Almanac Issue 22

Page 1

subma rine cable

ALMANAC

I S S U E

22


subma rine cable

ALMANAC Issue 22 | May 2017 Copyright © 2017 by Submarine Telecoms Forum, Inc. While all reasonable steps to verify information from the public domain have been taken, based on changing circumstances and dynamic factors, incomplete information subject to change may exist. Our goal is to periodically update and modify such information. If you have a correction, please let us know by emailing almanac@subtelforum.com. All rights reserved. No part of this book may be used or reproduced by any means, graphic, eletronic, or mechanical, including photocopying, recording, taping or by any information storage retrieval system without the written permission of the publisher except in the case of brief quotations embodied in critical articles and reviews. Submarine Telecoms Forum, Inc. 21495 Ridgetop Circle Suite 201 Sterling, Virginia 20166 USA www.subtelforum.com

W

FOREWORD

elcome to the twenty-second edition of the Submarine Cable Almanac, one of our most popular reference tools. There have been 35 systems updated, and 8 systems added since the last issue. If you’re interested in finding a specific system, or wish to see all systems in a region, simply type that name or region into the search function. We hope that you, our readers, will participate in this almanac as you’ve done with our previous products. There is always room for additional data, so let us know if there is something else we should include in future editions. Please let us know by completing our Submarine Almanac Update Form, available by clicking here, or by emailing almanac@subtelforum. com. Finally, I want to thank all of the sponsors, staff and dedicated readers that contributed to this Almanac. Your feedback has been invaluable.

Kristian Nielsen +1 703.444.0845 Vice President www.subtelforum.com


AAE-1..............................................................................8 AAG................................................................................10 AC-1..............................................................................12 AC-2..............................................................................14 ACE - PHASE 1..............................................................16 ACE - PHASE 2..............................................................17 ADONES.........................................................................18 ADRIA-1........................................................................19 AEC................................................................................20 AJC................................................................................22 AKORN...........................................................................23 ALASIA...........................................................................24 ALASKA UNITED EAST...................................................25 ALASKA UNITED WEST..................................................26 ALBA-1..........................................................................27 ALETAR..........................................................................28 ALEXANDROS.................................................................29 ALONSO DE OJEDA........................................................30 ALPAL-2........................................................................31 AMERICAN SAMOA-FIJI................................................32 AMERICAS I...................................................................33 AMERICAS I SOUTH.......................................................34 AMERICAS II..................................................................35 AMERIGO VESPUCCI......................................................36 AMX-1...........................................................................37 ANTEL............................................................................38 ANTILLES CROSSING.....................................................39 APCN 2...........................................................................40 APG................................................................................42 APHRODITE 2.................................................................44 APNG-2.........................................................................45 APOLLO..........................................................................46 APX-CENTRAL...............................................................49 APX-EAST......................................................................50 APX-WEST.....................................................................52 ARBR.............................................................................53 ARCOS-1.......................................................................54 ASC................................................................................55 ASE................................................................................56 ASH................................................................................58 ATHENA..........................................................................59 ATISA.............................................................................60 ATLANTIS-2...................................................................61 ATLAS OFFSHORE..........................................................62 AUSTRAL........................................................................63 AWE...............................................................................64 BAHAMAS-2..................................................................66 BALTICA.........................................................................67 BAR-SAV.......................................................................68

BASS STRAIT 2..............................................................69 BBG................................................................................70 BCS EAST.......................................................................72 BCS EAST-WEST INTERLINK.........................................73 BCS NORTH....................................................................74 BDM...............................................................................75 BEST CABLE SYSTEM....................................................76 BHARAT-LANKA.............................................................78 BICS...............................................................................79 BIN.................................................................................80 BIOS / JONAH................................................................81 BLAST............................................................................82 BORACAY-PALAWAN......................................................83 BOTNIA...........................................................................86 BRCS..............................................................................87 BRUSA...........................................................................88 BSCS..............................................................................89 BSFOCS.........................................................................90 CADMOS........................................................................91 CAMEROON-BRAZIL......................................................92 CANALINK......................................................................93 CANTAT-3.......................................................................94 CAUCASUS CABLE SYSTEM...........................................96 CB-1..............................................................................97 C-BUS...........................................................................98 CEIBA-2.........................................................................99 CELTIXCONNECT...........................................................100 CFX-1..........................................................................101 CIOS.............................................................................102 CJFS............................................................................103 C-LION1......................................................................104 COLUMBUS II...............................................................106 COLUMBUS III..............................................................108 CONCERTO-1...............................................................110 CORFU-BAR.................................................................111 DANICA NORTH............................................................112 DANICA SOUTH............................................................113 DANICE........................................................................114 DARE............................................................................115 DDSCN.........................................................................118 DEEP BLUE..................................................................119 DENMARK-NORWAY 6.................................................120 DENMARK-POLAND 2..................................................121 DIDON..........................................................................122 DMCS...........................................................................123 EAC-C2C......................................................................124 EASSY..........................................................................125 EAST-WEST.................................................................126 ECFS............................................................................127


ECLINK.........................................................................128 EIG...............................................................................130 ELLALINK.....................................................................132 ENDEAVOUR.................................................................133 ESTEPONA-TETOUAN...................................................134 EUROPA.......................................................................135 FA-1 NORTH/SOUTH.....................................................136 FALCON........................................................................138 FAR EAST.....................................................................140 FARICE-1.....................................................................141 FARLAND.....................................................................142 FASTER........................................................................144 FEHMARN BELT............................................................146 FIBRALINK...................................................................147 FLAG EUROPE-ASIA....................................................148 FLORES-CORVO..........................................................150 FOG..............................................................................151 GBICS..........................................................................154 GCN..............................................................................156 GEMINI BERMUDA.......................................................157 GEORGIA-RUSSIA........................................................158 GLO-1..........................................................................159 GLOBENET...................................................................160 GO-1............................................................................161 GOKI.............................................................................162 GONDWANA-1.............................................................163 GREENLAND CONNECT................................................164 GREENLAND CONNECT NORTH.....................................165 GUANTÁNAMO BAY CABLE...........................................168 GUANTÁNAMO BAY 2....................................................169 GWEN...........................................................................170 HANNIBAL....................................................................171 HANTRU-1...................................................................172 HAWAIKI.......................................................................174 HAWK CABLE SYSTEM.................................................176 HIBERNIA ATLANTIC.....................................................178 HIBERNIA EXPRESS.....................................................180 HK-G............................................................................182 HONOTUA.....................................................................183 HSCS............................................................................184 HUGO...........................................................................185 I2I................................................................................186 ICN1.............................................................................187 ICN2.............................................................................188 IFC-1...........................................................................189 I-ME-WE.....................................................................190 INDIGO.........................................................................192 ITALY-ALBANIA............................................................193 ITALY-GREECE..............................................................194

ITALY-LIBYA.................................................................195 ITALY-MONACO............................................................196 JAKA2DELEMA.............................................................197 JAKABARE...................................................................198 JAPAN-US...................................................................200 JASUKA........................................................................202 JUNIOR........................................................................203 KAFOS..........................................................................204 KELTRA-2....................................................................205 KHULNA-CHENNAI......................................................206 KJCN............................................................................207 KODIAK KENAI.............................................................208 KUWAIT-IRAN..............................................................209 LEV..............................................................................210 LION.............................................................................211 LION-2.........................................................................212 LIQUID SEA..................................................................213 MAC.............................................................................214 MAIN ONE....................................................................215 MAREA.........................................................................216 MATRIX........................................................................218 MAYA-1........................................................................219 MBDC...........................................................................220 MCT..............................................................................221 MED CABLE NETWORK................................................222 MEDNAUTILUS.............................................................223 MELITA-1.....................................................................224 MENA...........................................................................226 MIC-1..........................................................................228 MICRONESIA CABLE SYSTEM......................................229 MINERVA......................................................................230 MKCS...........................................................................231 MOANA.........................................................................232 MONET.........................................................................233 MYTHIC........................................................................234 NCP..............................................................................236 NCSCS.........................................................................238 NEPTUNE CANADA.......................................................239 NORSEA COM-1...........................................................240 NORTHSTAR.................................................................241 ORVAL..........................................................................242 PAC..............................................................................243 PALAU-GUAM..............................................................244 PAN-AM.......................................................................245 PANGEA.......................................................................246 PANIOLO......................................................................247 PC-1............................................................................248 PCCS............................................................................250 PEC..............................................................................251


PLCN............................................................................252 PPC-1..........................................................................254 QATAR-UAE..................................................................255 QUINTILLION SUBSEA..................................................256 RJCN............................................................................257 RNAL............................................................................258 SAC..............................................................................259 SACS............................................................................260 SAEX............................................................................262 SAFE............................................................................264 SAM-1.........................................................................266 SAMOA-FIJI.................................................................267 SAPL............................................................................268 SAPL CX.......................................................................270 SAS-1..........................................................................271 SAT-3...........................................................................272 SCAN............................................................................273 SCF-CN.......................................................................274 SCOTLAND-ORKNEY-SHETLAND.................................275 SEABRAS-1.................................................................276 SEACOM.......................................................................277 SEAK............................................................................278 SEA-ME-WE 3.............................................................280 SEA-ME-WE 4.............................................................282 SEA-ME-WE 5.............................................................284 SEA-US........................................................................286 SEAX-1........................................................................288 SEAX-2........................................................................289 SEAX-3........................................................................290 SG-SCS.......................................................................291 SHEFA 2.......................................................................292 SILPHIUM....................................................................293 SJC..............................................................................294 SKR1M.........................................................................295 SMPCS.........................................................................296 SMPR-1.......................................................................297 SOCC............................................................................298 SOLAS..........................................................................299 SOUTHERN CROSS CABLE NETWORK..........................300 SVALBARD...................................................................302 TANGERINE..................................................................303 TANNAT........................................................................304 TASMAN GLOBAL ACCESS...........................................305 TAT 14..........................................................................306 TE NORTH.....................................................................308 TEAMS.........................................................................309 TGN EURASIA...............................................................310 TGN GULF....................................................................312 TGN INTRA-ASIA..........................................................313

TGN NORTHERN EUROPE.............................................314 TGN TRANSATLANTIC...................................................316 TGN TRANSPACIFIC.....................................................318 TGN WESTERN EUROPE...............................................320 TGN-TATA INDIACOM...................................................321 TGN-TIC.......................................................................322 TIERRA DEL FUEGO......................................................323 TIS...............................................................................324 TONGA-FIJI..................................................................325 TPE...............................................................................326 TRIDENT.......................................................................328 TSE-1..........................................................................329 TUBROK-EMASED........................................................330 TUI-SAMOA.................................................................331 TWA-1.........................................................................332 UGARIT.........................................................................333 UNISUR........................................................................334 UNITY...........................................................................336 VENTSPILS-GOTLAND.................................................338 VMSCS.........................................................................339 WACS...........................................................................340 WARF...........................................................................341 WESTERN VISAYAS-PALAWAN....................................342

ADVERTISER INDEX

STF ANALYTICS..............................................................48 OFS................................................................................84 STF EDITORIAL SCHEDULE..........................................105 TE SUBCOM.................................................................116 SUBOPTIC....................................................................152 HUAWEI MARINE..........................................................166 WFN STRATEGIES........................................................235


SUBMARINE CABLES OF THE WORLD Greenland

Quintill

ion Sub

sea

Bar r ow Wain wr igh t

Prudhoe Bay

Point Hope

No m e

Seydisfjordur

Iceland

Nuuk

Fa

rice

-1

Landeyjarsandur Danice

e

Anchorag

Valde z

Quintill

SH

nect

A -2

Ayre of Ca ra

sea

Dunnet Bay

Ju ne au G re en la nd C on nect

Angoon

Hawk Inlet Sitka

EF

ion Sub

i

Kodiak Na rr ow Ca pe

C on

Maywick

ON

ia od a K en K

la nd

UF EA

Canada k

Gre en

Q aq or toq

Whittier Kenai d Sew ar Homer

Pete r sbur g

AK SE

Wr an gell Ketchikan

Banff

- Atla

e r nia

Hib

ntic

Co le r aine Redcar Humanby

Killa la

Ireland

Du blin

Ala sk Ala a U sk n ite aU d ni W No ted e st E rt AK hSt ast OR ar N

Cork

en

ead

O xwich Ba y

rm

rdso

ga

Mid

Ha rb or Point e

UNE

NEPT

Highbridge White san d B ay Wide m o uth Ba y no Por th cur

-1

AC

T-14 TA

Por t Alber n i

Hibe

Milton

- Atla

r nia

Nedonna Beach

Florence

Lannion

AEC

ntic nia- Atla FA- 1 tlan tic a T r ans tlan tic TG N a T r ans TG N AC-2 Apollo TAT-14 ress Exp Hibernia 1 ACApollo FA- 1

-1

CA

Co rvo

Ma nasq ua n Tucke rto n

VO R

O

-C

ES

R

O

FL

Flores

G ra ciosa Pon ta De lg ad a

Faial

ss C ro

aiki Haw

rn

Morro Bay

Sou

the

G

San Lu is G ro ver O bispo Bea ch

G

He rm osa Bea ch

China-US

O lah

St. David's

er

Am

BP-GOM

le

tanam

San Ju an

M

NA

C

N

Praia

dg

lla

u ri

n

Am

Pue rt o n id ad Vie jo Tri

G

lo

eri

SG

ca

C

II

be

Guinea t

av

ou

r

S- 2

lalink

de

Eu

PCCS

En

st

s

Ea

Cros

X-

s

Fo rt aleza

SAC

H

ana

AS

Mo

So

uth

ern

Ha

Cros

So

wa iki

uth

ern

AP

1

AN TI

CS

One

AT L

r

eroo

PA NA M

n-B

Bolivia

Papeete Moorea

Arica

Rio de Janeiro

Paraguay

Sao Paulo

Chile

Ma ld on ado

Argentina

N

A

Las Tonin as

Puerto Montt

Santa Cruz Punta Arenas

Tier r a del F u ego

TE

L

2 AT

S-

C

N N TA

UN

SA

Uruguay

Valpa ra iso

IS UR M-1

Florianopolis

SA

Huahine

TI

Uturoa

Monet

Eulalink

AMX

A

S

Seabras-1

Salvad or

N

Vaitap e

LA

Samoa Pag o Pag o

-1

M

Globenet SAC

Brazil

AT

oa

iji

BRUSA

CS

Austral

am

-F

razi

SA

Lima Lurin

Côte d'Ivoire Abidja n

Cam

SAC

nS

Monrovia

ado

Ecu

SAM-1

ic a

Freetown

Salinas

Puerto Máncora

SAPL

er

Am

GLO-

Honotua

-F

WA

Colom bia

Manta

Ghana T

Conakry

Ca yen ne

Sam oa

oa

Burkina Faso

Sucujaque

ne

S

Peru

Sam

Senegal

3

-S

Venezuela

s

Georgetown

iji

Dakar

Banjul

Main

Pun

na

as Ca m Carac

SAT-

Tolu

Ustu po

q ui

tage

stad

ha

ACE

att

ry Pr ty Batte ma Ci Pana

Car

Americas II

Willem

h ac

r r an

ta Go rda

PCCS

eto

w

Rio

Ba

SAM -1

G

Bri

PL

SA

Puerto Limon

M

1

Bluef ie lds SAPL

Mali

OS-1

PA

A

A-

t

-1

X AM et -1 Mon bras t ne Sea be Glo M-1 as I SA eric C Am SA

AY

ne

Alba

US

M

X

BR

CF X- 1

be

A

Nouakchott

EC FS

I

East- We st

Glo

Puerto Puerto Tro jillo Pue rt o Cortes Pue rt o Barrios Lem pir a San Jose Pue rt o Ca be zas

Mauritania

o2

AMX

Montego O cho Bay Rios

ARC

CJFS

SA

AR CO S-1 SAM -1

Ha lf -M oo n Bay

AMX

C

Globenet

ab

Fib ra lin k

PA

Sardinia Alta Vist a

II

oC

1

Guan

Tulum

Lad yville

Lin

icas

am

X-

Cancun

Samuel L Spencer Beach

El Me da no

III

na

er

Ke

S

AAG

II

bus

Colum

Morocco

k

Ca

Am

ntan

CF

SAPL

S-1

Gua

Ha van a

SEA- U

bus

Colum

l

CS

Mazatlan

Oahu

AM Mon X Sea et bras -1

II us S mb BIC Colu C MA

st

AP

a awaul

-1

M

SA

Ver o Bea ch Freeport Boca Raton Hollywood Miami

Mexico

I

Americas

Ing le side

ITY

UN

icas

ha

nc

Fu Gemini Bermuda

Jacksonville

M-1

So

ss

AR CO

X- Ea

US

C ro

PC

SEA-

e rn

u th

Teut an

Ca sab la nca

Pascagoula S

n-U Japa AAG

Valencia

Asi

n

PC -1 PLCN

B

Spain

Cadiz

et

be

Glo

Tijua na

em in lo i Be be rm ne ud t a

-1

Vir g in ia Be ach

Faster

CB

MAC

China-US

Bord

Bilbao

Vig o

No rt hpo r t Island Park

United States

Point Arena

NCP

GLO

MAREA

S-1

NU

ga l

Tra

Japan-US

Lynn

bo

C h Bro ar le ok sto h w av n e n

fic nspaci

St. Hilaire

N TG n t er e Wes op Eur

Lis

TGN

Bandon

ic

p acif

T r ans

Ha lifa x

Plerin

Penmarch

n Po rtu

TPE

TG N

Pen na nt Point

Peve

Guernsey

ntic

Hibe r

War r ent on

PC -1

Southport

United Lo Kingdom

Holyh

Kilm or e Q ua y

l

Accr


Hotellneset

Svalbard

Andoy Harstad

Sw eden

Umea Vaasa

Finland

Sandviken

a

Tysvae r

nT

a

t-3

Kristiansand

PA NG

Denm ark -Russia

Denm

Co pe nha

ge n

Lithuania Belarus

Norden De Marne

Okha

a

n

lio

intil

Qu

Mieln o Ribn itz- Da m g ar ten Kolobrzeg

G ed ser

TG N NE

Sven toji

Dueodde

West er la nd

Magadan

Latvia

Liepaja

ion1

ark

Thisted

EA

Logi Kingisepp

Tallin

Estonia Vent spils

C-L

No rS Co m ea -1

G oth en bu rg

Russian Federation

Kotka

Ha ng o

EE- S1

Stockh olm Stavsn as

Ard en da l

Helsingfors

Vadd o

Ma rieh am n C

Fa r East

Norway

BC S EastWe Inte rlin st k

bse

Su

Mys Leva sho va

Far East

owestoft

Poland

Germany Czech Republic

Slovenia

BSFOCS

ille

rse

Dubrovnik Ajaccio

Greece

W5

MIN ER

C ab le Syst

Poti

em

Georgia

Turkey

JC

N

Uzbekistan Turkm enistan

North Korea

Tajikistan

n eo Inch n a Tae

Marmaris

Tar tus

Iraq

Iran

Tel A viv

Nepal

E

E-1 AA

AL

E TP

RN

G AP an

ng

Fa

2C C-C

F WAR

Ya p

AAG

Piti

m

A-U

Microne

siaCS

S

SE

Penang

Re ag an Test S it e

Ebe ye

NTR

U-1

Da vao

Ma ju ro

Micronesia

Marshall Islands

N

Medan

AJC

Kua nta n Mer sing

Malay sia

Kato ng

Ma nad o

Tand joe ng San ga tta

pore

Singa

Pon tian ak

Ka2

La

DeM

a

ASC

FE

PPC-1

Toweli

Keta pa ng

Pap ua

Sulawe si Ban djer

JASUKA

SA

Ma lu ku

Ja

Indonesia Pangkalanbun

SMP C S

m asin

JaKa2L

aDeMa SUB

Madang

Papua New Guinea

Ja kar ta

Dar es Salaam

MAT

Sur ab aja

Lua nd a

AR

Mataram

AM

- KU

PA

LIO

Noro

Point Mo re sby

NG

Wain gap u

Por to Am b oim

on

ua

-G

au

Pal

EA

LF

W -3 SM RE DA OM

EA SS AA y E-1 TE AM S

AC

SE

Tum

Philippines

Jember

Auki

Kupang

N-2

Angola

Mozam bique

Mayotte IC

Zambia

N

2

Poindimie

Sy EAS

Lifou

iki

Jaco tet Baie du

wa

Por t He dlan d

Noum'ea AP

O nslow

AW

Suva

ICN1

M a ur it iu s-R o dr igue s

Mo uli Isla nd

Ha

COM

Port Vila

st

SEA

Luganville

We

ASC

M

E

NG

A ustralia

Gon

dw

an

Walvis Bay

-2

Toliar y

W-3

ad

N

APX-

Botswana

Swakopmund

a ag

LIO

en t

Namibia

r

a sc

SM

Zimbabwe

Tr id

ACE

Tom asina

Ma put o

r ou av st a ss X-E ro AP C i e rn waik u th Ha

de

En

So

South Africa

Mtunzini

SAFE

Durban

rn Sou

iki

the

wa

Bro okva le Sydn ey Oxford Falls

Adelaide

ana

Ha

C ro

ss

Perth

Me lkb osstr an d Ca pe Town

Mo

Benguela Lucir a

Namibe

1

ADONES

an

r ac

Bo

G AP MCT

Tanzania

Nzeto

alaw

HA

Mombasa

Ca bind a Soyo

SEA- U S

ISA

AT

P a y-

Palau

Dumai

Rwanda Burundi

AAG

Capepisa Bata ng as

SC

DD

Kenya

Pointe Noire

Ballesteros

La Union SJC APCN2

G

Dem ocratic Republic of the Congo

S

PLC N

AA

Gabon

S

khla

Mogadishu

Uganda Congo

Ch in a- U

Song

N

Kribi

Libr eville

Ch in a- U

2

APCN

G

-3

Sihan ou kville Vun g Tau m

Male

Bata tana

San

APG

Cambodia

Sri Ra cha

M- T

S

SMW

Da N an g

APCN2

Petchaburi

Co lo m bo

Douala

e

Okinawa

g

AA

Pyapon

TG N TIS TIC IC S i2i

Triv

FAL CO

US

i

1

ru

a nd

en

2C SJCC -C N-IA C 2 EA TG -C C EA E AS

C

On

SC

nn

MYTHI

G

BB

ain

Central A frican Republic

Cam eroon

AAE-1

M NC

South Sudan

SMW-3

Por t Ha rco ur t

he

AAE-

Cochin

Somalia

Ethiopia

SMW-4 FEA

Nigeria

Lag os

C

h uc

To

Shantou

Laos

Thailand

SMW-5

Cotonou

a-

Ch en nai

Djibouti

Lom e

ln

Japan-

PC-1

-3

KI

a

hu

K

Aden

a Benin Togo

W

AJC

GO

Mumbai

1

AAE-

Al Hudaydah

a

Vietnam

Myanmar

ia Euras TGN W-5 SM

ON FALC

Co x's Baza ar

Tong Fu k

nO

Al G ha yda h

Yem en

Khu ln a

Pali

K wa

Eritrea

India

ON

ng

Chad

Bangladesh

LC

Oman

Jeddah

Port Sudan

Sudan

Karachi

h

FA

Mu scat

Tseu

jaira

TWA-1

Al See b

Ch in a- U S

Fa ster

SM

Fuzhou

Ch ab aha r

Fu

Dubai

UA E

NCP TPE

G AP -2 A FE APCN

sh

Halul

Saudi Arabia

AAE-1

Al-Khobar Manama

Bhutan

E

Egypt

Niger

5 TPC- C C2 EAC-RNAL

Miyazaki

SC

Bandar Abbas

TGN Transpacific TGN Transpacific

AJC

Libya

Ja pa n- U S

Emi

UNITY

C-J FO

Kharg Bushehr

Kuwait City

Za far a na

Algeria

Wad a

Shanghai

Pakistan

Al Faw

Aqa ba

AS

Ra s Sidr

SMW -3

Suez

Japan Shim a

Fukuoka Kitakyushu

Ch on gm in g

Israel

Alexan dr ia

Naoetsu Kitaiba r aki Ajigaura Ibaraki

Pusan Keoje

E

W -4

Darnah Benghazi

azi

SM

Ben gh

E

PC-1

South Korea

TP

China

W-5

Tr ip oli-

Trip oli

TP

Afghanistan

Beir ut Ha if a

I-ME-W

Tunisia

Syria

GOKI

Qingdao K

MIN ER VA

SM

HAW S

SMW-5

D RO

SMW-5

XAN

GB I MENA

ALE

EAC-C2C

Kélibia

Oran

ra

R

Ky rgy zstan

A rm enia

IT

VA

Ishikari

Na kho dka Ca uca sus

Istanbul

a-

Annaba

Algiers El D je m ila

Lechaina Kor op i

EMOS-1

Pozallo

Soch i

TE AM S TG EIG N GU

S LA AT

Co rf u

SM

le

Med Cab

S

Var na

UR

O tr ant o

Ses Co vete s ALPAL -2

l

Bulgaria

Du rr es

Bari

MedNautilus

O rva

1

Bar

Ara nci

EIG

E-

OC BSF

PPC-1

V

AA

Nevelsk

Novorossiysk

ITUR

Ma

Mangalia

R SA

Mongolia

Romania

Savo na

BA

Barcelona

Kazakhstan

Odesa

AJC

deaux

Hungary

SOCN

Italy

Ukraine

Slovakia

Austria

France

APX-East APX- C en tr al

SAFE

Me

Bass Strait 2

ds tairs C Sa a ye ux Va int -s le u rry -e M er n-C au x

Stan ley

lb ou

rn

e

Sou the rn C ro ss Tasman Global Access

Whenuapai Aucklan d

ch int rlo P o Inve n dy Sa

Bass Strait 1

Do m b ur g

Broa

HSCS

IJmuiden

ensey Bay

Boat Harbour Hobart

New Zealand


mo

Pa

ler

Ba

rce Ma lona rse ille s

AAE-1

lat Zafrana a T u b A

Fujairah n Oma

LANDING POINTS: • • • • • • • • • • • • • • •

Marseilles (France) Bari (Italy) Chania (Greece) Abu Talat (Egypt) Zafarana (Egypt) Jeddah (Saudi Arabia) Djibouti (Djibouti) Aden (Yemen) Barka (Oman) Fujairah (UAE) Doha (Qatar) Karachi (Pakistan) Mumbai (India) Ngwe Saung (Myanmar) Satun & Songkhla (Thailand)

