'Ð
41,
'à .1,'
.4
,t
...q
,
l',r i '.)r tr.|t,
'itit
il',l
',,1,
,.I
,,:
r:.
"t
.
ffi,'
ht\
OSAGE STATION
!
1$F
t¿.
1I
Ài
z
I
ll
.r1
ta
I',l
It
t
t
t
t
É.
iÞs¡¡
t-:',
v
7
t
t
RENEE MORGAN MAYOR NEWETL ARNERICH VICE MAYOR LISA BtACKWEtt COUNCILMEMBER KAREN STEPPER COUNCI LMEMBER ROBERT STORER COU NCI LM EM BER
IOSEPH A. CATABRIGO TOWN MANACER
IANI HA FINANCE
MANACER/TREASURER STEVEI{ C. tAKE DEVELOPMENT SERVICES DIRECTOR/CITY ENCINEER
Table of Contents OPERATING BUDGET BUDGET & CIP MESsAGE..,.
|-xvil
DIRECTORY OF PUBLIC OFFICIALS
.,........1
SERVICE DELIVERY sTRUCTURE.................
,.........2
VISION AND M¡sSION
...3
THE COMMUNITY
...4
TOWN OF DANVILLE 5TATISTICS.....
..........5
SUMMARIES
Financial Personne[ 5ummaries......... G EN
ERAL GOVERN M8NT...........
Town Counci[.. Town Manager City Attorn ey ..................... City Cterl<. Community Outreach Emergency Prepared ness
....7
23 ...29 30 ....32 34 36 38 40
POLICE SERVICES
43
Po[ice 5ervices Managemeht....,.......... Patro[.... Traffic....... I nvesti gati ons............ School Resource Program... AnimaI Contro[......... ADMI NISTRATIVE 5ERVICES.........
Administrative Services
Management.........
Finance.....
nformation Tech notogy. Human Resources Economic Development...., Business Promotion Funds Risk Management....... lnterna[ 5ervices... Asset Rep[acement .............. I
44 46 48 50 52 54 57 ........58 60 62
64 66 68 70 72
74
\\'\\'\\'.(l;il
ì\,1 I l( -(
lì.g()\
Table of Contents DEVELOPMENT 5ERVICE5....,.......
Devel'opment Services Management............. Planning... Buitding...... Code Enforcement.. Engineering....... Capitat Project Management ................ Tra ns po rtatio n............ C[ean Water Program....... MAINTENANCE SERVICES Maintenance Services Management ..... Buil.ding Maintenance ............. Parl< Maintenance Roadside Maintenance .......,...... Street Maintenance .................... Street Light Maintenance Traffic Signat Maintenance ............. Equipment RECREATION, ARTS & COMMUNITY SERVICES ..... Recreation, Arts Community Services Mgmt Sports & Fitness
I
Facilities Management CutturaI Arts ........... Youth Services Teen Services Adul.t Services Senior Services Library Services Community Events
..
81 82 84 86 88 90 92 94 96 ....99 ..100
to2 to4 106 108 110 7L2
It4 ..............717 ..............118
..............120 ..............122
t24 t26 !28 130 ...........132 ...........]-34 ...................L3 6
SUCCESSORAGENCY
..t39
ASSE5SM ENT DISTRICTS .,..
..1.43
TEN YEAR FORECAST.....................
..747
'175 MASTER FEE SCHEDUTE
ffi
XXX
\\'\\'\\'.(11ìr ì\'l
I
l(
( :l-g()\
Table of Contents CAPITAT IMPROVEMENT PROGRAM
oVERVIEW
..........ctP1
SUMMARY TABLES Project Activity..... crPs N ew Projects................ crP6 Summary of Planned Appropriations .............Tab[e A............ clPT Summary of Recommended Ceneral Purpose Revenue Appropriations .......... Summary of Appropriations by Funding .. Tabte C. ............C1p10 summary of compteted Projects from Prior Fiscal Year........Tabte D .............c1p11 Summary of Estimated CIP Fund Acrivity.............. .Tabte Ë clP12 Summary of Projects Funded Prior to ....Tabte F clP13 Project Status and Priority Project Cost Summary by Park Site.................... .. Tabl.e H..............C1 P19 Project Cost Summary by Buitding 5i1e..................... Downtown Projects Cost Summðry............. Proposed Green lnfrastructure Projects
........
Source
2OL6lt7
PAVEMENT MANAGEMENT PROGRAM Projects Contributing to Overall Town Pavement
Condition lndex
ïabte
L ..............C1 P27
PRO¡ECTS GeneraI lmprovements by Project Number Generat lmprovements by Project Name.... Parl<s and Facitities by Project Number....... Parl<s and Facitities by Project Name Transportation by Project Number.... Transportation by Project Name
NUM8ER.......... NAME
INDEX BY PRO¡ECT INDEX BY
ffi
...c1P29 ... ctP30 ... ...
...;...........
ctPss ctPs6 clP89 clP90
CIP123
c¡p125
tvrr'r.'.,11,r,r',
ll, .,-:,.g,1
br I
\r
Budget 6{- CIP Message
l
t,
ADMINISTRATIVE STAFF REPORT
TO:
Mayor and Town Council
SUBJECT:
Resolution No. 49¡-2017: approving the setting the 2077f18 Appropriation LimiÇ
7.2
1une6,2017 20L7f1.8
Operating Budget and
Resolution No. 50-2017: approving the 201ff18 through 202A22 Capital Improvement Program and appropriating funds for 207ry18 capital projects; Resolution No. 57-20175A: approving the 2017f18 Operating Budget for the Successor Agency to the former Community Development Agency of the Town of Danville; and, Resolution No. 52-2077, approving the 201f18 Master Fee Schedule for User and Cost Recovery Fees
SUMMARY / 18 Operating Budget and Capital Improvement Program ("Budget and CIP") continue to reflect the careful financial pla4ning that has been the Town's hallmark. All planned services address the Town's highest priorities as established by the Town Council. The Budget is balanced, prudent reserves continue to be maintained, and tenyear forecasts show that Danville is holding to a course that is fiscally sustainable. T}lre 2017
For 2017/ 18, total revenues of fi36,197,665 are forecast, including fi34,01.6,068 for the Town and fi2,181.,597 for the Town as Successor Agency to the former Community Development Agency. Total operating expenditures of 932,893,454 are recommended,
including
ç31.,71'1.,857
for the Towrç and fi1,18L,597 for the
Successor Agency.
Recommended capital appropriations for 2017 /18 total 912,722,191.
BACKGROUND Service Priorities
"Smøll Town Atmosphere, Outstønding Quølity of Life'- Danville is dedicated to this vision. The mission of the Town Government is to deliver superior municipal services that make people's lives better. In order to achieve this missiory we:
. ' ' '
Keep residents, businesses and property safe Provide well-maintained public facilities Protect our environment, preserve our history and retain our special character Provide opportunities that support residents' growth and enrichment
. ' ' .
Promote and support economic vitality and growth Represent and promote Danville's best interests Celebrate corrununity tluough farnily-uriented sÂĄlecial events Effectively engage and communicate with residents and businesses
This is why our Town goverrunent exists. Fiscal Approach
Danville
is
committed
to
maintaining long-term fiscal sustainability through
conservative management practices as well as operation of an effective and cost efficient local government. Municipal services address the highest priority needs and are delivered through a combination of Town personnel, contracted and privalized sources, as well as partnerships with other entities. Services continue to be enhanced through increased use of technology.
This ongoing approach to fiscal management has produced the following positive outcomes:
. . . . .
Balanced annual budgets with no unfunded future liabilities and no OPEB costs; Carefully managed expenditures resulting in positive year-end fund balances; Annual General Fund transfers to fund high priority capital projects; Maintaining healthy operating and capital reserves; and Rolling ten-year forecasts which illustrate ongoing fiscal sustainability.
Revenue Trends
Danville is a mature coffununity. \tVhile much growth and change has and continues to occur outside of and around Danville, the Town itself has experienced minimal growth and change over the past decade and a half. The Town's major revenue sources reflect this stability, with modest growth averaging approximately 2.0o/o annually. General Fund revenues have increased at an average rate of 2.8% annually, largely due to steady growth in Property Tax, which accounts for over 50% of the Town's General Fund revenues. Property Tax revenues have increased by an average of 4.9% per year, while Sales Tax has increased by an average of less thanl% per yeil and Franchise Fees have increased by 3.8% annually. Special Purpose revenues have remained flat. The Town-wide Lighting and Landscape Assessment District generates consistent assessment revenues year over yeaĂ?, underscoring that little population growth is occurring, and assessments are set at a flat rate with no escalator. Building and Planning fees continue to increase as property owners reinvest in upgrading their homes, buildings, and property.
2017
/18 Operating Budget & CIP
il
June 6,2017
Gas Tax revenues have been declining for the past four years due to less fuel demand and lower prices. Passage of the Road Repair and Accountability Act of 2017 willimpose new taxes on gasoline and diesel fuel, and increase vehicle registration fees. For Danville, this is estimated to increase total Highway Users Tax Account (otherwise known as Gas Tax) to $1.2 million in2017 /18, and to $1.7 million in2018/19. These funds are critical to the ongoing maintenance of the Town's public streets, and continuing to maintain a Townwide Pavement Condition Index (PCI) of.70 or greater.
Town operating expenditures have increased by an average oÍ 4.3% annually over this five year time period. Table 1 illustrates the recent history for Danville's major sources of General Fund and Special Purpose revenues. Table I Revenue History (In
I
millions)
2012/13
2013/14
2014/15
2015/16
2016/17
2017/18
Actuøl
Actual
Actuøl
Actual
Budset
Budeet
Total General Fund
s22.ls
s22.s2
$23.86
s2s.29
$24.10
$2s.2s
Property Tax Sales Tax Franchise Fees All Other
$10.46
$10.94
stt.77
$12.53
$s.1 3
$s.1 0
$2.06 $4.42
$5.46 s2.21 $5.09
$12.24 $5.36
$2.00 $4.s6
ss.26 s2.12 $4.70
$4.35
$13.04 $s.31 $2.38 94.s2
s8.71
$8.88
$9.29
$9.13
$8.33
$8.77
$3.13
$3.13
$3.1 9
$2.19 $1.03 $2.36
s2.2s $2.1 3
$3.00 $0.97 $1.97
$3.12 s2.6s $0.90 $1.66
$3.12 82.7s
$ 1.37
$3.14 82.74 $1.12 s2.29
$1.69
$30.86
$31.40
$33.1s
$34.43
$32.43
$34.02
CDA/Successor Agency
$1.s3
sL.22
$1.3s
$3.83
s2.24
$2.18
Operøtíng Expendìtures
826.12
826.97
826.32
827.26
830.18
831.71
Total Special Revenue Lighting & Landscape Building & Planning Gas Tax
All Other Total Revenues
2OL7N8
$2.1 s
$1.21
HIGHLIGHTS
The Town has a number of projects and programs underway and planned for 2017/18 that will contribute significantly to the overall quality of life enjoyed by Danville residents.
Downtown Pørking
Continuing to improve the supply of parking to support an economically viable downtown remains a high priority. Several projects are currently in the works:
2017
/ 18 Operating Budget & CIP
il
June6,2017
FøciliV - Construction of a new 79 space parking lot at the northwest corner of East Linda Mesa and Rose Street will be completed in winter 2017. Rose Street Pørking
-
This project is occurring in partnership with the San Ramon Valley Unified School District. As part of the classroom modernization project which began in 20'1.6, the Town has committed $1.2 million for construction of 200 new student parking spaces on campus. This project, slated for completion in fall 2019, will benefit students, residents and downtown businesses. Student Parkinç at San Ramon Vølleu Hiçh School
ViIIøge Theatre Parking Lot Expansion - This project will increase the lot capacity from 69 to 200 spaces through acquisition of the property located next door to the Theatre. Design is expected to commence in summer 2017 wlthconstruction slated to begin in spring 2018. Sycamore Park and Ride Expansion - Design work will begin to increase the capacity of the existing Park and Ride Lot by 116 spaces to accommodate commuters, downtown patrons
and employees, and Iron Horse Trail users. Design is expected to begin in fall 2017. Trønsp ortøtion ønd
Mobility
Street and Pøaement Møintenønce - A total of $4.9 million will be spent on resurfacing arterial and residential streets Town-wide. This includes $1.05 million to resurface major arterials; fi812,275 for San Ramon Valley Boulevard Improvements; $41"6,536 Íor Danville Boulevard Improvements; and undertakingfi2.6 million in overlay and slurry seal work
in
designated neighborhoods, with the goal of maintaining a minimum Town-wide Pavement Condition Index (PCD oÍ70. La GondøWøy Bridge
- Planning and design studies will begin toward replacement of the
decades-old La Gonda Way Bridge across San Ramon Creek, just east of the intersection at Danville Boulevard. Design is expected to begin in winter/spring 2018, and construction is targeted to occur within the next four years. The new bridge will be wider to accommodate better pedestrian and bicycle circulation in addition to vehicular tralfic.
Parks anilFøcilities Upgrades to the audio-visual systems at the Veterans Memorial Building, Oak Hill Park Community Center and Danville Community Center are planned, and installation of ADA accessible doors at the Veterans Memorial Building. Town-ruide Facilitlt Improaements
-
Dnnaille Librøra - The Town is partnering with the Contra Costa County Library Administration to enhance seating and collaborative meeting space for the teen section of the library. This project is expected to be completed in sununer 2017. Town Office Improaemerzfs - Renovations are planned for the public use portions of the Town Offices, including the front lobby, public hallway, restrooms and conference rooms. These areas are in need of upgrade and have not been improved since the Town occupied the building in 1985. Construction is expected to take place in summer 2018. 2017 /18
Operating Budget & CIP
ry
June 6,2017
Progrøms EconomicDeaelopment - The vitality of the local economy remains a top priority. The Town will continue to implementskategies inthe Comprehensive Economic Development Plan (CEDP) adopted infune 201,6 andthe Community Branding and Marketing Plan adopted in May 2017.
Crime Prevention
-
To support the goal of keeping people and propefty safe, the Town
will continue to utĂlize Automated License Plate Recognition Cameras at gateway
intersections throughout Town. This technology has helped assist the Danville Police Department in both deterring and solving property and other crimes that occur in Town, bringing property crime to an all-time low.
I
Technolo
-
The Town
will continue implementation of
the new Land Management system to replace outdated permitting software; and implement a new Document and Collaboration Management System by winter 2017 /18. The Town will also install fiber-optic cable, improving connectivity among Town facilities including the Town Meeting Hall.
- The Parks & Leisure Services and Arts Commissions will implement strategies and recommendations in the Parks, Recreation and Arts Strategic Plan, including enhancements to cultural arts programming, public art, mobile recreatiory and promotion of the expansive trail networks in Danville. The Strategic Plan will be adopted by the Town Council in summer 2017. Recreation and Arts
2017N8 OPERATING BUDGET SUMMARY
Budget continues to focus on the Town's highest priorities and delivery of quality municipal services. The Budget is balanced, reserves significant new funding for capital projects, and maintains strong reserve and contingency levels. The Town's overall financial condition continues to be excellent. T}:re 2017/ L8
Revenues and expendifures include both the Town and Successor Agency components. Town revenues are classified as either General Fund or Special Revenue. Revenues
For
/18, revenues are forecast to total 936,197,665. This includes Town revenues of W4,016,068, inc1udingfi25,249,221 or 74.2o/' for the General Fund andfi8,766,847 or 25.8% in Special Purpose revenues. Successor Agency revenues will total 92,181.,597. 2017
For summary purposes, comparisons are made on a "budget to budget" basis, and do not include subsequent amendments to the201.6/17 budget.
2017
/18 Operating Budget & CIP
V
June 6,2017
GenerølFund
General Fund revenues are considered unrestricted and may be expended for any operating or capital purpose. The General Fund is the primary source of operating funds for the Town. Major revenue sources for the General Fund are Propefty Tax, Sales Tax, Recreation Fees, and Charges and Franchise Fees. General Fund revenues Íor2017 /18 are forecast to totalfi25,249,221", a4.8% increase from prior year revenues of fi24,103,237. a
Properta Tør revenues represent 51,.6% of the Town's total General Fund. Revenues are forecast to total fi13 ,041. ,067 , a 6.5% increase from the prior year. The Town receives approximately 7.5% of property taxes paid by Danville property owners, with the balance allocated: 50% to Education, 17% to Contra Costa County, and 25.5% to Special Districts.
a
forecast to total $5,314,000 , a1..0% decrease from the prior year. Approximately 13% of this total is attributable to Sales Tax proceeds returned for online sales. The Town receives 1% of ttLe 8.25% Sales Tax collected in Danville, with the remaining7.2ï% allocated to the State and Contra Costa County.
a
Recreøtion Fees ønd Chørges are forecast to total 92,58'1.,657, a 10.4% increase from the
Sales Tøx revenues are
prior year. The increase is attributable to additional Cultural Arts programming, theatre ticket revenue, camps, sports leagues, court rentals, and classes. a
Frøncltise Fees areforecast to total fi2,378,874, a10.6% increase from the prior year. The increase is attributable to an increase in the solid waste and recycling franchise fee
that took effect in March 2017. o
AII Other Generøl Fund Reaenues are forecast to total g\,933,624, a3.2% decrease from the prior year. The reduction is attributable to lower fines and forfeiture revenue.
Property Tax, Sales Tax, Recreation Fees and Charges and Franchise Fees account for 92.3% of the total General Fund revenue forecast for 2017 /18. Sp
eciøl Purp o se Reo enue
Special Purpose revenues are restricted to certain uses, and are tracked and accounted for in separate funds. Major sources of Special Purpose revenue for the Town are Lighting and Landscape Assessment District (LLAD), Building and Planning Gas Tax, Measure J and Clean Water. Special Purpose revenues are forecast to total 98,766,847, a 5.2% increase from prior year revenues of $8,333,863.
Lighting nnd Løndscape Assessment District revenues are forecast to total fi3,120,682, a negligible increase from the prior year. The increase is attributable to minimal growth and assessments set at a flat rate. 2017
/18 Operating Budget & CIP
VI
June6,2017
a
Buildinç and Planninç revenues are forecast to total 92,752,600, a 3.9% increase from the prior year. This reflects continuation of the robust level of building and permitting activity that the Town has experienced since 2011,.
a
total 91,211",992, a 33 .38 % increase from the prior year. This increase is attributable to the Road Repair and Accountability Act of 2017 which will significantly increase local skeets and roads funds for cities and counties. Danville Íevenues are projected to increase to $1.2 million in2017/18, and to $1.7 million in2018/19. These funds are critical to the Town's ongoing efforts to achieve Pavement Condition Index levels oÍ.70 or greater. Gas Tax (Hisfu.Lløa Users Tax) revenues are forecast to
c
Meøsure I refurn to source revenues are forecast to total fi742,857, a2.5% increase from the prior yeat. This is attributable to a County-wide increase in sales tax revenue.
o
CIeøn Wøter Assessment revenues are forecast to total fi570,793, from the prior year, as assessments are set at a flat rate.
These five revenues account 2017
for
95.8%
which is no change
of the Special Purpose revenue forecast for
/18.
Successor Agency
Revenues received from the Redevelopment Property Tax Trust Fund (RPTTF) for payment of the Successor Agency Recognized Obligations are forecast to total fi2,181,,597, a2.6% decrease from the prior year revenues of.fi2,2410,30L. The reduction reflects lower administrative costs and lower debt service payments. Expenditures
For 2017/18, recommended operating expenditures total fi32,893,454,
including fi31,71'1.,857 f.or the Town and $L,L8'1.,597 for the Successor Agency. Total operating expenditures are recoÍunended to increase by 4.6% from prior year expenditures of $33,351,589.
For summary purposes, comparisons are made on a "budget to budget" basis, and do not reflect adjusted budget amounts (including amendments and prior year carryovers). T ow
n
O p er øting E xp en
ditur es
Recommended Town operating expenditures total 931.,711,857, a5.0o/o increase from prior year operating expenditures of 930,193,970. Operating expenditures include fi22,322,328 from the General Fund, and $9,389,529 fromSpecial Purpose revenue.
o
Generøl Goaernment expenditures increase by fi'1.40,342 or 7.8%, from $1,792,873 to fi1,933,215. This is largely attributable to increased staffing in the Town Manager's Office and increased employee expenses department-wide.
2017 / 18
Operating Budget & CIP
VII
June 6,2017
a
Police Seroices expenditures increase by fi393,225 or 4.3o/o, from 99,251.,269 to 99,644,494. This is attributable to an increase oÍfi397,309 or 5.0% for sworn personnel costs for thirty (30) officers under the new the DSA union contract, with a slight decrease in all other areas. Police services continue to be effectively provided through a contract with the Contra Costa County Sheriff's Office.
a
Administrøtiae Seruices expenditures increase by fi287,013 or 8.0%, from fi3,601,723 to 93,888,736. This is largely attributable to a $233,000 increase in liability insurance premiums in the Risk Management Program, and the addition of a 0.5 FTE Program Coordinator position in Economic Development to assist in carrying forward the Town's economic development and business promotion efforts. Deaelopment Seraices expenditures increase by fi168,317 or 3.9o/o from fi4,284,881. to 94,453,198. This is largely attributable to increased Building Services costs including $68,060 for permitting and software maintenance associated with the new Energov permitting software, and $52,000 for contract plan check and inspection services; and increased employee expenses department-wide. In Development Services, all Building and Planning costs continue to be 100% Special Revenue funded.
a
Maintenønce Seraices expenditures increase by fi264,376 or 3.6%, from fi7,289,945 to fi7,554,32L This is largely attributable to $59,563 in increased contract services costs, fi62,620 in increased electricity costs, 952,340 in increased water costs, and increased employee expenses department-wide; offset by a $50,000 reduction in fuel costs. In Maintenance Services,69.5% of operating costs are Special Revenue funded.
a
Arts ønd Seruices expenditures increase by fi264,6'1,4 or 6.7%, from fi3,973,279 to fi4,237,893. This is largely attributable to $93,166 in increased contract services costs and $20,500 in increased co-sponsorship pass through costs in Cultural Arts; $39,408 in increased contract services costs in Youth Services and increased employee expenses department-wide. Increased contract services costs are attributable to recommendations contained in the new Parks, Recreation and Arts Strategic Plan. The cost recovery rate for Recreatiory Arts and Community Services Programs remains strong at76.2%.
The Town delivers municipal services through a combination of Town personnel, contracted and privatized services, and partnerships with other agencies. Total expenditures are allocated 40.3% for permanent and temporary Town staffing, 39.8% for contracted services and 19.9% for Administration, Materials, Supplies and EquipmenÇ and Program Activities. Successor Agency
total fi'1,,181,,597, a 4I% decrease from the prior year expenditures of fi1,239,30'1,. Expenditures cover debt service and allowable administrative costs. With approval of the Last and Final ROPS by the State, Successor Agency expenditures
2017
/ 18 Operating Budget &
CIP
VIII
June 6, 2017
administrative costs are greatly reduced as the Town ramps down its Successor Agency Oversight Board. By July \, 20\8, individual City/Town Successor Agency Oversight Boards are scheduled to be replaced with one County-wide Oversight Board that will ensure that all ROPs payments are made pursuant to the approved Last and Final ROPs for each Successor Agency. An additional $1",000,000 is transferred into the General Fund balance to be allocated for one time capital projects.
Town-wide Lighting and Landscape Assessment District 1983-1 The Town-wide Lighting and Landscape Assessment District (LLAD) funds maintenance
of roadside landscaping and street lighting, and 50% of public parks and buildings maintenance. Revenues include annual property assessments set pursuant to Proposition 218, and fund transfers from the General Fund, Asset Replacement Fund and the CIP. Assessments are set at fixed rates and were last increased in 2003. LLAD expenditures include operating expenses, capital expenses, asset replacement and overhead costs that are allocated based upon a current cost allocation plan. Tøble 2 2017
& Capital
Operating
LLAD
Zone
A B c D ¿
Expenses
/18 LLAD Fund Activity
%
Assessment Assessment Revenue*
g 823,260 $ 582,115 g 99'J.,302 fi 744,744 fi 869,262 fi 662,204
Revenue
Differcnce
70.7%
(
75.1.%
(
76.2%
fi1.,664,91,4 fi1.,13't"ß19
68.0%
fi4,348,738 93,120,692
71.9%
$
fi
24'L;J.45)
246,558)
Transfer In/ .F. Subsid
Net Change in Fund Balance
$ 250,000 $ 150,000
$ ($
96,558)
(fi
428,056)
$ 2ozo58) $o ($ 533.2e5) $ 4o0.0oo (91,228,056) $ 800,000 (
8,855
($ 207,058) ($ 133.2e5)
includes interest income on assessment revenue
Total recofiunended expenses, including operating, capital and transfers outfor overhead are projected to totaI84,348,738, a3.7% increase from prior year expenses of fi4,195,504. Assessment revenues and transfers in are projected to total fi3,920,682 a 69% increase from prior year revenues and transfers in of 93,668,092. Assessment revenues of fi3,120,682 are increased by 0.08% from prior year revenues of 93,118,092, and transfers in of $800,000 are increased by 45.4'/" from prior year transfers in of $550,000.
In total, 71.8% of LLAD costs will be funded through assessment revenues, with 28.2% funded through transfers in from the General Fund, and available fund balance. For the prior yeat,74.3% of LLAD costs were funded through assessment revenues. Net change in total LLAD fund balance is a reduction of 9428,056, from fi3,354,985 to$2,926,929. 2017
/18 Operating Budget & CIP
x
June6,2017
Transfers and Designations Trønsfers
In
CDALoøn Re-Payment - Debt payment of $1,000,000 toward the balance owed to the Town by the former CDA under the 2011 Re-entered Cooperation Agreement between the Town and Successor Agency is included as a revenue source to the General Fund, and designated for capital purposes. This is the result of the Superior Court of Sacramento judgement in the matter of Danville Successor Agency v. California Department of Finance (Case No. 34-2014-80001738).
Trønsfers Out Recommended General Fund transfers and designations lor 2017 /18 total fi4,224,446, a 0.4% increase from prior year transfers and designations of fi4,206,099.
General Fund transfers include $1,800,000 to fund the Pavement Management Program and fi1,524,446 for CIP General Purpose. Capi tal Imaroaement
-
Lighting and Løndscøping - General Fund transfers total $800,000 to subsidize LLAD operating costs in benefit Zones A, B and D. Asset Repløcement - General Fund transfers include $100,000 for Asset Replacement.
Operating Reserve Policy Pursuant to Resolution No. 35-98, the Town Council has a policy of maintaining a minimum Operating Reserve in an amount that represents 20% ol the total annual Operating Budget. An Operating Reserve amount of fi6,342,371" is required to meet the 20% policy. For 2017 /18, the Operating Reserve is funded at $11,1"LL,504, equivalent to 35.0% of the Operating Budget.
Staffing and Employee Costs Town staffing remains unchanged for 2017 /18, and includes 94.75 full time equivalent (FTE) permanent employees, 30.0 FTE contract employees provided through the Contra Costa County Sheriff's Office, and 36.0 FTE part-time temporary employees. Employee expenses increase by 4.0%, from fi11,1.49,513 to $11,598,838. This includes a merit-based puy increase (no COLA), and an increase in the Town-funded portion of employee medical coverage. Town employees receive a40'1, defined contribution pension plan with no Town-funded retirement medical benefits; and the Town has no unfunded pension or other post-employment benefit (OPEB) liabilities. Compliønce r.uith SB L436 - SB 1.436, passed by the State in August 201,6, amended the Brown Act to require that, prior to taking final action on the Operating Budget the Town
2017 / 18
Operating Budget & CIP
X
June 6,2017
Council shall orally provide a surrunary of any change in salaries, salary schedules or fringe benefits for the Town Manager, City Attorney or any department heads. In compliance with SB
the following two changes are incorporated into the Town Employee Salary Schedule Íor 2017 /18:
o o
1,4g6,
Additionof l".0FTEAssistantTownManager,witha salaryrangeof
$10,833 -fi14,840; of 1.0 FTE Recreation, Arts and Community Services Director, with a salary
Addition range of fi10,379 - fi13,791.
Master Fee Schedule
For 2017 / 1,8, Town Fees and Charges are unchanged from the prior year, with the following two exceptions: Police Seraices - DUI Emergency Response Reimbursement Fees are adjusted to reflect 2017 / 18 sworn personnel costs. Straight time costs are increased from fi118.47 to fi127 .35 for Officers and fi134.17 tofi1.44.41,for Sergeants; Overtime costs are increased from fi70.24 to fi75.56 for Officers and fi81,.24 to fi87.39 for Sergeants. No other changes.
Deaelopment Seraices - Engineering - Encroachment permit fees for public utility companies have been increased from $43.00 per hour to $89.50 per hour, to reflect actual costs and ensure greater cost recovery.
TEN.YEAR FORECASTS Ten-year forecasts cover fiscal )¡ears 2017/18 through 2026/27. These forecasts are updated annually to assist with planning and to ensure on-going sustainability of service delivery based upon availability of revenues. Reoenues
Ten-year forecasts project a10.7% increase in total revenues, from fi36,197,665 in2017 /18 to 840,662,912 in2026/ 27 . General Fund revenues are forecast to increase by 17 .3%, from 925,249,222 to fi29,619,270; Special Purpose revenues are projected to increase by 12.7% from fi8,766,847 to $9,877,36'1,. Successor Agency revenues are projected to offset the recognized obligations of the Agency. Projections include no increases to current LLAD assessments, Police funds (SLESF, Abandoned Vehicle Abatement or Asset Seizure), Clean Water revenues or Donations. O p er øting E xp
enditur es
Operating expenditures are forecast to increase22.3%, from fi3'J.,711",857 in2017 /18 to fi38,799,381.in2026/27, equivalent to 2.23% annually. Successor Agency expenditures are projected to decrease by 1,.3% from fi1,18'1,597 to fi1,166,282. 2017
/18 Operating Budget & CIP
XI
June 6,20!7
Trønsfers and Designøtions Forecasts project average annual General Ftrncl transfers of $2,385,922 Í.x Capital Improvement purposes including Pavement Management and CIP General Purpose, and $1,085,000 for LLAD operations. These numbers include an average of $935,940 annually in revenue attributable to repayment of the outstanding loan to the Town under the 201L Restated Cooperation Agreement. This loan is fully repaid by 2025/26.
will continue to be sustainable through 2026/27, assuming that the Town continues to operate at current service levels and
The ten-year forecast shows that Town operations
utilizes accumulated reserves to augment new revenues. 201 7/201.8
APPROPRIATIONS LIMIT
Proposition 4, passedinl979, requires the Town Council to adopt an annual limit which fixes the amount of general tax revenue that can be appropriated in one fiscal year. Any excess must be returned to the taxpayers. The limit is adjusted annually using adjustment factors provided by the State Department of Finance. Proposition111", passed in June 1990, allows the Town Council to annually choose the population factor used to calculate the appropriation limit. The Town Council may choose either: 1) population growth within the Town or 2) population growth within Contra Costa County. The chosen population factor is then multiplied by the annual growth in California per capita income to arrive at a total annual adjustment factor.
For2017/18, populationgrowth is:0|1,6% withinDanville, and1..13% withinContraCosta County; annual growth in California per capita income is3.69o/o. Multiplying population growth within Contra Costa County by the annual growth in California per capita income results in a total growth factor oÍ 4.86%. Increasing the 201.6/17 appropriation limit by 4.86% results in a2017 / 1"8 appropriation limit of 938,406,151.
total 925,249,22L, of which 922,290,931, is subject to the Irroposition LLL appropriation limit. 'Iown revenues subject to Proposition 111 are well below the appropriation limit and no Proposition LLL constraints FY 2017 /18 General Fund revenues are forecast to
are projected in the ten-year financial forecast. 2013/'14
Prior Year Limit $30,708,031 Population % Increase 1,.0052 1,.0512 Inflation % Increase Population % xlnflatton% 1,.0566 Prop LL1 Limit 932,448,1.40 Increase from Prior Year fi1,740,109
2017
/18 Operating Budget & CIP
20L4/15
2015/16
201,6/17
fi32,448,'140
932,690,770
fi34,373,983
fi36,625,529
1.0098
1..0128
1..0112
1.0113
0.9977
1.0382
1..0537
1.0369
1..0074
1.051"4
1.0655
1..0486
fi32,690,770
934,373,983
fi36,625,529
fi38,406,151.
9242,630
g-]..,683,213
92,251.,546
fi1.,790,622
XII
2017 2018
1une6,2017
201.7/18
- 2021122 CAPITAL IMPROVEMENT PROGRAM
The Town's Five-Year Capital Improvement Program (CIP) identifies current and future capital needs and identifies sources of funding to be appropriated in order to meet those needs. Approval of the CIP includes appropriating funding for all 2017/18 projects. Years 2018/19 through 2021./22 are included for planning purposes only.
For 2017 / 18, total of 47 projects are included, with appropriations totaling 912,722,191,. Prior year appropriations of 97,207,036 remain to be expended for projects that are in the planning, design or construction phase. Total appropriations for 2017 /18 plus prior year's amount to fi19,929,227 for design and construction activity that is funded and awaiting completion. Pavement Management Program
A major component of the CIP is the Pavement Management Program which provides major pavement maintenance including slurry seals and pavement overlays on public streets. The Program strives to maintain a minimum average "Pavement Condition Index" (PĂź) of 70 Town-wide. The Town's current average Town-wide PCI is75. Recommended 2017 /18 expenditures total $2,600,000 for Pavement Managemenf including appropriations of $1,800,000 from the General Fund, $600,000 in Measure J funds and $200,000 from Gas Tax.
SUMMARY
. . ' . . .
The Town's overall financial condition continues to be excellent. The 2017 /18 Budget continues the Town's practice of providing quality municipal services that carry out the mission of the Town Government and focus upon addressing the highest priority community needs. The Budget is balanced while maintaining healthy operating and capital reserves. Capital projects are fully funded and require no borrowing or debt. The Town has no unfunded employee pension or medical liabilities. Ten-year forecasts illustrate that Town operations are is fiscally sustainable based upon current service levels.
PUBLIC CONTACT Posting of the meeting agenda serves as notice to the general public. A draft of the Budget and CIP was posted on the Town's website for public review on April 27,2017. The draft Budget and CIP were reviewed by the Town Council at four public study sessions that were held on ll4ay 2,9,1.6 anĂ°,23,2017. Notice of the public hearing was published in a newspaper of general circulation as required by law.
2017
/18 Operating Budget & CIP
Xru
June 6,2017
FISCAL IMPACT
Sufficient revenues are available to funcl all 2017/18 expenditures contained in the 2017/18 Operating Budget and Capital Improvement Program, while maintaining adequate operating and capital reserve and contingency levels.
RECOMMENDATION Adopt Resolution No.49-2017; approving the 2017 /18 Operating Budget and setting the 201"6 / 17 Appropriation Limit;
Adopt Resolution No. 50-201"7: approving the 2017/18 through 2021./22 Capital Improvement Program and appropriating funds for
/18 capital projects; Adopt Resolution No. 5L-20175A: approving t}ire 2017 / 18 Operating Budget for the Successor Agency to the former Community Development Agency of the Town of 2017
Danville; and,
Adopt Resolution No. 52-2017, approving the 2017 /18 Master
Fee Schedule
for User and
Cost Recovery Fees
by'
Cala Manager
L**
Uรง,-
Lani Ha Finance Manager f Treasurer
C.
Development Services Director
Attachments
CDA B
2017
Resolution Resolution Resolution Resolution
/18 Operating Budget & CIP
No.49-2017 No. 50-20L7 No. 51-201754 No.52-2017
XIV
June 6,2017
RESOLUTION NO. 49-2017 APPROVTNG THE 201ry18 OPERATING BUDGET AND SETTTNG THE 201ry18 APPROPRIATTON trMIT WHEREAS, an Operating Budget for FY April 26,2017; and
2017 /18
was submitted to the Town Council on
WHEREAS, the Town Council held four public study sessions on May 2, }r/ray 9,May L6, and May 23,2017 to review the draft Fy 2017 /18 Operating Budgef and
WHEREAS, the Town Council accepted public testimony and studied the proposed Operating Budge! and WHEREAS, the emphasis in the Operating Budget is focused upon the Town's Missiory which is to deliver superior municipal services that make people's lives better, through:
. o o o . . o ¡
keeping resid.ents, businesses and, property safe
providingwell-maintained publicfacilities protecting our environmenÇ preserving our history and retaining the special character
providing opportunities that support residents' growth and enrichment promoting and supporting economic vitality and growth representing and promoting Danville's best interests celebrating community through family oriented special events effectively engaging and communicating with residents and businesses; and
WHEREAS, the Operating Budget proposes programmatic service levels which are within the Town s financial means, while reserving funds for capital projects, meeting debt service obligations, and adequate reserve and contingency levels; and WHEREAS, sufficient revenues are available to fund aII2017 /18 expenditures; and WHEREAS, the Town Council is required to adopt an appropriation limit for proceeds of taxes pursuant to Proposition 111 þassed by thé votergin June 1990 ; and. WHEREAS, this limit fixes the amount of general tax revenue that can be appropriated in a given fiscal year; and WHEREAS, any excess revenue must be returned to the taxpayers; and
ATTAGHMENT A
WHEREAS, pursuant to Proposition 111, the Town Council has selected the growth in California per capita income and population growth within Contra Costa County as the adjustment factors for FY 2017 /18; now therefore, be it RESOLVED that the Danville Town Council hereby
1.
Adopts the2017 /18 Operating Budget
2.
Appropriates Town Revenues, Fund Balances and Special Revenues totaling g3'l.,711,857 for 2017 /18 Operating Expenditures;
3.
Sets the FY 2017/18 Appropriation
4.
Adjusts FY 2A17/18 Employee Salary Ranges as shown on Exhibit A;
5.
Amends and reallocates 912,200 in FY 201,6/17 expenses from the General Fund to the Donation Fund for purchase of a police canine and operation of a police youth academy.
6.
Directs the Town staff to publish the2017 /18 Operating BudgeĂ&#x2021; and
7.
Directs the Town Manager to implement the
as recommended;
Limit at fi38,406,151;
2017
/18 Operating Budget.
APPROVED by the Danville Town Council at a regular meeting on June 6,2017, by the following vote: AYES: NOES:
ABSTAINED: ARSHNT:
MAYOR
APPROVED AS TO FORM:
ATTEST:
,-atA
T3 4.F CITY ATTORNEY
CITY CLERK PAGE 2 OF RESOLUTION NO. 49.2017
TOI^/N OF DANVITLE
EXHIBIT A
SATARY RANGES (effective laly 1.,20171 201ry18
MINIMUM
CLASSIFICATION
MAXIMUM
General Government
ødd reduce
Assistant Town Manager Assistant to the Town Manager
g
$
10,833 5,632
1..4,840
$
7,71s
$
10,379
fi
13,791,
$
Administrative Services adjust add delete
adjust
Administrative Services Director Human Resources Analyst Human Resources Technician Economic Development Manager
$ $ $
5,632 4,440 7,268
$ $ $
7,715 6,082 9,956
$
7,268 7,268
$ $
9,956 9,956
10,379 7,843
g g
13,791 10,744
Development Services
ødjust ødjust
Transportation Manager Principal Planner
$
Recreation" Arts &.Communih¡ Services
add delete
Recreatiorç Arts & C. S. Director Recreation Services Manager
fi
$
RESOLUTION NO. 50.2017
AppRovrNG THE 201ry18 THROUGH202A22 CAPTTAL TMPROVEMENT PROGRAM AND APPROPRIATING FUNDS FOrR2017/18 CAPTTAL PROIECTS WHEREAS, Government Code Section 6540l requires the Town of Danville to make a determination that tlne 2017/ 18 through 2021,/22 Capitat Improvement Program is in conformance with the Town of Danville General Plan; and WHEREAS, Government Code Sections 65302 et seq. require that the Town of Danville must take into consideration future capital facilities when planning for the development of the community; and WHEREA.S, the Contra Costa Transportation Authority Growth Management Program requires that the Town develop a five-year capital improvement program; and
WHEREAS, the Town of Danville staff has prepared the 2017/18 through 2021,/22 Capital Improvement Program; and WHEREAS, the Planning Commission will review the 2017/L8 through 2021/2022 Capital Improvement Program after adoption as needed and consider findings in conformance with the Town of Danville General Plan; and WHEREAS, the public notice of this action was given in all respects as required by law; and WHEREAS, the Town Council did hear and consider all reports, recofiunendations, and testimony submitted and presented at the hearing; and WHEREAS, the Town Council has determined that the additional funding requested is available from funding sources as shown within t}ire 2017 / 18 through 2021./ 22 Capital Improvement Program; nory therefore, be it RESOLVED, that the Town Council hereby:
rl.. Adopts
the 2017/18 through 2021,/2022 Capital Improvement Program as recorrunended, including new projects, subject to the findings of conformance to the General Plan as determined by the Planning Commission;
2.
Appropriatesfi12,722,19'1. for 2017/18 capital improvement projects as shown on Table A in the 2017 /18 Capital lmprovement Program;
ATTACHMENTB
3. Directs the Town staff to publish the 2017/18 through
2021./22 Capital
Improvement Program; and
4.
Directs the Town Manager to implement the 2017/18 through 2021,/22 Capital Improvement Program.
APPROVED by the Danville Town Council at a regular meeting on June 6,2017 by the following vote: AYES: NOES:
ABSTAINED: ABSENT:
MAYOR
APPROVED AS TO FORM:
ATTEST:
'E¿"rrs*) CITY ATTORNEY
CITY CLERK
PAGE 2OF RESOLUTION NO. 50-2017
RESOLUTION NO.
51,-2017
S
A
AppRovING THE 2017ï18 OPERATING BUDGET FOR THE SUCCESSOR AGENCY TO THE FORMER COMMUNITY DEVELOPMENT AGENCY OF THE TOIA¡¡{ OF DANVILLE WHEREAS,
a draÍt FY 2017/18 Operating Budget for the Successor Agency
was
submitted to the Town Council on April 26,201.6; and WHEREAS, the Town Council held four public study sessions on May 2,May 9,May L6, and May 23,2017, to discuss the proposed Successor Agency BudgeÇ and WHEREAS, sufficient revenues are available to fund all FY expenditures; now therefore, be it
2017
/18 Successor Agency
RESOLVED that the Town Council, acting in their capacity as Successor Agency to the former Community Development Agency of the Town of Danville, hereby appropriates fi1..,181.,597 and adopts the Successor Agency Budget for FY 2017 /18.
