Modul 2 - Mengenal Elemen-Elemen Kompetensi QS Di Dalam Periode Proyek

Page 1

Modul 2: Mengenalpasti ElemenElemen Kompetensi QS Di Dalam Lifecycle Proyek


Pengurusan Proyek ‘Project Life Cycle’ Facilities Management / Maintenance Management/Operations Management

Project Management Project Manager Design Process Management (Consultants/s.o) Design Development Feasibility study

Tender Award

Facilities/Maintenance/Operations Manager

Construction Project Contract Management (Contractor) Construction

Handover

Construction Management Documentation & Tendering

(Construction Manager)

(Construction Costing) (Project Costing) (Life Cycle Costing)

Defects Liability period

Decommissioning


Kejayaan/Kegagalan Proyek TIME

Terlaksana Semua Perjanjian & Hutang

QUALITY

Client & Customer Satisfaction

Menjaga Alam Sekitar

COST Keselamatan & Kesehatan


Aktivitas-aktivitas Pengurusan Proyek Di Dalam Jangkahayat Proyek CONCEPTUAL

Feasibility Study

DESIGN DEVELOPMENT

Schematic Design

Detail Design

TENDERING

Tender Documentation

Client’s Brief

CONSTRUCTION

Construction Site Management

PROJECT HAND OVER

Testing & Commissioning

Time

Appoint Consultant

Specifications

Cost Tendering Site Investigation

Project Planning (Project Objectives)

Conceptual Design

Detail Cost Estimate

Quality

Project Handover

Health & Safety Authorities Approval

Environment Tender Evaluation

Preliminary Estimate

Defects Liability Period (DLP) Management

Contract Administration Budget Allocation

Cost Planning

Elemental Cost Analysis

Tender Award

Project Monitoring

Close-Out


KEBERHASILAN/ KEGAGALAN SEBUAH PROYEK

Design

Construction Detail Design & Specifications

Schematic Design

(1)* • Time • Cost • Quality • Health & Safety • Environment

(2)* • Contract Sum • Claims & Payments • Variations • Extension of Time • Determination • Completion • Etc.

Construction Management (1)

Elemental Cost analysis

Contract Administration (2)

Authorities Approval

Project Success or Failure

Project Monitoring

Detail Cost Estimate/Pre-tender Estimate

Start Conceptual Design Preliminary Estimate Clients’ Brief Planning

Budget Allocation Site Tender Investigation Award Consultant Appointment Tender Cost Planning Exercise

Feasibility Study

Inception

Tender Evaluation Tender Documentation

Tendering

Testing & Commissionin g DLP Management

Hand Over

Final Account

Close Out


Simulasi 1: Simulasi 1: 1. Buat list permasalahan utama yang timbul dalam pengurusan proyek anda 2. Menggunakan kerangka aktivitas pelaksanaan proyek (harap merujuk bahan rujukan simulasi), tandakan aktivitas-aktivitas proyek yang tidak /kurang dijalankan dalam pelaksanaan proyek anda yang menjadi penyebab timbulnya masaalah-masalah ini.


Bahan Rujukan Simulasi (1) Design

Construction Detail Design & Specifications

Schematic Design

(1)* • Time • Cost • Quality • Health & Safety • Environment

(2)* • Contract Sum • Claims & Payments • Variations • Extension of Time • Determination • Completion • Etc.

Construction Management (1)

Elemental Cost analysis

Contract Administration (2)

Authorities Approval

Project Success or Failure

Project Monitoring

Detail Cost Estimate/Pre-tender Estimate

Start Conceptual Design Preliminary Estimate Clients’ Brief Planning

Budget Allocation Site Tender Investigation Award Consultant Appointment Tender Cost Planning Exercise

Feasibility Study

Inception

Tender Evaluation Tender Documentation

Tendering

Testing & Commissionin g DLP Management

Hand Over

Final Account

Close Out


Bahan Runjukan Simulasi (2) CONCEPTUAL

Feasibility Study

DESIGN DEVELOPMENT

Schematic Design

Detail Design

TENDERING

Tender Documentation

Client’s Brief

CONSTRUCTION

Construction Site Management

PROJECT HAND OVER

Testing & Commissioning

Time

Appoint Consultant

Specifications

Cost Tendering Site Investigation

Project Planning (Project Objectives)

Conceptual Design

Detail Cost Estimate

Quality

Project Handover

Health & Safety Authorities Approval

Environment Tender Evaluation

Preliminary Estimate

Defects Liability Period (DLP) Management

Contract Administration Budget Allocation

Cost Planning

Elemental Cost Analysis

Tender Award

Project Monitoring

Close-Out


Bahan Runjukan Simulasi (2) CONCEPTUAL

Feasibility Study

DESIGN DEVELOPMENT

Schematic Design

Measuring Detail Design

TENDERING

Tender Documentation

Client’s Brief

CONSTRUCTION

Construction Site Management

PROJECT HAND OVER

Testing & Commissioning

Time

Appoint Consultant

Specifications

Cost Tendering Site Investigation

Project Planning (Project Objectives)

Budget Allocation

Conceptual Design

Detail Cost Estimate Authorities Approval

Preliminary Estimate

• • • • • Tender • Evaluation •

Quality Contract Sum Health & Safety Claims & Payments Variations Extension of Time Environment Determination Completion Etc.

Project Handover

Defects Liability Period (DLP) Management

Contract Administration * Cost Planning & Life Cycle Costing

Elemental Cost Analysis

Tender Award

Project Auditing

Final Account