Djibouti

Kenya


ASIA AFRICA EUROPE [PLANNED] RFS Year:

2017

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms):

600,000,000 25,000

Design Capacity: 40 Tbps Fiber Pairs:

5

Channels: 80

Channel Capacity:

Owners:

System Supplier:

100 Gbps

British Telecom, China Unicom, Chuan Wei, Djibouti Telecom, Etisalat, HKT (PCCW Global), Mobily, Omantel, Ooredoo, PTCL, Telecom Egypt, Telecom Yemen, Viettel, OTEG, Reliance Jio, Time. com, TOT TE SubCom, NEC

System Installer: TE SubCom

Marine Surveyor:

Fugro

Region: Indian Ocean Pan-East Asian

Shanghai Cox Bazaar Mumbai

Hong Kong

Myanmar

Sri Lanka Singapore

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


AAG

Lantau Sri Racha Vung Tau Mersing Changi

LANDING POINTS: • • • • • • • • • •

Changi (Singapore) Keawaula (Hawaii) Lantau (Hong Kong) La Union (Philippines) Mersing (Malaysia) Grover Beach (USA) Sri Racha (Thailand) Tanguisson (Guam) Tungku (Brunei) Vung Tau (Vietnam)

La Union Tungku

Tanguisson


San Luis Obispo

Keawaula

ASIA-AMERICA GATEWAY RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs:

500,000,000 20,547

2.88 Tbps

3 Fiber Pairs

Channels: 96

Channel Capacity:

Owners:

System Supplier:

100 Gbps

AT&T Inc., Bayan, Bharti, BT Global Network Services, CAT Telecom, ETPI, FPT Telecom, the Government of Brunei Darussalam, PT Indosat, PLDT, Saigon Postel Corporation, StarHub, Telcotech, TELKOM Indonesia, Telstra, Telekom Malaysia, TNZL, Viettel, VNPT Alcatel Submarine Networks, NEC

System Installer: Alcatel Submarine Networks, ASEAN Cableship, NEC, Orange Marine Cableship:

System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

Rene Descartes

AT&T, PLDT, Starhub Ltd, Telstra International, TM Berhad Mitsubishi, Ciena 2011, 2014

40 Gbps, 100 Gbps

Region: Transpacific


AC-1

Brookhaven ATLANTIC CROSSING 1 RFS Year:

1999

Est. End of Service Date: 2024 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

875,000,000 13,377

40 Gbps

Design Capacity: 2 Tbps Fiber Pairs:

Owners: System Supplier:

4 Fiber Pairs

Level 3 Communications

Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

System Maintainer:

LANDING POINTS: • Beverwijk (Netherlands) • Brookhaven (USA) • Westerland (Germany) • Whitesands Bay (UK)

Upgrader: Upgrade Year: Upgraded Capacity:

Level 3 Communications Xtera Communications 2010

20 Gbps

Region: Transatlantic


Westerland Beverwijk Whitesands Bay


AC-2

Bellport

ATLANTIC CROSSING 2 RFS Year:

2000

Est. End of Service Date: 2025 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

700,000,000 6,185

320 Gbps

Design Capacity: 2.5 Tbps Owners:

System Maintainer: Upgrader: Upgrade Year:

LANDING POINTS: • Bellport (USA) • Widemouth (UK)

Upgraded Capacity:

Level 3 Communications Level 3 Communications Infinera 2010

10 Gbps

Region: Transatlantic


Widemouth Bay


ACE - PHASE 1

AFRICA COAST TO EUROPE - PHASE 1 RFS Year:

Penmarch

2012

Est. End of Service Date: 2037 Est. System Cost (US$): 500,000,000 Total Length (kms): 12,000 Design Capacity: 12.8 Tbps Channel Capacity: 100 Gbps Owners:

Lisbon Asilah

System Supplier: Alcatel-Lucent Submarine Networks (Main contractors), TE SubCom (Sub contractors) System Installer:

• • • • • • • • • • • • • • • •

Penmarch (France) Lisbon (Portugal) Tenerife (Spain) Nouakchott (Mauritania) Dakar (Senegal) Banjul (The Gambia) Conakry (Guinea) Freetown (Sierra Leone) Monrovia (Liberia) Abidjan (Ivory Coast) Accra (Ghana) Cotonou (Benin) Lagos (Nigeria) Kribi (Cameroon) Bata (Equatorial Guinea) Libreville (Gabon)

Orange Marine

Marine Surveyor: Fugro System Maintainer: Orange, PT Comunicações S.A., Sonatel, Gestor de Infraestructuras de Guinea Ecuatorial (GITGE) Region: EMEA

C La oto go no s u

D Ba ak N nj ar ou C ul ak Fr on ch e ot M eto akr t on wn y ro vi a Ac Abi cr dja a n

Tenerife

LANDING POINTS:

Benin Telecoms, Cable Consortium of Liberia, Canalink Africa SL, Côte d’Ivoire Telecom, Dolphin Telecom JLT, Gambia Submarine Cable, Guinéenne de Large Bande, International Mauritania Telecom, MEO, MTN, Orange (France), Orange Cameroun, Orange Mali, Orang

Kribi Bata Libreville


ACE - PHASE 2

AFRICA COAST TO EUROPE - PHASE 2 [PLANNED] RFS Year:

2017

Est. End of Service Date: 2037 Est. System Cost (US$): 200,000,000 Total Length (kms): 5,000 Design Capacity: 12.8 Tbps Channel Capacity: 100 Gbps Owners:

Benin Telecoms, Cable Consortium of Liberia, Canalink Africa SL, Côte d’Ivoire Telecom, Dolphin Telecom JLT, Gambia Submarine Cable, Guinéenne de Large Bande, International Mauritania Telecom, MEO, MTN, Orange (France), Orange Cameroun, Orange Mali, Orang

System Supplier: Alcatel-Lucent Submarine Networks (Main contractors), TE SubCom (Sub contractors) System Installer:

Orange Marine

Marine Surveyor: Fugro System Maintainer: Orange, PT Comunicações S.A., Sonatel, Gestor de Infraestructuras de Guinea Ecuatorial (GITGE) Region: EMEA

Santana Muanda

Luanda

Ca

pe

To w

n

Swakopmund

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

LANDING POINTS: • Santana (São Tomé and Príncipe) • Muanda (DRC) • Luanda (Angola) • Swakopmund (Namibia) • Cape Town (South Africa),


ADONES

ANGOLA DOMESTIC NETWORK SYSTEM RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

Cabinda

System Supplier: Cableship:

Angola Telecom Ericsson Teleri

Region: EMEA

Nzeto Luanda Porto Amboim

Benguela Lucira

Namibe

Benguela (Angola) Cabinda (Angola) Luanda (Angola) Lucira (Angola) Namibe (Angola) Nzeto (Angola) Porto Amboim (Angola) Soyo (Angola)

30 Gbps

System Installer: Elettra

Soyo

LANDING POINTS:

1,800

Design Capacity: 80 Gbps Owners:

• • • • • • • •

35,000,000


ADRIA-1

ADRIA-1 RFS Year:

2000

Est. End of Service Date: 2025 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier:

13,400,000 430

622 Mbps

Deutsche Telekom AG, OTE

Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

System Maintainer:

Hellenic Telecommunications Organization S.A.

Region: EMEA

Dubrovnik

Durres

Corfu

LANDING POINTS: • Corfu (Greece) • Dubrovnik (Croatia) • Durres (Albania)


AEC

Shirley

LANDING POINTS: • Shirley, New York (United States) • Killala (Ireland)


AMERICA EUROPE CONNECT RFS Year:

2016

Est. End of Service Date: 2041 Est. System Cost (US$):

Total Length (kms): Design Capacity: Fiber Pairs:

300,000,000 5,536

78 Tbps

6 Fiber Pairs

Channels: 130

Channel Capacity: 100 Gbps

Owners: AquaComms

System Supplier:

TE SubCom

System Installer: TE SubCom Cableship:

Reliance

Region: Transatlantic

Killala


AJC Maruyama Shima

AUSTRALIA-JAPAN CABLE RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

520,000,000

Tumon

Tanguisson

12,224

320 Gbps

25.6 Tbps

4 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: Australia Japan Cable Limited, Communications Global Network Services Limited, NTT Communications Corporation, SOFTBANK Telecom Corp., Telstra Holdings (Bermuda) No. 1 Limited, Worldcom Global Networks Limited

System Supplier:

Ocean Cable Company, Tyco Telecommunications

System Installer: FCR, KDD Cableship:

System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

Fresnel, Subaru

Australia Japan Cable, SoftBank Telecom Corp Ciena, Infinera 2012, 2014

40 Gbps, 100 Gbps

Region: Transpacific

LANDING POINTS: • • • • • •

Maruyama (Japan) Oxford Falls (Australia) Shima (Japan) Sydney (Australia) Tanguisson (Guam) Tumon (Guam)

Oxford Falls Sydney


AKORN

Anchorage

Florence

AKORN RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:

LANDING POINTS: • Anchorage (USA) • Florence (USA)

System Maintainer:

100,000,000 2,968

10 Gbps

4 Fiber Pairs

Alaska Communications

Tyco Telecommunications ACS Cable Systems

Region: Americas


ALASIA

ALASIA RFS Year:

2012

Est. End of Service Date: 2037 Est. System Cost (US$):

Total Length (kms):

15,000,000 350

Design Capacity: 25.6 Tbps Fiber Pairs:

8 Fiber Pairs

Channels: 40

Channel Capacity:

Owners:

40 Gbps

Cyprus Telecommunications Authority, Syrian Telecommunications Authority

Region: EMEA

LANDING POINTS: • Pentaskhinos (Cyprus) • Tartus (Syria)


ALASKA UNITED EAST

Whittier

Valdez

Juneau

Harbor Pointe

ALASKA UNITED EAST RFS Year:

1999

Est. End of Service Date: 2024 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

100,000,000 3,751

2.5 Gbps

Design Capacity: 10 Gbps Fiber Pairs:

Owners:

LANDING POINTS: • • • •

Harbor Pointe (USA) Juneau (USA) Valdez (USA) Whittier (USA)

System Supplier: System Maintainer:

2 Fiber Pairs GCI

NEC

General Communication Incorporated

Region: Americas


ALASKA UNITED WEST

Whittier

Ketchikan

Warrenton

ALASKA UNITED WEST RFS Year:

2004

Est. End of Service Date: 2029 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

30,000,000 2,483

10 Gbps

Design Capacity: 640 Gbps Fiber Pairs:

Owners: System Supplier:

• Ketchikan (USA) • Warrenton (USA) • Whittier (USA)

GCI

Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI Cableship:

LANDING POINTS:

4 Fiber Pairs

System Maintainer:

Global Sentinel

General Communication Incorporated

Region: Americas


ALBA-1

Havana Santiago de Cuba Morant Point

Camuri

ALBA-1 RFS Year:

2013

Est. End of Service Date: 2038 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

72,000,000 1,600

640 Gbps

Design Capacity: 5.12 Tbps Owners:

System Supplier:

LANDING POINTS: • Camuri (Venezuela) • Ocho Rios (Jamaica) • Santiago De Cuba (Cuba) • Siboney (Cuba)

Telecom Venezuela, Transbit SA Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Shanghai Bell, Telecomunicaciones Gran Caribe

Marine Surveyor: Survey Boat:

EGS

RV Ridley Thomas

Region: Americas


ALETAR

T a r t u s

A l e x a n d r i a

ALETAR RFS Year:

1997

Est. End of Service Date: 2022 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners:

System Supplier:

• Alexandria (Egypt) • Tartus (Syria)

733

5 Gbps

1 Fiber Pair

Lebanese Ministry of Telecom (6.25%), Syrian Telecom (46.875%), Telecom Egypt (46.875%) Alcatel Submarine Networks

System Installer: FCR Cableship:

LANDING POINTS:

23,000,000

System Maintainer:

Vercors

Telecom Egypt

Region: EMEA


ALEXANDROS

Marseille

Pentaskhinos

Alexandria

ALEXANDROS RFS Year:

2010

Est. End of Service Date: 2035 Total Length (kms):

3,500

Design Capacity: 10 Tbps Owners:

LANDING POINTS: • Alexandria (Egypt) • Marseille (France) • Pentaskhinos (Cyprus)

System Maintainer:

Cyprus Telecommunications Authority, Telecom Egypt

Cypress Telecommunications Authority

Region: EMEA


ALONSO DE OJEDA

ALONSO DE OJEDA RFS Year:

1999

Est. End of Service Date: 2024 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

8,700,000 128

15 Gbps

Design Capacity: 100 Gbps Owners:

System Supplier:

Antelecom NV

Alcatel Submarine Networks

System Installer: IT International Telecom

System Maintainer:

Setar NV, United Telecommunications Services

Region: Americas

Oranjestad Willemstad

LANDING POINTS: • Oranjestad (Aruba) • Willemstad (Netherlands Antilles)


ALPAL-2

ALPAL-2 RFS Year:

2002

Est. End of Service Date: 2027 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

17,600,000 312

10 Gbps

Design Capacity: 160 Gbps Fiber Pairs:

Owners: System Supplier:

4 Fiber Pairs

APT, France Telecom, Telefonica Pirelli

System Installer: Global Marine Systems Limited Cableship:

System Maintainer:

Ses Covetes

El Djemila

LANDING POINTS: • El Djemila (Algeria) • Ses Covetes (Majorca)

Maersk Responder

Telefonica de España, S.A.U.

Region: EMEA


AMERICAN SAMOA-FIJI

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

American Samoa

Fiji

AMERICAN SAMOA-FIJI [PLANNED] RFS Year:

2018

Est. End of Service Date: 2041 Est. System Cost (US$):

LANDING POINTS: • Pago Pago (American Samoa) • Fiji

Initial Capacity: Owners:

35,000,000 40 Gbps

American Samoa Hawaii Cable

Region: AustralAsia


AMERICAS I Vero Beach

Magens Bay

AMERICAS I RFS Year:

1994

Est. End of Service Date: 2019 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

220,000,000 2,013

120 Gbps

Design Capacity: 320 Gbps Owners:

System Supplier:

AT&T, CANTV (Venezuela), Embratel, TSTT

Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

System Maintainer:

Upgrader:

LANDING POINTS: • Magens Bay (Virgin Islands) • Vero Beach (USA)

Upgrade Year: Upgraded Capacity:

AT&T, Telecom Services Trinidad & Tobago Xtera Communications 2010

20 Gbps

Region: Americas


AMERICAS I SOUTH

AMERICAS I SOUTH RFS Year:

1994

Est. End of Service Date: 2019 Total Length (kms): Initial Capacity: Owners: System Supplier:

Magens Bay

6,014

560 Mbps

AT&T, CANTV (Venezuela), Embratel, TSTT

Alcatel Submarine Networks, Tyco Telecommunications SSI

System Installer: C&W (Marine) Cableship:

Cable Installer, Agile, Fresnel

Region: Americas

Camuri

Macqueripe

Fortaleza

LANDING POINTS: • • • •

Camuri (Venezuela) Fortaleza (Brazil) Macqueripe (Trinidad) Magens Bay (Virgin Islands)


AMERICAS II Hollywood

Miramar St Croix Le Lamentin Willemstad Camuri

Chaguaramas

Cayenne

AMERICAS II RFS Year:

Fortaleza

2000

Est. End of Service Date: 2025 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

350,000,000 8,373

80 Gbps

1.48 Gbps

12 Fiber Pairs on Repeaterless Segment, 2-4 Fiber Pairs on Repeatered Segments

Owners: Antelecom NV, AT&T, Brazil Telecom, CANTV (Venezuela), Embratel, France Telecom, GT&T, Sprint, Telecom Italia, Telefonica, Telesur, Telintar, Trescom Int., TSTT, Verizon

System Supplier:

ASN Australia, Tyco Telecommunications

System Installer: Tyco Telecommunications SSI Cableship:

System Maintainer:

Global Link

AT&T, Orange, Telecom Services Trinidad & Tobago, United Telecommunications Services

Region: Americas

LANDING POINTS: • Camuri (Venezuela) • Cayenne (French Guiana) • Chaguaramas (Trinidad) • Fortaleza (Brazil) • Hollywood (USA) • Lamentine (France) • Miramar (Puerto Rico) • St Croix (US Virgin Islands) • Willemstad (Netherlands Antilles)


AMERIGO VESPUCCI

AMERIGO VESPUCCI RFS Year:

1999

Est. End of Service Date: 2024 Est. System Cost (US$):

Total Length (kms): System Maintainer:

15,000,000 84

United Telecommunication Services

Region: Americas

Bonaire Curaçao

LANDING POINTS: • Bonaire (Netherlands) • Curacao (Curacao)


AMX-1 Jacksonville

Maimi

San Juan

AMERICA MOVIL SUBMARINE CABLE SYSTEM-1 RFS Year:

2014

Est. End of Service Date: 2039 Est. System Cost (US$):

LANDING POINTS: • Jacksonville (United States) • Miami (United States) • San Juan (Puerto Rico) • Puerto Barrios (Guatemala) • Barranquilla (Colombia) • Cartagena (Colombia) • Fortaleza (Brazil) • Salvador de Bahia (Brazil) • Rio de Janeiro (Brazil) • Puerto Plata (Dominican Repub

Total Length (kms): Initial Capacity:

700,000,000 17,800

100 Gbps

Design Capacity: 50 Tbps

Channels: 100 Gbps Owners:

System Supplier:

America Movil

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Marine Surveyor:

Fugro, EGS

Region: Americas


ANTEL

Maldonado

Las Toninas

ANTEL RFS Year:

2010

Est. End of Service Date: 2035 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

15,000,000 250

50 Gbps

Design Capacity: 3.84 Tbps Owners:

System Supplier:

LANDING POINTS: • Las Toninas (Argentina) • Maldonado (Uruguay)

Antel (Uruguay), Telecom Argentina

Alcatel-Lucent Submarine Networks

System Installer: IT Telecom Region: Americas


ANTILLES CROSSING

Hams Bluff

Port Castries Bridgetown

ANTILLES CROSSING RFS Year:

2006

Est. End of Service Date: 2031 Total Length (kms): Initial Capacity:

952

40 Gbps

Design Capacity: 160 Gbps Owners:

System Supplier:

LANDING POINTS: • Bridgetown (Barbados) • Hams Bluff (Virgin Islands) • Port Castries (St Lucia)

Antilles Crossing, Barbados Light & Power, Leucadia, Telebarbados Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI Upgrader:

Upgrade Year: Upgraded Capacity:

Ciena 2013

40 Gbps

Region: Americas


APCN 2 Pusan

Chongming

Shantou Lantau

Tanshui

Batangas

n

ta an

Ku

ng

to Ka


raki

Kitaiba a

kur Chi

ASIA-PACIFIC CABLE NETWORK 2 RFS Year:

2002

Est. End of Service Date: 2027 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

1,100,000,000 19,000

160 Gbps

Design Capacity: 25.6 Tbps Fiber Pairs:

4 Fiber Pairs

Channels: 64

Channel Capacity:

Owners:

System Supplier:

100 Gbps

China Telecom, Chunghwa Telecom International, CTM, France Telecom, KDDI, KT Coropration, NTT Communications, PLDT (Philippines), Reach NHK, Singtel, Telekom Malaysia Ocean Cable Company

System Installer: Global Marine Systems Limited Cableship:

Marine Surveyor: System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

Cable Retriever, Bold Endurance, Fu Lai, Asean Restorer, Maersk Recorder, Maersk Repeater, Maersk Responder, Maersk Reliance, Subaru, Kuroshio Maru, Cable Installer. Barges, Networker, Elbe, Chin Ann 3 C&C Technologies

China Telecommunications Corporation, Chunghwa Telecom Co., KDDI, KT Corporation, NTT Communications Corporation, PLDT, Singapore Telecommunications Ltd, TM Berhad NEC

2011, 2014

40 Gbps, 100 Gbps

Region: AustralAsia

LANDING POINTS: • • • • • • • • • •

Batangas (Philippines) Chikura (Japan) Chongming (China) Katong (Singapore) Kitaibaraki (Japan) Kuantan New Port (Malaysia) Lantau (Hong Kong) Pusan (South Korea) Shantou (China) Tanshui (Taiwan)


APG

Chongming Nanhu

Toucheng Lantau

Da Nang

Songkhla Kuantan Tuas


Pusan

Shima

Maruyama

ASIA PACIFIC GATEWAY RFS Year:

2016

Est. End of Service Date: 2041 Est. System Cost (US$):

Total Length (kms):

313,000,000 10,400

Design Capacity: 54 Tbps

Channel Capacity:

Owners:

LANDING POINTS: • • • • • • • • • • •

Chongming (China) Da Nang (Vietnam) Kuantan (Malaysia) Tseung Kwan (Hong Kong) ShinMaruyama (Japan) Nanhui District (China) Busan (South Korea) Shima (Japan) Songkhla (Thailand) Toucheng (Taiwan) Tanah Merah (Singapore)

System Supplier:

100 Gbps

China Telecom, China Unicom, Chunghwa Telecom International, Facebook, KT Coropration, NTT Communications, PLDT (Philippines), StarHub (Singapore), Telekom Malaysia, TIME dotCom, VNPT, FPT Corp. NEC

System Installer: NTT Com, S.B. Submarine Systems, NEC

System Maintainer:

China Telecommunications Corporation, Chunghwa Telecom Co.

Region: AustralAsia


APHRODITE 2

Chania Yeroskipos

APHRODITE 2 RFS Year:

1994

Est. End of Service Date: 2019 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners:

System Supplier:

LANDING POINTS: • Chania (Greece) • Yeroskipos (Cyprus)

Cableship:

30,000,000 868

1.12 Gbps

AT&T, Belgacom, British Telecom, Cyprus Telecommunications Authority (62%), France Telecom, OTE, Sprint, Verizon Alcatel Submarine Networks Skandi Hav

Region: EMEA


APNG-2 Point Moresby

AUSTRALIA PAPUA NEW GUINEA 2 RFS Year:

2006

Est. End of Service Date: 2031 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs:

11,000,000 3,400

1.12 Gbps

2 Fiber Pairs

Owners: Telikom PNG, Telstra (Australia)

System Supplier:

Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks Cableship:

System Maintainer:

Ile de Re

Telstra International

Region: AustralAsia

Sydney

LANDING POINTS: • Port Moresby (Papua New Guinea) • Sydney (Australia)


APOLLO

Brookhaven Manasquan

LANDING POINTS: • • • •

Brookhaven (USA) Lannion (France) Manasquan (USA) Widemouth (UK)


Widemouth Bay Lannion

APOLLO RFS Year:

2003

Est. End of Service Date: 2028 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

350,000,000 12,700

10 Gbps 64 Tbps

4 Fiber Pairs

Channels: 80

Channel Capacity: 100 Gbps

Owners: Alcatel, Apollo SCS Limited, C&W

System Supplier:

Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks Cableship:

Upgrader: Upgrade Year: Upgraded Capacity:

Ile de Batz, Ile de Brehat, Ile de Sein, Skandi Neptune Alcatel-Lucent Submarine Networks 2012, 2014

40 Gbps, 100 Gbps

Region: Transatlantic


SUBMARINE CABLE SYSTEM REPORTING Presenting the industry’s most extensive collection of 375+ current and planned submarine cable systems impacting financiers, carriers, cable owners, system suppliers, component manufacturers and marine contractors, and detailing more than 50 menu-based data fields and maps in a customer-customizable report.

