subma rine cable
ALMANAC
I S S U E
21
subma rine cable
ALMANAC Issue 21 | February 2017 Copyright © 2017 by Submarine Telecoms Forum, Inc. While all reasonable steps to verify information from the public domain have been taken, based on changing circumstances and dynamic factors, incomplete information subject to change may exist. Our goal is to periodically update and modify such information. If you have a correction, please let us know by emailing almanac@subtelforum.com. All rights reserved. No part of this book may be used or reproduced by any means, graphic, eletronic, or mechanical, including photocopying, recording, taping or by any information storage retrieval system without the written permission of the publisher except in the case of brief quotations embodied in critical articles and reviews. Submarine Telecoms Forum, Inc. 21495 Ridgetop Circle Suite 201 Sterling, Virginia 20166 USA www.subtelforum.com
W
FOREWORD
elcome to the twenty-first edition of the Submarine Cable Almanac, one of our most popular reference tools. There have been 26 systems updated, and 3 systems added since the last issue. If you’re interested in finding a specific system, or wish to see all systems in a region, simply type that name or region into the search function. We hope that you, our readers, will participate in this almanac as you’ve done with our previous products. There is always room for additional data, so let us know if there is something else we should include in future editions. Please let us know by completing our Submarine Almanac Update Form, available by clicking here, or by emailing almanac@subtelforum. com. Finally, I want to thank all of the sponsors, staff and dedicated readers that contributed to this Almanac. Your feedback has been invaluable.
Kristian Nielsen +1 703.444.0845 Vice President www.subtelforum.com
AAE-1..............................................................................8 AAG................................................................................10 AC-1..............................................................................12 AC-2..............................................................................14 ACE - PHASE 1..............................................................16 ACE - PHASE 2..............................................................17 ADONES.........................................................................18 ADRIA-1........................................................................19 AEC................................................................................20 AJC................................................................................22 AKORN...........................................................................23 ALASIA...........................................................................24 ALASKA UNITED EAST...................................................25 ALASKA UNITED WEST..................................................26 ALBA-1..........................................................................27 ALETAR..........................................................................28 ALEXANDROS.................................................................29 ALONSO DE OJEDA........................................................30 ALPAL-2........................................................................31 AMERICAN SAMOA-FIJI................................................32 AMERICAS I...................................................................33 AMERICAS I SOUTH.......................................................34 AMERICAS II..................................................................35 AMERIGO VESPUCCI......................................................36 AMX-1...........................................................................37 ANTEL............................................................................38 ANTILLES CROSSING.....................................................39 APCN 2...........................................................................40 APG................................................................................42 APHRODITE 2.................................................................44 APNG-2.........................................................................45 APOLLO..........................................................................46 APX-CENTRAL...............................................................49 APX-EAST......................................................................50 APX-WEST.....................................................................52 ARCOS-1.......................................................................53 ASC................................................................................54 ASE................................................................................56 ASH................................................................................58 ATHENA..........................................................................59 ATISA.............................................................................60 ATLANTIS-2...................................................................61 ATLAS OFFSHORE..........................................................62 AUSTRAL........................................................................63 AWE...............................................................................64 BAHAMAS-2..................................................................66 BALTICA.........................................................................67 BAR-SAV.......................................................................68 BASS STRAIT 2..............................................................69
BBG................................................................................70 BCS EAST.......................................................................72 BCS EAST-WEST INTERLINK.........................................73 BCS NORTH....................................................................74 BDM...............................................................................75 BEST CABLE SYSTEM....................................................76 BHARAT-LANKA.............................................................78 BICS...............................................................................79 BIN.................................................................................80 BIOS / JONAH................................................................81 BLAST............................................................................82 BORACAY-PALAWAN......................................................83 BOTNIA...........................................................................86 BRCS..............................................................................87 BRUSA...........................................................................88 BSCS..............................................................................89 BSFOCS.........................................................................90 CADMOS........................................................................91 CAMEROON-BRAZIL......................................................92 CANALINK......................................................................93 CANTAT-3.......................................................................94 CAUCASUS CABLE SYSTEM...........................................96 CB-1..............................................................................97 C-BUS...........................................................................98 CEIBA-2.........................................................................99 CELTIXCONNECT...........................................................100 CFX-1..........................................................................101 CIOS.............................................................................102 CJFS............................................................................103 C-LION1......................................................................104 COLUMBUS II...............................................................106 COLUMBUS III..............................................................108 CONCERTO-1...............................................................110 CORFU-BAR.................................................................111 DANICA NORTH............................................................112 DANICA SOUTH............................................................113 DANICE........................................................................114 DARE............................................................................115 DDSCN.........................................................................118 DENMARK-NORWAY 5.................................................119 DENMARK-NORWAY 6.................................................120 DENMARK-POLAND 2..................................................121 DIDON..........................................................................122 DMCS...........................................................................123 EAC-C2C......................................................................124 EASSY..........................................................................125 EAST-WEST.................................................................126 ECFS............................................................................127 ECLINK.........................................................................128
EIG...............................................................................130 ELLALINK.....................................................................132 ENDEAVOUR.................................................................133 ESTEPONA-TETOUAN...................................................134 EUROPA.......................................................................135 FA-1 NORTH/SOUTH.....................................................136 FALCON........................................................................138 FAR EAST.....................................................................140 FARICE-1.....................................................................141 FARLAND.....................................................................142 FASTER........................................................................144 FEHMARN BELT............................................................146 FIBRALINK...................................................................147 FLAG EUROPE-ASIA....................................................148 FLORES-CORVO..........................................................150 FOG..............................................................................151 GBICS..........................................................................154 GCN..............................................................................156 GEMINI BERMUDA.......................................................157 GEORGIA-RUSSIA........................................................158 GLO-1..........................................................................159 GLOBENET...................................................................160 GO-1............................................................................161 GOKI.............................................................................162 GONDWANA-1.............................................................163 GREENLAND CONNECT................................................164 GREENLAND CONNECT NORTH.....................................165 GUANTÁNAMO BAY CABLE...........................................168 GUANTÁNAMO BAY 2....................................................169 GWEN...........................................................................170 HANNIBAL....................................................................171 HANTRU-1...................................................................172 HAWAIKI.......................................................................174 HAWK CABLE SYSTEM.................................................176 HIBERNIA ATLANTIC.....................................................178 HIBERNIA EXPRESS.....................................................180 HONOTUA.....................................................................182 HSCS............................................................................183 HUGO...........................................................................184 I2I................................................................................185 ICN1.............................................................................186 ICN2.............................................................................187 IFC-1...........................................................................188 I-ME-WE.....................................................................190 ITALY-ALBANIA............................................................192 ITALY-GREECE..............................................................193 ITALY-LIBYA.................................................................194 ITALY-MONACO............................................................195 JAKA2DELEMA.............................................................196
JAKABARE...................................................................197 JAPAN-US...................................................................198 JASUKA........................................................................200 KAFOS..........................................................................201 KELTRA-2....................................................................202 KHULNA-CHENNAI......................................................203 KJCN............................................................................204 KODIAK KENAI.............................................................205 KUWAIT-IRAN..............................................................206 LEV..............................................................................207 LION.............................................................................208 LION-2.........................................................................209 LIQUID SEA..................................................................210 MAC.............................................................................211 MAIN ONE....................................................................212 MAREA.........................................................................214 MATRIX........................................................................216 MAYA-1........................................................................217 MBDC...........................................................................218 MCT..............................................................................219 MED CABLE NETWORK................................................220 MEDNAUTILUS.............................................................221 MELITA-1.....................................................................222 MENA...........................................................................224 MIC-1..........................................................................226 MICRONESIA CABLE SYSTEM......................................227 MINERVA......................................................................228 MKCS...........................................................................229 MOANA.........................................................................230 MONET.........................................................................231 MYTHIC........................................................................232 NCP..............................................................................234 NCSCS.........................................................................236 NEPTUNE CANADA.......................................................237 NORSEA COM-1...........................................................238 NORTHSTAR.................................................................239 ORVAL..........................................................................240 PAC..............................................................................241 PALAU-GUAM..............................................................242 PAN-AM.......................................................................243 PANGEA.......................................................................244 PANIOLO......................................................................245 PC-1............................................................................246 PCCS............................................................................248 PEC..............................................................................249 PLCN............................................................................250 PPC-1..........................................................................252 QATAR-UAE..................................................................253 QUINTILLION SUBSEA..................................................254
RJCN............................................................................255 RNAL............................................................................256 SAC..............................................................................257 SACS............................................................................258 SAEX............................................................................260 SAFE............................................................................262 SAM-1.........................................................................264 SAPL............................................................................266 SAPL CX.......................................................................268 SAS-1..........................................................................269 SAT-3...........................................................................270 SCAN............................................................................271 SCF-CN.......................................................................272 SCOTLAND-ORKNEY-SHETLAND.................................273 SEABRAS-1.................................................................274 SEACOM.......................................................................275 SEAK............................................................................276 SEA-ME-WE 3.............................................................278 SEA-ME-WE 4.............................................................280 SEA-ME-WE 5.............................................................282 SEA-US........................................................................284 SEAX-1........................................................................286 SG-SCS.......................................................................287 SHEFA 2.......................................................................288 SILPHIUM....................................................................289 SJC..............................................................................290 SKR1M.........................................................................291 SMPCS.........................................................................292 SMPR-1.......................................................................293 SOCC............................................................................294 SOLAS..........................................................................295 SOUTHERN CROSS CABLE NETWORK..........................296 SVALBARD...................................................................298 TANGERINE..................................................................299 TANNAT........................................................................300 TASMAN GLOBAL ACCESS...........................................301 TAT 14..........................................................................302 TE NORTH.....................................................................304 TEAMS.........................................................................305 TGN EURASIA...............................................................306 TGN GULF....................................................................308 TGN INTRA-ASIA..........................................................309 TGN NORTHERN EUROPE.............................................310 TGN TRANSATLANTIC...................................................312 TGN TRANSPACIFIC.....................................................314 TGN WESTERN EUROPE...............................................316 TGN-TATA INDIACOM...................................................317 TGN-TIC.......................................................................318 TIERRA DEL FUEGO......................................................319
TIS...............................................................................320 TONGA-FIJI..................................................................321 TPE...............................................................................322 TRIDENT.......................................................................324 TSE-1..........................................................................325 TUBROK-EMASED........................................................326 TUI-SAMOA.................................................................327 TWA-1.........................................................................328 UGARIT.........................................................................329 UNISUR........................................................................330 UNITY...........................................................................332 VENTSPILS-GOTLAND.................................................334 VMSCS.........................................................................335 WACS...........................................................................336 WARF...........................................................................337 WESTERN VISAYAS-PALAWAN....................................338
ADVERTISER INDEX
STF ANALYTICS..............................................................48 OFS................................................................................84 STF EDITORIAL SCHEDULE..........................................105 TE SUBCOM.................................................................116 SUBOPTIC 2019...........................................................152 HUAWEI MARINE..........................................................166 WFN STRATEGIES........................................................233
SUBMARINE CABLE Greenland
Quintillio
n Sub
sea
Bar r ow Wain wr igh t
Prudhoe Bay
Point Hope
No m e
Seydisfjordur
Iceland
Nuuk
Fa
ric
e -1
Landeyjarsandur Danice
e
Anchorag
Valde z
Gre en
Q aq or toq
SH
nect
ON
A -2
Ayre of Ca ra
n Sub
sea
Dunnet Bay G re en la nd C on nect
Angoon
Sitka
EF
Maywick
Quintillio
Ju ne au
Hawk Inlet
Kodiak Na rr ow Ca pe
C on
UF
Canada
k dia ai Ko en K
la nd
EA
Whittier Kenai d Sew ar Homer
Pete r sbur g
AK
SE
Wr an gell Ketchikan
Banff
Hibe
- Atla
r nia
ntic
Co le r aine Redcar Humanby
Killa la
Ireland
Southport
Du blin
Ala sk Ala a U n sk a U ited ni W e No ted E st rt AK hSt ast OR ar N
Cork
en
ead
O xwich Ba y
orm
ards
Midg
Ha rb or Point e
NE
NEPTU
Highbridge White san d B ay Wide m o uth Ba y no Por th cur
-1
AC
T-14 TA
Por t Alber n i
- Atla
r nia Hibe
Milton
Nedonna Beach
Florence
Lannion
AEC
ntic nia- Atla FA- 1 tlan tic T r ansa tlan tic TG N T r ansa TG N AC-2 Apollo TAT-14 ess Expr Hibernia AC-1 Apollo FA- 1
acific
Transp
Japan-US
United States
Point Arena
NCP
Lynn
NU
CA
GL
O-1
MAREA
S-1
Tucke rto n
S-C
RE
O
FL
Flores
O RV
O
Co rvo
Ma nasq ua n
G ra ciosa Pon ta De lg ad a
Faial
ss ro C
aiki
e rn
Haw
Sou
th
G
San Lu is G ro ver O bispo Bea ch
Morro Bay
G
He rm osa Bea ch
China-US
O ilah
ss
Jacksonville
Ver o Bea ch
SAPL
am
oC
le
Mauritania
ana
Montego O cho Bay Rios
X
S-1
NA
M
Praia
na
as
Carac
la
Ca
mu
ri
eto
wn
Am
Pue rt o id ad Vie jo Trin
eri
ca
s II
Guinea t
ur vo
lalink
ea
Eu
PCCS
End
s Cros
SAC
H
ana
AS
Mo
So uthe
rn
Haw
So
aiki
uthe
rn
Cros
s
Ea st
One
S- 2
AP X-
3
1
AN TI
Cam
eroo
PA NA M
n-Br
Bolivia
Papeete Moorea
Arica
Rio de Janeiro
Paraguay
Sao Paulo
Chile
Ma ld on ado
Argentina
AN
Las Tonin as
Puerto Montt
Santa Cruz Punta Arenas
Tier r a del F u ego
TE
L
2 STI
AT N N
TA
UR IS
M
C
UN
Uruguay
Valpa ra iso
-1
Florianopolis
SA
Huahine
SA
Uturoa
Monet
Eulalink
AMX
-1
M
SA
Seabras-1
Salvad or
N
Vaitap e
Globenet SAC
Lima Lurin
Samoa Pag o Pag o
LA
iji
AT
-F
BRUSA
CS
Austral
am
oa
az
SA
SAC
nS
CS
AT L
Fo rt aleza
Brazil
Côte d'Ivoire Abidja n
r
Puerto Máncora
SAM-1
ic a
Monrovia
ado
Ecu
SAPL
er
Am
GLO-
Ca yen ne
Honotua
-F
Freetown
Salinas
Sam oa
m oa
WA
CS
Colom bia
Manta
Ghana T
Conakry
-S
Peru
Sa
Burkina Faso
Sucujaque
ne
Georgetown
iji
Senegal
be
Main
SG
Venezuela
Glo
SAT-
Ustu po
ge
stad
ha
Gorda
rta
Tolu
q uil
Americas II
Willem
h ac
r r an
Punta
Ca
ACE
att ry Pr ty Batte ma Ci Pana
Dakar
Banjul
A X AM et -1 on as t br ne Sea be Glo M-1 s I SA erica C Am SA
-1
N
dg
Rio
Ba
SAM
C
Bri
PL
SA
PCCS
Puerto Limon
G
1
Bluef ie lds SAPL
Mali
I
PA
M
A-
t
-1
US
AY
ne
Alba
BR
M
