PORTFOLIO COMPILATION WORKS 2011 - 2019 SOFFIAN HASHIM
Islamic College of Melbourne Victoria Entry Ramp / Stairs / Decking Design Documentation
LEGEND Synthetic turf
Existing retaining wall. 05 -
Existing demountable building.
04 -
TMB-01 Existing chain link fencing
BAL-01 Balustrade
Continuous top track fixed to existing fencing midrail.
P EX
P
P
P
P
P
P
EX
EXP
700 typ.
P P
P
Stainless steel pos to engineer's deta
Stainless steel flat bar to both side of ramp.
TAC-01
Stainless steel flat bar to both side o ramp.
TMB-01
Concrete slab to engineer's details.
02
TMB-
Deck and ramp structure 05 to engineer's details.
TMB-01
A402 A401
A402
2mm thick plate to engineer's details.
A402
HR-01
Concrete slab to engineer's details.
2mm thick plate to engineer's deta
Existing retaining wall footing.
P
P
Up
03 -
02fenceSECTION Chain link to match existing. Stairs and Scale 1 : 50
EX
1:100 Fall
P
Ramp up 1:14
P
03
6 x Risers at 180mm typ.
Existing retaining wall footing.
EX
P
HR-01
P
1:100 Fall
04 A402
TUF-01
Existing fence.
HR-01
HR-01
Existing precast panel.
900 typ.
P P
Ramp up 1:14
BAL-01
A402
BAL-01
300 Typ. Going
300 300 50 min min
01
1100 Clear
1000
Existing fencing post
Future shade structure column. 1:100 Fall
03 -
BAL-01
concrete paving.
P
P
Post to engineers details
Planter box with retaining wall.
180 Typ. Riser
P
P
HR-01
NSG-01
TMB-01
Extend of chain post to support link meshNew to be removed.sliding gate fixed to
900 typ.
1100 Clear
P
HR-01 Ramp up 1:14
Existing chain wire fencing.
Existing mid rail.
700
TAC-01
Tactile
75
Handrail
75
HR-01 P
P
P
200
P
BAL-01
03
Sliding Gate
02 A400
SECTION DETAIL
Stair Detail
SECTION Ramp and Decking
03
Scale 1 : 50
A400
Scale 1 : 10
SECTION DETAIL Post to Bearer Scale 1 : 10
Remove top sleeper and cut steel solder.
EX
Packer as required.
P
Light post.
Step up
3100 Clear
TAC-01
TAC02
02 -
02 -
Existing concrete sleepers.
EX
NSG-01 typical to all step and deck edging.
TMB-01
New Post.
P
6
-
75
Existing footing.
Ramp, Decking , Stairs and Gate Existing footing.
Future shade structure post. Existing motorized gate.
07
A400
Scale 1 : 50
HR-01
1100 Clear
Deck and ramp structure to engineer's details.
P
Step up
P P
HR-01
1
04 ELEVATION
NSG-01 typical to all stair edging.
4
2
HR-01
Elevation
5
3
TMB-01
Existing sleeper post.
P
TAC02
75
Packer as required. Existing fencing post.
P
P
1
2mm thick plate to engineer's details.
Existing concrete sleepers.
300 75 min
6
5
2mm thick plate to engineer's details.
BAL-01
New sliding gate G01 as detailed.
2 3 4 HR-01
TMB-01
TMB-01
700 typ. 900 typ.
Remove chain link fence to mid rail. Remove bottom rail and top row of sleepers. Allow to cut cteel solder.
Stainless steel flat bar to both side of ramp.
Existing demountalbe building.
75
NSG-01 typ.
Deck and ramp sturcture to engineer's details.
Stainless steel flat bar to both side of ramp.
Stainless steel posts to engineer's details.
Existing concrete paving.
75
P
P
HR-01
Existing lower rail.
10 Clear
Stainless steel posts to engineer's details.
EX
TAC02
Existing chain wire fencing.
Deck and ramp structure to engineer's details.
Existing concrete paving.
New Post.
P
04 -
Line of concrete slab under.
TMB-01
TMB-01
Planter box with retaining wall.
TAC-02
CONC-01
Remove base rail to gate opening.
Allow for track to be fixed to decking and concrete slab.
P
P
Up
700
NSG-01 typical to all step and deck edging.
P
P
1:100 Fall
TAC-01
200
P
P
P
1110 Clear
Bored piers footing to engineer's details.
Existing chain link fencing.
Existing chain link fencing.
TAC-01
TUF-01
EX
Line of concrete slab under.
Existing fence.
P
Existing kerb.
Planter box retaining wall.
01 A400
SECTION DETAIL
05
Deck and Court Junction
A400
Scale 1 : 10
Light post.
SECTION DETAIL
06
Deck and Court Junction
A400
Scale 1 : 10
SECTION DETAIL
08
Step in Deck
A400
Scale 1 : 10
Existing concrete sleepers. EX
P
Existing bitumen. Sliding Gate
Existing Gate
05 -
Scale 1 : 50
Existing stairs and handrail.
75
900 typ.
Entry Ramp,Stairs and Decking
700 typ.
100
-
300 300 min min
PLAN
100
01
07
6 x Risers at 180mm typ.