REPORTING IN 5 BUSINESS DAYS

STF Analytics

For more information: subtelforum.com/stfanalytics

Powered by the comprehensive and industry leading STF Submarine Cable Database


APX-CENTRAL

ASIA PACIFIC EXPRESS CENTRAL [PLANNED] RFS Year:

2018

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms):

150,000,000 4,800

Design Capacity: 32 Tbps Fiber Pairs:

4 Fiber Pairs

Channels: 80

Channel Capacity:

Owners: System Supplier:

100 Gbps

SubPartners TE SubCom

Region: AustralAsia

Perth Adelaide Melbourne

Hobart

LANDING POINTS: • • • •

Adelaide (Australia) Hobart (Australia) Melbourne (Australia) Perth (Australia)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


APX-EAST

PROJECT COMPLETION PHASES: Pre-Engineering

LANDING POINTS: • Auckland (New Zealand) • Hermosa Beach (United States) • Oahu, Hawaii (United States) • Sydney (Australia)

Survey

System Manufacture

System Installation

Commissioning & Acceptance


Hermosa Beach

Oahu

ASIA PACIFIC EXPRESS EAST [PLANNED] RFS Year:

2018

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms):

350,000,000 12,700

Design Capacity: 40 Tbps Fiber Pairs:

4 Fiber Pairs

Channels: 100

Channel Capacity:

Owners: System Supplier:

100 Gbps

SubPartners TE SubCom

Region: Transpacific


APX-WEST

ASIA PACIFIC EXPRESS WEST [PLANNED] RFS Year:

Singapore

2018

Est. End of Service Date: 2041 Est. System Cost (US$):

Total Length (kms):

150,000,000 4,600

Design Capacity: 20 Tbps Fiber Pairs:

2 Fiber Pairs

Channels: 100

Channel Capacity:

Owners:

Jakarta

System Supplier:

100 Gbps

SubPartners, Singtel, Telstra, Google TE SubCom

Region: AustralAsia

Christmas Island

Perth LANDING POINTS: • Jakarta (Indonesia) • Christmas Island (Australia) • Perth (Australia) • Singapore

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


ARBR

ARBR [PLANNED] RFS Year:

2018

Est. End of Service Date: 2043

Design Capacity: 48 Tbps Fiber Pairs:

Owners:

4 Fiber Pairs

Seabras Group (an affiliate of Seabras), Werthein Grupo

Region: Americas

Praia Grande

Las Toninas

LANDING POINTS: • Praia Grande (Brazil) • Las Toninas (Argentina)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


ARCOS-1 Hollywood Nassau

Crooked Island

Cancun

Tulum

Pu Pu ert er o B to ar lo Co rio rte s s

Punta Cana

Tr oj il

Puerto Cabezas

on

ta

m

iq

ui

Li

Ch

to

ia ar M

• • • • • • • • • • • • •

Bluefields (Nicuragua) Cancun (Mexico) Cartagena (Columbia) Cat Island (Bahamas) Crooked Island (Bahamas) Hollywood (USA) Ladyville (Belize) Maria Chiquita (Panama) Nassau (The Bahamas) Providenciales (Turks and Caicos Islands) Puerto Barrios (Guatemala) Puerto Cabezas (Nicuragua) Puerto Cortes (Honduras) Puerto Lempira (Honduras) Puerto Limon (Costa Rica) Puerto Plata (Dominican Republic) Punta Cana (Dominican Republic) Punto Fijo (Venezuela), Riohacha (Columbia) San Juan (Puerto Rico) Trojillo (Honduras) Tulum (Mexico) Ustupo (Panama) Willemstad (Netherlands Antilles)

tad

ms

ille Riohacha Punto W Fijo Cartagena

er Pu

LANDING POINTS:

• •

an

Ju

n Sa

Puerto Lempira

Bluefields

• • •

Providenciales

Puerto Plata

Ladyville

• • • • •

Cat Island

Ustupo

ARCOS-1 FALSE RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

250,000,000 8,700

80 Gbps

Design Capacity: 8.4 Tbps Fiber Pairs:

Owners:

System Supplier: Marine Surveyor: System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

12 Fiber Pairs on Repeaterless Segments, 3 Fiber Pairs on Repeatered Segments

Alestra (Mexico), AT&T, Axtel (Mexico), BTC (Bahamas), BTL (Belize), CANTV (Venezuela), Codetel (Dominican Republic), Colombus Networks, Enitel (Nicaragua), Hondutel (Honduras), ICE (Costa Rica), Impsat (USA), Internexa (Colombia), Orbinet SA (Colombia), Racsa (Costa Rica), Telecarrier (Panama), Tricom (Dominican Republic), Ultracom (Puerto Rico), UTS (Curacao), Verizon

Norddeutsche Seekabelwerke (Tyco Telecommunications, Partial) Fugro

Colombus Networks USA Inc., United Telecommunications Services Xtera Communications 2008, 2016

40 Gbps, 100 Gbps

Region: Americas


ASC

AUSTRALIA-SINGAPORE CABLE [PLANNED] RFS Year:

Singapore

2018

Est. End of Service Date: 2043 Est. System Cost (US$):

Total Length (kms):

170,000,000 4,600

Design Capacity: 40 Tbps Fiber Pairs:

4 Fiber Pairs

Channels: 150

Channel Capacity:

Anyer

Owners:

System Supplier:

100 Gbps

Vocus Communications, AustraliaSingapore Cable International Limited Alcatel Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Region: AustralAsia

Perth

LANDING POINTS: • Perth (Australia) • Tanah Mera (Singapore) • Anyer (Indonesia)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


ASE

Hong Kong

Philippines

Malaysia Singapore


Japan

ASIA SUBMARINE-CABLE EXPRESS RFS Year:

2013

Est. End of Service Date: 2038 Est. System Cost (US$):

Total Length (kms):

412,000,000 7,200

Design Capacity: 15.36 Tbps Fiber Pairs:

6 Fiber Pairs

Channels: 128

Channel Capacity:

Owners:

System Supplier:

40 Gbps

NTT Communications (Japan), PLDT (Philippines), StarHub (Singapore), Telekom Malaysia

Fujitsu Limited, NEC Corporation

System Installer: S.B. Subarine Systems, NTT, NEC

System Maintainer:

NTT Communications Corporation, PLDT, StarHub, TM Berhad

Region: AustralAsia

LANDING POINTS: • • • • • •

Japan Philippines Hong Kong Malaysia Singapore Cambodia


ASH Keawaula

AMERICA SAMOA HAWAII RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners:

Pago Pago

LANDING POINTS: • Keawaula (Hawaii) • Pago Pago (American Samoa)

System Supplier:

100,000,000 4,680

1.2 Gbps

2 Fiber Pairs

ASH Cable Company

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Cableship:

System Maintainer:

Ile de Ré

Telecom New Zealand

Region: AustralAsia


ATHENA

ATHENA RFS Year:

2011

Est. End of Service Date: 2036 Total Length (kms):

Owners:

600

Cypress Telecommunications Authority, Telecom Italia Sparkle

Region: EMEA

K o r o p i

P e n t a s k h i n o s

LANDING POINTS: • Koropi (Greece) • Pentaskhinos (Cyprus)


ATISA

an p i a S an i n i T Rota

m a u G

ATISA [PLANNED] RFS Year:

2018

Est. End of Service Date: 2042 Total Length (kms): Fiber Pairs: Owners: System Supplier:

280

6 Fiber Pairs

DOCOMO Pacific NEC

Region: AustralAsia

LANDING POINTS: • • • •

Guam Saipan Rota Tinian

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


ATLANTIS-2

Lisbon

Conil

Funchal El Medano

Praia

Dakar

ATLANTIS-2 RFS Year:

Fortaleza

2000

Est. End of Service Date: 2025 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

370,000,000 13,100

40 Gbps

Design Capacity: 160 Gbps Fiber Pairs:

Rio de Janeiro

Channels: 2 to 8

Channel Capacity:

Owners:

System Supplier:

Las Toninas

LANDING POINTS: • • • • • • • • •

Conil (Spain) Dakar (Senegal) El Medano (Spain) Fortaleza (Brazil) Funchal (Portugal) Las Toninas (Argentina) Lisbon (Portugal) Praia (Cape Verde) Rio de Janeiro (Brazil)

2 Fiber Pairs, Initial: 2 wavelengths, Design: 8 wavelengths 40 Gbps

Cabo Verde Telecom, Deutsche Telekom AG, Embratel, France Telecom, Marconi, Sonatel, Telecom Argentina, Telecom Italia, Telefonica, Telefonica de Argentina, Telintar, Verizon Alcatel Submarine Networks, Pirelli, Fujitsu

System Installer: FCR Cableship:

System Maintainer:

Raymond Croze, Fresnel, Vercors, Teneo, Teliri, Maersk Defender

PT Comunicações S.A., Sonatel, Telefonica de España S.A.U., Telefonica International Wholesale Services

Region: Transatlantic


ATLAS OFFSHORE

M a r s e i l l e

A s i l a h

ATLAS OFFSHORE RFS Year:

2007

Est. End of Service Date: 2032 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

31,000,000 1,634

40 Gbps

Design Capacity: 320 Gbps Owners:

System Supplier:

LANDING POINTS: • Asilah (Morocco) • Marseille (France)

Maroc Telecom of Morocco Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Region: EMEA


AUSTRAL

AUSTRAL [PLANNED] Puerto Montt

RFS Year:

2018

Est. End of Service Date: 2043 Est. System Cost (US$):

Total Length (kms): Owners: System Supplier:

100,000,000 1,800

AUSTRAL University of Magellan, Magellan CPC Huawei Marine Networks

System Installer: IT International Telecom Region: Americas

Punta Arenas

LANDING POINTS: • Puerto Montt (Chile) • Punta Arenas (Chile)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


AWE

Djibouti

LANDING POINTS: • Perth, Australia • Djibouti

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


AUSTRALIA WEST EXPRESS [PLANNED] RFS Year:

2017

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms):

300,000,000 10,100

Design Capacity: 20 Tbps Fiber Pairs:

2 Fiber Pairs

Channels: 100

Channel Capacity:

Owners: System Supplier:

200 Gbps

GoTo Networks

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Region: Indian Ocean Pan-East Asian

Perth


BAHAMAS-2

BAHAMAS-2 RFS Year:

1997

Est. End of Service Date: 2022 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

25,000,000 478

2.5 Gbps

Design Capacity: 2.4 Tbps Fiber Pairs:

Channel Capacity: Owners: System Supplier:

5-12 Fiber Pairs on Repeaterless Segments 40 Gbs

AT&T, Balteco, Verizon

Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI

Marine Surveyor:

V e r o B e a c h

System Maintainer:

C&C Technologies

AT&T, Bahamas Telecommunications Company

Region: Americas

E i g h t M i l e R o c k

N a s s a u

LANDING POINTS: • Eight Mile Rock (Bahamas) • Nassau (The Bahamas) • Vero Beach (USA)


BALTICA

Y s t a d D u e o d d e G e d s e r K o l o b r z e g

BALTICA RFS Year:

1997

Est. End of Service Date: 2022 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners:

LANDING POINTS: • • • •

Dueodde (Bornholm) Gedser (Denmark) Kolobrzeg (Poland) Ystad (Sweden)

System Maintainer:

16,000,000 437

5 Gbps

6 Fiber Pairs

Polish Telecom, TDC, Telecom Finland, Telenor, Teliasonera

Orange Polska S.A., TDC A/S, TeliaSonera International Carrier AB

Region: EMEA


BAR-SAV

S a v o n a

B a r c e l o n a

BAR-SAV RFS Year:

1996

Est. End of Service Date: 2021 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier:

LANDING POINTS: • Barcelona (Spain) • Savona (Italy)

System Maintainer:

39,000,000 760

5 Gbps

Telecom Italia, Telefonica

Alcatel Submarine Networks

Telecom Italia Sparkle, Telefonica de España S.A.U.

Region: EMEA


BASS STRAIT 2

I n v e r l o c h

S t a n l e y

BASS STRAIT 2 RFS Year:

2003

Est. End of Service Date: 2028 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier:

LANDING POINTS: • Inverloch (Australia) • Stanley (Tasmania, Australia)

17,000,000 240

10 Gbps

Telstra (Australia)

Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks Cableship:

Ile de Batz

Region: AustralAsia


BBG

LANDING POINTS: • • • •

Sri Lanka Singapore Oman UAE


BAY OF BENGAL GATEWAY RFS Year:

2014

Est. End of Service Date: 2039 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

30,000,000 8,040

6.4 Tbps

Design Capacity: 55 Tbps Fiber Pairs:

Channel Capacity: Owners: System Supplier:

3 Fiber Pairs 100 Gbps

Bay of Bengal Consortium

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Cableship:

Marine Surveyor: Survey Boat: System Maintainer:

Ile De Brehat EGS

Northern Endeavour E-marine

Region: Indian Ocean Pan-East Asia


BCS EAST

Liepaja Sventoji

BCS EAST RFS Year:

1997

Est. End of Service Date: 2022 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

LANDING POINTS: • Liepaja (Latvia) • Sventoji (Lithuania)

Owners:

15,000,000 98

2.5 Gbps

Teliasonera

Region: EMEA


BCS EAST-WEST INTERLINK Sandviken

Sventoji

BCS EAST-WEST INTERLINK RFS Year:

1997

Est. End of Service Date: 2022 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier:

LANDING POINTS: • Sandviken (Sweden) • Sventoji (Lithuania)

20,000,000 218

2.5 Gbps

Teliasonera Ericsson

System Installer: AKN Cableship:

Pleijel

Region: EMEA


BCS NORTH

Helsingfors Mariehamn Haraldsholm Hango

Kotka Logi

Stavsnas

BCS NORTH RFS Year:

2003

Est. End of Service Date: 2028 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier:

LANDING POINTS: • • • • • •

Hango (Finland) Haraldsholm (Finland) Helsingfors (Finland) Kotka (Finland) Mariehamn (Finland) Stavsnas (Sweden)

30,000,000 793

10 Gbps

Rostelecom, Teliasonera Ericsson

System Installer: AKN Cableship:

System Maintainer:

Pleijel

TeliaSonera International Carrier AB

Region: EMEA


BDM

Melaka Dumai Batam

BATAM-DUMAI-MELAKA RFS Year:

2011

Est. End of Service Date: 2036 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

76,000,000 400

80 Gbps

Design Capacity: 2.56 Tbps Fiber Pairs:

4 Fiber Pairs

Channels: 64

Channel Capacity:

Owners: System Supplier:

LANDING POINTS: • Batam (Indonesia) • Dumai (Indonesia) • Melaka (Malaysia)

10 Gbps

PT Mora Telematika, PT XL Axiata, Telekom Malaysia Huawei Marine Networks

System Installer: Huawei Marine Networks

System Maintainer:

TM Berhad

Region: AustralAsia


BEST CABLE SYSTEM

Malaysia Brunei

Indonesia LANDING POINTS: • • • • • •

Brunei Sabah Malaysia Southern Philippines Kalimantan, Indonesia extension to Guam

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


Guam Philippines

Yap

Palau

BEST CABLE SYSTEM [PLANNED] RFS Year:

2018

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms): Owners:

150,000,000 5,092

Best Cable Corp. Pte. Ltd.

Region: AustralAsia


BHARAT-LANKA

BHARAT-LANKA RFS Year:

2007

Est. End of Service Date: 2032 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

40,000,000 338

40 Gbps

Design Capacity: 960 Gbps

Channel Capacity:

Owners: System Supplier:

Tuticorin

NEC

Sri Lanka Telecom

Region: Indian Ocean Pan-East Asian

Dehiwala-Mount Lavinia

• Dehiwala-Mount Lavinia (Sri Lanka) • Tuticorin (India)

BSNL, Sri Lanka Telecom Limited (SLT), Sri Lanka

System Installer: NEC

System Maintainer:

LANDING POINTS:

40 Gbps


BICS

BAHAMAS INTERNET CABLE SYSTEM RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

31,000,000 1,000

10 Gbps

Design Capacity: 12 Tbps

Channel Capacity:

Owners:

10 Gbps

Carribbean Crossings

Region: Americas

Boca Raton

Crown Haven Riding Point Freeport

Marsh Harbour Sandy Point Upper Bogue

Nassau

LANDING POINTS: • Boca Raton (USA) • Crown Haven (Bahamas) • Freeport (Bahamas) • Marsh Harbour (Bahamas) • Nassau (The Bahamas) • Riding Point (Bahamas) • Rock Sound (Bahamas) • Sandy Point (Bahamas) • Upper Bogue (Bahamas)

Rock Sound


BIN

BALKANS-ITALY NETWORK RFS Year:

2011

Est. End of Service Date: 2036 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Channel Capacity: Owners:

21,700,000 276

40 Gbps 40 Gbps Unifi

Region: EMEA

B a r i

LANDING POINTS: • Bari (Italy) • Durres (Albania)

D u r r e s


BIOS / JONAH

BIOS/JONAH RFS Year:

2011

Est. End of Service Date: 2036 Est. System Cost (US$):

Total Length (kms):

15,000,000 2,300

Design Capacity: 12.8 Fiber Pairs:

Owners: System Supplier: Marine Surveyor:

2 Fiber Pairs

Bezeq International

Alcatel-Lucent Submarine Networks Elettra

Region: EMEA

B a r i

T e l A v i v

LANDING POINTS: • Tel Aviv (Israel) • Bari (Italy)


BLAST

BROADBAND LINKING THE AMERICAN SAMOA TERRITORY RFS Year:

2015

Est. End of Service Date: 2040 Est. System Cost (US$):

Total Length (kms): Owners: System Supplier:

11,000,000 250

ASTCA (American Samoa) IT International Telecom

System Installer: IT International Telecom

Marine Surveyor:

IT International Telecom

Region: AustralAsia

Ofu Aunu'u

Tutuila

LANDING POINTS: • Fogagogo, Tu’tuila (American Samoa) • Ofu Harbor, Ofu (American Samoa) • Luma, Ta’u (American Samoa) • Aunu’u Warf, Aunu’u (American Samoa)

Luma


BORACAY-PALAWAN

BORACAY-PALAWAN RFS Year:

2013

Est. End of Service Date: 2038 Est. System Cost (US$):

Total Length (kms):

20,000,000 332

Design Capacity: 4.8 Tbps Fiber Pairs:

12 Fiber Pairs

Channels: 40

Channel Capacity:

Owners: System Supplier:

10 Gbps

Globe Telecom

Huawei Marine Networks

Region: AustralAsia

Coron Taytay

LANDING POINTS: • • • • •

Taytay (Philippines) San Jose (Philippines) Coron (Philippines) Boracay (Philippines) Caticlan (Philippines)

San Jose Boracay Caticlan



Optical Fiber for SUBMARINE SYSTEMS TRANSMITTING at 100 Gb/s and BEYOND Ultra low loss Ultra large effective area Optimized for both C- and L-band transmission

www.ofsoptics.com


BOTNIA

BOTNIA RFS Year:

1994

Est. End of Service Date: 2019 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:

8,500,000 77

1.2 Gbps

6 Fiber Pairs Teliasonera NKT

System Installer: AKN Cableship:

System Maintainer:

Pleijel

TeliaSonera International Carrier AB

Region: EMEA

U m e a

V a a s a

LANDING POINTS: • Umea (Sweden) • Vaasa (Finland)


BRCS

BATAM-RENGIT CABLE SYSTEM RFS Year:

2007

Est. End of Service Date: 2032 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners:

10,000,000 63

10 Gbps

Excelcom

Region: AustralAsia

Sungai Rengit Batam

LANDING POINTS: • Batam (Indonesia) • Sungai Rengit (Malaysia)


PROJECT COMPLETION PHASES:

BRUSA

Pre-Engineering

Survey

System Manufacture

System Installation

Virginia Beach

San Juan

Fortaleza

Rio de Janeiro

BRAZIL-USA [PLANNED] RFS Year:

2018

Est. End of Service Date: 2043 Total Length (kms):

Owners:

11,000

Telefonica

LANDING POINTS:

System Supplier:

• • • •

System Installer: Alcatel-Lucent Submarine Networks

Rio de Janeiro (Brazil) Fortaleza (Brazil) San Juan (Puerto Rico) Virginia Beach, Virginia (USA)

Alcatel-Lucent Submarine Networks

Region: Americas

Commissioning & Acceptance


BSCS

BATAM SINGAPORE CABLE SYSTEM RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:

13,100,000 73

80 Gbps

3 Fiber Pairs

Telekom Indonesia

Ocean Cable Company

System Installer: Stena Offshore, ASEAN Cableship, NEC Cableship:

Northern Installer

Region: AustralAsia

Changi Batam

LANDING POINTS: • Batam (Indonesia) • Changi (Singapore)


BSFOCS

Odesa

Novorossiysk

Varna

BLACK SEA FIBRE OPTIC CABLE SYSTEM RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners:

System Supplier:

51,000,000 933

2.5 Gbps

2 Fiber Pairs

Armentel, AT&T, BTC, Cypress Telecommunications Authority, DTAG, HT, KDDI, OTE, Rostelecom, Telecom Slovenia, Ukrtelecom

Alcatel Submarine Networks, Tyco Telecommunications SSI

System Installer: Global Marine Systems Limited Cableship:

System Maintainer:

LANDING POINTS: • Novorossiysk (Russia) • Odesa (Ukraine) • Varna (Bulgaria)

Maersk Fighter

Cyprus Telecommunications Authority, Hellenic Telecommunications Organization S.A., OJSC “Rostelecom”

Region: EMEA


CADMOS

CADMOS RFS Year:

1995

Est. End of Service Date: 2020 Est. System Cost (US$):

Total Length (kms):

8,000,000 262

Design Capacity: 622 Mbps Fiber Pairs:

Owners:

System Supplier: System Maintainer:

2 Fiber Pairs

Cyprus Telecommunications Authority (62%), Lebanese Ministry of Telecommunications (38%) Tyco Telecommunications

Cyprus Telecommunications Authority

Region: EMEA

P e n t a s k h i n o s

B e i r u t

LANDING POINTS: • Beirut (Lebanon) • Pentaskhinos (Cyprus)


CAMEROON-BRAZIL

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Cameroon

Fortaleza

CAMEROON-BRAZIL [PLANNED] RFS Year:

2018

Est. End of Service Date: 2043 Est. System Cost (US$):

Total Length (kms): Design Capacity: Fiber Pairs:

487,000,000 5,900

32 Tbps

4 Fiber Pairs

Channels: 80

Channel Capacity: Owners: System Supplier:

LANDING POINTS: • Fortaleza (Brazil) • Kribi (Cameroon)

100 Gbps

CamTel, China Unicom Nexans

System Installer: Global Marine Region: Transatlantic

Commissioning & Acceptance


CANALINK

C a d i z

CANALINK RFS Year:

T e n e r i f e

2011

Est. End of Service Date: 2036 Est. System Cost (US$):

Total Length (kms):

157,000,000 2,000

Design Capacity: 5.12 Tbps Fiber Pairs:

4 Fiber Pairs

Channels: 128

Channel Capacity:

Owners: System Supplier:

LANDING POINTS: • Cadiz (Spain) • Tenerife (Spain)

Marine Surveyor:

10 Gbps

Isalink, IT3

Alcatel-Lucent Submarine Networks Fugro, Elettra

Region: EMEA


CANTAT-3

Pennant Point

CANTAT-3 RFS Year:

Est. End of Service Date: 2020 Est. System Cost (US$):

LANDING POINTS: • Blaabjerg (Denmark) • Pennant Point (Canada) • Redcar (United Kingdom) • Tjørnuvík (Faroe Islands) • Vestmannaeyjar (Iceland) • Westerland (Germany)

1994

Total Length (kms): Initial Capacity: Owners: System Supplier:

385,000,000 6,450

7.5 Gbps

Tata Communications

Alcatel Submarine Networks

System Installer: BT Marine, TeleDanmark, Orange Marine Region: Transatlantic


Vestmannaeyjar

TjÓŠrnuvik

Blaabjerg Redcar Westerland


CAUCASUS CABLE SYSTEM

Varna Poti

CAUCASUS CABLE SYSTEM RFS Year:

2008

Est. End of Service Date: 2033 Est. System Cost (US$):

Total Length (kms):

76,000,000 1,187

Design Capacity: 9 Tbps Fiber Pairs:

Owners: System Supplier: Upgrader: Upgrade Year:

LANDING POINTS: • Poti (Georgia) • Varna (Bulgaria)

Upgraded Capacity:

2 Fiber Pairs

Caucasus Online

Tyco Telecommunications TE SubCom 2016

100 Gbps

Region: EMEA


CB-1

Charlestown

Bermuda

CHALLENGER BERMUDA-1 RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

50,000,000 1,448

20 Gbps

Design Capacity: 320 Gbps Owners:

LANDING POINTS: • Bermuda (Bermuda) • Charlestown • Rhode Island (United States)

System Supplier: System Maintainer:

Cable Company Ltd, Verizon Alcatel-Lucent Submarine Networks Cable Co Ltd, Verizon Ltd

Region: Americas


C-BUS Manasquan

CARIBBEAN-BERMUDA US RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Design Capacity: Fiber Pairs: Owners: System Supplier:

10,000,000 1,609

1.6 Tbps

2 Fiber Pairs LIME

Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI, IT International Telecom Upgrader:

Upgrade Year: Upgraded Capacity:

Xtera Communications 2016

100 Gbps

Region: Americas

LANDING POINTS: • Manasquan (USA) • Magens Bay (British Virgin Islands)

Tortola


CEIBA-2

CEIBA-2 [PLANNED] RFS Year:

2018

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms):

15,000,000 290

Design Capacity: 8 Tbps Owners:

System Supplier:

Republic of Equatorial Guinea Huawei Marine

Region: EMEA

Malabo

Kribi Bata

LANDING POINTS: • Malabo, Equatorial Guinea • Bata, Equatorial Guinea • branching unit to Kribi, Cameroon

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


CELTIXCONNECT

D u b l i n

H o l y h e a d

CELTIXCONNECT RFS Year:

2011

Est. End of Service Date: 2036 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:

LANDING POINTS: • Dublin (Ireland) • Holyhead (UK)

22,000,000 131

960 Gbps

72 Fiber Pairs

Sea Fibre Networks

Alcatel Submarine Networks

System Installer: Global Marine Systems Limited Region: EMEA


CFX-1

Boca Raton

COLOMBIA-FLORIDA SUBSEA FIBER RFS Year:

2008

Morant Point

Est. End of Service Date: 2023 Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