Pue rt o Ca be zas
ARCO
be
AM
Nouakchott
EC FS
Americas
M
Glo
Pue rt o Lem pir a
CF X- 1
Tro jillo
mo2 AMX
San Ju an East- We st
SA
S-1 -1 SAM
AR CO
CJFS
AMX
C
Puerto Puerto Cortes Pue rt o Barrios San Jose
Alta Vist a
ab
1
Guant
Ha lf -M oo n Bay
Fib ra lin k
PA
Link
II
Lad yville
bu
Colum
na
Sardinia
s
S-1
ntan
X-
Cancun Tulum Samuel L Spencer Beach
S
AAG
Ca
El Me da no
s III
ca
SEA- U
II
eri
Gua
CF
Oahu
bus
Colum
Am
Mazatlan Ha van a
la
Keawau
AR CO
st
AP
AM Mon X Sea et bras -1
s II bu S BIC Colum MAC
Freeport Boca Raton Hollywood Miami
Mexico
M-1
SA
Globenet
ITY
UN
sI
erica
Am
BP-GOM
-1
Ing le side
CS
US
C ro
PC
SEA-
X- Ea
e rn
u th
So
Gemini Bermuda
Pascagoula S
Morocco
l
ha
nc
Fu
PC -1 PLCN
Teut an
Ca sab la nca St. David's
n-U Japa AAG
Valencia
As
t
ne
be
Glo
Tijua na
em in iB lo be erm ne ud t a
B
Spain
Cadiz
-1
Vir g in ia Be ach
Faster
CB
MAC
China-US
Bord
Bilbao
Vig o
bo
C h Bro arle okh sto ave wn n No rt hpo r t Island Park
St. Hilaire
TG n t er e Wes r op Eu
Lis
TGN
Bandon
c
p acifi
T r ans
Ha lifa x
Plerin
Penmarch
N
Po rtn ug al
TPE
TG N
Pen na nt Point
Peve
Guernsey
ntic
Hibe r
War r ent on
PC -1
United Lo Kingdom
Holyh
Kilm or e Q ua y
il
Accr
ES OF THE WORLD Hotellneset
Svalbard
Andoy Harstad
Sw eden
Umea Vaasa
Finland
Sandviken
an
Ta
t-3
Kristiansand
PA NG
Denm -Ru ark ssia
Denm
Co pe nha
ge n
Sven toji
Lithuania
a
se
n
illio
Sub
nt
Qui
Mieln o Ribn itz- Da m g ar ten Kolobrzeg
G ed ser
Magadan
Latvia
Liepaja
Dueodde
West er la nd TG N NE
ion1
ark
Thisted
EA
Logi Kingisepp
Tallin
Estonia Vent spils
C-L
No rS Co m ea -1
G oth en bu rg
Russian Federation
Kotka
Ha ng o
EE- S1
Stockh olm Stavsn as
Ard en da l
Helsingfors
Vadd o
Ma rieh am n Tysvae r
C
Fa r East
Norway
BC S EastWe Inte rlink st
Belarus
Norden De Marne
Okha
Mys Leva sho va
Far East
owestoft
Poland
Germany Czech Republic Austria Slovenia
BSFOCS
ille
rse
Dubrovnik Ajaccio
W5
Lechaina Kor op i
EMOS-1 MIN ER
C ab le Syst
Poti
em
Georgia
Turkey
N
Turkm enistan
North Korea
Tajikistan
n eo Inch n ea Ta
Tar tus
Syria Iraq
Tel A viv
Shanghai C
C-J FOS
Nepal
India
E-1
Co x's Baza ar
E DAR
TP E RN AL G
E-1
-4
AA
W SM
2C C-C
F WAR
OM
EA SS AA y E1 AM S
SE
TE
AC
Penang
Ya p
Medan
g
Malay sia
Kato ng
Ma nad o
Tand joe ng San ga tta
pore
Singa
Pon tian ak
Ja
Ka
2L
Indonesia
aD
U
Micrones
iaCS
S
Re ag an Test S it e
Ebe ye RU
-1
Ma ju ro
Micronesia
Marshall Islands
SA FE
Ma lu ku
eM
a
PPC-1
Toweli
Keta pa ng
Pap ua
Sulawe si
Pangkalanbun Ban djer
SMP C S
m asin
JaKa2L
aDeMa SUB
Madang
Papua New Guinea
Ja kar ta
Dar es Salaam
MA
Sur ab aja
TA
Jember
Mataram
Por to Am b oim
A-
SE
AJC
Kua nta n Mer sin
Lua nd a
RA
M-
KU
PA
Wain gap u
LI
ON
Noro
Point Mo re sby
NG
Auki
Kupang
-2
Angola
Lucir a
Mozam bique
Mayotte IC
N
Zambia
Namibe
Lifou
iki
Poindimie
wa
y
Mo uli Isla nd
Por t He dlan d
Jaco tet Baie du
Noum'ea AP
O nslow
AW
Suva
ICN1
M a ur it iu s-R o dr igue s
Ha
EASS
Port Vila
st
COM
Luganville
We
ASC
SEA
W-3
M
E
NG
A ustralia
Gon
dw
an
Walvis Bay
-2
Toliar y
N
APX-
Botswana
Swakopmund
a ad
LIO
en t
Namibia
r
ca
s ga
SM
Zimbabwe
2
Tr id
ACE
Tom asina
Ma put o
ur avo t as ss X-E ro AP rn C ki ai the aw H
de
En
Sou
South Africa
Mtunzini
SAFE
Durban
rn
aiki
the
Haw
Bro okva le Sydn ey Oxford Falls
Adelaide
C ro
ss
Perth
Me lkb osstr an d Ca pe Town
ana
Benguela
Mo
ADONES
Pa
Philippines
Da vao
JASUKA
Tanzania
m
Gua
lau-
NT
Mombasa
Nzeto
AAG
Piti
SCN
Dumai
Rwanda Burundi
Ca bind a Soyo
on
DD
Kenya
Pointe Noire
Tum
HA
ASC
Dem ocratic Republic of the Congo
n
r ac
Bo
G AP MCT
Congo
wa
ala
Palau
Mogadishu
Uganda
Gabon
P a y-
khla
Kribi Bata Libr eville
SEA- U S
ISA
AT
Capepisa Bata ng as
Song
Male
a
ntan
Sa
AAG
La Union
G AA
m
N
Co lo m bo
Douala
S
M- T
ne
ru
nd
PLC N
Ballesteros G
Cambodia
Sri Ra cha
S
SJC APCN2
Sihan ou kville Vun g Tau
iva
Tr
FAL CO
2
AA
-3
IC
G
BB
nO
SC
AAE-1
Mai NC
Cam eroon
SMW-3
Por t Ha rco ur t
SMW-4 FEA
Lag os
SMW-5
Lom e
1
AAE-
Cochin
Somalia
Ethiopia
South Sudan
Central A frican Republic
APG
APCN2
Petchaburi SMW -3
Ch en nai
Djibouti
Nigeria
TG N TISI TIC CS i2i
SMW
Da N an g
S
APCN
Ch in a- U 2C SJCC - C N-IA C 2 EA TG - C C EA E AS
Pyapon
Thailand
Aden
Cotonou
nn
MYTH
a
a Benin Togo
he
W-5
-C
na ul
Kh
ia Euras TGN W-5 SM
ON FALC
SM
Al G ha yda h
Yem en Al Hudaydah
Pali g en h uc
To
Shantou
Laos
5 SMW-
GB I MENA
W -3 TE AM S TG EIG N GU LF
AAE-1
SM
Eritrea
Sudan
ai
Ch in a- U
KI
Myanmar Mumbai
S
Okinawa
O
Port Sudan
Tong Fu k
Vietnam
Japan-U
PC-1
-3
G
Khu ln a
nO
ON
K wa
LC
ng
FA
Mu scat
eu
Bangladesh
h
Al See b
Oman
Jeddah
AA Ts
Karachi
TWA-1
jaira
UA E
Ch in a- U S
AP
Ch ab aha r
Fu
Dubai
Fuzhou
NCP TPE
Fa ster AJC
an
Halul
Saudi Arabia
W
sh
Al-Khobar Manama
SM
ng
Egypt
Bhutan
TGN Transpacific TGN Transpacific UNITY
AJC
Libya
Emi
5 TPC- C C2 EAC-RNAL G AP -2 A FE APCN
Ch on gm in g
Kharg Bushehr
Kuwait City
Bandar Abbas
Chad
Wad a
Shim a
Fukuoka
Miyazaki
Pakistan
Al Faw
Aqa ba
Za far a na
Niger
Japan
Ja pa n- U S
Kitakyushu
Fa
Ra s Sidr
Naoetsu Kitaiba r aki Ajigaura Ibaraki
Pusan Keoje
E
E
Suez
E
PC-1
South Korea
TP
China
Iran
Israel
Alexan dr ia
Algeria
TP
Afghanistan
Beir ut
Darnah Benghazi
azi
GOKI
K
Ha if a Ben gh
AS
HAW S
Tr ip oli-
EA
D RO
Trip oli
E
XAN
MIN ER VA
Tunisia
I-ME-W
ALE
Qingdao
EAC-C2C
Kélibia
Oran
ra
RJC
Ky rgy zstan Uzbekistan
A rm enia
Marmaris
VA
Ishikari
Na kho dka Ca uca sus
Istanbul
IT
Sou
Annaba
Soch i
1
le
Med Cab
El D je m ila
S
SMW-5
S LA AT
Greece
SM
ALPAL -2
l
Co rf u
OC
Var na
UR
O tr ant o
Pozallo Algiers
Bulgaria
Du rr es
Bari
MedNautilus
O rva
1
Bar
Ara nci
EIG
E-
BSF
a-
V
AA
Ses Co vete s
Nevelsk
Novorossiysk
ITUR
Ma
Mangalia
R SA
Mongolia
Romania
Savo na
BA
Barcelona
Kazakhstan
Odesa
PPC-1
Italy
deaux
Hungary
AJC
France
Ukraine
Slovakia
SOCN
irs C Sa a ye u xVa int su le r yrM en er -C au x
APX-East APX- C en tr al
SAFE
Me
Bass Strait 2
dsta
Stan ley
lb ou
rn
e
Sou the rn C ro ss Tasman Global Access
Whenuapai Aucklan d
ch nt rlo P oi Inve dy San
Bass Strait 1
Do m b ur g
Broa
HSCS
IJmuiden
ensey Bay
Boat Harbour Hobart
New Zealand
Ba
ri
Ma rse ille s
AAE-1
Chania lat Zafrana a T u b A
Doha Fujairah ka Jeddah Bar
LANDING POINTS: • • • • • • • • • • • • • • •
Marseilles (France) Bari (Italy) Chania (Greece) Abu Talat (Egypt) Zafarana (Egypt) Jeddah (Saudi Arabia) Djibouti (Djibouti) Aden (Yemen) Barka (Oman) Fujairah (UAE) Doha (Qatar) Karachi (Pakistan) India Ngwe Saung (Myanmar) Satun & Songkhla (Thailand)
Djibouti
Aden
ASIA AFRICA EUROPE [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms):
600,000,000 25,000
Design Capacity: 40 Tbps Fiber Pairs:
5
Channels: 80
Channel Capacity:
Owners:
System Supplier:
100 Gbps
British Telecom, China Unicom, Chuan Wei, Djibouti Telecom, Etisalat, HKT (PCCW Global), Mobily, Omantel, Ooredoo, PTCL, Telecom Egypt, Telecom Yemen, Viettel, OTEG, Reliance Jio, Time. com, TOT TE SubCom, NEC
System Installer: TE SubCom
Marine Surveyor:
Fugro
Region: Indian Ocean Pan-East Asian
Karachi
Hong Kong g n Sau e w Ng
Satun Songkhla
India
am
tn Vie
Singapore
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
AAG
Lantau Sri Racha Vung Tau Mersing Changi
LANDING POINTS: • • • • • • • • • •
Changi (Singapore) Keawaula (Hawaii) Lantau (Hong Kong) La Union (Philippines) Mersing (Malaysia) Grover Beach (USA) Sri Racha (Thailand) Tanguisson (Guam) Tungku (Brunei) Vung Tau (Vietnam)
La Union Tungku
Tanguisson
San Luis Obispo
Keawaula
ASIA-AMERICA GATEWAY RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs:
500,000,000 20,547
2.88 Tbps
3 Fiber Pairs
Channels: 96
Channel Capacity:
Owners:
System Supplier:
100 Gbps
AT&T Inc., Bayan, Bharti, BT Global Network Services, CAT Telecom, ETPI, FPT Telecom, the Government of Brunei Darussalam, PT Indosat, PLDT, Saigon Postel Corporation, StarHub, Telcotech, TELKOM Indonesia, Telstra, Telekom Malaysia, TNZL, Viettel, VNPT Alcatel Submarine Networks, NEC
System Installer: Alcatel Submarine Networks, ASEAN Cableship, NEC, Orange Marine Cableship:
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Rene Descartes
AT&T, PLDT, Starhub Ltd, Telstra International, TM Berhad Mitsubishi, Ciena 2011, 2014
40 Gbps, 100 Gbps
Region: Transpacific
AC-1
Brookhaven ATLANTIC CROSSING 1 RFS Year:
1999
Est. End of Service Date: 2024 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
875,000,000 13,377
40 Gbps
Design Capacity: 2 Tbps Fiber Pairs:
Owners: System Supplier:
4 Fiber Pairs
Level 3 Communications
Tyco Telecommunications SSI
System Installer: Tyco Telecommunications SSI
System Maintainer:
LANDING POINTS: • Beverwijk (Netherlands) • Brookhaven (USA) • Westerland (Germany) • Whitesands Bay (UK)
Upgrader: Upgrade Year: Upgraded Capacity:
Level 3 Communications Xtera Communications 2010
20 Gbps
Region: Transatlantic
Westerland Beverwijk Whitesands Bay
AC-2
Bellport
ATLANTIC CROSSING 2 RFS Year:
2000
Est. End of Service Date: 2025 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
700,000,000 6,185
320 Gbps
Design Capacity: 2.5 Tbps Owners:
System Maintainer: Upgrader: Upgrade Year:
LANDING POINTS: • Bellport (USA) • Widemouth (UK)
Upgraded Capacity:
Level 3 Communications Level 3 Communications Infinera 2010
10 Gbps
Region: Transatlantic
Widemouth Bay
ACE - PHASE 1
AFRICA COAST TO EUROPE - PHASE 1 RFS Year:
Penmarch
2012
Est. End of Service Date: 2037 Est. System Cost (US$): 500,000,000 Total Length (kms): 12,000 Design Capacity: 12.8 Tbps Channel Capacity: 100 Gbps Owners:
Lisbon Asilah
System Supplier: Alcatel-Lucent Submarine Networks (Main contractors), TE SubCom (Sub contractors) System Installer:
• • • • • • • • • • • • • • • •
Penmarch (France) Lisbon (Portugal) Tenerife (Spain) Nouakchott (Mauritania) Dakar (Senegal) Banjul (The Gambia) Conakry (Guinea) Freetown (Sierra Leone) Monrovia (Liberia) Abidjan (Ivory Coast) Accra (Ghana) Cotonou (Benin) Lagos (Nigeria) Kribi (Cameroon) Bata (Equatorial Guinea) Libreville (Gabon)
Orange Marine
Marine Surveyor: Fugro System Maintainer: Orange, PT Comunicações S.A., Sonatel, Gestor de Infraestructuras de Guinea Ecuatorial (GITGE) Region: EMEA
C La oto go no s u
D Ba ak N nj ar ou C ul ak Fr on ch e ot M eto akr t on wn y ro vi a Ac Abi cr dja a n
Tenerife
LANDING POINTS:
Benin Telecoms, Cable Consortium of Liberia, Canalink Africa SL, Côte d’Ivoire Telecom, Dolphin Telecom JLT, Gambia Submarine Cable, Guinéenne de Large Bande, International Mauritania Telecom, MEO, MTN, Orange (France), Orange Cameroun, Orange Mali, Orang
Kribi Bata Libreville
ACE - PHASE 2
AFRICA COAST TO EUROPE - PHASE 2 [PLANNED] RFS Year:
2017
Est. End of Service Date: 2037 Est. System Cost (US$): 200,000,000 Total Length (kms): 5,000 Design Capacity: 12.8 Tbps Channel Capacity: 100 Gbps Owners:
Benin Telecoms, Cable Consortium of Liberia, Canalink Africa SL, Côte d’Ivoire Telecom, Dolphin Telecom JLT, Gambia Submarine Cable, Guinéenne de Large Bande, International Mauritania Telecom, MEO, MTN, Orange (France), Orange Cameroun, Orange Mali, Orang
System Supplier: Alcatel-Lucent Submarine Networks (Main contractors), TE SubCom (Sub contractors) System Installer:
Orange Marine
Marine Surveyor: Fugro System Maintainer: Orange, PT Comunicações S.A., Sonatel, Gestor de Infraestructuras de Guinea Ecuatorial (GITGE) Region: EMEA
Santana Muanda
Luanda
Ca
pe
To w
n
Swakopmund
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
LANDING POINTS: • Santana (São Tomé and Príncipe) • Muanda (DRC) • Luanda (Angola) • Swakopmund (Namibia) • Cape Town (South Africa),
ADONES
ANGOLA DOMESTIC NETWORK SYSTEM RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
Cabinda
System Supplier: Cableship:
Angola Telecom Ericsson Teleri
Region: EMEA
Nzeto Luanda Porto Amboim
Benguela Lucira
Namibe
Benguela (Angola) Cabinda (Angola) Luanda (Angola) Lucira (Angola) Namibe (Angola) Nzeto (Angola) Porto Amboim (Angola) Soyo (Angola)
30 Gbps
System Installer: Elettra
Soyo
LANDING POINTS:
1,800
Design Capacity: 80 Gbps Owners:
• • • • • • • •
35,000,000
ADRIA-1
ADRIA-1 RFS Year:
2000
Est. End of Service Date: 2025 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier:
13,400,000 430
622 Mbps
Deutsche Telekom AG, OTE
Alcatel Submarine Networks
System Installer: Alcatel Submarine Networks
System Maintainer:
Hellenic Telecommunications Organization S.A.
Region: EMEA
Dubrovnik
Durres
Corfu
LANDING POINTS: • Corfu (Greece) • Dubrovnik (Croatia) • Durres (Albania)
AEC
Shirley
LANDING POINTS: • Shirley, New York (United States) • Killala (Ireland)
AMERICA EUROPE CONNECT RFS Year:
2016
Est. End of Service Date: 2041 Est. System Cost (US$):
Total Length (kms): Design Capacity: Fiber Pairs:
300,000,000 5,536
78 Tbps
6 Fiber Pairs
Channels: 130
Channel Capacity: 100 Gbps
Owners: AquaComms
System Supplier:
TE SubCom
System Installer: TE SubCom Cableship:
Reliance
Region: Transatlantic
Killala
AJC Maruyama Shima
AUSTRALIA-JAPAN CABLE RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
520,000,000
Tumon
Tanguisson
12,224
320 Gbps
25.6 Tbps
4 Fiber Pairs
Channels: 64
Channel Capacity: 100 Gbps
Owners: Australia Japan Cable Limited, Communications Global Network Services Limited, NTT Communications Corporation, SOFTBANK Telecom Corp., Telstra Holdings (Bermuda) No. 1 Limited, Worldcom Global Networks Limited
System Supplier:
Ocean Cable Company, Tyco Telecommunications
System Installer: FCR, KDD Cableship:
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Fresnel, Subaru
Australia Japan Cable, SoftBank Telecom Corp Ciena, Infinera 2012, 2014
40 Gbps, 100 Gbps
Region: Transpacific
LANDING POINTS: • • • • • •
Maruyama (Japan) Oxford Falls (Australia) Shima (Japan) Sydney (Australia) Tanguisson (Guam) Tumon (Guam)
Oxford Falls Sydney
AKORN
Anchorage
Florence
AKORN RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:
LANDING POINTS: • Anchorage (USA) • Florence (USA)
System Maintainer:
100,000,000 2,968
10 Gbps
4 Fiber Pairs
Alaska Communications
Tyco Telecommunications ACS Cable Systems
Region: Americas
ALASIA
ALASIA RFS Year:
2012
Est. End of Service Date: 2037 Est. System Cost (US$):
Total Length (kms):
15,000,000 350
Design Capacity: 25.6 Tbps Fiber Pairs:
8 Fiber Pairs
Channels: 40
Channel Capacity:
Owners:
40 Gbps
Cyprus Telecommunications Authority, Syrian Telecommunications Authority
Region: EMEA
LANDING POINTS: • Pentaskhinos (Cyprus) • Tartus (Syria)
ALASKA UNITED EAST
Whittier
Valdez
Juneau
Harbor Pointe
ALASKA UNITED EAST RFS Year:
1999
Est. End of Service Date: 2024 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
100,000,000 3,751
2.5 Gbps
Design Capacity: 10 Gbps Fiber Pairs:
Owners:
LANDING POINTS: • • • •
Harbor Pointe (USA) Juneau (USA) Valdez (USA) Whittier (USA)
System Supplier: System Maintainer:
2 Fiber Pairs GCI
NEC
General Communication Incorporated
Region: Americas
ALASKA UNITED WEST
Whittier
Ketchikan
Warrenton
ALASKA UNITED WEST RFS Year:
2004
Est. End of Service Date: 2029 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
30,000,000 2,483
10 Gbps
Design Capacity: 640 Gbps Fiber Pairs:
Owners: System Supplier:
• Ketchikan (USA) • Warrenton (USA) • Whittier (USA)
GCI
Tyco Telecommunications SSI
System Installer: Tyco Telecommunications SSI Cableship:
LANDING POINTS:
4 Fiber Pairs
System Maintainer:
Global Sentinel
General Communication Incorporated
Region: Americas
ALBA-1
Havana Santiago de Cuba Morant Point
Camuri
ALBA-1 RFS Year:
2013
Est. End of Service Date: 2038 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
72,000,000 1,600
640 Gbps
Design Capacity: 5.12 Tbps Owners:
System Supplier:
LANDING POINTS: • Camuri (Venezuela) • Ocho Rios (Jamaica) • Santiago De Cuba (Cuba) • Siboney (Cuba)
Telecom Venezuela, Transbit SA Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Shanghai Bell, Telecomunicaciones Gran Caribe
Marine Surveyor: Survey Boat:
EGS
RV Ridley Thomas
Region: Americas
ALETAR
T a r t u s
A l e x a n d r i a
ALETAR RFS Year:
1997
Est. End of Service Date: 2022 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
System Supplier:
• Alexandria (Egypt) • Tartus (Syria)
733
5 Gbps
1 Fiber Pair
Lebanese Ministry of Telecom (6.25%), Syrian Telecom (46.875%), Telecom Egypt (46.875%) Alcatel Submarine Networks
System Installer: FCR Cableship:
LANDING POINTS:
23,000,000
System Maintainer:
Vercors
Telecom Egypt
Region: EMEA
ALEXANDROS
Marseille
Pentaskhinos
Alexandria
ALEXANDROS RFS Year:
2010
Est. End of Service Date: 2035 Total Length (kms):
3,500
Design Capacity: 10 Tbps Owners:
LANDING POINTS: • Alexandria (Egypt) • Marseille (France) • Pentaskhinos (Cyprus)
System Maintainer:
Cyprus Telecommunications Authority, Telecom Egypt
Cypress Telecommunications Authority
Region: EMEA
ALONSO DE OJEDA
ALONSO DE OJEDA RFS Year:
1999
Est. End of Service Date: 2024 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
8,700,000 128
15 Gbps
Design Capacity: 100 Gbps Owners:
System Supplier:
Antelecom NV
Alcatel Submarine Networks
System Installer: IT International Telecom
System Maintainer:
Setar NV, United Telecommunications Services
Region: Americas
Oranjestad Willemstad
LANDING POINTS: • Oranjestad (Aruba) • Willemstad (Netherlands Antilles)
ALPAL-2
ALPAL-2 RFS Year:
2002
Est. End of Service Date: 2027 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
17,600,000 312
10 Gbps
Design Capacity: 160 Gbps Fiber Pairs:
Owners: System Supplier:
4 Fiber Pairs
APT, France Telecom, Telefonica Pirelli
System Installer: Global Marine Systems Limited Cableship:
System Maintainer:
Ses Covetes
El Djemila
LANDING POINTS: • El Djemila (Algeria) • Ses Covetes (Majorca)
Maersk Responder
Telefonica de España, S.A.U.
Region: EMEA
AMERICAN SAMOA-FIJI
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
American Samoa
Fiji
AMERICAN SAMOA-FIJI [PLANNED] RFS Year:
2017
Est. End of Service Date: 2041 Est. System Cost (US$):
LANDING POINTS: • Pago Pago (American Samoa) • Fiji
Initial Capacity: Owners:
35,000,000 40 Gbps
American Samoa Hawaii Cable
Region: AustralAsia
AMERICAS I Vero Beach
Magens Bay
AMERICAS I RFS Year:
1994
Est. End of Service Date: 2019 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
220,000,000 2,013
120 Gbps
Design Capacity: 320 Gbps Owners:
System Supplier:
AT&T, CANTV (Venezuela), Embratel, TSTT
Tyco Telecommunications SSI
System Installer: Tyco Telecommunications SSI
System Maintainer:
Upgrader:
LANDING POINTS: • Magens Bay (Virgin Islands) • Vero Beach (USA)
Upgrade Year: Upgraded Capacity:
AT&T, Telecom Services Trinidad & Tobago Xtera Communications 2010
20 Gbps
Region: Americas
AMERICAS I SOUTH
AMERICAS I SOUTH RFS Year:
1994
Est. End of Service Date: 2019 Total Length (kms): Initial Capacity: Owners: System Supplier:
Magens Bay
6,014
560 Mbps
AT&T, CANTV (Venezuela), Embratel, TSTT
Alcatel Submarine Networks, Tyco Telecommunications SSI
System Installer: C&W (Marine) Cableship:
Cable Installer, Agile, Fresnel
Region: Americas
Camuri
Macqueripe
Fortaleza
LANDING POINTS: • • • •
Camuri (Venezuela) Fortaleza (Brazil) Macqueripe (Trinidad) Magens Bay (Virgin Islands)
AMERICAS II Hollywood
Miramar St Croix Le Lamentin Willemstad Camuri
Chaguaramas
Cayenne
Fortaleza
AMERICAS II RFS Year:
2000
Est. End of Service Date: 2025 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity:
350,000,000 8,373
80 Gbps
1.48 Gbps
Owners: Antelecom NV, AT&T, Brazil Telecom, CANTV (Venezuela), Embratel, France Telecom, GT&T, Sprint, Telecom Italia, Telefonica, Telesur, Telintar, Trescom Int., TSTT, Verizon
System Supplier:
ASN Australia, Tyco Telecommunications
System Installer: Tyco Telecommunications SSI Cableship:
System Maintainer:
Global Link
AT&T, Orange, Telecom Services Trinidad & Tobago, United Telecommunications Services
Region: Americas
LANDING POINTS: • Camuri (Venezuela) • Cayenne (French Guiana) • Chaguaramas (Trinidad) • Fortaleza (Brazil) • Hollywood (USA) • Lamentine (France) • Miramar (Puerto Rico) • St Croix (US Virgin Islands) • Willemstad (Netherlands Antilles)
AMERIGO VESPUCCI
AMERIGO VESPUCCI RFS Year:
1999
Est. End of Service Date: 2024 Est. System Cost (US$):
Total Length (kms): System Maintainer:
15,000,000 84
United Telecommunication Services
Region: Americas
Bonaire Curaçao
LANDING POINTS: • Bonaire (Netherlands) • Curacao (Curacao)
AMX-1 Jacksonville
Maimi
San Juan
AMERICA MOVIL SUBMARINE CABLE SYSTEM-1 RFS Year:
2014
Est. End of Service Date: 2039 Est. System Cost (US$):
LANDING POINTS: • Jacksonville (United States) • Miami (United States) • San Juan (Puerto Rico) • Puerto Barrios (Guatemala) • Barranquilla (Colombia) • Cartagena (Colombia) • Fortaleza (Brazil) • Salvador de Bahia (Brazil) • Rio de Janeiro (Brazil) • Puerto Plata (Dominican Repub
Total Length (kms): Initial Capacity:
700,000,000 17,800
100 Gbps
Design Capacity: 50 Tbps
Channels: 100 Gbps Owners:
System Supplier:
America Movil
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks
Marine Surveyor:
Fugro, EGS
Region: Americas
ANTEL
Maldonado
Las Toninas
ANTEL RFS Year:
2010
Est. End of Service Date: 2035 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
15,000,000 250
50 Gbps
Design Capacity: 3.84 Tbps Owners:
System Supplier:
LANDING POINTS: • Las Toninas (Argentina) • Maldonado (Uruguay)
Antel (Uruguay), Telecom Argentina
Alcatel-Lucent Submarine Networks
System Installer: IT Telecom Region: Americas
ANTILLES CROSSING
Hams Bluff
Port Castries Bridgetown
ANTILLES CROSSING RFS Year:
2006
Est. End of Service Date: 2031 Total Length (kms): Initial Capacity:
952
40 Gbps
Design Capacity: 160 Gbps Owners:
System Supplier:
LANDING POINTS: • Bridgetown (Barbados) • Hams Bluff (Virgin Islands) • Port Castries (St Lucia)
Antilles Crossing, Barbados Light & Power, Leucadia, Telebarbados Tyco Telecommunications SSI
System Installer: Tyco Telecommunications SSI Upgrader:
Upgrade Year: Upgraded Capacity:
Ciena 2013
40 Gbps
Region: Americas
APCN 2 Pusan
Chongming
Shantou Lantau
Tanshui
Batangas
n
ta an
Ku
ng
to Ka
raki
Kitaiba a
kur Chi
ASIA-PACIFIC CABLE NETWORK 2 RFS Year:
2002
Est. End of Service Date: 2027 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
1,100,000,000 19,000
160 Gbps
Design Capacity: 25.6 Tbps Fiber Pairs:
4 Fiber Pairs
Channels: 64
Channel Capacity:
Owners:
System Supplier:
100 Gbps
China Telecom, Chunghwa Telecom International, CTM, France Telecom, KDDI, KT Coropration, NTT Communications, PLDT (Philippines), Reach NHK, Singtel, Telekom Malaysia Ocean Cable Company
System Installer: Global Marine Systems Limited Cableship:
Marine Surveyor: System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
Cable Retriever, Bold Endurance, Fu Lai, Asean Restorer, Maersk Recorder, Maersk Repeater, Maersk Responder, Maersk Reliance, Subaru, Kuroshio Maru, Cable Installer. Barges, Networker, Elbe, Chin Ann 3 C&C Technologies
China Telecommunications Corporation, Chunghwa Telecom Co., KDDI, KT Corporation, NTT Communications Corporation, PLDT, Singapore Telecommunications Ltd, TM Berhad NEC
2011, 2014
40 Gbps, 100 Gbps
Region: AustralAsia
LANDING POINTS: • • • • • • • • • •
Batangas (Philippines) Chikura (Japan) Chongming (China) Katong (Singapore) Kitaibaraki (Japan) Kuantan New Port (Malaysia) Lantau (Hong Kong) Pusan (South Korea) Shantou (China) Tanshui (Taiwan)
APG
Chongming Nanhu
Toucheng Lantau
Da Nang
Songkhla Kuantan Tuas
Pusan
Shima
Maruyama
ASIA PACIFIC GATEWAY RFS Year:
2016
Est. End of Service Date: 2041 Est. System Cost (US$):
Total Length (kms):
313,000,000 10,400
Design Capacity: 54 Tbps
Channel Capacity:
Owners:
LANDING POINTS: • • • • • • • • • • •
Chongming (China) Da Nang (Vietnam) Kuantan (Malaysia) Tseung Kwan (Hong Kong) ShinMaruyama (Japan) Nanhui District (China) Busan (South Korea) Shima (Japan) Songkhla (Thailand) Toucheng (Taiwan) Tanah Merah (Singapore)
System Supplier:
100 Gbps
China Telecom, China Unicom, Chunghwa Telecom International, Facebook, KT Coropration, NTT Communications, PLDT (Philippines), StarHub (Singapore), Telekom Malaysia, TIME dotCom, VNPT, FPT Corp. NEC
System Installer: NTT Com, S.B. Submarine Systems, NEC
System Maintainer:
China Telecommunications Corporation, Chunghwa Telecom Co.
Region: AustralAsia
APHRODITE 2
Chania Yeroskipos
APHRODITE 2 RFS Year:
1994
Est. End of Service Date: 2019 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners:
System Supplier:
LANDING POINTS: • Chania (Greece) • Yeroskipos (Cyprus)
Cableship:
30,000,000 868
1.12 Gbps
AT&T, Belgacom, British Telecom, Cyprus Telecommunications Authority (62%), France Telecom, OTE, Sprint, Verizon Alcatel Submarine Networks Skandi Hav
Region: EMEA
APNG-2 Point Moresby
AUSTRALIA PAPUA NEW GUINEA 2 RFS Year:
2006
Est. End of Service Date: 2031 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs:
11,000,000 3,400
1.12 Gbps
2 Fiber Pairs
Owners: Telikom PNG, Telstra (Australia)
System Supplier:
Alcatel Submarine Networks
System Installer: Alcatel Submarine Networks Cableship:
System Maintainer:
Ile de Re
Telstra International
Region: AustralAsia
Sydney
LANDING POINTS: • Port Moresby (Papua New Guinea) • Sydney (Australia)
APOLLO
Brookhaven Manasquan
LANDING POINTS: • • • •
Brookhaven (USA) Lannion (France) Manasquan (USA) Widemouth (UK)
Widemouth Bay Lannion
APOLLO RFS Year:
2003
Est. End of Service Date: 2028 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
350,000,000 12,700
10 Gbps 64 Tbps
4 Fiber Pairs
Channels: 80
Channel Capacity: 100 Gbps
Owners: Alcatel, Apollo SCS Limited, C&W
System Supplier:
Alcatel Submarine Networks
System Installer: Alcatel Submarine Networks Cableship:
Upgrader: Upgrade Year: Upgraded Capacity:
Ile de Batz, Ile de Brehat, Ile de Sein, Skandi Neptune Alcatel-Lucent Submarine Networks 2012, 2014
40 Gbps, 100 Gbps
Region: Transatlantic
SUBMARINE CABLE SYSTEM REPORTING Presenting the industry’s most extensive collection of 375+ current and planned submarine cable systems impacting financiers, carriers, cable owners, system suppliers, component manufacturers and marine contractors, and detailing more than 50 menu-based data fields and maps in a customer-customizable report.
