon Door Stops Door Mount Coat Hooks Threshold Weather Strip Air Transfer Grille
G/D08
X
X
Latches
Bolts
G/D07
X
Remote electrical operation Mortice Latch/Lock* X Key Pad Operation Bathoom Lock
Emergency Exit Device
G/D06
socket outlets
450
Locks
G/D05
1500
Metal Framed & Glazed With Glazed Side Screen Hinges Closer Floor Springs Top Centre Hold Open
G/D04
equal
X
Vision Panel(s) Timber Framed & Glazed
G/D03
minimum zone of visibility
X
G/D02
500
Fire Rating Solid Core Hard Wood Clear Finish Soft Wood Painted
G/D01
1000
TYPE
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
1200
ITEM Exterior Interior
DOOR NUMBERS DX01 DX02 DX03 X X X
450
SPEC REF
Felixstowe Port - Alterations to the Chauffeurs Garage
Overhead sectional door with an intigrated pass-door Pass-door to be used as an emergency door: lock on the outside & handle in the inside
Project
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
725
1230
Job Number
kick plate ffl
heights of switches
typical door set - out
1 2
2
2
2
2
2
2
2
2
2
2
2
2
2
WM
2
2
2
2
2
2
2
2 1 1
1 1
1 1
1 1
2
2
2
2
2
2
2
1 1 2
2 2
2
WM
2
2
2 1 1
1 1
1 1
2
2
2
2
2
2
WM
WM
2 1 1 2 2
2
FM
Weather bar & Draught Seal X X X X M & E INFORMATION Fire door keep closed Fire door keep locked shut This door to be kept locked shut when not in use Fire Exit Keep Clear Toilets
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2 1
1
2
2
2 2
2
2
2
2
1
*Mortice Latch Lock with internal slip-turn. ** Magnetic hold open device to fail in event of Dre alarm activation WM Wall Mounted FM Floor Mounted
Rev A
28-04-08
Rev Date 170
230
170
New door to storage: FD06 is revised. New screen: GVP02.
ST
Revision
Drawn By
230
Inkpen Downie Architecture & Design Ltd
2361
2 Balkerne House
2090
2137
2395
DX 02 External Door Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
972
TENDER DRAWINGS
846
Project
1000 1120
874
1100 1245
1000
Alterations to the Chauffeurs Garage Client
Felixstowe Port new door to existing opening SO 2080x974 DL 2040x900
GD 01 Internal Door
SO 2080x912 DL 2040x838
SO 2080x912 DL 2040x838
GD 04, 05, 08, 16 GD 02, 03, 06, 09, 10, 11, 12, 14, 15, 17, 18 Internal Door FD 01, 02, 03, 04, 05, 07 Internal Door
GD 07 Internal Door
new door to existing opening
GD 13 Internal Door
DX 03 External Door
DX 01 External Door
Cad File
SO 1440x912 DL 1400x838
FD 06 Internal Door
Mac 7/725
Scale
Drawn By / D a t e
Checked By / Date
1:20
ST/Apr 2008
JI/
Title
Door Schedule
GVP 01, GVP 02, FVP 01 Internal Screen A/725/T/105 D r a w i n g N o.
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
IC
pos ed
CL=3.00
IC
Replace door with new window & brick up with matching brick
pr
op
os
ed
proposed
New SWP
DX03
Remove door & frame Block up existing opening
DX04
Existing structure to remove
GD11
Existing structure
GF09 Male WC GF06 Kitchen Area for all users
New 140mm blockwork
GF08 Lobby
Remove existing wall
GD18
GD04
GF07 Lobby
Remove existing stair
16
Stair 1
GF05 Shipwork Classroom
New steel staircase supporting structure to SE details
GF15 Tug Office New window
GD15 GD14
GF11 Lobby
Stair 2
DX06
Form new door openings with precast lintels over
1
up
GD03
New window with lintel over
GD13
GD08
GD06
New beam to SE details
GF12 Cleaner
GD09 UP
GD05 Remove existing walls
Replace door with new window & brick up to sill level with matching brick
New blockwork wall
GF14 WC Adapted Toilet
New door opening
Brick infill matching existing brick
NOTES
DX05
GD15A
GF13 Female WC
GD12
GD19
GD07
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Carry out alterations including removal and construction of new walls as indicated. All existing sanitary ware and associated plumbing to be removed and where indicated replaced with new to specification. All wall tiling to be removed and walls to be retiled to specification. Existing doors and frames to be removed and replaced with new.
UP
GROUND FLOOR PLAN
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
CL=3.08
CL=3.02
existing
pro
B
IC
New blockwork wall insulated & dry lined to internal face
GD10
Block up existing opening New steel staircase Going 280mm Rise 164.3mm
New blockwork wall
DX01 DX02
GF04 Gear Store
GF03 Gear Store UP
Inspection Pit to be filled in
UP
UP
UP
Stair 3
A GD01
A
GD02 Move existing staircase
GF16 Forklift School Rev A
25-04-08
Rev Date
Amended layout of ground floor with revised layout of corridor to adapted toilet and revised sanitary ware to Male toilet and insulation to block walls between offices and main work areas. Revision
Drawn By
New window opening
GF17 FLT Classroom
GVP01 Inkpen Downie Architecture & Design Ltd
GF02 Shipworking
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
GF01 Shipwork Container Stack
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
TENDER DRAWINGS D16
15 No Elephant Feet
Project
Alterations to 75 Park Garage D17
Remove walls
to Provide Training Facilities Client
Port of Felixstowe
GF18 FLT Office
Cad File
Scale
Drawn By / D a t e
Mac 4
1:50
ET/March 2008 JI/March 2008
Checked By / Date
Title
UP
Block up existing doors
UP
Ground Floor Plan
DX09 DX13 IC
DX12
DX11
DX10
D r a w i n g N o.
DX08
DX07
A/725/T/01
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
IC
B
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
B Cavity barrier min every 20m to full hight of cladding providing min.30min integrity & 15 min fire insulation
MEZZANINE FLOOR PLAN
Existing structure New 140mm blockwork
FF03 WC
FD04
UP
FD03
FD09
FD08
FF11 Photocopy Room
FF05 Corridor FD01
Continuity in insulation
New opening and door
FD07
FD05
FD02
New Trisomet Composite Wall Panels
External wall to offices:- interiors to be lined with PB on 48mm gyproc metal stud system. Cavity to be fire stopped @ every 20m
New ceiling to SE details
New ceiling to SE details
FF04 Clean. New ceiling to SE details
New studwall - 70mm steel "C" studs @ 600mm centres, 50mm Isowool APR 1200, 2x12.5mm plasterboard each side
FF08 Office
FF07 Office
FF02 Office
External wall to offices:- interiors to be lined with PB on 48mm gyproc metal stud system. Cavity to be fire stopped @ every 20m
1
16
FF06 Lobby
Fire Break
UP
Cavity barrier min every 20m to full hieght of cladding providing min.30min integrity & 15 min fire insulation
Existing structure to remove
NOTES
New SWP
New blockwork wall with pre insulated plasterboard lining to office side Chipboarded Floor on timber joists
FD08A
Remove existing stair
New blockwork enclosure to provide protected route New blockwork wall with pre insulated plasterboard lining to office side
FF01 Office/Class Room Cavity barrier min every 20m to full hight of cladding providing min.30min integrity & 15 min fire insulation
New floor and ceiling to SE details
Existing party wall below roof level to be retained Move existing stair New blockwork walls UP
UP
UP
UP
A
A
Rev A
25-04-08
Rev Date
Existing party wall below roof level to be retained
FD10
Amended layout of mezzanine floor with inclusion of photocopy room and an additional office FF03 WC door FD06 is omitted. Revision
Drawn By
FVP01 Internal window
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
FF09 Office
TENDER DRAWINGS Project
Aterations to 75 Park Garage New blockwork wall
FD10A
to Provide Training Facilities Client
Port of Felixstowe Cad File
Mac 4 UP
New floor and ceiling to SE details
UP
FF10 Office
Scale
Drawn By / D a t e
1:50
ET/March2008 JI/March 200
Title
Mezzanine Floor Plan D r a w i n g N o.