2,439

110 Gbps

12.8 Tbps

12 Fiber Pairs on Repeaterless Segment, 2 Fiber Pairs on Repeatered Segments

Owners: Columbus Networks

System Supplier:

System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

Tyco Telecommunications

Colombus Networks USA, Inc. TE SubCom 2011

40 Gbps, 2.5 Tbps per fiber pair

Region: Americas

LANDING POINTS: • Boca Raton (USA) • Cartagena (Columbia) • Morant Point (Jamaica)

Cartagena


CIOS

CYPRUS-ISRAEL OPTICAL SYSTEM RFS Year:

1994

Est. End of Service Date: 2018 Est. System Cost (US$):

Total Length (kms):

16,000,000 262

Design Capacity: 622 Mbps Fiber Pairs:

Owners: System Maintainer:

1 Fiber Pair

Bezeq, Cypress Telecommunications Authority Cyprus Telecommunications Authority

Region: EMEA

Ayia Napa

Nahariya Nahariya

LANDING POINTS: • Ayia Napa (Cyprus) • Nahariya (Israel)


CJFS

H a l f - M o o n B a y M o n t e g o B a y

CAYMAN JAMAICA FIBRE SYSTEM RFS Year:

1997

Est. End of Service Date: 2022 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

LANDING POINTS: • Half-Moon Bay (Cayman Islands) • Montego Bay (Jamaica)

6,500,000 870

2.5 Gbps

Design Capacity: 2.7 Tbps Owners:

LIME

Region: Americas


C-LION1 Helsinki

Rostock-Ribnitz

C-LION1 RFS Year:

2016

Est. End of Service Date: 2041 Est. System Cost (US$):

Total Length (kms):

74,000,000 1,172

Design Capacity: 144 Tbps Fiber Pairs:

Channel Capacity: Owners: System Supplier:

LANDING POINTS: • Helsinki (Finland • Rostock-Ribnitz (Germany)

8 Fiber Pairs 300 Gbps

Cinia Group

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

Marine Surveyor:

Fugro

Region: EMEA


EDITORIAL SCHEDULE 1 January Industry Calendar - 16th Edition 15 January STF #92 - Global Outlook

2017

Submarine Telecoms Industry Calendar

30 January Submarine Cable Map - 6th Edition 20 February Submarine Cable Almanac #21 20 March STF #93 - Finance & Legal 15 May STF #94 - Subsea Capacity 22 May Submarine Cable Almanac #22 17 July STF #95 - Regional Systems 14 August Submarine Cable Almanac #23 18 September STF #96 - Offshore Energy 16 October Industry Report - Issue 5 13 November Submarine Cable Almanac #24 20 November STF #97 - System Upgrades


COLUMBUS II

West Palm Beach Cancun

LANDING POINTS: • Cancun (Mexico) • Funchal (Portugal) • Magens Bay (Virgin Islands) • Palermo (Italy) • Sardinia (Gran Canaria) • West Palm Beach (USA)

Magens Bay


le rm o Pa Funchal Sardinia

COLOMBUS II RFS Year:

1994

Est. End of Service Date: 2019 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity:

600,000,000 12,165

560 Mbps 2.5 Gbps

Owners: Columbus II Consortium

System Supplier:

System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

Alcatel Submarine Networks, Tyco Telecommunications SSI, Pirelli AT&T, Telecom Italia Sparkle Xtera Communications 2012

100 Gbps

Region: Transatlantic


H

ol

ly wo

od

COLUMBUS III

LANDING POINTS: • Miami, Florida (USA) • Ponta Delgada, Azores Islands (Portugal) • Lisbon, Portugal • Conil, Spain • Mazara del Vallo, Sicily (Italy)


Lisbon Conil

COLOMBUS III RFS Year:

1999

Est. End of Service Date: 2024 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

236,000,000 9,833

40 Gbps

160 Gbps

2 Fiber Pairs

Owners: Columbus III Consortium

System Supplier:

Cableship: System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

Alcatel Submarine Networks, Pirelli, Tyco Telecommunications Vercors, Skandi Hav

AT&T, PT Comunicações S.A., Telecom Italia Sparkle, Telefonica de España S.A.U. Xtera Communications 2012

100 Gbps

Region: Transatlantic

M az ar a

Ponta Delgada


CONCERTO-1

Zandvoort Thorpeness

Bruges

CONCERTO-1 RFS Year:

1999

Est. End of Service Date: 2024 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs:

LANDING POINTS: • Bruges (Belguim) • Thorpeness (United Kingdom) • Zandvoort (Netherlands)

Owners: System Supplier:

25,000,000 574

2.5 Gbps

96 Fiber Pairs Flute

Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks Region: EMEA


CORFU-BAR

CORFU-BAR RFS Year:

1998

Est. End of Service Date: 2023 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer:

19,000,000 320

622 Mbps

3 Fiber Pairs

Crngorski Telecom, OTE

Hellenic Telecommunications Organization S.A.

Region: EMEA

Bar

Corfu

LANDING POINTS: • Bar (Montenegro) • Corfu (Greece)


DANICA NORTH

DANICA NORTH RFS Year:

1998

Est. End of Service Date: 2023 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:

10,000,000 25

10 Gbps

96 Fiber Pairs Teliasonera Ericsson

System Installer: AKN Cableship:

System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

Pleijel

TeliaSonera International Carrier AB Ciena 2013

40 Gbps

Region: EMEA

Tuborg

LANDING POINTS: • Barseback (Sweden) • Tuborg (Denmark)

Barseback


DANICA SOUTH

DANICA SOUTH RFS Year:

1998

Est. End of Service Date: 2023 Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:

20

10 Gbps

24 Fiber Pairs Teliasonera Ericsson

System Installer: AKN Cableship:

System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

Pleijel

TeliaSonera International Carrier AB Ciena 2013

40 Gbps

Region: EMEA

Copenhagen

LANDING POINTS: • Bjarred (Sweden) • Copenhagen (Denmark)

Bjarred


DANICE

Landeyjarsandur

Blaabjerg

DANICE RFS Year:

2008

Est. End of Service Date: 2033 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

76,000,000 2,291

1000 Gbps

Design Capacity: 5.1 Tbps Fiber Pairs:

Owners: System Supplier: System Maintainer: Upgrader:

LANDING POINTS: • Blaabjerg (Denmark) • Landeyjarsandur (Iceland)

Upgrade Year: Upgraded Capacity:

4 Fiber Pairs Farice Ltd.

Tyco Telecommunications Farice ehf Ciena 2013

100 Gbps

Region: EMEA


PROJECT COMPLETION PHASES:

DARE

Pre-Engineering

Djibouti

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Bossaso Berbera

Mogadishu

Mombasa Dar es Salaam

DJIBOUTI-AFRICA REGIONAL EXPRESS [PLANNED] RFS Year:

2018

Est. End of Service Date: 2043 Total Length (kms):

5,500

Design Capacity: 60 Tbps

Channel Capacity:

Owners:

LANDING POINTS: • • • • • •

Dar es Salaam Mombasa Mogadishu Bossaso Berbera Mocha Djibouti

System Supplier:

100 Gbps

Djibouti Telecom, Africa Marine Express, TeleYemen, Telesom Company, Hormuud Telecom Somalia Inc., Golis Telecom, Somtel Group TE SubCom

System Installer: TE SubCom

System Maintainer:

TE SubCom

Region: EMEA


TE SubCom Ready Anything for SubCom is a fully integrated supplier of undersea communications systems and services, with proven solutions and expertise applied at every phase of a project.

We understand that every undersea communications system is unique, which is why SubCom is prepared for just about anything, anywhere. What’s SubCom capable of? Plenty...

83 PERCENT

INCREASE IN SUBCOM EMPLOYEE HEADCOUNT SINCE 2014


OPERATIONAL EXCELLENCE SUBCOM HAS DELIVERED 100% OF OUR SYSTEMS ON-TIME

75 PERCENT

INCREASED CABLE CAPACITY

100 PERCENT - Since 1999 -

FACTORY & FLEET CAPABILITIES EIGHT SHIPS, 9 ROVS, AND 7 PLOWS MAKE UP THE LARGEST FLEET OF CABLE INSTALLATION VESSELS IN THE WORLD

PERMITTING EXPERTISE SINCE 2013, SUBCOM HAS OBTAINED REGULATORY PERMITS IN 55 COUNTRIES FOR CABLE LANDINGS OR TRANSITS IN ADDITION, WE HAVE SAFELY CROSSED

48 LANDINGS

1000+

55 COUNTRIES

- Since 2013 -

PIPELINES AND CABLES WITHOUT HAVING TO DELAY AN INSTALLATION VESSEL IN THE PAST 3 YEARS.

REGIONAL READINESS IN THE PAST THREE YEARS, SUBCOM HAS COMPLETED 48 LANDINGS


DDSCN

Colombo

Hulhumalé

DHIRAAGU DOMESTIC SUBMARINE CABLE NETWORK RFS Year:

2012

Est. End of Service Date: 2037 Est. System Cost (US$):

Total Length (kms): Owners: System Supplier:

LANDING POINTS: • Colombo (Sri Lanka) • Hulhumale (Maldives)

27,000,000 1,000

Dhiraagu NEC

System Installer: NEC

Region: Indian Ocean Pan-East Asian


DEEP BLUE

DEEP BLUE CABLE [PLANNED] RFS Year:

2019

Est. End of Service Date: 2044 Total Length (kms):

Owners:

14,000

Deep Blue Cable Ltd

Region: Americas

ican n i m o D blic u p e R Jamaica to Haiti Puer Rico

Panama

Trinidad

Columbia

LANDING POINTS: • • • • • • •

(Jamaica) (Haiti) (Trinidad) (Puerto Rico) (Dominican Republic) (Panama) (Colombia)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


DENMARK-NORWAY 6

DENMARK-NORWAY 6 RFS Year:

1992

Est. End of Service Date: 2017 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Maintainer:

8,950,000 124

1.5 Gbps

Norway PTT, TDC TDC A/S

Region: EMEA

Kristiansand

Thisted

LANDING POINTS: • Kristiansand (Norway) • Thisted (Denmark)


DENMARK-POLAND 2

DENMARK-POLAND 2 RFS Year:

1991

Est. End of Service Date: 2016 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Maintainer:

4,500,000 110

2.5 Gbps

Polish Telecom, TDC

Orange Polska S.A., TDC A/S

Region: EMEA

G e d e b a k O d d e

M i e l n o

LANDING POINTS: • Gedebak Odde (Denmark) • Mielno (Poland)


DIDON

DIDON RFS Year:

2014

Est. End of Service Date: 2039 Est. System Cost (US$):

Total Length (kms):

15,000,000 173

Design Capacity: 18 Tbps

Channel Capacity: System Supplier:

100 Gbps

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

System Maintainer:

France Telecom

Region: EMEA

Mazara del Vallo

Kélibia

LANDING POINTS: • Kélibia (Tunisia) • Mazara del Vallo • Sicily (Italy)


DMCS

DUMAI-MELAKA CABLE SYSTEM RFS Year:

2005

Est. End of Service Date: 2030 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

15,000,000 150

20 Gbps

Design Capacity: 320 Gbps Owners:

System Supplier:

PT Telekom, Telekom Malaysia NEC

System Installer: ASEAN Cableship

System Maintainer:

Dumai

Melaka

LANDING POINTS: • Dumai (Indonesia) • Melaka (Malaysia)

TM Berhad

Region: AustralAsia


EAC-C2C

Taean

Ajigaura Chikura Shima

Pusan

Nanhui

n sha ng Fa

O ah ok Kw K ng Hom eu Ts ung

Ch

Pali

Tanshui

Capepisa Nasugbu Vung Tau

Changi

EAC-C2C RFS Year:

Est. End of Service Date: 2034 Est. System Cost (US$):

LANDING POINTS: • • • • • • • • • • • • •

Capepisa (Philippines) Changi (Singapore) Chikura (Japan) Chung Hom Kok (Hong Kong) Fangshan (Taiwan) Nanhui District (China) Nasugbu (Philippines) Pali (Taiwan) Pusan (South Korea) Shima (Japan) Singapore (Singapore) Taean (South Korea) Tansh

2009

Total Length (kms):

850,000,000 35,429

Design Capacity: 30 Tbps Owners:

System Supplier: Marine Surveyor: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

PACNET NEC

C&C Technologies

Pacnet Global (Singapore) Pte. Infinera 2013

100 Gbps

Region: AustralAsia


EASSY Port Sudan

Djibouti

Mogadishu

EASTERN AFRICA SUBMARINE CABLE SYSTEM

Mombasa Dar es Salaam

RFS Year:

2010

Est. End of Service Date: 2035 Est. System Cost (US$):

Moroni

Total Length (kms): Initial Capacity:

247,000,000 9,900

30 Gbps

Design Capacity: 11.8 Tbps Fiber Pairs:

2 Fiber Pairs

Channels: 59

Channel Capacity:

Owners:

Toliary Maputo

LANDING POINTS:

Mtunzini • Dar es Salaam

(Tanzania) • Djibouti (Republic of Djibouti) • Maputo (Mozambique) • Mogadishu (Somalia) • Mombasa (Kenya) • Moroni (Comoros) • Mtunzini (South Africa) • Port Sudan (Sudan) • Toliary (Madagascar)

System Supplier: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

100 Gbps

Bharti Airtel, Botswana Telecommunications Corporation, British Telecom, Comores Telecom, Etisalat, France Telecom, Mauritius Telecom, MTN Group, Neotel, Saudi Telecom Company (STC), Saudi Arabia, SPV2, Sudan Telecom Limited, Sudatel, Tanzania Telecommuni Alcatel-Lucent Submarine Networks Telkom SA Limited

Alcatel-Lucent Submarine Networks 2014

100 Gbps

Region: EMEA


EAST-WEST

Santo Domingo Morant Point

EAST-WEST RFS Year:

2011

Est. End of Service Date: 2036 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

LANDING POINTS: • Morant Point (Jamaica) • Santo Domingo (Dominican Republic) • Tortola (British Virgin Islands)

35,000,000 1,700

120 Gbps

Design Capacity: 1.6 Tbps

System Installer: Orange Magine Upgrader:

Upgrade Year: Upgraded Capacity:

Xtera Communications 2016

100 Gbps

Region: Americas

Tortola


ECFS

EAST CARIBBEAN FIBER SYSTEM RFS Year:

1995

Est. End of Service Date: 2020 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

56,000,000 1,875

2.5 Gbps

Design Capacity: 4.6 Tbps Fiber Pairs:

Owners: System Supplier:

6 Fiber Pairs

AT&T, BET (Barbados), C&W, France Telecom, TSTT Alcatel Submarine Networks

System Installer: C&W (Marine) Cableship:

System Maintainer: Upgrader: Upgrade Year:

Tortola

Upgraded Capacity:

Anguilla St. Martin

Baliff Canefield

Martinique St. Lucia

Kingstown

• Anguilla (Anguilla) • Baliff (Guadeloupe) • Basseterre (St. Kitts & Nevis) • Bridgetown (Barbados) • Canefield (Dominica) • Dickenson Bay (Antigua) • Kingstown (St. Vincent) • Martinique (Martinique) • Montserrat (Montserrat) • Port Salines (Grenada) • St. Lucia

Orange, Telecom Services Trinidad & Tobago Xtera Communications 2009, 2013, 2016

10 Gbps, 40 Gbps, 100 Gbps

Region: Americas

Basseterre Dickenson Bay Montserrat

LANDING POINTS:

Mercury

Bridgetown

Port Salines Trinidad


Tr in

id

ad

Cu

ra

ça

o

ECLINK

ECLINK RFS Year:

2007

Est. End of Service Date: 2032 Total Length (kms): Initial Capacity:

1,240

1.875 Tbps

Design Capacity: 7.2 Tbps Fiber Pairs:

12 Fiber Pairs on Repeaterless Segment, 3 Fiber Pairs on Repeatered Segments

Channels: 60 Owners:

System Supplier:

Columbus Networks, New World Network Tyco Telecommunications SSI, Alcatel, NEC

System Installer: Tyco SSI Cableship:

Upgrader: Upgrade Year:

LANDING POINTS: • Curacao (Curacao) • Trinidad (Trinidad)

Upgraded Capacity:

Tyco Durable, Ile de Sein, Ile de Batz, Fu Hai, Segero, Cable Innovator TE SubCom 2016

100 Gbps

Region: Americas


YOUR AD HERE

Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com

ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000

F E B-16

M A Y -16

A UG-16

NOV -17

I S S U E 1 7

I S S U E 1 8

I S S U E 1 9

I S S U E 2 0


EIG

Bude

Monaco Sesimbra Gibraltar Tripoli

EUROPE INDIA GATEWAY RFS Year:

2011

Est. End of Service Date: 2036 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Channel Capacity: Owners:

LANDING POINTS: • Abu Talat (Egypt) • Bude (United Kingdom) • Djibouti (Republic of Djibouti) • Fujairah (United Arab Emirates) • Gibraltar (Gibraltar) • Jeddah (Saudi Arabia) • Monaco (Monaco) • Mumbai (India) • Muscat (Oman) • Zafarana (Egypt) • Sesimbra (Portugal) • Tripoli (Libya)

System Supplier: Marine Surveyor: System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

700,000,000 15,000

3.84 Tbps 100 Gbps

AT&T, Bharti Airtel, British Telecom, BSNL, C&W, Djibouti Telecom, Du, Gibtelecom, Libyan Post, Telecom, and Information Technology Company, MTN Group, Omantel, PT Comunicações, Saudi Telecom Company (STC), Telekom SA, Verizon, Telecom Egypt

Tyco Telecommunications, AlcatelLucent Submarine Networks Fugro, UTEC, GEMS

Oman Telecommunications Company, Telecom Egypt, Verizon Ltd., Vodafone Limited Ciena 2014

100 Gbps

Region: EMEA


Abu Talat Zafarana Jeddah

Djibouti

Fujairah Muscat

Mumbai


PROJECT COMPLETION PHASES:

ELLALINK

Survey

System Manufacture

System Installation

Lisbon

M

ad

eir

a

Pre-Engineering

Gran Canaria

Praia

Fortaleza

ELLALINK [PLANNED] RFS Year:

2019

Est. End of Service Date: 2044 Est. System Cost (US$):

Total Length (kms):

LANDING POINTS: • • • • • •

Fortaleza (Brazil) São Paulo (Brazil) Madeira (Canary Islands) (Cape Verde) Sines (Portugal)

250,000,000 9,200

Design Capacity: 72 Tps Fiber Pairs:

3 Fiber Pairs

Channels: 100

Channel Capacity:

Owners:

100 Gbps

Telebras, Islalink

Region: Transatlantic

Commissioning & Acceptance


ENDEAVOUR

K e a w a u l a

S y d n e y

ENDEAVOUR RFS Year:

2008

Est. End of Service Date: 2033 Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer: Upgrader: Upgrade Year:

LANDING POINTS: • Keawaula (Hawaii) • Sydney (Australia)

Upgraded Capacity:

9,125

80 Gbps

2 Fiber Pairs

Telstra (Australia)

Telstra International Infinera 2014

100 Gbps

Region: AustralAsia


ESTEPONA-TETOUAN

ESTEPONA-TETOUAN RFS Year:

1994

Est. End of Service Date: 2019 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier:

10,000,000 113

3.7 Gbps

Telefonica

STC Submarine Systems

System Installer: FCR Cableship:

System Maintainer:

Vercors

Telefonica de España S.A.U.

Region: EMEA

E s t e p o n a

T e u t a n

LANDING POINTS: • Estepona (Spain) • Tetouan (Morocco)


EUROPA

EUROPA RFS Year:

2013

Est. End of Service Date: 2038 Fiber Pairs:

Owners:

8 Fiber Pairs

CYTA, Lebanese ministry of Telecommunications

Region: EMEA

Pentaskhinos

Tripoli

LANDING POINTS: • Pentaskhinos (Cyprus) • Tripoli (Lebanon)


FA-1 NORTH/SOUTH

Northport Island Park

LANDING POINTS: • • • •

Island Park (USA) Northport (USA) Plerin (France) Porthcurno (United Kingdom)


Porthcurno

FLAG ATLANTIC 1 NORTH/SOUTH RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

900,000,000 12,820

4.68 Tbps 24 Tbps

6 Fiber Pairs

Owners: Global Cloud Xchange

System Supplier:

Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

Marine Surveyor: Survey Boat:

System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

Svitzer, SAIC

Vessel of Opportunity

Global Cloud Xchange Infinera, Ciena

2010, 2011, 2013

10 Gbps, 100 Gbps

Region: Transatlantic

Plerin


FALCON

Aqaba

Kuwait City

Bandar Abbas Cha

ba

D Khuba as i ab

Al M -Kh Su an ob m am ar ai a sm a

Suez

Jeddah Port Sudan

Al Hudaydah

LANDING POINTS: • Al Ghaydah (Yemen) • Al Hudaydah (Yemen) • Al-Khobar (Saudi Arabia) • Al Seeb (Oman) • Aqaba (Jordan) • Bandar-E Abbas (Iran) • Chabahar (Iran) • Colombo (Sri Lanka) • Dubai (UAE) • Hulhumalé (India) • Jeddah (Saudi Arabia) • Kuwait City (Kuwait) • Manama (Bahrain)

Al Ghaydah

ha

Al Seeb

r


Mumbai

Trivandrum Colombo HulhumalĂŠ

FALCON RFS Year:

2006

Est. End of Service Date: 2031 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

900,000,000 12,181

90 Gbps

Design Capacity: 2.56 Tbps Fiber Pairs:

Owners: System Supplier:

8 Fiber Pairs

Global Cloud Xchange

Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks

System Maintainer:

Upgrader:

E-marine PJSC, Oman Telecommunications Company, Reliance Globalcom Ltd Infinera

Region: Indian Ocean Pan-East Asian


FAR EAST

Magadan

Okha

Mys Levashova

FAR EAST RFS Year:

2015

Est. End of Service Date: 2040 Est. System Cost (US$):

Total Length (kms):

50,000,000 1,844

Design Capacity: 1.6 Tbps Fiber Pairs:

2 Fiber Pairs

Channels: 8

Channel Capacity:

Owners: System Supplier:

LANDING POINTS: • Mys Levashova (Russia) • Okha (Russia) • Magadan (Russia)

100 Gbps

Rostelcom

Huawei Marine Networks

System Installer: Global Marine Systems Limited Cableship:

Cable Innovator

Region: AustralAsia


FARICE-1

FARICE-1 RFS Year:

2004

Est. End of Service Date: 2029 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

25,000,000 1,395

20 Gbps

Owners: Farice Ltd., Iceland Telecom Ltd.