APPROVED by the Danville Town Council at a regular meeting on June 6,2017, by the following vote:
AYES: NOES:
ABSTAINED: ABSENT: CHAIR
APPROVED AS TO FORM:
ATTEST:
'il*frs*\ AGENCY ATTORNEY
AGENCY SECRETARY
ATTACHMEI{T C
RESOLUTION NO. 52.2017 ADOPTTNG THE 201ry18 MASTER FEE SCHEDULE FOR USER AND COST RECOVERY FEES WHEREAS, the Town of Danville charges facility use fees for the rental and use of Townowned andf or maintained facilities; and
WHEREAS, the Town charges City Clerk, Finance and Police processing fees for the purpose of recovering the reasonable costs of providing these services; and WHEREAS, the Town charges Development Services processing fees for Planning, Building, Engineering and Transportation for the purpose of recovering the reasonable costs of providing these services; and WHEREAS, pursuant to Government Code Section 6601,4(b), cities are authorized to charge and collect fees on development in order to pay for the reasonable costs of preparing and revising planning documents including, but not limited to, the General Plary Housing Element, special plans and zoning ordinance; and WHEREAS, the Town Council has determined that pursuant to this statutory authority, it is appropriate to charge and collect a Comprehensive Planning Fee in an amount reasonably necessary to prepare and revise these planning documents, which fee shall be accounted for in a restricted accounf and
WHEREAS, the Town Council has previously established such fees as part of the Danville Municipal Code and the annual Master Fee Schedule through resolution; and WHEREAS, pursuant to Town Council Resolution No. 24-2017,the Town Council must set the amount of the Towrls Parking In Lieu Fee annually in conjunction with adoption of the annual Master Fee Schedule; and
WHEREAS, the Town Council conducted a public hearing to receive testimony regarding the proposed increase in user and cost recovery fees, notice of which hearing was provided as required by law; now therefore, be it
RESOIVED,by the Danville Town Council that the Master Fee Schedule for User and Cost Recovery Fees, as set forth in Exhibit 1 attached hereto, is hereby adopted; and be it further RESOLVED that the Danville Town Council Sets the Town's Parking In Lieu Fee for FY 2017 f 18 at $3,500 per space for retail uses and $15,250 per space for atl other uses.
ATTACHMENTD
APPROVED by the Danville Town Council at a regular meeting on ]une 6,2017, by the following vote: AYES: NOES:
ABSTAINED: ABSENT:
MAYOR APPROVED AS TO FORM:
ATTEST:
1Z¿"frs CITY ATTORNEY
CITY CLERK
PAGE 2OF RESOLUTION NO. 52-2017
Directory of Public Officials TOWN COUNCIL Renee Morgan Newe[[ Arnerich Lisa Btackwell Karen Stepper Robert Storer
Mayor Vice-Mayor Counci[member Councilmember Councitmember
TOWN STAFF Joseph A. Calabrigo Robert Ewing Marie Sunseri Tai Witl.iams Steve 5impl<ins Nat Rojanasathira Steven C. Lal<e Jed Johnson Henry Perezal.onso
Lani Ha Steven Jones
Town Manager City Attorney City Cterl< Assistant Town Manager Chief of Potice Administrative Services Director Development Services Di rector Maintenance Services Director Recreation, Arts & Community Services Director Fi nance Manager/Treasurer Senior Civit Engineer
WITH ACIfiOWLEDGEMENT TO
Sabrina l(wan Gianna Boragno Lestie Eddy
ffi
Accounting Technician Program Coordinator Office Assistant
l
rvu rr'.,l;rrrt,tIĂŹ, ., r,.q,rr
Ð
U)
o 4
Eßtr¡æ Eþ$vW 3*ue$¡r€
o o
Danville Gitizens
to
Danville Town Gouncil
Heritage Resource
Arts Corunission
Corunission
Planning
Services
Go nrission
U) (-f
Town illanager
Gity Attorney
Developrnent
Maintenance
Services
Services
Design Review Board
Recreation, Arts &
General Governrnent
Police Services
Administrative Services
Town Council
Pabol
Finance
Planning
Town Manager
Trafñc
tnformation Technology
Building
Park Mainúenance
City Attorney
lnvestigations
Code Enforcement
dside Maintena
Culh¡ral Arts
Engineering
Steet Maintenance
Youth Services
Gapital Project Management
SteetLight
Teen Se¡vices
Maintenance
City Clerk
School Resource Program
Economic
lÞvelopment
Community Outeach Animal Conûol Emergency Preparedness
Maintena
Conununity Serv Sports & Fitness
cilities Manage
Adult Services
Risk Management
Transportation lnternal Services
Traffic Signal Maintenance
Senior Services
an Water Progra
Asset Replacement
Equipment Maintenance
Library Services Gommunity Events
.f:
4 F
o r-t
þ
Human Resources
o Ë
-
4
rD
Vision and Mission mall town øtmosphe re, outstanding quality of life." "S
OurVísion
Our Mission
Deliver superior municipal services that make people's lives better. We:
. Keep residents, businesses and property safe . P rovide well-mai ntained public faci |ities
' '
Protect our environment, preserve our history and retain the special character Provide opportunities that support residents'growth and enrichment . Promote and support economic vitality and growth . Represent and promote Danville's best interests . Celebrate community through family oriented special events . Engage and communicate with residents and businesses effectively IMPLEMENTATION Implementation
Town Council . Annual Planning & Goal Setting . ldentifu and meet
. .
Seruice Delivey needs (Budget) ldentify and meet Facility needs (ClP) Maintaín Fiscal
Sustainability (Budget)
ffi
Administration
lndividual
.Sef Performance
.Set Performance
lndicators (by department/ work group) . Offer work that is challenging, engaging and meaningful
Abjectives and standards . Do meaningful work that makes a dffirence to other people . Keep key questions in
focus
**Vision
ldealized description of desired outcome that inspires, energizes and helps you create a mental picture ofyourtarget.
**
Talks about HOW you will get to where you want to be (achieve your target)
Mission
.ì
tvu'..'.,1,"
rr,¡ 11,..(
il.{l()\
The Community Danvil,l,e was first established in 1858. The Town was settled by two young gotd miners, Andrew and Daniel lnman, who bought 4OO acres in what is today known as the Old Town area of the downtown. The Town was named after the lnman's hometown of Danville, l(entucky.
With the construction of the Bay Bridge in 1936 and the Caldecott Tunnet in L937, central Contra Costa County became accessible to the growing emptoyment centers in San Francisco and Oal<tand. Located in the center of the San Ramon Vatley, the 195Os and 196Os saw Danvitl.e evotve into a pleasant, desirabl.e residential community. Comptetion of lnterstate 68O in Lg68 improved access to the San Ramon Valtey area and further contributed to increased residentiat growth in Danvitte The decades of the t97}s and 198Os saw significant residential growth on the east side of l680 with the devetopment of the Sycamore, Greenbrool<, Sycamore Valtey and Crow Canyon Corridor areas. lncorporated in 1982 with a population of 26¡900, Town population increased to 4t,7LS by the year 2OOO. With a current poputation 42,865, the Town has retained its suburban and semi-rural character, with a mixture of older, wetl maintained neighborhoods and newer subdivisions and homes. The community enjoys a wonderful location, climate and environment. Preservation of open space, major ridgetines and scenic hittsides and other natural and scenic features are a high priority for the cõmmunity. Natural creel<s, hiking and bil<ing trails, and dedicated open space encircle the Town. Mt. Diabto, at 3,849 ft. elevation, rises to the east and the Las Trampas Regional. Wilderness, etevation2,O4g ft. creates the Town's western boundary.
Downtown Danvil.l.e is the historical center of Town. lt offers boutique shopping, many resident service businesses and fine dining. Downtown features a combination of wettpreserved historic buitdings, community buitdings such as the Veterans Memoriat Buitding ånd the Library and a mixture of commercial, office and residential uses. The area is a source of pride to reiidents and is the location for many hol.iday and special events which attract visitors throughout the year from around the Bay Area.
Danvitle's location in ctose proximity to technology, emptoyment centers and higher education, coupled with a high tevet of pubtic safety and excettent schoots continue to make it a popul,ar and sought aftel community, and a unique location within the dynamic and changing Tri-Vattey. The 2O3O General Pl,an adopted in 2C73, continues to chart a course of carefut ãnd timiteâ growth and change for Danvitle, envisioning a buil.d out poputation of 45,000 for the Town. Danvilte's citizens and the Town government are committed to preserving the best of the past whil,e pLanning for the future. Aggressive long-range planning efforts are needed to ensure that future growth is accommodated with minimal impact on the qual.ity of tife desired by existing residents. Achieving this goal, requires the Town Council and Staff to continue to work cõoperativety with the County, util.ity districts, school district, fire district, other cities in the area, and the community-at-targe.
ffi
1
\\'\\'\\'.(1rìr rVl llr .( ;ì.g()\
Town of Danville Statistics
1,2OL7) Date of Incorporation Form of Government Area Miles of Streets Poputation (January
+3,355
luty 1, L982 Councit-Manager 18.8 Square Mites
L45
Street Lights Signalized
3,449
lntersections
54
Buitding Permits Final.ed (Average), March
Facil.ities
Pa
18O per Month
Town Meeting Hal.l. Danvil.Le Library Danvitle Community Center Vil,l.age Theatre e Art CaLl.ery Veterans MemoriaI Buil.ding & Senior Center Oak HiLl. Park Community Center Hap Magee Ranch Parl< Buitdings lown Offices Town Service Center Teen Centers (Charl,otte Wood, Diabl.o Vista and Los Cerros) 5 Community Parl<s - 158.9 Acres 2 Neighborhood Parks - 2.4 Acres 4 Mini Parks - 1.4 Acres 5 Schoot Parks - L8.4 Acres Traits - 18.8 Acres
rl<s/5choo[s/Trai [s
Fire Statìons PubLic Schoo[s Bus Service
ffi
3L,2Ot7
2
TL
County Connection
.)
\\'\\'\\'.(l;rì lYt ì lt ( ;ì.g()\
ffi
(;
\\'\\'\\'.rlir r ì\¡r I ì r.c:r.g()\
4 J
fl
General Fund Revenue
6¡-
Exp. Proj.
Adopted
Adopted
Adjusted
Budget
Budget
Projected
tY 1,61L7
FY 1,61L7
FY 1,61t7
24,336,237
24,336,237
Budget FV
L7IL8
BEGINNING UNRESERVED FUND BALANCE
Operating Revenues Operating Transfers ln Carry forward Less 0perating Expenses
24,t03,236
297,553
297,553
297,553 67!,30! 671,301 -2L,194,690 -2L,542,LgO -20,687,560
25,249,22L 297,553
0
0
-22,322,328
1,000,000 1,000,000 4,206,099 4,762,90L
1,000,000
1,000,000
5,6L7,531
4,224,446
550,000 2,000,000
550,000 2,000,000
550,000 2,000,000
800,000 1,800,000
100,000
100,000
100,000
100,000
Capitat lmprovement
1,556,O99
7,556,O99
L,556,Ogg
1,524,446
Total Transfer to Other Funds
4,206,099
4,206,O99
4,206,099
4,224,446
L,4LL,432
0
CDA Loan repayment
Gross Funds Avaitabte
LE55 TRANSFERS TO OTHER FUNDS
LLADoperations Pavement Management Asset Reptacement
0
ENDING FUND BATANCE
ffi
1
556,802
\\'\\'
\\'.(1 lIl ì\/l I I(
..;ì.g()\
ffi
I
\\'\\, \\'.(1iรฌr r\/t I l!-( ยก.g()\
Summary of Appropriations FUNDING SOURCE
Salaries
&
Benefits GeneraI Fund Peg Fees Police - SLESF Potice - Abandoned VehicLe Potice - Asset Seizure BuiLding & P[anning Engineering Chitd Care lmpact Fee Cas Tax Measure J Ctean Water
LLAD-ZoneA LLAD-ZoneB LLAD-ZoneC LLAD-ZoneD
CTlP RTIP Tassajara Area Tra nsportation O[d Town Parl<ing ln Lieu ERIAD Assessment
District
Misc Development Fees SVAD Benefit District
Tri-VatLey Trans & Dev - Res Tri-Vatl.ey Trans & Dev - Com 5CC RegionaI SCC Sub RegionaI
Dougherty Valley Fee Successor Agency RPTTF TOTALS
m
o o o o 1,901-,459
209,369 o 692,723 21,8,520 1"47,327 298,679
Debt Service
t5,4o4,345 L3,3L5 too,o43 30,22o 28 556,085 6!,900 207 502238
too,o43 30,220 28 2,457,544 271,269 707 L,L94,961 260,L39 597,850
4t,6L8
202,L76 562,534 o o o
Total 22,322,328 t3,31-5
450,523 470,L39 553,264 578,655 983,932 3,775
367,32U-
Donations/Contri butions Asset Rep[acement- Genera I Asset Rep[acement- Lib/CC Civic Facitities Parl< Faci[ities CapitaL lmprovement Park Dedication lmpact Fee
N
6,9L7,983
Contractual Services & Asset Operations Reptacement
768,8t8 920,584 780,831,
t,546,466 3,77s
t,o94
3L6,t33 !,o94
o o
4,985 4,9L4
80,748
t9,9L8
4,985 4,914 LOO,666
o o o
1,776
1,776
78ru.
780 282 300 5f-2 L,368
3,OO7
31-3,1,26
282 300
o o o o o o o o o o o
5t2 L,368 232 40 86 7,6L9
232 40 84 86 7,6L9
2,LgO
2,1"90
8I+
41"9
4t9
23,9o0
t,L8t,5g7 3L3,t26 L,L57,697 32,893,454
11,598,858 L9,823,793
q
r,1-57,697
rl'.r'r,,'.,ltt
r
r,,,l
I
l. -,,'.g,rr
o
Ð SUMMARY OF GENERAL FUND REVENUE SOURCES
o ,) o 4
FISCALYEAR 2017/18 CHARGES FOR SERVICES 0.2%
sArEsrAx 21% s5314K 2.2% S567K
TI
0.5%
TRANSIENT TRANSTERTAX
Êi
$oor 5127K BUSTNESS UCENSE
-
1.5%
$386K
o.-
FRANCHISE CABLE
3.4% s862K FRANCHISE GAS
&
ETECTRIC
2.1% 5s38K FRANCHISE SOTID WASTE 3.9%
F o o )
l-
$gzgx VEHICTE TICENSE FEES 0.1%
$18K
o (n
INTERGOVERNMENTAT f¡% FINES
slK
H
sl7sK
o
& FORFEITS 0.7%
4
rD TNÍEREST TNCOME
1% $254K
RENTAL INCOME 0.696 S159K
Mrsc. REVENUE 0.7% $1s7K
RECREATION FEES
t"
Total
iz',z4g,2zL
ro.z%
& CHARGES
S2ss2K
ct')
Ð
SUMMARY OF TOTAL REVENUE SOURCES FISCALYEAR
F o o
2017/18 ABANDONED VEHICTE ABATE PSSTESF 0.3%
0.1% $19K
PEG FEE 0.3%
) ç
O% $lK
PSASSETSEIZURE
BUITD¡NG
& PTANNING 7.5%
$zzssr ENGINEERING
0.4% $138K
GASTAX 3.3% s1212K MEASUREJ
2.t% s743K
crEAN WATER 1.6% $571K
LLAD-ZONEA 1.6% $s82K ILAD-ZONEB 2.t% 5745K t tA
D
-
zoNE
c 1.8% s652K
LrAD-ZONED 3.t% s1132K DONATTONS/CO NTRTBUT]ONS
0% ssK REPTACEMENT - GENERAT
ox
$eK
ASSET REPI-ACEMENT
- uB/CC
0% $sK SUCCESSOR AGENCY
$2182K 1
-î t:
Total $56, L97 ,665
RPTTI 6%
o U) rË
o o ct)
Ð
o/o
Actual FY
!51L6
Adopted tY t6tt7
Amended
Projected
tY !61t7
FY 761L7
Adopted tY L7lt$
Change From
FY
t6tt7
GENERAT PURPOSE REVENUE GENERAL FUND Property Tax Transfer Tax Sales Tax Tripte FLp Sales Tax
Transient Occupanèy Tax Charges for Services Business License Tax Franchise Cabte Franchise Gas & Etectric Franchise 5o[id Waste
L
lntergovernmental Vehic[e License Fees Fines & Forfeits lnterest lncome Rental lncomeMisc. Revenue
Total RECREATION FEES & CHARGES Charges For Services Sports Al[iance Fees Facility Renta[s Misc. Revenue
Donations
Totat General Purpose Subtotal )
I
.t'-
Fl >)
!2,534,667 568,870 1,O50.O25
4,471,451 747,262 74,092 404,624
9t7,653
12,247,588 532,830
t2,247,588 532,830
6.5 6.5
o 5,3t4,OOO
o.o -1.0
127,277 60,o00 385,770 861.,692
4.2 o.o
o
o
o
5,368,1.28
5,368,128
t26,ot7
t26,oL7
L26,OL7
57,567 385,770 853,160
57,567 385,770
57,567
853,160 538,382 759,805
t7,629 267,732
210,OOO
210,OOO
240,!29
744,271 9,433
!3,O4t,067 567,sso
5,368,128
538,382 759,805 1,0oo !7,857
545,309
32,247,588 532,830
1,OOO
t7,857
385,770 853,160 538,382 759,805 1,0oo 77,957
538,382 978,8oo 1,OOO
1.0
1.0
0.o 28.8 0.o
17,629
-1-.3
210,OOO
175,OOO
-t6.7
253,5L3 158,770
3.2 o.0
t87,3L4 22,667,564
-28.3
245,740 :-58,770
245,740
245,740
192,779 686,100
158,77U.
L58,77U-
267-,178
2?',8t'',oz6
21,765,792
261,178 2L,763,792
27.,763,792
t,9tt,o92
1,813,801 155,379
1,928.801 ]-55,379
1,928,801 L55,379
2,O56,Ot3
1,66,250
397,267
361-,265
36!,265
36t,265
36t,265
8,631o
6,000 3,000
6,oo0
6,ooo
3,OO0
3,OOO
3,O00
13.4 o.o o.o o.o 0.0
2,483,239
2,339,445
2,454,445
2,454,445
2,58L,657
to.4
25,249,221
4.8
-1.0 0.o -1.0
261,t78
25,294,265 24,LO3,237 24,2f'8,237 24,2t8,237
.755,379
6,ooo
4.2
PEG FEE
lnterest lncome Totat
ts
FJ
SPECIAL PURPOSE REVENUE Franchise Cabl.e
U)
92,258 2,876
92,217
92,2t7
92,2t7
9t,304
o
o
o
95,t34
92,217
92,217
o 92,217
9t,30.4
4
F o o )
lts
o
Ð o/o Change
Actual FY
POLICE. SLESF lntergovernmentat lnterest lncome Misc. Revenue
Total
Adopted
!51t6
FY
Amended
t6tt7
FY
!1.4,6!8
100,ooo
477 535 115,630
o o
Projected
Adopted
N t6lt7
t6IL7
FY
From
t7lt8
FY
t6tt7
100,ooo o o
o
100,ooo
100,ooo o o 100,ooo
100,ooo
100,ooo
20,951
18,OOO
18,OOO
18,OOO
18,OOO
L,t60
22,ttt
858 18,858
858 18,858
858 18,858
858 18,858
o
1,OOO
1,OOO
1,OOO
1,OOO
776 176
158
138 1,138
138
138
t,t38
t,t38
o.o o.o o.o
4!!,600
tt.9
100,ooo o
o.o o.o o.o o.o
U)
('
Fl
-)
Ê)
4
POLICE . ABANDONED VEHICLE
lntergovernmentaI lnterest lncome Total
o.o o.o
o.o
POLICE. ASSET SEIZURE
lntergovernmental lnterest lncome TotaI BU¡LDING & PLANNING Charges For Services-Ptanning
448,773
367,675
Charges For Services-Bui Lding Misc. ReVenue
2,5OO,98O
2,282,81.2
367,67s 2,482,8t2
393,675 2,482,8t2
2,3t6,OOO
1.5
52,614
o
26,OOO
o
25,OOO
Totat
3,OO2,367
2,650,487
2,876,487
2,876,487
2,752,600
100.o 3.9
264,!58
129,350 500
729,350 500
729,350 500 o L29,850
t37,350
6.2
500
o.o o.o 6.2
ENGINEEERING Charges For Services-Engineering
Devetopment Fees Misc. Revenue Total GAS
L,507 39
o
o
265,704
129,850
129,850
953,234
896,877
896,877
t4,3t5
Lt,862
lt,862
o
t37,850.
ÏAX
Gas Tax
lirterest lncome Misc. Revenue
Total
ta
1,738
896,817 LL,862
1,200,L30
!1,862
1,597
o
o
o
o
969,L4t
90,8,679
9o8,679
90a,679
1.,21t,992
33.8 o.o o.o 33.4
F o o ¿ (-
o
o/o
Actual FY
MEASURE
t5l!6
Adopted L6IL7
FY
Amended
Projected
FY
FY
t6lt7
Adopted L7IT8
L6It7
FY
Change From
FY
t6lt7
¡
lntergovernmentaI ¡nterest lncome
731,369
71.6,865
9,7t4
8,i11
Misc- Revenue
34,734 775,817
o
Total CLEAN WATER Assessments Charges For Services
lntergovernmentaI lnterest lncome TotaI
2.5
Fl
o
Ê)
742,857
2.5
734,746 8,111
724,976
7L6,a65 8,111 o 724,976
562,736
562,!54
562,L54
562,!54
562,L54
1,492
1,O10 o
1,O10 o
1,O10
1,O10
o
o
7,629
7,629 57o,793
7,629
7,629 57o,793
o.o o.o o.o o.o o.o
to,223 586,058
57o,793
57o,793
LLAD . ZONE A Assessments
578,4A7
lnterest lncome Misc. Revenue À
Totat
LLAD. ZONE
578,334
t,tgt
578,334
t,tgt-
578,334 L,LgT
58o,924
t,LgL
3,302 583,388
o
o
o
o
579,525
579,525
579,525
582,t1.5
743,625 5,290 748,9L5
74a;468 3,276 744,744
741,468 3,276 744,744
74a,468 3,276 744,744
74t,468
664,819 8,576
6s9,63s 2,569
659,635 2,569 o 662,20,4
6s9,63s 2,569
659,635 2,569
o.4 o.o o.o o.4
B
Assessments
¡nterest lncome
Total LLAD. ZONË
L,67u-
3,276 744,744
o.o o.o o.o
C
Assessments
lnterest lncome Misc. Revenue
Total
60,2to
o
733,605
662,20,4
1,o40,756
1,040,758 1,963 88,898
1,O40,758
!,L3t,6t9
L,tst,6L9
o
o
o.o o.o o.o
662,2o,4
662,2o,4
o.o
1,040,758 1,963 88,898
1,040,758
o.o o.o o.o o.o
LLAD. ZONE D Assessments
lnterest lncome Misc. Revenue
Total
I'
7,47t 76,745 t,1.24,972
t,963 88,898
t,t3t,6t9
Fl
o.o o.o
7L6,865 8,111 o 724,976
tt,607
U)
(-
t,963
gg,ggg
t,t31.,6t9
4
r o o H
) l-
o
Ð %o
Actual
tY DONATIONS/CONTRIBUTIONS lnterest lncome Donation
Total
tslt6
Adopted
Amended
Projected
Adopted
IY L6IL7
tY
t6lt7
N L6lt7
FY
t7178
Change From
tY
t6lt7
Misc. Revenue
Total ASSET REPLACEMENT
904
62,005
974 3,760 4,734
974 3,760 4,734
974 3,760 4,734
974 3,760 4,734
0.0 0.0 0.0
22,881 16,627 39,509
9,387 0 9,387
9,387 0 9,387
9,387 9,387
9,387 0 9,387
0.0 0.0 0.0
7,78t 7,78t
4,652 4,652
4,652 4,652
4,652 4,652
4,652 4,652
0.0 0.0
8,766,847
5.2
34,0!6,069
4.9
2,797,59 7
-2.6
0 0 0
0 0 0
2,240,3 01
2,18 1,59 7
0.0 0.0 0.0 0.0
6t,tot
i,
SpeciaI Purpose Subtotal
TOTAT OPERATING REVENUE SUCCE5SOR AGENCY Property Tax - RPTTF lnterest lncome RentaI lncome Misc. Revenue
TotaI
L132,3]-5
8,333,863 8,559,865
a J:
0
9,559,965
34,426,580 32,437,099 32,778,099 32,779,099 1,151,464 655
2t5,L3t 2,461,820 3,829,O70
2,240,301 2,240,30L 2,240,307 0 0
0 o
0
0
2,240,30t 2,240,30t
SuccessorAgencyTotal j,829,070 z,z4o,3o! TOTAT - ALt REVENUE
>) >) Ê)
4
+l
. LIB/CC
lnterest lncome Total
;..¿ i,-¿
ASSET REPTACEMENT . GENERAL
lnterest lncome
U) ('
2,240,30L 2,240,301 2,t81,597
38,255,650 34,677,400 35,018,400 55,019,400
36,197,665
-2.6
4.4
F o o ) (rD
o
Ð SUMMARY OF EXPENDITURES
15
o Ë
FlSCAt YEAR 2017/18
FJ
(-t
ADMINISTRATIVE SERVICES
u,8% MAINTENANCE SERVICES 23%
l¡J
o
Þ
$3889K DEVETOPMENT SERVICES
$zss¿x
13.5% s44s3K
oa
rn X
T5 fD
Þ
al¡r {-t ç Ë rD CN
GENERAL GOVERNMENT 5.9%
$1933K
RECREATION SERV¡CES 12.9%
s4238K Pot¡cE sERVtcEs 29.3% S9644K SUCCESSOR AGENCY 3.6%
s1182K
a
a J:
Total $3Z,ggg ,454
Ð o/o
Actual FY
75t!6
Adopted
Adjusted
tY !61t7
FY
!6tt7
Adopted L7IL8
FY
Change From
FY
L6IT7
GENERAL GOVERNMENT
Town Council Town Manager 'ciry Attorney City Cterk Community Outreach Emergency Prepared ness
Total
'
tzg,otg 599,334
427,664 198,76! 7.5l-,!28 95,177 1,601,O82
!66,274 593,459
1.87,274
t66,249
655,tOt
378,577 277,926 264,147 tt2,l+9o L,792,873
380,679 292,526 289,t47 l-46,365 L,950,O92
808,549 384,673 272,LL7
!83,526
0.o 36.2 L.6 -2.1 -50.5
118,108
5.O
7.,933,27.5
7.8
J
Traffic Investigation School Resource Program AnimaI ControI Total ADM INISTRATIVE SERVICES Administrative Services Management Finance lnformation Technology Human Resources Economic Deve[opment Risk Management lnternaI Services Asset Replacement
Total a
ti a
Þ)
4
Þú
4
o
oa
4
POTICE SERVICES
Police Services Management Patrol
U)
(' ts ') ;J )
t,303,553 4,858,477 91'2,560
765,t0s 5t8,gg7 239,892 8,598,584
363,953 696,2!6 665,352 414,909 327,373 493,143 262,304 2go,649
3,5í3,899
1,486,649 5,to2,5L7 t,o76,609 773,4!8
56t,2go 250,786 9,257.,269
409,701 760,707 693,528 448,362 335,435
1,515,535 5,137,OO9
!,o99,833 773,4!8 56]-,567 250,786 9,338,7.42
409,701
9t6,5to 749,O55 506,o27 52l,,O72
395,OOO
470,OOO
282,964 276,L26 3,6OL,723
337,026 4,27.4,404
305,O13
1,,426,729
-4.O
'-) ,)
5,40]',025
5.9 6.o 6.3 6.6 1.5
rrj X IJ o
t,t4t,405 822,308 598,409
254,6t8 9,644,494
356.898 779,365 655,305
4.3
-t2.9
633,600 285,525
2.5 -5.5 4.6 18.1 60.4 o.9
3t3,!26
1-3.4
3,888,736
8.o
46g,7gO
396,!27
)
c-.
(.t ç
4
o cn
Ð
o/o
Actual FY L5IT6
240,507 605,441
t,490,244 95,909
-
r:
RECREATION, ARTS & COMMUNITY SERVICES Recreation Management Sports & Fitness Facilities Management Culturat Arts Youth Teens Adutts Seniors
t13,833 5OO,921
59t,733 436,242
713,754 437,276 292,065 4,284,88L
4,L42,217
Total
245,975 608,234 !,372,823
406,975
275,1-66
MA¡NTENANCE SERVICES Maintenance Services Management Buitding Maintenance Parl< Maintenance Roadside Maintenance Street Maintenance Street Light Maintenance Traffic SignaL Maintenance Equipment Maintenance
;
Adjusted FY
L6It7
Adopted FY T7IL8
FY
t6IA7
U) (Èr
F.¿ F¿
DEVELOPMENT SERVICES Development Services Management P[anning
Building Code Enforcement Engineering Capitat Project Management Transportation Ctean Water Program Total
Adopted FY 1,61!7
Change From
245,975
265,460
7tL,368 !,562,823 Lt3,833
656,071-
5t8.,L93 735,228 543,!65 463,414 4,895,999
1,462,842 121,,692
36t,oo4 457,35U-
435,432 293,347
4,453,t98
7.9 7.9 6.6 6.9 -27.9 20.1 -o.4 o.4
3.9
Ê)
Ë
FÚ Ft
0a
4 )!
336,405 789,76s L,67o,O37 1-,254,830
359,836 869,587 2,O93,649 1,674,5t9 939,499 721,826
385,794 92L,427
374,836 883,743 2,1.53,998
2,t87,!64
t,767,1+69
1,688,156 1,OO8,521
223,OOO
939,858 752,427 276,!55
232,38!
408,O30
457,O75
360,353
5,82L,7o3
7,289,945
7,605,261
7,554,32t
74L,37t 630,A69 166,845
779,906 223,OOO
7.2 6.o 4.5 o.8 7.3 8.o o.o -11.7
3.6
-l )
rn X
13
o ) a(-t l-
4
346,955 572,O78 465,239 585,490 407,123 341,893 97,796 356,L82
390,896 648,7t3 524,868 705,793 5o2,796
383,627 653,699 501,O51 582,69a 4L6,O35 401-,4to L28,528
399,436 654,771 50L,342 698,706 4L6,O35 402,999
t28,61!
4t6,532 13t,560
44]-,t58
443,26L
455,673
7.9 -o.8 4.8
2t.t 20.9 3.8 2.4 3.3
rD ct)
7o Change
Actual FY
Library Services Community Events Total TOTAL OPERATING EXPENDITURES
t5lt6
Adopted
Adjusted
FY
FY
t6tt7
From
t6tt7
;.ì
203,794 257,268 4,237,893
3.5 -4.1 6.7
,-)
30,193,970 t2,LL2,288 tL,7tt,g57
5.O
19o,592 220,8o2
t96,9L4
3,58,4,7,50
3,973,279
2 7,26'.,636
Adopted
U) ('
268,167
t6tt7 t96,9!4
268,3L5 4,LtO,39O
FY
t7IL8
FY
4 FÚ
SUCCE5SOR AGENCY Successor Agency
4
4,239,30t
!,18!,597
t,23g,3Ot
7,,A87,,597
-4.7 -4.7
TOTAL - ALL EXPENDITURES
31,O52,O80 3L,433,27L 33,35l-,58.9 32,893,454
4.6
4
CAPITAL APPROPRIAT¡ONS
11,090,615 9,t49,345
39.L
5 )
3,790,444 3,79o,444
TotaI
ToTAt OPERATING &
GAPITAL
1",23934L L,239,30L
1,6,8,0,0.,752
1"2,722,1,91,
4z,L4z,6gs 4o,s82,6:'6 so,Ls2,34l. 4s,6Ls,64s
oa
.:rz..4
FN
X
IJ o e(-f ('
4
o (r)
ta
Ð
U) OPERATING EXPEN5ES BY CATEGORY
i
FISCALYEAR 2OI7I2OL8
Employee Expenses CENERAT GOVERNMENÏ POLICE SERVICES ADM IN ISTRATIVE SERVICES
1,585,399
L64,304 1,855,529
DEVELOPMENT SERVICES
3,514,863
MAINTENANCE SERVICES
2,877,544
RECREATION, ARTS & COMMUNIÏY
1,607,199
Temporary
Materiats
Salaries Administration &Supplies
0
108,815
95,912
Contracted'
>) Program
Services Equipment Activities
50,589 2,500
90,000
245,000 51,500 100,500 8,587,1+84 182,500 313,206 60,500 737,642 286,843 280,067 4L6,136 852,019 76,000 to2,375 t68,460 578,000 8,500 5,000 147,257 tL8,922 510,881 L,g72,487 270,508 L,656,727 632,672 709,336 386,325 1,163,243 28,568 316,550
TotaI
t,933,275 9,644,494 3,888,736
¡,
11,598,838
L,L6L,429 628,590 t,548,gzt L2,63L,870 908,7L2 3,213,497
FÚ Ë
4,453,798 7,554,321 4,237,893
ca
5L,71L,857
Þ) Fl
SERVICES
TOTAT
4
4
rc X ìJ o
er-t ç Ë
o U)
Ð o/o
Actual FY 1,5116
Adopted
Adjusted
FY
FY
t6tt7
t6lt7
Adopted FY T7IL8
Change From
FY
t6tt7
U) l'
;-.t
;.ì
APPROPRIATIONS BY FUND
Ê) GeneraI Fund Peg Fees Potice - SLESF Police - Abandoned Vehicle Police - Asset Seizure Buil.ding t Planning Engineering Child Care lmpact Fee Gas Tax Measure l Clean Water t\j
LLAD-ZoneA LLAD-ZoneB LLAD-ZoneC LLAD-ZoneD nations/Co ntri b utions Asset Replace¡nênt- GeneraI Asset Replacement- Lib/CC Civic Facilities Park Facilities Capitat lmproveme¡t Park Dedication lmpact Fee Do
CTIP RTIP Tassaja ra Area Tra nspo rtatio n
Old Town Parking ln Lieu N ERIAD Assessment District Misc Devetopment Fees
l ta
t9,t15,4o3 to,o24
2t,Lg4,690
L43,840
3t
5,O37
2,2t5,326 38t,zgL
2,5o8,460 391,558 227 1,246,295 299,].88 749,809 838,224 930,6L4 753,142 1,505,580 3,89o 428,064 1,200 5,476 5,428
2,457,544 27t,269 207
94J75
loo,666
L,949 857 309 303 563 1,515 250
1,776 780
16,OO1
L4,337 2,309,o39 291,7a4 273 996,O95 294,7A9 446,746 548,622 .707,170
22,!8O,gO2
22,322,328
1-3,357
t9,338
t3,3t5
100,049 30,242
100,048 30,242
100,o43 3c.,22c 28
227
t,t5o,78L
4,441 6,o40 155,254
260,829 578,46c 801,955 874,O3t 722,840 1,464,739 3,800 279,745 1,201 5,476 5,428 91,375
7.,996
r,949
779
857 309 303 s63 1,515 250
63t,679 t,255,9t3 55,O71
248,365
t,o70
57t 249 663 4,143 . 170
1,7.94,96L
260,!39 597,850 768,81,8 920,584 780,85t
t,546,466 3,775
3L6,t33 t,og4 4,995 4,91.4
282 300 5]-2
t,368 232
5.3 -o.3 o.o -o.1 -9.O 10.9 -28.9 -8.9 3.8 -o.3 3.4
-4.t 5.3 8.o 5.6 -a.7 13.O -8.9 -9.O -9.5 10.2 -8.9 -9.O -4.7 -1.O -9.L -9.7 -7.2
4
FÚ
Ë
0a
4
)¡/
3 t-rl
X
ì5 o e.(.t l-
4
o CN
Ð
o/o
Adopted
Actuat FY
District Tri-VatLey Trans & Dev - Res Tri-Vattey Trans & Dev - Com SVAD Benefit
SCC Regional.
Regional Dougherty Valley Fee Successor Agency RPTTF
SCC Sub
TOTALS
t5lt6
FY 1,61t7
80
44
a6t
92 94
95 1,801 2,202 70 3,790,444
4J63 2,400 459 7",240,30t
31,O52,O80 3L,433,271
Adjusted FY L6IL7 44 92 94 8,363 2,400 459 t,240,301
33,35L,589
Change From
Adopted FY 7.71L8
FY
40 84 86
t6lt7
-9.1-
U) ç F.{ F¿
-9.O
Ê)
L,L81,5g7
-8.9 -8.9 -8.8 -8.7 -4.7
FÚ
32,893,454
4.6
7,6t9 7,t90 41,9
4
4
0a
4
;-.¿
l! N
rn
ÌfX
o ¿
arì -
4
o CN
J:
Personnel Allocation by Service Program STAFFING ALLOCATION BY SERVICE PROGRAM
Service Program
GeneraI Government Potice Services
Permanent Staff
Contract Staff
Temporary'! Staff
6.75 L.75
o.oo
o.oo 6.oo
37.75
1,.25
1,6.25
TotaI 6.75
nistrative Services Devetopment Services Maintenance Services Recreation, Arts Et Community Services
28.OO
30.oo o.oo o.oo o.oo
tr-7s
o.oo
22.50
38.25
TOTAT
94.75
50.oo
55.50
L60.25
Ad mi
15.OO
27.50
2.75
30.25
3.OO
31.OO
Based upon converting total part-time temporary hours budgeted to futl-time equivatents (1,950 hours equals 1.o FTE)
RECOMMENDED STĂ&#x201A;FFING CHANGES
Service Program General Government Town Manager Ad mi
E[iminate 1.o Administrative Assistant Add 1.O Assistant Town Manager
nistrative Services
Management Human
Resources
Economic
Development
Reduce 1.O Administrative Coordinator to O.5 Administrative Coordinator Re-cl.assify 1.O Human Resources Technician to 1.O Human Resources Anatyst Add O.5 Program Coordinator
Recreation, Arts and Community Services
Management
ffi
Re-cLassify 1.O Recreation Services Manager to 1.O Recreation, Arts and Community Services Director
2:t
r'ryrr'.i1lrr rvr I l, .t';r.gtrr
Personnel Allocation Detail Service P
ram
Position
Total Personnel
GENERAL GOVERNMENT Town Manager Town Manager Assistant Town Manager Assistant to the Town Manager
1.OO 1.OO 1.OO
city Attorney
1.OO
City Cterk
1.OO
Pubtic I nformation Coordi nator
1.OO
Emergency Preparedness Manager
o.75
City Attorney City Cterk
Community Outreach Emergency Preparedness
6,75
GENERAL GOVERNMENT TOTAL
POLICE SERVICES Police Services Management Police Chief Administrative Lieutenant Admi nistrative Assista nt Temporary
1.OO 1.OO
1.00 3.OO
Patrol Sergeant Officer
4.OO
16.00
Traffic Sergeant Officer Temporary
1.OO
3.O0 2.OO
lnvestigations Sergeant lnvestigator Temporary
1.OO 1.OO
School Resource Officer Schoot Program Coordinator
2.OO
1.OO
Schoot Resource Program
37.75
POLICE SERVICES TOTAL
ffi
o.75
¿4
.r'ryr,,'.,1rrr ryr
Il,'.( lr.!()\
Personnel Allocation Detail Service Proqram
Total Personnel
Position
ADM INISTRATIVE SERVICES Admi nistrative Services Management
Administrative Services Director Admi nistrative Assista nt Administrative Services Coordinator
1.00 1.00 0.50
Fi nance Manager/Treasurer Accounting Analyst Accounting Technician Account Cl.erk ll Temporary
1.00 1.00 2.00 1.00 0.25
lnformation Technotogy Manager nformation Technotogy Anatyst I nformation Technology Technicia Temporary
1.00 2.00 1.00 0.50
Finance
I
nformati on Tech nolog,¡ I
n
Human Resources Human Resources Manager Human Resources Analyst Temporary
1.00 1.00 0.50
Economic Devetopment Manager Program Coordinator
1.00 0.50
Economic Development
ADMINISTRATIVE SERVICES TOTAT
1.6.25
DEVELOPMENT SERVICES Development Services Management Devetopment Services Di rector Planning Chief of Planning PrincipaI Ptanner Associate Ptanner Administrative Assista nt Temporary
ffi
2i¡
1.00 1.00 1.00 1.00 o.75 1.00
\\'\\' \\.( iiil ì\,r I ì( .( ;t.g()\
Personnel Allocation Detail Position
Service
Total Personnel
Buitding Chief Buitding OfficiaL Plans Examiner Buitding lnspector Development Coordinator Senior Devetopment Services Technician Devetopment Services Technician Temporary Code Enforcement
1.OO 1.OO 5.OO 1.OO 1.OO 2.OO
o.50
Ass't Ptanner/Code Enforcement Officer Admi nistratìve Assista nt
o.25
Civit Engi neering Assistant Pubtic Works Inspector Admi nistrative Assista nt
1.OO 1.OO 1.OO
Senior Civit Engineer Landscape Architect Associate Civil. Engineer Pubtic Worl<s I nspector
1.OO 1.OO 2.OO 2.OO
Transportation Manager Traffic Engineering Associate Transportation Program Anatyst Temporary
1.OO 1.OO 1.OO
1.OO
Engineering
CapitaL Project Management
Transportation
Clean Water
Clean Water Program Coordinator Temporary
o.25
o.50 1.OO
30.25
DEVELOPMENT SERVICES TOTAL
MAINTENANCE SERVICES Maintenance Services Management Maintenance Services Director Maintenance Services Coordinator
1.OO 1.OO
Buitding Maintenance ntenance Specialist Maintenance Worker Temporary Mai
ffi
)('¡
1.OO 2.OO 1.OO
rt *'ir'.,llrrrvl |ì, .( :r.g(l\
Personnel Allocation Detail Service
Position
Total Personnel
Park Maintenance
Maintenance Supervisor Maintenance Specia [ist Maintenance Worl<er Temporary
1.00 3.00 5.00 1.50
Maintenance 5u peri ntendent Maintenance Supervisor Mai ntena nce 5pecia [ist Maintenance Worker Temporary
1.00 1.00 1.00 4.00 0.50
Maintenance 5u pervisor Maintenance Specia [ist Maintenance Worl<er
1.00 1.00 3.00
Maintenance Worker
2.00
Roadside Maintenance
Street Maintenance
Street Light Maintenance MAINTENANCE SERVICES TOTAL
31.00
RECREATION, ARTS & COMMUNITY SERVICES Recreation, Arts & Community Services Management Recreation, Arts & Com. Svcs. Director Temporary Sports and Fitness Program Supervisor Program Coordinator Temporary Facilities program supervisor Program Coordinator Admi nistrative Assistant Facitity Attendant Temporary
Management
ffi
Âża
1.00 o.75 0.50 1.00 8.oo 0.50 1.00 1.00 2.00 2.75
tvs'*.t1'rrrvtll,,
".g,rr
Personnel Allocation Detail Position
Total Personnel
Cultural Arts Program Supervisor Program Coordinator Temporary
1.OO 2.OO
Program Supervisor Program Coordinator Temporary
0.50
Program Supervisor Program Coordinator Temporary
o.50
Program Supervisor Temporary
o.50 o.50
Program Supervisor Admi nistrative Assi sta nt Temporary
0.50
o.75
Youth Services 1.OO 4.OO
Teen Services
Adutt Services
1.25
4.50
Senior Services
Community Events Program Coordinator RECREATION, ART5 & COMMUNITY,ยกERV_lรงFs TOTAL
prfisciNNร l
ffi
rorru
1.OO
L.25
o.50 38.25 7,60..25
2{l
s rvu.,1;rr
rvr
Il,'.( ir.!()\
I'I
't
ì,
s
\
I
\
?.