A402 TMB-01
TMB-01
Existing retaining wall.
Planter box retaining wall. 06 A402
05 -
SECTION Ramp, Decking , Stairs and Gate Scale 1 : 50
B
9/10/17
Issued for Pricing
A
4/9/17
Issue to Consultants
ISSUE
DATE
REVISION
0mm
50mm
100mm
DO NOT SCALE FROM DRAWING. USE FIGURED DIMENSIONS ONLY. CHECK ALL DIMENSIONS ON SITE BEFORE MANUFACTURE OR CONSTRUCTION.
AR C HIT EC T U RE IN T E RI O RS M AST ERP LA NNIN G
PROJECT
CLIENT
ICM Entry Ramp and Stairs
PROJECT #
DWG #
2705
Ex. Auto Ticket Mach.
Existing wall to be demolished.
EX. Game Mach.
Entry Portal
2x Val Morgan screens to be removed.
Sheet over existing roller shutter.
Existing screen to be retained. Ex. Store To be demolished to make way for new open framed door.
Existing B&J's sign and existing finish to remain.
7160 COS
Design Development and Documentation
01 -
Existing HWS to be removed/ relocated.
Demolition Plan
Existing return air duct to be relocated to ceiling.
Entry Portal, Foyer - Level 2 Scale 1 : 50
Existing bulkhead to be demolished.
Ex. Auto Ticket Mach.
Patch and repair wall where existing wall is removed.
CFT02 Black entry tile to entry tile ingo.
MC01 Finish to underside and rear of new bulkhead.
Existing bulkhead to remain.
EX. Game Mach.
MC01 Black gloss finish cladding on new wall, WL03 (entry portal frame.)
08 MC01 Black gloss finish cladding on new wall, WL03 (entry portal frame.)
Existing bulkhead to remain. 590
Patch and repair ceiling.
AL Alum pow Conc
670 1890
Access panel locations TBC on site. AP01 RSD01 New roller shutter to extent of opening.
Lighting to underside of new bulkhead to lighting designers specs. Refer to A105.
980 ex.d oo
r
975
2660
HOYTS Broadway New South Wales
To be decommissioned.
Existing floor tiles to be removed.
Line of existing bulkhead to be adjusted.
Ex. Store
CFT05 New tiles to be laid on top of existing tiles.
MC Black cladd
AP01
New backlit Hoyts signage.
New opened framed door for storage entry.
340 porta l frame
Paint return air duct to match ceiling finish.
7145 open ing
02 -
340 porta l frame
Proposed Plan
AL02 Aluminium trim with powdercoated finish, PC03 junction between existing timber lining and new tile finish. Concealed fixing.
AL Alum pow Conc
MC Black cladd
0
Entry Portal, Foyer - Level 2 Scale 1 : 50
-
7835 670
7165
340
340
New Hoyts backlit signage. Power by contractor as required. New signage supplied by Hoyts.
10
Ex. bulkhead to be retained.
PT01 Black paint finish to match existing mall ceiling finish. TBC with Hoyts.
MC01 Black gloss finish cladding.
LT04 strip light New fitting. Refer to consultant drawings for details.
AFFL 3800 COS
Ex. black timber lining and signage to be retained.
10
10
AFFL 2290 COS
AFFL 2290
Ex. Ben & Jerry's signage to be retained. Ex. screen to be retained.
MC01 Black gloss finish cladding.
MC01 Black gloss finish cladding.
Ex. timber lining to be retained.
Existing B
RSD01 New roller shutter door.
Ex. door to be retained.
PC03
FFL 0 PC03
Proposed Elevation 03 Proposed Elevation B -
Proposed Entry Portal, Foyer - Level 2 Scale 1 : 50
NOTES: 1. Refer to A000 - Cover Sheet, Legend + Scope for all codes, symbols, specification and general notes. 2. Layouts and dimensions as shown are indicative only. All dimensions, heights and levels to be confirmed on site prior to any works. 3. Refer to SH01, SH02 & SH04 for all finishes and equipment selections. 4. Refer to to consultant drawings for power, data and hydraulic requirements
400
1.
AP03
WCPT01
To all entry tunnel walls. CFT04
EX-WCPT
+0 RL122.200
Walkway 1:20
CPT02
LTF06
Scale: 1:100
2200
CS01
2200
2200
2200
3000 Crossover
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
2565
2035
HDRL02
CS01
CS01
CS01
CS01
CS01 CS01
CS01
CS01
CS01
CS01
CS01
CS01
10940
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
01/A450 CS01
CS01
CS01
CS01
CS01
CS01 CS01
+3400
CS01
CS01
+2815
04/A303
CS01 CS01
WHC
LTW03
WHC
CS01 CS01
+1645
02/A450
CS01
CS01 LTW03
CS01
+2230
CS01
LTW03
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
CS01
WHC
+1060
CS01
CS01
HDRL02
CS01
08/A450
-
CPT02
Existing concrete ramp to be retained.
