Special alloys changing how sulfuric acid plants are built and operated By: Nelson Clark, Joanes Barros, Matheus Sanchez, Bruno Ferraro, Gabriel Murakami, Lucas Camargo and Paulo Portilho, Clark Solutions, Brazil

Since the first industrial sulfuric acid plants were built in the early 1900s, very little change occurred in the materials used to handle the harsh conditions of the acid producing environment. More recently, the development and increased availability of special alloys has dramatically simplified the design and construction of the plants— small, skid-mounted plants can now be built and shipped to customers for installation with minimal field work and assembly.

Old school construction

The contact process was first patented in 1831, and the process variant for applying vanadium catalyst was developed by BASF in 1913. Until the late 20th century the materials of construction applied in sulfuric acid plants changed very little. But in the later years of the last century, the development of new alloys and special materials as well as a reduction in their costs led to innovation throughout the contact section of acid plants.

Oxidation converters

SO2 oxidation converters are the core of any sulfuric acid facility. As a general rule, they are large, cylindrical, vertical vessels (though Clark Solutions has used horizontal vessels on small skid mounted plants.) They house 3, 4, or 5 catalytic beds where the SO2 to SO3 oxidation reaction takes place when the gases contact vanadium-based catalyst at reaction temperatures that range from 380-650 degrees C (7151200 degrees F). The high temperatures associated with the presence of a small amount of water and a sulfur trioxide rich atmosphere make the converter environment extremely aggressive when temperatures fall below the dew point or there are steam/water leaks. Historically, the approach to handling the gases in these converters has been the use of a refractory brick lined carbon steel vessel shell coupled with high temperature resistant cast iron internals (support grids and posts). Although construction can be excellent and long-lasting, carbon steel and cast iron have some disadvantages. The mechanical resistance of carbon steel is strongly affected in the temperature range above 500 degrees C (900 degrees F). Cast iron may suffer deformation in temperatures above 650 degrees C (1200 degrees F) (although some cast iron, such as Meehanite™, can withstand higher temperatures). The industry and designers always aim to increase production with the smallest plant possible. This drove designs to increase SO2 concentration in the reactor PAGE 32

and thus increase operating temperatures. First pass bottoms operating above 620 degrees C (1150 degrees F) that were unusual in the mid 1900s became the new standard. Some plants, at the expense of fast catalyst aging, would operate at 650 degrees C (1200 degrees F) continuously. The prevalence of these shifts became possible with the popularization of different grades of stainless steels. The carbon steel and cast iron construction has slowly but steadily been replaced by special 304 stainless steel grades, more resistant to the thermal stress and corrosion than the carbon steel. The new material has also led the industry to change converter design. While in the past the first catalytic pass had to be placed on top of the reactor due to thermal stress and increases in pressure drop increase, stainless steel construction (not as affected by thermal stress as carbon steel) allowed the first pass to be positioned wherever it made more sense to the designer. Many designers chose to install the first catalytic bed at the bottom of the reactor to simplify. Also, superheaters could be located on the ground level, which saved on ducting and supports. The heavy duty high temperature resistant cast iron castings used for catalyst support and internals of the converter have also been replaced by special grades of 304 or 321 stainless steel, the latter in the hotter areas. With proper design, the new materials of construction allowed the refractory brick to be partially or completely eliminated, depending on process conditions, making the vessels cheaper and lighter than prior versions.

Gas-gas heat exchangers

Another traditional piece of equipment in double absorption plants that has benefited from improved and more accessible materials is the gas-gas heat exchanger. Heat exchangers cool the gases prior to entering the interpass absorption tower while at the same time re-heating the cold gases exiting the absorption tower. In the hot side of the exchanger temperatures and SO2/SO3 laden gas are the challenges; on the cold side acid mist and SO3 slippage are potential problems. In a way, the same problems afflicting the converter affect hot gas-gas heat exchangers. Temperatures that could surpass 500 degrees C (900 degrees F) and the SO3 laden gas requires that hot heat exchangers use high temperature resistant materials of construction. An early solution was metallized carbon steel, a strategy to make the base material bear the hot and harsh conditions. The metallization process is

extremely difficult, though, and if done improperly can actually shorten tube life. What happened with hot gas-gas heat exchangers has its parallel in cold gas-gas exchangers. For nearly one century gas-gas heat exchangers have been built in plain carbon steel. The material selection is perfect and should last a very long time with regular design operating conditions of the exchanger. The only problem is that actual operation does not always go by the book. When engineers design a plant, they choose materials that operate at the design conditions. The problem with these designs is the non-expected operating conditions: low capacity operation, poor air/gas drying performance, unexpected mist carryover from the interpass absorption, improper SO3 absorption, and water or steam leakage. When one of these conditions exist, the cold exchangers are pushed beyond their design limits. Hot, strong, and corrosive acid will completely change the dynamics of corrosion. When this happens, the consequences are the same: accelerated corrosion, sulfate formation and pressure drop build up, gas leaks, increased emissions, reduced capacity, and earlier than expected plant shut down. This is why cold gas-gas heat exchangers are among the most frequent maintenance items and shutdown drivers in a double-absorption plant. The answer? Stainless steel construction in gas-gas heat exchangers increases equipment life, reduces corrosion and sulfate formation in upset conditions, and saves money on cleaning and maintenance. When properly designed and operated, stainless steel exchangers last longer and will pay for the extra cost on a “total cost of ownership” basis.

Strong acid piping

For more than a century hot strong sulfuric acid piping was designed and built using cast iron piping and connections. Cast iron grades changed from place to place, from country to country. Some places use 250# class piping and fittings to provide extra wall thickness for corrosion. Conventional cast iron fittings and gravity cast parts have chaplets to separate the molds—another weak point that in many situations is the starting point of a leak. In the end, the corrosion resistance of cast iron allied to the thick walls has for a long time been the only option to strong acid piping despite the natural shortfalls. Thus, the development of special alloys and steels, such as Clark solutions CSX™ family of high silicon stainless steels, was very welcome. Special alloys are designed to operate with corrosion rates below 0.02-0.04

Corrosion of different alloys.

CSX™ Isocorrosion curve.

mm/year (1-2 mils/year), while even the best cast irons will show corrosion rates at average transport velocities in the range of 0.15-0.30 mm/year (5-10 mils/year). The thick walls guarantee a long lifetime, at expense of substantial iron being captured by the acid. As an example, while some of the most frequently used cast irons have wall thicknesses as high as 22 mm (0.9 in), CSX piping uses wall thicknesses of 4 mm (0.2 in) or 6 mm (0.3 in) while still providing 20 or more years of service. The thinner walls make special alloy piping lighter, but this is not the only advantage. Cast iron piping is generally operated with acid at velocities of 1.0-2.0 m/s. Corrosion rates on cast iron increase with transport velocity. CSX and special alloy piping are normally designed for around 3 m/s for long runs and 5 m/s for short runs. The special alloys’ corrosion rates are not sensitive to transport velocity, so the design is limited only by acceptable pressure drop. Another advantage is welding capability. Welded lines substantially reduce the number of flanges used, which significantly reduces the risk of leaks at flanged connections. Even better, in the event of a leak or failure special alloy lines can be locally welded. No cranes, no replacement of large parts, no new gasketing or tightening. This saves a huge amount of time and energy when compared to cast iron lines, which may cost one or two days of production loss. In Brazil, where Clark Solutions designed and replaced cast iron pipelines with CSX, the customer reported gains in plant operation and up to 60-80% less downtime compared to prior operation. Sulfuric Acid Today • Spring/Summer 2021