A/725/T/02 B
Checked By / Date
New stud wall lining
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Read these drawings in conjunction with drawings A/725/T/04, 05, 10, 11 & with the specification clauses H43 A B C D & L10 Length of panels to be determined by cladding sub contractor who is to take into consideration handling issues at height ( Health & Safety). Cladding contractor to allow for replacement of gutters & RW downpipes to existing gullies. Cladding contractor to detail all junctions & conditions. Non standard details include:
B
C
Detail 5 - Roof to wall abutment. Detail 11 - Box gutter
1 10
A
A 6 10 4 10
E
S
W
12 11
N Rev A
28-04-08 Additional roof ventilation cowls. Roof light positions are rearranged.
Rev Date
ST
Revision
Drawn By
ROOF PLAN C 1 10
B Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
TENDER DRAWINGS Project
Alterations to 75 Park Garage to Provide Training Facilities Client
Port of Felixstowe Cad File
Scale
Drawn By / D a t e
Mac 7 - 708
1: 100
ST/March 2008 JI/March 2008
Checked By / Date
Title
Proposed Roof Ground Plan Floor and Mezzanine Floor Plan D r a w i n g N o.
R e v N o.
A/725/T/03 A/725/T/02 A /725/T/
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Read these drawings in conjunction with drawings A/725/T/03, 05, 10, 11 & with the specification clauses H43 A B C D & L10
New beam & ceiling joists to structural engineers design
Chipboarded Floor on timber joists FFL
Existing Floor Level Structure to SE details
16
x2 80 /16 4.3
New Steel Stair
New beam & floor joists to structural engineers design
DATUM = 0.00m
SECTION AA SECTION AA
6 10
15 11
Rev A
28-04-08 Additional roof ventilation cowls and grills on elevs. Roof light positions are rearranged. Amended layout of mezzanine floor in Section AA.
Rev Date
1 10
Revision
ST
Drawn By
2400
13 11
Existing FL
First fl.
Inkpen Downie Architecture & Design Ltd
14 11
2 Balkerne House F/W03
F/W02
F/W01
16 Stair 1
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
11 11
Tanking
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
G/W01
1
TENDER DRAWINGS Project
BOARDED INSPECTION PIT
Alterations to 75 Park Garage
Inspection pit to be filled in
to Provide Training Facilities DATUM = 0.00m
DATUM = 0.00m
Client
SECTION BB SECTION BB
NORTHEAST EAST ELEVATION FACE NORTH
Port of Felixstowe Cad File
Scale
Drawn By / D a t e
Mac 7 - 708
1: 100
ST/March 2008 JI/March 2008
Checked By / Date
Title
ProposedSections Existing Sectionsand andNorth NorthEast East Elevation D r a w i n g N o.
R e v N o.
A/725/T/04 A/725/S/02 A /725/T/
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Read these drawings in conjunction with drawings A/725/T/03, 04, 10, 11 & with the specification clauses H43 A B C D & L10
6 10 17.14
1 10
17.14
17.14
15 11 6 10 11.5
2 10
12.64
11.5 10.77
1 10
5 10
11 11 5.53
14 11
5.68
5.53
5.26
F/W13
8 11
14 11 5.53
5.26
9.15
15 11
9 11
2 10
7 10
F/W11
10 11
F/W10
F/W09
5.26
5.26
14 11
8.3
11 11
F/W12
7 10
F/W08
11A 11
F/W07
5.26
5.26
F/W06
F/W05
6.17
F/W04
5.26
5.26
5.53
5.52
5.25
4.55 4.18
4.18
G/W09
G/W14 3.11
G/W12
3.11
G/W11
G/W10
RWP
G/W08
G/W13 G/W07
G/W06
G/W05
3.1
3.1
RWP
RWP
G/W04
G/W03
G/W02
3.19
3.1
2.99
RWP
DATUM = 0.00m
SOUTH WESTELEVATION FACE SOUTH WEST
SOUTH EAST EAST FACE SOUTH ELEVATION
1 10
17.14
Rev A 14.05
28-04-08 Additional roof ventilation cowls and grills on elevs. FW/14 new window to office FF10. Roof light positions are rearranged.
Rev Date
Revision
ST
Drawn By
12.64
11.5
14 11
2 10
11A 11
11A 11
5.54
3.02
5.7 5.26
RWP
7.44
F/W14 RWP 5.27
5.27
4.19
4.19
RWP 5.29
5.3
11A 11
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
14 11
Drawing Status
5.52
TENDER DRAWINGS Project
Alterations to 75 Park Garage
3.21
3.16
7.56
7.43
11A 11
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
8.3
7.43
11 11
1 10
15 11
3.11
RWP
RWP
3.21
3.11
RWP
to Provide Training Facilities Client
Port of Felixstowe DATUM = 0.00m
NORTH WESTELEVATION FACE NORTH WEST
Cad File
Scale
Drawn By / D a t e
Mac 7 - 708
1: 100
ST/March 2008 JI/March 2008
Checked By / Date
Title
Existing Elevations Proposed Elevations D r a w i n g N o.
R e v N o.