Walkway 1:20
+280 LTF06
-85
R 135875
03
1230 aisle
CS01
06
Cinema 2 Xtreme
-
Scale: 1:100
g li
mit
35
º
CPT02
CS01 CS01
CS01
-110 HDRL02
-305
02/A303
-500
R 128335 R 125185
A451
DEMOLITION PLAN
win
LTF06
1100 aisle
1800
02
03/A303
150 Wall Panel
EX-CRTN
Both sides.
CS01
CS01
vie
04/A450
CS01
CS01 CS01
3D
CS01
CS01
CS01
1100 aisle
CS01
WHC
CS01
CS01
05/A303
Existing exit doors and walls to remain typically. (shown dashed).
CS01
CS01
CS01
Design Development and Documentation
CS01
LTW03
CS01
CS01
º
CS01
45
CS01
WHC
it
CS01
CS01 CS01
lim
CS01
CS01
CS01
CS01
LTW03
1700 Min Clear
CS01
CS01
1700 Min Clear
CS01
CS01
CS01
CS01
CS01 CS01
CS01
CS01
g in
07 -
CS01
01/A303
w vie
EX-CPT
Existing platform carpet to be removed typically.
CS01
CS01
CS01
03 -
CS01
2195
2D
Ex. timber framed platforms to be demolished.
CPT02
850 Min Clear
CS01
CS01
South Australia
PLAN
R 121850
Cinema 2 Xtreme Scale: 1:100
All existing downlights to be removed. Make good of ceiling.
Existing ceiling to be retained.
All existing wall and cleaners lights to be removed (both sides). Locations indicative only.
Existing screen masking curtains and blend wall to be retained. Refer note at A001.
All redundant existing ceiling downlight openings to be patched and painted PT11
Existing rear wall lining to be demolished. Make good and prepare for new wall panels.
2600 LTW04
4500 LTW04
3000 SPK01
Ceiling Bulkhead AFFL +6890
4900 LTW04
3000 SPK01
3000 SPK01
4900 LTW04
3000 SPK01
5400 LTW04
4500 SPK01
Ceiling Bulkhead AFFL +6890
36° LNG02 New acoustic panels. Contractor to allow for plywood backing plates to align flush to face of new full height plywood lining and ex. cols. Refer A451 for detail.
EX SPK EX SPK
LTW04 LTW04
WSPK03
01
DEMOLITION SECTION
07
Cinema 2 Xtreme
-
SECTION Ex. Female
WCPT01
WSPK03 WSPK03
02 A450
WSPK03
08 A450
Toilets2 Xtreme Cinema A420's for detail.
Crossover Platform AFFL +280
WCPT01
WCPT01
04
A450
FO
HDRL02
Scale: Refer 1:100
Scale: 1:100
Feature light
6000
FFL +0 Rear Platform AFFL FFL +3400 -500
Feature light
300 Min.
WCPT01
Ex. Foyer FFL +0
900 Typ.
-
LTW04
Feature light
A450
03
LTW04
WSPK03
4000
Crossover Platform Bio Box AFFL +280 AFFL +3400 Ex. Foyer
5900
FFL -500
Cinema blend wall. Refer note at A001.
LTW04
4000
Ex. Foyer
Ex. Female Toilets Refer A420's for detail.
4850
U/side conc. slab CeilingAFFL Bulkhead +2610 COS AFFL +6890
PT11
4000
All existing speaker to be removed (both sides). Refer note at A001.
Ex. Female Toilets Refer A420's for detail.
Ex. timber framed platforms to be demolished.
°
PT01
4000
EX SPK
FFL +0
45
LNG02
EX SPK U/side conc. slab AFFL +2610 COS
Typical feature wall halo light 4 ° mounted to acoustic panels. Contractor0to confirm detail with Hoyts prior to manufacture
Bio Box New acoustic panels. Refer 01/A452 AFFL +4560 Contractor to allow for adequate supportRear for speakers Platformto be fixed back to AFFL cinema wall. +3400
EX SPK
3500
Bio Box AFFL +4560
4000
Existing wall lights to be removed.
6000
Cinema Boxes
CPT02
1100 aisle
CS01
CPT03
Existing screen, masking and blend wall to be retained.
CPT02
6210
CS01
CS01
CS01
CS01
1670
16975 O/A COS
2200
CS01
1745
Cinema 2 Xtreme - Entry
-
28760 O/A Internal Length COS
1230 aisle
150 Wall Panel
105
6. Pricing Option: Ex Upgrade where ne
Allow to retain and relocate all existing lighting and services. Entry downlights to be relamped.
RCP
05
1230 aisle
Cinema 2 Xtreme - Entry Scale: 1:100
Scale: 1:100
HOYTS Westfield Tea Tree
4. CS01 Seat Type: V
5. Pricing Option: Cu acoustic rear wall
1100 aisle
-
Cinema 2 Xtreme - Entry
PLAN
EX Cinema 3 Store
04
DEMOLITION PLAN
3. All platform steps NSG02 (green, X-t
5595 Walkway CPT02
Existing wall and double doors to be demolished. Make good and prepare for new finishes. -
1 0 EB
A500
CPLB01 PT11 2500AFFL
150
01
EX-PB
C
EX. Wall Light
All entry tunnel walls.