System Supplier:

Cableship: Marine Surveyor: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

Pirelli

Pertinacia Fugro

Farice ehf Ciena 2013

100 Gbps

Region: EMEA

LANDING POINTS: • Dunnet Bay (Scotland) • Funningsfjør∂ur (Faroe Islands) • Sey∂isfjör∂ur (Iceland)

Dunnet Bay


FARLAND

FARLAND RFS Year:

1994

Est. End of Service Date: 2019 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier: System Maintainer:

10,000,000 149

18 Gbps

British Telecom

Tyco Telecommunications

British Telecommunications PLC

Region: EMEA

A l d e b u r g h

D o m b u r g

LANDING POINTS: • Aldeburgh (United Kingdom) • Domburg (Netherlands)


YOUR AD HERE

Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com

ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000

F E B-16

M A Y -16

A UG-16

NOV -17

I S S U E 1 7

I S S U E 1 8

I S S U E 1 9

I S S U E 2 0


FASTER

Shima Chikura China

LANDING POINTS: • • • •

Bandon, Oregon (USA) Chikura (Japan) Shima (Japan) Tanshui (Taiwan)


Oregon

FASTER RFS Year:

2016

Est. End of Service Date: 2041 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

350,000,000 9,000

28 Tbps 60 Tbps

6 Fiber Pairs

Channels: 100

Channel Capacity: 100 Gbps

Owners: Google, China Mobile International, China Telecom Global, Global Transit, KDDI and Singtel

System Supplier:

NEC

System Installer: Orange Marine Cableship:

RenĂŠ Descartes

Region: Transpacific


FEHMARN BELT

FEHMARN BELT RFS Year:

2000

Est. End of Service Date: 2025 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier:

10,000,000 20

2.5 Gbps

Teliasonera Ericsson

System Installer: Nexans Cableship:

System Maintainer:

Pleijel

TeliaSonera International Carrier AB

Region: EMEA

Rödbyhavn Puttgarden

LANDING POINTS: • Puttgarden (Germany) • Rödbyhavn (Denmark)


FIBRALINK

n

K i

n g s t o

M o n t e g o B a y

O c h o R i o s

P u e r t o P l a t a

FIBRALINK RFS Year:

2006

Est. End of Service Date: 2031 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

30,000,000 2,438

40 Gbps

Design Capacity: 7.2 Tbps Fiber Pairs:

Owners:

LANDING POINTS: • • • •

Kingstown (St. Vincent) Montego Bay (Jamaica) Ocho Rios (Jamaica) Puerto Plata (Dominican Republic)

System Supplier:

3 Fiber Pairs on Repeatered Segments Columbus Networks Alcatel

System Installer: International Telecom Cableship:

IT Intrepid

Region: Americas


FLAG EUROPE-ASIA

Porthcurno

Said Alexandria Port Aqaba Fujairah Jeddah

Su

ez

Estepona

Palermo

FLAG EUROPE-ASIA RFS Year:

1997

Est. End of Service Date: 2022 Est. System Cost (US$):

Total Length (kms):

LANDING POINTS: • • • • • • • • • • • •

Alexandria (Egypt) Aqaba (Jordan) Ben Pak Para (Thailand) Estepona (Spain) Fujairah (United Arab Emirates) Hong Kong (China) Jeddah (Saudi Arabia) Keoje (South Korea) Miura (Japan) Mumbai (India), Nanhui District (China) Ninomiya (Japan) Palerm (Italy)

Initial Capacity:

720,000,000 27,433

10 Gbps

Design Capacity: 500 Gbps Fiber Pairs:

Owners: System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

2 Fiber Pairs

Global Cloud Xchange

China Telecommunications Corporation, E-marine PJSC, Reliance Globalcom Ltd Ciena 2012

100 Gbps

Region: Indian Ocean Pan-East Asian, EMEA


Ni M no iu mi ra ya

Keoje Nanhui Hong Kong

tu

So

Sa

ng

kh

la

Mumbai

n

Penang Ban Pak Para


FLORES-CORVO

FLORES-CORVO RFS Year:

2014

Est. End of Service Date: 2039 Est. System Cost (US$):

Total Length (kms):

20,000,000 685

Design Capacity: 0.96 Tbps Fiber Pairs:

6 Fiber Pairs

Channels: 16

Channel Capacity:

Owners: System Supplier:

10 Gbps

Viatel (Azores)

Huawei Marine Networks, Nexans

System Installer: Huawei Marine Networks Region: EMEA

Corvo Flores

LANDING POINTS: • • • •

Flores (Azores) Corvo (Azores) Graciosa (Azores) Faial (Azores)

Graciosa Faial


FOG

FIBER OPTIC GULF RFS Year:

1998

Est. End of Service Date: 2023 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners:

Kuwait City

System Supplier: System Maintainer:

80,000,000 1,286

20 Gbps

4 Fiber Pairs

Bahrain Telephone Co., Kuwait Ministry of Communications, Qatar Telecommunication Company, UAE Telecommunications Company Fujitsu

E-marine PJSC

Region: EMEA

Manama Doha

LANDING POINTS: • • • •

Doha (Qatar) Dubai (UAE) Kuwait City (Kuwait) Manama (Bahrain)

Dubai




Al e

ar xan an dr a ia

Mazara

Za f

GBICS

GULF BRIDGE INTERNATIONAL CABLE SYSTEM RFS Year:

2011

Est. End of Service Date: 2036 Est. System Cost (US$):

Total Length (kms):

445,000,000 4,719

Design Capacity: 51.2 Tbps Fiber Pairs:

4 Fiber Pairs express route, 2 Fiber Pairs other landings

Channels: 128

Channel Capacity:

Owners: System Supplier:

100 Gbps

Gulf Bridge International TE SubCom

System Installer: e-Marine

System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

Gulf Bridge International Inc., Oman Telecommunications Company Xtera Communications 2012

100 Gbps

Region: EMEA


Al Fa w Bu sh eh r h

M

um

ba

i

Al

Se

eb

ira ja

Fu

Al K Al ho H ba D idd r oh a

Kuwait City

LANDING POINTS: • Alexandria (Egypt) • Al Hidd (Bahrain) • Al-Khobar (Saudi Arabia) • Al Seeb (Oman) • Bushehr (Iran) • Doha (Qatar) • Dubai (United Arab Emirates) • Fujairah (United Arab Emirates) • Jeddah (Saudi Arabia) • Kuwait City (Kuwait) • Mazara (Italy) • Mumbai (India) • Zafarana (Egypt)


GCN

Hams Bluff

Galisbay Gustavia

Basseterre Dickenson Bay Baie-Mahault Baliff Canefield Le Lamentin Port Castries

Kingstown

Bridgetown

Port Salines

Macqueripe

GLOBAL CARIBBEAN NETWORK LANDING POINTS: • Baie-Mahault (Guadeloupe) • Baliff (Guadeloupe) • Basseterre (St. Kitts & Nevis) • Bridgetown (Barbados) • Canefield (Dominica) • Dickenson Bay (Antigua) • Galisbay (St Martin) • Hams Bluff (Virgin Islands) • Kingstown (St. Vincent) • Le Lamentin (Martinique) • Macqueripe (Trinidad and Tobago)

RFS Year:

2007

Est. End of Service Date: 2032 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

17,520,000 1,926

1.2 Tbps

Design Capacity: 5 Tbps Owners:

System Supplier: Upgrader: Upgrade Year: Upgraded Capacity:

Global Carribean Network

Alcatel Submarine Networks Ciena 2013

40 Gbps

Region: Americas


GEMINI BERMUDA

Bermuda

GEMINI BERMUDA RFS Year:

2007

Est. End of Service Date: 2032 Est. System Cost (US$):

Total Length (kms):

40,000,000 1,500

Design Capacity: 1.6 Tbps Owners:

C&W, Verizon

System Installer: Orange Marine

System Maintainer:

Upgrader: Upgrade Year:

LANDING POINTS: • Manasquan, NJ (USA) • Bermuda

Upgraded Capacity:

Verizon Xtera 2016

100 Gbps

Region: Americas


GEORGIA-RUSSIA

GEORGIA-RUSSIA RFS Year:

2000

Est. End of Service Date: 2025 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer:

20,000,000 280

2.5 Gbps

4 Fiber Pairs

DanTelco, FOPTNET, Rostelecom OJSC “Rostelecom”

Region: EMEA

Novorossiysk

Sochi

Poti

LANDING POINTS: • Novorossiysk (Russia) • Poti (Georgia) • Sochi (Russia)


Bude

GLO-1

Vigo Sesimbra Casablanca

Nouakchott Dakar

GLOBACOM-1 RFS Year:

2010

Est. End of Service Date: 2035 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

640 Gbps 2.5 Tbps

2 Fiber Pairs

Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks, IT International Telecom Cableship:

Marine Surveyor: System Maintainer:

Lagos

8,717

Owners: Globacom Ltd.

System Supplier:

Accra

260,000,000

Ile de Batz, IT Intrepid

Alcatel Submarine Networks

IT International Telecom Canada

Region: EMEA

LANDING POINTS: • • • • • •

Accra (Ghana) Bude (United Kingdom) Casablanca (Morocco) Dakar (Senegal) Lagos (Nigeria) Nouakchott (Mauritania) • Sesimbra (Portugal) • Vigo (Spain)


GLOBENET

GLOBENET RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

Tuckerton

610,000,000 22,690

40 Gbps

Design Capacity: 4.6 Tbps Fiber Pairs:

Channel Capacity: Owners:

Bermuda

System Supplier: System Maintainer: Upgrader:

Boca Raton

Upgrade Year: Upgraded Capacity:

4 Fiber Pairs 100 Gbps Globenet

TE SubCom

IT International Telecom Canada Xtera Communications 2010, 2016 100 Gbps

Region: Americas

Punta Gorda

Fortaleza

Rio de Janeiro

LANDING POINTS: • • • • • •

Bermuda (Bermuda) Boca Raton (USA) Fortaleza (Brazil), Maiquetia (Venezuela) Rio de Janeiro (Brazil) Tuckerton (USA)


GO-1

M a z a r a

C a t a n i a

S t . P a u l ’ s S t . B a y G e o r g e ’ s B a y

GO-1 RFS Year:

1995

Est. End of Service Date: 2020 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier:

LANDING POINTS: • • • •

Cantina (Sicily) Mazara (Italy) St George’s Bay (Malta) St Paul’s Bay (Malta)

10,000,000 290

20 Gbps GO

Alcatel-Lucent Submarine Networks

System Installer: Elettra Cableship:

Teliri

Region: EMEA


GOKI

GOKI RFS Year:

2013

Est. End of Service Date: 2038 Est. System Cost (US$):

Incheon

Total Length (kms):

120,000,000 4,200

Design Capacity: 80 Gbps Owners:

System Supplier:

Kita-Kyushu

AT&T

Xtera Communications

System Installer: Kokusai Cable Ship Region: AustralAsia

Okinawa

LANDING POINTS: • Incheon (Korea) • Kita-Kyushu (Japan) • Okinawa Prefecture (Japan) • Tumon (Guam)

Tumon


GONDWANA-1

Poindimie

Mouli Island Lifou

Sy

dn

ey

Noum’ea

GONDWANA-1 RFS Year:

2008

Est. End of Service Date: 2033 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

LANDING POINTS: • Lifou (New Caledonia) • Mouli Island (New Caledonia) • Noum’ea (New Caledonia) • Poindimie (New Caledonia) • Sydney (Australia)

Owners: System Supplier:

57,500,000 2,152

640 Gbps

Post and Telecommunications Office of New Caledonia Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks Cableship:

System Maintainer:

Ile de Re

OPT - Nouvelle Caledonie

Region: AustralAsia


GREENLAND CONNECT

Nuuk

Landeyjarsandur

Qaqortoq

Milton

GREENLAND CONNECT RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

126,000,000 4,733

20 Gbps

Design Capacity: 2.56 Tbps Fiber Pairs:

Owners: System Supplier:

LANDING POINTS: • Landeyjarsandur (Iceland) • Milton (Canada) • Nuuk (Greenland) • Qaqortoq (Greenland)

2 Fiber Pairs

Tele Greenland

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Cableship:

Marine Surveyor: System Maintainer:

Maersk Responder, Blue Castor, Ile de Sein Elettra

TELE Greenland A/S

Region: Americas


GREENLAND CONNECT NORTH

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Aasiaat Sisimiut Maniitsoq Nuuk

GREENLAND CONNECT NORTH [PLANNED] RFS Year:

2018

Est. End of Service Date: 2043

Design Capacity: 4.8 Tbps

Channel Capacity:

LANDING POINTS: • • • •

Nuuk (Greenland) Maniitsoq (Greenland) Sisimiut (Greenland) Aasiaat (Greenland)

Owners: System Supplier:

100 Gbps

Tele Greenland

Huawie Marine

System Installer: Huawei Marine Region: Americas


The Power of Submarine Information Transmission


There’s a new power under ocean uniting the world in a whole new way. With unparalleled development expertise and outstanding technology, Huawei Marine is revolutionizing trans-ocean communications with a new generation of repeaters and highly reliable submarine cable systems that offer greater transmission capacity, longer transmission distances and faster response to customer needs. Huawei Marine: connecting the world one ocean at a time.


GUANTÁNAMO BAY CABLE

GUANTÁNAMO BAY CABLE RFS Year:

2016

Est. End of Service Date: 2041 Est. System Cost (US$):

Total Length (kms): Channel Capacity: Owners: System Supplier:

31,000,000 1,500

100 Gbps

US Government

Xtera Communications, NSW

System Installer: IT International Telecom

Marine Surveyor:

US Government

Region: Americas

South Florida

Guantánamo Bay

LANDING POINTS: • Guantánamo Bay (Cuba) • Florida (USA)


GUANTÁNAMO BAY 2

GUANTÁNAMO BAY 2 [PLANNED] RFS Year:

2018

Est. End of Service Date: 2043 Total Length (kms):

Channel Capacity: Owners: System Supplier:

1,200

100 Gbps

US Government

Xtera Communications

System Installer: Xtera Communications Region: Americas

Guantánamo Bay

Puerto Rico

LANDING POINTS: • Puerto Rico • Guantánamo Bay (Cuba)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


GWEN

GREECE TO WESTERN EUROPE NETWORK RFS Year:

2004

Est. End of Service Date: 2029 Est. System Cost (US$):

Total Length (kms): Fiber Pairs: Owners:

20,000,000 647

4 Fiber Pairs OTE

Region: EMEA

B a r i

C o r f u

LANDING POINTS: • Bari (Italy) • Corfu (Greece)


HANNIBAL

HANNIBAL RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms):

10,000,000 180

Design Capacity: 9.6 Tbps Fiber Pairs:

3 Fiber Pairs

Channels: 80

Channel Capacity:

Owners: System Supplier:

40 Gbps

Tunisie Telecom (Tunisia) Huawei Marine Networks

System Installer: Global Marine Systems Limited, Huawei Marine Networks Cableship:

Marine Surveyor:

Sovereign UTEC

Region: EMEA

Mazara

Kelibia

LANDING POINTS: • Kelibia (Tunisia) • Mazara (Italy)


HANTRU-1

Tumon

Ebeye

Reagan Test Site Majuro

Pohnpei

HANTRU-1 RFS Year:

2010

Est. End of Service Date: 2035 Est. System Cost (US$):

LANDING POINTS: • Ebeye (Kwajalein) • Majuro (Marshall Islands) • Pohnpei (Micronesia) • Reagan Test Site (Kwajalein) • Tumon (Guam)

Total Length (kms): Owners: System Supplier:

130,000,000 2,908

Hannon Armstrong TE SubCom

System Installer: TE SubCom

System Maintainer:

Truestone LLC

Region: AustralAsia


YOUR AD HERE

Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com

ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000

F E B-16

M A Y -16

A UG-16

NOV -17

I S S U E 1 7

I S S U E 1 8

I S S U E 1 9

I S S U E 2 0


HAWAIKI

Hawaii

Wallis Vanuatu Fiji

New Caledonia

Samoa American Samoa

Norfolk Island

Sydney

Whangarei

LANDING POINTS: • • • • • • • • •

Oregon (USA) Sydney (Australia) Hawaii (USA) Norfolk Island New Caledonia Fiji Samoa American Samoa Whangarei (New Zealand)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


Oregon

HAWAIKI [PLANNED] RFS Year:

2018

Est. End of Service Date: 2043 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

300,000,000 14,000

12.8 Tbps 30 Tbps

2 Fiber Pairs

Channels: 64

Channel Capacity: Owners: System Supplier:

100 Gbps

Hawaiki Submarine Cable TE SubCom

System Installer: TE SubCom Cableship:

Marine Surveyor:

Reliance EGS

Region: AustralAsia, Transpacific


HAWK CABLE SYSTEM

Marseille

LANDING POINTS: • Alexandria (Egypt) • Anatoliko (Cyprus) • Marseille (France)


HAWK CABLE SYSTEM RFS Year:

2011

Est. End of Service Date: 2035 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs:

250,000,000 3,181

2.72 Tbps

4 Fiber Pairs

Channels: 68

Channel Capacity:

Owners: System Supplier:

10 Gbps

Global Cloud Xchange Fujitsu

System Installer: Elettra, Orange Marine

Marine Surveyor:

Fugro

Region: EMEA

Anatoliko

Alexandria


Ly n

n

H

er rin Co g ve

HIBERNIA ATLANTIC

HIBERNIA ATLANTIC RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

320,000,000 12,111

10.16 Tbps

Design Capacity: 25 Tbps Fiber Pairs:

4 Fiber Pairs

Channels: 48

Channel Capacity:

Owners: System Supplier:

64

Columbia Ventures Corporation Tyco Telecommunications SSI

System Installer: FCR Cableship:

LANDING POINTS: • • • • •

Coleraine (Ireland) Dublin (Ireland) Herring Cove (Canada) Lynn (USA) Southport (United Kingdom)

System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

Vercors, Iberus, Nordic King, Teneo, Dock Express 20, Global Mariner, Atlantida Hibernia Netoworks

Huawei Marine Networks 2011

100 Gbps

Region: Transatlantic


So

Dublin

ut hp or

t

Coleraine


HIBERNIA EXPRESS

HIBERNIA EXPRESS RFS Year:

2015

Est. End of Service Date: 2040 Est. System Cost (US$):

Total Length (kms):

120,000,000 4,600

Design Capacity: 53 Tbps Fiber Pairs:

6 Fiber Pairs

Channels: 100

Channel Capacity:

Owners: System Supplier:

100 Gbps, 200 Gbps on select segments Hibernia Atlantic TE SubCom

System Installer: TE SubCom

Marine Surveyor: Survey Boat:

EGS

RV Ridley Thomas

Region: Transatlantic

New York

LANDING POINTS: • Halifax, Nova Scotia (Canada) • Brean (UK) • Cork (Ireland)


Cork

London


HK-G

HONG KONG-GUAM [PLANNED] RFS Year:

2019

Est. End of Service Date: 2044 Total Length (kms):

3,900

Design Capacity: 48 Tbps

Channel Capacity:

Owners: System Supplier:

100 Gbps

RTI Connectivity NEC

Region: AustralAsia

Hong Kong

Guam

LANDING POINTS: • Hong Kong • Guam

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


HONOTUA

HONOTUA RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

Spencer Beach

Owners: System Supplier:

122,000,000 4,634

640 Gbps

OPT French Polynesia

Alcatel-Lucent Submarine Networks

M

• Huahine (French Polynesia) • Moorea (French Polynesia) • Papeete (French Polynesia) • Spencer Beach, Hawaii (USA) • Uturoa (Raiatea, French Polynesia) • Vaitape (Bora Bora, French Polynesia)

Vaitape U

LANDING POINTS:

tu ro oo a re H ua a hi Pa ne pe et e

Region: AustralAsia


HSCS

HOKKAIDO-SAKHALIN CABLE SYSTEM RFS Year:

2008

Est. End of Service Date: 2033 Est. System Cost (US$):

Total Length (kms):

20,000,000 559

Design Capacity: 640 Gbps Owners:

System Supplier:

NTT Communications, TTK NEC

System Installer: KDD Cableship:

System Maintainer:

Subaru

NTT Communications Corporation, TTK

Region: AustralAsia

Nevelsk

Ishikari

LANDING POINTS: • Ishikari (Japan) • Nevelsk (Russia)


HUGO

Porthcurno Guernsey Lannion

HUGO RFS Year:

2006

Est. End of Service Date: 2031 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier:

LANDING POINTS: • Guernsey (Guernsey) • Lannion (France) • Porthcurno (United Kingdom)

11,960,000 426

3.3 Tbps C&W

Alcatel Submarine Networks

System Installer: Tyco SSI Cableship:

System Maintainer:

Tycom Reliance

Vodafone Limited

Region: EMEA


I2I

Chennai

I2I RFS Year:

2002

Est. End of Service Date: 2027 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

Tuas

90,000,000 3,100

160 Gbps 84 Tbps

8 Fiber Pairs

Channels: 105

Channel Capacity: 100 Gbps

Owners: Bharti Airtel

Marine Surveyor:

Upgrader: Upgrade Year: Upgraded Capacity:

C&C Technologies Ciena 2014

100 Gbps

Region: Indian Ocean Pan-East Asian

LANDING POINTS: • Chennai (India) • Tuas (Singapore)


ICN1

INTERCHANGE I RFS Year:

2014

Est. End of Service Date: 2039 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

32,000,000 1,259

20 Gbps

Design Capacity: 320 Gbps Owners:

System Supplier:

Interchange Limited

TE SubCom, Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Region: AustralAsia

Port Vila

LANDING POINTS: • Port Vila (Vanuatu) • Suva (Fiji)

Suva


ICN2

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Honiara

Port Moresby

Luganville Port Vila

INTERCHANGE II [PLANNED] RFS Year:

2017

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms):

LANDING POINTS: • Port Moresby (Papau New Guinea) • Port Vila (Vanuatu) • Luganville (Vanuatu) • Honiara (Solomon Islands)

72,000,000 3,500

Design Capacity: 1.28 Tbps Fiber Pairs:

1 Fiber Pair

Channels: 32

Channel Capacity:

Owners:

40 Gbps

Interchange Limited

Region: AustralAsia


IFC-1

IRELAND-FRANCE CABLE-1 [PLANNED] RFS Year:

2018

Est. End of Service Date: 2043 Total Length (kms):

565

Design Capacity: 120 Tbps Fiber Pairs:

Owners:

Dublin

6 Fiber Pairs

Ireland-France Subsea Cable

Region: EMEA

Cork

Lannion Paris

LANDING POINTS: • Cork (Ireland) • Paris (France)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


I-ME-WE

Marseille

Catania Tripoli Alexandria Suez

Jeddah

LANDING POINTS: • Alexandria (Egypt) • Catania (Italy) • Fujairah (United Arab Emirates) • Jeddah (Saudi Arabia) • Karachi (Pakistan) • Marseille (France) • Mumbai (India) • Suez (Egypt) • Tripoli (Lebanon)


INDIA-MIDDLE EAST-WESTERN EUROPE RFS Year:

2010

Est. End of Service Date: 2035 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

320,000,000 13,000

520 Gbps

Design Capacity: 5.6 Tbps Fiber Pairs:

3 Fiber Pairs

Channels: 128 Owners:

System Supplier:

Bharti Airtel, Etisalat, France Telecom, Ogero (Lebanon), PTCL (Pakistan), STC (Saudi Arabia), Tata Communications, Telecom Egypt, Telecom Italia Sparkle Alcatel-Lucent Submarine Networks

System Installer: S.B. Submarine Systems, NEC Cableship:

Marine Surveyor: System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

Fujairah

Cable Innovator Fugro

Orange, TATA Communications, Telecom Egypt, Telecom Italia Sparkle Mitsubishi

2012, 2014

40 Gbps, 100 Gbps

Region: EMEA

Karachi

Mumbai


INDIGO

INDIGO SUBSEA CABLE [PLANNED] RFS Year:

2019

Est. End of Service Date: 2043 Total Length (kms):

9,000

Design Capacity: 18 Tbps

Singapore

Fiber Pairs:

Owners: System Supplier:

Jakarta

2 Fiber Pairs

Google, Singtel, Telstra, AARNet, Indosat Ooredoo Alcatel Submarine Networks

Region: AustralAsia

Perth

Sydney

LANDING POINTS: • Sydney, Perth (Australia) • Singapore • Jakarta (Indonesia)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


ITALY-ALBANIA

Durres

Bari

ITALY-ALBANIA RFS Year:

1998

Est. End of Service Date: 2023 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs:

LANDING POINTS: • Bari (Italy) • Durres (Albania)

Owners:

10,000,000 236

2.5 Gbps

1 Fiber Pair

Telecom Italia Sparkle

Region: EMEA


ITALY-GREECE

Otranto Corfu

ITALY-GREECE RFS Year:

1995

Est. End of Service Date: 2020 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs:

LANDING POINTS: • Corfu (Greece) • Otranto (Italy)

Owners:

10,000,000 161

1.69 Gbps

4 Fiber Pairs

Telecom Italia

Region: EMEA


ITALY-LIBYA

ITALY-LIBYA RFS Year:

2000

Est. End of Service Date: 2025 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

10,000,000 570

2.5 Gbps

Design Capacity: 120 Gbps Fiber Pairs:

Owners: System Maintainer: Upgrade Year: Upgraded Capacity:

2 Fiber Pairs

Telecom Italia

Telecom Italia Sparkle 2011

40 Gbps

Region: EMEA

Mazara

Tripoli

LANDING POINTS: • Mazara (Italy) • Tripoli (Libya)


ITALY-MONACO

ITALY-MONACO RFS Year:

1995

Est. End of Service Date: 2020 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners:

Savona Monaco

LANDING POINTS: • Monaco (Monaco) • Savona (Italy)

System Maintainer:

10,000,000 162

565 Mbps

1 Fiber Pairs

Telecom Italia

Telecom Italia Sparkle

Region: EMEA


JAKA2DELEMA

Sangatta Pontianak Toweli Ketapang Pangkalanbun Bandjermasin

JAKA2DELEMA RFS Year:

2010

Jember Benculuk

Mataram

Est. End of Service Date: 2035 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

116,000,000 1,800

960 Gbps 9.6 Tbps

3 Fiber Pairs

Channels: 32

Channel Capacity: Owners: System Supplier:

100 Gbps

PT Telekomunikasi Indonesia NSW, Fujitsu

System Installer: Fujitsu, Orange Marine Upgrader:

Upgrade Year: Upgraded Capacity:

Fujitsu 2013

100 Gbps

Region: AustralAsia

LANDING POINTS: • Bandjermasin (Indonesia) • Benculuk (Indonesia) • Jember (Indonesia) • Ketapang (Indonesia) • Mataram (Indonesia) • Pangkalanbun (Indonesia) • Pontianak (Indonesia) • Sangata (Indonesia) • Toweli (Indonesia)


JAKABARE

Tuas

Batam Pontianak

Jakarta

JAKABARE RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

40,000,000 1,330

160 Gbps

Design Capacity: 1.28 Tbps Owners:

System Supplier:

LANDING POINTS: • • • •

Batam (Indonesia) Jakarta (Indonesia) Pontianak (Indonesia) Tuas (Singapore)

Indosat NEC

System Installer: NEC, ASEAN Cableship, Orange Marine Cableship:

Cable Innovator

Region: AustralAsia


YOUR AD HERE

Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com

ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000

F E B-16

M A Y -16

A UG-16

NOV -17

I S S U E 1 7

I S S U E 1 8

I S S U E 1 9

I S S U E 2 0


JAPAN-US

i ak a ar m ib ya ta ru Ki Ma

Shima

LANDING POINTS: • • • • • •

Kitaibaraki (Japan) Makaha (Hawaii) Maruyama (Japan) Morro Bay (USA) Point Arena (USA) Shima (Japan)


Point Arena Morro Bay

Makaha

JAPAN-US RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

590,000,000 21,880

640 Gbps

Design Capacity: 6.4 Tbps Fiber Pairs:

4 Fiber Pairs

Channels: 16

Channel Capacity:

Owners: System Supplier:

100 Gbps

AT&T, Japan Telecom, KDDI, MCIWorldCom, NTTWN Alcatel Submarine Networks, Fujitsu, Ocean Cable Company

System Installer: Global Marine Systems Limited Cableship:

System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

Subaru, Cable Innovator

AT&T, KDDI, NTT Communications Corporation, Softbank Telecom Corp, Verizon Ltd Ciena 2012