REPORTING IN 5 BUSINESS DAYS
STF Analytics
For more information: subtelforum.com/stfanalytics
Powered by the comprehensive and industry leading STF Submarine Cable Database
APX-CENTRAL
ASIA PACIFIC EXPRESS CENTRAL [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms):
150,000,000 4,800
Design Capacity: 32 Tbps Fiber Pairs:
4 Fiber Pairs
Channels: 80
Channel Capacity:
Owners: System Supplier:
100 Gbps
SubPartners TE SubCom
Region: AustralAsia
Perth Adelaide Melbourne
Hobart
LANDING POINTS: • • • •
Adelaide (Australia) Hobart (Australia) Melbourne (Australia) Perth (Australia)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
APX-EAST
PROJECT COMPLETION PHASES: Pre-Engineering
LANDING POINTS: • Auckland (New Zealand) • Hermosa Beach (United States) • Oahu, Hawaii (United States) • Sydney (Australia)
Survey
System Manufacture
System Installation
Commissioning & Acceptance
Hermosa Beach
Oahu
ASIA PACIFIC EXPRESS EAST [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms):
350,000,000 12,700
Design Capacity: 40 Tbps Fiber Pairs:
4 Fiber Pairs
Channels: 100
Channel Capacity:
Owners: System Supplier:
100 Gbps
SubPartners TE SubCom
Region: Transpacific
APX-WEST
ASIA PACIFIC EXPRESS WEST [PLANNED] RFS Year:
Singapore
2018
Est. End of Service Date: 2041 Est. System Cost (US$):
Total Length (kms):
150,000,000 4,600
Design Capacity: 20 Tbps Fiber Pairs:
2 Fiber Pairs
Channels: 100
Channel Capacity:
Owners:
Jakarta
System Supplier:
100 Gbps
SubPartners, Singtel, Telstra, Google TE SubCom
Region: AustralAsia
Christmas Island
Perth LANDING POINTS: • Jakarta (Indonesia) • Christmas Island (Australia) • Perth (Australia) • Singapore
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
ARCOS-1 Hollywood Nassau
Cat Island
Providenciales
Crooked Island
Cancun
Tulum
Pu e P Tr ue rto oj r t o Ba ill o Co rrio rte s s
Puerto Plata Punta Cana
Ladyville
n
ua
J an
S
Puerto Lempira Puerto Cabezas
on
ta
m
iq
ui
Li
Ustupo
Ch
to M
ar
ia
er Pu
d
sta
m ille W Riohacha Punto Fijo Cartagena
Bluefields
ARCOS-1 RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
250,000,000 8,700
80 Gbps
Design Capacity: 8.4 Tbps Owners:
LANDING POINTS: • • • • • • • • • • •
Bluefields (Nicuragua) Cancun (Mexico) Cartagena (Columbia) Cat Island (Bahamas) Crooked Island (Bahamas) Hollywood (USA) Ladyville (Belize) Maria Chiquita (Panama) Nassau (The Bahamas) Providenciales (Turks and Caicos Islands) Puerto Barrios (G
System Supplier: Marine Surveyor: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Alestra (Mexico), AT&T, Axtel (Mexico), BTC (Bahamas), BTL (Belize), CANTV (Venezuela), Codetel (Dominican Republic), Colombus Networks, Enitel (Nicaragua), Hondutel (Honduras), ICE (Costa Rica), Impsat (USA), Internexa (Colombia), Orbinet SA (Colombia),
Norddeutsche Seekabelwerke (Tyco Telecommunications, Partial) Fugro
Colombus Networks USA Inc., United Telecommunications Services Xtera Communications 2008, 2016
40 Gbps, 100 Gbps
Region: Americas
ASC
AUSTRALIA-SINGAPORE CABLE [PLANNED] RFS Year:
Singapore
2018
Est. End of Service Date: 2043 Est. System Cost (US$):
Total Length (kms):
170,000,000 4,600
Design Capacity: 40 Tbps Fiber Pairs:
Channel Capacity: Owners:
Anyer
System Supplier:
3 Fiber Pairs 100 Gbps
Vocus Communications, AustraliaSingapore Cable International Limited Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Region: AustralAsia
Perth
LANDING POINTS: • Perth (Australia) • Tanah Mera (Singapore) • Anyer (Indonesia)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
YOUR AD HERE
Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com
ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000
F E B-16
M A Y -16
A UG-16
NOV -17
I S S U E 1 7
I S S U E 1 8
I S S U E 1 9
I S S U E 2 0
ASE
Hong Kong
Philippines
Malaysia Singapore
Japan
ASIA SUBMARINE-CABLE EXPRESS RFS Year:
2013
Est. End of Service Date: 2038 Est. System Cost (US$):
Total Length (kms):
412,000,000 7,200
Design Capacity: 15.36 Tbps Fiber Pairs:
6 Fiber Pairs
Channels: 128
Channel Capacity:
Owners:
System Supplier:
40 Gbps
NTT Communications (Japan), PLDT (Philippines), StarHub (Singapore), Telekom Malaysia
Fujitsu Limited, NEC Corporation
System Installer: S.B. Subarine Systems, NTT, NEC
System Maintainer:
NTT Communications Corporation, PLDT, StarHub, TM Berhad
Region: AustralAsia
LANDING POINTS: • • • • • •
Japan Philippines Hong Kong Malaysia Singapore Cambodia
ASH Keawaula
AMERICA SAMOA HAWAII RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
Pago Pago
LANDING POINTS: • Keawaula (Hawaii) • Pago Pago (American Samoa)
System Supplier:
100,000,000 4,680
1.2 Gbps
2 Fiber Pairs
ASH Cable Company
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Cableship:
System Maintainer:
Ile de Ré
Telecom New Zealand
Region: AustralAsia
ATHENA
ATHENA RFS Year:
2011
Est. End of Service Date: 2036 Total Length (kms):
Owners:
600
Cypress Telecommunications Authority, Telecom Italia Sparkle
Region: EMEA
K o r o p i
P e n t a s k h i n o s
LANDING POINTS: • Koropi (Greece) • Pentaskhinos (Cyprus)
ATISA
an p i a S an i n i T Rota
m a u G
ATISA [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Total Length (kms): Fiber Pairs: Owners: System Supplier:
280
6 Fiber Pairs
DOCOMO Pacific NEC
Region: AustralAsia
LANDING POINTS: • • • •
Guam Saipan Rota Tinian
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
ATLANTIS-2
Lisbon
Conil
Funchal El Medano
Praia
Dakar
ATLANTIS-2 RFS Year:
Fortaleza
2000
Est. End of Service Date: 2025 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
370,000,000 13,100
40 Gbps
Design Capacity: 160 Gbps Fiber Pairs:
Rio de Janeiro
Channels: 2 to 8
Channel Capacity:
Owners:
System Supplier:
Las Toninas
LANDING POINTS: • • • • • • • • •
Conil (Spain) Dakar (Senegal) El Medano (Spain) Fortaleza (Brazil) Funchal (Portugal) Las Toninas (Argentina) Lisbon (Portugal) Praia (Cape Verde) Rio de Janeiro (Brazil)
2 Fiber Pairs, Initial: 2 wavelengths, Design: 8 wavelengths 40 Gbps
Cabo Verde Telecom, Deutsche Telekom AG, Embratel, France Telecom, Marconi, Sonatel, Telecom Argentina, Telecom Italia, Telefonica, Telefonica de Argentina, Telintar, Verizon Alcatel Submarine Networks, Pirelli, Fujitsu
System Installer: FCR Cableship:
System Maintainer:
Raymond Croze, Fresnel, Vercors, Teneo, Teliri, Maersk Defender
PT Comunicações S.A., Sonatel, Telefonica de España S.A.U., Telefonica International Wholesale Services
Region: Transatlantic
ATLAS OFFSHORE
M a r s e i l l e
A s i l a h
ATLAS OFFSHORE RFS Year:
2007
Est. End of Service Date: 2032 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
31,000,000 1,634
40 Gbps
Design Capacity: 320 Gbps Owners:
System Supplier:
LANDING POINTS: • Asilah (Morocco) • Marseille (France)
Maroc Telecom of Morocco Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Region: EMEA
AUSTRAL
AUSTRAL [PLANNED] Puerto Montt
RFS Year:
2018
Est. End of Service Date: 2043 Est. System Cost (US$):
Total Length (kms): Owners: System Supplier:
100,000,000 1,800
AUSTRAL University of Magellan, Magellan CPC Huawei Marine Networks
System Installer: IT International Telecom Region: Americas
Punta Arenas
LANDING POINTS: • Puerto Montt (Chile) • Punta Arenas (Chile)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
AWE
Djibouti
LANDING POINTS: • Perth, Australia • Djibouti
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
AUSTRALIA WEST EXPRESS [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms):
300,000,000 10,100
Design Capacity: 20 Tbps Fiber Pairs:
2 Fiber Pairs
Channels: 100
Channel Capacity:
Owners: System Supplier:
200 Gbps
GoTo Networks
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks
Region: Indian Ocean Pan-East Asian
Perth
BAHAMAS-2
BAHAMAS-2 RFS Year:
1997
Est. End of Service Date: 2022 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
25,000,000 478
2.5 Gbps
Design Capacity: 2.4 Tbps Owners:
System Supplier:
AT&T, Balteco, Verizon
Tyco Telecommunications SSI
System Installer: Tyco Telecommunications SSI
Marine Surveyor:
System Maintainer:
C&C Technologies
AT&T, Bahamas Telecommunications Company
Region: Americas
V e r o B e a c h
E i g h t M i l e R o c k
N a s s a u
LANDING POINTS: • Eight Mile Rock (Bahamas) • Nassau (The Bahamas) • Vero Beach (USA)
BALTICA
Y s t a d D u e o d d e G e d s e r K o l o b r z e g
BALTICA RFS Year:
1997
Est. End of Service Date: 2022 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
LANDING POINTS: • • • •
Dueodde (Bornholm) Gedser (Denmark) Kolobrzeg (Poland) Ystad (Sweden)
System Maintainer:
16,000,000 437
5 Gbps
6 Fiber Pairs
Polish Telecom, TDC, Telecom Finland, Telenor, Teliasonera
Orange Polska S.A., TDC A/S, TeliaSonera International Carrier AB
Region: EMEA
BAR-SAV
S a v o n a
B a r c e l o n a
BAR-SAV RFS Year:
1996
Est. End of Service Date: 2021 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier:
LANDING POINTS: • Barcelona (Spain) • Savona (Italy)
System Maintainer:
39,000,000 760
5 Gbps
Telecom Italia, Telefonica
Alcatel Submarine Networks
Telecom Italia Sparkle, Telefonica de España S.A.U.
Region: EMEA
BASS STRAIT 2
I n v e r l o c h
S t a n l e y
BASS STRAIT 2 RFS Year:
2003
Est. End of Service Date: 2028 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier:
LANDING POINTS: • Inverloch (Australia) • Stanley (Tasmania, Australia)
17,000,000 240
10 Gbps
Telstra (Australia)
Alcatel Submarine Networks
System Installer: Alcatel Submarine Networks Cableship:
Ile de Batz
Region: AustralAsia
BBG
LANDING POINTS: • • • •
Sri Lanka Singapore Oman UAE
BAY OF BENGAL GATEWAY RFS Year:
2014
Est. End of Service Date: 2039 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
30,000,000 8,040
6.4 Tbps
Design Capacity: 55 Tbps Fiber Pairs:
Channel Capacity: Owners: System Supplier:
3 Fiber Pairs 100 Gbps
Bay of Bengal Consortium
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Cableship:
Marine Surveyor: Survey Boat: System Maintainer:
Ile De Brehat EGS
Northern Endeavour E-marine
Region: Indian Ocean Pan-East Asia
BCS EAST
Liepaja Sventoji
BCS EAST RFS Year:
1997
Est. End of Service Date: 2022 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
LANDING POINTS: • Liepaja (Latvia) • Sventoji (Lithuania)
Owners:
15,000,000 98
2.5 Gbps
Teliasonera
Region: EMEA
BCS EAST-WEST INTERLINK Sandviken
Sventoji
BCS EAST-WEST INTERLINK RFS Year:
1997
Est. End of Service Date: 2022 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier:
LANDING POINTS: • Sandviken (Sweden) • Sventoji (Lithuania)
20,000,000 218
2.5 Gbps
Teliasonera Ericsson
System Installer: AKN Cableship:
Pleijel
Region: EMEA
BCS NORTH
Helsingfors Mariehamn Haraldsholm Hango
Kotka Logi
Stavsnas
BCS NORTH RFS Year:
2003
Est. End of Service Date: 2028 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier:
LANDING POINTS: • • • • • •
Hango (Finland) Haraldsholm (Finland) Helsingfors (Finland) Kotka (Finland) Mariehamn (Finland) Stavsnas (Sweden)
30,000,000 793
10 Gbps
Rostelecom, Teliasonera Ericsson
System Installer: AKN Cableship:
System Maintainer:
Pleijel
TeliaSonera International Carrier AB
Region: EMEA
BDM
Melaka Dumai Batam
BATAM-DUMAI-MELAKA RFS Year:
2011
Est. End of Service Date: 2036 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
76,000,000 400
80 Gbps
Design Capacity: 2.56 Tbps Fiber Pairs:
4 Fiber Pairs
Channels: 64
Channel Capacity:
Owners: System Supplier:
LANDING POINTS: • Batam (Indonesia) • Dumai (Indonesia) • Melaka (Malaysia)
10 Gbps
PT Mora Telematika, PT XL Axiata, Telekom Malaysia Huawei Marine Networks
System Installer: Huawei Marine Networks
System Maintainer:
TM Berhad
Region: AustralAsia
BEST CABLE SYSTEM
Malaysia Brunei
Indonesia LANDING POINTS: • • • • • •
Brunei Sabah Malaysia Southern Philippines Kalimantan, Indonesia extension to Guam
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
Guam Philippines
Yap
Palau
BEST CABLE SYSTEM [PLANNED] RFS Year:
2018
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms): Owners:
150,000,000 5,092
Best Cable Corp. Pte. Ltd.
Region: AustralAsia
BHARAT-LANKA
BHARAT-LANKA RFS Year:
2007
Est. End of Service Date: 2032 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
40,000,000 338
40 Gbps
Design Capacity: 960 Gbps
Channel Capacity:
Owners: System Supplier:
Tuticorin
NEC
Sri Lanka Telecom
Region: Indian Ocean Pan-East Asian
Dehiwala-Mount Lavinia
• Dehiwala-Mount Lavinia (Sri Lanka) • Tuticorin (India)
BSNL, Sri Lanka Telecom Limited (SLT), Sri Lanka
System Installer: NEC
System Maintainer:
LANDING POINTS:
40 Gbps
BICS
BAHAMAS INTERNET CABLE SYSTEM RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
31,000,000 1,000
10 Gbps
Design Capacity: 12 Tbps
Channel Capacity:
Owners:
10 Gbps
Carribbean Crossings
Region: Americas
Boca Raton
Crown Haven Riding Point Freeport
Marsh Harbour Sandy Point Upper Bogue
Nassau
LANDING POINTS: • Boca Raton (USA) • Crown Haven (Bahamas) • Freeport (Bahamas) • Marsh Harbour (Bahamas) • Nassau (The Bahamas) • Riding Point (Bahamas) • Rock Sound (Bahamas) • Sandy Point (Bahamas) • Upper Bogue (Bahamas)
Rock Sound
BIN
BALKANS-ITALY NETWORK RFS Year:
2011
Est. End of Service Date: 2036 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Channel Capacity: Owners:
21,700,000 276
40 Gbps 40 Gbps Unifi
Region: EMEA
B a r i
LANDING POINTS: • Bari (Italy) • Durres (Albania)
D u r r e s
BIOS / JONAH
BIOS/JONAH RFS Year:
2011
Est. End of Service Date: 2036 Est. System Cost (US$):
Total Length (kms):
15,000,000 2,300
Design Capacity: 12.8 Fiber Pairs:
Owners: System Supplier: Marine Surveyor:
2 Fiber Pairs
Bezeq International
Alcatel-Lucent Submarine Networks Elettra
Region: EMEA
B a r i
T e l A v i v
LANDING POINTS: • Tel Aviv (Israel) • Bari (Italy)
BLAST
BROADBAND LINKING THE AMERICAN SAMOA TERRITORY RFS Year:
2015
Est. End of Service Date: 2040 Est. System Cost (US$):
Total Length (kms): Owners: System Supplier:
11,000,000 250
ASTCA (American Samoa) IT International Telecom
System Installer: IT International Telecom
Marine Surveyor:
IT International Telecom
Region: AustralAsia
Ofu Aunu'u
Tutuila
LANDING POINTS: • Fogagogo, Tu’tuila (American Samoa) • Ofu Harbor, Ofu (American Samoa) • Luma, Ta’u (American Samoa) • Aunu’u Warf, Aunu’u (American Samoa)
Luma
BORACAY-PALAWAN
BORACAY-PALAWAN RFS Year:
2013
Est. End of Service Date: 2038 Est. System Cost (US$):
Total Length (kms):
20,000,000 332
Design Capacity: 4.8 Tbps Fiber Pairs:
12 Fiber Pairs
Channels: 40
Channel Capacity:
Owners: System Supplier:
10 Gbps
Globe Telecom
Huawei Marine Networks
Region: AustralAsia
Coron Taytay
LANDING POINTS: • • • • •
Taytay (Philippines) San Jose (Philippines) Coron (Philippines) Boracay (Philippines) Caticlan (Philippines)
San Jose Boracay Caticlan
Optical Fiber for SUBMARINE SYSTEMS TRANSMITTING at 100 Gb/s and BEYOND Ultra low loss Ultra large effective area Optimized for both C- and L-band transmission
www.ofsoptics.com
BOTNIA
BOTNIA RFS Year:
1994
Est. End of Service Date: 2019 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:
8,500,000 77
1.2 Gbps
6 Fiber Pairs Teliasonera NKT
System Installer: AKN Cableship:
System Maintainer:
Pleijel
TeliaSonera International Carrier AB
Region: EMEA
U m e a
V a a s a
LANDING POINTS: • Umea (Sweden) • Vaasa (Finland)
BRCS
BATAM-RENGIT CABLE SYSTEM RFS Year:
2007
Est. End of Service Date: 2032 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners:
10,000,000 63
10 Gbps
Excelcom
Region: AustralAsia
Sungai Rengit Batam
LANDING POINTS: • Batam (Indonesia) • Sungai Rengit (Malaysia)
PROJECT COMPLETION PHASES:
BRUSA
Pre-Engineering
Survey
System Manufacture
System Installation
Virginia Beach
San Juan
Fortaleza
Rio de Janeiro
BRAZIL-USA [PLANNED] RFS Year:
2018
Est. End of Service Date: 2043 Total Length (kms):
Owners:
11,000
Telefonica
LANDING POINTS:
System Supplier:
• • • •
System Installer: Alcatel-Lucent Submarine Networks
Rio de Janeiro (Brazil) Fortaleza (Brazil) San Juan (Puerto Rico) Virginia Beach, Virginia (USA)
Alcatel-Lucent Submarine Networks
Region: Americas
Commissioning & Acceptance
BSCS
BATAM SINGAPORE CABLE SYSTEM RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:
13,100,000 73
80 Gbps
3 Fiber Pairs
Telekom Indonesia
Ocean Cable Company
System Installer: Stena Offshore, ASEAN Cableship, NEC Cableship:
Northern Installer
Region: AustralAsia
Changi Batam
LANDING POINTS: • Batam (Indonesia) • Changi (Singapore)
BSFOCS
Odesa
Novorossiysk
Varna
BLACK SEA FIBRE OPTIC CABLE SYSTEM RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
System Supplier:
51,000,000 933
2.5 Gbps
2 Fiber Pairs
Armentel, AT&T, BTC, Cypress Telecommunications Authority, DTAG, HT, KDDI, OTE, Rostelecom, Telecom Slovenia, Ukrtelecom
Alcatel Submarine Networks, Tyco Telecommunications SSI
System Installer: Global Marine Systems Limited Cableship:
System Maintainer:
LANDING POINTS: • Novorossiysk (Russia) • Odesa (Ukraine) • Varna (Bulgaria)
Maersk Fighter
Cyprus Telecommunications Authority, Hellenic Telecommunications Organization S.A., OJSC “Rostelecom”
Region: EMEA
CADMOS
CADMOS RFS Year:
1995
Est. End of Service Date: 2020 Est. System Cost (US$):
Total Length (kms):
8,000,000 262
Design Capacity: 622 Mbps Fiber Pairs:
Owners:
System Supplier: System Maintainer:
2 Fiber Pairs
Cyprus Telecommunications Authority (62%), Lebanese Ministry of Telecommunications (38%) Tyco Telecommunications
Cyprus Telecommunications Authority
Region: EMEA
P e n t a s k h i n o s
B e i r u t
LANDING POINTS: • Beirut (Lebanon) • Pentaskhinos (Cyprus)
CAMEROON-BRAZIL
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Cameroon
Fortaleza
CAMEROON-BRAZIL [PLANNED] RFS Year:
2018
Est. End of Service Date: 2043 Est. System Cost (US$):
Total Length (kms): Design Capacity: Fiber Pairs:
487,000,000 5,900
32 Tbps
4 Fiber Pairs
Channels: 80
Channel Capacity: Owners: System Supplier:
LANDING POINTS: • Fortaleza (Brazil) • Kribi (Cameroon)
100 Gbps
CamTel, China Unicom Nexans
System Installer: Global Marine Region: Transatlantic
Commissioning & Acceptance
CANALINK
C a d i z
CANALINK RFS Year:
T e n e r i f e
2011
Est. End of Service Date: 2036 Est. System Cost (US$):
Total Length (kms):
157,000,000 2,000
Design Capacity: 5.12 Tbps Fiber Pairs:
4 Fiber Pairs
Channels: 128
Channel Capacity:
Owners: System Supplier:
LANDING POINTS: • Cadiz (Spain) • Tenerife (Spain)
Marine Surveyor:
10 Gbps
Isalink, IT3
Alcatel-Lucent Submarine Networks Fugro, Elettra
Region: EMEA
CANTAT-3
Pennant Point
CANTAT-3 RFS Year:
Est. End of Service Date: 2020 Est. System Cost (US$):
LANDING POINTS: • Blaabjerg (Denmark) • Pennant Point (Canada) • Redcar (United Kingdom) • Tjørnuvík (Faroe Islands) • Vestmannaeyjar (Iceland) • Westerland (Germany)
1994
Total Length (kms): Initial Capacity: Owners: System Supplier:
385,000,000 6,450
7.5 Gbps
Tata Communications
Alcatel Submarine Networks
System Installer: BT Marine, TeleDanmark, Orange Marine Region: Transatlantic
Vestmannaeyjar
TjÓŠrnuvik
Blaabjerg Redcar Westerland
CAUCASUS CABLE SYSTEM
Varna Poti
CAUCASUS CABLE SYSTEM RFS Year:
2008
Est. End of Service Date: 2033 Est. System Cost (US$):
Total Length (kms):
76,000,000 1,187
Design Capacity: 9 Tbps Fiber Pairs:
Owners: System Supplier: Upgrader: Upgrade Year:
LANDING POINTS: • Poti (Georgia) • Varna (Bulgaria)
Upgraded Capacity:
2 Fiber Pairs
Caucasus Online
Tyco Telecommunications TE SubCom 2016
100 Gbps
Region: EMEA
CB-1
Charlestown
Bermuda
CHALLENGER BERMUDA-1 RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
50,000,000 1,448
20 Gbps
Design Capacity: 320 Gbps Owners:
LANDING POINTS: • Bermuda (Bermuda) • Charlestown • Rhode Island (United States)
System Supplier: System Maintainer:
Cable Company Ltd, Verizon Alcatel-Lucent Submarine Networks Cable Co Ltd, Verizon Ltd
Region: Americas
C-BUS Manasquan
CARIBBEAN-BERMUDA US RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Design Capacity:
10,000,000 1,609
1.6 Tbps
Owners: LIME
System Supplier:
Tyco Telecommunications SSI
System Installer: Tyco Telecommunications SSI, IT International Telecom Upgrader:
Upgrade Year: Upgraded Capacity:
Xtera Communications 2016
100 Gbps
Region: Americas
LANDING POINTS: • Manasquan (USA) • Magens Bay (British Virgin Islands)
Tortola
CEIBA-2
CEIBA-2 [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms):
15,000,000 290
Design Capacity: 8 Tbps Owners:
System Supplier:
Republic of Equatorial Guinea Huawei Marine
Region: EMEA
Malabo
Kribi Bata
LANDING POINTS: • Malabo, Equatorial Guinea • Bata, Equatorial Guinea • branching unit to Kribi, Cameroon
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
CELTIXCONNECT
D u b l i n
H o l y h e a d
CELTIXCONNECT RFS Year:
2011
Est. End of Service Date: 2036 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:
LANDING POINTS: • Dublin (Ireland) • Holyhead (UK)
22,000,000 131
960 Gbps
72 Fiber Pairs
Sea Fibre Networks
Alcatel Submarine Networks
System Installer: Global Marine Systems Limited Region: EMEA
CFX-1
Boca Raton
COLOMBIA-FLORIDA SUBSEA FIBER RFS Year:
Morant Point
2008
Est. End of Service Date: 2023 Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
2,439
110 Gbps
12.8 Tbps
2.5 Tbps per Fiber Pair
Owners: Columbus Networks
System Supplier:
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Tyco Telecommunications
Colombus Networks USA, Inc. TE SubCom 2011
40 Gbps, 2.5 Tbps per fiber pair
Region: Americas
LANDING POINTS: • Boca Raton (USA) • Cartagena (Columbia) • Morant Point (Jamaica)
Cartagena
CIOS
CYPRUS-ISRAEL OPTICAL SYSTEM RFS Year:
1994
Est. End of Service Date: 2018 Est. System Cost (US$):
Total Length (kms):
16,000,000 262
Design Capacity: 622 Mbps Fiber Pairs:
Owners: System Maintainer:
1 Fiber Pair
Bezeq, Cypress Telecommunications Authority Cyprus Telecommunications Authority
Region: EMEA
Ayia Napa
Nahariya Nahariya
LANDING POINTS: • Ayia Napa (Cyprus) • Nahariya (Israel)
CJFS
H a l f - M o o n B a y M o n t e g o B a y
CAYMAN JAMAICA FIBRE SYSTEM RFS Year:
1997
Est. End of Service Date: 2022 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
LANDING POINTS: • Half-Moon Bay (Cayman Islands) • Montego Bay (Jamaica)
6,500,000 870
2.5 Gbps
Design Capacity: 2.7 Tbps Owners:
LIME
Region: Americas
C-LION1 Helsinki
Rostock-Ribnitz
C-LION1 RFS Year:
2016
Est. End of Service Date: 2041 Est. System Cost (US$):
Total Length (kms):
74,000,000 1,172
Design Capacity: 144 Tbps Fiber Pairs:
Channel Capacity: Owners: System Supplier:
LANDING POINTS: • Helsinki (Finland • Rostock-Ribnitz (Germany)
8 Fiber Pairs 300 Gbps
Cinia Group
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks
Marine Surveyor:
Fugro
Region: EMEA
EDITORIAL SCHEDULE 1 January Industry Calendar - 16th Edition 15 January STF #92 - Global Outlook
2017
Submarine Telecoms Industry Calendar
30 January Submarine Cable Map - 6th Edition 20 February Submarine Cable Almanac #21 20 March STF #93 - Finance & Legal 15 May STF #94 - Subsea Capacity 22 May Submarine Cable Almanac #22 17 July STF #95 - Regional Systems 14 August Submarine Cable Almanac #23 18 September STF #96 - Offshore Energy 16 October Industry Report - Issue 5 13 November Submarine Cable Almanac #24 20 November STF #97 - System Upgrades
COLUMBUS II
West Palm Beach Cancun
LANDING POINTS: • Cancun (Mexico) • Funchal (Portugal) • Magens Bay (Virgin Islands) • Palermo (Italy) • Sardinia (Gran Canaria) • West Palm Beach (USA)
Magens Bay
le rm o Pa Funchal Sardinia
COLOMBUS II RFS Year:
1994
Est. End of Service Date: 2019 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity:
600,000,000 12,165
560 Mbps 2.5 Gbps
Owners: Columbus II Consortium
System Supplier:
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Alcatel Submarine Networks, Tyco Telecommunications SSI, Pirelli AT&T, Telecom Italia Sparkle Xtera Communications 2012
100 Gbps
Region: Transatlantic
H
ol
ly wo
od
COLUMBUS III
LANDING POINTS: • Miami, Florida (USA) • Ponta Delgada, Azores Islands (Portugal) • Lisbon, Portugal • Conil, Spain • Mazara del Vallo, Sicily (Italy)
Lisbon Conil
COLOMBUS III RFS Year:
1999
Est. End of Service Date: 2024 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
236,000,000 9,833
40 Gbps
160 Gbps
2 Fiber Pairs
Owners: Columbus III Consortium
System Supplier:
Cableship: System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
Alcatel Submarine Networks, Pirelli, Tyco Telecommunications Vercors, Skandi Hav
AT&T, PT Comunicações S.A., Telecom Italia Sparkle, Telefonica de España S.A.U. Xtera Communications 2012
100 Gbps
Region: Transatlantic
M az ar a
Ponta Delgada
CONCERTO-1
Zandvoort Thorpeness
Bruges
CONCERTO-1 RFS Year:
1999
Est. End of Service Date: 2024 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs:
LANDING POINTS: • Bruges (Belguim) • Thorpeness (United Kingdom) • Zandvoort (Netherlands)
Owners: System Supplier:
25,000,000 574
2.5 Gbps
96 Fiber Pairs Flute
Alcatel Submarine Networks
System Installer: Alcatel Submarine Networks Region: EMEA
CORFU-BAR
CORFU-BAR RFS Year:
1998
Est. End of Service Date: 2023 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer:
19,000,000 320
622 Mbps
3 Fiber Pairs
Crngorski Telecom, OTE
Hellenic Telecommunications Organization S.A.