1230 aisle
EX-CPT
2. Refer to SH01 & SH and equipment de LTF06
1695
EX-SAP
1845 New ceiling
TR01
625
EX FHR
EX-CPT
01
Refer to A000 & A
EX
J19
EX. HW
BIN02
EX-PB
1300
-F
new tunnel wall. WM
EX FHR
300 Min. WCPT01
G F
21/6/18 2/3/18
Issued fo Issued fo
E D
23/2/18 20/12/17
Issued fo Issued fo
C B A
7/12/17 16/11/17 30/10/17
Issued to Issued fo Issued fo
ISSUE
DATE
REVISION
0mm
FFL -500
DO NOT SCALE FROM DRAWING. U CHECK ALL DIMENSIONS ON SITE B
01 A302
ELEVATION NOTES:
Cinema 2 Xtreme- Side Wall Scale: 1:100
AR C HIT EC T U RE IN T E RI O RS M AST ERP LA NNIN G
Speakers layout on left side wall to mirror on right side wall of theatre.
pmdl.com.au
02 A452 Ceiling Bulkhead AFFL +6890
03
Wall light on tunnel wall side to PMDL ARCHITECTURE + DESIGN HK (LIMITED) mirrorPMDL setout on platform side of ABN 56 062 961 317 ARCHITECTURE + DESIGN PTY LTD NSW NOMINATED ARCHITECTS:theatre. ANDREW PENDER 5317 DAVID MORRIS 5865 PETER DODDRELL 5134
PROJECT
CLIENT
DWG
02 E Hoyts Tea Tree A302 C
Sc
Hoyts Corpora
Details - Cinem
CLIENT REF & CONTACT
Westfield Tea Tree Plaza
All existing doors and door frames to be removed. All existing partitions to be demolished.
Allow to scabble back floor substrate under vinyl as required to ensure level bedding for all tiling. Existing walls to be removed.
Existing floor tiles to be demolished. Make good floor to receive new finish.
Allow to scabble back floor substrate under vinyl as required to ensure level bedding for all tiling.
All existing doors and door frames to be removed.
Existing floor tiles to be demolished. Make good to receive new finish.
1000 Existing wall to be demolished.
All existing partitions to be demolished. Notes:
Refer A000 and A001 for leg scope outline.
EX-VNYL
EX-VNYL
1.Existing fixtures and fittings including:
Ex. Male Toilets EX-CFT
EX-CFT
HOYTS Westfield Tea Tree
EX-FW
EX-FW
Ex. Female Toilets EX-CFT EX-FW
Ex. Acc WC
EX-FW
EX-FW
EX-CFT
Ex. Cleaners Room
All existing floor waste location to remain unless noted. Refer to note 5.
EX-CFT
Ex. Parents Room
EX-FW
EX-FW
Make good, reuse connection cap & seal if not required. Ma surfaces as returned to suit n power to suit new location in
EX-CFT
South Australia
2. All HDRY01 to be at 900m All fixtures and fittings to be removed. Refer to note 1.
Male Toilets Scale: 1:50
1200 Acc. Entry
review if update required.
PT01
D14
08
07
GR02 WC02 TRH01
SIM.
-
PT01
D12
16 -
HDRY01
SIM.
Parents Room CFT03
D12
750
365
FW01 BSN01 TAP01 SD01 MIR02
UR01 PAR02 Typ.
FW01
13
TRH02 Typ. WC01
14
06/A431 SIM.
HDRY01 PAR01 Typ.
Male Toilets
Ambulant Cubicle
700 Min. Ambulant
PT01
CFT03
6. EX-FW reuse existing pene Remove existing coverplate. U
CFT03 12
FW01 TRH01
TRH02 WC01
7. All partition doors to be fit HK01, centered rear door. HK AFFL.
1000 Min. Clear
16
8. All drainage to be conceale walls. Any exposed traps to h
9.Indicative mirror panel divis Contractor to review on site. 10. All toilet walls are CWT01 walls, CWT02.
WC03 GR01
625
HDRY01
2450
CFT03
FW01
SD01 TAP02 BSN02 MIR02 HDRY01
2050
03
Access. Unisex WC
365
FW01
HK01
HDRY01
SIM.
540
16
PT01
PT01
D14
MW02
WC05
450
HDRY01
06
WC01 Typ.
04
GR01
GR01
TRH02 Typ.
CFT03
Existing falls to floor wastes to remain typically.
1700
Cleaners Room SK01 TAP04
5. Refer to lighting consultan drawings for details.
1000
PT01
D12
PT01
TRH01 WC03
AL01 Typ.
15
PT01
PT01
1810
D11
500
PT01
CFT03
PT01
-
Signage Typ.
800
1000
PT01 PT01
19 18
17 -
PT01
1025
CFT03
05
PT01
PT01
Female Toilets
Signage Typ.
1450
AL01 Typ.
Existing falls to floor wastes to remain typically.
PAR01 typ.
600 HDRY01
6450 1720
2650 Ambulant
3855
GR01
1655
4.Existing light fittings to rela Light consultants and electric
04
06/A431 SIM. 700 Min. Ambulant
1000 Min. Clear
1000 Female Entry 1415 500 200 Min.
Ambulant Cubicle
2600 Ambulant
2055 COS 600
3.Existing flush plasterboard Provide new paint finish. Refe
All fixtures and fittings to be removed. Refer to note 1.