100 Gbps

Region: Transpacific


JASUKA

Batam

Pontianak

Tanjung Pandan

JASUKA RFS Year:

Est. End of Service Date: 2031 Est. System Cost (US$):

Jakarta

2006

Total Length (kms): Initial Capacity:

280,000,000 354

20 Gbps

Design Capacity: 320 Gbps Owners:

System Supplier:

• • • •

Batam (Indonesia) Jakarta (Indonesia) Pontianak (Indonesia) Tanjung Pandan (Indonesia)

Nokia Siemens Networks

System Installer: Nokia Siemens Networks

Marine Surveyor:

LANDING POINTS:

PT Telekom

Upgrader: Upgrade Year: Upgraded Capacity:

Nokia Siemens Networks Nokia Siemens Networks 2011

40 Gbps

Region: AustralAsia


JUNIOR

JUNIOR [PLANNED] RFS Year:

2017

Est. End of Service Date: 2042 Owners:

System Supplier:

Google

PadTec; Nexans

System Installer: Elettra Cableship:

Teliri

Region: Americas

Rio de Janeiro Santos

LANDING POINTS: • Rio de Janeiro (Brazil) • Santos (Brazil)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


KAFOS

Mangalia

Varna

Istanbul

KARADENIZ FIBER OPTIK SISTEMI RFS Year:

1997

Est. End of Service Date: 2022 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier:

LANDING POINTS: • Istanbul (Turkey) • Mangalia (Romania) • Varna (Bulgaria)

20,000,000 4,640

1.2 Gbps

BTC, Turk Telecom

Alcatel Submarine Networks

System Installer: FCR Cableship:

Vercors

Region: EMEA


KELTRA-2

KELTRA-2 RFS Year:

2007

Est. End of Service Date: 2032 Total Length (kms):

209

Design Capacity: 20 Gbps Fiber Pairs:

Owners: System Supplier:

6 Fiber Pairs

Telecom Italia, Tunisie Telecom (Tunisia) Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks

System Maintainer:

Telecom Italia Sparkle

Region: EMEA

LANDING POINTS: • Kelibia (Tunisia) • Trapini (Italy)


KHULNA-CHENNAI

K h u l n a

C h e n n a i

KHULNA-CHENNAI RFS Year:

2010

Est. End of Service Date: 2035 Est. System Cost (US$):

Total Length (kms):

LANDING POINTS: • Chennai (India) • Khulna (Bangladesh)

Owners:

48,000,000 115

Bangladesh Submarine Cable Company

Region: Indian Ocean Pan-East Asian


KJCN

Pusan

Kitakyushu

KOREA-JAPAN CABLE NETWORK RFS Year:

Fukuoka

2002

Est. End of Service Date: 2027 Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

500

2.88 Tbps 28.8 Tbps

12 Fiber Pairs

Channels: 24

Channel Capacity: Owners:

System Supplier:

100 Gbps

KEPCO, KT Coropration, NTT Communications, SOFTBANK Telecom Corp Fujitsu

System Installer: Fujitsu Cableship:

System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

Maersk Recorder

KT Corporation, NTT Communications Corporation, SoftBank Telecom Corp Ciena 2015

100 Gbps

Region: AustralAsia

LANDING POINTS: • Fukuoka (Japan) • Kita-Kyushu (Japan) • Pusan (South Korea)


KODIAK KENAI

Anchorage Kenai Seward Homer

Kodiak

Narrow Cape

KODIAK KENAI RFS Year:

2006

Est. End of Service Date: 2031 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

30,000,000 971

2.5 Gbps

Design Capacity: 10 Gbps Fiber Pairs:

LANDING POINTS: • • • • • •

Anchorage (USA) Homer (USA) Kenai (USA) Kodiak (USA) Narrow Cape (USA) Seward (USA)

Owners: Upgrader: Upgrade Year: Upgraded Capacity:

4 Fiber Pairs

Kodiak Kenai Cable Company Infinera 2010

10 Gbps

Region: Americas


KUWAIT-IRAN

KUWAIT-IRAN RFS Year:

2006

Est. End of Service Date: 2031 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners:

20,000,000 334

2.5 Gbps

6 Fiber Pairs

Ministry of Communication, Kuwait and Telecommunication Infrastructure Company, Iran

System Installer: e-Marine

System Maintainer:

E-marine PJSC

Region: EMEA

Failaka Soroosh

LANDING POINTS: • Kharg (Iran) • Soroosh (Iran) • Failaka (Kuwait)

Kharg


LEV

LEV RFS Year:

1999

Est. End of Service Date: 2024 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs:

175,000,000 2,600

2.5 Gbps

2 Fiber Pairs

Channels: 8 wavelengths of 1550 nm Owners:

System Supplier: System Maintainer:

Telecom Italia Sparkle

Alcatel Submarine Networks, Tyco Telecommunications Cyprus Telecommunications Authority

Region: EMEA

Mazara

Yeroskipou

Tel Aviv

LANDING POINTS: • Mazara (Italy) • Tel Aviv (Israel) • Yeroskipos (Cyprus)


LION

LOWER INDIAN OCEAN NETWORK RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

30,000,000 1,091

20 Gbps

Design Capacity: 1.28 Tbps Fiber Pairs:

2 Fiber Pairs

Channels: 64

Channel Capacity:

Owners: System Supplier:

10 Gbps

France Telecom, Mauritius Telecom, Orange Madagascar Alcatel-Lucent Submarine Networks

System Installer: FCR, Orange Marine Cableship:

System Maintainer:

Chamarel

Mauritius Telecom, Orange

Region: Indian Ocean Pan-East Asian

Tomasina Terre Rouge Sainte Marie

LANDING POINTS: • Sainte Marie (Reunion Island) • Terre Rouge (Mauritius) • Toamasina (Madagascar)


LION-2

LOWER INDIAN OCEAN NETWORK 2 RFS Year:

2012

Est. End of Service Date: 2037 Est. System Cost (US$):

Mombasa

Total Length (kms):

76,000,000 3,000

Design Capacity: 1.28 Tbps Fiber Pairs:

2 Fiber Pairs

Channels: 64

Channel Capacity:

Owners:

10 Gbps

France Telecom-Orange, Mauritius Telecom, Orange Madagascar, Telkom Kenya, Emtel Ltd

System Installer: Alpha Logistics, Elettra, Orange Marine Region: Indian Ocean Pan-East Asian

Mayotte

Co nn to L ectio ion n -1

LANDING POINTS: • Mombasa (Kenya) • Mayotte (Mayotte)


LIQUID SEA

LIQUID SEA [PLANNED] RFS Year:

2018

Est. End of Service Date: 2042 Total Length (kms):

10,000

Design Capacity: 30 Tbps Owners:

Liquid Telecom

Region: EMEA

Quseer

Aqaba

Djibouti

Mombasa Dar Es Salaam

Maputo Mtunzini

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

LANDING POINTS: • South Africa • Middle East (east coast of africa)


MAC

MID-ATLANTIC CROSSING RFS Year:

Brookhaven

2000

Est. End of Service Date: 2025 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

200,000,000 7,461

20 Gbps

Design Capacity: 920 Gbps Fiber Pairs:

Owners: System Supplier:

2 Fiber Pairs

Global Crossing

Alcatel Submarine Networks

System Installer: FCR Cableship:

System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

Fresnel

Level 3 Communications Ltd Infinera

2010, 2011

10 Gbps, 40 Gbps

Region: Americas

Hollywood

St. Croix

LANDING POINTS: • Brookhaven (USA) • Hollywood (USA) • St Croix (US Virgin Islands)


MAIN ONE

MAIN ONE RFS Year:

2010

Est. End of Service Date: 2035 Est. System Cost (US$):

Total Length (kms):

Seixal

Initial Capacity:

240,000,000 7,000

1.92 Tbps

Design Capacity: 10 Tbps

Channel Capacity:

Owners: System Supplier:

100 Gbps

Main One Cable Company TE SubCom

System Installer: TE SubCom Cableship:

System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

Resolute

Main One Cable Company, Tyco Electronics Subsea Communications LLC Xtera 2015

100 Gbps

Region: EMEA

s

ago L a cr Ac

LANDING POINTS: • • • • • • • •

Abidjan (Ivory Coast) Accra (Ghana) Casablanca (Morocco) Dakar (Senegal) Lagos (Nigeria) Port Harcourt (Nigeria) Seixal (Portugal) Tenerife (Spain)


MAREA

Virginia Beach

LANDING POINTS: • Virginia Beach, Virginia (USA) • Bilbao (Spain)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


Bilbao

MAREA [PLANNED] RFS Year:

2017

Est. End of Service Date: 2042 Total Length (kms):

Design Capacity: Fiber Pairs:

6,600

160 Tbps

8 Fiber Pairs

Owners: Microsoft, Facebook, Telefรณnica

System Supplier:

TE SubCom

System Installer: TE SubCom

Region: Transatlantic


MATRIX

MATRIX RFS Year:

2008

Est. End of Service Date: 2032 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

30,000,000 1,438

60 Gbps

Design Capacity: 2.56 Tbps Fiber Pairs:

Owners: System Supplier:

Batam Changi

4 Fiber Pairs

Matrix Networks and NAP Info TE Subcom

System Installer: Global Marine Systems Limited Cableship:

Wave Mercury, Cable Networker (barge)

Region: AustralAsia

Jakarta

LANDING POINTS: • Batam (Indonesia) • Changi (Singapore) • Jakarta (Indonesia)


MAYA-1

MAYA-1 RFS Year:

2000

Est. End of Service Date: 2025 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

120,000,000 4,506

10 Gbps

Design Capacity: 922.5 Gbps Fiber Pairs:

Owners: System Supplier: Marine Surveyor: Upgrader:

Hollywood

Upgrade Year: Upgraded Capacity:

2 Fiber Pairs

MAYA-1 Consortium

Alcatel Submarine Networks, Tyco Telecommunications C&C Technologies

Alcatel-Lucent Submarine Networks 2012

40 Gbps

Region: Americas

Cancun

Puerto Limon

LANDING POINTS: • Cancun (Mexico) • Hollywood (USA) • Maria Chiquita (Panama) • Puerto Limon (Costa Rica) • Tolu (Colombia)

Maria Chiquita

Tolu


MBDC

MORATELINDO BATAM - DUMAI CABLE RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners:

40,000,000 330

10 Gbps

Moratelindo

Region: AustralAsia

Dumai

LANDING POINTS: • Batam (Indonesia) • Dumai (Indonesia)

Batam


PROJECT COMPLETION PHASES:

MCT

Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Rayoung

Sihanoukville

MALAYSIA-CAMBODIA-THAILAND [PLANNED] RFS Year:

2018

Est. End of Service Date: 2041 Est. System Cost (US$):

Cherating

Total Length (kms): Initial Capacity:

70,000,000 1,425

1.5 Tbps

Design Capacity: 30 Tbps Fiber Pairs:

6 Fiber Pairs

Channels: 50

Channel Capacity:

Owners:

LANDING POINTS: • Cherating (Malaysia • Rayoung (Thailand • Sihanoukville (Cambodia)

System Supplier:

100 Gbps

Telekom Malaysia Berhad, Symphony Communication Public Company Limited, Telcotech limited Huawei Marine Networks

Region: AustralAsia


MED CABLE NETWORK

MED CABLE NETWORK RFS Year:

2005

Est. End of Service Date: 2030 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Maintainer:

LANDING POINTS: • Algiers (Algeria) • Annaba (Algeria) • Marseille (France)

1,300

20 Gbps

Med Cable

Middle East & North Africa (MENA) Submarine Cable Systems

Region: EMEA

Marseille

Algiers

40,000,000

Annaba


MEDNAUTILUS

Koropi

Ca

ta

ni

a

Istanbul

Chania

Haifa

Tel Aviv

MEDNAUTILUS RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

190,000,000 5,729

3.84 Tbps

Design Capacity: 38.4 Tbps Fiber Pairs:

6 Fiber Pairs

Channels: 64

Channel Capacity:

Owners: System Supplier:

LANDING POINTS: • • • • • •

Catania (Italy) Chania (Greece) Haifa (Israel) Istanbul (Turkey) Koropi (Greece) Tel Aviv (Israel)

100 Gbps

Telecom Italia Sparkle

Alcatel Submarine Networks

System Installer: Orange Marine Upgrader:

Upgrade Year: Upgraded Capacity:

Infinera

2011, 2012, 2013

10 Gbps, 40 Gbps, 100 Gbps

Region: EMEA


MELITA-1

MELITA-1 RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners:

14,000,000 100

50 Mbps

Melita Infrastructure Ltd.

Region: EMEA

Pozallo

St. Paul’s Bay

LANDING POINTS: • Pozallo (Italy) • St Paul’s Bay (Malta)


YOUR AD HERE

Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com

ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000

F E B-16

M A Y -16

A UG-16

NOV -17

I S S U E 1 7

I S S U E 1 8

I S S U E 1 9

I S S U E 2 0


MENA

Mazara

Alexandria Suez Zafarana

MIDDLE EAST NORTH AFRICA RFS Year:

2014

Est. End of Service Date: 2039 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs:

210,000,000 8,800

57.6 Tbps

6 Fiber Pairs

Channels: 96

Channel Capacity: 100 Gbps

Owners: Orascom Telecom Media and Technology Holding S.A.E.

System Supplier:

Alcatel Submarine Networks, TE SubCom

System Installer: Alcatel Submarine Networks, TE SubCom, e-Marine Cableship:

Marine Surveyor: System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

Maersk Responder, Ile de Sein, Niwa, Decisive EGS, Blue Star, Elettra

Middle East & North Africa (MENA) Submarine Cable Systems, Oman Telecommunications Company Infinera 2016

100 Gbps

Region: EMEA

Jeddah


M

um

ba

i

Al Seeb

LANDING POINTS: • • • • • •

Abu Talat (Egypt) Al Seeb (Oman) Jeddah (Saudi Arabia) Mazara (Italy) Mumbai (India) Zafarana (Egypt)


MIC-1

MORATEL INTERNATIONAL CABLE 1 RFS Year:

2008

Est. End of Service Date: 2033 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners:

10,000,000 70

10 Gbps

Moratelindo

System Installer: Global Marine Systems Limited Region: AustralAsia

Changi Batam

LANDING POINTS: • Batam (Indonesia) • Changi (Singapore)


MICRONESIA CABLE SYSTEM

MICRONESIA CABLE SYSTEM RFS Year:

2011

Est. End of Service Date: 2036 Total Length (kms):

Owners:

System Supplier:

174

Federals States of Micronesia Telecommunications Authority, Marshall Island National Telecommunications Authority TE SubCom

System Installer: TE SubCom Region: AustralAsia

Guam

Pohnpei

LANDING POINTS: • Majuro (Marshall Islands) • Kwajalein (Marshall Islands) • Pohnpei (Micronesia) • Guam

Majuro Kwajalein


MINERVA

MINERVA RFS Year:

2007

Est. End of Service Date: 2032 Initial Capacity:

10 Gbps

Channels: DWDM wavelengths Owners:

System Supplier:

Telecom Italia Sparkle

Alcatel-Lucent Submarine Systems

Region: EMEA

Mazara

Catania

Yeroskipou

LANDING POINTS: • Catania (Italy) • Mazara (Italy) • Yeroskipos (Cyprus)


MKCS

MATARAM-KUPANG CABLE SYSTEM RFS Year:

2011

Est. End of Service Date: 2036 Est. System Cost (US$):

Total Length (kms):

94,000,000 1,318

Design Capacity: 1.8 Tbps Fiber Pairs:

6 Fiber Pairs

Channels: 30

Channel Capacity:

Owners: System Supplier:

10 Gbps

PT Telkom

Huawei Marine Networks, Nexans

System Installer: Huawei Marine Networks Region: AustralAsia

Sum Mataram Besa bawaRaba r Waingapu Kupang

LANDING POINTS: • Mataram (Indonesia) • Sumbawa Besar (Indonesia) • Ambalawi (Indonesia) • Saraemee (Indonesia) • Waingapu (Indonesia) • Ende (Indonesia) • Kupang (Indonesia)


MOANA

MOANA SUBMARINE CABLE SYSTEM [PLANNED] RFS Year:

2018

Est. End of Service Date: 2043 Total Length (kms):

9,700

Design Capacity: 20 Tbps

Channel Capacity:

Owners: System Supplier:

Hawaii

200 Gbps

Bluesky Pacific Group

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Region: AustralAsia

Samoa Cook Islands New Zealand

LANDING POINTS: • • • •

New Zealand Hawaii Cook Islands Samoa

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


MONET

MONET [PLANNED] RFS Year:

2018

Est. End of Service Date: 2041 Est. System Cost (US$):

Total Length (kms):

280,000,000 10,556

Design Capacity: 60 Tbps Fiber Pairs:

6 Fiber Pairs

Channels: 100

Channel Capacity:

Owners: System Supplier:

100 Gbps

Algar Telecom, Angola Cables, Antel, Google TE SubCom

System Installer: TE SubCom

Boca Raton

Cableship:

Sentinel, Decisive

Region: Americas

Fortaleza

Santos

LANDING POINTS: • • • •

Santos (Brazil) Fortaleza (Brazil) Boca Raton Florida (United States)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


MYTHIC

MYTHIC [PLANNED] Est. RFS Year:

2017

Est. End of Service Date: 2042 Total Length (kms):

1,600

Design Capacity: 20 Tbps Fiber Pairs:

2 Fiber Pairs

Channels: 100

Channel Capacity:

Owners: System Supplier:

100 Gbps

Campana Group

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Region: AustralAsia

Myanmar

Thailand

Malaysia

LANDING POINTS: • Myanmar • Malaysia • Thailand

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


.com

Telecoms consulting of submarine cable systems for regional and trans-oceanic applications


NCP

Korea China

Japan

Taiwan

LANDING POINTS: • • • • • • •

Hillsboro, Oregon (USA) Chongming (China) Nanhui (China) Lingang (China) Busan (South Korea) Toucheng (Taiwan) Maruyama (Japan)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


USA

NEW CROSS PACIFIC [PLANNED] RFS Year:

2017

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms): Design Capacity: Channel Capacity: Owners:

System Supplier:

350,000,000 13,618

80 Tbps

100 Gbps

China Mobile, China Telecom, China Unicom, Chunghwa Telecom, KT Corporation, Microsoft, Softbank Mobile Corp TE SubCom

System Installer: TE SubCom

Region: Transpacific


NCSCS

NIGERIA-CAMEROON SUBMARINE CABLE SYSTEM RFS Year:

2015

Est. End of Service Date: 2040 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

30,000,000 1,100

40 Gbps

Design Capacity: 12.8 Tbps Fiber Pairs:

Owners: System Supplier:

6 Fiber Pairs

Cameroon Government, MainOne

Huawei Marine Networks, Nexans

System Installer: Huawei Marine Networks Region: EMEA

s

go La

Kribi

LANDING POINTS: • Kribi (Cameroon) • Lagos (Nigeria)


NEPTUNE CANADA

NEPTUNE CANADA RFS Year:

2007

Est. End of Service Date: 2032 Est. System Cost (US$):

Total Length (kms): Owners: System Supplier:

62,000,000 800

University of Victoria

Alcatel Submarine Networks

System Installer: Alcatel Submarine Networks Cableship:

Marine Surveyor:

Ile de Sein

NEPTUNE Canada

Region: Americas

P o r t A l b e r n i

LANDING POINTS: • Port Alberni (Canada)


NORSEA COM-1

Tysvaer

Lowestoft

NORSEA COM-1 RFS Year:

1999

Est. End of Service Date: 2024 Total Length (kms): Initial Capacity: Owners: System Supplier:

LANDING POINTS: • Lowestoft (United Kingdom) • Tysvær (Norway)

System Maintainer:

800

160 Gbps

North Sea Communications AS Alcatel AKN

TeliaSonera International Carrier AB

Region: EMEA


NORTHSTAR

Whittier

Valdez

Juneau

Nedonna Beach

NORTHSTAR RFS Year:

1999

Est. End of Service Date: 2024 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier:

LANDING POINTS: • • • •

Juneau (USA) Nedonna Beach (USA) Valdez (USA) Whittier (USA)

90,000,000 3,385

10 Gbps

Alaska Communications Systems Alcatel Submarine Networks

System Installer: C&W (Marine) Cableship:

System Maintainer:

Maersk Fighter, Fu Lai ACS Cable Systems

Region: Americas


ORVAL

ORVAL RFS Year:

2017

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms):

20,000,000 560

Design Capacity: 20 Tbps

Channel Capacity:

Owners:

System Supplier:

100 Gbps

Algerian Ministry of Post, Information Technology and Communications Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Region: EMEA

Valencia

Oran

LANDING POINTS: • Oran (Algeria) • Valencia (Spain)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


PAC

Grover Beach Tijuana

Mazatlán St. Croix

Puerto Viejo

Colon Fort Amadour

PAN-AMERICAN CROSSING RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

350,000,000 9,451

10 Gbps

Design Capacity: 3.2 Tbps Fiber Pairs:

2 Fiber Pairs

Channels: 16

Channel Capacity:

LANDING POINTS: • • • • •

Colon (Panama) Fort Amadour (Panama) Grover Beach (USA) Mazatlán (Mexico) Puerto Viejo (Venezuela) • St Croix (US Virgin Islands) • Tijuana (Mexico)

Owners: System Supplier: Cableship: Marine Surveyor: System Maintainer: Upgrader:

100 Gbps

Global Crossing

Tyco Telecommunications Agile

C&C Technologies

Level 3 Communications Ltd Xtera Communications

Region: Americas


PROJECT COMPLETION PHASES:

PALAU-GUAM

Survey

System Manufacture

System Installation

Guam

Pre-Engineering

Palau

PALAU-GUAM [PLANNED] RFS Year:

2017

Est. End of Service Date: 2042 Owners:

System Supplier:

LANDING POINTS: • Palau • Guam

Palau Telecoms

Xtera Communications

System Installer: IT International Telecom Region: AustralAsia

Commissioning & Acceptance


PAN-AM

Magens Bay Butler’s Bay

Baby Beach Battery Pratt

Barranquilla Punto Fijo Panama City

PAN AMERICAN RFS Year:

Lurin

Est. End of Service Date: 2024 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

LANDING POINTS: • • • • • • •

Arica (Chile) Baby Beach (Aruba) Barranquilla (Colombia) Battery Pratt (Panama) Butler’s Bay (St. Croix) Lurin (Peru) Magens Bay (Virgin Islands) • Panama City (Panama) • Punto Fijo (Venezuela) • Salinas (Ecuador)

1999

Arica

260,000,000 6,867

>10 Gbps

Design Capacity: 70 Gbps Fiber Pairs:

Owners:

Marine Surveyor: System Maintainer:

2 Fiber Pairs

Antel (El Salvador), AT&T, Cable Andino, CANTV (Venezuela), CNT, C&W, Embratel, Entel (Chile), Setar, Telecom Colombia, Telmex C&C Technologies

AT&T, Telefonica International Wholesale Services

Region: Americas


PANGEA

M å d e F a n ø

R e d c a r

L o w e s t o f t

B e v e r w i j k

PANGEA RFS Year:

2000

Est. End of Service Date: 2025 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

LANDING POINTS: • Beverwijk (Netherlands) • Fanø (Denmark) • Lowestoft (United Kingdom) • Måde (Denmark) • Redcar (United Kingdom)

Owners: System Supplier:

20,000,000 511

7 Tbps

Pangea Ltd

Alcatel Submarine Networks

System Installer: Nexans Cableship:

Marine Surveyor:

Pleijel Fugro

Region: EMEA


PANIOLO

PANIOLO Total Length (kms):

575

Region: AustralAsia

Kekaha Makahaii Kai Hawa Kaunakakai Maui Maui Hawaii

LANDING POINTS: • Kekeha, Hawaii (USA) • Makaha, Hawaii (USA) • Hawaii Kai, Hawaii (USA) • Kaunakakai, Hawaii (USA) • Maui, Hawaii (USA) • Hawaii, Hawaii (USA)


PC-1

Ajigaura Shima

LANDING POINTS: • Grover Beach (USA) • Harbor Pointe (USA) • Shima (Japan)


Harbor Pointe

Grover Beach

PACIFIC CROSSING 1 RFS Year:

2000

Est. End of Service Date: 2025 Est. System Cost (US$): 650,000,000 Total Length (kms): 20,910 Initial Capacity: 1.8 Tbps Design Capacity: 8.4 Tbps Fiber Pairs: 4 Fiber Pairs Channels: 20 Channel Capacity:

100 Gbps

Owners: NTT Communications System Supplier: Tyco Telecommunications Marine Surveyor:

C&C Technologies

System Maintainer: Alcatel-Lucent Submarine Networks Upgrader: Upgrade Year: Upgraded Capacity: Region:

Infinera 2013 40 Gbps, 100 Gbps Transpacific


PCCS

Jacksonville

Isla

na

hiba

is Hud

de Tortola Ver

orá

C Tera

Balboa

M

ar

ia

Ch

iq

ui

ta

Cartagena

PACIFIC CARIBBEAN CABLE SYSTEM RFS Year:

Manta

Est. End of Service Date: 2040 Est. System Cost (US$):

Total Length (kms):

• Jacksonville, Florida (USA) • Tortola, Virgin Islands (UK) • Isla Verde (Puerto Rico) • Hudishibana (Aruba) • Cartagena (Colombia) • Maria Chiquita (Panama) • Balboa (Panama) • Manta (Ecuador) • Tera Cora (Curaçao)

160,000,000 6,000

Design Capacity: 48 Tbps Fiber Pairs:

LANDING POINTS:

2015

Channel Capacity: Owners:

System Supplier: Marine Surveyor: Survey Boat:

6 Fiber Pairs 100 Gbps

Cable & Wireless Communications, Setar, Telconet, Telefónica Global Solutions, United Telecommunication Services Alcatel-Lucent Submarine Networks EGS

RV Ridley Thomas

Region: Americas


PEC

PAN-EUROPEAN CROSSING RFS Year:

1999

Est. End of Service Date: 2024 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Maintainer:

20,000,000 170

10 Gbps

Global Crossing

Level 3 Communications

Region: EMEA

Broadstairs Seaford

Veules-les-Roses

LANDING POINTS: • Bredene (Belguim) • Broadstairs (United Kingdom) • Seaford (United Kingdom) • Veules-les-Roses (France)

Brede


PLCN

Hong Kong

LANDING POINTS: • Hong Kong (China) • Los Angeles (USA)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


Los Angeles

PACIFIC LIGHT CABLE NETWORK [PLANNED] RFS Year:

2018

Est. End of Service Date: 2043 Est. System Cost (US$):

Total Length (kms):

400,000,000 12,800

Design Capacity: 120 Tbps Fiber Pairs:

5 Fiber Pairs

Channels: 240

Channel Capacity:

Owners: System Supplier:

100 Gbps

Pacific Light Data Communication, Facebook, Google TE SubCom

System Installer: TE SubCom

Region: Transpacific


PPC-1

Piti

Madang

PIPE PACIFIC CABLE RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity:

180,000,000 7,185

40 Gbps

2.56 Tbps

Owners: PIPE Networks Ltd.