þ,,
\r
t/
æ .:
I
JI
¿:<r-
,'r/
i
/
;,/''
,/,
'ø,Ølt 1,
/¡¡
/¿ Jø ir
.t"
Í
ir .\
ú
s
N
l. \.\1 r¡$ ,\
lr
\ì' -i
\'
r-
( ,\ À t
ù.'. D
{
',/,
'ul'
((
S -z\E
ffi 'r'r/
a
o
ñ\w
t,\\\ I
4r F í.
I
't'
N*ì,#
T\ *,*
;
¡
/ ¡
1., ''s'
?-
{N
\
t
-
t tf *1--'
*-.l It
¡¡na¡da*arü
General Government Actuat
tY L5lt6
PROGRAMS
Town Council Town Manager
CityAttorney City Cterk Community 0utreach Emergency Preparedness
Adopted
5 5
TY
TOTAL
L6IL7
FY
Adopted
t6tt7
tY
5 L97,274 5 5 655,tor 5 5 380,679 5
Lzg,otg
5
L66,274
s99,3s4
5
593,459
5
378,577
5
277,926
5
264,147
5
LL2,4gO
5 5
8
$
500
5
500
51, 779,5 73
5
t,829,480
5 tzl,664 5 t98,76t 5 rsr,tz8
5
Adjusted
9s,t76 2
5
zgz,sz6 2gg,!47 t+6,365
t7lt8 1,66,249
808,548 384,673
5
272,1.1,1
5
L83,526
5
118,108
1,g5o,o9z
15
FUNDING
Donations/Contri butions
5
500
GeneraI Fund
5
L,59L,047
5
0
5
0
5
0
5
0
5
0
5
0
5
9,535
5
12,800
5
12,800
Buitding
I
Measure
I
Ptanning
PEG Fee
$
TOTAT
780
PERSONNEL
FTE
PERMANENT
6.7s
5
soo
$ t,765,005
5 5 $
88,516
66,394 tz,Boo 1
6.75
ffi
2f)
rvrvs.tlirrrvlllL -r'l.gttr
Town Council PROGRAM DESCRIPTION The Town Council is etected to represent the citizens of Danvitte, and to set poticy in att areas of munlcipat affairs. The Town Council also serves as the Successor Agency to the
former Community Devetopment Agency, the Danvitte Financing Authority and the
DanvitLe Disaster Council. The Town Council annuatty reviews and formulates goals and priorities for the Town government; adopts a batanced budget that identifies municipaL services to be provided and a five-year Capital, lmprovement Program that prioritizes capitat needs and spending. The Town Council appoints commission, committee and board members, who advise the Council in various areas.
Council members serve in various capacities through participation in [oca[, regional and state organizations, inctuding: League of Catifornia Cities, Association of Bay Area Governments, Contra Costa Mayors' Conference, Contra Costa Transportation Authority, County Connection, RecycleSmart, Tri-Val,Ley CounciI and Transportation Councit, i-GATE, Visit Tri-Val.l.ey, East Bay Economic Development Attiance, East Bay RegionaI Communications System Authority and the San Ramon VaLLey Citizen Corps Councit.
The Town Council worl<s with other Tri-Vatl.ey cities to support federal Legislative advocacy efforts that benefit transportation, economic development, emergency preparedness and other goats estabtished by the cities. GOALS
{. Promote open government and encourage civic invotvement. * Adopt a batanced operating budget and ensure that the Town remains
on
a
fiscal,l,y sustainable course long term.
ÂĄr. Work towards enhancing the economic vitality of downtown. tr. Represent the Town's best interests by exercising leadership at the regionaf state and federal levet. HIGHLIGHTS
tr. ln 201,61l-7, the Town Council: o Adopted ordinances updating the buil.ding code to meet State guideLines; increased the recycting requirement for construction demolition and debris; regutated the sale, cultivation, processing and delivery of marijuana; reĂŁuthorized the Pubtic, Educational and Governmentat (PEG) fee on State
o {.
ffi
video franchises. Advocated for Danvitte on regional transportation issues, inctuding the Contra Costa Transportation Authority's proposed ha[f-cent sates tax measure.
ln 2Ot7lt8,.the Town Councit witl continue to set direction and poticy for the betterment of and in the interest of the Danvitte community. 3o
r'rr',r'.ti;rr rt,t I lt ., r.gor
EXPENDITURES ActuaI
tY 1.5116
Category
Emptoyee Expenses
5
Administration
5
Materiats
I Suppties
Contracted Services Equipment Other
Adopted
Adjusted
T6IL7
tY 1.6tt7
FY
5
5
49,05L 51.,t74 7,850
5
20,gtl-
5
5 5
32 0
s
57,135 66,825 L8,925 23,389 0 0
5 5
5
5
57,135
5
5
72,1"50
s
5
t3,926
5
5
24,063 0 0
s
5
s
L29 01
TOTAT
Adopted FY L7178
57,745 68,065 17,050 23,389 0 0
5 5
187 274
EXPENDITURE DETA¡L Emptoyee Expenses: monthty CounciI member costs inctude: 5675 sa[ary; SzoS heatth care reimbursement; 525 deferred compensation and 554 workers'compensation and FICA.
Administration :534,46|for dues/memberships and 533,605 for hosted meeting/conference
.*O.nr.r.
Materiats and Suppties: S6,300 for community awards; 55,OOO Mayor's discretionary fund and 55,750 for Town'hosted activities, proctamation supp[ies, and miscellaneous expenses. Contracted Services: 5zt,5oo for federaI advocacy services and 51,889 for tetevising of the annual Community Awards event.
FUNDING
GeneratFund
5
t28,sLg
$
Donations/Contributions
5
500
$
t65,774 500 L66,274
TOTAT
ffi
ll
5
186,774
5
$
500
5
L65,749 500
[87
\\'\\'\\'.rirrr ì\,r I l( .( ;ì.g()\
Town Manager PROGRAM DESCRIPTION
The Town Manager is appointed by the Town Council to serve as the Town's chief administrator, Executive Director of the Danvitte Financing Authority and Director of Emergency Services. The Town Manager serves as a Board Member on the East Bay Regional Communications System IPA and the Oversight Board for the Successor Agency to the former Com mu nity Development Agency. The Town Manager provides overatt administration and direction for a[[ areas of the Town government. The Town Manager ensures that atl, goats established by the Town Council are met, supports the Town Council by presenting information and recommendations that facititate informed pol.icy making, facititates communication among the Town Counci[, commissioners, Town staff and the community, and coordinates working retationships with external agencies and organizations.
GOALS
{. Assist the Town Council in establishing
{.
* * *
annual and long-term goats that support the government. vision and mission of the Town Ensure the provision of effective, high quaLity pubtic services to Town residents and customers. Careful,ty manage Town finances to batance the need to deliver service in areas of highest þriority, white ensuring tong-term fiscaI sustainabitity. Create and maintain a worl<ptace characterized by leadership, innovation, enthusiasm and high standards of accomptishment. Effectively partner with other government agencies and service providers.
HIGHLIGHTS
.!.
ln 2OL6lL7,the Town Manager's Office: Coordinated the Annual Town Councit Pl.anning & Goat Setting Worl<shop and the Annual Town CounciI Commissions Worl<shop. Successfutty negotiated the purchase of property for the future expansion of the Vittage Theatre Parl<ing Lot on Front Street. Continued to serve as representative to the Danvitte Library, Museum of the San Ramon Valley, Veterans community, and RecycteSmart. Continued legislative advocacy efforts at the state and federal [eve[s, inctuding participation in the Tri-Val,l,ey Cities consortium. ln 2Ot7ltï,the Town Manager's Office witl continue to provide leadership to Town staff and implement the goals established by the Town Counci[.
o o o o
* *
ffi
I
An Assistant Town Manager position is created through re-ctassification of an existing department head position, and shifted into the Town Manager's Office; 1.o Administrative Assistant position is etiminated. 32
r'rv
rr'.L1rrr rr,¡
llt .i lr.!or
EXPENDITURES Actual L5IT6
Category
Employee Expenses Temporary Sataries
TY
5
5
Administration
5
Materials & Suppties Contracted 5ervices Equipment Program Activities
5 5 5
5
589,662 352 5,907 L,245 400 0
t,768
5
s s 5 5
s s
Adopted
Adjusted
tY 16t77
tY
582,477 0 9,532 L,450 o 0 o
5
s 5 5 5 5 5
TOTAI
Adopted
t6lL7
FY
607,975 0 LO,L32 L,450 0 35,544 0
L7It8
5
797,706
5 5 5
0
9,692 1,150 0 0 0
5 5
s
101
EXPENDITURE DETAIL Employee Expenses: reflects an increase in staffing from 0.5 Assistant to the Town Manager to 1.0 Assistant Town Manager.
Administrationi 57,oL7 for professional dues and 52,675 for travel and conference attendance Materials and Suppties: miscetlaneous suppties and subscriptions.
FUNDING General Fund Measure I
5
599,334
5
0
5
65 5 10 L 0
5
0
5 5
5 93 ,459
5
Buitding & Pl,anning
5
0
5
0
5
0
5
653,638 88,516 66,394
TOTAT
5
S
808,s48
s99,334
$
s93,4s9
$
655,101
5
PERSONNEL PERMANENT
ffi
FTE
Town Manager Assistant Town Manager Assistant to the Town Manager
1.00 1.00 1.00
TOTAL PERMANENT FTE:
3.00
\\,\\'\\'-Llrìrt\'l Il( ( :r.g(l\
City Attorney PROGRAM DE5CRIPTION The City Attorney is appointed by the Town Council and serves as the principal Legat advisor to the Town, inctuding the Town Council, advisory boards and commissions and Town staff. The City Attorney's Office atso oversees the risk management function. The City Attorney keeps Town officials aware of changes in the [aw, providing tegat anatysis at the earliest stage of poLicy devetopment and worl<ing to develop a range of alternatives to achieve the desired poLicy goats.
The City Attorney serves on the Board
of Directors for the Municipal,
Pooting
Authority, a risk management and insurance pool for cities in the region. GOALS
* {.
*
{.
Advise the Town Councit, commissions and staff on a broad range of Legat issues, incl,uding [and use, publ,ic safety, personnet, code enforcement, public records, ethics and the Brown Act. Minimize the Town's exposure to litigation and associated costs. Draft and review a[[ Town ordinances, resotutions, contracts, leases and other legat documents. Manage litigation invotving the Town and manage other dispute resotution Processes.
HIGHLIGHTS
{.
ln 2ot6lL7, the City Attorney's Office:
o
Continued to worl< with the Town's Oversight Board in the dissolution of the Town's former Community Devetopment Agency, incl.uding disposition of al,[ remaining assets of the former CDA and adoption of a Last and Finat ROPS, providing certainty to al[ required future payments.
o Worked with the Town's Maintenance Department to obtain risl< management grant funding for a tree management program. o Prepared an ordinance addressing recreational marijuana uses potentiatl,y altowed by passage of Proposition 64.
{.
ln 2oL7lLĂ&#x2122;,the City Attorney's Office wit[:
o Complete the update to the Town's ADA Se[f Evaluation and Transition P[an. o Work with the Town's HR Manager and outside counsel to comptete an update of the Town's Personnet Pol,icies and Procedures. o Work with the Town's Planning Division on continued updates to the zoning ordinance.
ffi
J4
rvrt rt.,Ă&#x152;lrrrvrll, .( ;r.g()\
EXPENDITURES Actual
tY
Category
Adopted
t5lt6
tY
Employee Expenses
5
3tt,2to
s
Administration
5
2,OgL
5
Materiats & Suppties Contracted Services Program Activities
5
3,848 L2,898 97,6L7
5
5 5
332,477 1,450 4,650 0 40,000
5 5
Adjusted
t6lt7
FY
Adopted
t6lL7
FY
5
332,477
5
5
t,450
5
5
4,650 2,L02 40,000
5
5
s
5 5
L7It8 347,973 2,050 4,650 0
30,000
67t
TOTAI
EXPENDITURE DETAIL Administration: funding for professionaI dues and travet. Materiats and Suooties: 54,650 for tibrary and reference materiðls. Program Activities: 550,000 for outside counset to provide tegat assistance on speciatized matters such as tax and pension matters, land use and CEQA and titigation not covered by the Municipat Pooting Authority.
FUNDING General Fund TOTAT
5 427,664 5 37g,stl .5 $42 S 37g,s77 $
390,679 390,679
5 $
38+,613
394,67t
PERSONNEL PERMANENT
ffi
FTE
City Attorney
1.00
TOTAL PERMANENT FTE:
1.00
ì5
tr't', $.tl;rt rr,¡ IlL .(
;ì-11()\
City Clerk PROGRAM DESCRIPĂ?ION
The City Cl,erk serves as the Town's elections official. and rec.ords manager, Prepares Town Council agendas and maintains att legislative history, ensures that required [ega[ notices are appropriatety pubtished, maintains the Municipal Code and performs other statutory duties as required. The City Cterk's Office compties with al,t federal and state laws inctuding the Catifornia Government Code, California Etection Law, FPPC, Ralph M. Brown Act and Publ.ic Records Act.
The City Cterl<'s Office assists other departments by overseeing maintenance of Town contracts and surety bonds and conducting the pubtic bidding process. GOALS
{.
Maintain an accurate and complete Records Management Program, inctuding the legislative history of the Town Counci[, commissions and committees. * Provide pubtic access to information and respond to requests for pubtic records. .!. Serve as the Town's elections officiaU conduct biennial Town Council elections and speciaI elections as necessary. {. Maintain the Town's MunicipaL Code and perform quarterly Code updates. * Conduct biannual recruitments for Town commissions, boards and committees. HIGHLIGHTS
*
ln
2o16lt7,the City Cterk's Office:
o Provided pubLic access to video recordings of Town Council and Planning Commission meetings via the Town website. o Recruited to fitl.23 positions on Danvi[[e Commissions and Committees. o Continued imptementation of the new Records Management Program. o Updated the Danvitte Municipal Code to reftect adopted Ordinances. *
ln 2oL7lL&,the City Cterl<'s Office witL:
o o
ffi
lmptement electronic fil.ing of Campaign statements for elected officiats, Conftict of Interest Form 700 disctosures, and Ethics Education proof of participation. lmplement the use of digital, signatures on Town documents.
.l fr
rr'.r'l'.,1,u rvr ll, ., :,.q,r.
EXPENDITURES Adtual Category
FY
15/16
Adopted
Adjusted
tY t6tL7
TY
Adopted
T6IL7
tY
Employee Expenses
5
t64,243
5
171,,898
5
Administration
s s
7,260 20,485 6,773
5
9,903 53,100 63,O25
5
L2,1.44
5
36,364 72,120
Materials & Suppties Contracted Services
5
5 5
t7L,8g8
5
TOTAT
5 5
t7lt8 t83,396
5
L2,683 64,332
5
tL,700
292,526
LLI
2
EXPENDITURE DETAIL Administration: 58,783 for advertising and 5j,9OO for dues and trave[. Materiats and Suppties: Costs increase to implement new Records Management software incl.uding DocuSign (digitat signatures), eDisctosure (filing Form 700s), eCampaign (fiting campaign statements), and eFite (tracking ethics training). Costs inctu de:522,726 for software maintenance, 5t7,Boรณ for software licensing, and 56,000 for Records Management suppLies; 512,800 for video streaming on the Town's website (Granicus); and 55,OOO for misceltaneous suppl.ies and printing. Contract Services: 5tt,7oo for Municipal, Code updating and Electronic Document Management plan.
FUNDING General Fund
5
PEG Fee
5
TOTAT
t89,225 9,536 1
265,L26 12,800
5
s
277 926
6L
5 5
279,726 12,800 2
26
5 5
259,311 12,800 27
11
PERSONNEL PERMANENT
ffi
FTE
City Cterk
1.O0
TOTAL PERMANENT FTE:
1.O0
l/
tr'tVrr'.tl;r I rVt
I
lL .(
iรฌ.u()\
Community Outreach PROGRAM DESCRIPTION
Community Outreach promotes government transparency, communication, and civic engagemeñt through marl<eting, media relations, sociaI media and in-person efforts. Services provided through Community Outreach include: maintaining a current--Town website wnictr provides information about the Town Government and services; offering an ontine newsletter; preparing and distributing press reteases that address current news and information; serving as,a point of contact for the community and media; and using several social media platforms to provide timel.y and relevant information on Town programs, events, projects and policy decisions GOALS
* * *
Prepare and disseminate accurate and timel.y information on Town activities, programs and services to residents and constituents through printed publications, digitat media, and in-person efforts. Create opportunities for citizen involvement and engagement through the Town's website, community workshops, outreach activities and speciaI events. Provide a consistent voice in emergency communication
HIGHLIGHTS
*
ln 20!61t7, Community Outreach: o Expanded the use of Nextdoor as a primary socia[ media toot, reaching5go/o of Danvitl.e househotds; and continued the use of Twitter and Facebool<. o Began using Facebook Live as a videocasting service for communications. o Expanded the use of Nixl.e for pubLic safety text and e-mail aterts. o Suþported in-person community engagement efforts for Coffee and Cocoa with the Cops; the Parl<s, Recreation and Arts Strategic Plan; and Community Branding and Marketing Plan.
o o
{.
ffi
Continued outreach efforts
on pol.icy issues, inctuding the Plastic Bag
Ordinance, Smol<ing Ordinance and Community Choice Energy. Re-taunched a 12-page quarterty newstetter, mailed to 20,00O postal patrons.
ln 2o!71t8, Community Outreach wi[t: o Cotl.aborate with Economic Devetopment to imptement the Community Branding and Marketing Ptan. o Continué quarterly Mayor's Town Ha[[ events for the publ.ic to meet elected officiats and staff to discuss issues face-to-face. o Buil,d upon a partnership with the Chamber of Commerce on lnstagram.
)Õ
rvrvn'.,1;u rvt
ll,,':t.g,r.
EXPENDITURES ActuaI Category
FY
t5lt6
Adopted
Adjusted
Adopted
T6IU
tY 1,6tt7
FY
FY
Employee Expenses Administration Materials Suppties Contracted Services Program Activities
5 5 5 5 5
t43,78L
5
2,928 3,857 562 0
5
$
L73,497 9,150 14,000 8,500 60,000
TOTAT
S
151,128
5
264,147 s
I
5
s
5
t73,497
s
9,150 14,000 32,500 60,000
5 5
s
288,147
5 5 5 5 5
$
t7lt8 tos,47t 6,325 3,730 8,000 60,000
Lg3,sz6
EXPENDITURE DETAIL Emptoyee Expenses: reftects e[imination of 0.5 Assistant to the Town Manager.
Administration: 54,150 for outreach needs related to pol.icy education (e.g., Community Choice Energ¡y) and sociaI media posts; and 52,t75 for professional development. Materiats and S!¡ppties: 53,OOO for printed marketing materiaU 5¿OO for suppLies; and 53j0 for postage, reference materiaI and software [icenses. Contracted Services: 53,ooo for graphic design services and 55,ooo for website consultant services. Program Activities: 560,ooo for design, printing and maiting of the quarterly Town newstetter.
FUNDING General Fund TOTAL
5
r5r,rz8 5 15
128
264,147 2
147
5
2gB,L47 28
147
S
tg3,sz6 526
PERSONNEL PERMANENT
FTE
Pubtic lnformation Coordinator
1.00
TOTAL PERMANENT FTE:
1.O0
,lf)
rt rvu'.L1rrrrvr |ìi ., lr.gor
Emergency Prepare dne s s PROGRAM DESCRIPTION Emergency Preparedness devetops and maintains up-to-date disaster response plans and coordinates [oca[ efforts to maintain the Town in a state of readiness. The Emergency Preparedness Program reftects the high priority assigned to planning for and managing any man-made or natural disasters that may arise and affect the Town. All, government employees function in a secondary rote as disaster service worl<ers in the event of a declared emergency. Town emptoyees receive basic disaster preparedness training in their first year of empl.oyment. San Ramon Vatl,ey agencies worl< coltaborativety to recruit and train disaster volunteers through the San Ramon VaLl'ey Emergency Preparedness Citizen Corps Council (SRVEPCCC). Working together with the members of the SRVEPCCC ensures the Town and the entire San Ramon Vatl.ey is better abte to respond to and recover from a large scale disaster.
GOALS
* * * *
the Town utiLizes internal training as welt supplemental
emergency emergency. a declared need during the Town's management services to meet Worl< with the community and schoots to perform outreach and publ.ic education activities related to disaster preparedness, inctuding assisting with Community Emergency Response Team (CERT) training for San Ramon Vattey residents. Coordinate pl.anning and response efforts with the San Ramon Val.tey Fire Protection District, City of San Ramon, San Ramon Vattey Unified School District, Contra Costa County Office of Emergency Services and the American Red Cross. Ensure the Town has resources and relationships that a[[ow the Town to prepare for, respond to and recover from a natural or man-made disaster as quickl"y and efficientty as possib[e.
Ensure
HIGHLIGHTS
ffi
*
ln 2OL6lL7, Emergency Preparedness: o Completed the FEMA approved Disaster Debris Management P[an process in cotlaboration with RecycteSmart. o Put in pl,ace pre-positioned contracts for Supptemental Emergency Management Services and Disaster Debris Removal Services. o Updated the Emergency Operations P[an.
*
ln2OL7lL8, Emergency Preparedness wi[[: o Execute contracts for Publ,ic Assistance Auditing and Disaster Debris Monitoring. o Activety participate in the steering committee for the Local Hazard Mitigation PLan and ensure the ptan is approved by FEMA. o Manage the Town's recovery process in the aftermath of the 2Ot7 storms to ensure the el,igibil.ity for maximum Pubtic Assi3tance reimbursement. '1o
\\'\\'\\'-rllri rVI ll( .( ir.!()\
ËXPENDITURES AciuaI tY L5116
Category
Employee Expenses
5
Administration Materials I Suppties
5
Contracted Services
5
83,473 LO,256 743 0
Equipment
s
704
5
TOTAT
Adopted
Adjusted
Adopted
tY L6t77
tY L6lt7
tY
5
87,49O
5
5
10,000 5,000 7,500 2,500
s
5 5 5
5 5 5
87,490 10,075 5,000 37,500 6,300
5 5 $ 5
$
Ltz,4gO
76
s
L711.8
93,108 10,000 5,000 7,500 2,500
ttS,ro8
EXPENDITURE DETAIL Administration: Sto,ooo for participation in the 5an Ramon Vattey Emergency Preparedness Citizens Corps Councit. Materiats and Suppties: 5t,Ooo for printing, 52,500 for advertising and 5t,5oo for reference materials. Contracted Services: consuttant costs for disaster recovery services.
FUNDING GeneraI Fund TOTAL
5
95,t16 5
1,t2,49o
95,L76
11
5
t46,36s
5
118,108
1"46,365
108
PERSONNEL PERMANENT
FTE
Emergency Preparedness Manager
0.75
ÏOTAL PERMANENT FTE:
0.75
,11
!\'\\'\\'.rl
;rì r\,r
ì
ìL ( :r.g()\
úÈ
tDA![4UtJ
42
\\'\\' \\'.(l rr
r\11
llL.(
;ì.
g()\
Police Services
:J
Police Services Actual TY
PROGRAMS
Adopted
Adjusted
Adopted
L5IL6
tY t6tL7
FY 161:-7
FY 771L8
5 t,486,649 5 s,toz,st7 5 t,o76,6og
Police Services Management
5
t,303,55i
PatroI
5
4,858,477
Traffic
$ 5 5 5
Investigation School Resource Program AnimaI Control
9rz,56o 765,105
st8,997 239,892
5 5 5
773,4t8 s6t,zgo 250,786
5 t,5t5,535 5 5,t37,oog 5 1,099,9iยก 5 773,4t4
t,426,729
5
5,40L,025
S
1,141,405
5
822,308
5 56r,561 5 $ z5o,78o 5 I
TOTAT
5
598,409
254,618
142
FUNDING
Donations/Contri butions GeneraI Fund Potice - Abandoned
Vehicte
5 5t,752 S g,37z,gg3 5 15,788
5 g,L2 t,269 5
30,000
5
0
5
100,000
Sgo5
0
5 g,zo3,o5z 5 5 3o,ooo 5 $ 5,ooo 5 $ too,ooo 5
Potice - SLESF
5 5
TOTAT
5 8,598,584 5 g,zst,z,6g $ gร 59,L42 5
Potice - Asset Seizure
1.4,305 143,747
9,5L4,494 30,000 0
100,000
9,644,494
FTE
PERSONNET
30.00
CONTRACT PERMANENT
L.75
TEMPORARY
6.00
* part-time temporรฐry hours converted to futl time equivalents (FTE)
ffi
0
5
37.75
4:t
\\'\\ \\.(l;lrvlll(
{ il.g()\
Police Services Management PROGRAM DESCRIPTION
The Potice Department works in partnership with the community to protect people, property, rights, and enhance the quatity of tife in Danvitle. Potice protection is detivered through a combination of contract services provided through the Contra Costa County Sheriff's Office, and Town personnel and resources. The Potice Department maintains partnerships with the Sheriff's Office and locat, state and federaI agencies, including the City of San Ramon, 5an Ramon Vatl,ey Fire Protection District and San Ramon Val.Ley Unified Schoot District. Potice services are augmented through the service of eight Reserve Officers and trained Votunteers in Police.
GOALS
* .!.
* {.
Provide community-oriented police services responsive to the needs of Town citizens and businesses. Recruit and maintain a highty skitted and trained team of sworn potice personnet, police reserves and vo[unteers. Effectively manage potice resources and personnel to meet atl community, regionat, state and federaI requirements. Coordinate community outreach efforts incl.uding participation in neighborhood and business crime prevention meetings, citizen's academy and speciaI events.
HIGHLIGHTS Police staffing ratios (o.Zo officers per 1,000 poputation) and per capita costs (5zrz) are significantty less than the averages for law enforcement agencies in Contra Costa County (1.15 officers per 1,000 poputation and 5329 per capita).
*
ln 2O16117, Potice Services Management:
o o o o *
In 2o17l18, Police Management wi[[:
o o
ffi
Met with businesses and residents, engaging the community in education and adaptive probtem solving. Monitored police resources in the Town and adjusted them to meet emerging trends, inctuding a spike in property crimes. Adjusted personnel resources to address a rise in property crimes. lmplemented an Automated License Plate Recognition (ALPR) camera system throughout the Town. Continue to engage the community in probtem solving and crime reduction strategies. Worl< toward the imptementation of crime fighting strategies to assist the work of officers.
44
rt
it'rr.rl;u
rvr
ll,
.t :r.gtlr
EXPENDITURES Actual Category
Emptoyee Expenses Temporary Salaries
Administration
t
Materials Suppties Contracted Services
Equipment Program Activities
FY 75116
5 5 5 5 5 5 5
Adopted
Adjusted
Adopted
1.61t7
FY 1.61L7
FY
FY
99,356 '87,863
5
83,187
s
120,OOO
1,6,795
5
58,619 936,724 2l-,768 82,428
s
22,500 60,ooo 936,502 777,500 86,960
5 5 5
5
83,!87
s s
120,OOO
5 5 5 5
29,98t 60,513 950,519
t77,5o0 93,835
T7IL8 90,598
5 5 5 5 5 5 5
125,OOO 2?.,50,0
65,500 9L3,O1t 1L7,500 92,600
1,515
TOTAL
729
EXPENDITURE DETAIT Temporary Sataries: funding for six temporary emptoyees to assist with front counter coverage, crime prevention and vehicle maintenance. Materiats and Suppties: 5+S,ooo for advanced officer training, records management, misdemeanor comptaints, subpoena and support services and $ZO,5OO for technology upgrades, printing and uniforms.
Contracted Services: 5649,3o3for sworn personne[, 5z63,7z}for dispatch and communications. Equipmenc incl.udes 5zz,5oo for EBRCSA subscriber fees, 555,ooo for ALPR camera maintenance and operations, 55o,ooo for Body Worn Camera system costs, and Sto,ooo for misceltaneous equipment. Program Activities: 569,60o for l.iabil.ity insurance (.52,32o per sworn officer), Srg,ooo in celtular communication services and 55,OOo for community outreach.
FUNDING
GeneratFund Potice - SLESF Potice - Asset Seizure
Donations/Contributions
5 5 5 5
t,245,OgL 43,747
t4,305 410/
1,486,649
5 5 5 5
o o o
5 5 5 5
t, 5 L5,445 o o
90
$ 5 5 5
t,426,729 o o o
649
TOTAL
PERSONNEL
CONTRACT Chief of Police Administrative Lieutenant TOTALCONTRACTFTE: PERMANENT Administrative Assistant TOTAL PERMANENT FTE: TEMPORARY FTE:*
FTE
1.oO 1.OO
2.oo FTE
1.OO
1.oo 5.oo
*part-time temporary hours converted to futl time equival.ents (FTE)
.,1
rr
rvrr rr.rlrrr rvl Iìt .( ;r.!()\
Patrol PROGRAM DESCRIPTION Patrol provides a proactive and highty visibl.e law enforcement presence, 24 hours per day, 7 days per week. Danvitte is divided into three geographic beats to provide patrol coverage throughout Danvilte. Patrol Officers respond to emergencies and protect life and property. Emphasis is placed on providing effective and timely law enforcement services while maintaining positive and proactive customer contacts. Patrol includes the Police Reserve, Volunteers in Police, and Canine programs. Patrot officers respond to viotations of [aw, catts for service, traffic accidents and emergencies. Patrol operates with a minimum staffing [eve[ of three officers per shift and strives to respond to Priority I detaits within 5 minutes and Priority ll detaiLs within 15 minutes. Sworn Patrol staff is supptemented by eight trained Police Reserves, who contribute an average of 2,200 hours of service annuatty, and 34 citizen Volunteers in PoLice (VlPs), who contribute an average of 9,518 hours of service annua[ty. GOALS
* *
€. €.
*
Provide a safe and secure environment for att Town residents and businesses. Provide rapid and timety response to atl. emergencies. conduct pro-active patrol activities that maintain a highl.y visibte potice presence and identify threats to life and property. Augment patrol activities through the use of Potice Reserves, Votunteers in. Potice, bicycte patrols and watking beats. Assist the Investigations Unit on criminal cases and prosecution with the District Attorney's Office.
HIGHLIGHTS
{. ln 20!61t7, Patrot: Responded to Priority I catl.s within 5 minutes and 32 seconds on average, a reduction of 9o/o over tast year. o Handted nearty 25,500 catts for service. o tncreased the úse of VlPs to conduct vacation house checks and preventative patrots to combat the rise in property crimes over the two prior years.
o
o
Conducted two citizen police,academies; one youth and one teen police academy.
.1. ln 2Ot7lL8, Patrol wit[: o Continue to reduce the response times to Priority I cal,ts for service to
within
5 minutes.
identify tong term solutions for high votume ca[[s for service; devise strategies to reduce catls for service through proactive probtem solving. o Worl< toward imptementing a probtem focused poticing modet. o Worl< to
ffi
4(r
t u r,r,.tl:rr rvtllr.r
;l.grrr
EXPENDITURES Actual Category
FY
Emptoyee Expenses Temporary Sataries
Administration Materiats t Suppties Contracted Services Equipment
5
5 5 5 5 5
t5lt6
Adopted
Adjusted
Adopted
t6lt7
tY L6177
FY
tY
3,zzo
47,898 39,666
9,448
4,676,36t
8r,884
0 0
5
5 5 5
0
5
0 0
5
0
5
17,000 18,000
5
22,437
5
$
29,4L4
5
20,000 20,000
5,012,5t7 55,000
$
5,O15,629
5
5,306,025
5
69,529
5
55,000
5 5
5
t7lt8
TOTAT
5,137,OO9
5
EXPENDITURE DETAIL Administration: 5tt,00O for the Reserve Program and 59,000 for the Canine Program. Both programs provide criticaI support to Patrol operations, MateriaLs and Suppties: Sto,ooo for uniforms; 55,ooo for the Canine Program; and 55,Ooo for miscetlaneous supp[ies.
Contracted Services: 54,981,025 for sworn personnet; 5275,000 for sworn overtime; and 550,000 for the SchooI Crossing Guard program.
Equipment 5Z5,OOO to fund the Automated Regionat lnformation Exchange System (ARIES), a computer interface that atlows member agencies of the criminaI justice system to exchange and analyze data via secured interface, and 53o,0oo for speciatized equipment.
FUNDING
Fund
General Potice - Abandoned Potice - Asset
Vehicte
Seizure
Donations/Contributions
S
4,84t,348
5
5, 102,5 L7
5
5
5 5 5
5
15,788
5
0
5
0 0
5
L,34L
s
0
5,L32,009
5
5 ,40 L,O2 5
0
5
0
5,000 0
5 5
0 0
s
5,401,025
5.137.009
TOTAT
PERSONNEL CONTRACT
ffi
FTE
Sergeant Traffic Officer
16.00
TOTAL CONTRACT FTE:
20.00
4.00
4?
l
rr'rr'.,1;rrn
tIĂŹ,.,
',.g,r.
Traffic PROGRAM DESCRIPTION The Traffic Unit provides for orderly and safe traffic ftow, investigates and devetops strategies to reduce traffic accidents, traffic retated deaths and injuries, and property damage. The Traffic Unit provides parl<ing enforcement and vehicle abatement services. The Abandoned Vehicte Program provides funding removi ng abandoned vehictes.
to assist in the overatl operation of
GOALS
* * * {.
Utitize motorcycle officers to emphasize enforcement of red tight viotations, traffic safety in school zones and speed enforcement on arterial roadways. Support traffic safety education efforts, including participation in the "Every 15 Minutes" DUI education and Street Srnarts traffic safety education programs. Coordinate with the Town's Transportation Division to coordinate engineering efforts to improve safety. Undertake Parl<ing Enforcement efforts as necessary parl<ing in commercial and residential areas.
to maintain avail,abitity of
HIGHTIGHTS
*
ln 2016lt7,Traffic:
o Reported an 1,to/o increase in traffic coltisions from the year prior. o Reported a reduction in injury accidents by 37o/o over the past two years. o Supported the education and engineering efforts to aid in the reduction of traffic coltisions by coordinating efforts with the Town's Transportation Division and tocal education programs.
*
ln 2Ot7 I !8,T raffic witt:
o o
Target the areas where cot[isions are occurring and the primary collision factors for those cottisions. Work to increase the ftow of traffic in residential areas and the downtown through educating students and businesses in and near the downtown area.
o Participate in regional training efforts as lead agency on the countywide IMPACT team.
ffi
+8
t*u u.,ìlrr
n,r
Iì,
-(
:ì.q()\
EXPENDITUREs
Category
Temporary Sataries Administration Materials & Suppties Contracted Services Equipment Program Activities
5 5 5
s
Actual
Adopted
Adjusted
Adopted
FY 15176
tY t6tL7
FY 76t77
tY
0
5
649 4,L73 907,738
5
0 0
5
s
TOTAL
5 5 5 5
80,000 4,000 5,000
5
s
982,609 5,000
5 5 5
0
s
91
80,000 4,000
5,724 982,609 5,000 22,500
80,000 4,000 5,000
s 5 5
s $
5
t7lt8
1,047,405 5,000 0
ogg,833
EXPENDITURE DETAIL TemPorary Sataries: funding for four part-time and temporary Parking Enforcement Officers whose efforts are focused within commerciaI districts and enforcement of red zones around schooI sites.
Administration: dues, travel and conference expenses. Materiats and Suppties: specialized suppl,ies for traffic enforcement officers. Contracted 5ervices: 51,021,405 for sworn personnel and 526,000 for sworn overtime.
FUNDING General
Fund
Potice - Abandoned
Vehicte
TOTAL
S
9L2,560
S
0
1,046,609 30,000
5 5
912,560
5 5
t,069,833 30,000
5 5
L,1tL,405
$
L,
50,000
PERSONNEL CONTRACT
FTE
Sergeant
Traffic Officer
1.00 3.00
TOTAL CONTRACT FTE:
4.00 2.00
TEMPORARY FTE:*
*part-time temporary hours converted to fut[ time equivalents (FTE)
ffi
4!)
\\'\\'\\'.(iiil ì\'r ll(
.( ;r.g()\
Investigations PROGRAM DESCRIPTION
The lnvestigations Unit coordinates and provides tinrely and
comprehensive investigations on atl. fetony and selected misdemeanor crimes and works with the District Attorney's Office to obtain criminal complaints and bring closure to cases. The lnvestigations Unit also coordinates investigative information with other county, state and federal law enforcement agencies, prepares crime trend rePorts and assists in pl,anning responses to those trends, partners with, and provides support to, other drug enforcement agencies. GOALS
*
Provide fottow-up investigations on atl felonies and setected misdemeanor crimes, obtain criminal compl,aint! on cases and bring ctosure to cases, incl,uding recovery
of property.
.f. Worl< proactively
{. {.
to prevent and solve crimes by estabtishing
trends 9nd
developing suppression and undercover operations to tocate criminals and gather inte[[igence i nformation. Educate residents and businesses about crime prevention strategies. Train and develop investigative sl<itl,s for Police Department staff.
HIGHLIGHTS
{.
f
n 2oL6l L7, lnvestigations:
o Reduced property crimes by over 25o/o to an atl time low of 365 reported crimes, down from 491 the prior year and a high of 806 in 1995. o Maintained a case closure rate of 45.9o/o. o Successfutly used DNA evidence to solve several crimes. o Worked to reduce the increase in residential property crime. o Continued to reduce crime against seniors and businesses. o lmplemented a Problem Oriented Pol.icing strategy that successfully reduced property crime.
{. ln 2OL7t tS,lnvestigations wit[: o Worl< to reduce the rate of residential. burgl.aries. o lncrease the [eve[ of crime prevention education toward
o o
ffi
businesses. Maintain a high case closure rate and a lower property crime rate.
Conduct outreach with residential and commercial areas awareness of crime trends. 5o
to
seniors and increase the
\\'\\'\\'.(l;u ĂŹ\'t I l( .( it.g()\
EXPENDITURES ActuaI Category
FY
Emptoyee Expenses
s
Temporary Sataries
5
Administration Materiats & Suppties Contracted Services Equipment Program Activities
5
751t6 2,547 38,517
s 5
5 5
726 9,362 474,320 1,526
s
238,tO7
s
TOTAL
Adopted
Adjusted
Adopted
FY 76117
tY 16t77
tY 17178
0 45,000 5,000 0 519,830 5,000 200,588
s 5 5 5 5
5 5 5 5
0
5
0
45,000 3,000
5
40,000 3,000
0
5 5
519,830
5
s
5,000
5
553,702 5,000
5
200,588
5
220,606
5
0
765,LOs
EXPENDITURE DETAIL Ïemporary Salaries: funding for two part-time temporary employees to assist with investigations and crime prevention. Administration: dues and travet expenses. Contract Services: 55z8,7Ozfor sworn personnel and 5z5,OOO for sworn overtime. Program Activities: 5t3o,ooo for Crime Lab services to provide for drug, atcohol, and toxicology screening; 5t7,606 for Property Services to provide for secure storage of evidence; S48,oo0 for Cal, lD which provides for fingerprint processing and identification; and 5z5,ooo to cover non-reimbursabte Booking Fee costs at
the County Detention facitity.
FUNDING General Fund
5
TOTAT
765,t05 5
lTslrt} 5
105
18
773,4t8 773,4L8
5
8zz,3o8 08
PERSONNEL
CONTRACT Sergeant Investigator TOTAL CONTRACT FTE: TEMPORARY FTE:*
FTE
L00 1.OO
2.OO 1.OO
*part-time temporary hours converted to futt time equivatents
-rl
(FTE)
tvu u'.t1;rrrvtlìr-L ;r.qt;r
School Resource Program PROGRAM DESCRIPTION
The School Resource Program works closely with the San Ramon Vattey Unified School, District and the community to enhance student safety at pubtic school sites throughout the Town and provides programs that promote resPonsible decisionmal<ing and devetopment of tife skiLts. The School Resource Program provides one fu[[-time sworn School Resource Officer (SRO) each at San Ramon Vatl.ey High School and Monte Vista High School and one non-sworn School, Program Coordinator (SPC)who serves at[ middte and etementary schoots. A COPS-SLESF grant hetps to offset the cost for the San Ramon Val,tey High School, Resou rce Officer.
The School Resource Program provides education, processes juvenite citations and administers the juvenite diversion program. GOALS
* ĂĽ
Provide security at high school camPuses. Engage and educate school communities, inctuding students, parents, teachers and administration to foster youth devetopment. ..'. Provide an atternative to prosecution for juvenile offenders through a juvenile diversion education program.
HIGHLIGHTS
N. ln 2ot6lL7, the Schoot Resource Program: o Started a "Recess with the Cops" program aimed at spending quatity time with al.l. elementary and middte schoots in Town. o Worked with Local agencies to educate youth, parents, and facutty on teen stress, emerging trends with youth, and drug trends. o Managed a successful. juveni[e diversion program at Monte Vista and San Ramon Vatl.ey high schools. o Del,ivered a Teen and Youth Police Academy program during summer 2OL6. N. ln 2OL7lL8, the School Resource Program wi[t: o Continue to educate youth, school faculty and parents on the dangers and trends facing youth in our community. o Continue to run a successfut diversion program aimed at reducing the number of juvenites that reoffend. o Continue with outreach efforts geared toward buitding relationships with youth in the Town.
ffi
|t'2
,r'rr,..'., l,r rvl
ll, -,,,-g,r.
EXPENDITURES
Category
ActuaI
Adopted
Adjusted
FY 1.51L6
tY L6tt7
FY
FY
L7IL$
63,265 300
s
65,tgt
$
65,tgt
5
5
5
2,000
5
6,962 448,570
5
2,000 10,000
5
to,27t
5
5
484,Ogg
5
484,Ogg
5
73,706 2,000 10,000 5L2,703
56r,5รณr
$
s98,409
Employee Expenses
5
Administration Materials t Suppties Contracted Services
5 5
TOTAL
$ 5rg,gg7 $ 56r,z9o $
s
Adopted
T6IL7
EXPENDITURE DETAIT Employee Expenses: The Schoot Program Coordinator position is attocated 0.75 FTE to work in partnership with tocal etementary and middte schools during the academic catendar year. The remaining 0.25 FTE associated with this position is allocated to the Recreation, Arts and Community Services Department. Admi nistration: trai ning expenses.
Materiats and Suppties: etementary, middle and high school suppl.ies.
Contracted Services: 5492,703 for sworn personnel and 52o,ooO for sworn overtime.