A/725/T/05 A/725/S/03 A /725/T/
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
DOOR SCHEDULE Job Number 725 Project Felixstowe Port - Alterations to the Chauffeurs Garage
DX06
DX07
DX08
DX09
DX10
DX11
DX12
DX13
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
3 Overhead (Normal Duty) Integral to Eoor Spring Magnetic hold open ** Dead Lock Remote electrical operation Mortice Latch/Lock* X Key Pad Operation Bathoom Lock
Latches Emergency Exit Device
Panic Bar Fail to Unlocked Fail to Manual Fail to Open Large Handle Indicator Type Surface Mounted
Bolts Lever Handles Snib Turn Pull Handle Push Plate
X X
3
X
X
3
X
3
X
3
X
6
X
1
X
3
X
G/D01
G/D02
G/D03
G/D04
G/D05
G/D06
G/D07
G/D08
G/D09
G/D10
G/D11
G/D12
G/D13 G/D14 G/D15
G/D15A G/D16 G/D17
G/D18
G/D19 F/D01
F/D02
F/D03
F/D04
F/D05
F/D07
F/D08
F/D08A
F/D09
F/D10
X FD60S X
X FD30S X
X FD60S X
X FD30S X
X FD30S X
X
X FD30S X
X
X FD30S X
X
X
X FD30S X
X X FD30S FD30S X X
X
X
X FD30S X
X FD30S X
X FD30S X
X
X
X FD30S X
X
X
X X FD60S X X
X
X
X FD60S X
X
X FD60S X
X FD30S X
X FD30S X
X FD30S X
X FD30S X
X FD30S X
X
X
X
X X
X X
X X
X X
X
X X
X
X X
X
X
X
X X
X
X X
X
X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X
3
X
Megadoor System 800 to manufacturers details and recommendations
Locks
DX05
X
X
Overhead sectional door to manufacturers details and recommendations
Metal Framed & Glazed With Glazed Side Screen Hinges Closer Floor Springs Top Centre Hold Open
DX04
X
Overhead sectional door to manufacturers details and recommendations
Exterior Interior Fire Rating Solid Core Hard Wood Clear Finish Soft Wood Painted Vision Panel(s) Timber Framed & Glazed
DOOR NUMBERS DX01 DX02 DX03
Overhead sectional door to manufacturers details and recommendations
TYPE
Overhead sectional door to manufacturers details and recommendations
ITEM
3 1
3 1
3 1
3 1
3 1
Kick Plate Escutcheon Door Stops Door Mount Coat Hooks Threshold Weather Strip Air Transfer Grille
2
2
2
2
2
4
2
X
X
Signs
X X
X X
X X
X X
3 1
3
3 1
3
3
3 1
3
3 1
3 1
X X
3 1
3 1
3
3
3 1
3 1
3 1
3
X
X
X
X
X
X X
2
2
2
2
2 WM
2
X
X
X
X
X
X
X
X
X
X
X
2
2
3 1
3 1
3 1
3 1
X
X
X
X
X
2
2
2
2
1 1 2
2
2
2
1 1 2
WM
2 WM
2
2
2
2
2
2
2
2
2
2
1 1 2 WM
2 WM
2
2
2
2
2
2
2
2
2
2
2
1 1 2 WM
2
2 2
2
WM
2
1
2
WM
2 WM
2 WM
2
2
2
2
WM
2 FM
2 2 FM
2
2
2
2
2
2
2
2
2
2
2
2
2
FM
2
WM
2
2
2
3 1
X
X X
3 1
FM
WM
X X
Fire door keep closed Fire door keep locked shut This door to be kept locked shut when not in use Fire Exit Keep Clear Toilets
3
X
1
2
X X
3 1
X
X
WM Weather bar & Draught Seal X X X X M & E INFORMATION
X
X
1 1
2
2
2
2
2 1
2 1
2
2
2
2
2
2 1
1
*Mortice Latch Lock with internal slip-turn. ** Magnetic hold open device to fail in event of Dre alarm activation WM Wall Mounted FM Floor Mounted Rev A
25-04-08
Rev Date
2 Balkerne House 170
230
equal
1230
capital and lower case with name in braille underneath text
door notice - fire door refrence 1200
1500
door notice - room name 54 equal
minimum zone of visibility
light switches
Room Name
1000
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
FOR INFORMATION Project
Alterations to 75 Park Garage to Provide Training Facilities Client
Felixstowe Port 500
socket outlets
450
1200
min to corner of wall
(shape indicative only)
ST Drawn By
Drawing Status
utility meters
alarm
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
vision panel lever handle dia 19mm with returned end
350
WC door F/D06 is omitted. New doors: G/D15A & F/D08A Revisions on G/D16 Revision
Inkpen Downie Architecture & Design Ltd
19mm dia stainless steel pull handle
450
SPEC REF
Cad File
kick plate ffl
Mac 7/725
Scale
Drawn By / D a t e
Checked By / Date
1:20
ST/Apr 2008
JI/
Title
heights of switches
typical door set - out
Door Schedule 01 D r a w i n g N o.
A/725/T/07
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
GF02
Timber Doors and frames to be factory painted to (nbs M60/112 )
Fair faced Block to be cleaned and painted Existing painted steel work to be painted (nbs M60116). (nbsM60/118) Existing painted steel work to be painted Galvanized steel work to be cleaned (nbs M60/118)
Timber Doors and frames to be factory painted to (nbs M60/112 )
Tiling or other special finishes
ed
Floor Finishes
DX03
GF09 Male WC
Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115 )
N/A
Mega Door to be self finish
Shipwork Container Stack
GF03
GF08 Lobby
GROUND FLOOR PLAN GD05
GD18 GD09
GF07 Lobby
Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115 )
N/A
16
Shipworking
GF12 Cleaner GD13
GD08
GF15 Tug Office
GD15 GD14
GF11 Lobby
GD06
N/A
GF14 WC Adapted Toilet
GD12
GD19
GD07
GD15A
GF13 Female WC
GD04
Stair 2
DX06
1
Stair 1
GD10
GD03
Sectional Doors to be self finish. GF05 Shipwork Classroom
Galvanized steel work to be cleaned
Gear Store
DX05 GD11
GF06 Kitchen Area for all users
N/A
NOTES
DX04
UP
Fair faced Block to be cleaned and painted Existing painted steel work to be painted (nbs M60116). (nbsM60/118) Existing painted steel work to be painted Galvanized steel work to be cleaned (nbs M60/118) Galvanized steel work to be cleaned
Skirtings
os
Doors / frames / architraves/windows/ surrounds/ shutters
op
Bespoke Mouldings or Fittings
pr
Ceilings
UP
Ground Floor
Internal Finishes Schedule
Shipworking
GF01
Walls
d
Shipwork Container Stack
Number
propose
Room Name
Fair faced Block to be cleaned and painted Clean existing Plaster - 2 coats of (nbs M60116). eggshell to (nbs M60/113 ) colour:- white
Timber Doors and frames to be factory painted to (nbs M60/112 )
Existing Painted M60/112 Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115 )
N/A
Gear Store DX01 DX02
Gear store
GF04
Existing Painted M60/112
Fair faced Block to be cleaned and painted Clean existing Plaster - 2 coats of (nbs M60116). eggshell to (nbs M60/113 ) colour:- white
GF05
Kitchen
GF06
Clean existing Plaster Paint 1 Primer 2 coats of eggshell (nbs M60119)
Lobby
GF07
Clean existing Plaster Paint 1 Primer 2 coats of eggshell (nbs M60117)
Plaster board to be plastered. Primed & painted to (nbs M60/113 )
GF08
Fair faced Block existing to be cleaned and painted (nbs M60/116 ) and new to be primed & painted (nbs M60/117)
Plaster board to be plastered. Primed & painted to (nbs M60/113 ) Clean existing Plaster - 2 coats of eggshell to (nbs M60/113 ) colour:- white
Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115 )
Timber Doors and frames to be factory painted to (nbs M60/112 )
Fair faced Block to be cleaned and painted Plaster board to be plastered. Primed & painted to (nbs M60/113 ) (nbs M60116).