System Supplier:

Tyco Telecommunications

System Installer: Tyco Telecommunications Cableship:

Upgrader: Upgrade Year: Upgraded Capacity:

Durable, Decisive Infinera 2012

100 Gbps

Region: AustralAsia

Sydney

LANDING POINTS: • Madang (Papua New Guinea) • Piti (Guam) • Sydney (Australia)


QATAR-UAE

QATAR-UAE RFS Year:

2004

Est. End of Service Date: 2029 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

10,000,000 208

20 Gbps

System Installer: e-Marine Cableship:

System Maintainer:

Etisalat

E-marine PJSC

Region: EMEA

Halul Das

LANDING POINTS: • Das Island (UAE) • Halul (Qatar)


PROJECT COMPLETION PHASES:

QUINTILLION SUBSEA

Pre-Engineering

Survey

System Manufacture

System Installation

Barrow Wainwright

Prudhoe Bay

Point Hope

Kotzebue Nome

QUINTILLION SUBSEA [PLANNED] RFS Year:

2017

Est. End of Service Date: 2041 Est. System Cost (US$):

Total Length (kms):

150,000,000 1,200

Design Capacity: 30 Tbps Fiber Pairs:

3 Fiber Pairs

Channels: 100

Channel Capacity:

Owners: System Supplier:

LANDING POINTS: • • • • • •

Oliktok (USA) Barrow (USA) Wainright (USA) Kotzebue (USA) Point Hope (USA) Nome (USA)

100 Gbps

Quintillion Subsea Holdings Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Cableship:

Marine Surveyor: Survey Boat:

Ile de Sein, Ile de Brehat Fugro Pelagos

Pacific Star, Dreamcatcher

Region: Americas

Commissioning & Acceptance


RJCN

RUSSIAN-JAPAN CABLE NETWORK RFS Year:

2006

Est. End of Service Date: 2031 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Maintainer:

N a k h o d k a

50,000,000 1,795

640 Gbps

Rostelecom

KDDI, OJSC “Rostelecom”

Region: AustralAsia

N a o e t s u

LANDING POINTS: • Nakhodka (Russia) • Naoetsu (Japan)


RNAL

Pusan

Wada

Toucheng Tong Fuk

REACH NORTH ASIA LOOP RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer:

LANDING POINTS: • • • •

Pusan (South Korea) Tong Fuk (Hong Kong) Toucheng (Taiwan) Wada (Japan)

Upgrader: Upgrade Year: Upgraded Capacity:

900,000,000 9,792

80 Gbps

6 Fiber pairs

FLAG Telecom, Level 3 Communications Global Cloud Xchange Ciena, Infinera 2011, 2014

40 Gbps, 100 Gbps

Region: AustralAsia


SAC

St. Croix

Puerto Viejo

Fort Amadour

Fortaleza

Lurin

Rio de Janeiro Santos

Valparaiso Las Toninas

SOUTH AMERICAN CROSSING RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

520,000,000 15,983

100 Gbps

Design Capacity: 4.84 Tbps Fiber Pairs:

LANDING POINTS: • • • • • • • • •

Fortaleza (Brazil) Fort Amadour (Panama) Las Toninas (Argentina) Lurin (Peru) Puerto Viejo (Venezuela) Rio de Janeiro (Brazil) Santos (Brazil) St Croix (US Virgin Islands) Valparaiso (Chile)

4 Fiber Pairs

Channels: 30

Channel Capacity:

Owners: System Supplier: System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

40 Gbps

Global Crossing

Alcatel Submarine Networks Level 3 Communications Infinera

2010, 2011

10 Gbps, 40 Gbps

Region: Americas


SACS

F o r t a l e z a

LANDING POINTS: • Luanda (Angola) • Fortaleza (Brazil)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


L u a n d a

SOUTH ATLANTIC CABLE SYSTEM [PLANNED] RFS Year:

2018

Est. End of Service Date: 2043 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

130,000,000 6,165

40 Tbps 40 Tbps

4 Fiber Pairs

Channels: 100

Channel Capacity: Owners: System Supplier:

100 Gbps

Angola Cables NEC

System Installer: NEC

Region: Transatlantic


SAEX

SOUTH ATLANTIC EXPRESS [PLANNED] RFS Year:

Virginia Beach

2019

Est. End of Service Date: 2044 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

350,000,000 17,230

48 Tbps

Design Capacity: 48 Tbps Fiber Pairs:

4 Fiber Pairs

Channels: 120

Channel Capacity:

Owners:

100 Gbps

SAEx International Limited

Region: Transatlantic

Fortaleza

LANDING POINTS: • Mtunzini (South Africa) • Yzerfontein (South Africa) • St Helena, • Ascension Island • Lagos (Nigeria) • Fortaleza (Brazil) • Virginia Beach, Virginia (USA)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


Lagos

Ascension Island

St Helena

Mtunzini Yzerfontein


SAFE

Sa

in

t-P

au

l

Baie du Jacotet

Durban Cape Town

LANDING POINTS: • Baie du Jacotet (Mauritius) • Cape Town (South Africa) • Cochin (India) • Durban (South Africa) • Penang (Malaysia) • Saint-Paul (Reunion)


Cochin Penang

SOUTH AFRICA-FAR EAST RFS Year:

2002

Est. End of Service Date: 2027 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

350,000,000 13,669

440 Gbps

Owners: France Telecom, Tata Communications, Telekom SA

System Supplier:

Tyco Telecommunications

System Installer: FCR Cableship:

System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

Vercors

Mauritius Telecom, Orange, TATA Communications, Telkom SA Limited, TM Berhad Alcatel-Lucent Submarine Networks 2014

40 Gbps

Region: Indian Ocean Pan-East Asian


SAM-1

SOUTH AMERICA-1 RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

650,000,000 24,140

160 Gbps

Design Capacity: 19.2 Tbps Fiber Pairs:

4 Fiber Pairs

Channels: 48

Channel Capacity:

Boca Raton

Owners: System Supplier: Marine Surveyor: System Maintainer:

San Juan

Puerto Barrios

Upgrader:

Puerto San Jose

Upgrade Year:

Barranquilla

Upgraded Capacity:

100 Gbps

Telefonica

Tyco Telecommunications C&C Technologies

Telefonica International Wholesale Services Infinera

2009, 2010, 2012

10 Gbps, 40 Gbps, 100 Gbps

Region: Americas

Salinas Mancora

Fortaleza

Lurin

Salvador Arica Santos

Valparaiso Las Toninas

Rio de Janeiro

LANDING POINTS: • • • • • • • • • • • • •

Arica (Chile) Barranquilla (Colombia) Boca Raton (USA) Fortaleza (Brazil) Las Toninas (Argentina) Lurin (Peru) Mancora (Peru) Puerto Barrios (Guatemala) Puerto San Jose (Guatemala) Rio de Janeiro (Brazil) Salinas (Ecuador) Salvador (Brazil) Sa


SAMOA-FIJI

SAMOA-FIJI [PLANNED] RFS Year:

2018

Est. End of Service Date: 2043 Est. System Cost (US$):

Total Length (kms): Owners:

57,400,000 1,300

Samoa Submarine Cable Company

Region: AustralAsia

Samoa

Fiji

LANDING POINTS: • • • •

Upolu (Samoa) Savai’I (Samoa) Suva (Fiji) Wallis and Futana

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


SAPL

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Oahu Hilo

SOUTH AMERICA PACIFIC LINK [PLANNED] RFS Year:

2018

Est. End of Service Date: 2044 Est. System Cost (US$):

Total Length (kms):

LANDING POINTS: • • • • • • • • • •

Oahu, Hawaii (USA) Balboa (Panama) Valparaiso (Chile) Jacksonville, Florida (USA) future connectivity to: Hilo, Hawaii (USA) Manta (Ecuador) Lima (Peru) Arica (Chile) Cuba Dominican Republic

460,000,000 14,200

Design Capacity: 30 Tbps Fiber Pairs:

3 Fiber Pairs

Channels: 100

Channel Capacity:

Owners: System Supplier:

100 Gbps

Ocean Networks

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks, IT International Telecom Region: Transpacific


Balboa Manta Lima Arica Santiago


SAPL CX

SOUTH AMERICA PACIFIC LINK CARIBBEAN EXPRESS [PLANNED] RFS Year:

Est. End of Service Date: 2042 Total Length (kms):

Jacksonville

2017 3,400

Design Capacity: 60 Tbps Fiber Pairs:

6 Fiber Pairs

Channels: 100

Channel Capacity:

Owners: System Supplier:

100 Gbps

Ocean Networks, Inc.

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Region: Americas

Panama

LANDING POINTS: • Jacksonville, Florida (USA) • Panama

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


SAS-1

SAUDI ARABIA-SUDAN RFS Year:

2003

Est. End of Service Date: 2028 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners:

20,000,000 333

1.28 Tbps

4 Fiber Pairs

STC (Saudi Arabia)

Region: EMEA

J e d d a h

P o r t S u d a n

LANDING POINTS: • Jeddah (Saudi Arabia) • Port Sudan (Sudan)


SAT-3

Sesimbra Chipiona

Alta Vista

Ab i Ac dja cr n a Co La to go no s u

Dakar

SOUTH ATLANTIC 3 RFS Year:

2002

Est. End of Service Date: 2027 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

370,000,000

Douala Libreville

Luanda

14,350

340 Gbps 800 Gbps

2 Fiber Pairs

Channel Capacity: 40 Gbps

Owners: Angola Telecom, AT&T, British Telecom, Camtel of Cameroon, CIT, Cote dIvoire Telecom, CPRM, C&W, France Telecom (12.08%), Ghana Telecom, Maroc Telecom of Morocco, Mauritius Telecom, Nigerian Telecommunications Ltd, Nitel (8.39%), OPT Benin, OPT Gabon, PT

System Supplier:

System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

Alcatel Submarine Networks

Angola Telecom, PT Comunicações S.A., Sonatel, Telefonica de España S.A.U., Telkom SA Limited, Vodafone Limited Alcatel-Lucent Submarine Networks 2014

40 Gbps

Region: EMEA

Melkbosstrand

LANDING POINTS: • • • • • • • • • • •

Abidjan (Ivory Coast) Accra (Ghana) Alta Vista (Spain) Chipiona (Spain) Cotonou (Benin) Dakar (Senegal) Douala (Cameroon) Lagos (Nigeria) Libreville (Gabon) Luanda (Angola) Melkbosstrand (South Africa) • Sesimbra (Portugal)


SCAN Hong Kong

SUBMARINE CABLE ASIA NETWORK RFS Year:

2011

Est. End of Service Date: 2036 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

Jakarta

LANDING POINTS: • Hong Kong • Indonesia

337,000,000 4,300

40 Gbps

Design Capacity: 1.92 Tbps Owners:

System Supplier:

PT. Fangbian Iskan Corporindo, Telemedia Pacific Inc. NEC

Region: AustralAsia


SCF-CN

SCF-CN RFS Year:

2007

Est. End of Service Date: 2032 Total Length (kms): Initial Capacity:

1,186

1.28 Tbps

Design Capacity: 1.28 Tbps Owners:

SCF (Group Loret)

Region: Americas

Basseterre

Martinique Port Castries

Kingstown Bridgetown Port Salines Redcar

LANDING POINTS: • Basseterre (St. Kitts & Nevis) • Bridgetown (Barbados) • Kingstown (St. Vincent) • Martinique (Martinique) • Port Castries (St Lucia) • Port Salines (Grenada) • Macqueripe (Trinidad and Tobago)


SCOTLAND-ORKNEY-SHETLAND

Shetland

Orkney

Scotland

SCOTLAND-ORKNEY-SHETLAND RFS Year:

2013

Est. End of Service Date: 2038 Est. System Cost (US$):

LANDING POINTS: • Scotland • Orkney • Shetland

Total Length (kms): Owners:

12,000,000 400

British Telecom

Region: EMEA


PROJECT COMPLETION PHASES:

SEABRAS-1

Pre-Engineering

Survey

System Manufacture

System Installation

New York

Commissioning & Acceptance

Fortaleza

SEABRAS-1 [PLANNED] RFS Year:

2017

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms): Design Capacity: Fiber Pairs:

509,000,000 10,750

72 Tbps

6 Fiber Pairs

Sao Paulo

Channels: 120

Channel Capacity: 100 Gbps

Owners: Seaborn Networks, Microsoft

System Supplier:

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Cableship:

Marine Surveyor: Survey Boat:

Ile de Sein Gardline

Sea Surveyor

Region: Americas

LANDING POINTS: • Sao Paolo (Brazil) • Fortaleza (Brazil) • New York, (USA)


SEACOM Mumbai

Djibouti

Mombasa Dar es Salaam

SEACOM RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

600,000,000 13,601

110 Gbps

Design Capacity: 4.2 Tbps

M

ap

ut

o

Owners:

M

tu

nz

in

i

LANDING POINTS:

• Abu Talat (Egypt) • Dar es Salaam (Tanzania) • Djibouti (Republic of Djibouti) • Maputo (Mozambique) • Mombasa (Kenya) • Mtunzini (South Africa) • Mumbai (India) • Zafarana (Egypt)

System Supplier:

Convergence Partners (12.50%), Herakles Telecom LLC (25%), Industrial Promotion Services (25%), Shanduka Group (12.50%), VenFin Limited (25%) Tyco Telecommunications SSI

System Installer: Tyco Telecommunications SSI Cableship:

System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

Durable, Decisive, Dependable, Resolute, Responder Seacom Ltd, E-marine PJSC Ciena 2013

100 Gbps

Region: Indian Ocean Pan-East Asian


SEAK

SOUTH EAST ALASKA RFS Year:

2008

Est. End of Service Date: 2033 Initial Capacity:

Owners:

10 Gbps GCI

Region: Americas

Juneau Hawk Inlet Angoon Sitka Petersburg Wrangell

Ketchikan

LANDING POINTS: • • • • • • •

Angoon (USA) Hawk Inlet (USA) Juneau (USA) Ketchikan (USA) Petersburg (USA) Sitka (USA) Wrangell (USA)


YOUR AD HERE

Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com

ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000

F E B-16

M A Y -16

A UG-16

NOV -17

I S S U E 1 7

I S S U E 1 8

I S S U E 1 9

I S S U E 2 0


SEA-ME-WE 3

RFS Year:

1999

Est. End of Service Date: 2024 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

1,500,000,000 39,622

40 Gbps

12.8 Tbps

2 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: SEA-ME-WE 3 Consortium

System Supplier:

Cableship:

Marine Surveyor: System Maintainer:

Upgrade Year: Upgraded Capacity:

Alcatel Submarine Networks, Fujitsu, Pirelli, KDD-SCS, Tyco Telecommunications

Agile, Maersk Defender, Maersk Fighter, Fresnel, Fu Lai, Nexus, Leon Thevinin, Vercors, Raymond Croze, Etisalat, Umm Al Anber C&C Technologies

British Telecommunications PLC, China Telecommunications Corporation, Chunghwa Telecom Co., Cyprus Telecommunications Authority, Deutsche Telekom AG, Hellenic Telecommunications Organization S.A., KDDI, KT Corporation, Oman Telecommunications Company, 2015

100 Gbps

Region: EMEA, Indian Ocean Pan-East Asian, AustralAsia

eb

SOUTH EAST ASIA-MIDDLE EAST-WESTERN EUROPE 3

Fujairah Jeddah

Se

Teutan

Mazara Marmaris Yeroskipou Chania Alexandria Suez

Al

Se

sim

br

a

G

oo

nh

ill y

Norden Oostende Penmarch

Djibouti

Kar


Na nh

Keoje

ui

Deep Water Bay

u to a an ip Sh Ta Pe Sat na un D ng a N an g

ou

Pyapon

Co

D chi La ehi n vi wa ni la a -M

Mumbai

nt

rachi

Medan

Tuas

Okinawa Toucheng Fangshan Batangas

Tungku Mersing

LANDING POINTS: • • • • • • • • • • •

Alexandria (Egypt) Al Seeb (Oman) Batangas (Philippines) Chania (Greece) Cochin (India) Da Nang (Vietnam) Deep Water Bay (Hong Kong) Dehiwala-Mount Lavinia (Sri Lanka) Djibouti (Republic of Djibouti) Fangshan (Taiwan) Fujairah (United Arab Emira

Perth


SEA-ME-WE 4

Marseille

An na Bi ba ze rte

Palermo

SOUTH EAST ASIA-MIDDLE EAST-WESTERN EUROPE 4 RFS Year:

2005

Est. End of Service Date: 2030 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

500,000,000 18,846

1.28 Tbps 12.8 Tbps

2 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: Algerie Telecom, Algeria, Bangladesh Submarine Cable Company Limited (BSCCL), Bangladesh, Bharti Airtel, CAT Telecom (Thailand), Du, France Telecom, Pakistan Telecommunication Company Limited, Pakistan, Saudi Telecom Company (STC), Saudi Arabia, Sri Lanka

System Supplier:

Alcatel Submarine Networks, Fujitsu

System Installer: Orange Marine Cableship:

System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

Alexandria Suez

Niwa, Descartes

E-marine PJSC, Orange, Singapore Telecommunications Limited, Sri Lanka Telecom Ltd, TATA Communications, Telecom Egypt, Telecom Italia Sparkle, TM Berhad, Verizon Ltd Alcatel-Lucent Submarine Networks, Mitsubishi Electric 2011, 2015

40 Gbps, 100 Gbps

Region: EMEA, Indian Ocean Pan-East Asian

Jeddah


Karachi

Cox’s Bazaar Mumbai Chennai

el

M

Colombo

Satun ak a

Tuas

LANDING POINTS: • • • • • • • • • • • • •

Alexandria (Egypt) Annaba (Algeria) Bizerte (Tunisia) Chennai (India) Colombo (Sri Lanka) Cox’s Bazaar (Bangladesh) Fujairah (United Arab Emirates) Jeddah (Saudi Arabia) Karachi (Pakistan) Marseille (France) Melaka (Malaysia) Mumbai (India) Mu


SEA-ME-WE 5

Marseille

An na Bi ba ze rte

Palermo Alexandria Suez

Jeddah SOUTH EAST ASIA-MIDDLE EAST-WESTERN EUROPE 5 RFS Year:

2017

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms): Design Capacity: Fiber Pairs:

1,000,000,000 20,000

24 Tbps

3 Fiber Pairs

Channels: 80

Channel Capacity: 100 Gbps

Owners: Bangladesh Submarine Cable Company Ltd, China Mobile International Ltd, China Global Telecommunications Limited, China Network Communications Group Co Ltd, Emirates Integrated Telecommunications Co, Orange, Myanmar Post and Telecom, PT Telekomunikasi Indo

System Supplier:

Alcatel-Lucent Submarine Networks, NEC

System Installer: Alcatel-Lucent Submarine Networks, NEC

Marine Surveyor:

Elettra

Region: EMEA, Indian Ocean Pan-East Asian


Karachi

Cox’s Bazaar Mumbai Chennai

LANDING POINTS: • • • • • • • • • • •

Marseille (France) Annaba (Algeria) Palermo (Italy) Bizerte (Tunisia) Jedda (Saudi Arabia) Fujairah (UAE) Karachi (Pakistan) Mumbai (India) Chennai (India) Colombo (Sri Lanka) Cox’s Bazar (Bangladesh) • Satun (Thailand) • Singapore (Singapore) • Ma

Ma Sin lac ga ca po re

Colombo

Satun


SEA-US

Hawaii Davao Guam City Manado

LANDING POINTS: • • • • •

Manado (Indonesia) Davao (Phillippines) Piti, Guam: Oahu Hawaii (United States) Los Angeles, California (United States)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


Los Angeles

SOUTH EAST ASIA-UNITED STATES [PLANNED] RFS Year:

2017

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms):

250,000,000 15,000

Design Capacity: 20 Tbps Fiber Pairs:

2 Fiber Pairs

Channels: 100

Channel Capacity:

Owners: System Supplier:

100 Gbps

Globe Telecom, GTA, GTI, Hawaiian Telcom, RTI, Telin, Telkom USA NEC

System Installer: NEC

Region: Transpacific


SEAX-1

SUPER SEA CABLE NETWORKS 1 [PLANNED] RFS Year:

2018

Est. End of Service Date: 2043 Total Length (kms): Fiber Pairs: Owners: System Supplier:

250

24 Fiber Pairs

Super SEA Cable Networks Pte., Ltd. Huawei Marine

System Installer: Huawei Marine Region: AustralAsia

Mersing Changi Batam

LANDING POINTS: • Changi (Singapore) • Mersing (Malaysia) • Batam (Indonesia)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


SEAX-2

SUPER SEA CABLE NETWORKS 2 [PLANNED] RFS Year:

2020

Est. End of Service Date: 2045 Total Length (kms): Fiber Pairs: Owners:

15,000

8 Fiber Pairs

Super SEA Cable Networks Pte., Ltd.

Region: Transpacific

Oregon

Hawaii Guam re

Singapo

Tawau

Jakarta

LANDING POINTS: • • • • • •

(Singapore) Jakarta (Indonesia) Tawau (East Malaysia) Guam (USA) Hawaii (USA) Oregon (North America)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


SEAX-3

SUPER SEA CABLE NETWORKS 3 [PLANNED] RFS Year:

2021

Est. End of Service Date: 2046 Total Length (kms): Fiber Pairs: Owners:

2,700

6 Fiber Pairs

Super SEA Cable Networks Pte., Ltd.