11
1000 Min. Clear
Amenities
All existing floor waste location to remain unless noted. Refer to note 5.
DEMOLITION PLAN
09 A106
PT01
Female Toilets
425
DEMOLITION PLAN
01 A106
Scale: 1:50
01 570 COS
EQ1
750 Typ. EQ2
4510
02 A108
EQ2
570 COS
EQ2
800
590 COS
3390 COS
A542
590 COS
2035
3520 COS
PROPOSED PLAN
A108
04
CWT01
Ceiling Level +2400 AFFL
03 -
610 Typ. +0 FFL
CWT01
ELEVATION New Vanity
11
SD01
Scale: 1:50
TAP01 BSN01
R
950 Typ. 1200 Typ.
CWT01
LAM04 Typ.
eq
485
ELEVATION
12
New Urinals
-
Scale: 1:50
Ceiling Level +2400 AFFL
300
Vanity top +800 AFFL
-
SSM01 to new vanity. Provide framing as required to support vanity & basins.
25
CWT01
+0 FFL
990
PAR02
CWT01
Ceiling Level +2400 AFFL
CWT01
UR01
MIR01 800 Typ.
AP02
+1200 AFFL
Zone for position of toilet paper dispenser shown hatched.
MIR02 SD01 TAP01 BSN01 Typ.
Concealed cistern in wall.
210
UR01
300
PAR02
CWT01 HDRY01
920 Clear Ambulant
CWT01
MIR01 CWT01
+1200 AFFL
860
Ceiling Level +2400 AFFL
+2000 AFFL
MIR01
585 COS
EQ3
CWT01
CWT01
+2000 AFFL
WC01
TRH02
HDRY01
+0 FFL
615
13
ELEVATION
-
New Vanity
300 Max.
ELEVATION Parents Room Vanity Scale: 1:50
Scale: 1:50
Ceiling Level +2400 AFFL
CWT01
PT01
eq CWT01 CWT01
PAR01 new toilet partitions as scheduled.
TAP04
+1000 AFFL
850
920
TRH01
WC01
500 +0 FFL
WC03
+0 FFL
WC05
1000
+0 FFL
GR01
895
+0 FFL
750 Typ. EQ3
Male Toilets
Ceiling Level +2400 AFFL
Ceiling Level +2400 AFFL
585 COS
5970
Scale: 1:50
Ceiling Level +2400 AFFL
1405
2725
PROPOSED PLAN
10
Female Toilets Scale: 1:50
850
990 MIR02
EQ1
800 BSN01 900 SD01
EQ1
700 max.
835 Typ. EQ1
04
920 Clear Ambulant
Tiling/Paint extent as shown to extend to side walls.
SK01
+0 FFL
04 TYPICAL SECTION 05 -
Toilet Vanity
-
ELEVATION
14
Scale: 1:20
Female Toilets
-
Scale: 1:50
ELEVATION
15
Adult and Junior WCs
-
Scale: 1:50
PT01
ELEVATION Cleaners Room Scale: 1:50
Substrate
PT01
CWT02
Wall stud Ceiling Level +2400 AFFL
CWT01
CWT01
990
Zone for position of toilet paper dispenser shown hatched GR02
+0 FFL
-
ELEVATION Accessible Unisex WC Scale: 1:50
TRH01
+0 FFL
AL02 AL03 to protect corners typically
CWT01
PT01
MIR02
Substrate
AL03
Wall stud
CWT01
Wall stud
PT01
CWT02
AL02
TAP02 BSN02
SD01
Substrate
AL03 to protect corners typically
CWT01
Substrate
AL03 to protect corners typically CWT01
+0 FFL 800
06
HDRY01
WC02
800 GR02 700 max.
800 975
GR02 WC02
Ceiling Level +2400 AFFL
800 100 900 SD01
Ceiling Level +2400 AFFL
460 140
Design Development and Documentation
- Handbasin -Tap -Soap Dispenser -Hand Dryer -Existing WC -Partitions -Existing Urinal Trough -Baby Change Tables -Vanity Joinery
EX-FW
07 -
300 Max.
ELEVATION Accessible Unisex WC Scale: 1:50
16 08 -
ELEVATION
-
DETAIL PLAN Corner Wall Detail Scale: 1:5
17 -
DETAIL PLAN Corner Wall Detail Scale: 1:5
18 -
DETAIL PLAN Corner Wall Detail Scale: 1:5
19 A432
DETAIL PLAN Corner Wall Detail Scale: 1:5
A
30/4/18
Issued for Con
ISSUE
DATE
REVISION
0mm
Accessible Unisex WC
DO NOT SCALE FROM DRAWING. USE FIG CHECK ALL DIMENSIONS ON SITE BEFOR
Scale: 1:50
AR C HIT EC T U RE IN T E RI O RS M AST ERP LA NNIN G
PROJECT
CLIENT
DWG
pmdl.com.au
PMDL ARCHITECTURE + DESIGN HK (LIMITED) PMDL ARCHITECTURE + DESIGN PTY LTD ABN 56 062 961 317 NSW NOMINATED ARCHITECTS: ANDREW PENDER 5317 DAVID MORRIS 5865 PETER DODDRELL 5134
Hoyts EQ
Hoyts Corporatio Details - L2 - Ex.