Region: EMEA
Bar
Corfu
LANDING POINTS: • Bar (Montenegro) • Corfu (Greece)
DANICA NORTH
DANICA NORTH RFS Year:
1998
Est. End of Service Date: 2023 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:
10,000,000 25
10 Gbps
96 Fiber Pairs Teliasonera Ericsson
System Installer: AKN Cableship:
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Pleijel
TeliaSonera International Carrier AB Ciena 2013
40 Gbps
Region: EMEA
Tuborg
LANDING POINTS: • Barseback (Sweden) • Tuborg (Denmark)
Barseback
DANICA SOUTH
DANICA SOUTH RFS Year:
1998
Est. End of Service Date: 2023 Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:
20
10 Gbps
24 Fiber Pairs Teliasonera Ericsson
System Installer: AKN Cableship:
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Pleijel
TeliaSonera International Carrier AB Ciena 2013
40 Gbps
Region: EMEA
Copenhagen
LANDING POINTS: • Bjarred (Sweden) • Copenhagen (Denmark)
Bjarred
DANICE
Landeyjarsandur
Blaabjerg
DANICE RFS Year:
2008
Est. End of Service Date: 2033 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
76,000,000 2,291
1000 Gbps
Design Capacity: 5.1 Tbps Fiber Pairs:
Owners: System Supplier: System Maintainer: Upgrader:
LANDING POINTS: • Blaabjerg (Denmark) • Landeyjarsandur (Iceland)
Upgrade Year: Upgraded Capacity:
4 Fiber Pairs Farice Ltd.
Tyco Telecommunications Farice ehf Ciena 2013
100 Gbps
Region: EMEA
PROJECT COMPLETION PHASES:
DARE
Pre-Engineering
Djibouti
Survey
System Manufacture
System Installation
Commissioning & Acceptance
Bossaso Berbera
Mogadishu
Mombasa Dar es Salaam
DJIBOUTI-AFRICA REGIONAL EXPRESS [PLANNED] RFS Year:
2018
Est. End of Service Date: 2043 Total Length (kms):
5,500
Design Capacity: 60 Tbps
Channel Capacity:
Owners:
LANDING POINTS: • • • • • •
Dar es Salaam Mombasa Mogadishu Bossaso Berbera Mocha Djibouti
System Supplier:
100 Gbps
Djibouti Telecom, Africa Marine Express, TeleYemen, Telesom Company, Hormuud Telecom Somalia Inc., Golis Telecom, Somtel Group TE SubCom
System Installer: TE SubCom
System Maintainer:
TE SubCom
Region: EMEA
TE SubCom Ready Anything for SubCom is a fully integrated supplier of undersea communications systems and services, with proven solutions and expertise applied at every phase of a project.
We understand that every undersea communications system is unique, which is why SubCom is prepared for just about anything, anywhere. What’s SubCom capable of? Plenty...
83 PERCENT
INCREASE IN SUBCOM EMPLOYEE HEADCOUNT SINCE 2014
OPERATIONAL EXCELLENCE SUBCOM HAS DELIVERED 100% OF OUR SYSTEMS ON-TIME
75 PERCENT
INCREASED CABLE CAPACITY
100 PERCENT - Since 1999 -
FACTORY & FLEET CAPABILITIES EIGHT SHIPS, 9 ROVS, AND 7 PLOWS MAKE UP THE LARGEST FLEET OF CABLE INSTALLATION VESSELS IN THE WORLD
PERMITTING EXPERTISE SINCE 2013, SUBCOM HAS OBTAINED REGULATORY PERMITS IN 55 COUNTRIES FOR CABLE LANDINGS OR TRANSITS IN ADDITION, WE HAVE SAFELY CROSSED
48 LANDINGS
1000+
55 COUNTRIES
- Since 2013 -
PIPELINES AND CABLES WITHOUT HAVING TO DELAY AN INSTALLATION VESSEL IN THE PAST 3 YEARS.
REGIONAL READINESS IN THE PAST THREE YEARS, SUBCOM HAS COMPLETED 48 LANDINGS
DDSCN
Colombo
Hulhumalé
DHIRAAGU DOMESTIC SUBMARINE CABLE NETWORK RFS Year:
2012
Est. End of Service Date: 2037 Est. System Cost (US$):
Total Length (kms): Owners: System Supplier:
LANDING POINTS: • Colombo (Sri Lanka) • Hulhumale (Maldives)
27,000,000 1,000
Dhiraagu NEC
System Installer: NEC
Region: Indian Ocean Pan-East Asian
DENMARK-NORWAY 5
DENMARK-NORWAY 5 RFS Year:
1992
Est. End of Service Date: 2017 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Maintainer:
9,560,000 123
2 Gbps
Norway PTT, TDC TDC A/S
Region: EMEA
Ardendal
Hjorring
LANDING POINTS: • Ardendal (Norway) • Hjrorring (Denmark)
DENMARK-NORWAY 6
DENMARK-NORWAY 6 RFS Year:
1992
Est. End of Service Date: 2017 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Maintainer:
8,950,000 124
1.5 Gbps
Norway PTT, TDC TDC A/S
Region: EMEA
Kristiansand
Thisted
LANDING POINTS: • Kristiansand (Norway) • Thisted (Denmark)
DENMARK-POLAND 2
DENMARK-POLAND 2 RFS Year:
1991
Est. End of Service Date: 2016 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Maintainer:
4,500,000 110
2.5 Gbps
Polish Telecom, TDC
Orange Polska S.A., TDC A/S
Region: EMEA
G e d e b a k O d d e
M i e l n o
LANDING POINTS: • Gedebak Odde (Denmark) • Mielno (Poland)
DIDON
DIDON RFS Year:
2014
Est. End of Service Date: 2039 Est. System Cost (US$):
Total Length (kms):
15,000,000 173
Design Capacity: 18 Tbps
Channel Capacity: System Supplier:
100 Gbps
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks
System Maintainer:
France Telecom
Region: EMEA
Mazara del Vallo
Kélibia
LANDING POINTS: • Kélibia (Tunisia) • Mazara del Vallo • Sicily (Italy)
DMCS
DUMAI-MELAKA CABLE SYSTEM RFS Year:
2005
Est. End of Service Date: 2030 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
15,000,000 150
20 Gbps
Design Capacity: 320 Gbps Owners:
System Supplier:
PT Telekom, Telekom Malaysia NEC
System Installer: ASEAN Cableship
System Maintainer:
Dumai
Melaka
LANDING POINTS: • Dumai (Indonesia) • Melaka (Malaysia)
TM Berhad
Region: AustralAsia
EAC-C2C
Taean
Ajigaura Chikura Shima
Pusan
Nanhui
n sha ng Fa
O ah ok Kw K ng Hom eu Ts ung
Ch
Pali
Tanshui
Capepisa Nasugbu Vung Tau
Changi
EAC-C2C RFS Year:
Est. End of Service Date: 2034 Est. System Cost (US$):
LANDING POINTS: • • • • • • • • • • • • •
Capepisa (Philippines) Changi (Singapore) Chikura (Japan) Chung Hom Kok (Hong Kong) Fangshan (Taiwan) Nanhui District (China) Nasugbu (Philippines) Pali (Taiwan) Pusan (South Korea) Shima (Japan) Singapore (Singapore) Taean (South Korea) Tansh
2009
Total Length (kms):
850,000,000 35,429
Design Capacity: 30 Tbps Owners:
System Supplier: Marine Surveyor: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
PACNET NEC
C&C Technologies
Pacnet Global (Singapore) Pte. Infinera 2013
100 Gbps
Region: AustralAsia
EASSY Port Sudan
Djibouti
Mogadishu
EASTERN AFRICA SUBMARINE CABLE SYSTEM
Mombasa Dar es Salaam
RFS Year:
2010
Est. End of Service Date: 2035 Est. System Cost (US$):
Moroni
Total Length (kms): Initial Capacity:
247,000,000 9,900
30 Gbps
Design Capacity: 11.8 Tbps Fiber Pairs:
2 Fiber Pairs
Channels: 59
Channel Capacity:
Owners:
Toliary Maputo
LANDING POINTS:
Mtunzini • Dar es Salaam
(Tanzania) • Djibouti (Republic of Djibouti) • Maputo (Mozambique) • Mogadishu (Somalia) • Mombasa (Kenya) • Moroni (Comoros) • Mtunzini (South Africa) • Port Sudan (Sudan) • Toliary (Madagascar)
System Supplier: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
100 Gbps
Bharti Airtel, Botswana Telecommunications Corporation, British Telecom, Comores Telecom, Etisalat, France Telecom, Mauritius Telecom, MTN Group, Neotel, Saudi Telecom Company (STC), Saudi Arabia, SPV2, Sudan Telecom Limited, Sudatel, Tanzania Telecommuni Alcatel-Lucent Submarine Networks Telkom SA Limited
Alcatel-Lucent Submarine Networks 2014
100 Gbps
Region: EMEA
EAST-WEST
Santo Domingo Morant Point
EAST-WEST RFS Year:
2011
Est. End of Service Date: 2036 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
LANDING POINTS: • Morant Point (Jamaica) • Santo Domingo (Dominican Republic) • Tortola (British Virgin Islands)
35,000,000 1,700
120 Gbps
Design Capacity: 1.6 Tbps
System Installer: Orange Magine Upgrader:
Upgrade Year: Upgraded Capacity:
Xtera Communications 2016
100 Gbps
Region: Americas
Tortola
ECFS
EAST CARIBBEAN FIBER SYSTEM RFS Year:
1995
Est. End of Service Date: 2020 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
56,000,000 1,875
2.5 Gbps
Design Capacity: 4.6 Tbps Owners:
System Supplier:
AT&T, BET (Barbados), C&W, France Telecom, TSTT Alcatel Submarine Networks
System Installer: C&W (Marine) Cableship:
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Tortola
Anguilla St. Martin
Baliff Canefield
Martinique St. Lucia
Kingstown
• Anguilla (Anguilla) • Baliff (Guadeloupe) • Basseterre (St. Kitts & Nevis) • Bridgetown (Barbados) • Canefield (Dominica) • Dickenson Bay (Antigua) • Kingstown (St. Vincent) • Martinique (Martinique) • Montserrat (Montserrat) • Port Salines (Grenada) • St. Lucia
Orange, Telecom Services Trinidad & Tobago Xtera Communications 2009, 2013, 2016
10 Gbps, 40 Gbps, 100 Gbps
Region: Americas
Basseterre Dickenson Bay Montserrat
LANDING POINTS:
Mercury
Bridgetown
Port Salines Trinidad
Tr in
id
ad
Cu
ra
ça
o
ECLINK
ECLINK RFS Year:
2007
Est. End of Service Date: 2032 Total Length (kms): Initial Capacity:
1,240
1.875 Tbps
Design Capacity: 7.2 Tbps Fiber Pairs:
3 Fiber Pairs
Channels: 60 Owners:
System Supplier:
Columbus Networks, New World Network Tyco Telecommunications SSI, Alcatel, NEC
System Installer: Tyco SSI Cableship:
Upgrader: Upgrade Year:
LANDING POINTS: • Curacao (Curacao) • Trinidad (Trinidad)
Upgraded Capacity:
Tyco Durable, Ile de Sein, Ile de Batz, Fu Hai, Segero, Cable Innovator TE SubCom 2016
100 Gbps
Region: Americas
YOUR AD HERE
Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com
ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000
F E B-16
M A Y -16
A UG-16
NOV -17
I S S U E 1 7
I S S U E 1 8
I S S U E 1 9
I S S U E 2 0
EIG
Bude
Monaco Sesimbra Gibraltar Tripoli
EUROPE INDIA GATEWAY RFS Year:
2011
Est. End of Service Date: 2036 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Channel Capacity: Owners:
LANDING POINTS: • Abu Talat (Egypt) • Bude (United Kingdom) • Djibouti (Republic of Djibouti) • Fujairah (United Arab Emirates) • Gibraltar (Gibraltar) • Jeddah (Saudi Arabia) • Monaco (Monaco) • Mumbai (India) • Muscat (Oman) • Zafarana (Egypt) • Sesimbra (Portugal) • Tripoli (Libya)
System Supplier: Marine Surveyor: System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
700,000,000 15,000
3.84 Tbps 100 Gbps
AT&T, Bharti Airtel, British Telecom, BSNL, C&W, Djibouti Telecom, Du, Gibtelecom, Libyan Post, Telecom, and Information Technology Company, MTN Group, Omantel, PT Comunicações, Saudi Telecom Company (STC), Telekom SA, Verizon, Telecom Egypt
Tyco Telecommunications, AlcatelLucent Submarine Networks Fugro, UTEC, GEMS
Oman Telecommunications Company, Telecom Egypt, Verizon Ltd., Vodafone Limited Ciena 2014
100 Gbps
Region: EMEA
Abu Talat Zafarana Jeddah
Djibouti
Fujairah Muscat
Mumbai
PROJECT COMPLETION PHASES:
ELLALINK
Survey
System Manufacture
System Installation
Lisbon
M
ad
eir
a
Pre-Engineering
Gran Canaria
Praia
Fortaleza
ELLALINK [PLANNED] RFS Year:
2018
Est. End of Service Date: 2043 Est. System Cost (US$):
Total Length (kms):
250,000,000 5,875
Design Capacity: 30 Tbps Fiber Pairs:
LANDING POINTS: • Fortaleza (Brazil) • São Paulo (Brazil) • Sines (Portugal)
3 Fiber Pairs
Channels: 100
Channel Capacity:
Owners:
100 Gbps
Telebras, Islalink
Region: Transatlantic
Commissioning & Acceptance
ENDEAVOUR
K e a w a u l a
S y d n e y
ENDEAVOUR RFS Year:
2008
Est. End of Service Date: 2033 Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer: Upgrader: Upgrade Year:
LANDING POINTS: • Keawaula (Hawaii) • Sydney (Australia)
Upgraded Capacity:
9,125
80 Gbps
2 Fiber Pairs
Telstra (Australia)
Telstra International Infinera 2014
100 Gbps
Region: AustralAsia
ESTEPONA-TETOUAN
ESTEPONA-TETOUAN RFS Year:
1994
Est. End of Service Date: 2019 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier:
10,000,000 113
3.7 Gbps
Telefonica
STC Submarine Systems
System Installer: FCR Cableship:
System Maintainer:
Vercors
Telefonica de España S.A.U.
Region: EMEA
E s t e p o n a
T e u t a n
LANDING POINTS: • Estepona (Spain) • Tetouan (Morocco)
EUROPA
EUROPA RFS Year:
2013
Est. End of Service Date: 2038 Fiber Pairs:
Owners:
8 Fiber Pairs
CYTA, Lebanese ministry of Telecommunications
Region: EMEA
Pentaskhinos
Tripoli
LANDING POINTS: • Pentaskhinos (Cyprus) • Tripoli (Lebanon)
FA-1 NORTH/SOUTH
Northport Island Park
LANDING POINTS: • • • •
Island Park (USA) Northport (USA) Plerin (France) Porthcurno (United Kingdom)
Porthcurno
FLAG ATLANTIC 1 NORTH/SOUTH RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
900,000,000 12,820
4.68 Tbps 24 Tbps
6 Fiber Pairs
Owners: Global Cloud Xchange
System Supplier:
Alcatel Submarine Networks
System Installer: Alcatel Submarine Networks
Marine Surveyor: Survey Boat:
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Svitzer, SAIC
Vessel of Opportunity
Global Cloud Xchange Infinera, Ciena
2010, 2011, 2013
10 Gbps, 100 Gbps
Region: Transatlantic
Plerin
FALCON
Aqaba
Kuwait City
Bandar Abbas Cha
ba
D Khuba as i ab
Al M -Kh Su an ob m am ar ai a sm a
Suez
Jeddah Port Sudan
Al Hudaydah
LANDING POINTS: • Al Ghaydah (Yemen) • Al Hudaydah (Yemen) • Al-Khobar (Saudi Arabia) • Al Seeb (Oman) • Aqaba (Jordan) • Bandar-E Abbas (Iran) • Chabahar (Iran) • Colombo (Sri Lanka) • Dubai (UAE) • Hulhumalé (India) • Jeddah (Saudi Arabia) • Kuwait City (Kuwait) • Manama (Bahrain)
Al Ghaydah
ha
Al Seeb
r
Mumbai
Trivandrum Colombo HulhumalĂŠ
FALCON RFS Year:
2006
Est. End of Service Date: 2031 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
900,000,000 12,181
90 Gbps
Design Capacity: 2.56 Tbps Fiber Pairs:
Owners: System Supplier:
8 Fiber Pairs
Global Cloud Xchange
Alcatel Submarine Networks
System Installer: Alcatel Submarine Networks
System Maintainer:
Upgrader:
E-marine PJSC, Oman Telecommunications Company, Reliance Globalcom Ltd Infinera
Region: Indian Ocean Pan-East Asian
FAR EAST
Magadan
Okha
Mys Levashova
FAR EAST RFS Year:
2015
Est. End of Service Date: 2040 Est. System Cost (US$):
Total Length (kms):
50,000,000 1,844
Design Capacity: 1.6 Tbps Fiber Pairs:
2 Fiber Pairs
Channels: 8
Channel Capacity:
Owners: System Supplier:
LANDING POINTS: • Mys Levashova (Russia) • Okha (Russia) • Magadan (Russia)
100 Gbps
Rostelcom
Huawei Marine Networks
System Installer: Global Marine Systems Limited Cableship:
Cable Innovator
Region: AustralAsia
FARICE-1
FARICE-1 RFS Year:
2004
Est. End of Service Date: 2029 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
25,000,000 1,395
20 Gbps
Owners: Farice Ltd., Iceland Telecom Ltd.