FUNDING 5
46L,2gO
5
46t,56t
5
5
100,000 0
5
100,000
5
498,409 100,000
5
0
5
0
S
598,409
GeneraI Fund Potice - SLESF
s
Donations/Contributions
5
TOTAL
$ srg,997 $ 56r,z9o $ 56r,56t
5
368,997 100,000 50,000
5
PERSONNEL CONTRACT
FTE
School Resource Officer
2.00
TOTAL CONTRACT FTE:
2.00
PERMANENT
ffi
FTE
School Program Coordinator
0.75
TOTAL PERMANENT FTE:
o.75
5:รฌ
rr'.r'rr'.,1'r' rvr
I
1, .,
;,.!,r,
Animal Control PROGRAM DESCRIPTION Animal. Services for the Town are provided through a contract with the Contra Costa County Animat Services Department. The Town provides animaI services in order to protect the pubtic and animats in our community and to prevent cruelty, abuse, and neglect of animats by enforcing att state and local [aws. The contract includes responding to dead, injured or stray animats, enforcement of leash [aws, investigating animal cruelty comptaints, animal licensing, rabies control, lost and
found, providing spaying and neutering, a vaccination ctinic and citizen requests for services. Eighteen of the 19 cities in Contra Costa County currentty contract with the Contra Costa County AnimaI Services Department to provide animaI controI services.
GOALS
* * *
Provide timety and effective animat control services to the residents of Danvitte. Shetter homeless, abandoned, and lost animats. Provide information and resources to the publ,ic that enhance the qual,ity of Life of animals in our community.
HIGHLIGHTS
*
f
n 20161t7, Animal Services:
o Respondedto 7-,279 catts for service. o Provided tow cost vaccinations and humane education events throughout the County. o lmptemented a pet retention program and enrichment programs aimed at keeping animats in their homes and not into the care of the County.
*
ln 2oL7l18, Animal Services wilL
o Continue to respond to requests for service in priority order. o ldentify additionat performance metrics to improve customer service delivery for Animal Services.
*
ffi
For 2Ot7tL8, the per capita cost for animal control services increased 5O.zO from 5S.l+ to 55.94. This 4.4o/o increase is similar to the increase in fees from the prior year.
-ยก4
\\'\\'\\'.(]ยก r rvl I รฌr .( l.g()\
EXPENDITURES Actual Category
Contracted Services
FY
5
TOTAL
L5IT6
239,892
5
Adopted
Adjusted
tY L6177
tY
25O,786
5
250,786
250,786
23
Adopted
t6tt7
tY t7l]"8
5
786
Z5+,6t9 18
EXPENDITURE DETAIT Contracted Services: Contract cost for service with Contra Costa County Animat 5ervices.
FUNDING General Fund TOTAL
ffi
5
z39,B9z 23
5
zso,7ï6 5 86
z5o,7g6 25
786
S
zs4,6t} 18
ffi
56
\\,\\' \\'.(lil r ìvl llL.(-:r.g()\'
Administrative Services
(-r
Administrative Services Adopted IY L6IL7
Actuat FY
15/16
Adjusted
Adopted
FY L6117
tY L7lr8
PROGRAMS Ad mi
nistrative Services Management
Finance
lnformation Technology Human Resources Economic Devetopment Risk Management
lnternat Services Asset Replacement
5 5 s 5 5 5 5 5
363,9s3
5
409,70L
696,2t6
5
760,707
5
693,528
S
448,162
5
335,435
5
395,000
5
282,864
5
276,L26
665,352 At4,gog 321,373
+93,t+3 262,304 z9o,649
TOTAT
5 5 5 5
5 5 5 5
4o9,7or 916,5ro 249,055 so6,oz7
szr,oTz 47o,ooo 305,013 337,026
723
4,21.4,404
5 s,54o,ts7
5
356,898
5
779,365
5
655,305
5
468,790
5
396,727
5
633,600
5
285,525
5
3L3,!26
736
FUND¡NG
Generat Fund
5 z,g64,t77
5 j,08t,778
Various Funds
5
5
TOTAT
$ 3,5t5,899 5 3,6oL,72¡ 5 4,2L4,404
519,9¿5
PERSONNET
FTE
PERMANENT
15.00
TEMPORARY
L.25
'r part-time temporary hours converted to
time equivatents
ffi
s+9,722
futt
5
5
5
674,241
j,490,5i5 398,zor
S 3,888,7i6
16,25
(FTE)
17
n'rvrt'.tllrr rvr llr t ;r.gLrr
Administrative Services Mgmt. PROGRAM ÐESCRIPTION
The Administrative Services Department encompasses various functions that support internal and externaI Town operations. The Department includes: Finance, lnformation Technotogy, Human Resources, Economic Development, lnternal Services, Risl< Management and Asset Replacement. Significant emphasis is placed on maintaining current l<nowledge of a[[ [aws, requirements and practices related to financiaI oversight and management, and personnel,. Within the Finance Division, the Finance Manager serves as the Town's Treasurer
GOALS
.E Ensure prudent safekeeping, management and accounting of the Town's financiaI assets.
{. Provide guidance over policies, processes and management of lnformation
Technotogy infrastructure to enable Town programs and staff to function efficientty and effectively. * Maintain a worl<ptace that is fair, equitabte and consistent with the Town's personnel policies and employment [aw. å Worl< with the business community and regional partners to support economic vital.ity. .1. Anticipate and cóntrol risl< through toss prevention strategies. {. Manage Town assets, incLuding vehictes, equipment, furnishings and supplies. HIGHLIGHTS
*ln
2OL6 I L7, Ad mi ni strative Se rvices
o Focused on imptementation
M a nageme
nt:
of the lnformation Technology Master
P[an, Comprehensive Economic Devetopment P[an, Land Management System and Document Management System.
lncreased staffing tolnclude i.o FTE Administrative Services Coordinator position to support al.l, department areas of service. o Added lnternaI Services as a separate program to inctude office supplies, tel.ephone and data charges for atl. Town departments (previousl.y incl.uded in lT and Asset Reptacement). o
{.
ln 2Ot7 I L8, Ad mi ni strative 5e rvices
Man
agem
e
nt wi
l,l,:
o Continue imptementation of the Comprehensive Economic Devetopment P[an, and the Community Branding and Marl<eting P[an. o Deploy SharePoint as a file management and coltaboration too[. o Support the Town's continued emptoyee engagement and training/staff
deve[opment efforts. o Focus on launching the second phase of the new Land Management System with expanded online capabilities.
ffi
-r
fì
\\'\\' \\'.rl rr rvr I l(
-(
r.go\
EXPENDITURES ActuaI Category
Emptoyee Expenses
Administration Materials I Suppties TOTAT
FY
15/16
5
360,729 2,34L 883
5
$
363,9s3
$
5 5
Adopted
Adjusted
Adopted
FY 761L7
tY L6lw
FY
408,70t
5 5
1,000 0
5 5 5
4o9,7or 5
408,70L 1,000 0
t7lt8
5 5
353,208
5
580
3,3LO
4o9,7or S
35ó,898
EXPENDITURE DETAIL Employée Expenses: reftects a reduction in staffing from 1.0 Administrative Services Coordinator to 0.5 Administrative Services Coordinator.
Administration: meeting, travet, and employee development costs.
FUNDING General Fund Measure
I
TOTAT
5 5
L76,23CI
L87,723
234,L27 L75,574
5 5
70L
953
5 5
234,L27
5
L75,574
5
70L
332,947 23,95L 35
PERSONNEL FTE
PERMANENT
ffi
Administrative Services Director Administrative Assistant Administrative Services Coordinator
0.50
TOTAL PERMANENT FTE:
2.50
1.00 1.00
51)
\\'\\ \\'.(iirrVl ll(,( ;r.g()\
Finance PROGRAM DESCRIPTION The Finance Division is responsible for safel<eeping, management and accounting of the Town's financiaI assets, to ensure that atl assets are effectively managed to serve Danvit[e's taxpayers.
Finance functions inctude accounting (accounts receivabte, accounts payable, vendor payments and payroLL), budgeting (budget preparation, incl.uding long-term forecasting and anatysis), audits, asset management, purchasing and contracts, business [icense processing, investment management and debt management. The Finance Manager serves as the appointed Town Treasurer responsibte for investing and managing al.L Town funds in accordance with the Town's adopted lnvestment Po[icy. GOALS
{.
Protect the Town's fiscal resources, investments and assets by fol,l.owing the Town's pol,icies on purchasing and investments. .1. CarefuLLy tracl< the revenue and expenditures set forth in the budget (accounts payab[e, accounts receivable, payrotl and business license) by foLl.owing GASB standards. {. Worl< with the Town Manager and staff to prepare the Annual Operating Budget and Capital lmprovement Program, incLuding tong-term forecasting and analysis. ..r. Prepare the Comprehensive AnnuaI Financial Report (CAFR) in accordance to CASB standards and faciLitate an independent audit to ensure integrity of the Town's financia[ reports. HIGHLIGHTS
ĂĽ
For its 15th consecutive year, the Town was recognized in 2Ot5l16 by the Government Finance Officers Association (GFOA) for outstanding financial reporting in the Comprehensive Annual FinanciaI Report.
{.
ln 2Ă&#x2122;t6lt7, the Finance Division: o Completed imptementing changes to payrol.t reporting to compLy with the Affordabl.e Care Act (ACA).
o
Compteted imptementing
sick leave reporting and
monitoring
requirements to compty with the Heal.thy Worl<places, Healthy FamiLies Act of 201,4 (Assembl.y Bil,t 1522).
{. ln 2OL7lt8, the Finance Division wil.l. imptement Phase ll of Energov for Business License processing, an integration to the town-wide [and management system.
ffi
6o
t. .t'u'.,1tu rvt I l. .( l.g()\'
EXPENDITURES ActuaI Category
FY
t5l!6
Employee Expenseยก Temporary Salaries Administration Materials I Suppties Contracted Services Equipment
s
445,703
$ 5 5 5 5
4,981"
TOTAT
5
Adopted
Adjusted
Adopted
I6IL7
FY T6IL7
FY 17118
FY
5 5 5 5
505,326 o
5
1,84,467
4,639
5
1,010
696,2t6
S
to,5g4 52,772 L77,527
tt,682 58222
5 5 5 5 5 5
506,782 25,OOO
7.L,682
93,417 278,6L9 1,O10
529,579
5 5 5 5 5 5
2,OOO
13,1.52
67,307 1.66,3L7
1,010
760;,79759rรณ,5roSl'g,'Os
EXPENDITURE DETAIL Temoorarv Salaries: to assist with imolementation of Enersov. te
Administration:57,7oo for credit card fees and bank charges and 55,452 for training, travel and dues. Materials and Suppties: 562,805 for enlerprise-wide accounting and software maintenance and disaster and recovery services; 54,5O2 for reference materials and printing costs for the annuat
budget and
CAFR.
Contracted Servicesi 594,377 for independent investment management services and banl<ing fees; 5ยกl,Sgo for auditing services; 524,35o for consulting services related to Property Tax, Sales Tax and State mandates.
Equipment miscettaneous equipment.
FUNDING Genera[ Fund Various Funds
5 5
624,865
TOTAT
5
ag6,zto 5
71.,351;
692,462 69,245
s s
s 5
TeoJoT 5
754,863 L6t,647
s
71-8,24L
5
61.,t24
916,510 5
l7gร as
PERSONNEL PERMANENT
FTE
Finance Manager/Treasurer Accounting Analyst Accounting Technician Account Cterk ll
1.OO 1.OO 2.OO 1.OO
TOTAL PERMANENT FTE:
5.OO
0.25
TEMPORARY FTE:*
*part-time temporary hours converted to full time equival,ents (FTE)
ffi
(il
tt rt,,r'.,1"rrt,t
I1..,,'.!,ยกr
Information Têchnolo gy PROGRAM DESCRIPTION
The lnformation Technology (lT) Division provides reliable information systems, technology operations, and support for a[[ Town operations in nine locations. lT provides [ong-ra nge planni n g f or critica I technology i nfrastructu re throughout the Town and ensures access to Town information and services 24 hours per day, 7 days per weel<. lT provides a hel.p desl< system that supports a[[ Town technical operations.
IT maintains desl<top systems (computers, notebooks, phones, mobite data computers for po[ice), applications (enterprise, desktop and geographic
information system), networl< infrastructure (switches, routers, servers and data networks), tetecommunications systems, and data storage (data storage, backup systems), as we[[ as providing various other services (hetp desl<, project management, software deployment and training). GOALS
{. Assist departments
f.
with implementation of new systems and appl.ications to support Town service priorities or increase organizationat productivity. Develop information systems and structures that promote the public's interaction with its.[ocaI government.
.!. Maintain, upgrade and replace critical technology systems infrastructure.
{. Provide responsive,
and
resutts- and sotutions-oriented service to internal and
externaI customers. H¡GHLIGHTS
{. ln 20L61t7, the lT Division: Ensured business continuity of mission critical systems (Munis, EnerGov, and Office 565) by moving to ctoud-based services that offer 24171365 availabil,ity with ISO 9OOO security levets and automatic updates. o Completed installation of a backup, restore and disaster recovery system; and upgraded the Town's fibernet, switches, routers and servers. o DepLoyed Phase 1 of new EnerGov, permitting/l.and management system. o
{. ln 20t7lLï,rhe o
lT Division witL: lmplement EnerGov (Phase 2), focusing on enhancing the Citizen Access PortaI and online Business License functiona[ity.
Assist with imptementation of SharePoint to function as the Town's document management and coltaboration system; and development of a new Capita[ lmprovement Project (ClP) management software. o Manage a CIP project to install fiber optic cable between Town facilities.
o
ffi
ti2
r.'rvrr'.i1'rrrt'r
Il,, rt.!r,r
EXPENDITURES Actual Category
Employee Expenses Temporary Salaries
FY
751t6 403,545
o 7,462 87,770 LL4,552
Equipment
5 5 5 5 5 5
TOTAT
$
665,352
Administration Materiats E 5uppl,ies Contracted Services
52,O23
Adopted
Adjusted
Adopted
tY L6lt7
tY 16177
FY 771L8
5 5 5 5 5
555,1O7
5 5 5 5 5
526,378 23,750 2,225 85,900 41,o75 L4,200
s
L4,700
$
O95,5zg
5
s
23,750 2,225
5 5 5
87,O37
s
66,736
5 5
488,155 52,500 11,500 83,000 31,150 9,000
$
655,305
749,O55
EXPENDITURE DETAIL Temporary Salaries: temporary staffing for Gl5 implemenation.
Administration: travet, dues, conferences, and training. Material,s and Suppl,ies: 570,000 for software licensing; Sto,ooo for apptication software
maintenance and 55,000 for miscellaneous supplies. Contracted Services: 5t5,OOO for consutting services for enterprise system configurations, 5z,0oo for networl< security, 58,ooo for G15 maintenance and $6,t50 for website maintenance. Equipment: misceltaneous new technology equipment.
FUNDING General Fund TOTAL
s $
665,352 665,352
5 $
693,529 693,528
5 5
S 749,O55 S 749,O55
655,¡OS
655,505
PERSONNEL PERMANENT
FTE
lnformation Technology Manager lnformation Technology Anatyst lnformation Technology Technician
2.OO
TOTAL PERMANENT FTE:
4.00
1.00 1.00
0.50
ïEMPORARY FTE:*
*part-time temporary hours converted to fu[l time equivatents (FTE)
ffi
(i:r
u',,r'rr'.rirtr rt,l I l, .,
;r.!or
Human Resources PROGRAM DESCRIPTION Human Resources is responsibte for maintaining a worl<place that is fair, equitable,
and consistent with the Town's Personnel Policies and employment [aw. HR oversees the Town's emptoyment process incl.uding recruitment, employee devetopment, training, benefit administration and safety for a worl<force of 94.75 permanent fuL[-time and 15O temporary part-time employees. The Town continuously impLements and assesses safety programs, conducts site inspections, provides record keeping and ongoing employee training and certifications. Emptoyees are provided training in leadership, communication, and presentation and computer sl<i[[s. GOALS .3.
{. {. {.
Recruit qualified, competent, welt suited applicants and retain
an
exceptionat workforce through em pl.oyee engagem e nt. Provide the tools necessary to enhance employee development through technicat, soft skil,l, and leadership training opportunities. Maintain a worl<place that is fair and equitable by providing compensation and inctusive benefits that support an exceptionaI workforce. Ensure compliance with appl,icabl.e laws that regulate the worl<place in safety, benefits and fair [abor standards.
HIGHLIGHTS
.t ln 2ot6lt7, Human Resources: o lmplemented changes to the emptoyee leave pol.icy. o Recruited and hired 10 new fu[[ time employees (as of ApriL 2OtTl. o lmptemented Empl.oyee Engagement Committee efforts. o Provided worl< place communication training for a[[ Town Employees and Town Counci[.
{.
ln 2Ot7 ttg Human Resources wil.l,: o Update PersonneL Pol,icies and Procedures to meet new laws and regulations for the worl<place. o Continue a leadership rol.e on the PACE and MCSIG JPA medical insurance
o
ffi
executive boards. Continue to implement employee engagement strategies.
64
u'rt rr'.rlrrr rvrIlt ., ;r.grn
EXPENDITURES Actuat
tY
Category
t5lt6
Emptoyee Expenses Temporary Sataries
5 5
263,O55
Administration
s
L5,382 67,979
Materials & Suppties Contracted Services
5
23,9t9
5
Equipment
s
37,L39 7,435
Adopted
Adjusted
Adopted
tY L61L7
FY t6lL7
tY
269,t46
5 5
18,000 75,000 29,000
s s
44,7L6 12,500
5 5
909
TOTAT
5 5 5 5 5 5
272,432 55,000 81,264 42,295 64,286 L2,750
t7lt8 285,190 21,000 63,000
5 5
s s
34,OOO
59,100 6,500
s s
448
EXPENDITURE DETAIL Temporary Sataries: on going support services for Human Resources program.
Administration: 547,500 for emptoyee development training, 57,ooo for claims prevention and 58,500 for advertising and recruitment Materiats and Suppties: 5tz,5oo for ergonomic furniture, Sto,ooo for emptoyee recognition, and 5tt,5oO for training suppties and reference materiats. Contracted Services: 5z5,OOo for in-house training costs, $tt,ooo for human resources consultants, and 523,100 for safety consultants for OSHA compliant services and pre-emptoyment physicats.
Equipment misce[[aneous equipment.
FUNDING Generat Fund
5
TOTAL
5
4t4,9og 5 4t4,9og 5
8,36z 5 ¡¡g,16z $
trt
5o6,oz7 5oó,ozz
5
468,79o
5
46g,T9o
PERSONNEL PERMANENT
FTE
Human Resources Manager Human Resources Analyst
1.00 1.00
TOTAL PERMANENT FTE:
2.00 0.50
TEMPORARY FTE:*
*part-time temporary hours converted to fut[ time equivatents (FTE)
ffi
ti5
r,,'rV$'.tlltr rr.t
llt .r';r.gttr
Economic Development PROGRAM DESCRIPTION Economic Development promotes and encourages the estabtishment and retention of a diverse and heaLthy economic base to meet local consumer needs and attract prospective shoppers and guests. The Economic Development Manager acts as a concierge to Danvitle-based businesses and assists in guiding prospective new businesses through the entittement and permitting process.
Efforts continue to focus on the promotion of a strong [oca[ brand identity with implementation of the "Live Locatty" branding and marl<eting campaign, partnerships with [oca[ and regionaI business organizations, refreshing the Business Promotion Grant Funding Program, and strengthening the "Business Concierge" operationaI process. GOALS
.E Support economic development activities across the community that have a positive impact on the Town's fiscal heal,th. ÂĄ?. Foster supportive conditions and offer vatuable resources to heLp smatl, businesses and proprietors prosper. .1. Deliver effective economic development progra'ms by worl<ing with [oca[ and
.t
regionaI partners. Continue to enhance the character and functional,ity of the Town to attract visitors and support the quatity of Life for residents and businesses.
HIGHLIGHTS
.f.
ln 201,61 17, Economic Devetopment: o Adopted a unified Community Branding and Marl<eting Ptan. o Provided 566,5oo in Business Promotion and Retail. lncentives grants to mu Ltipl.e businesses and organizations. o Delivered the second annual regionaI Tri-Val.l.ey Smal.l Business Commerce Convention.
{. ln 2OL7 I t8, Economic Deve[opment wi[[: lmplement strategies derived from the unified Community Branding and Marketing Ptan, buil,ding upon the "Live Local[y" campaign. o Worl< with the P[anning and Buil.ding Divisions to stream[ine the permitting process as a way of fostering business devetopment and expansion. o Evolve the business promotion grants program to align with the Town's recently adopted "Live Loca[[y" unified community branding campaign. o
o
Continue
to
partner with local/regionaI organizations
to
enhance
economic devetopment resource avaitabitity. o Ptan and implement the third annual regional Tri-Val,tey Small, Business Commerce Convention.
ffi
ti6
\\'\\'\\'.(l,rr r\,r
ll(
( ;ĂŹ.g()\
EXPENDITURES ActuaI Category
Emptoyee Expenses Temporary Sataries Administration Materials I Suppties Contracted Services Program Activities Other TOTAT
FY
5 5 5 5 5 5
s
$
Adopted
15/16
FY
t49,673 o
2L,300 32,594 52,584 66,5l-6 4,706
Adjusted
L6II7
FY
5 5 5
153,015
s
153,O15
5,OOO
5,OOO
s
t9,820
5 5 5 5 5
46,400 18,OOO
5 5
93,200 o
s
Adopted
L6IL7
48,904 26,293
FY
t7lt8
5 5
tgg,3g7
s
46,680 19,550 23,500
5,OOO
!37,587
5 5
177,757
s
102,OOO
38,5!6
s
o
s
Ssz
327,s73
L27
EXPENDITURE DETAIL Administration: 5to,ooo for cooperative advertising; 53o,3oo for dues/membership (Danvitte Area Chamber of Commerce, CALED, EBEDA, Visit Tri-Vat[ey, etc.) 56,380 for meeting/conference registration and expenses. Materials and Suppties: 5z,5oo for "Live Locally" Program outreach and marketing; 5l,Zoo for software subscription; 57,ooo for printing, 51,150 for postage, supplies, and reference materia[s; and 55,zOO for Museum of the San Ramon Val.tey/Visitor Center Program. S5,OOO for CEDP imptementation; progrôm implementation. for Locatly" "Live 516,5oo
Contracted Services:
5Z,OOO
for business education workshop; and
Program Activities: 56o,ooo for Business Promotion Grants; 53z,ooo in pass-through costs for the Visit Tri-Vattey TBID; and Sto,ooo for the miscetteanous programming.
FUND¡NG General Fund TOTAL
5
zz7,z7s
5
s3s,+zs 335
327 73
5
5
szt,oTz 2
S
3g6,tzl
$
396,L27
PERSONNEL PERMANENT
ffi
FTE
Program Coordinator Economic Devetopment Manager
0.50 1.00
TOTAL PERMANENT FTE:
1.50
67
rvrvu.tl;rrrvr ll, -, ;r.gor
Business Promotion Funds
ACTIVITY
SPONSOR
Town of Danvitle in Partnership with Danvi[[e Area Chamber of Commerce
Cohesive Marketing Program
¡ . . e
Art &Wine Strolt Brew Crawl Fallfest Summerfest
Danvitle Square Shopping Center
a
2077
Danvitle Women's Club
a
Tinsel b Treasures Folk Art Show
Downtown Merchants
a
Seasonal Strotts
Eugene 0'Nei[[ Foundation
a
Eugene O'Neitt Foundation Festival
a
Digitat Eats Program
Danville Area Chamber of Commerce
La Jotta
Property Management
Museum of the San Ramon Vattey
Rakestraw Books
. ¡ ¡ a
REqUESTED
APPROVED
tY 20L7lt$
FY
5
3o,ooo
5
2OL7IL$
3o,ooo
1,500 1,500 1,500 1,500
1,500 1,500 1,500 1,500
1,500
1,500
1,500
1,500
6,000
6,000
1,500
1,500
5,000
5,000
Retics on Raitroad Antique Faire
1,500 1,300
1,500 1,300
Downtown Pub Crawl
1,500
1,500
"Where's Watdo in Danville" Event
2,500
2,500
t
2018 Advertising & Promotion
Museum Exhibits and Downtown Events
5 58,roo 5
TOTAT
{i
fì
58,ioo
\\'\\'\\'.(lir r rvi ll( .( rì.!()\
\r)ยก r
r- rlI ri\r
nr[รฌ',\r,rr.rr
(i t)
U
q I
Risk Management PROGRAM DESCRIPTION The Town's Risk Management Program seeks to anticipate and control risk through use of loss prevention strategies and estabtished risk management principtes and procedures. The Town is a member of the Municipal Pooting Authority (MPA), a ]PA inctuding 17 of the 19 cities in Contra Costa County. The City Attorney serves as the Town's risk manager and serves on the Board of Directors for the MPA.
Through the MPA, the Town participates in pooted insurance for general liabil'ity, vehicte damage and worl<ers'compensation. These programs effectively combine setf-insurance with commercial excess insurance resutting in the most comprehensive coverage for the Town. The Town also purchases property insurance for atl Town facitities and earthquake coverage for criticat Town facitities.
Examptes of efforts aimed at avoiding major risk exposures incl.ude sidewatl< and pl,ayground inspection programs and working with property owners to clean out creeks and drainage facitities to avoid flooding of private property. GOALS
* * * * *
Proactively reduce the Town's exposure to potentiat tiabil,ity and provide adequate insurance and/or risk transference for Liabitities that do arise. Work with the Municipat Pool,ing Authority to reduce the Town's major risk exposures. Evaluate al,t contracts to ensure appropriate insurance and indemnification is provided to protect the Town. Work ctosety with the MPA's ctaims adjusters to quickty evaluate and handte al,l. tiabitity ctaims received by the Town. Partner with the Human Resources Division to maintain a safe work environment, provide appropriate safety training and reduce emptoyee injuries and workers' compensation claims.
HIGHLIGHTS
ffi
*
ln 2016lt7,the Risl< Management Program began imptementation of an urban forest management ptan and updates to the Town's Personne[ Poticies.
*
ln 2017118, the Risl< Management Program pl.ans to complete updates to the Town's Personnel Poticies and review risl< transfer provisions in the Town's form contracts.
'7 1)
\\'\\'\\'.(lirr rVl llr .( ;ĂŹ.g()\
EXPENDITURES ActuaI Category
Program Activities
TOÏAL
FY
5 5
L5IT6
Adopted
Adjusted
Adopted
N t6tt7
FY 1.6tL7
FY
493,t43
5
j95,ooo 5
493,t4r
S
595,000
5
47o,ooo 47o,ooo
t7lt8
$
6¡5,600
5
633,600
EXPENDITURE DETAIL
Program Activities: 5455,000 for tiabitity insurance premiums; 5z9,ooo for empl,oyment tiabitity (ERMA); 57,4oo for vehictes; 5z9,ooo for property; S94o0o for earthquake (inctuding the Veterans Memoriat Buitding Library and two Community Centers); 5t,zoo for emptoyee bonds and 520,000 to be reserved for ctaims settlement.
FUNDING GeneraI Fund
TOTAI
5 493,t43 5 5 tgl,tll 5
j95,ooo 5
47o,ooo
5
65¡,600
$
47O,OOO
$
633,600
395,000
)
ffi
71
rvrl,,.,1;rnVr I 1,.( rì.g()\
Internal Services PROGRAM DESCRยกPTION tnternaI Services includes services and expenditures required to support at[ areas of Town service deLivery at all service detivery locations. This includes tetecommunications (tel.ephone, cettular and facsimite), generaI office supplies, maiI metering and postage and maintenance associated with photocopiers in a[[ locations housing Town staff.
GOALS
รฅ
* {.
* *
Procure atl standard supplies in the most cost effective and efficient manner possibte, util.izing Danvitte-based vendors whenever possib[e. Provide a retiable telecommunications networl< for Town emptoyees, inctuding voice catts, voice maiI and facsimite access. Provide retiabte cettutar and data support services that attow employees to access etectronic data and mail before, during and after the standard worl< day. Maintain postal mait metering equipment and services that supports the Town's needs.
Manage cost-effective and retiable copy machines under
a contract
services
agreement.
HIGHLIGHTS
*
f
n 2016 I t7, lnternal Services:
o Upgraded the phone system at the Danvitte Library to ยกP phones, including voice mail and integration into the Town's phone network. o lntegrated the Town's copy machines under a singte maintenance and tease contract and upgraded necessary equipment. o Continued to provide upgrades to the Town's celtutar and data systems. o Offered Wi-Fi hotspot access devices for staff worl<ing remotely. *
ln 2017118, lnternat Services wi[t:
o o
ffi
Continue to manage the Town's copy machine contract. Continue to procure quatity suppties, equipment, and services at the best vatue and price for Danvitle taxpayers.
'72
tt u r,.,lrrtrvr ll, ., ;t.g,lr
EXPENDITURES Actual Category
tY
t5lt6
Materiats & Suppties
5 5
50,258 79,407
5
Equipment Program Activities
5
L32,639
5
TOTAL
2
Adopted
Adjusted
Adopted
tY 16t77
tY 16tL7
tY t7118
78,706 87,150 117,008
5
o4
s 5
s
2
89,772 98,233 117,008
5 5 5
013
82,606 86,500 Lt 6,4Lg 2
25
EXPENDITURE DETAIL
Materia[s & Suppties:542,7oo for Town-wide suppl.ies; 5z8,60o for postage: S4,go6for printing S5,4oo for phone-retated materials and 5t,ooo for misceltaneous supplies. Equipment: 569,500 for photocopy leases and maintenance; 5t6,ooo for tel,ephone maintenance and 5t,Oo0 for miscetl.aneous equipment. Program Activities: 589,640 for [andline phone services; 525,35r for mobile telephone services and 5t,44o for cable tetevision services.
FUNDING GeneraI Fund
5
z6z,3o4
5
TOTAL
z8z,864
S
jo5,or3 S
285,525
285,525
/.t
tt'rr rr.t1;rr rt't llt .r ;r.gor
Asset Replacement PROGRAM DESCRIPTION The Asset Repl.acement Program provides for the ongoing reptacement of Town-owned capitat assets, inctuding: motor vehicles, specialized vehictes and equipment, office furnishings and equipment, information technol.ogy equipment, building furnishings and other materiats. Assets are replaced per an established schedute with strict reptacement criteria incl.uding pubtic and emptoyee safety, equipment age, maintenance costs and resate va[ue.
The Town's vehicte inventory currently includes 11 hybrid vehicles and eight electric vehictes, comprising one-third of the total vehicte fteet. GOALS
* * *
RepLace capital assets based upon the need to maintain safety standards and promote efficiency in atl. areas of the Town government. Reptace Town vehictes in accordance with an established VehicLe Replacement Pol.icy. Migrate the Town vehicte fteet toward reducing GHG emissions and reducing fuel' consumption wherever possibte and practicat.
HIGHLIGHTS
*
ln 2016lL7,the Asset Replacement Program:
o
o o *
ln 2017118, the Asset Reptacement Program wil[:
o
o o o
ffi
Reptaced lT equipment, including 25 computers, two redundant storage area network systems, networl< infrastructure (inctuding switches, routers and server farm), and re-negotiated copier tease contracts town-wide. ln Potice, reptaced two patrot vehictes. ln Maintenance Services, reptaced two pickup trucl<s.
Continue to replace outdated lT equipment, inctuding computers and monitors in anticipation of electronic ptan review. In Potice, replace two patrol vehictes and one Administrative Lieutenant's vehicle. In Maintenance, reptace two picl<up trucks with service bodies. In Development Services, reptace one Public Works lnspector's vehic[e.
'74
\\'\\'\\'.(l rr l\'' ll( -(-ir.g()\
EXPENDITURES Adopted
Actual Category
TY
LsIL6
tY
t6tt7
Adjusted
Adopted
N
tY 171L8
76177
Materiats & Suppties
5
0
5
0
5
0
5
75,8t5
5
5
5
5
2L4,834
s
L06,L26 170,000
0 118,553
5
Equipment Vehicles
5
2L8,473
5
74,L26 239,000
TOTAT
2
t26
6
EXPENDITURE DETAIT
Equipment replacement costs of 538,OOO for computers and monitors; SZt,tZífor network equipment reptacement; and 5t5,000 for three potice mobite data computers. Vehicles: 51O4,OOO to purchase and equip two new tord lnterceptors and one Toyota Camry for Potice; 577,ooo to purchase and equip two new Ford F-250 pickups for Maintenance; and $z7,ooo for one Ford Escape for
Engineering.
i
FUNDING
PegFee Buitding & Planning Asset Replacement -
General
5 5 5
05
57,753 5 232,896 5
TOTAL
ffi
0
5
0
s
276,L26
5
5,981
5
0
0
5
0
33L,045
5
3L3,t26 3
'75
\\'\\'\\'.(i;ilrVrll( ( lì.g(l\
Asset Replacement Administrative Policy VEHICLE MAINTENANCE
& REPLACEMENT
The Town of Danvitte owns, operates and maintains vehictes that are essential to various areas of the
Town's service detivery. ln order to maximize the life and usefutness of alt Town-owned vehictes, the Town has estabtished this Vehicle Maintenance and Replacement Poticy. The poticy includes the following sections:
. . . . .
MaintenanceResponsibitity Vehicte Categories Replacement Criteria Vehicte Inventory New Vehictes
1.
MAINTENANCE RESPONSIBILITY
aLl. vehicl.es to specific person.net in order to increase accountabitity and enhance Longevity. The staff assigned to a vehicle is responsible for sharing maintenance vehicte care and responsibitity for the vehicte with the designated Fleet Maintenance Manager. Maintenance for alt Town vehicles occurs through a combination of centralízedandde-centralizedvehícle maíntenance
The Town assigns
seruices.
Centralízed vehicle maíntenance servíces are coordinated through the designated Fteet Maintenance Manager. These services are provided to the Town through contracts with private vendors and incl.ude atl routine and specialized services required to l<eep vehicles in proper mechanical. worl<ing order. Examptes of centralized vehicle maintenance services provided through the Fl.eet Maintenance Manager include regular services such as oiI changes, tune-ups, brake service and replacement, tire reptacement etc., and emergency or extraordinary repairs necessitated by a vehicte breal<down or malfunction or vehicle involvement in a collision. The Fl.eet Maintenance Manager keeps records on atl vehicles and works with appropriate assigned personnel to assure that a proper routine maintenance schedule is maintained at proper intervals.
De-centralÍzed vehícte maíntenance servíces inctude keeping atl vehictes fueted and clean. The appearance of each vehicte is the responsibitity of the emptoyee assigned to that vehicle. Al[ Town vehictes are expected to be maintained in clean condition both inside and out. In order to assure proper levets of emergency preparedness, atl vehictes are to be operated and maintained with a minimum of Vz tankof fuel at all times.
ffi
1Ít
\\'\\'\\.(llr
Ì\,1
ll(.( ir.g()\
Asset Replacement Administrative Poticy: Vehicte Maintenance and Reptacement Page 2
2.
VEHICTE CATEGORIES
FolLowing is a description of the various types of vehictes owned by the Town.
CategoryA-1: Police PatroUEmergency Response Vehictes
priority. They are typical.l.y operated 16 hours per day,7 days per week, and accumutate, on average, 21,ooo miLes of annual usðge. They are subjeci to frequent starts and stops, high-speed operation and emergency response usage. They are used to transport police officers, occasionaI civilians, and suspects who are ptaced under arrest and must be transported. Given the type of usage, wear and tear on the vehicl.es is considerable and the need for consistent rel.iabil.ity and dependabil.ity is extremely high. These vehicles are assigned the highest
Gategory A-2: Non-Patrol, Potice Vehicl,es These vehicles provide secondary police response and are used to provide pro-active and community based pol,icing. They are driven on a daity basis, typical.l.y 5 days per week. lnvestigations vehictei
accumulate, on average, 17,OOO miles of annual usage. They are driven at moderatã to tow speeds and used to transport peopl.e and Light equipment. Giveñ the type of usage, wear and tear is moderate, and the need for consistent rel,iabil.ity is moderate to high.
Category B-1: Maintenance Vehicl,es These vehictes are operated by Community Services personneI assigned to Maintenance or Facil.ities. They are typical.l.y driven on a dai[y basis, 5-7 days per week, and accumulate, on average, 9,OOO mites
of annual usage. They are operated at moderate to low speeds and are used to trañsport peopte, materiats, toots and suppl.ies to various job sites throughout town. These vehicl.es also respond to emergency ca[[ out situations. Given the type of usage, wear and tear is moderate and the need for consistent reLiability is moderate to high. Category B-2: Heavy Duty/Specialty Maintenance Vehicles These vehictes are operated intermittentty, typical.ty severat times per week. Given the nature of their usage, these vehictes are not assigned to specific personnel, but rather are deptoyed on a jobby-job basis. The vehicles are used to transport speciat equipment or to move or trañsport hèavy loads. Wear and tear is moderate,'increasing with vehicte age. The need for consistent rel,iabitity
moderate.
ii
Category C-1: lnspection and Poot Vehictes* These vehicles are typicatly driven on a daily basis, 5 days per week and accumutate, on average, 57,ooo miles of annual usage. They are driven at moderðte to low speeds and are used to tranlport peopte and tight equipment to job sites throughout town. Certain types of inspection vehicles are intermittentty operated in "off road" conditions. lnspector's vehictes are assigned to specific
ffi
\\'\\'\\'-(lrll lyl I lt ('1.0()\
Asset Replacement Administrative Policy: Vehicte Maintenance and Reptacement Page 3 personnel, whil.e poot vehictes are shared by staff members in various departments. Given the type of usage. wear and tear is moderate and the need for consistent retiabil.ity is moderate. Category C-2: Other Assigned Vehictes* These vehicles are assigned to specific individuals, who because of their position with the Town, may be cal.l.ed upon to respõnd to emergency catlouts on a 24 hour basis. These vehicles are driven on a daily basis, 5 days pei week and are home garaged during non-work hours. Given the type of usage, wear and tear is moderate and the need for consistent rel.iabil,ity is moderate to high.
Category M-1: Police MotorcYcles
to perform certain ðspects of traffic enforcement. Motorcyctes are typicatl.y operated 8 hours per day, 4 days per week, and accumutate, on average, 6,000 mi[es of annuat usage. They are subject to frequent starts and stops, high-sp_eed operatioñ and emergency response usage. Given the type of vehicte and usage, the need for officer safety, rel,iabil,ity and dependabil,ity is extremely high.
The PoLice Traffic Division deptoys a motorcycte unit
For Categories C-t and C-2, the Town is promoting fuel efficiency and conservatíon through the purchase of hybrid a;nd electríc vehícles to perform these functíons.
3.
REPLACEMENT CRITERIA
A request to reptace a vehicle must originate within the department that util,izes that vehicl.e. The request shoutd specify the category of vehicle, as well as the replacement criteria being met. lt is anticipated that ioutine vehicl,e ieplacement wit[ occur through the Town's annuaI operating budget and asset replacement process. The fotl.owing criteria wil.t be utitized to determine appropriate vehicle replacement intervals. ln order to warrãnt reptacement, a minimum of three of the fotlowing criteria must be met: Category A-1: Police PatroUEmergency Response Vehicles
1. Vehicl,e miteage exceeds loO,OOo miles. 2. Annuat maintenance costs exceed 54,ooo. j. Overalt condition of the vehicle is poor: peeting paint torn seats, systems inoperable (A/C, seat hardware, radio etc.), poor susPension. 4. Vehicl.e engine or transmission/drive train requires reptacement, 5' Vehicte hai sustained major body damage vatued at over 56'ooo to repair' 6. Vehicte age exceeds 4years. Category A-2: Non-Patrol Police Vehictes Category B-t: Maintenance Vehicles Category C-1: lnspection, Poo[ t OtherVehicles*
áì
lmM
7tl
rt'rt'u'.,1,,r rvrll, .t ;t.g,r.
Asset Replacement Ad mi
nistrative
PoLi
cy: Vehicle Mai ntenance and Replacement
Page 4
Category C-2: Other Assigned Vehictes*
1. Vehicte miLeage exceeds IOO,OOO mi[es. 2. Annual maintenance costs exceed 5Âż,ooo. 3. OveraLt condition of the vehicl.e is poor: peeting paint, torn seats, systems
inoperabl.e (A/C, seat hardware, radio etc.), poor suspension. 4. Vehicle engine or transmission/drive train requires reptacement. 5. Vehicte has sustained body damage vatued at: a. over 56,Ooo to repair if the vehicte is tess than 5 years of age; or b. over 54,ooo to repair if the vehicte is greater than 5 years of age. 6. Vehicl.e age exceeds 10 years. * Replacement of hybrid vehicles may also factor in extraordinary battery replacement costs once the vehicte exceeds 5-7 years of age. Category B-2: Heavy Duty/Speciatty Maintenance Vehicles
1. 2. 3.
Vehicle miteage exceeds 8O,OOO mites. Annual maintenance costs exceed 56,ooo Overatl condition of the vehicte is poor: peeling paint, torn seats, systems inoperable (A/C, seat hardware, radio etc.), poor suspension. 4. Vehicl.e engine or transmission/drive train requires reptacement. 5. Vehicte has sustained body damage valued at: a. over 56,000 to repair if the vehicle is less than 5 years of age; or b. over 54,ooo to repair if the vehicte is greater than 5 years of age. 6. Vehicte age exceeds 15 years. Category M-1: Police Motorcycles
1. Vehicle miteage exceeds 60,000 miles. 2. Annual maintenance costs exceed 53,OOO 3. Overall condition of the vehicte is poor: peeling paint, systems inoperabte,
poor suspension or
handl.ing.
4. Vehicte engine or transmission/drive train requires reptacement. 5. Vehicle has sustained body damage vatued at: 6. 7.
a. b.
over $4,ooo to repair if the vehicle is less than 5 years of age; or over 5z,5OO to repair if the vehicle is greater than 5 years of age. Vehicte has sustained damage to the frame. Vehicle age exceeds 5 years.
4. VEHICLE
INVENTORY
A current Vehicl.e lnventory which inctudes atl. vehicl.es that have been authorized by the Town Counci[, through the Town's financiat ptanning process, is tisted in the Vehicle lnventory data base.
'7
ll
rvrr .r'.,lirrrvr 11.., :,.grrr
Asset Replacement Administrative Poticy: Vehicle Maintenance and Reptacement Page 5
5.
NEW VEHICLES
No new vehicles (an additional. vehicle that has not been previousty authorized) may be purchased or added without the recommendation of the Town Manager and approvat by the Town Councit. Any
request to increase the vehicte inventory by adding a new vehicte, shall originate within the department that witl, utitize the vehicte, and shalt fo[[ow the fotlowing process:
t)
A request from Department Head witl, be submitted to the Town Manager describing the need and
justification for the vehicle;
z) itre Town Manager wil,l. review
j)
ffi
and approve requests for incl.usion in the draft annual operating budget and asset replacement program. The vehicl.e request wil,t then be Presented to the Town Councit for consideration. Once approved by the Town Counci[, the vehicte witl be added to the Comprehensive Vehicte lnventory, and may be purchased. Consideration of whether or not to add new vehictes to the Town Vehicle lnventory witl. onty occur through the annuaI operating budget process.
