Maribor 2012 European Capital Of Culture architectural ideas competition
Group 2 - New footway and bicycle bridge
site constraints
shape evolution
surface
structure
walk shape
main spine generated surface
PROCESS
98143/2
site constraints - banks height and boat corridor
transverse ribs
promenade surface
surface slope analysis
supporting spines
definition of the main shape according to the cosntraints and the slope
contemplation surface
triangulation of the structure
overall view of the structure optimal walking shape definition
surface subdivision
resulting surface
cross sections 1/100
256,0 boat path clearance 20m x 3.60 m
Drava
Lent
longitudinal section 1/200
plan 1/200
Tabor
Maribor 2012 European Capital Of Culture architectural ideas competition
Group 2 - New footway and bicycle bridge urban scale flow existing stage
river position projected stage
existing stage
p o o
l
footbridge / surroundings relations
projected stage
BACKGROUND
98143/2