System Supplier:
Cableship: Marine Surveyor: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Pirelli
Pertinacia Fugro
Farice ehf Ciena 2013
100 Gbps
Region: EMEA
LANDING POINTS: • Dunnet Bay (Scotland) • Funningsfjør∂ur (Faroe Islands) • Sey∂isfjör∂ur (Iceland)
Dunnet Bay
FARLAND
FARLAND RFS Year:
1994
Est. End of Service Date: 2019 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier: System Maintainer:
10,000,000 149
18 Gbps
British Telecom
Tyco Telecommunications
British Telecommunications PLC
Region: EMEA
A l d e b u r g h
D o m b u r g
LANDING POINTS: • Aldeburgh (United Kingdom) • Domburg (Netherlands)
YOUR AD HERE
Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com
ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000
F E B-16
M A Y -16
A UG-16
NOV -17
I S S U E 1 7
I S S U E 1 8
I S S U E 1 9
I S S U E 2 0
FASTER
Shima Chikura China
LANDING POINTS: • • • •
Bandon, Oregon (USA) Chikura (Japan) Shima (Japan) Tanshui (Taiwan)
Oregon
FASTER RFS Year:
2016
Est. End of Service Date: 2041 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
350,000,000 9,000
28 Tbps 60 Tbps
6 Fiber Pairs
Channels: 100
Channel Capacity: 100 Gbps
Owners: Google, China Mobile International, China Telecom Global, Global Transit, KDDI and Singtel
System Supplier:
NEC
System Installer: Orange Marine Cableship:
RenĂŠ Descartes
Region: Transpacific
FEHMARN BELT
FEHMARN BELT RFS Year:
2000
Est. End of Service Date: 2025 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier:
10,000,000 20
2.5 Gbps
Teliasonera Ericsson
System Installer: Nexans Cableship:
System Maintainer:
Pleijel
TeliaSonera International Carrier AB
Region: EMEA
Rödbyhavn Puttgarden
LANDING POINTS: • Puttgarden (Germany) • Rödbyhavn (Denmark)
FIBRALINK
n
K i
n g s t o
M o n t e g o B a y
O c h o R i o s
P u e r t o P l a t a
FIBRALINK RFS Year:
2006
Est. End of Service Date: 2031 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
30,000,000 2,438
40 Gbps
Design Capacity: 7.2 Tbps Fiber Pairs:
Owners:
LANDING POINTS: • • • •
Kingstown (St. Vincent) Montego Bay (Jamaica) Ocho Rios (Jamaica) Puerto Plata (Dominican Republic)
System Supplier:
2 Fiber Pairs
Columbus Networks Alcatel
System Installer: International Telecom Cableship:
IT Intrepid
Region: Americas
FLAG EUROPE-ASIA
Porthcurno
Said Alexandria Port Aqaba Fujairah Jeddah
Su
ez
Estepona
Palermo
FLAG EUROPE-ASIA RFS Year:
1997
Est. End of Service Date: 2022 Est. System Cost (US$):
Total Length (kms):
LANDING POINTS: • • • • • • • • • • • •
Alexandria (Egypt) Aqaba (Jordan) Ben Pak Para (Thailand) Estepona (Spain) Fujairah (United Arab Emirates) Hong Kong (China) Jeddah (Saudi Arabia) Keoje (South Korea) Miura (Japan) Mumbai (India), Nanhui District (China) Ninomiya (Japan) Palerm (Italy)
Initial Capacity:
720,000,000 27,433
10 Gbps
Design Capacity: 500 Gbps Fiber Pairs:
Owners: System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
2 Fiber Pairs
Global Cloud Xchange
China Telecommunications Corporation, E-marine PJSC, Reliance Globalcom Ltd Ciena 2012
100 Gbps
Region: Indian Ocean Pan-East Asian, EMEA
Ni M no iu mi ra ya
Keoje Nanhui Hong Kong
tu
So
Sa
ng
kh
la
Mumbai
n
Penang Ban Pak Para
FLORES-CORVO
FLORES-CORVO RFS Year:
2014
Est. End of Service Date: 2039 Est. System Cost (US$):
Total Length (kms):
20,000,000 685
Design Capacity: 0.96 Tbps Fiber Pairs:
6 Fiber Pairs
Channels: 16
Channel Capacity:
Owners: System Supplier:
10 Gbps
Viatel (Azores)
Huawei Marine Networks, Nexans
System Installer: Huawei Marine Networks Region: EMEA
Corvo Flores
LANDING POINTS: • • • •
Flores (Azores) Corvo (Azores) Graciosa (Azores) Faial (Azores)
Graciosa Faial
FOG
FIBER OPTIC GULF RFS Year:
1998
Est. End of Service Date: 2023 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
Kuwait City
System Supplier: System Maintainer:
80,000,000 1,286
20 Gbps
4 Fiber Pairs
Bahrain Telephone Co., Kuwait Ministry of Communications, Qatar Telecommunication Company, UAE Telecommunications Company Fujitsu
E-marine PJSC
Region: EMEA
Manama Doha
LANDING POINTS: • • • •
Doha (Qatar) Dubai (UAE) Kuwait City (Kuwait) Manama (Bahrain)
Dubai
Al e
ar xan an dr a ia
Mazara
Za f
GBICS
GULF BRIDGE INTERNATIONAL CABLE SYSTEM RFS Year:
2011
Est. End of Service Date: 2036 Est. System Cost (US$):
Total Length (kms):
445,000,000 4,719
Design Capacity: 51.2 Tbps Fiber Pairs:
4 Fiber Pairs express route, 2 Fiber Pairs other landings
Channels: 128
Channel Capacity:
Owners: System Supplier:
100 Gbps
Gulf Bridge International TE SubCom
System Installer: e-Marine
System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
Gulf Bridge International Inc., Oman Telecommunications Company Xtera Communications 2012
100 Gbps
Region: EMEA
Al Fa w Bu sh eh r h
M
um
ba
i
Al
Se
eb
ira ja
Fu
Al K Al ho H ba D idd r oh a
Kuwait City
LANDING POINTS: • Alexandria (Egypt) • Al Hidd (Bahrain) • Al-Khobar (Saudi Arabia) • Al Seeb (Oman) • Bushehr (Iran) • Doha (Qatar) • Dubai (United Arab Emirates) • Fujairah (United Arab Emirates) • Jeddah (Saudi Arabia) • Kuwait City (Kuwait) • Mazara (Italy) • Mumbai (India) • Zafarana (Egypt)
GCN
Hams Bluff
Galisbay Gustavia
Basseterre Dickenson Bay Baie-Mahault Baliff Canefield Le Lamentin Port Castries
Kingstown
Bridgetown
Port Salines
Macqueripe
GLOBAL CARIBBEAN NETWORK LANDING POINTS: • Baie-Mahault (Guadeloupe) • Baliff (Guadeloupe) • Basseterre (St. Kitts & Nevis) • Bridgetown (Barbados) • Canefield (Dominica) • Dickenson Bay (Antigua) • Galisbay (St Martin) • Hams Bluff (Virgin Islands) • Kingstown (St. Vincent) • Le Lamentin (Martinique) • Macqueripe (Trinidad and Tobago)
RFS Year:
2007
Est. End of Service Date: 2032 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
17,520,000 1,926
1.2 Tbps
Design Capacity: 5 Tbps Owners:
System Supplier: Upgrader: Upgrade Year: Upgraded Capacity:
Global Carribean Network
Alcatel Submarine Networks Ciena 2013
40 Gbps
Region: Americas
GEMINI BERMUDA
Bermuda
GEMINI BERMUDA RFS Year:
2007
Est. End of Service Date: 2032 Est. System Cost (US$):
Total Length (kms):
40,000,000 1,500
Design Capacity: 1.6 Tbps Owners:
C&W, Verizon
System Installer: Orange Marine
System Maintainer:
Upgrader: Upgrade Year:
LANDING POINTS: • Manasquan, NJ (USA) • Bermuda
Upgraded Capacity:
Verizon Xtera 2016
100 Gbps
Region: Americas
GEORGIA-RUSSIA
GEORGIA-RUSSIA RFS Year:
2000
Est. End of Service Date: 2025 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer:
20,000,000 280
2.5 Gbps
4 Fiber Pairs
DanTelco, FOPTNET, Rostelecom OJSC “Rostelecom”
Region: EMEA
Novorossiysk
Sochi
Poti
LANDING POINTS: • Novorossiysk (Russia) • Poti (Georgia) • Sochi (Russia)
Bude
GLO-1
Vigo Sesimbra Casablanca
Nouakchott Dakar
GLOBACOM-1 RFS Year:
2010
Est. End of Service Date: 2035 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
640 Gbps 2.5 Tbps
2 Fiber Pairs
Alcatel Submarine Networks
System Installer: Alcatel Submarine Networks, IT International Telecom Cableship:
Marine Surveyor: System Maintainer:
Lagos
8,717
Owners: Globacom Ltd.
System Supplier:
Accra
260,000,000
Ile de Batz, IT Intrepid
Alcatel Submarine Networks
IT International Telecom Canada
Region: EMEA
LANDING POINTS: • • • • • •
Accra (Ghana) Bude (United Kingdom) Casablanca (Morocco) Dakar (Senegal) Lagos (Nigeria) Nouakchott (Mauritania) • Sesimbra (Portugal) • Vigo (Spain)
GLOBENET
GLOBENET RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
Tuckerton
610,000,000 22,690
40 Gbps
Design Capacity: 4.6 Tbps Fiber Pairs:
Channel Capacity: Owners:
Bermuda
System Supplier: System Maintainer: Upgrader:
Boca Raton
Upgrade Year: Upgraded Capacity:
4 Fiber Pairs 100 Gbps Globenet
TE SubCom
IT International Telecom Canada Xtera Communications 2010, 2016 100 Gbps
Region: Americas
Punta Gorda
Fortaleza
Rio de Janeiro
LANDING POINTS: • • • • • •
Bermuda (Bermuda) Boca Raton (USA) Fortaleza (Brazil), Maiquetia (Venezuela) Rio de Janeiro (Brazil) Tuckerton (USA)
GO-1
M a z a r a
C a t a n i a
S t . P a u l ’ s S t . B a y G e o r g e ’ s B a y
GO-1 RFS Year:
1995
Est. End of Service Date: 2020 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier:
LANDING POINTS: • • • •
Cantina (Sicily) Mazara (Italy) St George’s Bay (Malta) St Paul’s Bay (Malta)
10,000,000 290
20 Gbps GO
Alcatel-Lucent Submarine Networks
System Installer: Elettra Cableship:
Teliri
Region: EMEA
GOKI
GOKI RFS Year:
2013
Est. End of Service Date: 2038 Est. System Cost (US$):
Incheon
Total Length (kms):
120,000,000 4,200
Design Capacity: 80 Gbps Owners:
System Supplier:
Kita-Kyushu
AT&T
Xtera Communications
System Installer: Kokusai Cable Ship Region: AustralAsia
Okinawa
LANDING POINTS: • Incheon (Korea) • Kita-Kyushu (Japan) • Okinawa Prefecture (Japan) • Tumon (Guam)
Tumon
GONDWANA-1
Poindimie
Mouli Island Lifou
Sy
dn
ey
Noum’ea
GONDWANA-1 RFS Year:
2008
Est. End of Service Date: 2033 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
LANDING POINTS: • Lifou (New Caledonia) • Mouli Island (New Caledonia) • Noum’ea (New Caledonia) • Poindimie (New Caledonia) • Sydney (Australia)
Owners: System Supplier:
57,500,000 2,152
640 Gbps
Post and Telecommunications Office of New Caledonia Alcatel Submarine Networks
System Installer: Alcatel Submarine Networks Cableship:
System Maintainer:
Ile de Re
OPT - Nouvelle Caledonie
Region: AustralAsia
GREENLAND CONNECT
Nuuk
Landeyjarsandur
Qaqortoq
Milton
GREENLAND CONNECT RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
126,000,000 4,733
20 Gbps
Design Capacity: 2.56 Tbps Fiber Pairs:
Owners: System Supplier:
LANDING POINTS: • Landeyjarsandur (Iceland) • Milton (Canada) • Nuuk (Greenland) • Qaqortoq (Greenland)
2 Fiber Pairs
Tele Greenland
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Cableship:
Marine Surveyor: System Maintainer:
Maersk Responder, Blue Castor, Ile de Sein Elettra
TELE Greenland A/S
Region: Americas
GREENLAND CONNECT NORTH
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
Aasiaat Sisimiut Maniitsoq Nuuk
GREENLAND CONNECT NORTH [PLANNED] RFS Year:
2018
Est. End of Service Date: 2043
Design Capacity: 4.8 Tbps
Channel Capacity:
LANDING POINTS: • • • •
Nuuk (Greenland) Maniitsoq (Greenland) Sisimiut (Greenland) Aasiaat (Greenland)
Owners: System Supplier:
100 Gbps
Tele Greenland
Huawie Marine
System Installer: Huawei Marine Region: Americas
The Power of Submarine Information Transmission
There’s a new power under ocean uniting the world in a whole new way. With unparalleled development expertise and outstanding technology, Huawei Marine is revolutionizing trans-ocean communications with a new generation of repeaters and highly reliable submarine cable systems that offer greater transmission capacity, longer transmission distances and faster response to customer needs. Huawei Marine: connecting the world one ocean at a time.
GUANTÁNAMO BAY CABLE
GUANTÁNAMO BAY CABLE RFS Year:
2016
Est. End of Service Date: 2041 Est. System Cost (US$):
Total Length (kms): Owners: System Supplier:
31,000,000 1,500
US Government
Xtera Communications, NSW
System Installer: IT International Telecom
Marine Surveyor:
US Government
Region: Americas
South Florida
Guantánamo Bay
LANDING POINTS: • Guantánamo Bay (Cuba) • Florida (USA)
GUANTÁNAMO BAY 2
GUANTÁNAMO BAY 2 [PLANNED] RFS Year:
2018
Est. End of Service Date: 2043 Total Length (kms):
Channel Capacity: Owners: System Supplier:
1,200
100 Gbps
US Government
Xtera Communications
System Installer: Xtera Communications Region: Americas
Guantánamo Bay
Puerto Rico
LANDING POINTS: • Puerto Rico • Guantánamo Bay (Cuba)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
GWEN
GREECE TO WESTERN EUROPE NETWORK RFS Year:
2004
Est. End of Service Date: 2029 Est. System Cost (US$):
Total Length (kms): Fiber Pairs: Owners:
20,000,000 647
4 Fiber Pairs OTE
Region: EMEA
B a r i
C o r f u
LANDING POINTS: • Bari (Italy) • Corfu (Greece)
HANNIBAL
HANNIBAL RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms):
10,000,000 180
Design Capacity: 9.6 Tbps Fiber Pairs:
3 Fiber Pairs
Channels: 80
Channel Capacity:
Owners: System Supplier:
40 Gbps
Tunisie Telecom (Tunisia) Huawei Marine Networks
System Installer: Global Marine Systems Limited, Huawei Marine Networks Cableship:
Marine Surveyor:
Sovereign UTEC
Region: EMEA
Mazara
Kelibia
LANDING POINTS: • Kelibia (Tunisia) • Mazara (Italy)
HANTRU-1
Tumon
Ebeye
Reagan Test Site Majuro
Pohnpei
HANTRU-1 RFS Year:
2010
Est. End of Service Date: 2035 Est. System Cost (US$):
LANDING POINTS: • Ebeye (Kwajalein) • Majuro (Marshall Islands) • Pohnpei (Micronesia) • Reagan Test Site (Kwajalein) • Tumon (Guam)
Total Length (kms): Owners: System Supplier:
130,000,000 2,908
Hannon Armstrong TE SubCom
System Installer: TE SubCom
System Maintainer:
Truestone LLC
Region: AustralAsia
YOUR AD HERE
Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com
ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000
F E B-16
M A Y -16
A UG-16
NOV -17
I S S U E 1 7
I S S U E 1 8
I S S U E 1 9
I S S U E 2 0
HAWAIKI
Hawaii
Wallis Vanuatu Fiji
New Caledonia
Samoa American Samoa
Norfolk Island
Sydney
Whangarei
LANDING POINTS: • • • • • • • • •
Oregon (USA) Sydney (Australia) Hawaii (USA) Norfolk Island New Caledonia Fiji Samoa American Samoa Whangarei (New Zealand)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
Oregon
HAWAIKI [PLANNED] RFS Year:
2018
Est. End of Service Date: 2043 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
300,000,000 14,000
12.8 Tbps 30 Tbps
2 Fiber Pairs
Channels: 64
Channel Capacity: Owners: System Supplier:
100 Gbps
Hawaiki Submarine Cable TE SubCom
System Installer: TE SubCom Cableship:
Marine Surveyor:
Reliance EGS
Region: AustralAsia, Transpacific
HAWK CABLE SYSTEM
Marseille
LANDING POINTS: • Alexandria (Egypt) • Anatoliko (Cyprus) • Marseille (France)
HAWK CABLE SYSTEM RFS Year:
2011
Est. End of Service Date: 2035 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs:
250,000,000 3,181
2.72 Tbps
4 Fiber Pairs
Channels: 68
Channel Capacity:
Owners: System Supplier:
10 Gbps
Global Cloud Xchange Fujitsu
System Installer: Elettra, Orange Marine
Marine Surveyor:
Fugro
Region: EMEA
Anatoliko
Alexandria
Ly n
n
H
er rin Co g ve
HIBERNIA ATLANTIC
HIBERNIA ATLANTIC RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
320,000,000 12,111
10.16 Tbps
Design Capacity: 25 Tbps Fiber Pairs:
4 Fiber Pairs
Channels: 48
Channel Capacity:
Owners: System Supplier:
64
Columbia Ventures Corporation Tyco Telecommunications SSI
System Installer: FCR Cableship:
LANDING POINTS: • • • • •
Coleraine (Ireland) Dublin (Ireland) Herring Cove (Canada) Lynn (USA) Southport (United Kingdom)
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Vercors, Iberus, Nordic King, Teneo, Dock Express 20, Global Mariner, Atlantida Hibernia Netoworks
Huawei Marine Networks 2011
100 Gbps
Region: Transatlantic
So
Dublin
ut hp or
t
Coleraine
HIBERNIA EXPRESS
HIBERNIA EXPRESS RFS Year:
2015
Est. End of Service Date: 2040 Est. System Cost (US$):
Total Length (kms):
120,000,000 4,600
Design Capacity: 53 Tbps Fiber Pairs:
6 Fiber Pairs
Channels: 100
Channel Capacity:
Owners: System Supplier:
100 Gbps, 200 Gbps on select segments Hibernia Atlantic TE SubCom
System Installer: TE SubCom
Marine Surveyor: Survey Boat:
EGS
RV Ridley Thomas
Region: Transatlantic
New York
LANDING POINTS: • Halifax, Nova Scotia (Canada) • Brean (UK) • Cork (Ireland)
Cork
London
HONOTUA
HONOTUA RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
Spencer Beach
Owners: System Supplier:
122,000,000 4,634
640 Gbps
OPT French Polynesia
Alcatel-Lucent Submarine Networks
M
• Huahine (French Polynesia) • Moorea (French Polynesia) • Papeete (French Polynesia) • Spencer Beach, Hawaii (USA) • Uturoa (Raiatea, French Polynesia) • Vaitape (Bora Bora, French Polynesia)
Vaitape U
LANDING POINTS:
tu ro oo a re H ua a hi Pa ne pe et e
Region: AustralAsia
HSCS
HOKKAIDO-SAKHALIN CABLE SYSTEM RFS Year:
2008
Est. End of Service Date: 2033 Est. System Cost (US$):
Total Length (kms):
20,000,000 559
Design Capacity: 640 Gbps Owners:
System Supplier:
NTT Communications, TTK NEC
System Installer: KDD Cableship:
System Maintainer:
Subaru
NTT Communications Corporation, TTK
Region: AustralAsia
Nevelsk
Ishikari
LANDING POINTS: • Ishikari (Japan) • Nevelsk (Russia)
HUGO
Porthcurno Guernsey Lannion
HUGO RFS Year:
2006
Est. End of Service Date: 2031 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier:
LANDING POINTS: • Guernsey (Guernsey) • Lannion (France) • Porthcurno (United Kingdom)
11,960,000 426
3.3 Tbps C&W
Alcatel Submarine Networks
System Installer: Tyco SSI Cableship:
System Maintainer:
Tycom Reliance
Vodafone Limited
Region: EMEA
I2I
Chennai
I2I RFS Year:
2002
Est. End of Service Date: 2027 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
Tuas
90,000,000 3,100
160 Gbps 84 Tbps
8 Fiber Pairs
Channels: 105
Channel Capacity: 100 Gbps
Owners: Bharti Airtel
Marine Surveyor:
Upgrader: Upgrade Year: Upgraded Capacity:
C&C Technologies Ciena 2014
100 Gbps
Region: Indian Ocean Pan-East Asian
LANDING POINTS: • Chennai (India) • Tuas (Singapore)
ICN1
INTERCHANGE I RFS Year:
2014
Est. End of Service Date: 2039 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
32,000,000 1,259
20 Gbps
Design Capacity: 320 Gbps Owners:
System Supplier:
Interchange Limited
TE SubCom, Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Region: AustralAsia
Port Vila
LANDING POINTS: • Port Vila (Vanuatu) • Suva (Fiji)
Suva
ICN2
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
Honiara
Port Moresby
Luganville Port Vila
INTERCHANGE II [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms):
LANDING POINTS: • Port Moresby (Papau New Guinea) • Port Vila (Vanuatu) • Luganville (Vanuatu) • Honiara (Solomon Islands)
72,000,000 3,500
Design Capacity: 1.28 Tbps Fiber Pairs:
1 Fiber Pair
Channels: 32
Channel Capacity:
Owners:
40 Gbps
Interchange Limited
Region: AustralAsia
IFC-1
IRELAND-FRANCE CABLE-1 [PLANNED] RFS Year:
2018
Est. End of Service Date: 2043 Total Length (kms):
565
Design Capacity: 120 Tbps Fiber Pairs:
Owners:
Dublin
6 Fiber Pairs
Ireland-France Subsea Cable
Region: EMEA
Cork
Lannion Paris
LANDING POINTS: • Cork (Ireland) • Paris (France)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
YOUR AD HERE
Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com
ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000
F E B-16
M A Y -16
A UG-16
NOV -17
I S S U E 1 7
I S S U E 1 8
I S S U E 1 9
I S S U E 2 0
I-ME-WE
Marseille
Catania Tripoli Alexandria Suez
Jeddah
LANDING POINTS: • Alexandria (Egypt) • Catania (Italy) • Fujairah (United Arab Emirates) • Jeddah (Saudi Arabia) • Karachi (Pakistan) • Marseille (France) • Mumbai (India) • Suez (Egypt) • Tripoli (Lebanon)
INDIA-MIDDLE EAST-WESTERN EUROPE RFS Year:
2010
Est. End of Service Date: 2035 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
320,000,000 13,000
520 Gbps
Design Capacity: 5.6 Tbps Fiber Pairs:
3 Fiber Pairs
Channels: 128 Owners:
System Supplier:
Bharti Airtel, Etisalat, France Telecom, Ogero (Lebanon), PTCL (Pakistan), STC (Saudi Arabia), Tata Communications, Telecom Egypt, Telecom Italia Sparkle Alcatel-Lucent Submarine Networks
System Installer: S.B. Submarine Systems, NEC Cableship:
Marine Surveyor: System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
Fujairah
Cable Innovator Fugro
Orange, TATA Communications, Telecom Egypt, Telecom Italia Sparkle Mitsubishi
2012, 2014
40 Gbps, 100 Gbps
Region: EMEA
Karachi
Mumbai
ITALY-ALBANIA
Durres
Bari
ITALY-ALBANIA RFS Year:
1998
Est. End of Service Date: 2023 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs:
LANDING POINTS: • Bari (Italy) • Durres (Albania)
Owners:
10,000,000 236
2.5 Gbps
1 Fiber Pair
Telecom Italia Sparkle
Region: EMEA
ITALY-GREECE
Otranto Corfu
ITALY-GREECE RFS Year:
1995
Est. End of Service Date: 2020 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs:
LANDING POINTS: • Corfu (Greece) • Otranto (Italy)
Owners:
10,000,000 161
1.69 Gbps
4 Fiber Pairs
Telecom Italia
Region: EMEA
ITALY-LIBYA
ITALY-LIBYA RFS Year:
2000
Est. End of Service Date: 2025 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
10,000,000 570
2.5 Gbps
Design Capacity: 120 Gbps Fiber Pairs:
Owners: System Maintainer: Upgrade Year: Upgraded Capacity:
2 Fiber Pairs
Telecom Italia
Telecom Italia Sparkle 2011
40 Gbps
Region: EMEA
Mazara
Tripoli
LANDING POINTS: • Mazara (Italy) • Tripoli (Libya)
ITALY-MONACO
ITALY-MONACO RFS Year:
1995
Est. End of Service Date: 2020 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
Savona Monaco
LANDING POINTS: • Monaco (Monaco) • Savona (Italy)
System Maintainer:
10,000,000 162
565 Mbps
1 Fiber Pairs
Telecom Italia
Telecom Italia Sparkle
Region: EMEA
JAKA2DELEMA
Sangatta Pontianak Toweli Ketapang Pangkalanbun Bandjermasin
JAKA2DELEMA RFS Year:
2010
Jember Benculuk
Mataram
Est. End of Service Date: 2035 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
116,000,000 1,800
960 Gbps 9.6 Tbps
3 Fiber Pairs
Channels: 32
Channel Capacity: 100 Gbps
Owners: PT Telekomunikasi Indonesia
System Supplier:
NSW, Fujitsu
System Installer: Fujitsu, Orange Marine Upgrader:
Upgrade Year: Upgraded Capacity:
Fujitsu 2013
100 Gbps
Region: AustralAsia
LANDING POINTS: • Bandjermasin (Indonesia) • Benculuk (Indonesia) • Jember (Indonesia) • Ketapang (Indonesia) • Mataram (Indonesia) • Pangkalanbun (Indonesia) • Pontianak (Indonesia) • Sangata (Indonesia) • Toweli (Indonesia)
JAKABARE
Tuas
Batam Pontianak
Jakarta
JAKABARE RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
40,000,000 1,330
160 Gbps
Design Capacity: 1.28 Tbps Owners:
System Supplier:
LANDING POINTS: • • • •
Batam (Indonesia) Jakarta (Indonesia) Pontianak (Indonesia) Tuas (Singapore)
Indosat NEC
System Installer: NEC, ASEAN Cableship, Orange Marine Cableship:
Cable Innovator
Region: AustralAsia
JAPAN-US
i ak a ar m ib ya ta ru Ki Ma
Shima
LANDING POINTS: • • • • • •
Kitaibaraki (Japan) Makaha (Hawaii) Maruyama (Japan) Morro Bay (USA) Point Arena (USA) Shima (Japan)
Point Arena Morro Bay
Makaha