BO
rvs' rr'.,ltu rtrt I l, ., ;r.g,rt
Development Services PROGRAMS
Actual
Adopted
Adjusted
Adopted
tY L5lt6
tY L6lt7
tY L6lt7
TY
Ptanning
5 5
5
608,234
Buitding
5 t,4go,z44 5
L,372,823
Development Services Mgmt
Code Enforcement
Engineering Capitat Project Management Transportation Ctean Water Program
5 5 5 5 5
z4o,5o7
5
245,975
6os,h4t 9s,909
5
113,833
+06,975
5
500,921
59t,733
5
7t3,754
436,242
5
437,276
z7s,t66
5
292,065
5 24s,975 5 5 7tt,368 5 5 t,s6z,8zi
5
5 ui,8i3 5 5 5r8,r9i 5 5 73s,zzg 5 5 s43,t65 5 5 463,ht4 5
L7IL8 265,460 656,071
1,462,842
LzL,692
36t,oo4 857,350 435,432 293,347 198
TOTAT
FUNDING
Buitding
I
Ptanning
Capitat lmprovement Clean Water
Engineering Gas Tax
GeneraI Fund Measure
J
TOTAL
5 2,2sL,28s
5 5 5 5 5 5
t3s,gto z7s,t66
zgt,7t4 213,473
8¡r,465 tos,zo4
5 5 5 5 5 5
2,2t5,326
5
2,508,460
5 z369,0zï
5 5 5
z7t,z6g
j09,948
5
26L,657
267,947
5 S 5 5
g7s,ttrg
5
L,ozg,ts7
5
x,008,874
83,s89
5
tzt,ghï
5
t68,z7s
69,sLs
zgz,o6s
38r,z9t
69,515
463,4t4 3gL,5s7
go,74g 293,347
5 4,t42,2t7 5 4,zB4,BBr $ 4,ggt,ggg 5 A,4sl,tgg
PERSONNEL
FTE
PERMANENT
27.50
TEMPORARY
2.75
* párt-time temporary hours converted to futl time equivatents (FTE)
ffi
5
30.25
8l
tvrvu.rl'rrrvr Il, ., rr.!,lr
Development Services Mgmt. PROGRAM DESCRIPTION The Development Services Department reviews a[[ devetopment appl.ications to ensure consistency with community standards and protection of public heatth and safety; and ensures that new capital projects are designed and constructed to meet community needs and expectations.
Planning reviews apptications for consistency with the General Plan, ordinances and development standards. Buitding ensures the safety of structures through ptan checl<, permitting and inspection services. Code Enforcement activities focus on responding to requests to maintain high "quatity of [ife." Engineering reviews design and construction ptans for improvements associated with new development. CapitaI Project Management is responsibte for designing and managing construction of al,t projects inctuded in the Capital. lmprovement Program. Transportation plans and imptements programs and services that ensure the safe and efficient movement of motorists, bicycles and pedestrians. The Ctean Water Program is responsibl,e for ensuring ongoing compliance with the Federa[ty-mandated Clean Water Act. GOALS
.i.
Ensure a customer-centric development review process that is seamtess, consistent, responsive, and incorporates customer feedbacl<. Ensure comptiance with al.t appLicabte state and federal taws and regutations retated to planning, buil.ding codes, transportation, engineering standards, ctean water and environ mentat protection. .1. Design, manage and construct high priority capitat projects.
{.
.t
Coordinate with Maintenance Services and Recreation, Arts and Community Services on alt capital projects and activities. .f. Continue to pursue federal and state transportation funds to improve the pubtic roadway network. HIGHLIGHTS
ĂĽ
ln 2OL7lL8 Development Services Management wi[[:
o o o
ffi
Launch the second phase of the EnerGov Permitting and Land Management System with enhanced Citizen Access PortaL on[ine Business License, automated reports, electronic signatures and preparation for eReview capabil.ities. Train and educate Engineering Staff to update and produce the CapitaL I mprovement Program Documents. Oversee an update of Downtown Business District (DBD) Ordinance for the Downtown Core and North Hartz Avenue.
82
ivrr'r.'.tlrrr
r,,,t
I
l, ., rr-g,ÂĄr
EXPENDITURES Adopted tY 1,61L7
ActuaI Category Emptoyee Expenses
Administration Materials & Supplies TOTAT
FY 1511.6
S 5
5
2s&,76z L,Lzs øzz
S
5 5
242,67s z,6oo 7oo
Adjusted tY 761L7
Adopted
tY
S 242,67s 5 S 2,600 5
57ooS
t7lt8 261,,060
3,700 700
$ z4o,so7 $ 24s,9ls $ z4s,97s $
z6s,46o
5 t2s,53g 5 5 t2o,4s6 5
S 5 5
ts4,699
$ zho,so7 $ z4s,97s $ z4s,97s $
26s,46o
FUNDING GeneraI Fund Buitding É Ptanning Capital lmprovement TOTAL
5
t2t,L26
5
59,69L 59,690
5
5os
t25,539 L20,436
'o
L28,423
z33B
PERSONNEL PERMANENT
ffi
FTE
Devetopment Services Director
1.00
TOTAL PERMANENT FTE:
1.O0
tì3
rvl u'.Ll;rrrvi I l, .( :r.g()\
Planning PROGRAM DESCRIPTION Planning provides current and advanced ptanning services to ensure consistency with the General Ptan, planning and land use sections of the municipal code, and design guidelines and standards.
Current P[anning activities inctude review and processing approximatety 15o applications, inctuding rezonings, subdivisions, tand use permits, devetopment plans, sign reviews, variances and tree removal requests. ln addition, Planning reviews approximateLy 4OO buitding permit apptications for zoning compliance. Advanced Pl.anning efforts inctude updates to the General Plan as we[[ as preparation of other long range plans, studies and ordinance updates that implement General Plan goals and policies.
GOALS
* {.
*
Review and analyze planning apptications and projects to ensure consistency with the 2o3o Generat Plan, zoning ordinance and atl other planning and design standards, to ensure new projects meet community standards. Ensure environmental protection and mitigation pursuant the California Environmentat Quatity Act (CEQA). Provide staff support and make recommendations on a[[ ptanning matters that go before the Town Councit, Planning Commission, Heritage Resource Commission, Design Review Board and the Historic Design Review Committee.
to
HIGHLIGHTS
.!.
ln 2Ă&#x2122;t6lL7, Ptanning: Updated Singte Famity Zoning standards to compty with recent Legat rulings. Dedicated the historic Danvilte Hotet and Mccautey House. Processed key residential. (inctuding 150-unit DiabLo Road apartments and 19-tot Otd Btackhawk Road subdivision) and commerciat (inctuding Hettinger Plaza) projects.
o o o *
ffi
ln 2ot7lL&, Ptanningwitt: o Update land use regutations and standards within Areas L,2,2A,3 and 11 of the Downtown Business District (DBD)to reftect the needs of a new retail environment. o lnitiate a feasibitity analysis of devetopment scenarios in the "North Hartz" area to develop land use and devetopment standards that stimutate private redevelopment. o Update the second dwel.ting unit and wiretess communications ordinances. o lmplement a pubtic education ptaque program for Danvitte heritage resources. o Continue to imptement 2O14-2022 Housing Element measures.
ft4
u'rr,,r,t'.tl;rr
rt,lllL -( ir.go\
EXPENDITURES Actual Category
FY
5 S 5 5 S
Emptoyee Expenses Temporary Salaries
Administration Materials & Suppties Contracted Services
FY
TY
stz,643
5
zt,5t8
5
6,052
5
to,275
5
s¿,953
s
5L6,209 45,000 LO,375 1,4,650 22,000
5 5 5 5 5
516,zo9 45,ooo 10,575 14,650
L2s,t34
Adopted L7IL8
FY
5 5 5 5 5
s57,zg6 45,ooo 10,975
to,goo 3z,ooo 65
7L
TOTAL
EXPEND
Adjusted L6IL7
Adopted L6IL7
tslt6
1
ETAIL
Temporary Salaries: part-time temporary assistônce required in connection with processing minor ptanning apptications and assisting Code Enforcement.
Administration:57,t25 for Ptanning Commission training and Heritage Resource Commission training; 53,7sofor staff training and certifications. Material,s and Supplies:
57,t5o for printing, postage, suppl,ies and reference materials; 53,750 for
GlS mapping and land management software maintenance.
Contrðcted Services: 5z5,oo0 for consulting services for DBD Ordinance Updates; 55,ooo for Gl5 consutting services and $z,OOo for Historic Resource consutting services.
FUNDING Buitding Ë Planning
S 6os,44t 5
6o8,234
5 7tt,368 5 7r
TOTAT
68
6s6,o7t
07t
PERSONNEL FTE
PERMANENT
1.00
Chief of P[anning Principal, Planner Associate Ptanner Administrative Assistant
1.00 o.75
TOTAL PERMANENÏ FTE:
3.75
1.O0
1.00
TEMPORARY FTE:*
*part-time temporary hours converted to fu[[ time equivatents (FTE)
ffi
85
r.'rr' tr'.,ì'r' rt'r I l, .,'lr.g,rr
Building PROGRAM DESCRIPTION Buitding is responsible for providing responsive and timel,y permit, ptan review, and inspection services to ensure that att buitding construttion meets minimum safety requirements and is in comptlance wlth appltcabte buttdlng codes and standards. Permit staff review over 3,3OO buitding permit apptications for completeness and assist customers through the permit process. The Ptan Review process involves the checking of construction drawings for new buitdings and structures, additions, atterations, demolition and repair worl< to verify comptiance with [oca[, state and federal laws retated to buitding safety, accessibitity and energy efficiency. Plan review services are augmented through utitizing the services of wetl qualified consuttant firms when appropriate. lnspection services are provided on a timety basis to ensure that att construction compties with approved plans and permits.
GOALS
* * {. *
Ensure a safe buitt environment for the heatth, safety and welfare of the pubtic through the provision of comprehensive permit, ptan review and inspection services. Serve as the welcoming and customer-centric coordination hub of the Town's Permit and Reception Center. Seel< batance in the permitting process between enforcement and conformance with intent of the appticabte codes, standards and regulations being appl,ied. Collaborate with other Town staff to ensure a solutions-oriented permitting, plan review and inspection process that is seamtess, consistent, and responsive.
HIGHLIGHTS
â&#x201A;Ź.
ln 2OL6|LT,Buitding:
o o o *
ln 2Ot7
o o
ffi
Launched the first phase of the new EnerGov Permitting and Land Management System with permitti nglpl,an ni ng appl.i cations and mobi le inspection capabitities. Extended business hours at the Permit Counter for buitding permit issuance fromT:3o AM - Noon to7:3o AM to 4:oo PM. Adopted the 2016 version of the Catifornia Buil.ding Codes. I 1,8, Buil.ding witl,:
Launch the second phase of the EnerGov Permitting and Land Management System with edhanced Citizen Access Portal, ontine Business License, automated reports, etectronic signatures and preparation for eReview
capabilities. Provide buitding ptan checl< and inspection services for the 57-townhome project on West El. Pintado Road, 19-home subdivision on Otd Blacl<hawk Road and commerciat expansion projects in Downtown Danvi[[e. tl (r
rvu'rr'.rlirr rvtIlt i ;r-!or
EXPENDITURES ActuaI Category
Employee Expenses Temporary Sataries Administration Materiats û Suppties Contracted Services Equipment
FY 15116
5 5 5 5 5 5
889,853 45,772 62,451 59,267 432,423 478
Adopted
Adjusted
Adopted
76t17
tY 76tL7
TY
FY
t,ozt,g73
5 5 5 $ 5 5
50,000 49,350 42,500 208,000 1,000
L,372
TOTAL
s s s 5
5 5
2'
L,O2t,973 50,000 49,350 42,500 398,000 1,000
s 5 5 5 5 5
T7IL8
L,OtL,532 25,000 54,750 110,560 260,000 1,000
842
62
EXPENDITURE DETAIL Temporary Salaries: part-time temporary assistance at the permit counter.
Administration: S37,650 for credit card transaction fees and bank related charges; 5t7,too for professional dues, certifications, training, conferences and meeting expenses. Materials and Supplies: 5too,o6o for permitting and GIS software maintenance, ctoud storage and backup services; 58,ooo for printing, reference materials and uniforms; and 5z,5Oo for misc suppl.ies. Contracted Services: 5Z5O,OOO for pl,an checl< services; 55,OOO for inspection services and 55,OOO for consuttant services when project scope or size exceeds the expertise of in-house staff.
FUNDING
Buitding&Planning 5 t,4go,z44 S 1,372,82s 5 L,562,823 5
t,46z,B4z
TOTAL
PERSONNEL
PERMANENT Chief Buitding Official Ptans Examiner Senior Devel,opment Services Tech Buitding lnspector Devetopment Coordinator Development Services Tech TOÏAL PERMANENT FTE: TEMPORARY FTE:*
FTE
1.00 1.00 1.OO
3.O0
1.00 2.00 9.OO
0.50 *part-time temporðry hours converted to futt time equivatents
(t
/
(FTE)
\\'\\' \\'.(1;ì
r
rVt I l( -(
ir.g()\
Code Enforcement PROGRAM DESCRIPTION The condition of private property is a factor that affects the quaLity of tife for atl Danvitle
residents and businesses. Code Enforcement works with Planning, Maintenance Services, Police Services, and the City Attorney to respond to Municipal Code-related comptaints and nuisance abatement issues associated with private property. Code Enforcement activities are handLed on a comptaint basis. Code Enforcement activities assist in the maintenance of the safety, quatity and appearance of Danvitle's 75 residential. neighborhoods along with its commercial and office centers.
Code Enforcement receives approximatety 35O municipal. code-related contacts on an annual basis, with approximatety hal.f of those contacts elevating to formal code enforcement complaint status. The Code Enforcement Officer also assists ĂŻown residents with referrals to other agencies avaitable to address residents' concerns, including Contra Costa County Animal Services, Contra Costa County Environmental Heal,th and the Contra Costa Mosquito and Vector Controt District.
GOALS
{. Provide responsive Code Enforcement to assist in maintaining residents' qual,ity of
* *
Life.
Direct residents to external resources for handting non-Town retated concerns. Encourage non-enforcement solutions to Code complaints wherever possible.
HIGHLIGHTS
{.
ln 2OL6lL7, Code Enforcement:
o o o
Continued enforcement of the Smol<ing Ordinance affecting muttifamily housing units on a complaint basis, starting May 1, 201.6. lmplemented the Plastic Bag Ordinance on a complaint basis, starting Juty 1, 20]-6. Began utilization of the new land management software, EnerGov, for Code Enforce ment activiti es.
*
ln 2OL7lt8., Code Enforcement wi[[:
o Continue refining the EnerGov permitting and [and management software for Code Enforcement activities. o Collaborate with the Planning Division and City Attorney to update sections of the Danvil,[e MunicipaI Code. o Maintain a high Code Enforcement closure rate.
ffi
88
tr'..' rr'.r1;rr rvt
ll,
., ;r-g,rr
"_E-lt_?_ENp_lLU"-BE5______
Adopted tY 76tt7
Actuat
tY 751t6
Category Employee Expenses
5
Administration Program Activities
s
0
5
0
95,909
5
S 5
TOTAT
107,933 1,ooo 5,ooo 1
Adjusted
Adopted
IY L6IL7
t\ L7lL8
5
to7,833
5
tts,692
5
1,000 5,O00
5
1,000 5,000
$
3
$
L2L
3
EXPENDITURE DETAIL Program Activities: 55,oo0 for Code Enforcement and abatement costs
FUND¡NG Buitding
I
Planning
5
95,909 5 113,83j 5 1.t3,933 5
TOTAL
1
t21.,692
t2
ONNEL PERMANENT
ffi
FTE
Assistant Planner/Code Enforcement Administrative Assistant
o.25
TOTAL PERMANENT FTE:
1.25
1.OO
{19
\\'\\'\\'.(lilr ì\'t ll( .( ;ì.g()\
Engineering PROGRAM DESCRIPTION Engineering provides ptan checking and construction inspection for street and pubtic works improvements, inctuding the processing of drainage and utitity design, subdivision and development applications, right-of-way acquisition requests and a[[ encroachment and grading permits. Engineering is responsibte for ensuring that subdivision and permitted improvements on private property and within the public right-of-way are designed and constructed safety and consistent with conditions of approval and att appLicabte Town standards. Engineering and Capitat Project Management work in an integrated fashion to design, construct and manage a[[ Town capital projects. GOALS
* *
Offer high qual,ity services that combine a strong foundation of engineering principtes to meet the needs of Town businesses and residents.
Design/plan, advise, administer, oversee and inspect att pubtic worl<s improvements and subdivision developments and provide these services on
budget and on time. .3. Ensure projects are compl.iant with state and federal regulations and Town poticies and procedures to enhance the quatity of tife and protect the pubtic health, safety and well-being of those who [ive, work and ptay in the Town of Danvitte.
HยกGHLIGHTS
*
f
n 2016 I t7, Engineering:
o o o o .!.
ln 2oL7lt8, Engineeringwil,t:
o o o
ffi
lncorporated encroachment permits into the new EnerGov Permitting and Land Management System. Compl.eted the Camino Tassajara Repaving Project (SAFETEA-LU Phase ll). Managed plan checl< and construction approvats for the Ponderosa "RedHawk" Subdivision. Supported CIP Management on various Town-wide capita[ projects. Ptan check the 19-tot Abigait Ptace - 3743 t 3755 Otd Bl'acl<hawl< Road subdivision project. Estabtish a response protocol for Underground Service Alerts (USA) to include fietd marl<ings of Town operated facilities. Support CIP Management on various Town-wide capital projects.
{lo
rvu rr'-,1'rrrvr ll, .,,r.g,rr
EXPEND Adopted L6IL7
Actuat Category
FY
Emptoyee Expenses
5
Administration Materials & Suppties Contracted Services Equipment
5
$
TOTAL
$
s 5
T5IL6
TY
5 5 5 5 5
374,053 725 6,244 25,953 0
+zt,tzt t,6oo 1o,2oo 5o,ooo 2,ooo 1
Adjusted
Adopted
tY 1,61t7
tY
$ 5 5 5 $
A44,Lz7
t,6oo to,zoo 6o,266 z,ooo
5 $ 5 5
5
L93
L7ltï zg4,to4 z,zoo t3,zoo 5o,ooo 1,500 004
EXPENDITURE DETAIL Administration: travet expenses and professionaI dues. Materials and Suppties: 58,750 for software maintenance and ticensing costs and 5t,450 for safety ctothing and reference materiats. Contracted Services: 546,OOO for engineering consulting services and subdivision pl.an check and 54,ooo for GIS support.
FUNDING General Fund Engineering TOTAL
5 rt9,6jo 5 L26,636 5 5 5 zgt,zgt 5 39L,557 5 S 4o6,97s S 500,921 S 518,195 $ 5
LLs,26L 29t,71.4
89,735 27L,269 36t,OO4
PERSONNEL PERMANENT
FTE
Civi t Engineering Assistant
ffi
1.00 1.00
Pubtic Works lnspector Administrative Assistant
1.00
TOTAL PERMANENT FTE:
5.00
9l
tt'ivs.,1rtrrt rIl, , r,.g,r,
Capital Project Management PROGRAM DESCRIPTION Capitat Project Management is responsibte for the planning, design and construction management of projects in the Five-Year Capitat lmprovement Program (ClP). CapitaL Project Management coordinĂ°tes preparing of the ClP, including prioritizing a list of projects, devetoping associated cost estimates and identifying funding sources, inctuding state and federal grants.
Major activities include: 1) project design, rights-of-way acquisition, environmental review, agency permits, specification preparation and bid processing; 2) construction management, evaluating bids on construction contracts, qualifying contractors, inspecting construction work, progress payments, change orders and notices of
completion; and 3) preparing and maintaining record maps of streets and infrastructure, record drawings of CIP project construction, tegal descriptions for property tra nsactions and
gra
nt
ad mi ni
stration.
GOALS
* {.
* * *
Facititate cost effective and timely design and construction of various pubtic worl<s and faciLities to meet present and projected community needs. Provide engineering, landscape architectural and inspection services necessary to support Capital. Project Management activities. Communicate the pendency and status of att projects to affected users, residents and property owners to minimize construction-retated impacts. Manage a Pavement Management Program that maintains the Town's Pavement Condition lndex {PCl)through preventative maintenance and overtay projects. Sol.icit and secure grant funding from various sources to support the ClP.
HIGHLIGHTS
.t
f
n
o o o o *
2ot6lt7,
Capitat Project Management: Compteted the Osage Station Parl< Picnic and Play Area Renovation Project. Compteted Camino Tassajara Repaving Project (SAFETEA-LU Phase ll). Completed the 2OLSI!6 Slurry Seal Project. Compteted the Railroad Avenue Decorative Crosswatks and Pavement Overtay Project.
ln 2OL7lt8, Capital. Project Management wi[t: o Construct the Osage Station South Parking Lot lmprovements Project. o Undertake 55 mitLion in new Pavement Management Program worl<. o Construct the Rose Street Parl<ing Facil,ity Project. o Begin the Front Street Creel< Bank Stabilization and Danvilte Various Storm Drai nage mprovements projects. I
ffi
q2
*'*'*.,l;,rr\,r
I1, .( rĂŹ.(l()\
EXPENDITURES Actuat t511.6
Empl,oyee Expenses
Temporary Salaries Administration Materiats & Suppties Contracted Services Equipment
Adopted tY 1.61L7
N
Category
5
s86,826
5
$zzss 51155
5
4,s67
5
5os Sos
TOTAL
S
591
704,354 0 650 6,950
Adjusted T6IL7
Adopted tY L7l!8
FY
5
s 5 5
1,000
5
800
5
725,828 0 650 6,950 1,000 800
5
5o 5 5
5
5o
7ts 28
7t3,7s4
846,9so gso 8,450 1,ooo
857,550
EXPENDยกTURE DETAIL Administration: 5950 for traveI expenses. Materjals and Suppties: 55,oOO for software maintenance and ticensing; 53,450 for printing and suppties.
FUNDING General Fund Capitat lmprovement TOTAL
5 5
sL7,st3 74,zzo
5 5
59 733
644,239 69,5L5
713,754
5 5
66s,7t3 6g,5ts
5 5
778,940
78,4to 857,550
PERSONNEL PERMANENT
ffi
FTE
Senior Civit Engineer Landscape Architect Associate Civit Engineer Pubtic Works lnspector
1;00 1.00 2.00 2.00
TOTAL PERMANENT FTE:
6.00
():รฌ
\\'\\'\\'.(]irr rvl I l( .( ;r-ll()\
Transportation PROGRAM DESCRIPTION Transportation provides programs and services that ensure the safe and efficient movement of al"t modes of travet throughout the Town. Transportation addresses the impacts of traffic congestion upon the Town's residents by operating [oca[ traffic management programs, participating in regional coordination and advocacy, participating in tocat development review processes, and pursuing regional and locaI transportation improvements. Transportation manages a network of signats, flashing beacons, radar disptay signs, tighted crosswatks, signage, pavement markings, and bicycte and pedestrian facilities to ensure mobitity for Danvilte residents tocatty and within the subregion. The Transportation staff
ensurei quatity N
of tife through
eighborhood Traffic
regionaI advocacy and
the implementation of
a
Management Progra m (NTM P).
GOALS
* * * *
Ensure a safe, retiabte and efficient transportation system for atl. modes of transportation inc[usive of motorists, pedestrians and bicycLists. Foster cotlaborative education, engineering and enforcement efforts to detiver effective traffic safety education and traffic catming programs that support and maintain the quatity of Life in the community. Oversee the Downtown Parking Management Program and pursue new parl<ing management strategies in support of the Town's economic devetopment efforts. Maintain strong advocacy in regional transportation ptanning and poticy devetopment to ensure funding opportunities for transportation needs.
HIGHLIGHTS
*
ln 2Ă&#x2122;t6lLT,Transportation: Participated in the development of a countywide half-cent sales tax measure. Compteted the biennial Measure I Checktist reporting requirements. lmptemented parking rnanagement strategy and improvement efforts for the downtown area and a westside Danvitle residential permit parl<ing program. lmptemented high-visibil.ity ("green") bicycte [ane pavement markings. Conducted the bienniat traffic count monitoring study.
o o o o o
{. In 20L7 I ts,Transportation wit[: o Continue partnership on sub-regional programs including Street Smarts and
o o
ffi
TRAFFIX Measure J Traffic Congestion Retief (Student
Transportation). through various CIP network Enhance the Town's mutti-modal transportation projects and the Pavement Management Program. Review traffic impact analyses for anticipated devetopment apptications.
94
rvrvs'.Llrrr rvl
llt
.r
;t.!ttr
EXPEND¡TUREs Actual 15/16
Category Employee Expenses Temporary Sataries Administration Materiats Suppties Contracted Services Equipment
t
Adopted tY t6lL7
FY
5
295,640
5
0
5
3,288
s s
1,,314
5
136,000 0
Adjusted tY t6lL7
Adopted FY L7178
5 z4o,z66 So
5
369,339
5
5 5
0 7,sLO
5
7,5t0
s
7,500 73,50o 8,500
5
20,500
5
5
t37,3L6
5
5
8,500
s
5 5 5 5
TOTAT
358,982 1,000 6,800 6,650 57,000 5,000
543,L65
435
EXPENDITURE DETAIL Administration: 56,800 for professionaI dues and training. Material,s and Suppl,ies: 53,700 for Highway Capacity Software and suppl.ies, andS1,950 for printing postage, reference materiats and application software maintenance.
Contracted Services: 53O,OOO for the Street Smarts Program; 5t5,OOO for traffic consutting services and traffic counts; 59,500 for CMA and regional transportation pl.anning; and 5z,5oo for signs and striping. Equipment: 55,OOO for transportation and data col.l.ection equipment and maintenance.
FUNDING General Fund Gas Tax Measure J TOTAT
5
s s
77,565 253,473
tos,204
5 5
$
43
85,7¿o 267,947
8j.599 437
5 1,t1,,269 S 5 309,948 5 5 t2t,94l S
5,500 26L,657 1.68,275
76
PERSONNEL PERMANENT
FTE
Transportation Manager Traffic Engineeri ng Associate Transportation Program Anatyst
1.00 1.00 1.00
TOTAL PERMANENT FTE:
3.OO
TEMPORARY FTE:*
0.25
*part-time temporary hours converted to ful.l time equivatents
ffi
(l:)
(FTE)
tlu
\\'.t1;rr
rt,tl]t t :r.gor
Clean \7ater Program PROGRAM DESCRIPTION The Ctean Water Program (Program) was estabtished to compty with the Federal Ctean Water Act and Catifornia's Porter-Cologne Water Qual.ity Control Act, which require locat agencies to eliminate or reduce polluted storm water from urban runoff. Danvil.te is part of the Contra Costa Ctean Water Program which inctudes Contra Costa County and 18 other cities. The Program is reguLated by a Municipal. Regionat Permit (MRP) which is issued by the San Francisco Regional Water QuaLity Control Board (SFRWQCB). The Program implements best management practices, monitors the effectiveness of the Town's Storm Water Management Ptan, and mal<es adjustments as necessary. This includes activities such as publ.ic education, development review, drainage maintenance, trash control and construction inspection activities, businesses and itticit discharges. Street Maintenance supports the Program by inspecting and cteaning Town drainage systems and sweeping aLl, publ,ic residential streets on a monthly basis, and commercial streets on a weekly basis.
GOALS
* {. * i. ¡. *
Reduce pesticides, trash, PCBs, mercury and other poltutants. lmplement MRP 2.O development regulations for private and pubtic projects. Conduct construction, business and il.ticit inspections and code enforcement. CompLete maintenance activities per MRP 2.O. Perform outreach and education on storm water potl.ution prevention. Devel.op a Green Infrastructure Ptan per MRP 2.O requirements.
HIGHLIGHTS
*
ln 2OL61L7, the Ctean Water Program: o lmplemented and reported on new MRP 2.o requirements. o Ensured that MRP 2.O requirements were met for al,l. CIP and private development projects; and implemented measures to meet trash reduction goal, of 7Oo/o by Jul.y t,2Ot7 (have currently achieved a 95.60/o reduction). o Devetoped a Green lnfrastructure Frameworl< per MRP 2.o.
{. ln2Ot7lt8, the Clean Water Program wi[t: o lmplement measures to meet trash reduction goats of 8Oo/o by 201,9 (have o o o o
ffi
currentty achieved a 95.60/o reduction). Ensure that aLL ClP and private devetopment projects compty with MRP 2.O. Devetop a Green lnfrastructure Ptan by September 2oL9. Map and manage trash on private lands greater than 1O,OOO ft2 by ZOf8. Work to meet total maximum dail,y loads requirements for Mercury and PCBs.
9l¡
\\'\\
\\'.(1 lìr
rvl Il( -( :ì.go\
EXPENDITURES Adopted T6IL7
Actuat
tY
Category Employee Expenses Temporary Sataries
5
86,L96 o
5
t3,3L5
5
5
TL,6L3 L62,347
5
1,,695
5
Administration Materiats & Suppties Contracted Services Equipment
27
TOTAT
EXPENDITURE
Adjusted tY 1.6tL7
FY
1.511.6
5 5 5 5 5 5
69,96s 5,ooo
zt,too 18,ooo
t77,ooo t,ooo
5
5 5 5
5 5
69,96s 5,ooo
zr,roo t8,ooo 348,s49 t,ooo
Adopted FY L711,8
5
69,247 s,ooo 22,Loo 18,ooo
5
5 S 5 5
166
t78,ooo 1,ooo
29
7
AIL
Temporary Sataries: 55,OOO for temporary part-time assistance for implementation of the MRP.
Administration: 520,000 for State Water Resources Board and Green Business Program fees/permits and 5z,tOO for professiona[ dues/training. Materials and Supplies: 5t5,OOO for educationat and outreach efforts and 53,ooo for suppties. Contracted 5ervices: 5t25,00o for CCCWP group permit costs; 529;ooo for business inspections; 5t3,ooo for environmentaI consulting; Sto,ooo for Gl5 mapping and 51,ooo for water testing. Equipment: St,000 for MRP 2.0 imptementation toots/devices.
FUNDING
5 275,t66 5 z9z,o65 5 463,ht4 S
Clean Water TOTAL
zg3,s47 2
7
PERSONNEL
PERMANENT
FTE
Coordinator FTE:
Clean Water Program
0.5O
TOTAL PERMANENT
O.5o
TEMPORARY
FTE:*
1.OO
*part-time temporary hours converted to futl time equivatents
ffi
gJ
(FTE)
tt rt'rr'.r1;rrrvtììt ., rr.qrrr
ffi
98
\\'\\'\\'.(i;tl
rVI
Il(.( lì.g()\
Maintenance Services ActuaI PROGRAMS
tY
Buitding Maintenance
S 5
Parks Maintenance
S 1,,670,037
Roadside Maintenance
5 L,zs4,83o 5 74t,37t 5 630,069 S t66,B4s 5 z3z,3ït
Maintenance Services Management
5treet Maintenance Street Light Môintenance
Traffic Signal Maintenance Equipment Maintenance
Adopted
Adjusted
Adopted
r6tfi
tY 1.61L7
TY
FY
1.511.6
3t6,4o5 lgg,Tos
5 5s9,8j6 5 5 809,S97 5 5 2,093,649 5 t,67h,st9
983,743
5 5
5
2,L53,998
S
z,tgl,tot+
S
L,767,469
5 5
t,6BB,t56
5 9s9,499 5 5 72L,82,6 5 zz3,ooo 5 5 4o8,ojo
S
S
703
TOTAT
L7IL8
374,836
959,858
5 5 5
752,L27 276,1,55
457,O75
385,79+
9zt,4z7
t,oog,s2t 779,9o6 zzS,ooo
360,35¡ 2L
6L
FUNDING
LtAD-ZoneD TOTAT
$ 5,821,703 $ 7,289,94s S 7,6os,z6r 5 7,ss4,32L
Donations/Contributions Gas Tax
General Fund
LtAD-ZoneA LLAD-ZoneB
ttAD-ZoneC
S 5
5 5 5 5
294,977 5,ooo 877,622 2,263,642
8or,66z 872,8s7
7zt,8z6 1,,464,459
PERSONNET
FTE
PERMANENT
28.00
TEMPORARY
3.00
* part-time temporary hours converted to futl time equivatents (FTE)
ffi
s $
5 t6g,Tz7 5 2,632 5 718,+89 5 L,77t,s73 5 548,599 5 7o6,tg4 5 630,069 5 t,zs4,62t
Ctean Water
5 284,977 5
$ 3,ooo 5 5 93t,t3o 5 5 2,56t,35r 5 858,0¡o
303,120 3,000 928,40L
5
2,505,528
5
768,642
gzg,4sg
5
9L9,5L4
7sz,tzz
S
779,906
5 t,5o5,3oo
5
t,546,2tt
S
5
31.00
99
\\'\\ \\'.(];r r rVI I ì( .(';r.g(l\
Maintenance Services Management PROGRAM DESCRIPTION
Maintenance Services Management oversees the Maintenance Services Department to ensure that Town-owned facìLities retain a positive appearance, maximize functionaLity and enhance the quality of Life for Danvi[[e residents. Staff support is provided to the Parl<s and Leisure Services Commission and Sports ALLiance. Maintenance Services Management worl<s cl.osely with the San Ramon Val,tey Unified School District on co[laborative maintenance efforts, inctuding Town-School District school parks, tennis courts and swimming poots. GOALS
€. Provide leadership, oversight and support to Maintenance Services staff to ensure outstanding customer service and maximize performance and productivity.
{. Manage the Town-wide
Lighting & Landscape Assessment District and the Department's fiscaI resources to ensure cost-effective service detivery. .3. Manage contracts for parl<s and roadside landscaping, equipment maintenance, water feature maintenance, street sweeping, street tight repairs, custodiaI services, security systems and communication equipment. {. Respond promptly to service requests from residents, Sports Atliance members and Town staff.
HIGHLIGHTS
{. ln 2OL6lL7, Maintenance Services Management: o Continued to closely monitor water consumption
to compty with State and
EBMUD mandates.
o o
Continued the Town Service Center's certification in the Contra Costa
o
Green Business Program. Awarded Fleet and Parl< Maintenance contracts.
Renewed the Town's Lighting and Landscape Assessment District.
t!. n 2Ot7lL*, contract service costs wi[[ increase by the
in various program areas and water, electricity and sewer costs wi[[ continue to increase due to agency rate increases. f
{.
CPI amount
ln 2Ot7lLí, Maintenance Service Management wi[[ award new contracts for BuiLding Maintenance and Street Light Maintenance.
ffi
IOo
\\'\\ \\'.(liulvlIìr
(
iì.ir()\
EXPENDITURES Actual tY 1.51t6
Category Employee Expenses Administration Materials & Suppties Contracted Services Equipment TOTAT
Adopted
Adjusted
Adopted
FY 1.6tL7
tY 1.6tL7
TY
5 3o9,o6o 5 l,osz 5 L2,443 5 L2,445 5 z4,4os 5 34,133 5 34,t33 5 0 5o 5 $ ts,ooo 5 goo 4,200 $ s 5 4,zoo $ 5 336,4o5 5 3s9,836 S lt4,a36 5 $
3o¿,048
5
309,060
L7IL8
S
329,268
S
1,5,693
36,633 0
4,200
lgs,tg+
EXPEND¡TURE DETAIT Administratio¡157,500 for taxes and fees and 58,t93 for office assistance, professional. dues and trainings. Materiats and Suppties: Sf 6,558 for uniform services, 57,OOO for protective and safety ctothing, 55,400 for application software and 57,696 for office supplies, postðge and printing at the Town Service Center.
Equipment 53,300 for tease costs and 59oo for miscettaneous equipment. FUND¡NG GeneraI Fund TOTAT
5 $
336,+o5 t36,4os
5 3s9,Bs6 5 17+,936 5 5 559,8¡ó 5 3l4,Bs6 5
3as,7g4
tgs,79+
PERSONNEL PERMANENT
ffi
FTE
Maintenance Services Director Maintenance Services Coordinator
1.00
TOTAL PERMANENT FTE:
2.00
1.00
I
l)l
rV$ r\'.tl;rnVt lLt .t :r.gttr
Building Maintenance PROGRAM DESCRIPTION
Buitding Maintenance utilizes a combination of Town staff and service contracts to maintain 105,000 square feet of heaviLy utilized pubtic buitdings in safe and aesthetica tty- pteasin g con diti on.
Buitding Maintenance tracks maintenance performed at each individuat buitdîng and maintains a ten year asset replacement p[an. Buitdings are continuously improved to meet user needs and regutatory requirements. Capital improvement projects are identified and scheduted as needed. Facitities include:
¡:. Danvilte Library €. Veterans Memóriat Bl.dg. - & Senior Center
{. Town Meeting Hatt * Vill,age Theatre and Art Gattery * Danvitte community center {. oal< Hiu" parl< community center
* * *
Hap Magee Ranch Parl< houses (3) Park restrooms (t6) Teen Centers at Charlotte Wood, Diablo Vista and Los Cerros Middl'e Schoots Danvil'le Town Offices ¡?' Town Service Center
*
GOALS
i. * i. i.
Respond in a timety manner to requests for service in a[[ Town-owned and managed buil.dings.
Administer contracts for a variety of both routine and extra services, inctuding custodiat, ptumbing, HVAC, etectrical and pest management. Perform regutar inspections at each faciLity and mal<e immediate corrections to any safety and/or maintenance issues that need to be scheduted for completion. Perform maintenance activities for att buitdings on an ongoing scheduted basis to protong service Life and prevent breal<downs.
HIGHLIGHTS
*
ln 2OL6lt7, Buitding Maintenance reptaced HVAC units at the Danvil.te Library and the Town Service Center, refurbished the restrooms at the Danville Library, reptaced flooring and the exterior doors at the Sycamore Day School and replaced the flooring at alt three Teen Centers.
{.
For 2OL7lt&, utitity rates and service costs for water, electrical, sewer and solid waste disposal continue to increase. Suppl.y costs increase stightly due to the cost of paper products and increased buitding usage.
{. ln 2ot7lt8,
Buitding Maintenance witl award a new custodial services contract, instatt new flooring in the Vil.tage Theatre lobby, replace one HVAC unit at the Town Service Center, make drainage repairs at the Sycamore Vatl,ey Day School and install an atarm system at the Town Meeting Hatt.
ffi
t1t2
!\'\\'\\'.(ltr l\/l Il( .( ir.1l()\
EXPENDITUREs ActuaI Category Employee Expenses Temporary Salaries
Administration Materiats & Supplies Contracted Services
Equipment Program Activities
Adopted
FY t511.6
5 5 5 5 5 $
5
TOTAL
z7g,zzt
33,tt4 t,840 37,674
t1s,346 20,075 zaz,+as 7
FY
5
5
5 5 $ 5 5
269,493 4o,zs7
t,840
6o,tot r9o,588 65,ooo
z4z,3oï
I
765
Adjusted tY 1.61t7
t6tt7
587
5
5
5 s
s 5 5
269,493 4o,zs7
t,g4o 61,,604
zo3,z4z 65,ooo z4z,3o7
Adopted tY t7lt8
5 5 5 5
zïS,zoz 4o,zs7
7J4o 6o,tot tg+J49
5 S 5
65,ooo 270,779
883,743 s
gZt,4Z7
EXPENDITURE DETAIL Temporary Salaries: fund part-time temporary custodiaI workers for various Town facilities.
Administration: orofessiona[ dues and trainins costs. Materials and Supplies: 534,0O0 for custodiaI and paper suppties; 5z5,tOr for ptumbing, electricaI and paint suppties and 51,ooo for furniture repairs. Contracted Services: 5tt3,39o for custodiaI services and 58t,358 for a[arm services, ftoor refinishing, carpet cLeaning gutter and window cleaning, and painting.
Equipment repair costs associated with equipment at the Town Offices, Library, Community Centers, Vittage Theatre,Service Center and various park buil.dings. Program Activities: 5224,t63 for gas and electricity,5z5,536 for sewer and 521,080 for water.
FUND¡NG GeneraI Fund LLAD - Zone D
5 ¡68,908 S 420,857
TOTAI.
S 4s2,936 5 469,324 5 ¿30,807 5 452,tO3 869,587$883,7435g2 7 448,7tt
5
420,876
5
7
PERSONNEL
PERMANENT Maintenance Speciatist Maintenance Worker TOTAL PERMANENT FTE: TEMPORARY FTE:*
FI"E
1.00 2.00
5.o0 1.oo
*part-time temporôry hours converted to ful,t time equivatents (FTE)
ffi
I
t):ì
rvrvir'.r1lrr rvt
I
lr., ;r.q,n
Park Maintenance PROGRAM DESCRIPTION
for 198 acres of Town-owned and/or managed parl<s and community faciLities that enhance residents' quatity of tife and support recreationat activities offered through the Town and community organizations. Parl< Park Maintenance is responsibte
Maintenance responds to publ,ic requests and supports Town-sponsored programs such as the Music in the Parl< concert series, adutt softbatl at Sycamore Vattey and Diablo Vista Parks and bocce batl at Sycamore Val.tey Parl<. Water usage is continuatty monitored to meet EBMUD water use and consumption restrictions.
GOALS
* * * *
Provide for safe, attractive and welt-maintained parks, traits and open space. Provide dail.y [itter control, landscape maintenance, irrigation system, play area and hardscape inspections/ repairs to l<eep Town-maintained parl<s safe for public use. Maintain and inspect Town-maintained fiel.ds to meet sport league standards and atso altow for recreationat use. utilize integrated pest management practices to eradicate Pests and weeds.
HIGHLIGHTS
*
ln 2O1,61t7, Park Maintenance: o Continued to monitor water usage and meet EBMUD restrictions whil,e attempting to keep plant materiaI ative. o Prepared specifications for design RFP for the replacement of the ptay structures at Hap Magee Ranch Park. o Continued to utitize organic fertitizers for atl Town-maintained sports fietds. o lncreased Park Maintenance staffing by one additional Maintenance Worker.
*
ln 2Ot7ltï, water, electricity and sewer costs continue to increase. Water costs are increasing due to significant EBMUD rate increases, despite ongoing efforts to manage water usage and reduce consumption. CPI adjustments wi[[ increase the cost of major contracted services.
*
o
o o
ffi
Maintenance wilL Prepare ptans and specifications for replacement of the ptay structures at Hap Magee Ranch Parl<. Repair ptayground safety surfaces at several park sites. Upgrade the Lighting control system for the Town-maintained tennis courts at Monte Vista High Schoot.
ln 2Ot7lt8.,
Parl<
t04
\\'\\'\\'-(1ir Ì\,r I ì(,(-iì.g()\
EXPENDITURES Category
Employee Expenses Temporary Sataries Administration Materiats É Suppl,ies Contracted Services Equipment Program Activities
Actual
Adopted
Adjusted
Adopted
FY 1.511.6
tY 1.6tL7
tY 1.6tL7
tY L7lt8
5
722,788 24,435 L4,O4L 80,523
s
460,28t
5
9,O59
s
358,910
5
s 5
TOTAL
1
5 5 s 5 5 5 S
833,808 63,ooo 20,552
S 5
8i3,8o8
tzg,275 s9z,tz6
5 5 5 5
t33,6o9
15,ooo 44z,B3B
63,000 zo,55z
5
647,L92 t3,ooo 44z,8z$
s 2,
7
S S 5 5 s
5 5
8s6,gos 63,000 3o,zs3
t29,275 622,266
r¡,ooo +lz,+6r L64
2 f,87
998
EXPENDITURE DETAIL Temporary 5ataries: costs for seasonaI Parl< Maintenance Worl<ers.