Region: Indian Ocean Pan-East Asian

Digha Cox’s Bazaar Ngweg Saun Satun alacca Medan M re Singapo

LANDING POINTS: • Digha (India) • Cox’s Bazaar (Bangladesh) • Ngwe Saung (Myanmar) • Satun (Thailand) • Medan (Indonesia) • Malacca (Malaysia) • Tuas (Singapore)

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


SG-SCS

Chaguaramas

Georgetown

Totness

SURINAME-GUYANA SUBMARINE CABLE SYSTEM RFS Year:

2010

Est. End of Service Date: 2035 Est. System Cost (US$):

Total Length (kms):

54,000,000 1,249

Design Capacity: 3.6 Tbps Fiber Pairs:

2 Fiber Pairs

Channels: 64

Channel Capacity:

Owners: System Supplier:

LANDING POINTS: • Macqueripe (Trinidad) • Georgetown (Guyana) • Totness (Suriname)

10 Gbps

Guyana Telephone and Telegraph Co. Ltd, Telesur of Suriname

Huawei Marine Networks, Nexans

System Installer: Global Marine Systems Limited, Huawei Marine Networks Cableship:

Sovereign

Region: Americas


SHEFA 2

Tórshavn

Maywick

Sandwick

Ayre of Cara

SHETLAND-FAROESE 2 RFS Year:

2008

Est. End of Service Date: 2033 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity:

27,000,000 828

Banff

20 Gbps

570 Gbps

Owners: Faroese Telecom

System Supplier:

NSW

System Installer: International Telecom Cableship:

Marine Surveyor: System Maintainer: Upgrader:

IT Intrepid Fugro

Faroese Telecom

Xtera Communications

Region: EMEA

LANDING POINTS: • • • • •

Ayre of Cara (UK) Banff (UK) Maywick (UK) Sandwick (Scotland) Tórshavn (Faroe Islands)


SILPHIUM

Chania

Darnah

SILPHIUM RFS Year:

2012

Est. End of Service Date: 2037 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

20,000,000 426

70 Gbps

Design Capacity: 1.2 Tbps Fiber Pairs:

3 Fiber Pairs

Channels: 40

Channel Capacity:

Owners: System Supplier:

LANDING POINTS: • Chania (Greece) • Darnah (Libya)

10 Gbps

Libyan Post, Telecom, and Information Technology Company Huawei Marine Networks, Nexans

System Installer: Huawei Marine Networks Region: EMEA


SJC

Chikura

Lantau

Nasugbu

SOUTH-EAST ASIA JAPAN CABLE RFS Year:

Tuas

Est. End of Service Date: 2038 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Channel Capacity: Owners:

System Supplier:

LANDING POINTS: • • • • • •

Chikura (Japan) Lantau (Hong Kong) Nasugbu (Philippines) Shantou (China) Telisai (Brunei) Tuas (Singapore)

2013 400,000,000 8,986

28 Tbps

6 Fiber Pairs 100 Gbps

SJC Consortium (Brunei International Gateway Sendirian Berhad, China Mobile, China Telecom, China Telecom (Hong Kong) International Ltd., Donghwa Telecom Co., Ltd., Globe Telecom, Inc., Google SJC Bermuda Ltd., KDDI Corporation, Singapore Telecom, Telin, TE SubCom, NEC

System Installer: S.B. Submarine Systems, NEC Upgrader:

Upgrade Year: Upgraded Capacity:

TE SubCom 2014, 2016 100 Gbps

Region: AustralAsia


SKR1M

SISTEM KABEL RAKYAT 1 MALAYSIA [PLANNED] RFS Year:

2018

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms):

100,000,000 3,500

Design Capacity: 4 Tbps Owners:

System Supplier:

TIME dotCom Bhd NEC

System Installer: Telekom Malaysia Region: AustralAsia

Sabah

Peninsular

Sarawak

LANDING POINTS: • Peninsular Malaysia • Sabah, Malaysia • Sarawak, Malaysia

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


SMPCS

Maluku

Sulawesi

Papua

SULAWESI-MALUKU-PAPUA CABLE SYSTEM RFS Year:

2015

Est. End of Service Date: 2040 Est. System Cost (US$):

Total Length (kms):

71,100,000 2,000

Design Capacity: 40 Gbps Owners:

System Supplier:

LANDING POINTS: • Sulawesi (Indonesia) • Maluku (Indonesia) • Papua (Indonesia)

PT Telekom (Indonesia)

NEC, Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks, NTT, NEC

Marine Surveyor: Survey Boat:

Fugro

Fugro Supporter

Region: AustralAsia


SMPR-1

ST. MAARTEN-PUERTO RICO 1 RFS Year:

2004

Est. End of Service Date: 2029 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Maintainer:

15,000,000 382

2.5 Gbps

Smitcoms

SMITCOMS

Region: Americas

S a n J u a n

LANDING POINTS: • San Juan (Puerto Rico) • St Martin (Netherlands Antilles)

S t . M a r t i n


SOCC

SOLOMONS OCEANIC CABLE NETWORK [PLANNED] RFS Year:

2018

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms): Owners: System Supplier:

54,000,000 827

Solomons Oceanic Cable Company TE SubCom

Region: AustralAsia

Noro

LANDING POINTS: • • • •

Honiara (Solomon) Sydney (Australia) Auki (Soloman) Noro (Soloman)

Sydney

Auki Honiara

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


SOLAS

SOLAS RFS Year:

2012

Est. End of Service Date: 2037 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners:

6,000,000 140

5 Gbps

Eircom

System Installer: Global Marine Systems Limited Cableship:

System Maintainer:

Wave Sentinel

Vodafone Limited

Region: EMEA

Kilmore Quay

Oxwich Bay

LANDING POINTS: • Kilmore Quay (Ireland) • Oxwich Bay (UK)


SOUTHERN CROSS CABLE NETWORK

Nedonna Beach Morro Bay Kahe Point

Suva Brookvale Alexandria

LANDING POINTS: • • • • • • • •

Alexandria (Australia) Brookvale (Australia) Kahe Point (Hawaii) Morro Bay (USA) Nedonna Beach (USA) Spencer Beach (USA) Suva (Fiji) Takapuna (New Zealand) • Whenuapai (New Zealand)

Takapuna Whenuapai

Spencer Beach


SOUTHERN CROSS CABLE NETWORK RFS Year:

2000

Est. End of Service Date: 2030 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

1,300,000,000 30,000

3.6 Tbps 14 Tbps

3 Fiber Pairs Segments A,C,G1,G2,I. 4 Fiber Pairs Segments D and F

Channels: 16

Channel Capacity: 100 Gbps

Owners: Southern Cross Cable Network

System Supplier:

Alcatel Submarine Networks, Fujitsu

System Installer: Alcatel Submarine Networks Cableship:

System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

Cable Innovator laid 13761 km, Nexus laid 3306 km, Vercors laid 10007 km. Fresnel laid 800 km Southern Cross Cables Limited, Verizon Ciena

2012, 2013

40 Gbps, 100 Gbps

Region: AustralAsia, Transpacific


SVALBARD

SVALBARD RFS Year:

2004

Est. End of Service Date: 2029 Est. System Cost (US$):

Hotellneset

Total Length (kms): Initial Capacity: Owners: System Supplier:

80,000,000 2,800

4.8 Tbps Telenor

Tyco Telecommunications, Nexans

System Installer: Global Marine Systems Limited Cableship:

Innovator

Region: EMEA

Andøy

LANDING POINTS: • Andøy (Norway) • Harstad (Norway) • Hotellneset (Norway)

Harstad


TANGERINE

B r o a d s t a i r s

O o s t e n d e

TANGERINE RFS Year:

2000

Est. End of Service Date: 2025 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs:

LANDING POINTS: • Broadstairs (United Kingdom) • Oostende (Belguim)

Owners: System Maintainer:

10,000,000 121

240 Gbps

96 Fiber Pairs

Level 3 Communications Level 3 Communications

Region: EMEA


PROJECT COMPLETION PHASES:

TANNAT

Pre-Engineering

Maldinado

Survey

Santos

System Manufacture

System Installation

Commissioning & Acceptance

TANNAT [PLANNED] RFS Year:

2017

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms):

50,000,000 2,000

Design Capacity: 90 Tbps Fiber Pairs:

Owners: System Supplier:

6 Fiber Pairs

Google, Government of Uruguay Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Cableship:

LANDING POINTS: • Santos (Brazil) • Maldonado (Uruguay)

Marine Surveyor:

Ile de Brehat EGS

Region: Americas


TASMAN GLOBAL ACCESS

TASMAN GLOBAL ACCESS [PLANNED] RFS Year:

2017

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms):

60,000,000 2,300

Design Capacity: 20 Tbps Fiber Pairs:

Channel Capacity: Owners: System Supplier:

2 Fiber Pairs 100 Gbps

Spark New Zealand, Vodafone, Telstra Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Cableship:

Ile de Re

Region: AustralAsia

ia

al r t s u

A

New Zealand

LANDING POINTS: • Australia • New Zealand

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


M

an

as

qu

an

TAT 14

Tuckerton

TAT-14 RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

400,000,000 15,453

160 Gbps

Design Capacity: 9.38 Tbps Fiber Pairs:

4 Fiber Pairs

Channels: 40

Channel Capacity:

Owners: System Supplier:

40 Gbps

TAT-14 Consortium

Mitsubishi Electric Corporation

System Installer: Global Marine Systems Limited Cableship:

Marine Surveyor: System Maintainer:

LANDING POINTS: • • • • •

Blaabjerg (Denmark) Katwijk (Netherlands) Manasquan (USA) Norden (Germany) Saint-Valery-en-Caux (France) • Tuckerton (USA) • Widemouth (UK)

Upgrader: Upgrade Year: Upgraded Capacity:

Cable Innovator, Cable Endeavour, Bold Endurance, Wave Sentinel, Subaru, Maersk Recorder, Maersk Forwarder, Sir Eric Sharp, Agile, Teliri, Fresnel, Vercors Fugro

AT&T, British Telecommunications PLC, Deutsche Telekom AG, KPN Telecom International, Orange, TeliaSonera International Carrier AB Mitsubishi 2012

40 Gbps

Region: Transatlantic


Blaabjerg

en d r h o t N k u o m ij e y w d t i a W Ba K ux a C -en y r e l -Va t n i a S


TE NORTH

Marseille

Cyprus

Alexandria

TELECOM EGYPT NORTH RFS Year:

2011

Est. End of Service Date: 2036 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

150,000,000 2,938

10 Tbps

Design Capacity: 20 Tbps Fiber Pairs:

8 Fiber Pairs

Channels: 25

Channel Capacity:

Owners: System Supplier: System Maintainer:

LANDING POINTS: • Abu Talat (Egypt) • Pentaskinos (Republic of Cyprus) • Marseille (France)

Upgrader: Upgrade Year: Upgraded Capacity:

100 Gbps

Telecom Egypt

Alcatel-Lucent Submarine Networks Telecom Egypt Infinera 2012

100 Gbps

Region: EMEA


TEAMS Fujairah

THE EAST AFRICAN MARINE SYSTEM RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

130,000,000 4,500

120 Gbps

Design Capacity: 1.28 Tbps Owners:

M om

ba s

a

System Supplier:

LANDING POINTS:

• Fujairah (United Arab Emirates) • Mombasa (Kenya)

Etisalat (15%), TEAMS Ltd. (85%) Alcatel-Lucent Submarine Networks

System Installer: e-Marine Cableship:

Marine Surveyor:

Niwa

Fugro

Region: Indian Ocean Pan-East Asian


TGN EURASIA Marseille

Alexandria Ras Sidr

Jeddah

Djibouti

LANDING POINTS: • Abu Talat (Egypt) • Djibouti (Republic of Djibouti) • Jeddah (Saudi Arabia) • Marseille (France) • Mtunzini (South Africa) • Mumbai (India) • Zafarana (Egypt)


i ba um M

TGN EURASIA RFS Year:

2009

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity:

250,000,000 9,240

160 Gbps

1.28 Tbps

Owners: SEACOM, Tata Communications, Telecom Egypt

System Maintainer:

TATA Communications, Tyco Electronics Subsea Communications LLC

Region: Indian Ocean Pan-East Asian


TGN GULF

Kuwait City

M

an

am

a

Al-Khobar Sumaisma

Dubai

TGN GULF RFS Year:

2011

Est. End of Service Date: 2036 Est. System Cost (US$):

Total Length (kms): Design Capacity: Fiber Pairs:

200,000,000 2,306

System Maintainer:

m

Seaco

1.28 Tbps

2 Fiber Pairs

Owners: Tata Communications

System Supplier:

Con

n to nectio

TE SubCom

TATA Communications, Tyco Electronics Subsea Communications LLC

Region: EMEA

LANDING POINTS: • Al-Khobar (Saudi Arabia) • Dubai (UAE) • Kuwait City (Kuwait) • Manama (Bahrain) • Sumaisma (Qatar)


TGN INTRA-ASIA

Toyohashi

Deep Water Bay

Ballesteros

Piti Vung Tau

Si n

ga po re

TGN INTRA-ASIA RFS Year:

Est. End of Service Date: 2034 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Channel Capacity: Owners: System Supplier:

LANDING POINTS: • Ballesteros (Philippines) • Deep Water Bay (Hong Kong) • Piti (Guam) • Singapore (Singapore) • Toyohashi (Japan) • Vung Tau (Vietnam)

2009 180,000,000 6,485

3.84 Tbps 100 Gbps

Tata Communications

Tyco Telecommunications

System Installer: Orange Marine

System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

TATA Communications, Tyco Electronics Subsea Communications LLC Ciena

2014`

100 Gbps

Region: AustralAsia


H

u m

a n

b y

TGN NORTHERN EUROPE

D e M a r n e

TGN NORTHERN EUROPE RFS Year:

2002

Est. End of Service Date: 2027 Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Maintainer:

LANDING POINTS: • De Marne (Netherlands) • Humanby (UK)

551

3.84 Tbps

4 Fiber Pairs

Tata Communications

TATA Communications, Tyco Electronics Subsea Communications LLC

Region: EMEA


YOUR AD HERE

Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com

ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000

F E B-16

M A Y -16

A UG-16

NOV -17

I S S U E 1 7

I S S U E 1 8

I S S U E 1 9

I S S U E 2 0


TGN TRANSATLANTIC

Wall Township

LANDING POINTS: • Highbridge (UK) • Saunton Sands (UK) • Wall Township (USA)


Highbridge Saunton Sands

TGN TRANSATLANTIC RFS Year:

2001

Est. End of Service Date: 2026 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

340,000,000 12,670

2.56 Tbps 50 Tbps

4 Fiber Pairs

Channels: 64

Owners: Tata Communications

System Supplier:

System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

Tyco Telecommunications TATA Communications, Tyco Electronics Subsea Communications LLC Ciena 2013

100 Gbps

Region: Transatlantic


TGN TRANSPACIFIC

E m i T o y o h a s h i

LANDING POINTS: • • • •

Emi (Japan) Hermosa Beach (USA) Nedonna Beach (USA) Toyohashi (Japan)


N e d o n n a B e a c h H e r m o s a B e a c h

TGN TRANSPACIFIC RFS Year:

2002

Est. End of Service Date: 2027 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs:

580,000,000 21,424

5.12 Tbps

8 Fiber Pairs

Channels: 96

Channel Capacity: 100 Gbps

Owners: Tata Communications

System Supplier:

System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

Tyco Telecommunications TATA Communications, Tyco Electronics Subsea Communications LLC Ciena 2014

100 Gbps

Region: Transpacific


TGN WESTERN EUROPE

Highbridge

Bilbao

TGN WESTERN EUROPE RFS Year:

2002

Est. End of Service Date: 2027 Est. System Cost (US$):

Seixal

Total Length (kms): Initial Capacity: Owners: System Supplier:

LANDING POINTS: • Bilbao (Spain) • Highbridge (UK) • Seixal (Portugal)

System Maintainer:

100,000,000 3,487

3.84 Tbps

Tata Communications

Tyco Telecommunications TATA Communications, Tyco Electronics Subsea Communications LLC

Region: EMEA


TGN-TATA INDIACOM

TGN-TATA INDIACOM RFS Year:

2004

Est. End of Service Date: 2029 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs: Owners:

90,000,000 3,175

640 Gbps

8 Fiber Pairs

Tata Communications

Region: Indian Ocean Pan-East Asian

Chennai

Changi

LANDING POINTS: • Chennai (India) • Changi (Singapore)


TGN-TIC

TGN-TIC RFS Year:

2005

Est. End of Service Date: 2030 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Fiber Pairs:

90,000,000 3,175

5.12 Tbps

8 Fiber Pairs

Channels: 64 Owners:

System Maintainer:

Tata Communications

TATA Communications

Region: Indian Ocean Pan-East Asian

Chennai

Tuas

LANDING POINTS: • Chennai (India) • Tuas (Singapore)


TIERRA DEL FUEGO

TIERRA DEL FUEGO RFS Year:

2012

Est. End of Service Date: 2037 Est. System Cost (US$):

Total Length (kms): Owners: System Supplier:

5,000,000 27

AR-SAT

Boskalis, Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Cableship:

Ile de Batz

Region: Americas

Punta Dungeness Espiritu Santo

LANDING POINTS: • Punta Dungeness (Argentina) • Espiritu Santo (Argentina)


TIS

THAILAND-INDONESIA-SINGAPORE RFS Year:

2006

Est. End of Service Date: 2031 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier:

36,000,000 1,003

30 Gbps

CAT Telecom (Thailand), PT Telekom, Singtel Tyco Telecommunications

System Installer: ASEAN Cableship

System Maintainer:

Songkhla

Region: AustralAsia

Batam

LANDING POINTS: • Batam (Indonesia) • Songkhla (Thailand)

Singapore Telecommunications Limited


TONGA-FIJI

Suva

Nuku’alofa

TONGA-FIJI RFS Year:

2012

Est. End of Service Date: 2037 Est. System Cost (US$):

Total Length (kms): Owners: System Supplier:

LANDING POINTS: • Nuku’alofa (Tonga) • Suva (Fiji)

18,900,000 827

Tonga Cable Limited

Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Region: AustralAsia


TPE

Q i n g d a o K e o j e C h o n g m i n g F u z h o u T a n s h u i

LANDING POINTS: • • • • • •

Chongming (China) Shin-Maruyama (China) Keoje (South Korea) Nedonna Beach (USA) Qingdao (China) Tanshui (Taiwan)


N e d o n n a B e a c h

TRANS-PACIFIC EXPRESS RFS Year:

2008

Est. End of Service Date: 2033 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

440,000,000 16,163

1.28 Tbps 5.12 Tbps

4 Fiber Pairs

Channels: 64

Channel Capacity: 100 Gbps

Owners: AT&T, China Telecom, China Unicom, Chunghwa Telecom International, KT Coropration, Verizon, NTT Com

System Supplier:

Tyco Telecommunications

System Installer: Global Marine Systems Limited, NTT Cableship:

System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

Cable Innovator

China Telecommunications Corporation, Chunghwa Telecom Co., KT Corporation, NTT Communications Corporation, Verizon Ltd TE SubCom 2013

10 Gbps

Region: Transpacific


TRIDENT

TRIDENT [PLANNED] RFS Year:

Singapore

2018

Est. End of Service Date: 2043 Est. System Cost (US$):

Total Length (kms):

290,000,000 4,600

Design Capacity: 28 Tbps Fiber Pairs:

Jakarta

2 Fiber pairs Perth-Singapore (8 Tbps), 1 fibre pair Perth-Jakarta (10 Tbps), 1 fibre pair OnslowJakarta (10 Tbps) and 1 fibre pair Perth-Onslow (10 Tbps)

Channels: Perth-Singapore 40, rest 100

Channel Capacity:

Owners: System Supplier:

100 Gbps

Trident Subsea Cable TE SubCom

System Installer: TE SubCom Region: AustralAsia

Onslow

Perth

LANDING POINTS: • • • •

Perth (Australia) Onslow (Australia) Jakarta (Indonesia) Singapore

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance


TSE-1

Fuzhou

New Taipei City

TAIWAN STRAIT EXPRESS RFS Year:

2013

Est. End of Service Date: 2038 Est. System Cost (US$):

Total Length (kms):

10,000,000 270

Design Capacity: 6.4 Tbps Fiber Pairs:

Owners:

LANDING POINTS: • Changle, Fuzhou City, China • Tamsui District, New Taipei City, Taiwan

8 Fiber Pairs

Taiwan International Gateway Corporation, China Mobile, Chunghwa Telecom, Taiwan Mobile, Far EasTone Telecommunications, China Unicom

System Installer: Huawei Marine Networks, NTT, S.B. Submarine Systems Region: AustralAsia


TUBROK-EMASED

Tobrok

El-Quawef

TUBROK-EMASED RFS Year:

2010

Est. End of Service Date: 2035 Est. System Cost (US$):

Total Length (kms): Design Capacity: Fiber Pairs:

10,000,000 180

25.6 Tbps

8 Fiber Pairs

Channels: 80

Channel Capacity: 40 Gbps

Owners: Libyan Post Telecommunications & Information Technology Company

System Supplier:

Huawei Marine Networks

System Installer: Huawei Marine Networks, Orange Marine Region: EMEA

LANDING POINTS: • Tobruk (Libya) • El Quawef (Libya)


TUI-SAMOA

PROJECT COMPLETION PHASES: Pre-Engineering

Survey

System Manufacture

System Installation

Commissioning & Acceptance

Samoa

Fiji Fiji

TUI-SAMOA [PLANNED] RFS Year:

2017

Est. End of Service Date: 2042 Est. System Cost (US$):

Total Length (kms):

57,400,000 1,470

Design Capacity: 8 Tbps

Channel Capacity:

Owners: System Supplier:

LANDING POINTS: • • • •

Samoa Wallis & Futana Vanua Levu, Fiji Suva, Fiji

100 Gbps

Samoa Submarine Cable Company Alcatel-Lucent Submarine Networks

System Installer: Alcatel-Lucent Submarine Networks Region: AustralAsia


TWA-1

Fujairah

Karachi Al Seeb

TRANSWORLD ASSOCIATES RFS Year:

2006

Est. End of Service Date: 2031 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier:

40,000,000 1,300

1.28 Tbps

Trans-World Associates

Tyco Telecommunications

System Installer: Tyco Telecommunications

System Maintainer:

Upgrader:

LANDING POINTS: • Al Seeb (Oman) • Fujairah (United Arab Emirates) • Karachi (Pakistan)

Upgrade Year: Upgraded Capacity:

E-marine PJSC, Oman Telecommunications Company Huawei Marine 2016

100 Gbps

Region: EMEA


P e n t a s k h i n o s

UGARIT

T a r t u s

UGARIT RFS Year:

1995

Est. End of Service Date: 2020 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners: System Supplier: System Maintainer:

LANDING POINTS: • Pentaskhinos (Cyprus) • Tartus (Syria)

16,000,000 240

622 Mbps

Cypress Telecommunications Authority Tyco Telecommunications

Cyprus Telecommunications Authority

Region: EMEA


UNISUR

F l o r i a n o p o l i s

M a l d o n a d o

L a s T o n i n a s

UNISUR RFS Year:

Est. End of Service Date: 2019 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Owners:

LANDING POINTS: • Florianopolis (Brazil) • Las Toninas (Argentina) • Maldonado (Uruguay)

1994

System Maintainer:

74,000,000 1,720

560 Mbps

Antel (Uruguay), Embratel, Telecom Argentina, Telefonica de Argentina Telefonica International Wholesale Services

Region: Americas


YOUR AD HERE

Contact: Kristian Nielsen | Tel: +1 (703) 444-0845 | knielsen@subtelforum.com

ALMANAC DOWNLOADS 530,000 520,000 510,000 500,000 490,000 480,000 470,000 460,000 450,000 440,000

F E B-16

M A Y -16

A UG-16

NOV -17

I S S U E 1 7

I S S U E 1 8

I S S U E 1 9

I S S U E 2 0


UNITY

Chikura

LANDING POINTS: • Chikura (Japan) • Los Angeles (USA)


Hermosa Beach

UNITY RFS Year:

2010

Est. End of Service Date: 2035 Est. System Cost (US$):

Total Length (kms): Initial Capacity: Design Capacity: Fiber Pairs:

300,000,000 9,486

1.92 Tbps 7.68 Tbps

8 Fiber Pairs

Channels: 96

Channel Capacity: 100 Gbps

Owners: Bharti Airtel, Global Transit, Google, KDDI, PACNET, Singtel

System Supplier:

Tyco Telecommunications

System Installer: NEC, Kokusai Cable Ship

System Maintainer:

Upgrader: Upgrade Year: Upgraded Capacity:

KDDI

Ciena 2013

100 Gbps

Region: Transpacific


VENTSPILS-GOTLAND

VETNSPILS-GOTLAN RFS Year:

2004

Est. End of Service Date: 2029 Total Length (kms): Initial Capacity: Fiber Pairs: Owners: System Supplier:

175

2.5 Gbps

34 Fiber Pairs Baltcom

TE SubCom

Region: EMEA

Stockholm

Stavsnas

Fårösund Ventspils

LANDING POINTS: • Fårösund (Sweden) • Stockholm (Sweden) • Ventspils (Latvia)


VMSCS

Catania

St. George’s Bay

VODAFONE MALTA-SICILY CABLE SYSTEM RFS Year:

2004

Est. End of Service Date: 2029 Est. System Cost (US$):

Total Length (kms): Initial Capacity:

LANDING POINTS: • Balluta (Malta) • Catania (Italy)

Owners:

10,000,000 250

10 Gbps

Vodafone Malta

Region: EMEA


WACS

WEST AFRICA CABLE SYSTEM RFS Year:

2012

Est. End of Service Date: 2037 Est. System Cost (US$):

Total Length (kms):

Whitesand Bay

Initial Capacity: Design Capacity: Fiber Pairs:

600,000,000 14,350 5.12

14.5 Tbps

4 Fiber Pairs

Channels: 32

Channel Capacity: Owners:

Sesimbra

System Supplier: Marine Surveyor:

Alta Vista

System Maintainer: Upgrader: Upgrade Year: Upgraded Capacity:

m La e go s

ra Lo Ac c

Douala

Pointe Noire Muanda • Accra (Ghana) • Alta Vista (Spain) • Cape Verde (Cape Verde) • Douala (Cameroon) • Lagos (Nigeria) • Lome (Togo) • Luanda (Angola) • Muanda (DRC) • Pointe Noire (Congo) • Sesimbra (Portugal) • Walvis Bay (Namibia) • Highbridge (UK)

Angola Cables, Broadband Infraco, Congo Telecom, C&W, MTN Group, Office Congolais de Poste et Telecommunication, PT Comunicações, Tata Communications, Telecom Namibia, Telekom SA, Togo Telecom, Vodacom Alcatel-Lucent Submarine Networks Fugro

Angola Cables, Telecom Nambia, Telkom SA Limited Huawei Marine Networks 2015

100 Gbps

Region: EMEA

Cape Verde

LANDING POINTS:

100 Gbps

Luanda

Walvis Bay


WARF

Cochin

Hulhumalé

WARF RFS Year:

2007

Est. End of Service Date: 2032 Est. System Cost (US$):

Total Length (kms): Owners: System Supplier:

LANDING POINTS: • Cochin (India) • Hulhumalé (India)

Marine Surveyor:

20,000,000 680

WARF Telecom International Alcatel Submarine Networks Fugro

Region: Indian Ocean Pan-East Asian


WESTERN VISAYAS-PALAWAN

Taytay

San Jose de Buenavista Iloilo

WESTERN VISAYAS-PALAWAN RFS Year:

2014

Est. End of Service Date: 2039 Est. System Cost (US$):

LANDING POINTS: • Taytay, Palawan • San Jose de Buenavista, Iloilo (Philippines)

Total Length (kms): Owners:

20,000,000 300

PLDT (Philippines)

Region: AustralAsia



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.