JAPAN-US RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
590,000,000 21,880
640 Gbps
Design Capacity: 6.4 Tbps Fiber Pairs:
4 Fiber Pairs
Channels: 16
Channel Capacity:
Owners: System Supplier:
100 Gbps
AT&T, Japan Telecom, KDDI, MCIWorldCom, NTTWN Alcatel Submarine Networks, Fujitsu, Ocean Cable Company
System Installer: Global Marine Systems Limited Cableship:
System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
Subaru, Cable Innovator
AT&T, KDDI, NTT Communications Corporation, Softbank Telecom Corp, Verizon Ltd Ciena 2012
100 Gbps
Region: Transpacific
JASUKA
Batam
Pontianak
Tanjung Pandan
JASUKA RFS Year:
Est. End of Service Date: 2031 Est. System Cost (US$):
Jakarta
2006
Total Length (kms): Initial Capacity:
280,000,000 354
20 Gbps
Design Capacity: 320 Gbps Owners:
System Supplier:
• • • •
Batam (Indonesia) Jakarta (Indonesia) Pontianak (Indonesia) Tanjung Pandan (Indonesia)
Nokia Siemens Networks
System Installer: Nokia Siemens Networks
Marine Surveyor:
LANDING POINTS:
PT Telekom
Upgrader: Upgrade Year: Upgraded Capacity:
Nokia Siemens Networks Nokia Siemens Networks 2011
40 Gbps
Region: AustralAsia
KAFOS
Mangalia
Varna
Istanbul
KARADENIZ FIBER OPTIK SISTEMI RFS Year:
1997
Est. End of Service Date: 2022 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier:
LANDING POINTS: • Istanbul (Turkey) • Mangalia (Romania) • Varna (Bulgaria)
20,000,000 4,640
1.2 Gbps
BTC, Turk Telecom
Alcatel Submarine Networks
System Installer: FCR Cableship:
Vercors
Region: EMEA
KELTRA-2
KELTRA-2 RFS Year:
2007
Est. End of Service Date: 2032 Total Length (kms):
209
Design Capacity: 20 Gbps Fiber Pairs:
Owners: System Supplier:
6 Fiber Pairs
Telecom Italia, Tunisie Telecom (Tunisia) Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks
System Maintainer:
Telecom Italia Sparkle
Region: EMEA
LANDING POINTS: • Kelibia (Tunisia) • Trapini (Italy)
KHULNA-CHENNAI
K h u l n a
C h e n n a i
KHULNA-CHENNAI RFS Year:
2010
Est. End of Service Date: 2035 Est. System Cost (US$):
Total Length (kms):
LANDING POINTS: • Chennai (India) • Khulna (Bangladesh)
Owners:
48,000,000 115
Bangladesh Submarine Cable Company
Region: Indian Ocean Pan-East Asian
KJCN
Pusan
Kitakyushu
KOREA-JAPAN CABLE NETWORK RFS Year:
Fukuoka
2002
Est. End of Service Date: 2027 Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
500
2.88 Tbps 28.8 Tbps
12 Fiber Pairs
Channels: 24
Channel Capacity: 100 Gbps
Owners: KEPCO, KT Coropration, NTT Communications, SOFTBANK Telecom Corp
System Supplier:
Fujitsu
System Installer: Fujitsu Cableship:
System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
Maersk Recorder
KT Corporation, NTT Communications Corporation, SoftBank Telecom Corp Ciena 2015
100 Gbps
Region: AustralAsia
LANDING POINTS: • Fukuoka (Japan) • Kita-Kyushu (Japan) • Pusan (South Korea)
KODIAK KENAI
Anchorage Kenai Seward Homer
Kodiak
Narrow Cape
KODIAK KENAI RFS Year:
2006
Est. End of Service Date: 2031 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
30,000,000 971
2.5 Gbps
Design Capacity: 10 Gbps Fiber Pairs:
LANDING POINTS: • • • • • •
Anchorage (USA) Homer (USA) Kenai (USA) Kodiak (USA) Narrow Cape (USA) Seward (USA)
Owners: Upgrader: Upgrade Year: Upgraded Capacity:
4 Fiber Pairs
Kodiak Kenai Cable Company Infinera 2010
10 Gbps
Region: Americas
KUWAIT-IRAN
KUWAIT-IRAN RFS Year:
2006
Est. End of Service Date: 2031 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
20,000,000 334
2.5 Gbps
6 Fiber Pairs
Ministry of Communication, Kuwait and Telecommunication Infrastructure Company, Iran
System Installer: e-Marine
System Maintainer:
E-marine PJSC
Region: EMEA
Failaka Soroosh
LANDING POINTS: • Kharg (Iran) • Soroosh (Iran) • Failaka (Kuwait)
Kharg
LEV
LEV RFS Year:
1999
Est. End of Service Date: 2024 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs:
175,000,000 2,600
2.5 Gbps
2 Fiber Pairs
Channels: 8 wavelengths of 1550 nm Owners:
System Supplier: System Maintainer:
Telecom Italia Sparkle
Alcatel Submarine Networks, Tyco Telecommunications Cyprus Telecommunications Authority
Region: EMEA
Mazara
Yeroskipou
Tel Aviv
LANDING POINTS: • Mazara (Italy) • Tel Aviv (Israel) • Yeroskipos (Cyprus)
LION
LOWER INDIAN OCEAN NETWORK RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
30,000,000 1,091
20 Gbps
Design Capacity: 1.28 Tbps Fiber Pairs:
2 Fiber Pairs
Channels: 64
Channel Capacity:
Owners: System Supplier:
10 Gbps
France Telecom, Mauritius Telecom, Orange Madagascar Alcatel-Lucent Submarine Networks
System Installer: FCR, Orange Marine Cableship:
System Maintainer:
Chamarel
Mauritius Telecom, Orange
Region: Indian Ocean Pan-East Asian
Tomasina Terre Rouge Sainte Marie
LANDING POINTS: • Sainte Marie (Reunion Island) • Terre Rouge (Mauritius) • Toamasina (Madagascar)
LION-2
LOWER INDIAN OCEAN NETWORK 2 RFS Year:
2012
Est. End of Service Date: 2037 Est. System Cost (US$):
Mombasa
Total Length (kms):
76,000,000 3,000
Design Capacity: 1.28 Tbps Fiber Pairs:
2 Fiber Pairs
Channels: 64
Channel Capacity:
Owners:
10 Gbps
France Telecom-Orange, Mauritius Telecom, Orange Madagascar, Telkom Kenya, Emtel Ltd
System Installer: Alpha Logistics, Elettra, Orange Marine Region: Indian Ocean Pan-East Asian
Mayotte
Co nn to L ectio ion n -1
LANDING POINTS: • Mombasa (Kenya) • Mayotte (Mayotte)
LIQUID SEA
LIQUID SEA [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Total Length (kms):
10,000
Design Capacity: 30 Tbps Owners:
Liquid Telecom
Region: EMEA
Quseer
Aqaba
Djibouti
Mombasa Dar Es Salaam
Maputo Mtunzini
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
LANDING POINTS: • South Africa • Middle East (east coast of africa)
MAC
MID-ATLANTIC CROSSING RFS Year:
Brookhaven
2000
Est. End of Service Date: 2025 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
200,000,000 7,461
20 Gbps
Design Capacity: 920 Gbps Fiber Pairs:
Owners: System Supplier:
2 Fiber Pairs
Global Crossing
Alcatel Submarine Networks
System Installer: FCR Cableship:
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Fresnel
Level 3 Communications Ltd Infinera
2010, 2011
10 Gbps, 40 Gbps
Region: Americas
Hollywood
St. Croix
LANDING POINTS: • Brookhaven (USA) • Hollywood (USA) • St Croix (US Virgin Islands)
MAIN ONE
MAIN ONE RFS Year:
2010
Est. End of Service Date: 2035 Est. System Cost (US$):
Total Length (kms):
Seixal
Initial Capacity:
240,000,000 7,000
1.92 Tbps
Design Capacity: 10 Tbps
Channel Capacity:
Owners: System Supplier:
100 Gbps
Main One Cable Company TE SubCom
System Installer: TE SubCom Cableship:
System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
Resolute
Main One Cable Company, Tyco Electronics Subsea Communications LLC Xtera 2015
100 Gbps
Region: EMEA
s
ago L a cr Ac
LANDING POINTS: • • • • • • • •
Abidjan (Ivory Coast) Accra (Ghana) Casablanca (Morocco) Dakar (Senegal) Lagos (Nigeria) Port Harcourt (Nigeria) Seixal (Portugal) Tenerife (Spain)
YOUR AD HERE
Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com
ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000
F E B-16
M A Y -16
A UG-16
NOV -17
I S S U E 1 7
I S S U E 1 8
I S S U E 1 9
I S S U E 2 0
MAREA
Virginia Beach
LANDING POINTS: • Virginia Beach, Virginia (USA) • Bilbao (Spain)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
Bilbao
MAREA [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Total Length (kms):
Design Capacity: Fiber Pairs:
6,600
160 Tbps
8 Fiber Pairs
Owners: Microsoft, Facebook, Telefรณnica
System Supplier:
TE SubCom
System Installer: TE SubCom
Region: Transatlantic
MATRIX
MATRIX RFS Year:
2008
Est. End of Service Date: 2032 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
30,000,000 1,438
60 Gbps
Design Capacity: 2.56 Tbps Fiber Pairs:
Owners: System Supplier:
Batam Changi
4 Fiber Pairs
Matrix Networks and NAP Info TE Subcom
System Installer: Global Marine Systems Limited Cableship:
Wave Mercury, Cable Networker (barge)
Region: AustralAsia
Jakarta
LANDING POINTS: • Batam (Indonesia) • Changi (Singapore) • Jakarta (Indonesia)
MAYA-1
MAYA-1 RFS Year:
2000
Est. End of Service Date: 2025 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
120,000,000 4,506
10 Gbps
Design Capacity: 922.5 Gbps Owners:
System Supplier: Marine Surveyor: Upgrader: Upgrade Year:
Hollywood
Upgraded Capacity:
LANDING POINTS: • Cancun (Mexico) • Hollywood (USA) • Maria Chiquita (Panama) • Puerto Limon (Costa Rica) • Tolu (Colombia)
Maria Chiquita
Alcatel Submarine Networks, Tyco Telecommunications C&C Technologies
Alcatel-Lucent Submarine Networks 2012
40 Gbps
Region: Americas
Cancun
Puerto Limon
MAYA-1 Consortium
Tolu
MBDC
MORATELINDO BATAM - DUMAI CABLE RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners:
40,000,000 330
10 Gbps
Moratelindo
Region: AustralAsia
Dumai
LANDING POINTS: • Batam (Indonesia) • Dumai (Indonesia)
Batam
PROJECT COMPLETION PHASES:
MCT
Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
Rayoung
Sihanoukville
MALAYSIA-CAMBODIA-THAILAND [PLANNED] RFS Year:
2017
Est. End of Service Date: 2041 Est. System Cost (US$):
Cherating
Total Length (kms): Initial Capacity:
70,000,000 1,425
1.5 Tbps
Design Capacity: 30 Tbps Fiber Pairs:
6 Fiber Pairs
Channels: 50
Channel Capacity:
Owners:
LANDING POINTS: • Cherating (Malaysia • Rayoung (Thailand • Sihanoukville (Cambodia)
System Supplier:
100 Gbps
Telekom Malaysia Berhad, Symphony Communication Public Company Limited, Telcotech limited Huawei Marine Networks
Region: AustralAsia
MED CABLE NETWORK
MED CABLE NETWORK RFS Year:
2005
Est. End of Service Date: 2030 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Maintainer:
LANDING POINTS: • Algiers (Algeria) • Annaba (Algeria) • Marseille (France)
1,300
20 Gbps
Med Cable
Middle East & North Africa (MENA) Submarine Cable Systems
Region: EMEA
Marseille
Algiers
40,000,000
Annaba
MEDNAUTILUS
Koropi
Ca
ta
ni
a
Istanbul
Chania
Haifa
Tel Aviv
MEDNAUTILUS RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
190,000,000 5,729
3.84 Tbps
Design Capacity: 38.4 Tbps Fiber Pairs:
6 Fiber Pairs
Channels: 64
Channel Capacity:
Owners: System Supplier:
LANDING POINTS: • • • • • •
Catania (Italy) Chania (Greece) Haifa (Israel) Istanbul (Turkey) Koropi (Greece) Tel Aviv (Israel)
100 Gbps
Telecom Italia Sparkle
Alcatel Submarine Networks
System Installer: Orange Marine Upgrader:
Upgrade Year: Upgraded Capacity:
Infinera
2011, 2012, 2013
10 Gbps, 40 Gbps, 100 Gbps
Region: EMEA
MELITA-1
MELITA-1 RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners:
14,000,000 100
50 Mbps
Melita Infrastructure Ltd.
Region: EMEA
Pozallo
St. Paul’s Bay
LANDING POINTS: • Pozallo (Italy) • St Paul’s Bay (Malta)
YOUR AD HERE
Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com
ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000
F E B-16
M A Y -16
A UG-16
NOV -17
I S S U E 1 7
I S S U E 1 8
I S S U E 1 9
I S S U E 2 0
MENA
Mazara
Alexandria Suez Zafarana
MIDDLE EAST NORTH AFRICA RFS Year:
2014
Est. End of Service Date: 2039 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs:
210,000,000 8,800
57.6 Tbps
6 Fiber Pairs
Channels: 96
Channel Capacity: 100 Gbps
Owners: Orascom Telecom Media and Technology Holding S.A.E.
System Supplier:
Alcatel Submarine Networks, TE SubCom
System Installer: Alcatel Submarine Networks, TE SubCom, e-Marine Cableship:
Marine Surveyor: System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
Maersk Responder, Ile de Sein, Niwa, Decisive EGS, Blue Star, Elettra
Middle East & North Africa (MENA) Submarine Cable Systems, Oman Telecommunications Company Infinera 2016
100 Gbps
Region: EMEA
Jeddah
M
um
ba
i
Al Seeb
LANDING POINTS: • • • • • •
Abu Talat (Egypt) Al Seeb (Oman) Jeddah (Saudi Arabia) Mazara (Italy) Mumbai (India) Zafarana (Egypt)
MIC-1
MORATEL INTERNATIONAL CABLE 1 RFS Year:
2008
Est. End of Service Date: 2033 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners:
10,000,000 70
10 Gbps
Moratelindo
System Installer: Global Marine Systems Limited Region: AustralAsia
Changi Batam
LANDING POINTS: • Batam (Indonesia) • Changi (Singapore)
MICRONESIA CABLE SYSTEM
MICRONESIA CABLE SYSTEM RFS Year:
2011
Est. End of Service Date: 2036 Total Length (kms):
Owners:
System Supplier:
174
Federals States of Micronesia Telecommunications Authority, Marshall Island National Telecommunications Authority TE SubCom
System Installer: TE SubCom Region: AustralAsia
Guam
Pohnpei
LANDING POINTS: • Majuro (Marshall Islands) • Kwajalein (Marshall Islands) • Pohnpei (Micronesia) • Guam
Majuro Kwajalein
MINERVA
MINERVA RFS Year:
2007
Est. End of Service Date: 2032 Initial Capacity:
10 Gbps
Channels: DWDM wavelengths Owners:
System Supplier:
Telecom Italia Sparkle
Alcatel-Lucent Submarine Systems
Region: EMEA
Mazara
Catania
Yeroskipou
LANDING POINTS: • Catania (Italy) • Mazara (Italy) • Yeroskipos (Cyprus)
MKCS
MATARAM-KUPANG CABLE SYSTEM RFS Year:
2011
Est. End of Service Date: 2036 Est. System Cost (US$):
Total Length (kms):
94,000,000 1,318
Design Capacity: 1.8 Tbps Fiber Pairs:
6 Fiber Pairs
Channels: 30
Channel Capacity:
Owners: System Supplier:
10 Gbps
PT Telkom
Huawei Marine Networks, Nexans
System Installer: Huawei Marine Networks Region: AustralAsia
Sum Mataram Besa bawaRaba r Waingapu Kupang
LANDING POINTS: • Mataram (Indonesia) • Sumbawa Besar (Indonesia) • Ambalawi (Indonesia) • Saraemee (Indonesia) • Waingapu (Indonesia) • Ende (Indonesia) • Kupang (Indonesia)
MOANA
MOANA SUBMARINE CABLE SYSTEM [PLANNED] RFS Year:
2018
Est. End of Service Date: 2043 Total Length (kms):
9,700
Design Capacity: 20 Tbps
Channel Capacity:
Owners: System Supplier:
Hawaii
200 Gbps
Bluesky Pacific Group
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Region: AustralAsia
Samoa Cook Islands New Zealand
LANDING POINTS: • • • •
New Zealand Hawaii Cook Islands Samoa
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
MONET
MONET [PLANNED] RFS Year:
2017
Est. End of Service Date: 2041 Est. System Cost (US$):
Total Length (kms):
280,000,000 10,556
Design Capacity: 60 Tbps Fiber Pairs:
6 Fiber Pairs
Channels: 100
Channel Capacity:
Owners: System Supplier:
100 Gbps
Algar Telecom, Angola Cables, Antel, Google TE SubCom
System Installer: TE SubCom
Boca Raton
Cableship:
Sentinel, Decisive
Region: Americas
Fortaleza
Santos
LANDING POINTS: • • • •
Santos (Brazil) Fortaleza (Brazil) Boca Raton Florida (United States)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
MYTHIC
MYTHIC [PLANNED] Est. RFS Year:
2017
Est. End of Service Date: 2042 Total Length (kms):
1,600
Design Capacity: 20 Tbps Fiber Pairs:
2 Fiber Pairs
Channels: 100
Channel Capacity:
Owners: System Supplier:
100 Gbps
Campana Group
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Region: AustralAsia
Myanmar
Thailand
Malaysia
LANDING POINTS: • Myanmar • Malaysia • Thailand
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
.com
Telecoms consulting of submarine cable systems for regional and trans-oceanic applications
NCP
Korea China
Japan
Taiwan
LANDING POINTS: • • • • • • •
Hillsboro, Oregon (USA) Chongming (China) Nanhui (China) Lingang (China) Busan (South Korea) Toucheng (Taiwan) Maruyama (Japan)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
USA
NEW CROSS PACIFIC [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms): Design Capacity:
350,000,000 14,000
80 Tbps
Channel Capacity: 100 Gbps
Owners: China Mobile, China Telecom, China Unicom, Chunghwa Telecom, KT Corporation, Microsoft, Softbank Mobile Corp
System Supplier:
TE SubCom
System Installer: TE SubCom
Region: Transpacific
NCSCS
NIGERIA-CAMEROON SUBMARINE CABLE SYSTEM RFS Year:
2015
Est. End of Service Date: 2040 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
30,000,000 1,100
40 Gbps
Design Capacity: 12.8 Tbps Fiber Pairs:
Owners: System Supplier:
6 Fiber Pairs
Cameroon Government, MainOne
Huawei Marine Networks, Nexans
System Installer: Huawei Marine Networks Region: EMEA
s
go La
Kribi
LANDING POINTS: • Kribi (Cameroon) • Lagos (Nigeria)
NEPTUNE CANADA
NEPTUNE CANADA RFS Year:
2007
Est. End of Service Date: 2032 Est. System Cost (US$):
Total Length (kms): Owners: System Supplier:
62,000,000 800
University of Victoria
Alcatel Submarine Networks
System Installer: Alcatel Submarine Networks Cableship:
Marine Surveyor:
Ile de Sein
NEPTUNE Canada
Region: Americas
P o r t A l b e r n i
LANDING POINTS: • Port Alberni (Canada)
NORSEA COM-1
Tysvaer
Lowestoft
NORSEA COM-1 RFS Year:
1999
Est. End of Service Date: 2024 Total Length (kms): Initial Capacity: Owners: System Supplier:
LANDING POINTS: • Lowestoft (United Kingdom) • Tysvær (Norway)
System Maintainer:
800
160 Gbps
North Sea Communications AS Alcatel AKN
TeliaSonera International Carrier AB
Region: EMEA
NORTHSTAR
Whittier
Valdez
Juneau
Nedonna Beach
NORTHSTAR RFS Year:
1999
Est. End of Service Date: 2024 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier:
LANDING POINTS: • • • •
Juneau (USA) Nedonna Beach (USA) Valdez (USA) Whittier (USA)
90,000,000 3,385
10 Gbps
Alaska Communications Systems Alcatel Submarine Networks
System Installer: C&W (Marine) Cableship:
System Maintainer:
Maersk Fighter, Fu Lai ACS Cable Systems
Region: Americas
ORVAL
ORVAL [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms):
20,000,000 560
Design Capacity: 20 Tbps
Channel Capacity:
Owners:
System Supplier:
100 Gbps
Algerian Ministry of Post, Information Technology and Communications Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Region: EMEA
Valencia
Oran
LANDING POINTS: • Oran (Algeria) • Valencia (Spain)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
PAC
Grover Beach Tijuana
Mazatlán St. Croix
Puerto Viejo
Colon Fort Amadour
PAN-AMERICAN CROSSING RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
350,000,000 9,451
10 Gbps
Design Capacity: 3.2 Tbps Fiber Pairs:
2 Fiber Pairs
Channels: 16
Channel Capacity:
LANDING POINTS: • • • • •
Colon (Panama) Fort Amadour (Panama) Grover Beach (USA) Mazatlán (Mexico) Puerto Viejo (Venezuela) • St Croix (US Virgin Islands) • Tijuana (Mexico)
Owners: System Supplier: Cableship: Marine Surveyor: System Maintainer: Upgrader:
100 Gbps
Global Crossing
Tyco Telecommunications Agile
C&C Technologies
Level 3 Communications Ltd Xtera Communications
Region: Americas
PROJECT COMPLETION PHASES:
PALAU-GUAM
Survey
System Manufacture
System Installation
Guam
Pre-Engineering
Palau
PALAU-GUAM [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Owners:
System Supplier:
LANDING POINTS: • Palau • Guam
Palau Telecoms
Xtera Communications
System Installer: IT International Telecom Region: AustralAsia
Commissioning & Acceptance
PAN-AM
Magens Bay Butler’s Bay
Baby Beach Battery Pratt
Barranquilla Punto Fijo Panama City
PAN AMERICAN RFS Year:
Lurin
Est. End of Service Date: 2024 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
LANDING POINTS: • • • • • • •
Arica (Chile) Baby Beach (Aruba) Barranquilla (Colombia) Battery Pratt (Panama) Butler’s Bay (St. Croix) Lurin (Peru) Magens Bay (Virgin Islands) • Panama City (Panama) • Punto Fijo (Venezuela) • Salinas (Ecuador)
1999
Arica
260,000,000 6,867
>10 Gbps
Design Capacity: 70 Gbps Owners:
Marine Surveyor: System Maintainer:
Antel (El Salvador), AT&T, Cable Andino, CANTV (Venezuela), CNT, C&W, Embratel, Entel (Chile), Setar, Telecom Colombia, Telmex C&C Technologies
AT&T, Telefonica International Wholesale Services
Region: Americas
PANGEA
M å d e F a n ø
R e d c a r
L o w e s t o f t
B e v e r w i j k
PANGEA RFS Year:
2000
Est. End of Service Date: 2025 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
LANDING POINTS: • Beverwijk (Netherlands) • Fanø (Denmark) • Lowestoft (United Kingdom) • Måde (Denmark) • Redcar (United Kingdom)
Owners: System Supplier:
20,000,000 511
7 Tbps
Pangea Ltd
Alcatel Submarine Networks
System Installer: Nexans Cableship:
Marine Surveyor:
Pleijel Fugro
Region: EMEA
PANIOLO
PANIOLO Total Length (kms):
575
Region: AustralAsia
Kekaha Makahaii Kai Hawa Kaunakakai Maui Maui Hawaii
LANDING POINTS: • Kekeha, Hawaii (USA) • Makaha, Hawaii (USA) • Hawaii Kai, Hawaii (USA) • Kaunakakai, Hawaii (USA) • Maui, Hawaii (USA) • Hawaii, Hawaii (USA)
PC-1
Ajigaura Shima
LANDING POINTS: • Grover Beach (USA) • Harbor Pointe (USA) • Shima (Japan)
Harbor Pointe
Grover Beach
PCCS
Jacksonville
Isla
na
hiba
is Hud
de Tortola Ver
orá
C Tera
Balboa
M
ar
ia
Ch
iq
ui
ta
Cartagena
PACIFIC CARIBBEAN CABLE SYSTEM RFS Year:
Manta
Est. End of Service Date: 2040 Est. System Cost (US$):
Total Length (kms):
• Jacksonville, Florida (USA) • Tortola, Virgin Islands (UK) • Isla Verde (Puerto Rico) • Hudishibana (Aruba) • Cartagena (Colombia) • Maria Chiquita (Panama) • Balboa (Panama) • Manta (Ecuador) • Tera Cora (Curaçao)
160,000,000 6,000
Design Capacity: 48 Tbps Fiber Pairs:
LANDING POINTS:
2015
Channel Capacity: Owners:
System Supplier: Marine Surveyor: Survey Boat:
6 Fiber Pairs 100 Gbps
Cable & Wireless Communications, Setar, Telconet, Telefónica Global Solutions, United Telecommunication Services Alcatel-Lucent Submarine Networks EGS
RV Ridley Thomas
Region: Americas
PEC
PAN-EUROPEAN CROSSING RFS Year:
1999
Est. End of Service Date: 2024 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Maintainer:
20,000,000 170
10 Gbps
Global Crossing
Level 3 Communications
Region: EMEA
Broadstairs Seaford
Veules-les-Roses
LANDING POINTS: • Bredene (Belguim) • Broadstairs (United Kingdom) • Seaford (United Kingdom) • Veules-les-Roses (France)
Brede
PLCN
Hong Kong
LANDING POINTS: • Hong Kong (China) • Los Angeles (USA)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
Los Angeles
PACIFIC LIGHT CABLE NETWORK [PLANNED] RFS Year:
2018
Est. End of Service Date: 2043 Est. System Cost (US$):
Total Length (kms):
400,000,000 12,800
Design Capacity: 120 Tbps Fiber Pairs:
5 Fiber Pairs
Channels: 240
Channel Capacity:
Owners: System Supplier:
100 Gbps
Pacific Light Data Communication, Facebook, Google TE SubCom
System Installer: TE SubCom
Region: Transpacific
PPC-1
Piti
Madang
PIPE PACIFIC CABLE RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity:
180,000,000 7,185
40 Gbps
2.56 Tbps
Owners: PIPE Networks Ltd.