Administration: LLAD reimbursement costs and Sto,o0o for associated training costs. Materials and Suppties: 538,ooo for irrigation; 5t7,soo for hardscape; 555,oo0 for litter; 58,628 for asphatt; 5t6,ooo for protective ctothing/suppl.ies and 5t3,o97 for pl.ants and other suppl,ies. Contracted Services: 5454,82o for [andscape maintenance; 5t9,ooo for consutting services; 523,678 for trails and hardscape repairs; 5t3,ooo for irrigation maintenance; 553,2oo for pond maintenance; 5z7,goo for custodiaI services and 526,o00 for tree maintenance. Equipment: costs associated with equipment purchases, leases, or warranties. Program Activities: S+34,78O for water; 526,398 for electricity; $3i,69O for sewer and for sports fietd tighting.
S8,OOO
FUNDING GeneraI Fund LLAD - Zone D
Donations/Contributions
5
s s
833,64L 833,764 2,632
5 s 5
TOTAT
t,o47,066 t,o43,593 3,ooo
5
t,o76,5o6 7.,o74,492 3,ooo
S 1,o90,o56 S L,og4,tog
5
i,ooo L64
18
2
PERMANENT Maintenance Supervisor Maintenance Speciatist Maintenance Worker TOTAL PERMANENT FTE: ïEMPORARY FTE:'I
5 5
FTE 1.OO
3.O0 5.OO
9.oo 1.5O
'tpart-time temporary hours converted to full time equivatents (FTE)
ffi
I05
rvrr u'.t1;rrrt,t
|
1, .(
ir.g()\
Roadside Maintenance PROGRAM DESCRIPTION Roadside Maintenance is responsible for over 60 acres of roadside landscaping, medians and community areas. Roadside Maintenance strives to provide attractlve, aestheticaLty-pl.easing streetscape areas inctuding clean and safe pedestrian pathways. Water usage is continualty monitored to meet EBMUD water usage restrictions. GOALS
å Provide for safe, attractive and we[[-maintained roadsides and medians. * Conduct regular irrigation system inspections and repairs. å Perform dail,y titter control. * Prune trees, control weeds and replace ptant material as needed. {. ldentify and evaluate tong-term maintenance needs on an annual basis. HIGHLIGHTS
*
ln 2Ùt6l17, Roadside Maintenance: Completed major tree projects, such as the downtown area and Sycamore Val,tey Creel< Trai[, to enhance roadside safety and community appearance. Monitored irrigation systems for efficient water use and compliance with drought restrictions. Assumed maintenance responsibitity for several newty landscaped areas, inc[uding the Downtown beautification and redevelopment projects.
o o o * * *
Util,ity costs for water, electricity and sewer continue to rise due to increases imposed by EBMUD and PG&E. Contracted tree maintenance costs are increasing as trees age and require higher levets of maintenðnce. Creek cteaning contract costs have risen significantl.y due to more stringent Catifornia Department of Fish and WiLdl.ife restrictions. ln 2oL7lL8, Roadside Maintenance witt: Continue to respond to drought and storm retated tree issues that continue to be identified. Continue to identify tree projects to maintain roadsides and enhance streetscape aesthetics and pubtic safety. Upgrade irrigation equipment as part of ongoing water conservation and efficiency efforts. Worl< with consuttant to evatuate locations where replacing existing Landscaping with more drought toterant materials may be appropriate.
o o o
ffi
I06
rvrr'rr'.,1',r rvr 11.., ;r.gtrr
EXPENDITURES Actual FY t511.6
Category
Employee Expenses Temporary Sal,aries Administration Materials & Suppties Contracted Services Equipment Program Activities
S s s S S 5
5
LO,g26 28,779
3o.Él0 ss6,964 6,L7,6
zzg,zss
Adjusted
Adopted
t6tt7
FY 1,61L7
FY
FY
5 5 5 5
5
5 5
696,8os 25,ooo 33,42o 65,339 s1,s,zs7
5
703,8L5
5 5 $
25,OOO
1"6,228
5 $
322,360
830
TOTAL
EXPE
s82,L4o
Adopted
5
33,43o/ 69,385 597,252
L7It8 665,ggg 25,ooo 39,203 65,339 527,L62 1,6,228 349,225
s s 5
5
1"6,227
5 5
322,360
s
15ó
1
DETAIL
Temporary Sataries: 5z5,ooo for cost of part-time, temporary staffing to assist with various work and activities.
Administration: 553,o5o for LLAD reimbursement costs. Materials and Supp[ies: irrigation, titter, hardscape and planting suppties; 53z,6oo for Roadside Zone A and 532,74o for Roadside Zone B. Contracted Services: 5zzz,6o3 for Roadside Zone A and 5z36,56ofor Roadside Zone B; 5r5,ooo for creek cleaning, 5zz,5oo for downtown litter removat, 516,200 for irrigation repairs and Sh,zgg for hardscape repairs. Program Activities: 5ro5,zoo for Roadside Zone A water and 5zz4,4oo for Roadside Zohe 5t5,ooo for Roadside Zone A electricity and 53,465 for Roadside Zone B eLectricity.
ruNDt_ft_G GeneraI Fund LLAD - Zone A LLAD - Zone B
$ 5 5
238
5
o
548,398 706,L94
5 5
80t,662 872,857
TOTAT
519
5 5 5
o 838,O30 929,439 767
5 5 5
B
water,
o 768,642
9t9,5L4 6
PERSONNEL
PERMANENT Maintenance Superintendent Maintenance Supervisor Maintenance Specialist Maintenance Worker TOTAL PERMANENT FTE: TEMPORARY FTE:*
FTE 1.OO 1.OO 1.OO
r+.oo
7.oo
o.5o 'rpart-time temporary hours converted to ful.l time equival.ents (FTE)
ffi
al)7
\\'\\'\\'-(1ill ì\'l ll( .t ir.g()\
Street Maintenance PROGRAM DESCRIPTION
Street Maintenance utitizes a combination of Town staff and contract services to
maintain approximateLy 145 mil.es of streets and roadways,4,TCiO storm drain inlets, 6.1 mites of roadside ditches and 4.6 miles of creel<s and channets. Street Maintenance performs a number of activities to comply with the federal Clean Water Act and reduce the ftow of pollutants and trash into storm drains and waterways. Street sweeping is performed on a monthty basis for a[[ residential streets and weekly for commercial streets; a minimum of 25o/o of catch basins and Town maintained drainage channels are inspected and/or cleaned annua[[y. GOALS
* {. i. tr *
Repaint pavement legends, striping and curb markings to enhance safety.
Maintain safe streets and sidewalks by performing inspections and repairing potholes, curbs and gutters.
Ă&#x17E;erform street swĂŁeping and inspection and/or cleaning of catch basins in compliance with the Municipat Regional Permit issued by the San Francisco Regional Water QuaLity Control Board. Conduct cleaning, repair, replacement and instatlation of traffic signs to ensure they are tegibte and functional for motorists and pedestrians. Maintain creeks and channets to reduce potential for ftooding and property damage
HIGHLIGHTS
*
ln201,6lt7, Street Maintenance:
o o o o
*
ln2OL711.8, Street Maintenance witt: o Continue a regutar street sweeping program on a[[ publ,ic Town streets. o Perform regular ongoing maintenance of town-maintained drainage facilities.
o
o o
ffi
Swept over 6,00O curb miles of streets. lnspected and cleared over 5OO storm drain inlets and 58 creel<s and drainage channels, before, during and after the major winter storm events. Reduced effects of winter storms by taking a proactive approach to creel< and drainage maintenance throughout the epic storm season. lnstatted 2,873 feet of striping, 62 pavement legends, and 48O signs.
Continue with street name sign replacement to increase visibitity and continue transition to new sign standards. Repaint pavement striping on various arterial and residential streets. Reptace damaged sections of sidewalks, curbs and gutters in high traffic areas.
t Ott
i,,'rr'..'-,1'rr,r't
I
l, r,,.gor
EXPENDITURES Category
Actuat
Adopted
Adjusted
tY tslL6
tY t6tL7
FY
S 4t8,3tz S 5L745 5oS 5 trz,g66 S S zz4,7st 5
Employee Expenses Temporary Salaries
Administration Materials & 5uppl,ies Contracted Services Equipment Program Activities
Szzzs
5 +2,94s
S
503,327 0 457 62,234 3t9,251. 10,030 44,200 93
EXPENDITURE
Adopted
1.6tt7
FY
5
503,327
5
0
5
457
s s
62,593 3L9,25L 10,030 44,200
5
s
5 5 5 S S 5 S
t7IL8 s39,gg6
tg,ooo 3,toz 6z,zs4 327,7s9 to,o3o 46,4oo
Se3
2L
AIL
Materia[s and 5upplies: 5Zt,68z for signs, markings, pðint and suppl.ies; 5t8,oOO for asphalt suppties and 522,552 for concrete, drainage and hardscape suppties.
Contracted Services: Szz5,o4o for town-wide street sweeping; S+t,739 for catch basin cteaning, creek maintenance and downtown trash removah 536,08O foisign maintenance; 5tz,5OO for sidewatk repairs; 54,OOO for ernergency ctean up/drainage repaiis, 54,400 for asphal,t repairs and 54,ooo for titter. Equipment: inctudes costs associated with purchase, leasing, or maintenance of equipment. Program Activities: inctudes eLectricity costs.
FUNDING Gas Tax
Clean Water TOTAL
S 5
s7t,644 t69,727
5 6s4,622 5 5 284,977 5
74L,37L
654,98L 284,877 939,858
S
5
7o5,4oL
3o\,tzo 2L
PERSONNEL PERMANENT
ffi
FTE
Maintenance Supervisor Maintenance Speciatist Maintenance Worker
f.oo
TOTAL PERMANENT FTE:
5.OO
1.OO 1.OO
I Oll
\\'\\'\\'.(l;ìi ì\'Ì ll(
.(
it.g()\
Street Light Maintenance PROGRAM DESCR¡PTION Street Light Maintenance provides for safe, wett'tighted streets by funding utitity costs, performing monthty street tight inspections and undertaking necessary repairs on
approximatety 1,100 Town-owned street tights; and funding utitity costs additionat 2,100 PC&E owned street l,ights.
for
an
Repair requests to PGÛE and the Town's street Light maintenance contractor are done electronicatty, which atlows the Town to monitor the status of requests through the PGÛE website and the contractor's database.
GOALS .3. Conduct proactive regutar inspections within three street tighting zones, inctuding Downtown Danvi[[e, main arteriaI streets and residentiaI areas. {. Respond to requests for street tight repairs from the pubtic in a timely manner. Determine the responsibte agency for reported street Light maintenance issues and notify of necessary repairs. Maintain a database to accuratety track repairs and maintenance of street I'ights.
* *
HIGHLIGHÏ5 Street tight maintenance includes etectricity costs associated with att Pc&E and Townowned tights, and maintenance and repairs associated with Town-owned tights. Etectricity costs continue to increase, and account for the majority of the program costs. street l,ights have been instatted on Sycamore Valley Road, Camino Tassajara and in the downtown area, increasingthe effectiveness of Lighting white reducing costs in these areas. Further opportunities to utilize LED technol,ogy and other energy saving measures continue to be pursued. LED
*
ln 2o16lL7,Street Light Maintenance:
o Continued inspections of Downtown, arterial and residential street tights. o Facilitated over 125 street light repairs. o Reptaced two street tights atong Camino Tassajara that were damaged in
*
traffic accidents. ln2Ot7/18,Street Light Maintenance wi[t:
o o
ffi
Proactivety inspect Downtown, arteriaI and residentiaI street tights. Award a new street Light maintenance contract.
II
f
)
*'n'rr'-,ltu n,r I l, .r',-gor
EXPENDITURES Actual Category Employee Expenses Temporary Sataries Administration Materiats & Suppties Contracted Services Program Activities TOTAT
FY
5
Adopted FY 1,61t7
L51t6 ro5,B35
5 t79,69s 5
t7g,695
5 5 6,299 $ 5 39,500 5 5 485,ooo 5
tl,,33t
Sos 1.t,332
5o 5 5 $ 5 S
Adjusted FY T6IL7
9,642
LJ44
S
4z,go7
47o,34t 630,069
72
,0
6,299 69,802 485,000
Adopted FY
t7ltï
$
2O2,L76
5
L1.,331
5
6,2ee 44,soo 515,6oo
So S 5
752,127
906
EXPENDITURE DETAIL Administration: LLAD reimbursement costs. Materiats and Suppties: 56299 for repair parts and suppties. Contracted Services: 54O,5OO for street tight repairs and 54,000 for consulting services. Program Activities: 55r5,600 for electriciry costs.
FUNDING LIAD - Zone
C
TOTAT
5 630,069 5 72t,926 5 7sz,L2l 5 63
S
lzt,8z6
75
L27
779,9o6 779,906
PERSONNEL PERMANENT
ffi
FTE
Maintenance Worker
2.00
TOTAL PERMANENT FTE:
2.00
tlt
\\'\\'\\'.(1lrÌ r\/r I l( .( iÌ.g()\
Traffic Signal Maintenance PROGRAM DESCRIPTION
Traffic Signal. Maintenance maintains and operates a networl< oÍ 54 traffic signats, traffic control signage, radar disptay signs, itluminated crosswatl<s, and overhead ftashing beacons in a manner that ensures mobil,ity for Danvitle residents. Traffìc signat maintenance is accomptished through a contract with the Contra Costa County Publ,ic Worl<s Department. The program atso contributes to a percentage of maintenance costs associated with the six Caltrans-owned and operated traffic signats proximate to the lnterstate 68O on and off ramps within Danvilte. GOALS
{. Maintain and operate a roadway system consisting of 54 optimaLLytimed
and
coordinated traffic signats, traffic controt signage and striping.
.E Continuously improve operation of the transportation networl< through appLication of avai[abte technologies, capitaI improvements and traffic signal timing enhancements. {. Conduct proactive, regular inspections of traffic signaI apparatus, itluminated crosswalks, flashing beacons and radar disptay signs. .E Promptly respond to pubtic inquiries regarding traffic signaI operations. HIGHLIGHTS
.E ln 2OL6l t7, Traffic Signal, Mai ntenance: o Provided over 1,5OO hours of traffic signal. maintenance services. Reptaced signal cabinets and/or controllers at 3 intersections. Repl,aced or upgraded over 8OO toop detectors at 20 intersections. lnspected battery bacl<-up systems at atl signalized intersections; reptaced batteries and/or hardware at 22 signatized intersections. o Assisted with depl,oyment of the Townwide ALPR camera system.
o o o
åln 2ot7 I L8, Traffic Signat Mai ntenance wi[[: Replace/upgrade traffic si gna[ cabinets/controtlers at 3 i ntersections. RepLace/upgrade il.tuminated crosswalks at 4 locations. Convert fluorescent street name sign lamps to LED and replace ittuminated street name sign panels at 15 intersections. o Develop plans for software and hardware upgrades to the traffic signal interconnect system and traffic signaI controller network. o Conduct Townwide inspections and complete a 5-year imptementation plan for repainting of signal pol.es and cabinets.
o o o
ffi
I I')
tvu'..'.rll,t rvt ll,
-, ;r.g,rr
EXPENDITURES Actual Category
Contracted Services TOTAT
FY
1.5tt6
Adopted
Adjusted
Adopted
ty L6tt7
TY
L6IL7
ty t7lL8
5 t66,845 5 166,845
2z3,ooo
5
223
22z,ooo
S
2z3,ooo 223
2
ENDITURE DETAIL Contracted 5ervices: S223,000 for traffic signal maintenance and consutting.
F UNDING Gas Tax
TOTAL
ffi
5 !66,84s 5 z2spoo 5 Í,66,845
22
I t:J
2zz,ooo 223,OOO
S
2z3,ooo 223
\\'\\'\\'.(1lu
ì\,1
|
ì(
(
iì.1.1()\
Equipment PROGRAM DESCRIPTION Equipment Maintenance ensures that atl Town vehictes and equipment are properly maintained to altow safe operation'with maximum useful tife. Contracted services, equipment repairs and gasotine costs support a fleet of 58 vehictes. Specific criteria have been devetoped and incorporated into a ten-year reptacement schedule that includes each type and piece of equipment used by the Town. Once due for replacement, vehicles and equipment are evaluated further to ensure that reptacement is necessary and appropriate. GOALS
{.
* {. .!.
Schedute and perform routine maintenance service and repairs on atl Town vehictes. Reptace vehictes that meet specific criteria set forth in the Town's Vehicle Replacement Poticy; coordinate auction of vehictes tal<en out of service. Maintain and repair speciatized equipment inctuding a turf tractor, bacl<hoe, forl<tift, message boards, and other smaller pieces of equipment and machinery. Conduct daity inspections of two-cycle equipment, incl.uding generators, weed eaters, blowers, chain saws and special.ty equipment, such as concrete saws, boring tools and smal[ engine turf equipment.
HIGHLIGHTS
{. ln 2Ă&#x2122;t6lt7, Equipment Maintenance: o Continued the purchase and maintenance of a greener fleet including the
o o o
instail.ation of two new EV charging stations; one at the Clocl<tower parl<ing lot and one at the Library/Community Center parl<ing [ot. Awarded a new fteet maintenance contract. Proactively inspected and maintained equipment, resutting in nearty tOOo/o equipment up time. Completed significant preventative maintenance on the backhoe.
{. ln 2Ot7lt8, Equipment Maintenance wi[[: o Incl.ude a greener fleet of 11 hybrid and 8 electric vehicles, which is
o
ffi
equivatentto 33o/o of the total fteet. Reduce fuel costs as much as possibte by maintaining a greener fteet and ma nagi ng fuet contracts.
tl4
rvs'u'.rl:rr rvt
I
1, .(
;ĂŹ.g()\
EXPENDITURES
Actual Category
Adopted tY t6tt7
FY 1,511,6
5
385 1,06,533 16,385 108,066
s
t,otz
S S 5 5 5
1
s
Administration Materials & Suppties
5
Contracted Services Equipment Program Activities
s
5
TOTAL
Adjusted
Adopted L7IT8
FY 1.6tL7
12,ooo 2o2,ooo
33,os2 Ls9,7z8 1,250
5 S S S 5
FY
12,ooo
zo2,2Lz 24,92s 206,688 1,250
5 5 S s s
12,ooo 152,ooo 33,os2 L62,O57 1,250
408,050
EXPENDITURE DETAIL
Administration: fuel fees paid to the State Board of Equalization. Material,s & 5uppties: 5t5z,ooo for gasoline and suppLies for Town-owned vehictes. i
Contracted Services: 57,ooo for towing expenses and 526,053 for tractor, forkl,ift, bacl<hoe, and other maintenance.
Equipment 59r,63o for police vehicle maintenance;565,42o for maintenance of all other Town vehictes and 55,oo0 for miscellaneous equipment purchases.
FUNDING
Generat Fund TOTAT
ffi
S 232,38L 5 4o8,oio 5 4s7,o75 5 232
o
1
I r5
7
36o,ss3
5
u'u rr'.,llrrrvr I l, ., l,.g,n
ffi
116
\\'\\, \\,.(l
;l
I
ì\/l I lc.(
:ì,
g()\
RecreatiolĂŹ, Arts
6{-
Community Services
L,
o
Recreation, Arts 6¡, Community Services Actual
tY
PROGRAMS
Recreation, Arts É Comm. Svcs. Mgmt Sports and Fitness Facitities Management CutturaI Arts Youth Services Teen Services
Adult Services Senior Services Library Services Community Events TOTAT
5 5 5 5 S 5 5 5 5
1.511.6
l+6,9s5 572,o78 +6s,239 585,490
4o7,tz3 34t,893
9l,lg6
Adopted
Adjusted
tY 1,61t7
FY
5
383,627
5
653,699
5
501,051
5
582;69L
5
41,6,O35
5
40t,4LO
5
!28j28
5 5 5 5 5 5 5 5 5 5
Adopted
t6lt7
FY
399,436 6s4,77L
5ot,j4z
L7It8
5
390,896
S
648,7L3
5
524,868
S
705,793
698,206 4t6,o35 402,999
$
502,796
5
4L6,532
tz8,6tr
5
131,560
44s,z6t 5 455,673 r9o,59z 5 t96,914 t96,9t4 5 203,794 268,3t5 5 257,268 5 zzo,Soz 5 268,L67 $ 3,584,t50 5 3,g7r,z7g $ 4,tto,39o 5 4,z3|,gg3 356,182
5
44L,t58
FUNDING
General Fund Recreation Fees TOTAL
t Charges
S
1,105,197
5
2,479,ot3
5 3,584,150
I
!,655,945
5
t,656,236
2,454,445
5
z,sgt,6s7
3,973,279 $ 4,tto,39o 5 4,237,893
PERSONNEt
FTE
PERMANENT
1.5.75
TEMPORARY
22.50
* part-time temporary hours converted to futl time equivatents (FtE)
ffi
5 L,633,g34 S 5 2339,445 S
38.25
I l?
rvrvir'., l,r rt,t lì,'.( ir.!()\
Recreation, Arts
& Community
Svcs
Mgmt
PROGRAM DESCRIPTION Recreation, Arts and Community Services (RACS) Management ensures that the Department's mission to provide recreational experiences, promote health and weltness, foster human development and the arts are met. Efforts include program oversight, resource management and cost recovery. Staff support is provided to the Arts Commission, Gatl.ery Curatorial Committee, Parks and Leisure Services Commission, Senior lssues 5ub-Committee, Traits 5ub-Committee, Sports A[iance and Veterans Memoriat Buitding Board of Trustees.
With completion of the new Parks, Recreation and Arts Strategic Ptan, a number of department programs witl. be focusing on implementation measures that are aimed at further enrichment opportunities for a[[ segments of the community. GOALS
{. Support devetopment
of innovative, high qual.ity programs and services offering growth and enrichment opportunities, in collaboration with partner organizations,
* {. {.
in order to meet the needs and interests of Danvitle residents. Effectivety manage the Department's fiscat resources to ensure program and facility revenues and expenditures are within the established cost recovery plan. Lead and support department staff to ensure outstanding customer service and maximize departmentaI performance. Support Town commissions and committees, and facititate training and networking opportunities for commissioners and committee rnembers.
HIGHLIGHTS
*
ln 2OL6lt7, Recreation, Arts and Community Services Management:
o o o {.
ln 2OL7lt8, Recreation, Arts and Community Services Management witt:
o o
ffi
Final.ized the Parl<s, Recreation and Arts Strategic Ptan Update. Exptored opportunities to further increase RACS' presence in the community, inctuding at community events. Continued to encourage teens and young adutts to appl.y for seasonal emptoyment with the Town of Danvilte.
Work with the Parks and Leisure Services and Arts Commissions to begin the implementation of the Parl<s, Recreation and Arts Strategic Pl,an Update. Ensure that department marl<eting efforts are complimentary and coincide with the imptementation of the Community Branding and Marl<eting Plan.
I
lft
r'rt'rr'-ri;u lvt I lt -t :r.gor
EXPENDITURES
Actual Category
Employee Expenses Temporary Salaries Administration Materials & Suppties Contracted Services
FY
t5IL6
5
t70,L75
5
s
L0,062 4,4L3
5
83,t35
5
79,L70
$
TOTAT
Adopted tY t6lt7
5 $ 5 5 5
Adjusted IY L6IL7
L73,479 26,Loo to,z jo gg,3rg 85,500
S
5 5 5 5
173,479
z6,too lo,z3o 88,319 1O1,3Og
Adopted TY L7IL8
5
5 5 5 S
zog,g4g z7,ooo
to,23o 86,318
s7,soo
383,627s399,4t6st9O,896
346,9ss
EXPENDITURE DETAIL
Temporary 5alaries: temporary staffing to assist with various work and activities. Materiats and Suppties: Szt,ooo in postage for the quarterly Activity Guide; 55o,ooo for Activity Guide printing; 513,5oo for marketing materials and 5r,818 for Commission costs.
Contracted Services: 549,OOO for graphic services associated with the quarterty.Activity Guide; 55,500 for the Arts and Youth Programs and 53,000 for commission projects.
FUNDING Generat Fund TOTAL
5 346,9ss 5 383,627 5 s99,+26 5 S s46,9ss $ 383,627 $ 399,436 S
390,896 390,896
PERSONNEL
PERMANENT
FTE
Recreation, Arts & Com.Svcs. TOTAL PERMANENT TEMPORARY
Director
1.O0
FTE:
1.00
FTE:*
o.75
*part-tirne temporary hours converted to futt time equivalents
ffi
I t!)
(FTE)
rvrvrr'-, i;rr rvl I l, ., ;r.gor
Sports 6r Fitness PROGRAM DE5CRIPTION The Sports and Fitness Program promotes health and weltness by offering a variety of year-round activities, fitness ctasses and sports leagues for atl ages. Annuatty, the Program offers over 150 fitness ctasses and aquatics programs serving over 1,500
community members. Youth and adults participate
in sports leagues,
inctuding basketbalt, softba[t, votleybatt, lacrosse, bocce batt and kickbal,L teagues. The Cubbies Program provides youth ages 3 to 5 the opportunity to be introduced to organized Tbatt in a non-competitive, nurturing environment. GOALS
* * *
Provide active recreational opportunities for youth and adults through leagues. Strengthen water safety and fitness in the community by providing seasonal aquatics programs at the Monte Vista and San Ramon Val,l,ey High School. Community PooLs. Promote heatth and wetlness by offering a variety of sports and fitness ctasses for atl ages.
HIGHLIGHTS
*
fn 201.6lt7,Sports and Fitness:
o
o
i.
Expanded bocce batl court avaitabil,ity for leagues and drop-in use, in conjunction with expansion of the bocce batl courts at Sycamore Vattey Parl< from four courts to eight. lmptemented a mini youth triathton for late summer 2Ot6.
ln 2OL7lt&,Sports and Fitness witt: Expand the mini youth triathton event. Expand Sports Programming to incl,ude atternative sports which do not need to be pl,ayed on sports fietds such as running, picktebatt and cycting. o Add a showcase a[[-star type event to adult sports leagues at the end of the
o o
season.
ffi
l'21)
\\'\\'\\'-(liìì ì\'i lì( -(-ír.go\
EXPENDITURES
Adopted FY L61L7
ActuaI
Category
FY 1.511.6
Adjusted
Adopted
t6lt7
FY 7711.8
FY
Employee Expenses Temporary Sataries Administration Materials & Suppties Contracted Services Equipment Program Activities
5 5 5 S 5 5
t4s,3gs t63,o46
TOTAT
s 572,o78 s 653,699 $ 654,77L $
648,7L3
5
L43,720
5
t36,8t2
5
t37,884
5
L54,36t
5
5
5
2,743
5
t83,gL7 4,765
5
23,982 242,578 493
5
43,620
s
5
5
5
274,235 3,950
5
L83,9L7 4,765 43,620 274,235 3,950
4,20t
5
6,40,0_
s
6,40,0
5
s s
5
4,769 43,7.89
285,696 6,028
5o
EXPENDITURE DETAIL
Temporary SAlaries: funding for seasonat part-time employees to assist with classes, programs, camps and aquatics.
Administration: 54/69 for background checks, training, and advertising. Material,s and Suppties: 523,789 for sports equipment, staff, and team uniforms; 52o,ooo for Software
Maintenance.
Contracted Services: S23g,685for instructor fees; 533,ilglfor solltbatl. and basketbal,l officials and 5tz,4t6 for Bocce Court Preparation.
Equipment 56,ozA to purchase sports equipment. FUNDING General Fund Recreation Fees & Charges TOTAL
5 (99,sL91 5 5 67L,397 5
lé3,7451
5
(L2,6731 667,41+4
s
667,444 s 5 s 572,o78 5 653,699 $ 654,77L 5
126,O44l.
674,757
648,7L3
PERSONNEL PERMANENT
FTE
Program Supervisor Program Coordinator
o.50
TOTAL PERMANENT FTE:
1.50
1.OO
FTE:* 8.oo *part-time temporary hours converted to ful.l time equivalents
TEMPORARY
ffi
t21
(FTE) rvil
rr'.,1lrr n,t
lì, .,-;,.!,,t
Facilities Management PROGRAM DESCRIPTION Facitities Management strengthens community image and sense of place by mal<ing Town parks and facitities avaitabte for Town programs and private rental use for the community. Facitities Management oversees use of Danvilte parks, sports fields and comm unity faci lities, i ncludi ng:
*
Danvitle Community Center and Library {. Town Meeting Hatt Vil.l.age Theatre and Art Gal.l.ery Veterans Memorial. Buitding and Senior Center â&#x201A;Ź. Oak HitL Park Community Center Diabl,o Vista, Hap Magee Ranch, Oak Hil[, Osage Station and Sycamore Vattey
* * *
ĂĽ
*
{.
Parl<s
lohn Baldwin, Green Vattey, Greenbrool<, Montair and Vista Grande School Parl<s lohn Baldwin Mul.tipurpose Room, Diabto Vista and Los Cerros Middl.e Schools' Gymnasiums, Monte Vista Community Pool, and High School Tennis Courts
Sports fiel.ds at Los Cerros and Stone Vattey Middle Schools and Atamo and Rancho Romero Elementary Schools
GOALS
* {.
* *
batanced reservation schedute of facitity use to include Town programs, co-sponsored groups and private rentats. Provide high-qual.ity customer service before, during and after facility use. Maximize community use of Town and Schoot District facitities. Manage facil,ity revenues/expenditures within the established cost recovery plan.
Maintain
a
HIGHLIGHTS
*
ln 2016lt7, Facilities Management:
o o *
Expanded bocce bal.t court avaitabiLity for leagues and drop-in use at Sycamore Val,tey Parl<.
lmptemented new reservations for the picnic area fotlowing the renovation of ptay and picnic areas at Osage Station Parl<.
ln 2Ot7lt8, Facitities Management witt:
o o
Develop a Sports Fietd Usage Manual to assist in ensuring use and fiel,d rental information is availabte to atl users. Offer amenities related to technotogy and audio visuaI needs for buil"ding renta[s.
ffi
r22
r'r' ir'.tlitt
rvt
llt
-, :r.gLrr
EXPENDITURES
Actual Category
FY 1,511,6
Adopted
Adjusted
L6It7
FY 1,61L7
FY
Employee Expenses Temporary 5ataries
5
344,638
5
40,773
Administration Materials & Suppties
5
5 367,269 $ 5 86,9s2 5 s,28o 5 5 40,550 5 S
Contracted Services Equipment
5
77,068 2,375 385
s
0
TOTAL
S 46s,2s9 S
s
5osj,ooo 5
501.051
Adopted L7I18
FV
5 5 5
367,560 96,952 3,280 40,550 o 3,000
385,j86
5 5o
86,9s2 4,980 44,sso
5
5,ooo
S soL,342 S
s24.B6g
5
EXPENDITURE DETAIL
Temporary Sataries: for part-time temporary Facitities Attendants to assist with operation of Townmanaged facitities.
Administration: 54,980 for professionaI development and Live Scan. Materiats and Suppties: $3z,ooo for apptication software maintenance; 5j,850 for uniforms and suppties; 54,OOO for furniture reptacement and 54,TOO for printing and marketing materiats.
FUNDING
General Fund Recreation Fees
t
5 Charges
5
TOTAL
þ2,+z61 5 558,665 5 239
(6,s931
5
(6,zozl
S
507,644
5
507,644
5
501,O51
5
L7,224 507,644 524,868
PERSONNEL
PERMANENT Program Supervisor Program Coordinator Administrative Assistant Facilities Attendant TOTAL PERMANENT FTE: TEMPORARY FTE:*
FTE
0.50 1.OO 1.OO
2.OO
4.So 2.75
*part-time temporary hours converted to futt time equivatents
ffi
I
2:l
(FTE)
tvrvit'.rl;rr rvtlìt t :r.grrr
Cultural Arts PROGRAM DESCRIPTION
Art Ga[[ery, Cultural Arts provides a variety of activities and opportunities for residents of a[[ ages in the visual, performing and Based
ðt the
Vil.l,age Theatre and
musical arts. Cultural Arts works to enhance cuttural experiences, encourage participation in the arts and support Danvitle's smatltown atmosphere. For 2Ot7lt8, co-sponsored events include productions by Rote Ptayers Ensembte Theatre, Danville Children's MusicaI Theatre and the Eugene O'Neit[ Foundation Festivat. GOALS
{. Enrich experiential
learning through visua[ arts exhibits, performances, camps,
*. it"tttiå:i"ïtåiåi¿' with comptementing
{.
{.
every 6-8 weeks and ofrer a variety of types of art work,
programs that enhance the visitor experience and educationa[ worl<shops for a[[ ages. Offer co-sponsored shows by partnering with [oca[ nonprofits with an eye toward diverse content: cinema, live theatre, live music and comedy for atl ages. Maintain a quatity theatre and performing arts facitity with standards for a positive patron and user experience.
HIGHLIGHTS
{. ln 2ot6lt7,
o o o o o .1. ln
o o
ffi
CutturatArts: Co-sponsored productions by the Rote Ptayers Ensembte Theatre, Danville Children's Musical Theatre and the Eugene O'Neit[ Foundatio¡. Offered 5 Moonl,ight Movies at the Danvitte Town Green. Staged the 3lst Year of Music in the Park Concerts. Hosted 7 art exhibitions in the Vil,tage Theatre Art Galtery, featuring photography, painting, mixed media, surfboards, and art qui[ts. Offered 44 art camps and 8 drama camps,81 art ctasses and worl<shops for kids and adutts, and 17 drama and performing arts classes for l<ids.
2ot7lt8,
CutturaI Arts wit[: lncrease the [eve[ of programs offered, with an emphasis on exptoring new themes and techniques in art and cultivating exptoration, growth and community through the performing arts. Increase the number of cultural arts programs offered with an emphasis in outdoor performances for famiLies and chitdren; create a publ.ic sculpture program featuring dogs; and introduce a mobite recreation program catted Art on the Go where art is brought to the community neighborhood parks.
124
tvryu'.,1;rr rvtllr -, rr.g,rr
EXPENDITURES
Actual Category
TY
Emptoyee Expenses Temporary Sataries
5
Administration
$ 5 5 $ 5
Materiats & Suppties Contracted 5ervices Equipment Program Activities
5
Adopted tY t6t77
L5IL6 239,942
zs,tgo 101,069 LL,4gg
t68,459 5,306 34,o25
5
5 5 5
5
5 5
Adjusted tY t6tt7
263,297
3s,tzs s9,34s z¿,roo
t7t,9a4 s,sso 2O,OOO
5 5 5
$ 5 5
5
t
TOTAT
zo+,toz ss,tzs 1.07,345
z4,too t7t,gt84 8,850 87,ooo
Adopted
IY L7IL8
5
5 5 5 5 5
z7ï,t33 4z,8oo 74,98o
jo,8to
z65,15o
5o
698 706
ts,gzo
70s
EXPENDITURE DETAIL
Temporary Sataries: part-time, temporary staffing to assist with various work and activities.
Administration: 568,ooo revenue sharing with co-sponsored groups; 51,865 for music licensing; 5t,6oo for advertising; 53,515 for Live Scan, training and dues. Materiats and Suppties: $tz,45o for uniforms and event suppl.ies to inctude Pubtic Art Project; 5t,3oo for postage; $8,oOo for advertising and marketing materials; 54,060 for miscellaneous suppl.ies; and $5,000 for ActiveNet Software.
Contracted Seryices: 53z,ooo for Vendini ticl<et software; $zo,ooo for Music in the Park; 516,050 for Cultural Art Events and Gal,l.ery exhbit preparation; 584,roo for ctass instructor fees and 5tt3,ooo for camp instructor fees.
FUNDING
General Fund Recreation Fees
t
Charges
5 5
TOTAT
L37,t9o 448,3oo
5 S
267,983
3t4,7o8
5
1
5 5
z68,998 429,708
5 5
273,t69 432,62+
706
PERSONNEL
PERMANENT Program Supervisor Program Coordinator TOTAL PERMANENT FTE: TEMPORARY FTE:*
FTE
1.OO
2.00 3.OO O.7S
*part-time temporary hours converted to ful.t time equivatents
ffi
I'2it
(FTE)
rvrvrr'.11;rr
n'tIlr, lr.!trr
Youth Services PROGRAM DESCRIPTION
Youth Services provides social, recreationaI and educational experiences for youth ages preschool to 10 by offering safe spaces to pl,ay and learn. Each year, over 7,50O youth participate in enrichment classes, day camps, excursions, events and adaptive recreation activities for physicatty and developmentatly disabled persons. GOALS
* * ĂĽ
*
Deliver theme-based seasonal camps and extended day care opportunities that
provide youth with enriching experiences and meet
the needs of
parent/guardian schedutes. Detiver quaLity year-round ctasses that foster youth Life sl<itl,s, education and enrichment in a wetcoming environment. Through partnerships with non-profit organizations, provide opportunities for community members with disabilities to participate in activities and programs. Host youth-centered events that encourage famity participation.
HIGHLIGHTS
*ln 2ot6 I 17, Youth Services: o
Offered famil,y-friendty events including
the Chitdren's Fal.[ Fest,
Eggstravaganza, ELf Workshop, Happy Birthday Dr. Seuss Party and the Recreation Expo. o Cotlaborated with nonprofit organizations on Recreational Activities for Devetopmentatly Disabl,ed (RADD) program. o lncreased the attendance at each event and added a celebration of Star Wars with the May the 4th Be With You event. o Added three new ctasses/camps: Little Medical, School, Cooking Round the Wortd, and Tiny Tot Science.
*
ln 2OL7ltĂ&#x2122;, Youth Services wil[:
o Continue offering diverse programs, activities and famity-friendl.y events. o Continue offering high-qual,ity seasonat camps. o Begin to offer Mobite Recreation at parl<s and events throughout Town.
ffi
l)b
\\'\\'\\'.(l;rrrVll]( ( r.g()\
EXPEND¡TURES
ActuaI Category
TY
Empl.oyee Expenses
5
Temporary Salaries Administration Materials & Suppties Contracted Services Equipment Program Activities
5
TOTAT
5
5
Adopted
L5IL6 128,826 83,558 3,497 77,O22
FY
5 5
4,479
5 5 5
4o7,t23
$
S
t6tt7
FY
5 L2g5gO 5 5 9z,Ls3 5 S s,Lg2 5 5 4o,t36 5
!69,393 338
5
Adjusted
Lsg,492
4!6,035
3,o72 6,400
5
FY
3,O72 6/+oo
5 5 5 5 5 5 5
4l6,o3s
$
tzg,5go 92,t53 5,192 40,L36 L39,492
5 S
$
Adopted L7IT8
T6IL7
r37,gjt 119,430 s,4gz 4s,263 r78,9oo
3,tzo t3,76o so2,r96
EXPENDITURE DETAIT
Temporary Salaries: funding for part-time temporary emptoyees to assist with ctasses, programs, and activities. Material.s and SuppLies:
5z3,5r6for class, camp, mobite recreation and event suppl.ies; 52o,ooo for software maintenance and 5L,747 for staff uniforms, marl<eting materials, and postage. Contracted Services: 5f O¿OO for transportation and 5168,500 for instructors and speakers.
FUNDING
Generat Fund Recreation Fees & Charges
5 (8,s64) 5 5 +ts,68l 5
TOTAI
407
t23
48,L62 367,873
416,o35
S 5
48,L62 367,873
5 5
4t
z9,rr5 t*72,68t 502 796
PERSONNET
PERMANENT Program Supervisor Program Coordinator TOTAL PERMANENT FTE: TEMPORARY FTE:*
FTE
O.5O
1.00
1.50
4.oo
*part-time temporary hours converted to futt time equivatents (FTE)
ffi
l'¿7
tt
* rr'.tlrrrrvrIli r';r.gtl
Têen Services PROGRAM DESCRIPTION Teen Services provides recreational, social and educationaI experiences for youth ages
alternatives for youth during the hours of 3:0O p.m. to 6:00 p.m. when youth are more vulnerable to crime. After school teen programs offered at atl Danvil[e middte schoots provide a safe ptace to hang out, learn new ski[[s, devetop friendships and receive adu[t support.
18. The Division's progrðms offer positive
11 to
The Search lnstitute's 4O Developmental Assets are used
to design Programs that
promote youth development. The Danvitle Youth Council fosters leadership development, planning and decision-mal<ing sl<i[[s, responsibiLity and service to others. GOALS
€. Offer complimentary after school Teen Centers located at Chartotte Wood, Diabl,o Vista and Los Cerros Middl,e Schoots that provide a fun, enriching and safe space for youth.
¡r. Provide teens with activities and experiences for social, leadership and decisionmaking skil.l. devetopment, including classes, day camps, workshops, special
* *
events and excursions. Advise the DanviLLe Youth Councit, which teaches youth teadership and independence and develops teens into mentors for the younger generation. Hire teens and offer volunteer opportunities as a means to teach life sl<i[ts, responsibil.ity and leadership devetopment.
HIGHLIGHTS
.E ln 2oL6lL7, Teen Services:
o o o
Expanded the Danvitl,e Youth Counci['s programs, increased volunteer participation at Town events and hosted two planning retreats. lmplemented enrichment activities at the Teen Centers. Renovated Teen Centers with new furniture, updated games and new
activities.
.!.
f
n 2Ot7l!8,Teen Services wi[[:
o o o
ffi
Begin providing lnternet access at atl three Teen Centers. Offer new and varied enrichment courses for teens. Continue to grow the Danvitl,e Youth Counci['s programs and partnerships.
t28
l
rvrr'.rIlu rvi
ll,,-;t.gor
EXPENÐITURES
Actual T5IL6
Category
Adopted tY t6tt7
FY
Emptoyee Expenses Temporary Salaries Administration Materials & Suppl,ies Contracted Services Equipment Program Activities
5
1,,503
s
2t,loo
TOTAT
s
Adjusted
Adopted FY T7IL8
tY L6tt7
s
t45,938
5
L49,7g3
s
1,51",382
5
1.6t,467
5
L08,996 3,067 27,745 33,544
s
L26,8t3
5
t26,8L3
5
t30,444
5
4,857 45,308 50,349 2,500 2L,790
s s
5
5
4,957 45,308 50,349 2,500
s
s
2L,7gO
5
5,L42 45,663 46,820 1,500 25,496
$
4t6,532
s s 5
s s s s
34t,893
$
40t,4to
5
s
402,ggg
s 5
EXPENDITURE DETAIL
Temporary Salaries: funding for part-time temporary employees to assist with ctasses, programs, and activities. Materials and Suppties: 51'6,863 for afterschool program and summer camp suppl.ies; S4,oo0 for furniture; 54,8oo for snacks and 52o,ooo for apptication software and stafi uniforms. Contracted Services: $t6,rOO for transportation and 53O,7zO for instructor fees. Program Activities: SzS,4g6for admission charges. FUNDING
General Fund Recreation Fees
t
5
Charges
TOTAL
5
1.85,6t7 156,276
5
5
z4s,z44
t56,t66
5 5
246,833
ts6,t66 40 999
$
s s
249,tgt 1.67,34L
L6,532
PERSONNEL PERMANENT
FTE
Program Supervisor School Program Coordinator Program Coordinator
o.5o 0.25
ÏOTAL PERMANENT FTE:
1.75
1.OO
TEMPORARY FTE:*
*part-time temporðry hours converted to
ffi
4.50 ful.l.
time equivatents (FTE)
l2f)
it'rvu.rl,rr
r,,
t
lì, ., rr.gor
Adult Services PROGRAM DESCRIPTION
for
to
participate in recreational, social and educational activities, ctasses and programs. ln addition, the
AduLt Services provides year-round opportunities
adutts
program manages volunteer efforts Town-wide. GOALS .1. Offer quatity enrichment and Lifetong learning programs adults.