Shipwork Classroom
N/A
new S/W for painting M60/112
Lino to (nbs M50/150 )
Proprietry Coved skirting
Lino to Vinyl tospec (nbs M50/150 M50/152 )
GF04 Gear Store
GF03 Gear Store
Gear store
UP
N/A
UP
Stair 3 GD01
Timber Doors and frames to be factory painted to (nbs M60/112 )
UP
UP
GD02
GF16 Forklift School
Shipwork Classroom GF17 FLT Classroom
Clean existing Plaster - 2 coats of eggshell to (nbs M60/113 ) colour:- white
Kitchen units as specification
Tiling to 1/2 height 1200 mm above coved skirting all round to spec M40/110
GVP01
GF02 Shipworking
Kitchen
GF01 Shipwork Container Stack
Timber Doors and frames to be factory painted to (nbs M60/112 )
D16
15 No Elephant Feet
Lobby
Male WC
GF09
new S/W for painting M60/112
Timber Doors and frames to be factory painted to (nbs M60/112 )
Female WC
GF12
GF13
Clean existing Plaster Paint 1 Primer 2 coats of eggshell (nbs M60117)
UP
Lobby
DX09 DX13
Vinyl to (nbs M50/152 )
Tiling to 1/2 height 1200 mm above coved skirting all round to spec M40/110
Vinyl to (nbs M50/152 )
Tiling to 1/2 height 1200 mm above coved skirting all round to spec M40/110
Timber Doors and frames to be factory painted to (nbs M60/112 )
new S/W for painting M60/112 Timber Doors and frames to be factory painted to (nbs M60/112 )
Clean existing Plaster - 2 coats of eggshell to (nbs M60/113 ) colour:- white
UP
Lino to (nbs M50/150 )
Proprietry Coved skirting
Fair faced Block to be cleaned and painted Plaster board to be plastered. Primed & (nbs M60116). painted to (nbs M60/113 )
Fair faced Block to be cleaned and painted (nbs M60116).
Existing Concrete floor to be steam cleaned and finished in
IC
Fair faced Block to be cleaned and painted Clean existing Plaster - 2 coats of (nbs M60116). eggshell to (nbs M60/113 ) colour:- white Clean existing Plaster Paint 1 Primer 2 coats of eggshell (nbs M60117)
Clean existing Plaster Paint 1 Primer 2 coats of eggshell (nbs M60117)
Cleaners
D17
GF18 FLT Office
new S/W for painting M60/112
Proprietry Coved skirting
GF11
Lobby
Timber Doors and frames to be factory painted to (nbs M60/112 )
GF10
Lobby
Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115 )
Existing Concrete floor to be steam cleaned and finished in
DX12
DX11
DX10
DX08
DX07
IC
B
Male WC
lobby
Lino to (nbs M50/150 )
Proprietry Coved skirting
Vinyl to (nbs M50/152 )
Tiling to 1/2 height 1200 mm above coved skirting all round to spec M40/110
Vinyl to (nbs M50/152 )
Tiling to 1/2 height 1200 mm above coved skirting all round to spec M40/110
Female WC
Vinyl to (nbs M50/152 )
Tiling to 1/2 height 1200 mm above coved skirting all round to spec M40/110
Adapted WC
Timber Doors and frames to be factory painted to (nbs M60/112 )
Clean existing Plaster - 2 coats of eggshell to (nbs M60/113 ) colour:- white
Timber Doors and frames to be factory painted to (nbs M60/112 )
Clean existing Plaster - 2 coats of eggshell to (nbs M60/113 ) colour:- white
Timber Doors and frames to be factory painted to (nbs M60/112 )
Clean existing Plaster - 2 coats of eggshell to (nbs M60/113 ) colour:- white
Timber Doors and frames to be factory painted to (nbs M60/112 )
new S/W for painting M60/112
Timber Doors and frames to be factory painted to (nbs M60/112 )
N/A
Proprietry Coved skirting
Cleaners
Fair faced Block to be cleaned and painted (nbs M60116).
Adapted WC
GF14
Clean existing Plaster Paint 1 Primer 2 coats of eggshell (nbs M60117)
Proprietry Coved skirting
Fair faced Block to be cleaned and painted (nbs M60116).
Tug Office
GF15
Clean existing Plaster Paint 1 Primer 2 coats of eggshell (nbs M60117)
Vinyl to (nbs M50/152 )
Tug Office
Fair faced Block to be cleaned and painted (nbs M60116).
Forklift School
GF16
Classroom
GF17
Office
GF18
Fair faced Block to be cleaned and painted Existing painted steel work to be painted (nbs M60116). (nbs ) Existing painted steel work to be painted Galvanized steel work to be cleaned (nbs M60/118) Galvanized steel work to be cleaned
Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115 )
N/A
Forklift School
Sectional Doors to be self finish.
Plaster board to be plastered. Primed & Clean existing Plaster painted to (nbs ) Paint 1 Primer 2 coats of eggshell (nbs M60117) Fair faced Block to be cleaned and painted (nbs M60116).
Timber Doors and frames to be factory painted to (nbs M60/112 )
Clean existing Plaster Plaster board to be plastered. Primed & Paint 1 Primer 2 coats of eggshell painted to (nbs ) (nbs M60117) Fair faced Block to be cleaned and painted (nbs M60116).
Timber Doors and frames to be factory painted to (nbs M60/112 )
new S/W for painting
Lino to (nbs M50/150 )
N/A
Classroom
new S/W for painting
Lino to (nbs M50/150 )
N/A
Office
Rev Date
Revision
Drawn By
B
FF01
new block work to be primed & painted (nbs M60/117 )
Ceilings
Plaster board to be plastered. Primed & painted to (nbs M60/113 )
Bespoke Mouldings or Fittings
Doors / frames / architraves/windows/ surrounds/ shutters Timber Doors and frames to be factory painted to (nbs M60/112)
Skirtings
Floor Finishes
Tiling or other special finishes FD06
FF02 Office
FF07 Office
Lino to (nbs M50/150)
N/A
FF04 Clean.
Office / Class Room
FD04
FD09 FD07
FD05
MEZZANINE FLOOR PLAN FF02
WC
FF03
Cleaners Cupboard
FF04
new block work to be primed & painted (nbs M60/117 )
Plaster board to be plastered. Primed & painted to (nbs M60/113 ) Walls to be finished in tile backer (for tiling) to (nbs ) Plaster board to be plastered. Primed & painted to (nbs M60/113 ) Walls to be finished in tile backer (for tiling) to (nbs )
Corridor
FF05
new block work to be primed & painted (nbs M60/117 )
Plaster board to be plastered. Primed & painted to (nbs M60/113 )
N/A Timber Doors and frames to be factory painted to (nbs M60/112)
new S/W for painting (nbs M60/112)
proprietory coved skirting nbs M60/770 Plaster board to be plastered. Primed & painted to (nbs M60/113 )
Timber Doors and frames to be factory painted to (nbs M60/112)
Plaster board to be plastered. Primed & painted to (nbs M60/113 )
Timber Doors and frames to be factory painted to (nbs M60/112)
Plaster board to be plastered. Primed & painted to (nbs M60/113 )
Timber Doors and frames to be factory painted to (nbs M60/112)
new S/W for painting (nbs M60/112)
Timber Doors and frames to be factory painted to (nbs M60/112)
new S/W for painting (nbs M60/112)
Timber Doors and frames to be factory painted to (nbs M60/112)
new S/W for painting (nbs M60/112)
Lino to (nbs M50/150)
vinyl to (nbs M50/152)
tiling to full height to (nbs M40/110 )
FD01
Office
FD03
FD08
FF11 Photocopy Room
FF05 Corridor
FD02
Office
FF08 Office
FF03 WC
new S/W for painting (nbs M60/112)
UP
First Floor
Internal Finishes Schedule
Office / Class Room
Walls
1
16
FF06 Lobby
UP
Number Room Name
Inkpen Downie Architecture & Design Ltd
FD08A
2 Balkerne House
FF01 Office/Class Room
WC
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status UP
proprietory coved skirting nbs M60/770
vinyl to (nbs M50/152)
tiling to full height to (nbs M40/110 )
Cleaners Cupboard
UP
UP
TENDER DRAWINGS
UP
A
Project N/A
Corridor Lino to (nbs M50/150) FD10
FVP01
Alterations to 75 Park Garage
N/A
Stair Enclosure
FF06
new block work to be primed & painted (nbs M60/117 )
Plaster board to be plastered. Primed & painted to (nbs M60/113 )
Stair Enclosure Lino to (nbs M50/150) FF09 Office
Office
FF07
new block work to be primed & painted (nbs M60/117 )
Plaster board to be plastered. Primed & painted to (nbs M60/113 )
Office Lino to (nbs M50/150) FD10A
Office
Office
Office
FF08
FF09
FF10
new block work to be primed & painted (nbs M60/117 )
new block work to be primed & painted (nbs M60/117 )
new block work to be primed & painted (nbs M60/117 )
Plaster board to be plastered. Primed & painted to (nbs M60/113 )
Plaster board to be plastered. Primed & painted to (nbs M60/113 )
Plaster board to be plastered. Primed & painted to (nbs M60/113 )
Timber Doors and frames to be factory painted to (nbs M60/112)
N/A
Office
new S/W for painting (nbs M60/112)
UP
UP
N/A new S/W for painting (nbs M60/112)
Drawn By / D a t e
NA
ST/March 2008 JI/March 2008
Checked By / Date
Title
Office Lino to (nbs M50/150)
Scale
Mac 7 - 708 B
N/A new S/W for painting (nbs M60/112)
Cad File
Office
Lino to (nbs M50/150)
Timber Doors and frames to be factory painted to (nbs M60/112)
Port of Felixstowe
FF10 Office
Lino to (nbs M50/150)
Timber Doors and frames to be factory painted to (nbs M60/112)
to Provide Training Facilities Client
N/A
Finishes Schedule D r a w i n g N o.