System Supplier:
Tyco Telecommunications
System Installer: Tyco Telecommunications Cableship:
Upgrader: Upgrade Year: Upgraded Capacity:
Durable, Decisive Infinera 2012
100 Gbps
Region: AustralAsia
Sydney
LANDING POINTS: • Madang (Papua New Guinea) • Piti (Guam) • Sydney (Australia)
QATAR-UAE
QATAR-UAE RFS Year:
2004
Est. End of Service Date: 2029 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
10,000,000 208
20 Gbps
System Installer: e-Marine Cableship:
System Maintainer:
Etisalat
E-marine PJSC
Region: EMEA
Halul Das
LANDING POINTS: • Das Island (UAE) • Halul (Qatar)
PROJECT COMPLETION PHASES:
QUINTILLION SUBSEA
Pre-Engineering
Survey
System Manufacture
System Installation
Barrow Wainwright
Prudhoe Bay
Point Hope
Kotzebue Nome
QUINTILLION SUBSEA [PLANNED] RFS Year:
2017
Est. End of Service Date: 2041 Est. System Cost (US$):
Total Length (kms):
150,000,000 1,200
Design Capacity: 30 Tbps Fiber Pairs:
3 Fiber Pairs
Channels: 100
Channel Capacity:
Owners: System Supplier:
LANDING POINTS: • • • • • •
Oliktok (USA) Barrow (USA) Wainright (USA) Kotzebue (USA) Point Hope (USA) Nome (USA)
100 Gbps
Quintillion Subsea Holdings Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Cableship:
Marine Surveyor: Survey Boat:
Ile de Sein, Ile de Brehat Fugro Pelagos
Pacific Star, Dreamcatcher
Region: Americas
Commissioning & Acceptance
RJCN
RUSSIAN-JAPAN CABLE NETWORK RFS Year:
2006
Est. End of Service Date: 2031 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Maintainer:
N a k h o d k a
50,000,000 1,795
640 Gbps
Rostelecom
KDDI, OJSC “Rostelecom”
Region: AustralAsia
N a o e t s u
LANDING POINTS: • Nakhodka (Russia) • Naoetsu (Japan)
RNAL
Pusan
Wada
Toucheng Tong Fuk
REACH NORTH ASIA LOOP RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer:
LANDING POINTS: • • • •
Pusan (South Korea) Tong Fuk (Hong Kong) Toucheng (Taiwan) Wada (Japan)
Upgrader: Upgrade Year: Upgraded Capacity:
900,000,000 9,792
80 Gbps
6 Fiber pairs
FLAG Telecom, Level 3 Communications Global Cloud Xchange Ciena, Infinera 2011, 2014
40 Gbps, 100 Gbps
Region: AustralAsia
SAC
St. Croix
Puerto Viejo
Fort Amadour
Fortaleza
Lurin
Rio de Janeiro Santos
Valparaiso Las Toninas
SOUTH AMERICAN CROSSING RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
520,000,000 15,983
100 Gbps
Design Capacity: 4.84 Tbps Fiber Pairs:
LANDING POINTS: • • • • • • • • •
Fortaleza (Brazil) Fort Amadour (Panama) Las Toninas (Argentina) Lurin (Peru) Puerto Viejo (Venezuela) Rio de Janeiro (Brazil) Santos (Brazil) St Croix (US Virgin Islands) Valparaiso (Chile)
4 Fiber Pairs
Channels: 30
Channel Capacity:
Owners: System Supplier: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
40 Gbps
Global Crossing
Alcatel Submarine Networks Level 3 Communications Infinera
2010, 2011
10 Gbps, 40 Gbps
Region: Americas
SACS
F o r t a l e z a
LANDING POINTS: • Luanda (Angola) • Fortaleza (Brazil)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
L u a n d a
SOUTH ATLANTIC CABLE SYSTEM [PLANNED] RFS Year:
2018
Est. End of Service Date: 2043 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
130,000,000 6,200
40 Tbps 40 Tbps
4 Fiber Pairs
Channels: 100
Channel Capacity: 100 Gbps
Owners: Angola Cables
System Supplier:
NEC
System Installer: NEC
Region: Transatlantic
SAEX
SOUTH ATLANTIC EXPRESS [PLANNED] RFS Year:
Virginia Beach
2019
Est. End of Service Date: 2044 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
350,000,000 17,230
48 Tbps
Design Capacity: 48 Tbps Fiber Pairs:
4 Fiber Pairs
Channels: 120
Channel Capacity:
Owners:
100 Gbps
SAEx International Limited
Region: Transatlantic
Fortaleza
LANDING POINTS: • Mtunzini (South Africa) • Yzerfontein (South Africa) • St Helena, • Ascension Island • Lagos (Nigeria) • Fortaleza (Brazil) • Virginia Beach, Virginia (USA)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
Lagos
Ascension Island
St Helena
Mtunzini Yzerfontein
SAFE
Sa
in
t-P
au
l
Baie du Jacotet
Durban Cape Town
LANDING POINTS: • Baie du Jacotet (Mauritius) • Cape Town (South Africa) • Cochin (India) • Durban (South Africa) • Penang (Malaysia) • Saint-Paul (Reunion)
Cochin Penang
SOUTH AFRICA-FAR EAST RFS Year:
2002
Est. End of Service Date: 2027 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
350,000,000 13,669
440 Gbps
Owners: France Telecom, Tata Communications, Telekom SA
System Supplier:
Tyco Telecommunications
System Installer: FCR Cableship:
System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
Vercors
Mauritius Telecom, Orange, TATA Communications, Telkom SA Limited, TM Berhad Alcatel-Lucent Submarine Networks 2014
40 Gbps
Region: Indian Ocean Pan-East Asian
SAM-1
SOUTH AMERICA-1 RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
650,000,000 24,140
160 Gbps
Design Capacity: 19.2 Tbps Fiber Pairs:
4 Fiber Pairs
Channels: 48
Channel Capacity:
Boca Raton
Owners: System Supplier: Marine Surveyor: System Maintainer:
San Juan
Puerto Barrios
Upgrader:
Puerto San Jose
Upgrade Year:
Barranquilla
Upgraded Capacity:
100 Gbps
Telefonica
Tyco Telecommunications C&C Technologies
Telefonica International Wholesale Services Infinera
2009, 2010, 2012
10 Gbps, 40 Gbps, 100 Gbps
Region: Americas
Salinas Mancora
Fortaleza
Lurin
Salvador Arica Santos
Valparaiso Las Toninas
Rio de Janeiro
LANDING POINTS: • • • • • • • • • • • • •
Arica (Chile) Barranquilla (Colombia) Boca Raton (USA) Fortaleza (Brazil) Las Toninas (Argentina) Lurin (Peru) Mancora (Peru) Puerto Barrios (Guatemala) Puerto San Jose (Guatemala) Rio de Janeiro (Brazil) Salinas (Ecuador) Salvador (Brazil) Sa
YOUR AD HERE
Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com
ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000
F E B-16
M A Y -16
A UG-16
NOV -17
I S S U E 1 7
I S S U E 1 8
I S S U E 1 9
I S S U E 2 0
SAPL
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
Oahu Hilo
SOUTH AMERICA PACIFIC LINK [PLANNED] RFS Year:
2018
Est. End of Service Date: 2043 Est. System Cost (US$):
Total Length (kms):
LANDING POINTS: • • • • • • • • • •
Oahu, Hawaii (USA) Balboa (Panama) Valparaiso (Chile) Jacksonville, Florida (USA) future connectivity to: Hilo, Hawaii (USA) Manta (Ecuador) Lima (Peru) Arica (Chile) Cuba Dominican Republic
460,000,000 14,200
Design Capacity: 30 Tbps Fiber Pairs:
3 Fiber Pairs
Channels: 100
Channel Capacity:
Owners: System Supplier:
100 Gbps
Ocean Networks
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks, IT International Telecom Region: Transpacific
Balboa Manta Lima Arica Santiago
SAPL CX
SOUTH AMERICA PACIFIC LINK CARIBBEAN EXPRESS [PLANNED] RFS Year:
Est. End of Service Date: 2042 Total Length (kms):
Jacksonville
2017 3,400
Design Capacity: 60 Tbps Fiber Pairs:
6 Fiber Pairs
Channels: 100
Channel Capacity:
Owners: System Supplier:
100 Gbps
Ocean Networks, Inc.
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Region: Americas
Panama
LANDING POINTS: • Jacksonville, Florida (USA) • Panama
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
SAS-1
SAUDI ARABIA-SUDAN RFS Year:
2003
Est. End of Service Date: 2028 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
20,000,000 333
1.28 Tbps
4 Fiber Pairs
STC (Saudi Arabia)
Region: EMEA
J e d d a h
P o r t S u d a n
LANDING POINTS: • Jeddah (Saudi Arabia) • Port Sudan (Sudan)
SAT-3
Sesimbra Chipiona
Alta Vista
Ab i Ac dja cr n a Co La to go no s u
Dakar
SOUTH ATLANTIC 3 RFS Year:
2002
Est. End of Service Date: 2027 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
370,000,000
Douala Libreville
Luanda
14,350
340 Gbps 800 Gbps
2 Fiber Pairs
Channel Capacity: 40 Gbps
Owners: Angola Telecom, AT&T, British Telecom, Camtel of Cameroon, CIT, Cote dIvoire Telecom, CPRM, C&W, France Telecom (12.08%), Ghana Telecom, Maroc Telecom of Morocco, Mauritius Telecom, Nigerian Telecommunications Ltd, Nitel (8.39%), OPT Benin, OPT Gabon, PT
System Supplier:
System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
Alcatel Submarine Networks
Angola Telecom, PT Comunicações S.A., Sonatel, Telefonica de España S.A.U., Telkom SA Limited, Vodafone Limited Alcatel-Lucent Submarine Networks 2014
40 Gbps
Region: EMEA
Melkbosstrand
LANDING POINTS: • • • • • • • • • • •
Abidjan (Ivory Coast) Accra (Ghana) Alta Vista (Spain) Chipiona (Spain) Cotonou (Benin) Dakar (Senegal) Douala (Cameroon) Lagos (Nigeria) Libreville (Gabon) Luanda (Angola) Melkbosstrand (South Africa) • Sesimbra (Portugal)
SCAN Hong Kong
SUBMARINE CABLE ASIA NETWORK RFS Year:
2011
Est. End of Service Date: 2036 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
Jakarta
LANDING POINTS: • Hong Kong • Indonesia
337,000,000 4,300
40 Gbps
Design Capacity: 1.92 Tbps Owners:
System Supplier:
PT. Fangbian Iskan Corporindo, Telemedia Pacific Inc. NEC
Region: AustralAsia
SCF-CN
SCF-CN RFS Year:
2007
Est. End of Service Date: 2032 Total Length (kms): Initial Capacity:
1,186
1.28 Tbps
Design Capacity: 1.28 Tbps Owners:
SCF (Group Loret)
Region: Americas
Basseterre
Martinique Port Castries
Kingstown Bridgetown Port Salines Redcar
LANDING POINTS: • Basseterre (St. Kitts & Nevis) • Bridgetown (Barbados) • Kingstown (St. Vincent) • Martinique (Martinique) • Port Castries (St Lucia) • Port Salines (Grenada) • Macqueripe (Trinidad and Tobago)
SCOTLAND-ORKNEY-SHETLAND
Shetland
Orkney
Scotland
SCOTLAND-ORKNEY-SHETLAND RFS Year:
2013
Est. End of Service Date: 2038 Est. System Cost (US$):
LANDING POINTS: • Scotland • Orkney • Shetland
Total Length (kms): Owners:
12,000,000 400
British Telecom
Region: EMEA
PROJECT COMPLETION PHASES:
SEABRAS-1
Pre-Engineering
Survey
System Manufacture
System Installation
New York
Commissioning & Acceptance
Fortaleza
SEABRAS-1 [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms): Design Capacity: Fiber Pairs:
509,000,000 10,750
72 Tbps
6 Fiber Pairs
Sao Paulo
Channels: 120
Channel Capacity: 100 Gbps
Owners: Seaborn Networks, Microsoft
System Supplier:
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Cableship:
Marine Surveyor: Survey Boat:
Ile de Sein Gardline
Sea Surveyor
Region: Americas
LANDING POINTS: • Sao Paolo (Brazil) • Fortaleza (Brazil) • New York, (USA)
SEACOM Mumbai
Djibouti
Mombasa Dar es Salaam
SEACOM RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
600,000,000 13,601
110 Gbps
Design Capacity: 4.2 Tbps
M
ap
ut
o
Owners:
M
tu
nz
in
i
LANDING POINTS:
• Abu Talat (Egypt) • Dar es Salaam (Tanzania) • Djibouti (Republic of Djibouti) • Maputo (Mozambique) • Mombasa (Kenya) • Mtunzini (South Africa) • Mumbai (India) • Zafarana (Egypt)
System Supplier:
Convergence Partners (12.50%), Herakles Telecom LLC (25%), Industrial Promotion Services (25%), Shanduka Group (12.50%), VenFin Limited (25%) Tyco Telecommunications SSI
System Installer: Tyco Telecommunications SSI Cableship:
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Durable, Decisive, Dependable, Resolute, Responder Seacom Ltd, E-marine PJSC Ciena 2013
100 Gbps
Region: Indian Ocean Pan-East Asian
SEAK
SOUTH EAST ALASKA RFS Year:
2008
Est. End of Service Date: 2033 Initial Capacity:
Owners:
10 Gbps GCI
Region: Americas
Juneau Hawk Inlet Angoon Sitka Petersburg Wrangell
Ketchikan
LANDING POINTS: • • • • • • •
Angoon (USA) Hawk Inlet (USA) Juneau (USA) Ketchikan (USA) Petersburg (USA) Sitka (USA) Wrangell (USA)
YOUR AD HERE
Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com
ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000
F E B-16
M A Y -16
A UG-16
NOV -17
I S S U E 1 7
I S S U E 1 8
I S S U E 1 9
I S S U E 2 0
SEA-ME-WE 3
RFS Year:
1999
Est. End of Service Date: 2024 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
1,500,000,000 39,622
40 Gbps
12.8 Tbps
2 Fiber Pairs
Channels: 64
Channel Capacity: 100 Gbps
Owners: SEA-ME-WE 3 Consortium
System Supplier:
Cableship:
Marine Surveyor: System Maintainer:
Upgrade Year: Upgraded Capacity:
Alcatel Submarine Networks, Fujitsu, Pirelli, KDD-SCS, Tyco Telecommunications
Agile, Maersk Defender, Maersk Fighter, Fresnel, Fu Lai, Nexus, Leon Thevinin, Vercors, Raymond Croze, Etisalat, Umm Al Anber C&C Technologies
British Telecommunications PLC, China Telecommunications Corporation, Chunghwa Telecom Co., Cyprus Telecommunications Authority, Deutsche Telekom AG, Hellenic Telecommunications Organization S.A., KDDI, KT Corporation, Oman Telecommunications Company, 2015
100 Gbps
Region: EMEA, Indian Ocean Pan-East Asian, AustralAsia
eb
SOUTH EAST ASIA-MIDDLE EAST-WESTERN EUROPE 3
Fujairah Jeddah
Se
Teutan
Mazara Marmaris Yeroskipou Chania Alexandria Suez
Al
Se
sim
br
a
G
oo
nh
ill y
Norden Oostende Penmarch
Djibouti
Kar
Na nh
Keoje
ui
Deep Water Bay
u to a an ip Sh Ta Pe Sat na un D ng a N an g
ou
Pyapon
Co
D chi La ehi n vi wa ni la a -M
Mumbai
nt
rachi
Medan
Tuas
Okinawa Toucheng Fangshan Batangas
Tungku Mersing
LANDING POINTS: • • • • • • • • • • •
Alexandria (Egypt) Al Seeb (Oman) Batangas (Philippines) Chania (Greece) Cochin (India) Da Nang (Vietnam) Deep Water Bay (Hong Kong) Dehiwala-Mount Lavinia (Sri Lanka) Djibouti (Republic of Djibouti) Fangshan (Taiwan) Fujairah (United Arab Emira
Perth
SEA-ME-WE 4
Marseille
An na Bi ba ze rte
Palermo
SOUTH EAST ASIA-MIDDLE EAST-WESTERN EUROPE 4 RFS Year:
2005
Est. End of Service Date: 2030 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
500,000,000 18,846
1.28 Tbps 12.8 Tbps
2 Fiber Pairs
Channels: 64
Channel Capacity: 100 Gbps
Owners: Algerie Telecom, Algeria, Bangladesh Submarine Cable Company Limited (BSCCL), Bangladesh, Bharti Airtel, CAT Telecom (Thailand), Du, France Telecom, Pakistan Telecommunication Company Limited, Pakistan, Saudi Telecom Company (STC), Saudi Arabia, Sri Lanka
System Supplier:
Alcatel Submarine Networks, Fujitsu
System Installer: Orange Marine Cableship:
System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
Alexandria Suez
Niwa, Descartes
E-marine PJSC, Orange, Singapore Telecommunications Limited, Sri Lanka Telecom Ltd, TATA Communications, Telecom Egypt, Telecom Italia Sparkle, TM Berhad, Verizon Ltd Alcatel-Lucent Submarine Networks, Mitsubishi Electric 2011, 2015
40 Gbps, 100 Gbps
Region: EMEA, Indian Ocean Pan-East Asian
Jeddah
Karachi
Cox’s Bazaar Mumbai Chennai
el
M
Colombo
Satun ak a
Tuas
LANDING POINTS: • • • • • • • • • • • • •
Alexandria (Egypt) Annaba (Algeria) Bizerte (Tunisia) Chennai (India) Colombo (Sri Lanka) Cox’s Bazaar (Bangladesh) Fujairah (United Arab Emirates) Jeddah (Saudi Arabia) Karachi (Pakistan) Marseille (France) Melaka (Malaysia) Mumbai (India) Mu
SEA-ME-WE 5
Marseille
An na Bi ba ze rte
Palermo Alexandria Suez
Jeddah SOUTH EAST ASIA-MIDDLE EAST-WESTERN EUROPE 5 RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms): Design Capacity: Fiber Pairs:
1,000,000,000 20,000
24 Tbps
3 Fiber Pairs
Channels: 80
Channel Capacity: 100 Gbps
Owners: Bangladesh Submarine Cable Company Ltd, China Mobile International Ltd, China Global Telecommunications Limited, China Network Communications Group Co Ltd, Emirates Integrated Telecommunications Co, Orange, Myanmar Post and Telecom, PT Telekomunikasi Indo
System Supplier:
Alcatel-Lucent Submarine Networks, NEC
System Installer: Alcatel-Lucent Submarine Networks, NEC
Marine Surveyor:
Elettra
Region: EMEA, Indian Ocean Pan-East Asian
Karachi
Cox’s Bazaar Mumbai Chennai
LANDING POINTS: • • • • • • • • • • •
Marseille (France) Annaba (Algeria) Palermo (Italy) Bizerte (Tunisia) Jedda (Saudi Arabia) Fujairah (UAE) Karachi (Pakistan) Mumbai (India) Chennai (India) Colombo (Sri Lanka) Cox’s Bazar (Bangladesh) • Satun (Thailand) • Singapore (Singapore) • Ma
Ma Sin lac ga ca po re
Colombo
Satun
SEA-US
Hawaii Davao Guam City Manado
LANDING POINTS: • • • • •
Manado (Indonesia) Davao (Phillippines) Piti, Guam: Oahu Hawaii (United States) Los Angeles, California (United States)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
Los Angeles
SOUTH EAST ASIA-UNITED STATES [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms):
250,000,000 15,000
Design Capacity: 20 Tbps Fiber Pairs:
2 Fiber Pairs
Channels: 100
Channel Capacity:
Owners: System Supplier:
100 Gbps
Globe Telecom, GTA, GTI, Hawaiian Telcom, RTI, Telin, Telkom USA NEC
System Installer: NEC
Region: Transpacific
SEAX-1
SEAX-1 [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Total Length (kms): Fiber Pairs: Owners: System Supplier:
250
24 Fiber Pairs
Super Sea Cable Networks Huawei Marine
System Installer: Huawei Marine Region: AustralAsia
Mersing Changi Batam
LANDING POINTS: • Changi (Singapore) • Mersing (Malaysia) • Batam (Indonesia)
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
SG-SCS
Chaguaramas
Georgetown
Totness
SURINAME-GUYANA SUBMARINE CABLE SYSTEM RFS Year:
2010
Est. End of Service Date: 2035 Est. System Cost (US$):
Total Length (kms):
54,000,000 1,249
Design Capacity: 3.6 Tbps Fiber Pairs:
2 Fiber Pairs
Channels: 64
Channel Capacity:
Owners: System Supplier:
LANDING POINTS: • Macqueripe (Trinidad) • Georgetown (Guyana) • Totness (Suriname)
10 Gbps
Guyana Telephone and Telegraph Co. Ltd, Telesur of Suriname
Huawei Marine Networks, Nexans
System Installer: Global Marine Systems Limited, Huawei Marine Networks Cableship:
Sovereign
Region: Americas
SHEFA 2
Tórshavn
Maywick
Sandwick
Ayre of Cara
SHETLAND-FAROESE 2 RFS Year:
2008
Est. End of Service Date: 2033 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity:
27,000,000 828
Banff
20 Gbps
570 Gbps
Owners: Faroese Telecom
System Supplier:
NSW
System Installer: International Telecom Cableship:
Marine Surveyor: System Maintainer: Upgrader:
IT Intrepid Fugro
Faroese Telecom
Xtera Communications
Region: EMEA
LANDING POINTS: • • • • •
Ayre of Cara (UK) Banff (UK) Maywick (UK) Sandwick (Scotland) Tórshavn (Faroe Islands)
SILPHIUM
Chania
Darnah
SILPHIUM RFS Year:
2012
Est. End of Service Date: 2037 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
20,000,000 426
70 Gbps
Design Capacity: 1.2 Tbps Fiber Pairs:
3 Fiber Pairs
Channels: 40
Channel Capacity:
Owners: System Supplier:
LANDING POINTS: • Chania (Greece) • Darnah (Libya)
10 Gbps
Libyan Post, Telecom, and Information Technology Company Huawei Marine Networks, Nexans
System Installer: Huawei Marine Networks Region: EMEA
SJC
Chikura
Lantau
Nasugbu
SOUTH-EAST ASIA JAPAN CABLE RFS Year:
Tuas
Est. End of Service Date: 2038 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Channel Capacity: Owners:
System Supplier:
LANDING POINTS: • • • • • •
Chikura (Japan) Lantau (Hong Kong) Nasugbu (Philippines) Shantou (China) Telisai (Brunei) Tuas (Singapore)
2013 400,000,000 8,986
28 Tbps
6 Fiber Pairs 100 Gbps
SJC Consortium (Brunei International Gateway Sendirian Berhad, China Mobile, China Telecom, China Telecom (Hong Kong) International Ltd., Donghwa Telecom Co., Ltd., Globe Telecom, Inc., Google SJC Bermuda Ltd., KDDI Corporation, Singapore Telecom, Telin, TE SubCom, NEC
System Installer: S.B. Submarine Systems, NEC Upgrader:
Upgrade Year: Upgraded Capacity:
TE SubCom 2014, 2016 100 Gbps
Region: AustralAsia
SKR1M
SISTEM KABEL RAKYAT 1 MALAYSIA [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms):
100,000,000 3,500
Design Capacity: 4 Tbps Owners:
System Supplier:
TIME dotCom Bhd NEC
System Installer: Telekom Malaysia Region: AustralAsia
Sabah
Peninsular
Sarawak
LANDING POINTS: • Peninsular Malaysia • Sabah, Malaysia • Sarawak, Malaysia
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
SMPCS
Maluku
Sulawesi
Papua
SULAWESI-MALUKU-PAPUA CABLE SYSTEM RFS Year:
2015
Est. End of Service Date: 2040 Est. System Cost (US$):