CLIENT REF & CONTACT
DATE
SCAL As S
35715 23220 1875
3600 150
EXISTING COLUMN
1950 1000
800
2290
1200
1600
1000 1200
4100
800
6360
1530
7870
NBN
DRY STORAGE SHELVES 4100 X 500
BENCH
2290 X 800
E1
2000
E3
E5
E6
E4
EXISTING ROLLER DOOR
NBN
DRY STORAGE
OFFICE / STORAGE
1000
PROPOSED TBC & NBN RELOCATION
EXISTING COLUMN
1140
100
3480
800
150 550 500
OPEN REFRIGERATED DISPLAY 11070 X 870
2200
The Butcher Club Watergardens Shopping Centre
1000
3680
1795
11170
1645
12495 1465 100
700
1610 REFRIGERATED GRAB AND GO 3854 X 870
REFRIGERATED GRAB AND GO 3854 X 870
REFRIGERATED GRAB AND GO 3854 X 870
LEASE LINE
100 580
100
6320 7505
980
4685 X 800
REFRIGERATED FRIDGE 3802 X 1125
100
100
7605
1400
1400
11470
800
3455
150
3000
155
5800
150
2610
15560
100
SCALE 1: 100 REV. DATE -
ISSUE & AMENDMENTS
18.12.19 ISSUED PRELIMINARY SET TO LANDLORD
INI.
THE BUTCHER CLUB
SJ
PRELIMINARY ISSUE
TENANCY 182 WATERGARDENS SHOPPING CENTRE
71 BALMAIN STREET, RICHMOND, VIC 3121 PHONE: 03 9510 8855 COPYRIGHT 2019
BLACK POWDERCOATED ALUMINIUM SIGNAGE WITH CUT OUT LETTER WHITE OPAL ACRYLIC FINISH. INTERNALLY ILLUMINATED
LEASE LINE
PROPOSED SYMBOL IN M1 TO BE FIXED TO TM1 FINISH
ϱ͘ /ƚ ŝƐ ƚŚĞ ĐŽŶƚƌĂĐƚŽƌΖƐ ƌĞƐƉŽŶƐŝďŝůŝƚLJ ƚŽ ŽďƚĂŝŶ ĂƉƉƌŽǀĂůƐ ĨƌŽŵ ĂƉƉƌŽƉƌŝĂƚĞ ĂƵƚŚŽƌŝƚŝĞƐ ŝŶĐůƵĚŝŶŐ ůŽĐĂů ĐŽƵŶĐŝů ĂŶĚ ǁĂƚĞƌ ďŽĂƌĚ ĨŽƌ Ăůů ĂƌĐŚŝƚĞĐƚƵƌĂů ĂŶĚ ƐƚƌƵĐƚƵƌĂů ĚŽĐƵŵĞŶƚĂƚŝŽŶ͘ ϲ͘ DĞĂƐƵƌĞŵĞŶƚƐ ĨŽƌ ƚŚĞ ĨĂďƌŝĐĂƚŝŽŶ ŽĨ ƐĞĐŽŶĚĂƌLJ ĐŽŵƉŽŶĞŶƚƐ ƐƵĐŚ ĂƐ ǁŝŶĚŽǁƐ͕ ĚŽŽƌƐ͕ ŝŶƚĞƌŶĂů ĨƌĂŵĞƐ͕ ƐƚƌƵĐƚƵƌĂů ƐƚĞĞů ĐŽŵƉŽŶĞŶƚƐ ĂŶĚ ƚŚĞ ůŝŬĞ͕ ĂƌĞ ŶŽƚ ƚŽ ďĞ ƚĂŬĞŶ ĨƌŽŵ ƚŚĞƐĞ ĚŽĐƵŵĞŶƚƐ͘ DĞĂƐƵƌĞŵĞŶƚƐ ŵƵƐƚ ďĞ ƚĂŬĞŶ ŽŶ ƐŝƚĞ ƚŽ ƐƵŝƚ ƚŚĞ ǁŽƌŬ ĂƐ ĐŽŶƐƚƌƵĐƚĞĚ͘ ϳ͘ ůů ƐƚƌƵĐƚƵƌĂů ĐŽŵƉŽŶĞŶƚƐ ƐŚĂůů ďĞ ŝŶ ƐƚƌŝĐƚ ĂĐĐŽƌĚĂŶĐĞ ƚŽ ĚĞƚĂŝůƐ ĂŶĚ ƐƉĞĐŝĨŝĐĂƚŝŽŶƐ ĂƐ ƉƌĞƉĂƌĞĚ ďLJ Ă ƐƚƌƵĐƚƵƌĂů ĞŶŐŝŶĞĞƌ͕ ĂŶĚ ƚŚŽƐĞ ĚĞƚĂŝůƐ ĨŽƌŵ ƉĂƌƚ ŽĨ ƚŚĞ ƚŽƚĂů ƐƉĞĐŝĨŝĐĂƚŝŽŶ͘ ϴ͘ ůů ĂƌĐŚŝƚĞĐƚƵƌĂů ĚŽĐƵŵĞŶƚĂƚŝŽŶ ĂƌĞ ƚŽ ďĞ ƌĞĂĚ ŝŶ ĐŽŶũƵŶĐƚŝŽŶ ǁŝƚŚ ƚŚĞ ƐƚƌƵĐƚƵƌĂů ŶŐŝŶĞĞƌΖƐ ĚĞƚĂŝůƐ͕ ƐƉĞĐŝĨŝĐĂƚŝŽŶ ĂŶĚ Ăůů ŽƚŚĞƌ ƌĞůĂƚĞĚ ĚŽĐƵŵĞŶƚƐ͘
DRAWING TITLE
PROPOSED FLOOR PLAN DRAWN BY
DRAWING SCALE
PROJECT N°
SJ
AS SHOWN @A3
4493
M1 FRAME WITH GL1 INFILL REFER TO DETAIL
WD-100
DS09 307 M1
500
M1
GL1
M1
GL1
M1
M1
GL1
DWG N°
REVISION
-
PROPOSED SYMBOL IN M1 TO BE FIXED TO TM1 FINISH LEASE LINE