A /725/T/08
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
170
SO 2080x912 DL 2040x838
SO 2080x800 DL 2040x726
SO 2080x974 DL 2040x900
GD 07, 09, 13 Internal Door
GD 12, 18, 19 FD 04, 05 Internal Door
GD 14 Internal Door
new door to existing opening
new door to existing opening
GD 01, 02 Internal Door
230
GD 11 Internal Door
170
170
new door to suit site opening
GD 15A Internal Door
230
170
SO 2080x974 DL 2040x900
230
SO 2080x912 DL 2040x838
GD 03, 06, 08, 10, 16 FD 03 Internal Door
GD 04, 05, 15 FD 01, 02, 07, 08, 08A, 09, 10 Internal Door
170
230
new door to existing opening
GD 17 Internal Door
230
972 846 Rev A
25-04-08
WC door F/D06 is omitted. New doors: G/D15A & F/D08A Revisions on G/D16 Revision
ST Drawn By
874
1000
Rev Date
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
GVP 01, FVP 01 Internal Screen
new door to existing opening SO 2080x1074 DL 2040x1000
new door to existing opening
FOR INFORMATION Project
Alterations to 75 Park Garage to Provide Training Facilities Client
GX 01, 03, 05, 09, 12 External Door
DX 04, 06 External Door
DX 07 External Door
Felixstowe Port Cad File
Mac 7/725
Scale
Drawn By / D a t e
Checked By / Date
1:20
ST/Apr 2008
JI/
Title
Door Schedule 02 D r a w i n g N o.
A/725/T/09
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Simulator Room
GF01
GF02
Walls New block work to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-
Ceilings
Bespoke Mouldings or Fittings
Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White
Doors / frames / architraves/windows/ surrounds/ shutters Timber Doors and frames to be factory painted to (nbs 112 )
Fair faced Brick to be cleaned and painted Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) (nbs 116). Colour:-White Existing painted steel work to be cleaned and painted (nbs 118)
Timber Doors and frames to be factory painted to (nbs 112 )
Skirtings
New S/W for painting (nbs M60/112
N/A
Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White
Timber Doors and frames to be factory painted to (nbs 112 )
Proprietry Coved skirting
GF04
Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White
Timber Doors and frames to be factory painted to (nbs 112 )
Proprietry Coved skirting
Female WC
New block work to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-
Office
GF05
New block work to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-
Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White
Timber Doors and frames to be factory painted to (nbs 112 )
New block work to be primed & painted (nbs 116 ) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs 117) Colour:-
Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White
Timber Doors and frames to be factory painted to (nbs 112 )
GF06
Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115)
Existing Concrete floor to be steam cleaned and covered using Vinyl (nbs M50/152)
Remove existing covering. Existing Concrete floor to be steam cleaned and covered using Vinyl (nbs M50/152)
New S/W for painting (nbs M60/112
Carpet to (nbs M50/170)
Proprietry Coved skirting
Remove existing covering. Existing Concrete floor to be steam cleaned and covered using Vinyl (nbs M50/152)
Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White
Timber Doors and frames to be factory painted to (nbs 112 )
GF07
Kitchen
GF08
New block work to be primed & painted (nbs 119) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs 119) Colour:-
Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White
Timber Doors and frames to be factory painted to (nbs 112 )
New block work to be primed & painted (nbs 116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs 117) Colour:-
Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White
Timber Doors and frames to be factory painted to (nbs 112 )
Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White
Timber Doors and frames to be factory painted to (nbs 112 )
Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White
Timber Doors and frames to be factory painted to (nbs 112 )
Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White
Timber Doors and frames to be factory painted to (nbs 112 )
Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White
Timber Doors and frames to be factory painted to (nbs 112 )
New S/W for painting (nbs M60/112
Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White
Timber Doors and frames to be factory painted to (nbs 112 )
Proprietry Coved skirting
Remove existing covering.
New S/W for painting (nbs M60/112
Existing Concrete floor to be steam cleaned and painted using floor paint to (nbs M60/115 )
Plaster board to be dry lined or skim coated. Primed & painted to (nbs 113 ) Colour:-White
Timber Doors and frames to be factory painted to (nbs 112 )
Stair
GF10
New block/brick work to be primed & painted (nbs 116 ) Colour:PB to be dry lined or skim ccoated primed & painted to (nbs117) Colour:-
Lobby
GF11
New block/brick work to be primed & painted (nbs 116 ) Colour:PB to be dry lined or skim ccoated primed & painted to (nbs117) Colour:-
Seminar Room
GF12
Lobby
GF13
Cleaner Cupboard
GF14
Office
GF15
New block work to be primed & painted (nbs 116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs 117) Colour:New block/brick work to be primed & painted (nbs 116) Colour:PB to be dry lined or skim ccoated primed & painted to (nbs 117) Colour:New block work to be primed & painted (nbs 116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs 117) Colour:New block work to be primed & painted (nbs 116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs 117) Colour:-
DN 8 R
GF 01 Office
N/A
GF 05 Office
GF 10 Stair
GF 07 Office
DN 8 R
Tiling to 1/2 height 1200mm above coved skirting all round to (nbs M40/110 )
Tiling to 1/2 height 1200mm above coved skirting all round to (nbs M40/110 )
N/A
Adapted WC
GF 11 Lobby
Tiling to 1/2 height 1200mm above coved skirting all round to (nbs M40/110 )
GF 14 Cleaner
Female WC
Office
C
C Remove existing steel columns and mezzanine floor
Male WC
GF 12 Seminar
New S/W for painting (nbs M60/112
Office
GF09
Office
GF 02 Simulators
New block work to be primed & painted (nbs 116 ) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs 117) Colour:-
Locker
N/A
NOTES B
Simulator Room
New block work to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-
Male WC
Carpet to (nbs M50/170)
A
Tiling or other special finishes
Sectional Doors to be self finish.