*
{.
for the community's
Provide activities that offer opportunities for sociat, recreational and heatthy experiences for adutts inctuding ctasses, workshops, speciaI events and excursions. Foster opportunities for the community to give back through volunteering.
HIGHLIGHTS .3. ln
o o o o
2Ùt6lt7,Adutt Services: lncreased the number of enrichment classes offered which inctuded Baltet Fit, Gardening ctasses, and l(itchen/Bath Design and Remodet. Expanded the program ctasses and activities for more collaboration between adutts and seniors jointty in those activities. Re-branded the "Taste and Toast of" culinary series program to include an Evening with El,vis and a Franl< Sinatra Dinner Show. Cottaborated with the Youth and Teen department to add the Star Wars Crawl to the May the 4th event.
{. ln 2oL7lt8., Adutt Services wi[t:
o o o
ffi
lncrease the number and diversity of the enrichment classes offered to include health and wettness offerings. Cottaborate with [oca[ business to improve existing and add new programs. tncrease options for adutt volunteer opportunities.
l:ì0
tt rvrr'.rìlu rt,t
I
lL .r rl.gLtr
EXPENDITURES
Actuat FY L5t1.6
Category
Employee Expenses Temporary Salaries Administration Materials É Suppties Contracted Services Equipment
Adopted L6IL7
5
53,9L7
s
$
21.,379
5
5
5
5
155 2,807
s
L9,538
$
5
0
5
TOTAL
Adjusted
FY
5
97,796
FY
54,355 19,000 300 L6,750 37,923 200
Adopted FY T7IL8
L6It7 5
57,987
5
22,OOO
$
54,438 19,000 500
5
5
1.6,750
5
5
37,923 200
s
300 13,350 37,923 0
$ $
$
$
I
128,528
60
EXPENDITURE DETAIT
Temporary Salaries: funding for part-time, temporary staffing to assist with operation of the Townwide volunteer program.
Materials and Supplies: Sto,ooo for software maintenance; 52,400 for volunteer recognition; and 59So for marketing materials and misce[[aneous expenses. Contracted Services: costs for instructor fees and new programs.
FUNDING General Fund Recreation Fees
t Charges
5 $
63,9L8 33,878
$
5L,428
s
51,511
5
54,460
5
77,LOO
5
77,LOO
5
77,LOO
TOTAT
8
L2
1$L3
PERSONNEL PERMANENT
FTE
Program Supervisor
0.50
TOTAL PERMANENT FTE:
0.50
TEMPORARY FTE:*
0.50
*part-time temporðry hours converted to futt time equival.ents
ffi
l:ìl
(FTE)
\\'\\ \\'.{liL¡\'r ll(
.(
:r.!(}\
Senior Services PROGRAM DESCRIPTION Senior Services provides year-round opportunities for participation in recreationat, sociat and educational activities, ctasses and programs. Over 5,000 active adults over the age of 55 participate in sociat, recreational and educationaI prograrns provided by the Town each year. A number of low-cost and free programs and services are provided, inctuding drop-in programs GOALS
{. Provide activities
* * *
that offer opportunities for sociat, recreational, fitness
and
heatthy experiences for seniors including ctasses, workshops, community events and excursions. Offer affordable programs for seniors. Offer qual.ity enrichment, lifelong l"earning programs and referral services for seniorsin col,taboration with nonprofit and private sector service providers. Produce and distribute the Silver Streal< senior newsletter to residents.
HIGHLIGHTS
*
ln 20!6lt7,Senior Services:
o
o
o
*
ln 2Ot7lt$,Senior Services wit[:
o
o o
ffi
Added new programs and ctasses to its current offerings which include Mat Pitates, Jump Start your Memoir-One story at a Time, Buitd Your Brain with Lego, Uku[e[e, Music Appreciation, Fetdenl<rais Awareness Through Movement, Math Ctub, Peer Support Group and Batance, Stability and Fatt Prevention. Restructured the detivery of the Silver Streal< Newsletter from bi-monthly to quarterly to adhere with the Activity Guide schedute. Provided an intergenerational program pairing teens and seniors with the Digitat Age Generation Bridge Program.
Add new programs and classes to the current offerings to include more heatth and wettness options. Expand the number of intergenerationaI programs being provided. Continue to worl< with [oca[ businesses to help sponsor upcoming programs. l"l2
rV$'$'.r];il
rVt
llr
.t
ĂŽ.gLrr
EXPENDITURES
Actual Category Emptoyee Expenses Temporary Sataries
Administration Materials ú Suppties Contracted Services Equipment Program Activities
tY 5
L72,1.34
5
29,732 L,952 40,239 90,300 89
5
s s 5 5
TOTAT
Adopted tY t6tL7
L511,6
L55,L37 39,000 L,643 72,750 tL1.,628
s s 5
s s s s
2t,936
Adjusted L6IT7
l,OOO
60,o00
182
Adopted
tY t7t1,8
FY
5
t57,1.6t
s s s
59,OO0
72,829
5
ttt,628
s s
1,000 6o,ooo
t,643
158
5 S S 5 5
S 5
t67,6sz 42,ooo
t,942 55,250 1J7,B2g 1;ooo 5o,ooo
443
EXPENDITURE DETAIT
Temporary Sataries: funding for part-time, temporary staff to assist with program services. Materiats and 5upplies: 55,ooo for software maintenance; 52o,25o for event suppl,ies and marketing materiats for Lend a Hand Day, hotiday luncheons, softball, bocce batt, Senior Sneakers trips, silver screen, furniture and volunteer recognition; StO,OOO postage for Silver Streak and SzO,OóO for production and printing of the Silver Streak.
Contracted Services: 54O,5OO for transportation costs; court preparation and 5gz,3zï for instructor fees.
SZ,OOO
for entertainment;
erysranecAviOes 55o,ooo for admission charges associated with Senior
S3,OOO
for bocce
Sneal<er trips.
FUNDING Genera[ Fund Recreation Fees & Charges
$ 5
TOTAL
S
1,6t,372
5
r94,Bto L82
L92,648 z48,5ro 44f.,L58
5 5
L94,7s1. 248,s1.o
443
5 5
207,1.63
24B,sLo 45 6
PERSONNEL
PERMANENT Program Supervisor Administrative Assistant TOTAL PERMANENT FTE: TEMPORARY FTE:*
FTE
O.5O 1.OO
1.5o
1.25 *'part-time temporary hours converted to fuil. time equivatents (FTE)
ffi
I
3:ì
rt iv tt'.,11¡ rytIl, .,
lr.I¡r
Library Services PROGRAM DESCR¡PTION The Danvitle Library receives over 280,OOO visits annuatty. The Library serves ðs a community resource for information, literature, music, video, lnternet access, reference material and enrichment for chitdren. The Danvitte Library was built by the Town and opened in August tgg6, and operates as one of 26 branches in the Contra Costa County Library system. The DanviLLe Library atso benefits from outstanding community support provided by the Friends of the Danvil.te Library and the Danvitle Library Foundation. property owners is attocated to fund the countywide library system. This dedicated funding allows alt branch libraries to operate and be open to the pubLic 35 hours per week. In order to maintain the highest possibte [eve[ of service for Danville residents, the Town augments this dedicated tibrary funding in two ways: by funding att buitding maintenan!.e, capitat replacement and technotogy costs associated with operation of the Danville Library; and by appropriating Generat Fund revenues to expand operôting and service detivery hours by an additionat 25 hours per week. As a result, the Danvil.l.e Library is open for service Monday through Sunday, 60 hours per week. This is the maximum number of hours provided through any of the 26 branch libraries in Contra Costa County.
A portion of the property taxes paid by
al.L
GOALS o
Offer a robust collection of l,ending materiats in print, video, audio and electronic formats.
for the community in
a
Provide varied educational and enrichment programs
a
cottaboration with community organizations and the Town. Offer comptimentary high-speed Internet access for the pubtic.
H¡GHLIGHTS o
ln2ot6lL7, the Danvil.te Library:
o o o o o a
ß
Upgraded the Library's furniture in the Fireplace Room and other reading areas. Renovated the Library's main restrooms, lighting, HVAC, and teLephone systems. Provided enhanced motor sl<itl.s devetopment tools for the Chitdren's section. InstaLted an etectronic disptay system to promote events and activities at the Library. Served more patrons (by circulation) than any other library in the County's 26 Library branch system.
2OL7tL8, the Danvitte Library wil.t upgrade the Teen Area, including additional seating, workspace, tables and other amenities.
ln
I :r4
tl,r,,'r.'.,1lrr rvi
I
l,,'lr.gor
EXPENDITURES
Actual
Adopted tY 1.6tL7
tY 751t6
Category
Adjusted tY 1.6tL7
Adopted FY L7IT8
5 tgo,ïgz 5 Lg6,gL4 5 Lg6,gL4 5 $ Lgo,sgz 5 L96,gt4 $ tg6,gt4 5
Program Activities TOTAT
zo3,7g4 203,794
EXPENDITURE DETAIL
Program Activities:5tg6,9t4to fund an additional 25 hours of tibrary services per weelç for a totaI
of 60 hours of service per week.
FUNDING Generat Fund TOTAL
ffi
$
1.90,592 1
S Lg6,gL4 5 1,96,9t4 5 Lg6,gt4
592
I
:t5
1
9f.4
2o3,7g4 2
tvir
r,,'.,];rr lVl
Il, .( :t.!()\
Community Events PROGRAM DESCR¡PT¡ON Community Events manages the Town resources required to support annuaI celebrations that enricl.r the quatity of Life for residents, promote the community and enhance the tocal economy. This inctudes events that are staged and organized entirety by the Town (Townsponsoràd) or staged and organized by various community groups with some [eve[ of Town assistance (Town co-sponsored). Town support for co-sponsored events is typicatl,y in the form of partial, funding, street closures, encroachment permits, or staffing assistance.
6OAL5
å
* * *
Coordinate events that bring the community together to celebrate the community and Danvilte's heritage. Facititate famil.y-friendty events that are safe and accessible to everyone white managing the events' impact on traffic, circutation and access to private ProPerty. Promote and foster economic vitatity with a focus in Downtown Danvilte. cul,tivate partnerships with community organizations, businesses and residents through co-sponsored events.
HIGHLIGHTS
f. ln 2Ùt6lt7, Community Events: o Co-sponsored the 59th Annuat Kiwanis July 4th Parade, Danvitle Devit Mountain Run, Summerfest, Hot Summer Nights Car Show, Danville d'Etegance, Fa[[ Crafts Festival, Run for Education and Lighting of the Otd Oal< Tree. Distributed over 14,OOO Community Event Calendar racl< cards to the pubtic.
o o Promoted atl events through severat [oca[ and regional multi-media o
*
channets,
website calendars, print, online, newsletter, Facebook, and Twitter. Managed Community Event logistics, where actuat costs were under budget.
ln 2ot7lt8, Community Events wi[l:
o Continue to manage togistics for att Town co-sPonsored events. o Continue to atter logistics in an effort to streamtine resources. o Increase awareness of Community Events through the "Live Locatty" branding
o
and marketing efforts. Encourage event organizers
to utitize branding as part of their marl<eting
efforts.
ffi
r.ì6
tvs rr'.,1tulr,¡ ll, .( iì.g()\'
EXPENDITURES
ActuaI Category
FY
Emptoyee Expenses Temporary Salaries
5
Administration Materials & Suppties Contracted Services Program Activities
5
5
5
s $
TOTAL
Adopted FY L6IL7
t5tt6
5
37,880 51
7t,z$g
5o 5 8oo 5 zo,tsz 5 ts3,9z6 5 22,ooo
2,8t7 t5,463 t43,OgL 21,500 802
Adjusted
L6IL7
FY
5
5o S 5 5
5
268,L67
Adopted
tY
7t,z8g
5
57,5L0 0 1,500 2L,332
5
t53,426
5
23,500
5 5
8oo 2o,3oo Ls3,926 zz,ooo
L7ltl
5
269,315
257
EXPENDITURE DETAIL
Materials and Suppties: 57,800 for downtown banner rotation (five times per year); 59,853 for traffic safety signage and miscetlaneous suppties, and 53,679for community event marketi ng material.
contracted Services: 5t5o,ooo for Potice overtime; Szo,ooo for maintenance of downtown tree tighting, 5z,zz6 for portable toilet rentals, and 5t,zoo for street sweeping. Program Activities: 5t6,50o for Town co-sponsorship of the Juty 4th parade and S7,oO0 for Town co-sponsorship of the Lighting of the Otd Oak Tree event. FUNDING
General Fund
5
zzo,SOz
5 268,t67 5 Z68,3tS 5
z57,68
TOTAL
$
2zo,Bo2
$ 269,L67
257,268
$
268,3L5
$
PERSONNEL PERMANENT
ffi
FTE
Program Coordinator
0.50
TOTAL PERMANENT FTE:
0.50
I
.t?
tt lv rr'.r
l;r
nrrl
ll
rt
r.uLn
ffi
t38
\\'\\, \\'.(l iu r\11 I l( .('iĂŹ.!()\
I
I
t t
i iÂż I i
Successor Agency
Successor Agency Actuat PROGRAMS Successor Agency
Adopted tY t6tt7
tY tslL6
Adjusted
Adopted
tY 16tt7
FY
S 3,790,444 g t,z39,3or S L,z3g,soL S
TOTAL
01
t7lt8
L,rgr,5g7
L
FUNDING RPTTF ZOo/oLM
5o
5o
Successor Agency RPTTF
5
5
s,rgo¿44
TOTAL
Õ
ñd
t,z3g,3ot
5o
5o
5 L,z3g,sot
5
1,191,597 1
l:ìf)
7
rvrt it.illrrrr,ìlìL r ;r.grrr
Successor Agency PROGRAM DESCRIPTION
The Danvil.l,e Community Devetopment (Redevelopment) Agency (CDA) wal establ.ished in 1986, in atcordance with state-enacted Redevetopment Law, and was responsibte for carrying out the goa[s of the 7986 Redevetopmelt Ptan. lmptementation of those goal,s assisted private property owners and businesses, spurred private re-investment in the project area and reduced or eliminated btighted conditions that existed when the Agency was established.
ln 2011, the State enacted ABxl 26, which eliminated redevetopment. Effective February !,2O:-Z, the CDA was dissotved and atl assets were transferred to the Town, ácting as the Successor Agency for the former CDA. The role of the Successor Agency is to wind down the affairs of the former CDA. The Successor Agency bianiua[[y devel.ops a Recognized Obl,igation Payment Schedute (ROP5), which tists al,t ongoing obl.igations of the former CDA, and a[[ows the Successor Agency to receive Redevetopment Property Tax Trust Fund (RPTTF) revenues to mãet ihose obtigations. The ROPS must be approved by the Successor Agency's Oversight Board, the State Department of Finance and the County AuditorControtter. The Successor Agency Liquidated all assets, inctuding real property, hetd by the former CDA, as réquiied by ABxl 26. This process atso requires approval of lhe Successor Agency's Oversight Board and, in some cases, a[[ taxing entities within the Town.
lune 27,2OL2, the State passed AB t484, adding significant new and modified actions and deadl.ines associated with the ongoing dissotution process. On
HIGHLIGHTS are projected to futty fund alt2OL7l18 Enforceable Obl'igations incl,uded on the ROPs fited with the State. This inctudes: RPTTF revenues
* * * *
ffi
Debt service payments associated with the 2001 and 2005 Certificates of Participation (to be retired in2026 and 2035). Debt service payments associated with the 2OO1 Taxable Revenue Bonds (to be retired in 2028). Repayment of the outstanding 5e.S6 mi[tion debt to the Town under the z}lt Re-entered Cooperation Agreement between the former CDA and the Town (to be retired in 2026). Atlowable administrative costs.
t40
s u'rr'.LlrLrrvrIlr, :t.!,rr
EXPENDITURES
Actuat
Administration Contracted Services Program Activities Other Debt Service TOTAT
Adopted tY L6tt7
tY L5lt6
Category
s
(28,7731
S 5
1.9&942
3,628
5 2,46t,82o
5
L,1.64,826
3
Adjusted L6IL7
Adopted tY L7tL8
TY
4,000 70,600 5 5 7,500 0 S 5 L,L57,201, s
L
s 5 5
5 5
4,000 70,600 7,500 0 t,1,57 ,2O L L,23
5 5
4,000 19,900 0 0
5
7.,7.57,697
5
5
I
L
181,597
FUNDยกNG
SuccessorAgencyRPTTF TOTAI
ffi
53,190,444 S !,239,3Ot S L,23g,3}t S1.,tgt,Sgl ,790,444
,501
l4t
1$
I
tvt\ r\..],,lt rll, ..'.1,,t
ffi
142
\\'\\' \\'.(litlĂŹ\/l llL.(
ir.
g()\'
Ă&#x2030;.
a
Assessment Districts
a
Assessment Districts Adopted
ActuaI
tY
tY
1.511.6
Adopted
Adjusted
t6lt7
FY
tY L7lt$
L6IT7
PROGRAMS
Assessment District Debt
Service 5
TOTAL
5
496,295 496,295
5 5
1,6,40ยก L6,403
5 t6,403 5 $ 16,40ยก $
0
0
FUNDING
Sycamore Vattey A D (93-21 Tassajara Ranch A D (97-2)
5 39,759 5 5 32,8t6 5
5
5
5
5
0
1.,2L3
5
t,2L3
5
0
15,185
$
15,185
5
0
NeriadAD2oo5A(eZ-rยก
5
4z3,7zo
5
TOTAT
5
+96,295
5 L6,40! 5
ffi
t43
16,403
0
n rr rr'.t1;rr rvt llt .t ;i.qtl
Assessment Districts
PROGRAM DESCRIPTION
of Danvilte acts as trustee for three Assessment Districts that were initiatty created between 1985 and t99O to finance pubtic infrastructure improvements required to mitigate new development that occurred in the
The Town
Sycamore Va[[ey, Crow Canyon Corridor and Northeast Danvitle. Subsequent to their formation, the debt associated with each of these Districts has been refinanced in order to tower interest rates and reduce the cost to property owners. The three Assessment Districts are:
å Svcamore Vatlev Assessment District The Sycamore Vattey Assessment District was retired in September 2006. Because the District improvement fund continues to maintain a smal.l fund balance, the District continues to be incLuded in the Budget. However, property owners within the former District area of benefit are no longer paying speciaI assessments.
*
Tassajara Ranch Assessment District
The Tassajara Ranch Assessment District was retired in September 2013. Because the District improvement fund continues to maintain a sma[[ fund balance, the District continues to be inctuded in the Budget. However, property owners within the former District area of benefit are no longer paying speciaI assessments.
*
Northeast Roadway lmprovement Assessment District
The Northeast Roadway lmprovement Assessment District was retired in September 2015. Because the District improvement fund continues to maintain funds for improvements within the Diabto Road corridor, the District continues to be included in the Budget. However, property owners within the former District area of benefit are no longer paying special assessments.
ffi
144
\\'\\'\\'.( l;lt ì\'l l]( ( :ì,g()\
EXPENDITURES Actual
Adopted
tY 75176
Category
Administration Contracted Services Debt Service TOTAL
5
FY
Adjusted
t6lt7
tY
Adopted
t6l!7
F\ L7lt8
0
5
6,959
5
6,959
s
5
73,825
5
9,544
5
9,544
5
5
422,470
5
0
5
0
5
0 0 0
496,zgs
5
$
0
s
t6,405
5
16,405
FUNDING
ffi
Sycamore VatteyA D (93-21 Tassajara Ranch A D (97-2)
s s
39,759
NeriadAD2005A(gt-tl TOTAL
5
5
5
5
5
0
32,8t6
5
t,2t3
5
1,,2t3
s
0
5
423,720
s
15,185
5
15,185
5
0
5
496,zgs
5
L6,403
5
L6,403
$
0
145
\\'\\'\\'.(l
ir
r
ì\'r I l( .( rì.u()\
ffi
146
\\'\\'\\'.(l ilr ì\,1 I l('.( ;ì.rI()\'
I 'tÞ-
¡r,
-rt
P+.ð
r"-t-
I
D2..¡. ' -&''
.¡
îeÉiî ¡d,i.;' !,t
..:¿- a '""
r.'; íä:'¡ '>.
î.1.:
' .5;.;': ff,*f, .*
ätr$t: :sr>'
ÐrO
o
:
o
ìtÌ
'l
I
i.
I
I
t
I
{
{.
't
Ã&#x2022; \:J
Ten-year Forecast Ten-year forecasts are annually reviewed and updated to assist with tong term planning and to ensure ongoing fiscat sustainabitity for the Town. The economy, state actions affecting [oca[ governments, or [oca[ changes att have the potential to affect future Town revenues. Similarty, changing priorities and demands have the potentiaL to affect service detivery and future costs.
White overalt revenues are stable, Danvitle is a largely buitt-out community, and additionat revenue growth resulting from expansion is timited. The ten-year forecasts assume nominat infil,t poputation growth at a rate of o3o/o per year, based upon the forecasts included in the 2O3O General Plan.
All revenues and expendítures presentetd in the ten-year forecasts are comparing 2077/78 (currentyear) wíth 2o26/22 unless otherwíse stated. REVENUES
Total revenues are forecast to increase by LL.47o/o,from 536,t97,665 to 540,348,771. General Fund revenues are forecast to increase by 1.6.060/o, from Szs,z4g,zzt to 529,3o5,t29i Speciat Revenue funds are projected to increase by 12.670/o from 58,76 6,847 to 59,877,36t. Ptanning and Buitding revenues remain strong, increasing by an average of o.8o/o annually, white Engineering revenues decline significantly in the second five years due to reduced development activity. Gas Tax revenues increase by an average of 6.60/o annually, thanks to the passage of 58 1 in Aprit 2OL7. Other revenues are increased modestly: Measure J by 1%o annually and LLAD by O.3o/o annuaLl.y. Asset Replacement revenues are increased by 53OO,OOO annually, including 5tOo,ooO each from the Generat Fund, Building and Ptanning Fund, and the PEG fund. Redevelopment Property Tax Trust Fund (RPTTF) revenues witl cover the approved, outstanding debt of the Successor Agency inctuding repayment of the outstanding Town/CDA loan, plus attowabte administrative costs.
General Fund
Property lax revenues are forecast to increase by 2o/o annually, from $13,041,067 to 5t5,585,282; Property Transfer Tax is simitarty projected to increase by 2o/o annualty, from 5s67,3so ro 5678,0j6. Sales laxrevenues are conservatively estimated to increase by O.5o/o annually, from 55,5t4,000
to 55,557,969. Transient Occupancy Tax, Cabte Franchise, Fines and Forfeitures, Rental lncome and Míscellaneoui revenues are projected to increase to/o annually through 2O2Ot and t.So/o annually thereafter. Transient Occupanclrevenues increase from 5r27,277 to 5t43,387; Cable Franchise revenues increase from 5861,692 to 597o,76t; Fines and Forfeítures increase from 5r75,ooo to itg7,tst; Rental lncome increases from 5t58,77o to 5t78,866; and, Miscellaneous Revenue increases from $ztt,t7$ to 5237,908. Business License Tax, Gas and Electric Franchise and lnterest lncome are hetd ftat at the 2Ot7 | 18 amount. Solid Waste Franchise Feesincrease by 46.2Lo/o from 5978,800 to 51,43t,087. This reflects a poticy decision to increase the franchise fee rate from tOo/o to t3o/o in 2OL7lL8, and trom L3o/o to !5o/oin202!12} in order to hetp pay for the Pavement Management Program.
ffi
147
n's
rr'.,1;rr
rvtll, .,',.g,r,
Tên-year Forecast Under the Re-entered Cooperation Agreement between the Town and the Successor Agency to the former Danvil,te Community Development Agency, the Town witl, be repaid a total of $9.36 mittion between 2018 and 2026. The re-payment witt produce a temporary revenue stream of 5r to $r.r miltion per year, throu gh 2026, with a final payment of 5659,40r in 2026.
Special Revenue Funds Except as noted betow, projected fund balances in att Speciat Revenue Funds are forecast to be adequate to cover activity through 2O26t27.
-
Clean Water Program MRP 2.0 witt increase the Town costs for the Countywide group permit and [oca[ program activities. Annual assessments plus avaitabte fund balance are forecast to be sufficient to carry through the ten year forecast. However fund balance wi[[ be depteted by 2026127 and the Town wi[[ need to identify additionat future funding to continue the program.
Town-wide Lighting and Landscape Assessment Ðistríct (LLAD) Lg83-L - LLAD expenditures exceed annual assessment revenues in atl four benefit zones. Zones A, B and D are currently subsidized with $8oo,oo0 from the Generat Fund. Zone B requires a General Fund subsidy in 2O2O121' By 2026127, totat General Fund subsidy of $1.3 annuatty is required, absent a LLAD rate increase, while totat LLAD fund balance declines from 52,926,928 to 5-477,944. Revenue estimates are based upon current revenues, taxes and assessments and do not assume increases in either LLAD or Clean Water assessments, an increase in the current Transient Occupancy Tax rate, or passage of an additionat L/z cênt sates tax for Transportation as is currentty being considered in Contra Costa County. Without these, or some other additionat revenue sources, funding for capitat projects and pavement management witt fatl. betow what is needed to maintain the Town's infrastructure and meet residents' expectations. Inabitity to increase these revenues woutd have a significant and detrimental impact upon the General Fund, and woutd require some [eve[ of corresponding service [eve[ reductions in order to partia Ll.y offset i ncreased o perati n g expenses.
EXPENDITURES Ten-year forecasts show a 22.3o/o increase in Town operating expenditures from 53t,7tt,857 to 558,799,381, equivatent to $7,087,524 or 2.24o/o annualty. Successor Agency expenditures include enforceabte obl,igations approved with the bi-annual Recognized Obtigation Payment Schedu[es. Forecasts maintain services af. 2OL7 I L8 levels. Ten-year growth rates by department inctude: L8.5o/o for General Government, 33o/o for Police Services, L6.8o/o for Administrative Services, 23.2o/o for Development Services, L5.4o/o lor Maintenance Services, t6.3o/o for Recreation Services.
Staffing changes are timited to reducing staffing by one Engineering Pubtic Works Inspector in 2OL9|2O. In the General Fund, personnel costs were increased 2.Oo/o annually, contract police costs were increased 3.5%o annuatly (with the exception of Animal Control @ t.So/o annuatty), a[[ other expenditures were increased 1"-1".5o/o annually.
ffi
r
4ft
,r'*'u.,llrr
r,,,r
I
l, -,
"-gor
Tên-year Forecast ln the Speciat Revenue funds, personnel costs were increased i
2.Oo/o
and at[ other costs were
ncreased 1,-1,.5o/o annua[[y.
Because the Town does not participate in CaIPERS, in favor of a defined contribution benefit program for its emptoyees, Danville is not faced with the unfunded pension and retirement medical Liabitities that are of major concern to many pubtic agencies throughout the state.
Expenditure estimates do not assume voter or property owner approval of increased assessments or taxes associated with the Clean Water Program, Town-wide LLAD, the Transient Occupancy Tax or locat or countywide Transportation sates taxes. TRANSFERS AND DESIGNATIONS
Forecasts project ten-yeðr average annual General Fund transfers of $1,250,000 for CIP Pavement Management, 51,135,922 for CIP General Purpose, 51,085,000 for LLAD operating, and Stoo,ooo for Asset Reptacement. lt should be hightighted that these numbers are inftated by an average of 5937,ttO annualty, for repayment of the outstanding toan to the Town under the 2011 Restated Cooperation Agreement. This loan is futty repaid by 2026, at which time this temporary revenue source witt stop. Funding for future pavement management witt come from a combination of General Fund and Measure J Return-to-Source funds.
Future Chal[enges Despite being on solid financiaL footing, the Town can expect to face economic and service delivery chaltenges over the next decade, retated to a number of areas: Capital Expenditures- The Town maintains over SzOO mittion in infrastructure, inctuding streets, parks and buitdings. Over the past decade, the Town has expended 55-58 mittion annualty for capital projects, inclusive of Pavement Management. Whil,e the Town has accumulated capital reserves, new revenues for future capital projects are projected to decline over the next ten years, necessitating use of the accumulated reserves. As noted under "Transfers And Designations", repayment of the outstanding loan balance to the Town by the former CDA under the 2011 Re-stated Cooperation Agreement wil.l, end in 2026, further reducing available revenues availabte for capital purposes in 2027. During the second hatf of the upcoming decade, it witt be necessary to identify and secure new or additional sources of revenue, in order to fund capitat expenditures at current levets, and meet community expectations.
-
Streets and Roads Maíntenance ln order to maintain a PCI rating of 7O-75, the Town shoutd invest 5Z.S-5¡ mil,l.ion annuatty in its Pavement Management Program. The ten year forecast shows that the Town witt attocate an average of 5z.So miltion annuatly, wih 51.25 miltion of that amount coming from the General Fund. Gas Tax revenues are forecast to increase as a resutt of the passage of Senate Bitt r - The Road Repair and Accountabitity Act ol2otT,which wilt more than doubte local streets and roads funds allocated back to Danvitte by 2OLB|L9. Measure J Return To Source funds remain flat, reftecting overat[ sales tax growth. As General Fund revenues available for this purpose dectine, the Town witt be unabte to sustain funding Pavement Management at this level, absent new revenue sources.
ffi
t
4f,
\\'\\'\\'.(1iü ì\'l llr
-(
lì.g()\
Public Safety - Pubtic safety is, and wi[[ remain, the Town's highest priority. Potice Services are delivered through a combination of contracted services through the Contra Costa County Sheriff's Office, Town staff, police reserves and volunteers, and strong community partnerships. This has served the Town we[[ - staffing levels are among the lowest in the county, property crimes are [ow, and the Town continues to achieve the goat of maintaining a safe community. Police expenditures are expected to outpace overatl revenue and expenditure growth over the next ten years. Tenuous grant funding availabte to continue providing two Schoot Resource Officers may necessitate etiminating these positions.
Maintenance Services - Maintenance responsibitities and costs will continue to increase as facilities age, and costs are expected to outpace overall Town expenses and revenue growth over the next ten years. Aggressive water conservation strategies, imptementation of sotar photovoltaic arrays at five different Town facitities and ongoing conversion of the vehicte fleet to hybrid and etectric vehictes has slowed increases in water, electricity and fue] costs. Contract services costs wi[[ continue to increase with the cost of tiving and additional responsibitities associated with imptementation of MRP 2.0. Lighting and Landscape - Absent additional assessment revenues, increasing maintenance costs
will require increased General Fund transfers as described above, to cover operating and capital costs, and maintain positive LLAD fund batances. ln addition, no LLAD revenue witt be available to fund future capitat expenditures in future years.
Clean Water Program- The Town continues to compty with the federatty mandated Cl.ean Water Act and requirements imposed by the State Regional Water Quatity Controt Board (RWQCB). With issuance of the new five-year Municipat Regional Permit (MRP) in tate 2ot5, more stringent compliance standards are expected, and additional. future revenues witl. be required to comply with the new MRP. State Budget lmpacts- The State hs experienced an economic recovery over the past 2-3 years. ln addition, the passage of Proposition 3O in November 2OL2 provided temporary revenue increases in personal income tax (through 2018) and sales tax (through 2016). This appears to have mitigated the State's budget deficit in the short term. The ten-year forecasts assume no new revenue losses to the State resutting from future tegisl,ative action.
SUMMARY Despite modest future revenue growth, ten-year forecasts show that the Town is fiscatty sound for the next severat years. The Town's abitity to receive re-payment of the outstanding toan by the former CDA is of major significance to the Town, and increases avaitabte revenue by 5e.:6 mittion (outstanding toan batance plus interest) over the ten-year forecast. The Town wil.t nevertheless be required to identify and raise additionat revenues or make additionat service levet reductions in order to continue to futty fund Operating and Capitat expenditures at 2OL7lL8 levels.