ϭ͘ Ž ŶŽƚ ƐĐĂůĞ ĚƌĂǁŝŶŐƐ͕ ĨŝŐƵƌĞĚ ĚŝŵĞŶƐŝŽŶƐ ĂƌĞ ƚŽ ďĞ ĨŽůůŽǁĞĚ͘ ůů ĚƌĂǁŝŶŐƐ ĂƌĞ ŝŶ ŵŝůůŝŵĞƚĞƌƐ͘ Ϯ͘ ŽƉLJƌŝŐŚƚ ŽĨ ƚŚĞƐĞ ĚƌĂǁŝŶŐƐ ĂŶĚ ƌĞůĂƚĞĚ ĚŽĐƵŵĞŶƚƐ ƌĞƐĞƌǀĞĚ ďLJ ƚŚĞ ĚĞƐŝŐŶĞƌ͘ ϯ͘ ůů ĚŝŵĞŶƐŝŽŶƐ ĂƌĞ ƚŽ ďĞ ĐŽŶĨŝƌŵĞĚ ŽŶ ƐŝƚĞ ďLJ ƋƵĂůŝĨŝĞĚ ƉĞƌƐŽŶƐ͕ ĂŶLJ ŝŶĐŽŶŐƌƵĞŶĐŝĞƐ ŵƵƐƚ ďĞ ƌĞƉŽƌƚĞĚ ƚŽ ƚŚĞ ĂƉƉƌŽƉƌŝĂƚĞ ĂƵƚŚŽƌŝƚLJ͘ ϰ͘ /Ŷ ƚŚĞ ĞǀĞŶƚ ŽĨ ĞŶĐŽƵŶƚĞƌŝŶŐ ĂŶLJ ĚŝƐĐƌĞƉĂŶĐŝĞƐ ŽŶ ƚŚĞƐĞ ĚƌĂǁŝŶŐƐ͕ ƐƉĞĐŝĨŝĐĂƚŝŽŶƐ Žƌ ĨƵƌƚŚĞƌ ŝŶƐƚƌƵĐƚŝŽŶƐ ŝƐƐƵĞĚ͕ ƚŚĞ ďƵŝůĚĞƌͬƐƵďĐŽŶƚƌĂĐƚŽƌ ƐŚĂůů ĐŽŶƚĂĐƚ ƚŚĞ ĚĞƐŝŐŶĞƌ Žƌ ĂƉƉƌŽƉƌŝĂƚĞ ĂƵƚŚŽƌŝƚLJ ďĞĨŽƌĞ ƉƌŽĐĞĞĚŝŶŐ ǁŝƚŚ ĂŶLJ ǁŽƌŬ͘ ϱ͘ /ƚ ŝƐ ƚŚĞ ĐŽŶƚƌĂĐƚŽƌΖƐ ƌĞƐƉŽŶƐŝďŝůŝƚLJ ƚŽ ŽďƚĂŝŶ ĂƉƉƌŽǀĂůƐ ĨƌŽŵ ĂƉƉƌŽƉƌŝĂƚĞ ĂƵƚŚŽƌŝƚŝĞƐ ŝŶĐůƵĚŝŶŐ ůŽĐĂů ĐŽƵŶĐŝů ĂŶĚ ǁĂƚĞƌ ďŽĂƌĚ ĨŽƌ Ăůů ĂƌĐŚŝƚĞĐƚƵƌĂů ĂŶĚ ƐƚƌƵĐƚƵƌĂů ĚŽĐƵŵĞŶƚĂƚŝŽŶ͘
M1
GL1
M1
GL1
GL1
TL3
TL3
2300
2700 AFFL
400
1255 X 1050
PROPOSED FLOOR PLAN
01 STANDARD NOTES:
4000 AFFL
3640
BENCH
REFRIGERATED FRIDGE 3802 X 1125
1180
3785
6980
TRAY RACK
1200
BENCH
3785 X 800
BENCH
3785 X 800
BENCH
1500
1900
1950 500 550
DRY STORAGE SHELVES
REFRIGERATED FRIDGE 3802 X 1125
CW/SW/TW LOCATION
BENCH
REFRIGERATED GRAB AND GO 3854 X 870
M2 MESH ABOVE
REFRIGERATED FRIDGE 2456 X 1125
1400
MERCHANDISING 1600 X 870
PROPOSED COLUMNS
DISPLAY SHELVES
MERCHANDISING DISPLAY
1740
Design Development and Documentation
150
2 TIERS DISPLAY
4000
2 TIERS DISPLAY
1300
FREEZER 8.74m² -20C°
4685
2 TIERS DISPLAY
CLOSURE SYSTEM ABOVE
SERVERY DISPLAY 12515 x 1400
1620
2 TIERS DISPLAY
MERCHANDISING 1600 X 870
2 TIERS DISPLAY
1550
4335
13815
BULKHEAD / SIGNAGE
M2 MESH ABOVE
Interior Fitout
3785 X 800
BENCH
3785 X 800
REFRIGERATED GRAB AND GO 3854 X 870
1200
REFRIGERATED GRAB AND GO 3854 X 870
85
SHELVES
AGED REFRIGERATED DISPLAY 4000 X 800
REFRIGERATED GRAB AND GO 3854 X 870
1550
REFRIGERATED GRAB AND GO 3854 X 870
MERCHANDISING 1600 X 870
1640 POS
800 DISPLAY SHELVES
1740
Victoria
MERCHANDISING DISPLAY
1950
1900
HANGING RAIL
COOL ROOM 43.16m² -2° to 0°
TL2
TL2
100
TM1
1900
1200 AFFL
TM1
TL3
TL3
TL2
TL2
FFL
200
900 AFFL
INTERTENANCY WALL AND RETURN BY LANDLORD
A 105
ELEVATION A SCALE 1: 50
TL3
TL3
CONTINUOUS 200mm SKIRTING IN M2 FINISH.
CUSTOM POS JOINERY UNIT TO BE FINISHED IN M1 & M3 FRAME & TM1 TO FACE. ST1 TO COUNTER TOP. HINGED DOOR IN L1 FINISH. ALL INTERNAL CARCASS IN BLACK MELAMINE FINISH. REFER TO DETAIL
01 301
100x100mm RHS FULL HEIGHT COLUMN. ENSURE BASE PLATE CONCEALED BENEATH LEVEL FLOOR FINISH. ALL POS AND REFRIGERATED SERVICES TO BE RUN WITHIN COLUMN
01 300