GF03
Adapted WC
Floor Finishes
Carpet to (nbs M50/170)
Proprietry Coved skirting
Remove existing covering. Existing Concrete floor to be steam cleaned and covered using Vinyl (nbs M50/152)
Proprietry Coved skirting
Remove existing covering.
N/A
Tiling to 1/2 height 1200mm above coved skirting all round to (nbs M40/110 )
Tiling to 1/2 height 1200mm above coved skirting all round to (nbs M40/110 )
Existing Concrete floor to be steam cleaned and covered using Vinyl (nbs M50/152)
New S/W for painting (nbs M60/112
New S/W for painting (nbs M60/112
Vinyl (nbs M50/152)
N/A
Vinyl (nbs M50/152) N/A
Office
Kitchen
GF 03 Ad WC
Locker
Stair
GF 04 F WC
Ground Floor
Office
Number
Carpet to (nbs M50/170)
GF 08 Kitchen
GF 09 Locker
GF 13 Lobby
A
GF 15 Office
B
Lobby
Item New S/W for painting (nbs M60/112
GF 06 M WC
GROUND FLOOR Spec Clause
Colour
N/A
Seminar Room Vinyl (nbs M50/152) N/A
New S/W for painting (nbs M60/112
Carpet to (nbs M50/170)
Tiling to 1/2 height 1200mm above coved skirting all round to (nbs M40/110 )
N/A
Lobby
Cleaner Cupboard
Office
External Finishes Schedule
Internal Finishes Schedule
Room Name
Brick
As Existing
As Existing
Metal Cladding
H31/120
??????
J42
Grey
Rainwater Goods
R10/311
??????
Timber Doors & Frames
M60/111
??????
Over Head Sectional Door
L20/615
??????
Fascia's & Soffites
M60/110
??????
M60/110
??????
L1/330
??????
Roofs
Barge Boards
Windows
Rev A
28-04-08
Rev Date
Number
Ceilings
Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-
Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White
Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-
Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White
FF03
Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-
Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White
Lobby
FF04
Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-
Office
FF05
Office
First Floor
Internal Finishes Schedule
Room Name
Walls
Office
Stair
Office
FF01
FF02
FF06
Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-
Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White
Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White
Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-
Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White
Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White
Plaster board to be dry lined or skim coated. Primed & painted to (nbs ) Colour:-White
Storage
FF07
Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-
Corridor
FF08
Block work/brickwork to be primed & painted (nbs M60/116) Colour:Insulated PB wall liner to be dry lined or skim ccoated primed & painted to (nbs M60/117) Colour:-
Bespoke Mouldings or Fittings
Doors / frames / architraves/windows/ surrounds/ shutters Timber Doors and frames to be factory painted to (nbsM60/112 )
Timber Doors and frames to be factory painted to (nbsM60/112 )
Skirtings
New S/W for painting (nbsM60/112 )
New S/W for painting (nbsM60/112 )
Floor Finishes
Carpet to (nbs M50/170)
Carpet to (nbs M50/170)
Tiling or other special finishes N/A
Grilles
L1/650
??????
Aluminium Doors & Frames
L20/370
??????
B
Office
New S/W for painting (nbsM60/112 )
Timber Doors and frames to be factory painted to (nbsM60/112 )
New S/W for painting (nbsM60/112 )
Timber Doors and frames to be factory painted to (nbsM60/112 )
New S/W for painting (nbsM60/112 )
Carpet to (nbs M50/170)
New S/W for painting (nbsM60/112 )
Carpet to (nbs M50/170)
Proprietry Coved skirting
Vinyl (nbs M50/152)
Timber Doors and frames to be factory painted to (nbsM60/112 )
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Stair
FF 02 Office
Timber Doors and frames to be factory painted to (nbsM60/112 )
ST Drawn By
Inkpen Downie Architecture & Design Ltd 2 Balkerne House
DN 8 R
Vinyl (nbs M50/152)
Timber Doors and frames to be factory painted to (nbsM60/112 )
Revision
Office A
N/A
FF cleaners room is omitted. New storage FF06. Carpet floors to offices on FF.
Vinyl (nbs M50/152)
Lobby
Carpet to (nbs M50/170)
DN 8 R
Drawing Status
TENDER DRAWINGS
FF 01 Office FF 08 Corridor
Office
FF 04 Lobby
FF 05 Office
Project
Alterations to 75 Park Garage
N/A
Office
to Provide Training Facilities Client
Storage
New S/W for painting (nbsM60/112 )
FF 03 Stair
N/A
FF 06 Office
Port of Felixstowe
Corridor
Cad File
Mac 7 - 708
Drawn By / D a t e
Checked By / Date
NA
ST/April 2008
JI/March 2008
Title
FF 07 Storage
MEZZANINE FLOOR
Scale
Finishes Schedule
A B
D r a w i n g N o.
A /725/T/106
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
NOTES
Section Through Upstand Detail To Brickwork (Cavity Wall)
Section Through Upstand Detail Beneath Door/Window Cill
Legend:
Section Through Detail To Perimeter Edge
Section Through Detail To Roof Ventilation
1
9
10
7
17
7
5 6
4
5
6
4
5
4
6
4
5
2
1 2
3
1
3
Section Through Detail To External Gutter
1
Section Through Detail To Vertical Cladding
5
21
Mechanical Fixing SPF Type Screw At 200mm Centres
4
Weld Area
5
Bauder Single-Ply Membrane
6
Bauder Pre-Formed Metal Angle
7
Bauder Pre-Formed Metal Flashing
8
Timber To Raise Upstand
9
Door/Window
10
Door/Window Cill
11
Bauder Euroglaze RooDight
12
Hit & Miss Ventilation (4000mm)
13
Extruded PVCu Kerb
14
Bauder Pre-Formed Metal Edge Trim
15
Fascia Board
16
External Gutter
17
Timber Batten
18
Soil Vent Pipe Beneath Deck
19
Suitable InCll
20
Jubilee Clip
21
Soil Vent Pipe
22
Cavity Bridge
23
Internal Corner Section
24
Bauder Single-Ply Chute/OverDow
25
Rainwater Outlet
26
Outlet Grille
27
Integral Membrane Flashing
28
Vertical Cladding
29
Termination Bar
30
Bauder Mastic Sealant
6
28
20
14 7
6
4
5 2
Bauder PF300MF Fleece
3
Section Through Change In Level Detail
17
1
15
3
2
All collar bases must be at least 300mm x 300mm and all uniform. If pipe exceeds 250mm diamater, additional Cxings required in the Celd sheet, and base of pipe.
