TSUIKOTSU BUILDING Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles 10.06.2022ARC20001
Design BriefComposite area Spray & wet MakerPhotographyroomspacespace/breakout assembly Kiln & ceramics space Special projects space Heavy duty / large storage Individual persons storage Kitchen (place of inter-disciplinary crossover)
3Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO 2 4 Design Focal Points
Connection between TB & TC buildings and the commu nal kitchen should foster interdisciplinary collaboration and great quality / creative design by students.
All views overlook the park adjacent to the site, promoting a spectacular scene directly across the road.
The 3 stories allows enough room for new machinery and additional expansion as technologies and machinery become obsolete and upgraded.
The open-plan layout of the building allows Swinburne staff to manipulate the space so that the needs of each area and what it requires within it are met.
The large storage areas and open lobby will help the university to facilitate its expansion into larger and more ambitious projects.
Jones | Liam
Ashlee CarterBenefits2 to University
The bold, interesting architectural form / tectonic pro motes and showcase Swinburne University’s advancements in design, innovation and technology.
| Sophie Miles ARC20001 STUDIO
4Cori Emmolo |
5Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO 2 Site Plan
6Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO 2 Site Photos
7Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Tectonic2 System GLUELAM BEAMS (300 X 100) VERTICAL BEAMS (100 X 100) PRE-FAB TRUSS SYSTEM: DIAGONAL BEAMS (100 X 100) HORIZONTAL BEAMS (100 X 100)
8Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Relation2 to Archery Hall Creation of Tectonic in relation to Archery Hall Precedent Study
9Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Relation2 to Archery Hall Glue Laminated Beams Adapted to short curvatures of roof (short sections) Vertical Beams Removed the 4x Vertical Sets to 2x Vertical Sets to simplify the Horizontalstructure Beams Adapted to follow longitudinal curvature of roof (long sections) Additional Diagonal Beams Support connection between vertical beams Removal of Blue Horizontal Beams Removed to simplify the structure
10Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Relation2 to Archery Hall New OriginalDesignArchery Hall Short Roof Section
11Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Relation2 to Archery Hall Long Roof Section New OriginalDesignArchery Hall
12Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO 2 Sun6amDiagramsatSummerEquinox 12pm at Summer Equinox 3pm at Summer Equinox
13Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Existing2 Window Diagram EXISTING WINDOWS 2ND FLOOR EXISTING WINDOWS 3RD FLOOR REMOVED TO MAKE ENTRANCES KEPT INTERNAL WINDOW 2ND FLOOR LINE OF SITE 3RD FLOOR LINE OF SITE MOST OF THE EXISTING BUILDINGS WINDOWS HAVE BEEN GIVEN AN OFFSET GAP TO MAINTAIN THEIR DIERECT SUNLIGHT THIS WAS DONE OUT OF CONSIDERATION FOR THE EXISTING BUILDINGS, SPACES AND PEOPLE THE GAP BETWEEN THE WORKSHOP AND THE TC & TB BUILDING IS AROUND 2.5M
14Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Massing2 Diagram Area= 71 m² Area= 44 m² Area= 154 SECONDm² FLOOR Area= 44 m² FIRST FLOOR 08 Area= 12 m² 07 Area= 107 m² 06 03 09 6. Kitchen & Student Lounge 7. Maker Space 01 1. Voyer & Function Space 2. Ceramics Area 3. Meeting Room 4. Study Area 5. Bathroom 02 Area= 12 m² 8. Exhibition Space & Photography Studio 9. Lobby & Seating 10. Terrace 11. Study Area 12. Bathroom 05 EXPLODED AXONOMETRIC FLOOR LAYOUT Area= 187 m² SPLIT LEVELS 04 Area= 69 m² Area= 78 m² Area= 183 m² 11 Area= 185 m² 12 10
15Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Spatial2 Flow Diagram MAKER SPACE TOOL(ISSOLATED)METTINGSTORAGEROOM TOILETS TOILETSSPECIAL(ISSOLATED)TERRACEPROJECT / PHOTO KITCHENSTUDIO/STUDENT / STAFF LOUNGE VIEW CERAMICS LIFT X 3 STAIR PEOPLE ENTRANCE INDERVIDUAL STORAGE (INTERNAL FLOW) LARGE (INTERNALSTORAGEFLOW) DELIVERY DROP OFF LOBBY / GREETING AREA DROP OFF FLOW LIFTS X STORAGES3 INTERNAL FLOW PEOPLE ENTRANCE FLOW KITCHEN RELATIONSHIP TO STAIRS & INTERDICIPLINARY COLAB VIEW TERRACECONNECTION&METTING ROOM ISSOLATED
16Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Ground2 Floor Plan
17Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO 2 2nd Floor Plan
18Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO 2 3rd Floor Plan
19Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Elevations2 15m0m 5m 30m
20Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Elevations2 0m15m 5m 30m
21Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Sections2
22Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Sections2
23Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO 2 Roof System Detail 2 0M 3 1.5M 3MTECTONIC0.5M DETAIL 4 6 8 5 71011 - 50x25mm ROOF BATTENS @ 450 CTRS SUPP. SLATE TILED ROOF 2- 2 x 300 x 100mm RAFTERS 3 - PRE-FAB. TRUSS 4 - NUT AND BOLT JOINING RAFTERS TO VERTICAL BEAMS 5 - 20mm LINING BOARD CEILING FINISH 6 - WATER BARRIER 7 - R 3.5 INSULATION 8 - ROOF BATTENS 9 - NAILS ATTACH FROM LINING BOARD CEILING TO RAFTERS 10- NUT AND BOLTS JOINING TRUSS SYSTEM TOGETHER 9
24Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO 2 Roof Construction Process
25Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Renders2
26Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Renders2
27Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Renders2
28Cori Emmolo | Ashlee Jones | Liam Carter | Sophie Miles ARC20001 STUDIO Renders2