CUSTOM POS JOINERY UNIT TO BE FINISHED IN M1 & M3 FRAME & TM1 TO FACE. ST1 TO COUNTER TOP. HINGED DOOR IN L1 FINISH. ALL INTERNAL CARCASS IN BLACK MELAMINE FINISH. REFER TO DETAIL
100x100mm RHS FULL HEIGHT COLUMN. ENSURE BASE PLATE CONCEALED BENEATH LEVEL FLOOR FINISH. ALL POS AND REFRIGERATED SERVICES TO BE RUN WITHIN COLUMN
CONTINUOUS 200mm SKIRTING IN M2 FINISH.
2a
2b
2c
2d
MOOSHG Design Thesis Located on the moon with no restriction of laws, lies an architecture based on rhythm and music. The idea is to study one’s mind experiencing through music, exploring their darkest secrets and a journey which challenges one’s morality in search of their wildest pleasures.
1. MOOSHG 2. Physical study models are based on a study of rhythm and intensity of Daft Punk’s music. 2a. Iteration 1 2b. Iteration 2 2c. Iteration 3 2d. Iteration 4
A
FIX! Unconcious Collective
Dark Park
Signolot
B
Exotika B
A
Radiant Electron
Kitchen
Krumbles
Purge Hot House
3. Axonometric diagram of individual spaces and primary, secondary and sub-secondary circulation. 4. Sectional drawing
Triune House Single Dwelling A condensed house designed with interchangable spaces an with intention of hightening intimacy through atmospheric elements such as light, shadow and sound.
James Cook Library Sustainability is the main design approach for the James Cook Library. It optimizes natural ventilation whilst promoting night flushing by orientating it perpendicularly to the crosswind. This is to counter the harsh dry climate in Queensland and minimise the usage of artificial cooling.
Skydge Skyscraper Design A structural construction concept with a notion of pushing the boundaries of typical skyscraper construction methods and celebrating it by exposing the exo-skeleton of the tower - external spine with braced frame and outrigger system. In addition, it has an active hexagonal modules facade system which changes in size individually allowing controlled daylight for the users.
1. Phase One Housing Development Medan, Indonesia Engaged by the design team of AJM Planning and Urban Design Group based in Kuala Lumpur Malaysia to plan and provide visualization works for a phase one of a housing development in Medan, Indonesia.
2. Pop- Up Market Kuala Lumpur, Malaysia Pitching in a deisgn proposal to GDP Architects junior design team on turning an old carpark into a pop-up market at Jalan Ampang, Kuala Lumpur, Malaysia.