30
4
2
Section Through Detail To Soil Vent Pipe
If vertical dimension of metal exceeds 100mm then provision should be made to allow for face Cxing restraint
5
1
14
Plywood Deck
2
4
When exceeding 500mm in height Dat metal to be Cxed every 500mm there after. If this detail does not exceed 500mm in height the additional Dat bar is not required
5
3
6 15 16
1
2
3
2
4
5
1
Rev Date 3
2
1
Revision
Drawn By
Title:
Bauder Single-Ply Sectional Details
Inkpen Downie Architecture & Design Ltd 2 Balkerne House Drawn By:
G.Page
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Date: Scale:
Drawing Status
N.T.S
Drawing No:
T5-T7
TENDER DRAWINGS Project
Alterations to the Chauffeurs Garage Client
Felixstowe Port Cad File
Scale
Drawn By / D a t e
Mac 7
1:5
ST Apr 08
Checked By / Date
Title
Bauder Standard Details D r a w i n g N o.
R e v N o.
A/725/T/109 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
DETAIL 2
DETAIL 3
Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels with 19mm sealing washers.
Fix the Gutter and Eaves Fashing with a Hxing in every trough
70
32
CP&P Gutter Support Bracket 1 metre spacing and either side of gutter joint
Rivets/Stitching Screws 3 per Gutter Support Bracket
Factory Applied Vapour Check CP&P Eaves Flashing Butt or lap jointed sealed with two runs of continuous high performance strip sealant, 9x3mm
NOTE: END LAP FASTENERS EVERY TROUGH
NOTES
Read these drawings in conjunction with drawings A/725/T/03, 04, 05, 11 & with the specification clauses H43 A B C D & L10
Loose Insulation
80
30
35 40, 60, 80, 100mm\Pthickness av
200
3
120
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
175
CP&P Cantilever Gutter Ref. CCG (degree of roof pitch must be speciHed)
DETAIL 1 CP&P Flashing to be stitched using sealed rivets or self drilling fasteners with sealing washers at not more than 450mm centres
NO SIDE LAP SEALANT REQUIRED
Continuous high performance strip sealant 3mm diameter bead
ProHled Filler Sealed top and bottom
Corus Panels & ProHles
60
CP&P Flashing to be stitched using sealed rivets or self drilling fasteners with sealing washers at not more than 400mm centres
Rail to be jointed with sleeve to insure continuous seal, high performance 6mm dia. strip sealant
Loose laid insulation
SALES AND TECHNICAL OFFICE TEWKESBURY TEL: 01684 856600
80
Y = 0.126 W/mK CP&P Gable Flashing Butt or lap jointed sealed with two runs of continuous high performance strip sealant, 9x3mm
CP&P Internal Iashing stitched to underside of the panel using rivets at a minimum of 450mm centres. Sealed using continuous high performance strip sealant, 6mm diameter bead
ProHled Filler Sealed top and bottom
STATED CALCULATION RESULTS ARE DEPENDeNT ON COMPONENTS BEING AS SHOWN
2
40mm core - 0.45
c
f = 0.95
c c
Corus UK Ltd.
Corus UK Ltd.
(Abutment to cladding detail) This detail is a variation on Corus Standard Details Drawing no: RDTRIS005-01-A
DETAIL 7
3 runs of continuous, high performance, PE Foam sealing tape, 10x5mm. Do NOT lay over the top of the end crown.
3 runs of continuous, high performance, PE Foam sealing tape, 10x5mm. Do NOT lay over the top of the end crown.
Purlin By othe rs
DETAIL 5
THESE VALUES ARE BASED ON S.S SCREWS AND PURLIN CENTRES AT 2 METRES
25
Continuous high performance Strip Sealant 6mm diameter bead
60mm Minimum
60
Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners sealing washers. for composite panels with 19mm
100mm core - 0.20
Purlin
tape , con 50x4 mm laid to tightn ens ess
80mm core - 0.25 Cleader
Y = 0.019 W/mK
STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN
Corus UK Ltd.
60mm core - 0.32
50x4 mm PE fo tape , cont am in laid to en uously sure tightn air ess
Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels sealing washers.
SALES OFFICE AMMANFORD TEL: 01269 850691
f = 0.97 PANEL 'U' VALUES (W/m K.)
150 10
Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels with 19mm sealing washers.
80
50x4mm PE foam tape, continuously laid to ensure air tightness
Lead Flashing / EP Cover Flashing
DETAIL 4
Extension plate standard 3 metre length (optional)
150
Continuous high performance
I
strip sealant 9x2 mm
80
25 120
um inim mM 60m Purlin By others
D
A
Grommet type stitch Hxings at
Stitch screws at maximum
rooIight overlaps the metal sheet
Grommet type stitch Hxings at
maximum 450mm centres, stitch
maximum 450mm centres, stitch
screws if the rooIight incorporates
screws if the rooIight incorporates
a metal strip along the underlap side
Fixed at 750 centres
10
CP&P End Wall Flashing butt or lap jointed and sealed with 2 runs of continuous, high performance strip sealant, 9x3mm.
c
D
Corus UK Ltd.
Continuous, high performance, strip sealant, 9x3mm.
80
a metal strip along the underlap side
Primary Fastener, 5.5mm diameter self-drilling, austenitic S.S. high-thread fastener for composite panels with 19mm sealing washer.
Continuous high performance strip sealant 9x2 mm
tape , cont inuo 50x4 usly mm PE fo laid am to tightn ensure ai r ess
450mm centres where the
CP&P Flashing to be stitched using sealed rivets or self drilling fasteners with sealing washers at not more than 450mm centres.
CP&P Internal Flashing stitched to underside of panel using rivets at 400mm centres (minimum). Seal using continuous, high performance, strip sealant, 10x5mm PE Foam Tape.
Rev A Continuous PVC expandable foam seal between insulation and internal Iashing
Rev Date
omitted detail as not applicable Revision
Drawn By
Y = 0.260 W/mK f = 0.837 STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN
c
Corus UK Ltd.
Inkpen Downie Architecture & Design Ltd
Self drill/tap screws that incorporate minimum 29mm diameter washers
Factory Assembled
2 Balkerne House
GRP roof light
Tel 01206 577 244 arch@inkpendownie.co.uk
DETAIL 6
Balkerne Passage
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status CP&P Flashing to be stitched using sealed rivets or self drilling fasteners with sealing washers at not more than 400mm centres
Site applied Fire rated canister insulation
Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels with 19mm sealing washers.
TENDER DRAWINGS
CP&P Ridge Flashing Butt or lap jointed sealed with two runs of continuous high performance strip sealant
Project
ProHled Filler Sealed top and bottom
Alterations to 75 Park Garage to Provide Training Facilities
Double, triple or four layer depending upon U-value requirement
Client
Port of Felixstowe CP&P Internal Flashing Butt or lap jointed sealed with two runs of continuous high performance strip sealant, 9x3mm
Continuous, high performance, 10x5mm PE Foam Tape sealant.
Cad File
Scale
Drawn By / D a t e
Mac 7
1:5
ST/March 2008 JI/March 2008
Checked By / Date
Title
Standard Roof Details Y = 0.009 W/mK f = 0.975 STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN
D r a w i n g N o. c
Corus UK Ltd.
A/725/T/10
R e v N o.
A
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.
Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.
DETAIL 8
DETAIL 9
DETAIL 11 I
Window Frame, by others
Structural Steelwork, by others
DETAIL 10
Sealant strip, continuous, high performance 6mm Ø beads. Trisomet Panel
NOTES
Window Frame, by others Panel
CP&P Trisomet Panel. (see brochure for current thickness.)
Sealant strips, continuous, high performance 10x5mm PE Foam Tape.
thickness
Structural Steelwork, by others
CP&P Sill Flashing
CP&P Iashing to be stitched using sealed rivets or self-drilling fasteners with sealing washers at not more than 400mm centres.