Total Length (kms):
71,100,000 2,000
Design Capacity: 40 Gbps Owners:
System Supplier:
LANDING POINTS: • Sulawesi (Indonesia) • Maluku (Indonesia) • Papua (Indonesia)
PT Telekom (Indonesia)
NEC, Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks, NTT, NEC
Marine Surveyor: Survey Boat:
Fugro
Fugro Supporter
Region: AustralAsia
SMPR-1
ST. MAARTEN-PUERTO RICO 1 RFS Year:
2004
Est. End of Service Date: 2029 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Maintainer:
15,000,000 382
2.5 Gbps
Smitcoms
SMITCOMS
Region: Americas
S a n J u a n
LANDING POINTS: • San Juan (Puerto Rico) • St Martin (Netherlands Antilles)
S t . M a r t i n
SOCC
SOLOMONS OCEANIC CABLE NETWORK [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms): Owners: System Supplier:
54,000,000 827
Solomons Oceanic Cable Company TE SubCom
Region: AustralAsia
Noro
LANDING POINTS: • • • •
Honiara (Solomon) Sydney (Australia) Auki (Soloman) Noro (Soloman)
Sydney
Auki Honiara
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
SOLAS
SOLAS RFS Year:
2012
Est. End of Service Date: 2037 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners:
6,000,000 140
5 Gbps
Eircom
System Installer: Global Marine Systems Limited Cableship:
System Maintainer:
Wave Sentinel
Vodafone Limited
Region: EMEA
Kilmore Quay
Oxwich Bay
LANDING POINTS: • Kilmore Quay (Ireland) • Oxwich Bay (UK)
SOUTHERN CROSS CABLE NETWORK
Nedonna Beach Morro Bay Kahe Point
Suva Brookvale Alexandria
LANDING POINTS: • • • • • • • •
Alexandria (Australia) Brookvale (Australia) Kahe Point (Hawaii) Morro Bay (USA) Nedonna Beach (USA) Spencer Beach (USA) Suva (Fiji) Takapuna (New Zealand) • Whenuapai (New Zealand)
Takapuna Whenuapai
Spencer Beach
SOUTHERN CROSS CABLE NETWORK RFS Year:
2000
Est. End of Service Date: 2030 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
1,300,000,000 30,000
3.6 Tbps 14 Tbps
3 Fiber Pairs Segments A,C,G1,G2,I. 4 Fiber Pairs Segments D and F
Channels: 16
Channel Capacity: 100 Gbps
Owners: Southern Cross Cable Network
System Supplier:
Alcatel Submarine Networks, Fujitsu
System Installer: Alcatel Submarine Networks Cableship:
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
Cable Innovator laid 13761 km, Nexus laid 3306 km, Vercors laid 10007 km. Fresnel laid 800 km Southern Cross Cables Limited, Verizon Ciena
2012, 2013
40 Gbps, 100 Gbps
Region: AustralAsia, Transpacific
SVALBARD
SVALBARD RFS Year:
2004
Est. End of Service Date: 2029 Est. System Cost (US$):
Hotellneset
Total Length (kms): Initial Capacity: Owners: System Supplier:
80,000,000 2,800
4.8 Tbps Telenor
Tyco Telecommunications, Nexans
System Installer: Global Marine Systems Limited Cableship:
Innovator
Region: EMEA
Andøy
LANDING POINTS: • Andøy (Norway) • Harstad (Norway) • Hotellneset (Norway)
Harstad
TANGERINE
B r o a d s t a i r s
O o s t e n d e
TANGERINE RFS Year:
2000
Est. End of Service Date: 2025 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs:
LANDING POINTS: • Broadstairs (United Kingdom) • Oostende (Belguim)
Owners: System Maintainer:
10,000,000 121
240 Gbps
96 Fiber Pairs
Level 3 Communications Level 3 Communications
Region: EMEA
PROJECT COMPLETION PHASES:
TANNAT
Pre-Engineering
Maldinado
Survey
Santos
System Manufacture
System Installation
Commissioning & Acceptance
TANNAT [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms):
50,000,000 2,000
Design Capacity: 90 Tbps Fiber Pairs:
Owners: System Supplier:
LANDING POINTS: • Santos (Brazil) • Maldonado (Uruguay)
6 Fiber Pairs
Google, Government of Uruguay Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks
Marine Surveyor:
EGS
Region: Americas
TASMAN GLOBAL ACCESS
TASMAN GLOBAL ACCESS [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms):
60,000,000 2,300
Design Capacity: 20 Tbps Fiber Pairs:
Channel Capacity: Owners: System Supplier:
2 Fiber Pairs 100 Gbps
Spark New Zealand, Vodafone, Telstra Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Cableship:
Ile de Re
Region: AustralAsia
ia
al r t s u
A
New Zealand
LANDING POINTS: • Australia • New Zealand
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
M
an
as
qu
an
TAT 14
Tuckerton
TAT-14 RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
400,000,000 15,453
160 Gbps
Design Capacity: 9.38 Tbps Fiber Pairs:
4 Fiber Pairs
Channels: 40
Channel Capacity:
Owners: System Supplier:
40 Gbps
TAT-14 Consortium
Mitsubishi Electric Corporation
System Installer: Global Marine Systems Limited Cableship:
Marine Surveyor: System Maintainer:
LANDING POINTS: • • • • •
Blaabjerg (Denmark) Katwijk (Netherlands) Manasquan (USA) Norden (Germany) Saint-Valery-en-Caux (France) • Tuckerton (USA) • Widemouth (UK)
Upgrader: Upgrade Year: Upgraded Capacity:
Cable Innovator, Cable Endeavour, Bold Endurance, Wave Sentinel, Subaru, Maersk Recorder, Maersk Forwarder, Sir Eric Sharp, Agile, Teliri, Fresnel, Vercors Fugro
AT&T, British Telecommunications PLC, Deutsche Telekom AG, KPN Telecom International, Orange, TeliaSonera International Carrier AB Mitsubishi 2012
40 Gbps
Region: Transatlantic
Blaabjerg
en d r h o t N k u o m ij e y w d t i a W Ba K ux a C -en y r e l -Va t n i a S
TE NORTH
Marseille
Cyprus
Alexandria
TELECOM EGYPT NORTH RFS Year:
2011
Est. End of Service Date: 2036 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
150,000,000 2,938
10 Tbps
Design Capacity: 20 Tbps Fiber Pairs:
8 Fiber Pairs
Channels: 25
Channel Capacity:
Owners: System Supplier: System Maintainer:
LANDING POINTS: • Abu Talat (Egypt) • Pentaskinos (Republic of Cyprus) • Marseille (France)
Upgrader: Upgrade Year: Upgraded Capacity:
100 Gbps
Telecom Egypt
Alcatel-Lucent Submarine Networks Telecom Egypt Infinera 2012
100 Gbps
Region: EMEA
TEAMS Fujairah
THE EAST AFRICAN MARINE SYSTEM RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
130,000,000 4,500
120 Gbps
Design Capacity: 1.28 Tbps Owners:
M om
ba s
a
System Supplier:
LANDING POINTS:
• Fujairah (United Arab Emirates) • Mombasa (Kenya)
Etisalat (15%), TEAMS Ltd. (85%) Alcatel-Lucent Submarine Networks
System Installer: e-Marine Cableship:
Marine Surveyor:
Niwa
Fugro
Region: Indian Ocean Pan-East Asian
TGN EURASIA Marseille
Alexandria Ras Sidr
Jeddah
Djibouti
LANDING POINTS: • Abu Talat (Egypt) • Djibouti (Republic of Djibouti) • Jeddah (Saudi Arabia) • Marseille (France) • Mtunzini (South Africa) • Mumbai (India) • Zafarana (Egypt)
i ba um M
TGN EURASIA RFS Year:
2009
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity:
250,000,000 9,240
160 Gbps
1.28 Tbps
Owners: SEACOM, Tata Communications, Telecom Egypt
System Maintainer:
TATA Communications, Tyco Electronics Subsea Communications LLC
Region: Indian Ocean Pan-East Asian
TGN GULF
Kuwait City
M
an
am
a
Al-Khobar Sumaisma
Dubai
TGN GULF RFS Year:
2011
Est. End of Service Date: 2036 Est. System Cost (US$):
Total Length (kms): Design Capacity: Fiber Pairs:
200,000,000 2,306
System Maintainer:
m
Seaco
1.28 Tbps
2 Fiber Pairs
Owners: Tata Communications
System Supplier:
Con
n to nectio
TE SubCom
TATA Communications, Tyco Electronics Subsea Communications LLC
Region: EMEA
LANDING POINTS: • Al-Khobar (Saudi Arabia) • Dubai (UAE) • Kuwait City (Kuwait) • Manama (Bahrain) • Sumaisma (Qatar)
TGN INTRA-ASIA
Toyohashi
Deep Water Bay
Ballesteros
Piti Vung Tau
Si n
ga po re
TGN INTRA-ASIA RFS Year:
Est. End of Service Date: 2034 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Channel Capacity: Owners: System Supplier:
LANDING POINTS: • Ballesteros (Philippines) • Deep Water Bay (Hong Kong) • Piti (Guam) • Singapore (Singapore) • Toyohashi (Japan) • Vung Tau (Vietnam)
2009 180,000,000 6,485
3.84 Tbps 100 Gbps
Tata Communications
Tyco Telecommunications
System Installer: Orange Marine
System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
TATA Communications, Tyco Electronics Subsea Communications LLC Ciena
2014`
100 Gbps
Region: AustralAsia
H
u m
a n
b y
TGN NORTHERN EUROPE
D e M a r n e
TGN NORTHERN EUROPE RFS Year:
2002
Est. End of Service Date: 2027 Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer:
LANDING POINTS: • De Marne (Netherlands) • Humanby (UK)
551
3.84 Tbps
4 Fiber Pairs
Tata Communications
TATA Communications, Tyco Electronics Subsea Communications LLC
Region: EMEA
YOUR AD HERE
Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com
ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000
F E B-16
M A Y -16
A UG-16
NOV -17
I S S U E 1 7
I S S U E 1 8
I S S U E 1 9
I S S U E 2 0
TGN TRANSATLANTIC
Wall Township
LANDING POINTS: • Highbridge (UK) • Saunton Sands (UK) • Wall Township (USA)
Highbridge Saunton Sands
TGN TRANSATLANTIC RFS Year:
2001
Est. End of Service Date: 2026 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
340,000,000 12,670
2.56 Tbps 50 Tbps
4 Fiber Pairs
Channels: 64
Owners: Tata Communications
System Supplier:
System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
Tyco Telecommunications TATA Communications, Tyco Electronics Subsea Communications LLC Ciena 2013
100 Gbps
Region: Transatlantic
TGN TRANSPACIFIC
E m i T o y o h a s h i
LANDING POINTS: • • • •
Emi (Japan) Hermosa Beach (USA) Nedonna Beach (USA) Toyohashi (Japan)
N e d o n n a B e a c h H e r m o s a B e a c h
TGN TRANSPACIFIC RFS Year:
2002
Est. End of Service Date: 2027 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs:
580,000,000 21,424
5.12 Tbps
8 Fiber Pairs
Channels: 96
Channel Capacity: 100 Gbps
Owners: Tata Communications
System Supplier:
System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
Tyco Telecommunications TATA Communications, Tyco Electronics Subsea Communications LLC Ciena 2014
100 Gbps
Region: Transpacific
TGN WESTERN EUROPE
Highbridge
Bilbao
TGN WESTERN EUROPE RFS Year:
2002
Est. End of Service Date: 2027 Est. System Cost (US$):
Seixal
Total Length (kms): Initial Capacity: Owners: System Supplier:
LANDING POINTS: • Bilbao (Spain) • Highbridge (UK) • Seixal (Portugal)
System Maintainer:
100,000,000 3,487
3.84 Tbps
Tata Communications
Tyco Telecommunications TATA Communications, Tyco Electronics Subsea Communications LLC
Region: EMEA
TGN-TATA INDIACOM
TGN-TATA INDIACOM RFS Year:
2004
Est. End of Service Date: 2029 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs: Owners:
90,000,000 3,175
640 Gbps
8 Fiber Pairs
Tata Communications
Region: Indian Ocean Pan-East Asian
Chennai
Changi
LANDING POINTS: • Chennai (India) • Changi (Singapore)
TGN-TIC
TGN-TIC RFS Year:
2005
Est. End of Service Date: 2030 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Fiber Pairs:
90,000,000 3,175
5.12 Tbps
8 Fiber Pairs
Channels: 64 Owners:
System Maintainer:
Tata Communications
TATA Communications
Region: Indian Ocean Pan-East Asian
Chennai
Tuas
LANDING POINTS: • Chennai (India) • Tuas (Singapore)
TIERRA DEL FUEGO
TIERRA DEL FUEGO RFS Year:
2012
Est. End of Service Date: 2037 Est. System Cost (US$):
Total Length (kms): Owners: System Supplier:
5,000,000 27
AR-SAT
Boskalis, Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Cableship:
Ile de Batz
Region: Americas
Punta Dungeness Espiritu Santo
LANDING POINTS: • Punta Dungeness (Argentina) • Espiritu Santo (Argentina)
TIS
THAILAND-INDONESIA-SINGAPORE RFS Year:
2006
Est. End of Service Date: 2031 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier:
36,000,000 1,003
30 Gbps
CAT Telecom (Thailand), PT Telekom, Singtel Tyco Telecommunications
System Installer: ASEAN Cableship
System Maintainer:
Songkhla
Region: AustralAsia
Batam
LANDING POINTS: • Batam (Indonesia) • Songkhla (Thailand)
Singapore Telecommunications Limited
TONGA-FIJI
Suva
Nuku’alofa
TONGA-FIJI RFS Year:
2012
Est. End of Service Date: 2037 Est. System Cost (US$):
Total Length (kms): Owners: System Supplier:
LANDING POINTS: • Nuku’alofa (Tonga) • Suva (Fiji)
18,900,000 827
Tonga Cable Limited
Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Region: AustralAsia
TPE
Q i n g d a o K e o j e C h o n g m i n g F u z h o u T a n s h u i
LANDING POINTS: • • • • • •
Chongming (China) Shin-Maruyama (China) Keoje (South Korea) Nedonna Beach (USA) Qingdao (China) Tanshui (Taiwan)
N e d o n n a B e a c h
TRANS-PACIFIC EXPRESS RFS Year:
2008
Est. End of Service Date: 2033 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
440,000,000 16,163
1.28 Tbps 5.12 Tbps
4 Fiber Pairs
Channels: 64
Channel Capacity: 100 Gbps
Owners: AT&T, China Telecom, China Unicom, Chunghwa Telecom International, KT Coropration, Verizon, NTT Com
System Supplier:
Tyco Telecommunications
System Installer: Global Marine Systems Limited, NTT Cableship:
System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
Cable Innovator
China Telecommunications Corporation, Chunghwa Telecom Co., KT Corporation, NTT Communications Corporation, Verizon Ltd TE SubCom 2013
10 Gbps
Region: Transpacific
TRIDENT
TRIDENT [PLANNED] RFS Year:
Singapore
2019
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms):
290,000,000 4,600
Design Capacity: 28 Tbps Fiber Pairs:
Jakarta
2 Fiber pairs Perth-Singapore (8 Tbps), 1 fibre pair Perth-Jakarta (10 Tbps), 1 fibre pair OnslowJakarta (10 Tbps) and 1 fibre pair Perth-Onslow (10 Tbps)
Channels: Perth-Singapore 40, rest 100
Channel Capacity:
Owners: System Supplier:
100 Gbps
Trident Subsea Cable TE SubCom
System Installer: TE SubCom Region: AustralAsia
Onslow
Perth
LANDING POINTS: • • • •
Perth (Australia) Onslow (Australia) Jakarta (Indonesia) Singapore
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
TSE-1
Fuzhou
New Taipei City
TAIWAN STRAIT EXPRESS RFS Year:
2013
Est. End of Service Date: 2038 Est. System Cost (US$):
Total Length (kms):
10,000,000 270
Design Capacity: 6.4 Tbps Fiber Pairs:
Owners:
LANDING POINTS: • Changle, Fuzhou City, China • Tamsui District, New Taipei City, Taiwan
8 Fiber Pairs
Taiwan International Gateway Corporation, China Mobile, Chunghwa Telecom, Taiwan Mobile, Far EasTone Telecommunications, China Unicom
System Installer: Huawei Marine Networks, NTT, S.B. Submarine Systems Region: AustralAsia
TUBROK-EMASED
Tobrok
El-Quawef
TUBROK-EMASED RFS Year:
2010
Est. End of Service Date: 2035 Est. System Cost (US$):
Total Length (kms): Design Capacity: Fiber Pairs:
10,000,000 180
25.6 Tbps
8 Fiber Pairs
Channels: 80
Channel Capacity: 40 Gbps
Owners: Libyan Post Telecommunications & Information Technology Company
System Supplier:
Huawei Marine Networks
System Installer: Huawei Marine Networks, Orange Marine Region: EMEA
LANDING POINTS: • Tobruk (Libya) • El Quawef (Libya)
TUI-SAMOA
PROJECT COMPLETION PHASES: Pre-Engineering
Survey
System Manufacture
System Installation
Commissioning & Acceptance
Samoa
Fiji Fiji
TUI-SAMOA [PLANNED] RFS Year:
2017
Est. End of Service Date: 2042 Est. System Cost (US$):
Total Length (kms):
57,400,000 1,470
Design Capacity: 8 Tbps
Channel Capacity:
Owners: System Supplier:
LANDING POINTS: • • • •
Samoa Wallis & Futana Vanua Levu, Fiji Suva, Fiji
100 Gbps
Samoa Submarine Cable Company Alcatel-Lucent Submarine Networks
System Installer: Alcatel-Lucent Submarine Networks Region: AustralAsia
TWA-1
Fujairah
Karachi Al Seeb
TRANSWORLD ASSOCIATES RFS Year:
2006
Est. End of Service Date: 2031 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier:
40,000,000 1,300
1.28 Tbps
Trans-World Associates
Tyco Telecommunications
System Installer: Tyco Telecommunications
System Maintainer:
Upgrader:
LANDING POINTS: • Al Seeb (Oman) • Fujairah (United Arab Emirates) • Karachi (Pakistan)
Upgrade Year: Upgraded Capacity:
E-marine PJSC, Oman Telecommunications Company Huawei Marine 2016
100 Gbps
Region: EMEA
P e n t a s k h i n o s
UGARIT
T a r t u s
UGARIT RFS Year:
1995
Est. End of Service Date: 2020 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners: System Supplier: System Maintainer:
LANDING POINTS: • Pentaskhinos (Cyprus) • Tartus (Syria)
16,000,000 240
622 Mbps
Cypress Telecommunications Authority Tyco Telecommunications
Cyprus Telecommunications Authority
Region: EMEA
UNISUR
F l o r i a n o p o l i s
M a l d o n a d o
L a s T o n i n a s
UNISUR RFS Year:
Est. End of Service Date: 2019 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Owners:
LANDING POINTS: • Florianopolis (Brazil) • Las Toninas (Argentina) • Maldonado (Uruguay)
1994
System Maintainer:
74,000,000 1,720
560 Mbps
Antel (Uruguay), Embratel, Telecom Argentina, Telefonica de Argentina Telefonica International Wholesale Services
Region: Americas
YOUR AD HERE
Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com
ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000
F E B-16
M A Y -16
A UG-16
NOV -17
I S S U E 1 7
I S S U E 1 8
I S S U E 1 9
I S S U E 2 0
UNITY
Chikura
LANDING POINTS: • Chikura (Japan) • Los Angeles (USA)
Hermosa Beach
UNITY RFS Year:
2010
Est. End of Service Date: 2035 Est. System Cost (US$):
Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:
300,000,000 9,486
1.92 Tbps 7.68 Tbps
8 Fiber Pairs
Channels: 96
Channel Capacity: 100 Gbps
Owners: Bharti Airtel, Global Transit, Google, KDDI, PACNET, Singtel
System Supplier:
Tyco Telecommunications
System Installer: NEC, Kokusai Cable Ship
System Maintainer:
Upgrader: Upgrade Year: Upgraded Capacity:
KDDI
Ciena 2013
100 Gbps
Region: Transpacific
VENTSPILS-GOTLAND
VETNSPILS-GOTLAN RFS Year:
2004
Est. End of Service Date: 2029 Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:
175
2.5 Gbps
34 Fiber Pairs Baltcom
TE SubCom
Region: EMEA
Stockholm
Stavsnas
Fårösund Ventspils
LANDING POINTS: • Fårösund (Sweden) • Stockholm (Sweden) • Ventspils (Latvia)
VMSCS
Catania
St. George’s Bay
VODAFONE MALTA-SICILY CABLE SYSTEM RFS Year:
2004
Est. End of Service Date: 2029 Est. System Cost (US$):
Total Length (kms): Initial Capacity:
LANDING POINTS: • Balluta (Malta) • Catania (Italy)
Owners:
10,000,000 250
10 Gbps
Vodafone Malta
Region: EMEA
WACS
WEST AFRICA CABLE SYSTEM RFS Year:
2012
Est. End of Service Date: 2037 Est. System Cost (US$):
Total Length (kms):
Whitesand Bay
Initial Capacity: Design Capacity: Fiber Pairs:
600,000,000 14,350 5.12
14.5 Tbps
4 Fiber Pairs
Channels: 32
Channel Capacity: Owners:
Sesimbra
System Supplier: Marine Surveyor:
Alta Vista
System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:
m La e go s
ra Lo Ac c
Douala
Pointe Noire Muanda • Accra (Ghana) • Alta Vista (Spain) • Cape Verde (Cape Verde) • Douala (Cameroon) • Lagos (Nigeria) • Lome (Togo) • Luanda (Angola) • Muanda (DRC) • Pointe Noire (Congo) • Sesimbra (Portugal) • Walvis Bay (Namibia) • Highbridge (UK)
Angola Cables, Broadband Infraco, Congo Telecom, C&W, MTN Group, Office Congolais de Poste et Telecommunication, PT Comunicações, Tata Communications, Telecom Namibia, Telekom SA, Togo Telecom, Vodacom Alcatel-Lucent Submarine Networks Fugro
Angola Cables, Telecom Nambia, Telkom SA Limited Huawei Marine Networks 2015
100 Gbps
Region: EMEA
Cape Verde
LANDING POINTS:
100 Gbps
Luanda
Walvis Bay
WARF
Cochin
Hulhumalé
WARF RFS Year:
2007
Est. End of Service Date: 2032 Est. System Cost (US$):
Total Length (kms): Owners: System Supplier:
LANDING POINTS: • Cochin (India) • Hulhumalé (India)
Marine Surveyor:
20,000,000 680
WARF Telecom International Alcatel Submarine Networks Fugro
Region: Indian Ocean Pan-East Asian
WESTERN VISAYAS-PALAWAN
Taytay
San Jose de Buenavista Iloilo
WESTERN VISAYAS-PALAWAN RFS Year:
2014
Est. End of Service Date: 2039 Est. System Cost (US$):
LANDING POINTS: • Taytay, Palawan • San Jose de Buenavista, Iloilo (Philippines)
Total Length (kms): Owners:
20,000,000 300
PLDT (Philippines)
Region: AustralAsia