CP&P Drip Flashing
1000
1000mm panel
ProHled Filler, sealed top and bottom.
Seal between window and rail.
1000mm panel Window Frame, by others
CP&P Trisomet Panel. (see brochure for current thickness.)
Y = 0.721 W/mK f = 0.62
Primary Fastener. 5.5mmØ, self-drilling, austenitic S.S. high thread fastener with sealing washer for composite panels.
CP&P Iashing to be stitched using sealed rivets or self-drilling fasteners with sealing washers at not more than 400mm centres.
thickness
Seal with, continuous, high performance 10x5mm PE Foam Tape.
CP&P Drip Flashing Hxed to panel using a colour match rivet at 400mm centres
Panel
Sealant strip, continuous, high performance 6mm Ø beads.
CP&P Trisomet Panel. (see brochure for current thickness.)
CP&P 1.6mm Galv. support angle
Structural Steelwork, by others
20
55
55
A
STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN ASSUMING WINDOW 'U' VALUE INCLUDES THE WINDOW FRAME
c
CP&P Insultion retaining Iashing, 0.7mm standard white liner internal Hnish
Seal between support angle & panel with continuous, high performance 10x5mm. PE Foam Tape.
20
Primary Fastener. 5.5mmØ, self-drilling, austeniHc S.S. high thread fastener with sealing washer for composite panels.
Read these drawings in conjunction with drawings A/725/T/03, 04, 05, 10 & with the specification clauses H43 A B C D & L10
Loose laid insulation by others
Seal with, continuous, high performance 10x5mm PE Foam Tape.
Primary Fastener. 5.5mmØ, self-drilling, austeniHc S.S. high thread fastener with sealing washer for composite panels.
thickness
This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.
Y = 0.352 W/mK f = 0.73
CP&P sofHt Iashing
STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN ASSUMING WINDOW 'U' VALUE INCLUDES THE WINDOW FRAME
c
Corus UK Ltd.
Corus Panels & ProHles
Y = 0.204 W/mK
Corus UK Ltd.
f = 0.85 A STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN
c
Corus UK Ltd.
SALES AND TECHNICAL OFFICE TEWKESBURY TEL: 01684 856600
Y = 0.466 W/mK f = 0.73
SALES OFFICE AMMANFORD TEL: 01269 850691
A
STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN ASSUMING WINDOW 'U' VALUE INCLUDES THE WINDOW FRAME
c
DETAIL 11A
Corus UK Ltd.
DETAIL 12
(Abutment to cladding detail) This detail is a variation on Corus Standard Details Drawing no: RDTRIS018-01-A
DETAIL 15
3 runs of continuous, high performance, 10x5mm PE Foam Tape sealant.
Trisomet Panel 80mm core
Trisomet Panel Seal with continuous, high performance, 10x5mm PE Foam Tape.
Loose laid insulation by others 150
CP&P Insultion retaining Iashing, 0.7mm standard white liner internal Hnish
Seal between support angle & panel with continuous, high performance 10x5mm. PE Foam Tape.
10
Seal with continuous, high performance, 10x5mm PE Foam Tape.
TRISOMET PANEL
ROOFLIGHT
CP&P 1.6mm Galv. support angle
ROOFLIGHT
Foam Block Support
50x4mm PE foam tape, continuously laid to ensure air tightness
ROOFLIGHT ENDS MUST BE SUPPORTED BY AT LEAST 50mm
80
1000/32 External Sheet Factory curved
TRISOMET PANEL 150 x 150 box gutter
CP&P Extension plate 1.6mm Galv. standard 3m length
120
Purlin By others
Spigot for connection to RW pipe
Fixed at 750 centres
Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels with 19mm sealing washers.
Swanneck to down pipe at high level to bring pipe down to existing gully.
Continuous high performance Strip sealant 6mm diameter bead 80mm thick PUR or equivalent insulation, by others
Gutter to have end caps & over lapped connection properly sealed to prevent leakage
Y = 0.204 W/mK f = 0.85
Rev Date
Continuous R/A section tack welded to gutter & botted to easy support bracket
c
Corus UK Ltd.
c
Corus UK Ltd.
STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN
DETAIL 13
DETAIL 14
Drawn By
Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels with sealing washers.
Continuous, high performance, 10x5mm PE Foam Tape sealant.
Inkpen Downie Architecture & Design Ltd
Internal Lining Sheet 0.7mm thick Iat sheet, curved on site.
2 Balkerne House
Balkerne Passage
Tel 01206 577 244 arch@inkpendownie.co.uk
Colchester
CO1 1PA
Fax 01206 563 377 www.inkpendownie.co.uk
Drawing Status
TENDER DRAWINGS
Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels sealing washers.
60
Top sheet cut back on site to aviod cold bridge Loose laid insulation
Revision
Trisomet Panel 60mm core
CP&P Internal Flashing to be butt or lap jointed and sealed with continuous, high performance sealant strips, 9x3mm.
Primary Fastener 5.5mm diameter self drilling austenitic S.S. high thread fasteners for composite panels with 19mm sealing washers.
Continuous, high performance, 10x5mm PE Foam Tape sealant. Continuous, high performance, sealant CP&P Internal Iashing 10x5mm PE Foam Tape. stitched to underside of the panel using rivets at a minimum of 400mm centres. Sealed to panels using continuous high performance strip sealant, 10x5mm PE Foam Tape.
CP&P Internal Iashing stitched to underside of the panel using rivets at a minimum of 400mm centres. Sealed using continuous high performance strip sealant, 10x5mm PE Foam Tape.
Project
20mm Spacer Block sealed either side with a continuous high performance strip sealant 9x3mm against internal liner and a 6mm diameter bead against underside of the panel
Alterations to 75 Park Garage to Provide Training Facilities Client
Port of Felixstowe Y = zero (no calc) f = 0.97 (as panel)
CP&P Internal Corner Flashing Butt or lap jointed sealed with two runs of continuous high performance strip sealant, 9x3mm
60
Liner cut back on site and panels butted together to aviod cold bridge
Cad File
Scale
Drawn By / D a t e
Mac 7
1:5
ST/March 2008 JI/March 2008
Checked By / Date
Title
STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN
Standard Roof Details CP&P External corner Flashing to be butt or lap jointed and sealed with continuous, high performance sealant 10x5mm PE Foam Tape.
CP&P Flashing to be stitched using sealed rivets or self drilling fasteners with sealing washers at not more than 450mm centres AS SHOWN Y = 0.041 W/mK f = 0.96 STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN
WITHOUT TOP SKIN CUT BACK
AS SHOWN
Y = 0.248 W/mK
Y = 0.019 W/mK
f = 0.75 STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN BUT WITHOUT SITE CUTTING OF LINER
f = 0.939
c
Corus UK Ltd.
STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN
Flashing to be stitched using sealed rivets or self drilling fasteners with sealing washers at not more than 400mm centres
c
Y = 0.198 W/mK
R e v N o.
A/725/T/11
f = 0.744 STATED CALCULATION RESULTS ARE DEPENDENT ON COMPONENTS BEING AS SHOWN BUT WITHOUT SITE CUTTING OF LINER
Corus UK Ltd. D r a w i n g N o.
WITHOUT LINER CUT BACK
c
Corus UK Ltd.
Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.