ffi
l5o
\\'\\'\\,.(l,rĂ&#x152; rvi I l( .( lĂŹ.!()\
T
I
ffi
lirl
\\'\\'\\'.(1ยกrlVr
Il,
, :,-g,lr
Fund Activity Adopted 2018
Adopted 20L7
GENERAL FUND BEGINNING FUND BALANCE
Operating Revenues Transfers ln/Carry Forward Transfer ln Loan Repayment Transfer ln Overhead Less Operating Expenses Less Transfers Out Transfer Out To LLAD Transfer Out To CIP-Pavement Transfer Out To CIP Transfer Out To Asset Rept Net AnnuaI Change ENDlNG FUND BALANCE
Forecast
Forecast
20L9
2020
o
o
0
24,103,236
25,249,221
o 25,639,949
26,O38,O57
1,OOO,000
1,000,oo0
1,100,ooo
1,100,o00
297,553
297,553 -22,904,883
-23,4LO,179
797,553
-2L,t94,690
-22,322,328
297,553
-100,oo0
-800,ooo -1,800,oo0 -f-,524,446 -100,000
o
o
o
o
o o o
o o o
o o
0 0 0
447,L54
426,OLA
92,217 -L3,357
91",3O4
-L3,3L5
t24,OO3 92,217 -13,515
-L3,7t7
-100,ooo
-100,o00
-100,000
-100,oo0
o
-280,OO0
-63,OOO
0
-2L,t40
-302,Otl
-20,578
426,O1,4
t24,OO3
-84,298 39,705
L7,573 100,ooo -100,048
L7,525 100,ooo -100,045
L7,482 100,ooo -1o3,545
13,938 100,ooo -1o7,1.69
-48
-43
-3,s45
-7,t69
L7,525
t7,482
13,938
6,769
22t,985
21,O,60L
18,858 -30,220
199,239 18,858
L87,870
18,858 -30,242
-550,OOO -2,O0O,OOO
-1,556,O99
-800,000
-850,O00
-1,7oO,OOO
-100,ooo
-1,500,ooo -1,575,43L -100,ooo
-t,532,6L9
LESS DESIGNATIONS
Designated For Technotogy Designated For Other. ENDING FUND BALANCE
o
PEG FEES BEGยกNNING FUND BALANCE
Operating Revenues less Operating Expenses Less Transfers Out Transfer Out To Asset Repl Transfer For CapitaI Projects Net Annual Change ENDING FUND BALANCE
39,705 93,139
19,t27
POLICE. SLESF BEGINNING FUND BALANCE
Operating Revenues Less Operating Expenses Less Transfers Out Net Annual Change ENDING FUND BALANCE
POLICE . ABANDONED VEHICLE BEGINNING FUND BALANCE
Operating Revenues Less Operating Expenses Less Transfers Out Transfer Out To Asset Rept Net AnnuaI Change ENDING FUND BALANCE
ffi
-30,228
18,858 -30,236
o
o
o
-60,oo0
-1,1,,384
-1,1,,362
-1L,370
2LO,60L
199,239
1,87,870
-7t,378 1t6,492
I -t2
r. u
s'.i1rtrvtIl,.,
',.g,rr
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
202L
2022
2023
2024
2025
2026
2027
o
0 27,O49,647
o
o
o
0
o
26,443,69L
27,483,788
27,926,239
28,377,165
28,836,738
29,305,L29
1,10o,ooo
1,1Oo,OO0
1,1OO,OO0
1,100,000
1,1OO,OO0
297,553
297,553
659,40L 297,553
-25,701",092
-26,363,26t
-26,963,46t
297,553 -27,660,350
297,553
o
-24,OO9,725
-24,505,276
297,553 -25,L34,784
-1,OOO,OOO
-1,1OO,O0O
-1,1OO,OOO
-1,500,ooo
-1,500,000 -l'231,51.9 -100,ooo
-1,500,000" -1,24L,924
-1,500,ooo -L,O46,558
-1,1O0,O0O
-1,300,o00 -1,000,oo0
-1,300,000 -700,o00
-1,300,000 -200,o00
-L,122,7OO
-1,O11,458
-730,23L
-342,332
-100,000
-100,000
-100,ooo
-100,oo0
-100,000
-100,000
o
o
o
o
0
0
o
o
o 0 o
o o 0
o o 0
0 o 0
0 0 0
o o 0
4,L33 97,890 -L4,778
7,246
Lt,tL6
98,869
99,858
-L4,999
-L5,224 -80,000
o o
297,553
L9,127 94,07L
-725
t54
t,77L
95,O11
-13,923
-L4,132
95,96L -14,344
96,92L -L4,559
-100,ooo
-80,000
-80,oo0
-80,000
o
o
-80,o00 o
'80,000
o
o
o
0
-19,853
879
!,6t7
2,362
3,LL3
3,870
4,634
-725
1.54
t,77L
4,t33
7,246
tt,L1,6
L5,749
6,769
-4,150 100,ooo
-Lg,g52
100,oo0
-98,033 100,oo0
-L19,770
100,000
-37,772 100,o00
-60,750,
100,ooo
-Lto,gtg
-7L4,802
-118,820
-122,978
-127,283
-13t,738
-136,548
-LO,gLg
-14,802 -L8,952
-18,820
-22,978
-27,283
-31',738
-36,348
-37,772
-60.,750,
-88,035
-1t9,770
-f.56,179
105,106 1g,g5g
93,7L2
-30.,244
-30,252
-30,26l;
82,308 18,858 -30,270
70.,896
1g,g5g
59,474 1g,g5g -30,290
1g,g5g -50,300
-4,t50
L16,492
18,958
18,859 -50,280
100,000
48,O42
o
o
o
o
o
o
o
-tL,386
-LL,3g4 93,712
-l.L,403 82,308
-LL,4t2
-lL,422
-t1-,432
-1L,442
70.,896
59,474
48,O42
36,600
105,106
t
5,ì
rt
rvu'.iirtrvtllr
r ;r.gtrr
Fund Activity Adopted 2018
Adopted 2017
Forecast
Forecast
20t9
2020
POLICE. ASSET 5EIZURE BEGINNING FUND BALANCE
Operating Revenues Less 0perating [xpenses Net AnnuaI Change ENDING FUND BALANCE
19,620
20,727
2t,837
22,946
1,138
1,138
1,138
1,138
-3L
-28
_29
-30
1,707
1,110
L,LOg
1,108
20,727
21,837
22,946
24,054
3,789,905 2,650,487
3,183,266 2,752,600 -2,457,544
3,378,322 2,743,758 -2,503,914
3,5t8,L66 -2,551,17L
-100,000
-100,000
-100,000
0
0
0
195,056 3,378,322
L39,844 3,518,t66
297,368 3,815,534
1,30t,336 L37,850 -271,269
L,!67,917
1,370,588 458,449 -291,598
BUILDING É PLANNING BEGINN¡ÑG FUND BALANCE
0perating Revenues Less 0perating Expenses Less Transfers
-2,2t5,326
2,948,539
0ut
Transfer Out To Asset Repl Transfer For Capital Projects NetAnnuat Change ENDING FUND BALANCE
-100,000 -941,800 -606,639 3,L83,266
ENGINEEERING BEGINNING FUND BALANCE
Operating Revenues Less Operating Expenses Less Transfers 0ut Net AnnuaI Change ENDING FUND BALANCE
1,552,777 129,850
-38!,29L
479,056
-276,385
-25!,44t
-t33,4L9
202,67L
L,301.,336
t,l67,gt7
1,370,588
t76,851 t,547,439
2,520,567 go8,67g -1,150,781
2,278,465 -L,L94,g61
2,095,496 1,718,304 -L,L55,449
1,958,351 L,752,433 -L,L76,3L4
0
-200,000
-700,000
-t82,969
-L37,t45
-700,000 -123,881
2,095,496
1,958,351
1,834,470
!,173,254
957,973
833,O45
742,857 -260,L38
750,204 -265,t33
757,625 -270,224
-45,000 -500,000 -80,853
-98,000 -600,000
0
0
-610,000
-2t5,281
-L24,928
-610,000 -L22,599
1,L73,254
957,973
833,O45
7L0,446
GAs TAX BEG¡NNING FUND BALANCE
Operating Revenues Less 0perating Expenses Less Transfers
1.,211.,992
0ut
Transfer Out To Pavement NetAnnuat Change ENDING FUND BALANCE
=242,102 2,278,465
MEASURE J BEGINNING FUND BALANCE
Operating Revenues tess Operating Expenses Less Transfers 0ut Transfer For Capital Projects Transfer Out To Pavement Net Annual Change ENDING FUND BALANCE
ffi
t,254,tO7 724,976 -260,829
L-r4
r. rr rr'.,11r¡r,t Il, ., ;,.g,rr
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
2021,
2022
2023
2024
2025
2026
2027
26,267
27,372
28,476
29,578
30,679
t,L38
1,,L38
1,138
1,138
1,,138
'31
25,t6t t,138 '32
-33
-34
-36
-37
-38
L,707
1,106
1,105
t,Lo4
t,lo2
1,101
1,100
25,L61
26,267
27,372
28,476
29,578
30,679
31,779
3,8L5,534 2,949,542
4,065,746
4,442,295
4,354,062
4,L31,276
-2,599,330
3,L24,957 -2,648,409
2,7L0,L93 -2,698,426
2,626,613 -2,749,399
2,810,707 -2,80L,347
4,O40;636 2,888,362 -2,854,288
3,974,710 2,995,007 -2,908,242
-100,000
-100,000
-100,000
-100,000
-100,000
-100,000
-100,000
24,054 L,L38
0
0
0
0
0
0
0
250,2t2
376,548 4,442,295
-99,233
-90,640
-65,926
-t3,235
4,354,062
-222,786 4,L31,276
4,O40,636
3,974,770
3,96L,475
368,676 46,633 -315,059
4,065,746
!,586,196 tog,6Lg -292,326
1,403,489
L,l54,gtg
89g,g6t
325,669 -286,9L2
49,273
-297,844
48,511 -303,468
46,3t9 -309,t99
637,082 46,633 -3t5,O39
38,757
-182,707
-248,571
-254,957
-262,880
-268,406
-268,406
1,586,1,96
1,,403,489
t,l.54,gLB
8gg,g6t
637,O82
368,676
too,27o
1,834,470
1.,724,153
1,627,704
1,822,752 -1,2L9,201
1,858,970 -7,241,238
t,545,435 L,gg5,gtz -1,263,68t
!,477,666 t,933,593 -L,286,537
L,424,723 L,972,027 -L,309,813
t,386,937
1,787,244
-t,333,5L9
-700,000
-700,000 -82,268
-700,000
-700,000
-700,000
-700,000
-22,288
1,545,435
t,477,666
-37,786 t,386,937
492,L38 780,336
386,376
282,839
L81.,497
82,379
788,059
795,858
803,736
8t7,692
-29L,596
-297,200
-302,9t3
-308,737
1,547,439
-L,197,562 -700,000 -110,318
1,724,t53
ffi
-96,449 1,627,704
7to,446
600,152
765,L2L -275,414
772,69t -280,705
-286,098
-67,769
-52,944 1.,424,723
2,0tL,231
1,364,649
0
0
0
0
0
0
0
-600,000
-600,000 -L03,537
-600,000
-600,000
-].ot,342
-99,L78
-97,045
600,152
492,t38
-600,000 -L05,762 386,376
-600,000
-tto,2g4
-600,000 -108,014
282,839
t81.,497
82,3t9
-t4,726
l5ir
\\'\\'\\'.(l;u ì\'r
ll(
( rì.g()\
Fund Activity Forecast
Forecast
2019
2020
1,709,837 570,793 -597,850
t,677,780
!,620,899 570,8!3 -649,4L9
0
-5,000
-7,667 1,709,837
-32,O57
1,677,78o
-5,ooo -56,881 L,620,8g9
1,537,293
488,525 582,115
497,380 583,858
494,952 585,606
Adopted 2018
Adopted 20L7 CLEAN WATER BEGINNING FUND BALANCE
0perating Revenues Less 0perating Expenses
1,717,504 570,793
-578,460
570,803
-622,684
Less Transfers Out
Transfer For CapitaI Projects Net Annuat Change ENDING FUND BAI.ANCE
-5,000
-83,606
ILAD. ZONEA BEGINNING FUND BALANCE
5t5,297
Operating Revenues Transfers ln/Carry Forward Transfer ln From Asset Rep[. GeneraI Fund 5ubsidy
579,525
Less 0perating Expenses
0
0
0
0
250,000 -801,855
250,000 -768,818
250,000
-78t,844
250,000 -795,O95
-54,442 -26,772 488,525
-54,442
-54,442
9,955 497,380
-2,428 494,952
48L,O2t
744,744
843,422 744,744
746,864 746,968
749,L99
0 0
o
0
0
150,000
150,000
200,000
-874,O3t
-920,584
-936,229
-952,!46
Less Transfers Out
Transfer Overhead To Gen Fund Net Annual Change ENDING FUND BALANCE
LLAD. ZONE
-54,442 -L3,g3L
B
BEGINNING FUND BALANCE
0perating Revenues Transfers ln/Carry Forward Transfer ln From Asset Rep[. General Fund Subsidy Less Operating Expenses
L,O43,427
636,885
Less Transfers Out
Transfer For Capitat Projects Transfer Overhead To Gen Fund NetAnnual Change ENDING FUND BALANCE
ffi
0
0
0
0
-70,7L8
-70,7!8
-70,7l.8 .73,665 563,220
-200,005
-96,558
-70,718 -tog,g7g
843,422
746,864
656,885
r56
rvr.'r..,llu
rvr
ll,
.(
ir.!()\
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
202L
2022
2023
2024
2025
2026
2027
L,537,293
L,424,883
t,28t,3go
570,824 -678,234
570,834
570,845
1,109,318 570,855
-742,9L6
-779,240
570,866 -818,562
653,236 570,877 -867,L71
362,942 570,888
-86t,17t
-5,ooo
-5,000
0
0
0
0
0
-1,L2,4tO
-143,493
-208,385
-247,696
-290,294
-290,283
1,424,883
t,28t,3go
-L72,O72 1,109,518
900,932
653,236
362,942
72,658
48L,OzL
455,363 589,118
4L7,75L
367,951
305,728
590,881
592,650
594,425
230,841 596,2o4
143,045 5g7,g8g
587,359
250,000 -808,575
o 250,000 -822,288
-54,442
'5t+.442
-25,658 455,363
-37,6!3 4L7,75t
563,220 75L,437
753,682
0
0
200,000 -968,339
ffi
-709,327
goo,g32
0
0
0
0
0
250,000
25o,OOO
25o,OOO
-836,239
-850,431
250,000 -864,870
-879,558
250,000 -894,501
-54,442 -49,800
-54,442
367,95t
475,600
373,751 755,933
o 200,000 -984,813
-62,223 305,728
-54,442 -74,887
-54,442 -87,796
-too,g54
230,847
L43,O45
42,092
257,392
176,240
758,t9L
760,456
80,006 762,727
-3t,607 765,006
-54,442
0
0
0
0
0
200,000
250,000
250,000
250,000
-t,00L,573
-t,oLB,625
-1,,O35,972
250,000 -1,o53,622
'l'053,622
0
0
0
0
0
0
0
-70,7\8
-70,718
-70,718 -96,235
-70,718
-LO1,849
-70,7t8 -8t,t52 t76,240
-70,7L8
-87,620 475,600
-70,7t8 -tt6,358
-ttL,6L3
80,006
-31,607
-t09,334 -!40,941
373,751
_
257,392
L-r7
t. s,,r'.,1,,r r.,r lì,.-( :r.g()\
Fund Activity Adopted 2018
Adopted 20L7
ILAD,
Forecast
Forecast
20t9
2020
ZONE C
BEGINNING FUND BALANCE
Operating Revenues Transfers ln/Carry Forward GeneraI Fund Subsidy Less Operating Expenses Less Transfers Out Transfer For Capital Projects Transfer Overhead To Gen Fund Net AnnuaI Change
t,064,9L8 662,204
915,851 662,204
708,793 664;183
490,991 666,]-68
o
o
o
o
-722,840
-780,83L
-793,554
-806,489
-40,ooo
-40,o00 -48,43L
-40,ooo -48,431
-t49,O67 915,851
-207,O58
-277,802 490,99L
-20,ooo -48,43L -208,752 282,239
BEGINNING FUND BALANCE
L,258,756
1,,1,07,1.87
8t7,7LO
Operating Revenues Transfers ln/Carry Forward Generat Fund Subsidy Less Operating Expenses Less Transfers Out Transfer Overhead To Gen Fund Net Annual Change
I,tst,6t9
973,892
L,L3t,6t8
L,L34,74L
1,,L37,873
300,ooo
400,ooo -L,546,466
400,ooo -L,572,476
400,0oo -L,598,932
L,707,1,87
-tLB,448 -133,295 973,892
-tLB,448 -L56,L82 8L7,770
-LL8,448 -t79,507 638,203
BEGINNING FUND BALANCE
46,O85
47,OLg
Operating Revenues Less Operating Expenses Less Transfers Out
4,734 -3,8oo
4,734
47,978 4,734 -3,832
48,880 4,734 -3,889
Net Annual Change
934 47,Or9
959
902
47,978
48,880
845 49,725
t,973,24L 9,387
L,966,495 9,387
L,955,OO7
9,387 100,ooo 100,ooo 100,ooo
100,ooo 100,ooo 100,000
100,ooo 100,000 100,000
100,ooo 100,ooo 100,ooo 60,ooo -325,688
ENDING FUND BALANCE
-48,43t
708,793
LLAD - ZONE D
ENDING FUND BALANCE
-t,464,739 -1,1,8,448
-L5L,569
DONATIONS/CONTRIBUTIONS
ENDINC FUND BALANCE
-3,775
A55ET REPLACEMENT. GENERAL BEGINNING FUND BALANCE
0perating Revenues Transfers ln/Carry Forward Transfer ln From GeneraI Fund Transfer ln From Buil.ding & Planning Transfer ln From PEG Fee Transfer ln From Abandoned Vehicl.e Less Operating Expenses Less Transfers Out Transfer For Capitat Projects Net Annual Change ENDINC FUND BALANCE
ffi
1",943,599
o
o
o
-279,745
-3L6,L33
-320,875
9,387
o
0
o
o
29,642 L,973,24L
-6,746
-11,488
43,699
t,966,495
1.,955,OO7
t,998,706
I 5ยก8
i, l'r.'.,],'r rvrI1, ., r.g,,t
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
zo2L
2CI22
2023
2024
2025
2026
2027
282,239
668,t59
232,328 670,L55
t7t,o47 672,r-58
48,180 674,t67
150,OOO
150,OO0
100,ooo
200,ooo
-81_9,638
-853,OO5
-846,594
-860.,409
676,t82
-33,L97 678,202
680/,229
200,o00 -874,4s4
200,ooo -888,732
-888,732
L3,507
-92,157
200,ooo
o
0
0
o
o
0
o
-48,43L
-48,43t
-48,43L -34,674
-48,43L
232,328
L7L,O47
-48,43L -46,703 -33,197
-48,431
-49,9LO
-48,43L -61,,28t
-L22,867 48,180
638,203
434,927
L,L41.,Ot4
1,1.44,1,64
307,429 L,t47,324
400,ooo -1,,625,842
500,ooo -L,653,2L4
13,507
-58,961
-s6,934
-92,L57
-L49,OgL
24,953 t,156,867)
-to4,L24
205,248
L27,gts
1-,l.5O,494
1,r.53,673
600,ooo -1,709,378
600,o00
600,ooo
-t,68',,o57
-L,738,187
-1,767,49O
600,000 -1,767,490
-1,t8,449 -129,o77
-L18,448 -L25,879
-LO4,1.24
-230.,OO4
550,OOO
1,160,O59
-Lt8,448
-1,t8,448
-11,8,448
-ttB,448
-L18,448
-203,276
-1,27,498
434,927
307,429
-102,181 205,248
-77,333 L27,915
-to2,962 24,953
49,725
50,512
5t,90,6 4,734
53,O57
53,539
4,734
-3,947
-4,OO7
5L,239 4,734 -4,067
52,5t3
4,734
-4,1.28
4,734 -4,L90
4,734 -4,253
-4,31,6
787
727 51,239
667
5t,906
606 52,513
544
50,512
53,O57
487 53,s39
53,956
1,998,706 9,387
1,977,5L9 9;387
L,93L,374 9,387
1,88O,196
1,,823,gto
t,762,438
1,695,704
9,387
9,387
9,387
9,387
100,ooo 100,o00 100,ooo o -330.,573
100,oo0 100,ooo 80,ooo
100,ooo 100,ooo
100,ooo 100,ooo
100,ooo 100,ooo
80,ooo
100,ooo 100,ooo 80,ooo
80,ooo
80,ooo
100,o00 100,000 80,ooo
o
o
o
o
o
o
-335,532
-340,565
-345,673
-350,8s9
-356,LzL
-356,Lzt
o -6L,472
o
o
o
o
-2L,L86 L,977,519
-46,L45 1,93t,374
-5L,L78
-56,286 L,823,9tO
1,880,196
l5f)
t,762,438
4,734
41.8
o
o
-66,734 1,695,704
-66,734
!,628,969
tr'r\, rr'.rllrnt'r I ì,r.( :r.g()\
Fund Activity Adopted 2018
Adopted 20L7
Forecast
Forecast
20tg
2020
A55ET REPLACEMENT . LIB/CC
e¡ctñuNc ru¡¡o g¡LlNcr Operating Revenues Less Operating Expenses Less Transfers Out
Transfer For Capital Projects
NetAnnuaI Change ENDING FUND BALANCE
695,O87
698,538
651,O96
624,638
4,652
4,6s2
-7",2Ot
-L,Og4
4,652 -1,110
4,652 -t,L27
o
-51,O00
-30,000
-30,o00
3,45L 698,538
-47,442
65t,096
-26,458 624,638
-26,475 598,t63
2,240,30L
2,tgL,597
2,284,7L5
2,280,575
0
o
o
o
-1,240,30t
-t,L8L,597
-L,L84,7t5
-1,180,575
-1,000,000
-1,OO0,OO0
-1,1oO,ooo
-1,1Oo,OOO
0 0
0 o
0 0
o o
1,,L22,303
1,,L22,303
o
0 0 0
SUCCESSOR AGENCY RPTTF BEGINNING FUND BALANCE
Operating Revenues Additionat Loan received Less Operating Expenses Less Transfers Out Transfer Loan Repayment Net Annuat Change ENDING FUND BALANCE
RPTTF 2Oo/oLM BEGINNING FUND BALANCE
Operating Revenues Less Operating Expenses Net Annuat Change ENDING FUND BALANCE
0 0 1.,1.22,303
l60
t,t22,303
t,t22,303 0 0 0
t,122,3O3
1,,L22,3O3
o o 0
t,L22,3O3
s rr'*'.,1;u,r,t I 1.., :,.!Lrr
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
202t
2022
2023
2024
2025
2026
2027
598,163
57t,67t
545,161,
548,635
552,091
555,528
4,652
4,652
-L,t44
4,652 -1,!61
4,652
4,652
4,652
4,652
-L,17g
-t,L96
-1,274
-1,232
-!,232
-30,000
-30,000
0
0
0
-26,509
0 3,473
0
-26,492
3,456
571,671
545,161
548,635
552,091
3,438 555,528
3,420 558,948
3,420 562,368
2,279,2t2
2,274,7t4
2,272,250
2,281,625
2,272,850
t,830,677
1,166,282
o
0
0
0
o
-1,!79,2t2
-7,L74,714
-1,172,250
-L,tgt,625
-1,L72,850
0 -1,,17t,276
-L,766,282
-1,100,000
-1,100,000
-1,100,000
-1,100,000
-1,100,000
0 0
0 0
0 0
0 0
0 0
-659,40 1 0 0
0 0 0
1,122,303
L, !22,303
L,l2 2,303
1,1 22,303
L,L22,303
L,L 22,303
t, 1 22,303
0 0
0 0 0
0 0 0
0 0 0
0 0 0
o 0 0
0 0 0
7,122,303
1,1 22,303
7,72 2,303
t,L22,303
1,L22,303
.o
t,L2 2,303
ffi
558,948
t,L22,303
I
{il
0
t, r,,,$'.,1;rr rVt ll, .r :r.{l(l\
Revenue Adopted 20L7
Adopted
Forecast
Forecast
2018
20L9
2020
f-2,247,588
L3,O4t,067 567,350 5,514,000 L27,277 60,000 385,770
GENERAL PU RPOSE REVENUE GENERAL FUND ProPerty Tax
532,830
Transfer Tax
5,368,1'28
Säl,es Tax
Transient Occupancy Tax Charges for Services Business License Tax
57,567
385,770
Franchise Cabl.e Franchise Gas & Electric Franchise Solid Waste
lntergovernmentat Vehicle License Fees Forfeits Fines
t
lnterest lncome Rental lncome Misc. Revenue
TotaI
RECREAT¡ON FEES & CHARGES Charges For Services
Sports Altiance Fees
853,160
Misc. Revenue
Donation Total
SUBTOTAL
g6t,692
538,382
538,382
759,805 1,000
978,800 1,000
t7,857
t7,629
210,000
L75,OOO
245,740 r-58,770 26L,L78
253,5t3 t58,770
5,340,570 128,550 60,600 385,770 870,309 538,382 L,OO3,270
1,010 17,805
L3,567,926 590,27L 5,367,273
t29,835 61,,206
385,770 879,Ot2 538,382 L,O28,352 1,020 L7,983 178,518 253,513
2t,763,792
L87,3L4 22,667,564
L76,750 253,5L3 160,358 L89,L87 23,00,6,659
L9t,O79 23,352,LOL
1,813,801
2,056,OL3
2,097,133
2,L39,O76
1.55,379
t55,379 36L,265
1.58,487
6,t20
L6L,656 375,860 6,242
3,060 2,633,29O
2,685,956
36L,265 6,000 3,000 2,319,445
Facitity Renta[s
GENERAL PURPOSE
t26,ot7
13,501,888 578,697
6,000 3,000
2,58L,657
24,LO3,237 25,249'22L
368,49O
1.6t,96t
3:-2t
25,639,949 26,038,057
SPEC¡AL PURPOSE REVENUE PEG FEES
92,2L7
9L,304
92,2t7
Interest lncome
0
0
0
0
9L,304
92,2L7
93,L39
100,000 100,ooo
100,ooo 100,000
Total
ffi
93,L39
Franchise Cabte
92,2L7
POLICE. SLESF IntergovernmentaI
100,000
100,000
Total
lOO,OOO
lOO,OOO
t62
ryrr
t.,ilu rt,tll,, 1,.!,lr
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
202L
2022
2023
2024
2025
2026
2027
t3,839,285 602,o76 5,394,tO9 t3L,L34 61,818 385,770 887,802 538,382 L,O54,O6t 1,030
18,163 190,303
253,5t3
14,t16,070
6L4,tt8 5,421,080
L33,tOL 62,745 385,770
!4,398,392 626,400 5,448,L85
L4,686,360 638,928 5,475,426
1.4,980,O87
15,279,688
15,585,282
65L,707 5,502,803
664,74t
L35,Og7
t37,L24
63,697
64,642 385,770 928,355 538,382 t,328,907
L39,180 65,6tL 385,770 942,281 538,382 L,362,t30 t,,og4 Lg,27g Lgt,367 253,5!3
679,036 5,557,969 143,387 67,s95 385,770 970,76L 538,382 1,43t,o87 7,L27 19,860
183,007 253,5L3
385,770 9L4,636 538,382 1,296,494 t,061, t8,7L2 L85,752 253,5L3
90t,tL9 538,382 1,264,873
t,o46 t9,436
1.63,58L
t66,o35
169,525
tg2,ggo
195,885
23,704,07.6
24,255,L79
L98,823 24,633,430
2,L8L,857
2,225,495
2,27O,OO4
t64,889
1,69,L97
383,377 6,367
39L,O45
L7L,55L 398,866 6,624 3,3L2 2,85O,358
3,t84 2,739,675
6,495 3,247 2,794,469
1,O77
tg,gg3 1gg,53g
253,5L3 L7L,O53 201,805 25,OL9,974
204,932 25,4LL,653
2,315,405 L74,982 406,943 6,757 3,378 2,907,365
2,361,7]'3 L78,482 4L4,980 6,992 3,446 2,965,5L2
26,443,69L 27,049,647 27,493,799 27,926,239
ffi
94,07t
95,011
0
0
94,07L
95,011
100,000 100,ooo
100,000 100,ooo
95,96L 0 95,961
L73,61.9
5,530,3L7
tAL,268 66,596 385,770 956,4L5 538,382 L,396,L83 1,1.10
L9,567 194,237
L97,t5L
253,5L3 L76,223 207,9o5 25,8LL,9L5
253,5L3 L78,866 2tL,O23 26,2L9,BLO
2,408,947 192,051 423,280
2,457,126
7,O30
7,t7t
3,5L5 3,024,823
5,585
!95,692 43t,745
3,095,319
28,377,L65 28,936,739
29,305,L29
96,92L
97,890
0
0
0
0
96,92t
97,890,
98,869
99,858
100,000
100,000
100,000
100,000
100,000
lOO,OOO
1O0,OOO
100,ooo
100,000
1O0,OOO
I
(;3
98,869
99,858
\\'\\'\\'.(lilr ì\'r I ì( .( ;r.g()\
Revenue Adopted 2018
Adopted 20L7
Forecast
Forecast
20Lg
2020
POLICE - ABANDONED VEHICLE
18,000 858 18,858
18,858
18,000 858 18,858
POLICE. A55ET SEIZURE IntergovernmentaI lnterest lncome
1,000
1,O00
1,O00
Total
L,L38
138 1,138
138 1,138
1,000 138 1,158
367,675 2,282,872
41.L,600 2,3t6,OOO
L32,455 2,61L,303
2,665,705
2,650.,487
2,752,60lJ
2,743,758
2,948,539
L29,350 500
t37,350 500 137,850
lntergovernmentaI lnterest lncome Totat
BUILDING & PLANNING Charges For Services-Ptanning Charges For Services-Buil.ding Others
Total ENGINEEERING Charges For Services-Engineering
138
25,OOO
Devetopment Fees Totat
129,850
GAS TAX Gas Tax
896,817
lnterest lncome
18,000 858
1,200.,L30 11,,862
1,1,,862
18,OO0
858
18,858
282,834
478,556 500
457,949 500
479,056
458,449
1,706,442
1,740,57t
11,,862
11,,862
908,679
L,zLL,992
L,7L8,3O4
L,752,433
7L6,865
734,746
742,093
I,t1,L 724,976
8,111
749,51.4 8,111
742,857
8,111 750,20,4
757,625
562,L54
562,L54
562,L54
562,154
1,O10
1,O10
1,020
1,030
7,629
7,629
7,629
Total
570.,791
570.,793
7,629 570,803
LLAD - ZONE A Assessments
578,334
580,924
582,667
lnterest lncome
1.,L9L
7,!9t
L,T9L
584,415 1,,t9L
579,525
582,115
583,858
585,606
Total MEASURE J
lntergovernmentat lnterest lncome
Total CLEAN WATER Assessments Charges For Services lnterest lncome
TotaI
t64
57O,813
rvl's'.tllu
rvt
llt
,r :t.grtr
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
2o21
2022
2023
2024
2025
2026
2027
18,O00
18,O00
18,000
18,OO0
18,OO0
18,O00
18,000
858 18,858
858 18,858
858 18,858
8s8 18,859
858 18,858
858 18,858
8s8 18,859
1,000 138
1,OOO
1,OOO
1,000
1,OOO
l,OOO
1,000
t38
138
138
138
1,158
1,138
L,LtB
L38 1,138
L,L38
1,138
138 L,L38
284,825 2,664,7L7
264,OLr 2,860,946
2,452,O57
257,135 2,369,478
259,487 2,557,220
262,639 2;625,724
262,638 2,732,369
258,l-36
2,949,542 3,L24,957 2,7LO,L93 2,626,6L3 7,9LO,7íJ7 2,ggg,162
2,gg5,oo7
tog,tlg
48,773
48,O1.7
325,669
500 109,619
500 49,273
500 48,511
45,8L9 500 46,3L9
500 46,633
46,63t
t,775,382
1,810,890
L,g2L,73t
t,960,t65
L,ggg,369
1t,862
L,847,LOB 1,1,862
1,884,050
11,,862
1.1.,862
71,,862
L,787,2,44
L,822,752
1,858,97O
tL,862 L,8g5,gLz
L,933,593
L,972,O27
1,t,862 2,OLL,zlL
757,O1.O
764,580 8,LLL
772,225
779,949
787,747
795,625
8,111
772,69L
8,111 788,O59
8,111
765,12L
8,111 780.,336
795,858
8,111 80.3,736
BLL,692
562,t54
562,1.54
562,t54
562,t54
562,L54
t,o4t
562,1,54
562,1,54
1,O51
L,O72
1,O83
7,629
7,629
L,062 7,629
570.,834
570.,845
7,629 570,866
7,629
570,824
7,629 570,855
1,o94 7,629 57O,877
57O,888
586,168
587,927
58g,6go
593,234
595,013
1",LgL
t't9L
59t,459
l,Lgt
!,1,9L
t,!9L
L,LgT
587,559
589,118
590,881
592,650
594,425
596,20,4
596,798 1,L9L 597,989
325,L69 500
I
(iir
46,L33
46,L33 500
803,581 8,111
1,1O5
tlrvrt'.t1;rrrvi Iìt, rr.gtrr
Revenue
LLAD. ZONE B Assessments lnterest Income
Adopted
Adopted
Forecast
Forecast
201,7
2018
201,9
2o20
74L,468 3,276 744,744
74L,468 3,276 744,744
743,692 3,276 746,968
745,923 3,276 749,L99
6s9,635 2,569 662,2o,4
6s9,635 2,569 662,2o,4
661,,614
663,599 2,569 666,L68
LLAD. ZONE D Assessments
1,0,40,758
t,o40.,758
lnterest lncome
t,963
7.,O43,880 1.,963
t,o47,oL2
1..963
gg,ggg
Totat
LLAD. ZONE C Assessments lnterest Income TotaI
Misc. Revenue
Total
2,569 664,L85
1.,963
88,897
88,898
gg,ggg
L,L'L,6L8
L,L3L,6t9
t,L34,74L
L,L37,873
974 3,760 4,734
974 3,760
974 3,760
974 3,760
4,734
4,754
4,7t4
9,387 9,387
9,387 9,387
9ยก387
9,387
9,387 9,387
4,652 4,652
4,652 4,652
4,652 4,652
4,652
9,622,862
9,858,6L4
DONATIONSICONTRI BUTI ONS
lnterest lncome Donation TotaI ASSET REPLACEMENT
.
GENERAL
lnterest lncome
Total A55ET REPTACEMENT . LIB/CC lnterest lncome
Total SPECIAL PU RPOSE SUBTOTAT
8,333,862
8,766,A47
I+,652
34,016,068 35,262,8LL 35,896,67L
TOTAL OPERATING REVENUE
32,417,O99
SUCCESSOR AGENCY Property Tax - RPfiF Other charges Cooperative Loan Repayment
1.,240,30L o
L,L57,697
23,900
23,9c,0
1,OOO,OOO
1,OOO,OOO
1,100,ooo
1,100,ooo
Total
2,24o,3l,t
2,LBL,Sg7
2,284,7L5
2,280,575
SUCCESSOR AGENCY TOTAL
2,24O,'OL
2,L8L,597 2,28,4,7L5
TOTAL. ALL REVENUE
34,677,4OO
l6(r
23,900
1,160,815
t,1-56,675
2,280,575
36,L97,665 17,547,;526 38,L77,246
rvrvrr'.,1;u,r'lll,, ;r.!,tr
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
2021
2022
2023
2024
2o25
2026
2027
748,t61
750.,406
3,276 75L,437
3,276
752,657 3,276
753,692
755,933
3,276 758,Lgf,
665,59O
667,595
669,589
671-,598
2,569 6ó8,159
2,569 670.,7.55
2,569 672,L58
2,569 674,t67
1,O50,153
L,O53,303
1,o56,463
1,963 gg,ggg
t,963
1.,963
88,898 L,L44,L64
974
L,7,:4L,OL4
754,9L5
760.¡,456
759,45L 3,276 762,727
765,0,06
673,613 2,569
675,633 2,569
677,660 2,569
676,L82
678,2o2
680.,229
t,o59,633
t,062,8L2
1,O66,00O
1.,963
1.,963
gg,ggg
88,898
L,t47,324
L,L'O,4g4
88,898 L,L53,673
1,963 88,898
1,069,198 L,963 88,898 1,160,(}59
4,734
974 3,760 4,734
4,734
974 3,760 4,734
9,387 9,387
9,387 9,387
9,387 9,387
4,652 4,652
4,652 4,652
4,652 4,652
974 3,760
757,L80 3,276
3,760
9,779'20,8 9,79L,752 9,370,644
L,L56,86L
974
76L,730 3,276
4,734
974 3,760 4,734
4,734
9,387 9,387
9,387 9,387
9,387 9,387
9,387 9,387
4,652 4,652
4,6s2 4,652
4,652 4,652
4,652
9,7t3,269
9,877,36L
9,341,t,42
3,76Ú
9,578,737
36,222,899 36,841,399 36,954,432 37,267,38,0 37,955,902
974 3,760
4,65?,
38,550,006 39,L82,489
L,t55,3L2 23,900
1,150,814
t,L49,35U-
t,1,57,725
1,,148,950
1.,t47,376
1,1.42,382
23,90,0
23,gOO
23,9o,0
1,100,ooo
1,100,ooo
2,779,2L2
2,274,714
1,100,ooo 2,272,25O
23,9o0 659,40L
23,9o0
1,10(),ooo
2,28'.,625
23,9o0 1,100,ooo 2,272,85O
2,29t,625
2,272,850 L,83O,677 L,L66,292
2,279,2L2 2,274,7L4 2,272,250
38,502,111 3g,LL6,LL3 39,t26,68.7 39,549,005
I
(ì7
4o.¿2g,752
1,83O,677
o
L,L66,282
4O,38O,ó85 40,348,77L
\\'\\'\\'.(liìr tVl ll(
.(
lì.!()\
Expend.iture Adopted
Adopted
Forecast
Forecast
20t7
2018
zotg
2020
GENERAL GOVERNMENT
L66,249 909,548
t67,877 824,665 392,L83 329,564 186,806 t20,345
L66,274 593,459 378,577 277,926 264,147 tL2,4gO L,792,873
118,108 7.,933,2L5
Police Services Management Patrol
L,486,649 5,to2,5L7
L,426,-129
t,464,969
5,40L,O25
5,588,161
Traffic lnvestigation
L,O76,609
t,778,274 845,1t7
56l-,290 250,786
L,LAt,405 822,308 598,409 254,618
9,25L,269
409,70L 760,707 693,528 448,362 335,435 282,864
Town Councit Town Manager City Attorney City Cterl<
community outreach Emergency Prepa redness
Total
384,673 272,11,1
t83,526
2,O2L,44O
169,529
84L,lO3 399,840 295,443
190,t46 L22,625 2,018,686
POLICE SERVICES
SchooI Resource Program
AnimaI ControI
Total
ISTRATIVE SERVICES Administrative Services Management Finance
ADMI
I
773,4t8
L,504,430 5,781,818 1.,21-6,430
868,655
618,008
638,267
258,437
262,3t4
9,644,494
9,952,965
LO,27L,9L3
356,898 779,365
364,OL8
371,279 808,310
N
nformation Technology
Human Resources Economic Devetopment
lnternaI Services Risk Management Asset Rep[acement
Total
655,305
793,703 667,575 477,248 403,066 289,808
680.,O79
276,L26
468,790 396,L27 285,525 633,600 3L3,726
5,60L,723
3,888,716
3,956,345
485,86t Ato,L29 294,L55 652,75L 322,590 4,025,L53
245,975 608,234
265,460 656,07L L,462,842 12L,692 36t,OO4 857,350 435,432 293,347
270,747 668,699
276,L40 68L,57L
t,489,842
L,5t7,349
L24,O96
126,547
367,890 874,445 443,758 3L3,223
374,908 991,881 452,246 334,9L8 4,655,560
395,OOO
643,tO4 3L7,823
DEVELOPMENT SERVICES
Devetopment Services Management P[anning Buitding Code Enforcement Engineering Capitat Proj ect Management
Transportation Clean Water Program
TotaI
ffi
t,372,823 LL3,833 500,921 7t3,754 437,276 292,065 4,284,88L
l6ft
4,453,L98
4,552,700
rr,.r'\'.t]'rr
rr,ยก
I
l, -( ;r.g()\
Forecast 2021.
Forecast
Forecast
Forecast
Forecast
Forecast
2022
2023
2024
2025
2026
2027
17L,205 857,869 407,648 340.,828
L97,343
tBg,o7t
tgo,824
L92,6A4
L94,41.0
L96,244
820,649 4L5,609 306,9L4
837,005 423,727
853,686
870,70L
ggg,o55
432,OO3
440.,443
352,51.O
318,810
376,503
1"93,547
L97,O1,O
21,5,295
L27,3L7
2,054,843
204,L26 L32,L9t 2,L37.,64L
21.1,,5O4
L24,g49 2,096,O47
200,536 L29,73L 2,L32,579
364,385 207,782 134,698 2,zLO,6L3
449,O48 330,90,4
905,755 457,822
L37,253 2,211,,L75
t39,857 2,29L,476
1.,545,t54 5,982,224
1,630,560 6,404,235
7,675,332 6,626,337
t,721,544
1,769,245
6,t89,6L5
6,856,181
7,O94,O38
1,919,495 7,340,189
L,339,O7L
t,382,836
1,,475,OO3
1s23,513
943,898 703,235 274,296 7.t,295,295
970.,609
L,O26,643
1,,O56,O25
775,OO8
800,568
278,41-O
L,428,t29 998,LgL 750,285 282,586
286,825
t'.,65g,gg3
L2,0.16,906
L2,426,763
291,,t28 12,829,908
40L,804 869,s]-g
409,820 885,544 746,247 53L,36L 447,384 516,888 703,L98 347,52L 4,387,964
4L7,996 901,868 760,245 540,970 455,240
L,255,91"6
gg2,g4g 659,209 266,249 1o,607.,699
1,587,183 1,296,780 g18,o2o 680,957
270,242 LO,942,697
378,686 823,t89 692,879 494,632 4L7,3L8 298,567 662,542 327,429 4,095,f.83
332,34t 4,L66,456
29L,640 694,694
t,545,37t L2g,O47
382,O6L
909,665
ffi
Forecast
386,240 839,347 705,802 503,565 424,636 303,O46 672,480
393,945 853,788 7L9,O3t 5L2,662
726,369
732,5L1,
307,592 682,567 337,326 4,238,995
52L,926 439,667 3L2,205 692,806 342,386 4,3L2,824
287,250
292,97L
298,8o-7
70,8,07L
721.,709
735,6tL
7,573,9L9
7.,603,OO2
!,632,63t
L3t,5g7 389,353
L34,t97 396,785 946,305
L36,849
460,,897
927,80,4 469,7L5
358,609 4,767.,985
384,494 4,872,2O2
432,O84
40,4,360
478,703 412,788
965,L75 487,866 443,729
4,986,460
5,1O5,O28
I
(;9
304,759 749,783 L,662,8L6 L39,553 4L2,O82 984,422 497,205 477,579 5,zzg,Lgg
32t,642 7L3,746 352,734 4,464,44L
426,335
9t8,499 774,508 550,755 463,237 326,466 724,452 358,O25
4,542,277
4t9,952
3t7,O22 778,959 L,724,898 L45,123 427,974
L,OO4,052
L,O24,O75
510,830
764,230 t,693,569 L42,3Lt
506,725
5t6,429
5L4,624 5,356,293
555,182
5,489,66L
tr',,r'.r'.t l;r t t.,,j I lt .t-;r.uยกr
Expenditure Adopted 2077 MAINTENANCE SERVICES Maintenance Services Management Buitding Maintenance Park Maintenance Roadside Maintenance Street Maintenance Street Light Maintenance Traffic Signal. Maintenance Equipment Maintenance
TotaI
Adopted
Forecast
Forecast
2018
20tg
2020
400,805 952,L59
393,227 936,664 2,224,256
2,26!,990
1,688,156 1,008,521
1,716,808
L,745,957
965,449
779,906
792,6t5
223,OOO
360,353 7,554,32L
226,345 365,758
982,685 905,556 229,740 371,245
7,62L,L24
7,750,L7.6
390,896
397,æ9
648,7t3
659,t7t
404,846 669,800 544,653 729,956
385,794
359,836 869,587
92t,427
2,O93,649
2,187,1.64
L,674,579 939,499 721,826 223,OOO
408,030 7,289,945
RECREATION, ARTS & COMMUNITY SERVICES
Management Fitness Facil,ities Management CulturalArts Youth Teens Adutts Seniors Library Services Community Events Totat Recreation Sports &
TOTAT OPERATING
EXPENDITURES
383,627 653,699 501,051 582,69L
524,868
534,668
705,793
4L6,O35
502,796
7L7,77t sLt,O27
'4L6,532
stg,3g5
423,587
430,765
13l,,560
t33,823
t36,t26
44t,L58
455,673
L96,9L4 268,L67
203,794 257,268
463,346 206,851
47L,t52 209,954
26L,41.5
265,629
,,97t,279
4,237,893
4,309,467
4,r82,276
3 o,L9t,97O
3t,7ft,857
32,4L4,O41
3t,LO3.,701
4ot,47o 128,528
SUCCESSORAGENCY 5uccessor Agency
TotaI TOTAL . ALt EXPENDITURES
L,239,301
L,239,30L tL,453,277.
t1fJ
t,Lgt,5g7 t,LÛt,5g7
1.,t84,715 1,L84,7L5
1,180,575
t2,893,454 3t,598,756
34,284,278
1,180,575
\\'\\ \\'-(1rr ì\'r ll(
.(
:ì.Ir)\
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
Forecast
202t
2022
2023
2024
2025
2026
2027
408,550
4!6,405
424,433
432,6t7
440,961
967,9L4
983,936 2,339,430
1,,00O,227
1,,01,6,794
1,033,64t
L,O50,772
L,068,lg3
2,379,159 1,836,470
2,460,696 L,899,459 7,073,685 873,427
2,502,528
2,545,085
t,93t,776 t,og2,8g2
!,964,655 t,112,449
g45,5gg
2,4L9,577 1,867,694 1,o54,822 85g,3gg
887,690
902,LgO
240,234
243,838
25L,208
254,976
388,203 8,150,621
394,O26 8,288,766
247,495 399,936
405,935
4L2,O24
8,429,loo
8,572,266
8,717,708
434,289
441,985
7t4,O88
725,6!8
449,820 737,337
586,523 780,845 554,289
597,49L
608,667
457,796 749,249 620,o54
794,L24
807,633 572,621 476,5L3 150,820 520,885 229,572
2,300,377 1,775,6L1.
L,805,779 1,018,103 832,O23
t,000,234 8L8,671 233,!86 376,813 7,88L,337
8,014,825
4L2,OLO
4L9,304
680,605 554,828
697,583 565,195
426,729 702,744 575,759
742,352
754,963
767,793
527,903 438,066 138,470
536,553 445,494
545,348 455,050
140,855 487,L67
t:43,28L
269,973
216,300 274,267
2L9,544 278,692
4,456,339
4,531,680
4,608,32t
479,OgL
2L3,tO3
236,684 382,466
33,892,589 34,582.
L,179,2L2
t,tlg,2L2
t5,o7f'801
ffi
L,L74,7t4 L,L74,7L4 t5,757,417
1,,036,297
495,382
460,737
145,751 503,738 222,937
2g3,tgo 4,686,285
35,4L2,272 36,184,437
563,379 469,557 1.48,263
5L2,238
226,180 287,761 4,765,596 37,05
449,466
292,408 4,846,276
8,577 37,877,2t4
458,137
g2!,377 582,018 484,607
L53,422 529,680
233,0!6 297,13L 4,928,351 38,799,38f.
1,L72,250
t,181,625
1,172,850
L,L71.,276
1,1,66,282
1,L72,250
1,181,625
1,L72,850
I,Ll1,276
1,166,282
36,584,522 37,366,062 18,2tt,427
I ?1
t9,048,490 t9,965,665
rr'.r'*'.,1',r tvt l], .( :r.g()\
Expenditure Adopted 2018
Forecast
Forecast
20t9
2020
22,904,883
23,4tO,L79
13,515 103,545
LO7,1.69
2,2L5,326
22,322,328 73,3L5 100,o43 30,220 28 2,457,544
381.,29L
271",269
227
207 L,Lg4,g6L 260,L38 597,850
Adopted
20L7 APPROPRIATION BY FUND 21,,194,690
Generat Fund
t3,357 100,o48
PEG Fees P olice - SLESF
Police - Abandoned VehicLe Potice - Asset Seizure Buitding É Ptanning Engineering Chil.d Care lmpact Fee Gas Tax
LLAD-ZoneA LLAD-ZoneB LLAD-ZoneC tLAD-ZoneD
874,031.
722,840 L,464,739
Donations/Contributions Asset Replacement - GeneraI Asset Replacement - Lib/CC
Civic Facilities Park Facitities Capitat lmprovement Park Dedication lmpact Fee
CTIP RTIP Tassajara Area Transportation Old Town Parking In Lieu ER¡AD Assessment
District
Misc Devetopment Fees SVAD Benefit District
Tri-Vattey Trans & Dev - Res Tri-Vattey Trans & Dev - Com SCC RegionaL SCC Sub Regional
Dougherty Val.l,ey Fee Successor Agency FPTTF TOTALS
ffi
1.,1.50,781
260,829 578,460 801,855
Measure J Ctean Water
N
30,242 3L
768,8t8 92o,584 780.43L 1,546,466
3,800
3,775
279,745
3t6,L33
L,20t
L,O94
5,476
4,985
30,228 29
2,503,9t4 276,385 2LO 7.,L55,449
265,L33 622,684 78L,A44 936,229 793,554 L,572,476 3,832 320,875 1,110 5,o60
r-3,7t7 30,236 30 2,55t,L7t 281,598
7t3 t,176,3L4 27o,224 649,4L9 795,O95 952,1.46
806,489 t,598,932 3,889 325,688 L,t27 5,736 5,063
5'428
4,9L4
4,988
9t,375
L00.,666 L,776
1,O2,t76 1,802
LO3,709
857
780
792
309 303 563
282 300 5L2
804 29L 509
1,515
1.,368
250 44
232 40 84 86
286 305 520 L,389 235
L,949
92
94 8,363 2,4oo 459
L,240,30t
527
L,4o9
239 4L
7,6t9
7,733
87 89 7,449
2,LgO
4t9
2,223 425
2,256 432
1,1.8t,597
1.,L84,71.5
t,1.80.,575
3L,453,27L 12,893,454
172
4L 85
1.,829
87
756
34,284,278
\t rt tr'.,1iurt llì,.,,,.!,lr
Forecast
Forecast
202t
Forecast
Forecast
Forecast
Forecast
Forecast
2022
2023
2024
2025
2026
2027
24,OO9,725
24,505,276
t3,923
14,1-32 11,4,802
110,919
30,244 3L
2,599,330 286,91,2
2t6 t;-97,562 275,414 678,234 808,575 968,339
1-,219,20L 28o.,7o5
709,327
286,O9A 742,91.6
822,288
836,239
25,70L,O92
L4,559 L22,978 30,270 34 2,749,399 303,468 226 1.,263,68t 291.,596
779,240 85c.,431, 1,,OLB,625
984,8t3
L,OO7,573
8t9,638
833,OO5
L,625,842 3,947 33o,573 1,L44 5,2L3 5,L38 LO',264 L,857 816 295
t,653,2L4
846,594 t,687.,o57
L,709,378
4,O67 340.,565
345,673
3L4 s55 1,430 243 42 88 90 7,967 2;290 438 1,t79,2L2 35,O7 1,801
ffi
30,252 32 2,648,409 292,326 220
25,L34,784 L4,344 118,820 30,261 33 2,69A,426 297,844 223 L,24.L,238
4,O07
335,532
t,t6L
5,29L 5,2l-6 1"06,843 1,885
t,|79
860.,409 4,1-28
1,L96 5,45L 5,373
5,370 5,294 1o8,446
LL0,O73
840
L,942 853
76,363,26L 14,778 L27,283 50,280 36 2,80r-,347 309,L99 230 1,286,537 297,2o0 818,562 864,870 t,o35,972 a74,454 1,738,187 4,190 350,859 1,2L4 5,533 5,454 1,LL,724
26,963,46t L4,999 L31,738 30,290 37 2,854,288 31.5,O39
233 t,3og,8L3 302,9L3 861.,1.71.
879,558
1,o53,622 888,732 L,767,49O 4,253 356,LzL t-,232
5,6t6 5,536
27,660.J5o L5,224 1.36,348
30,300 38
2,9o8,242 32o,991 237 L,333,5L9 3o8,737 9o7,384 894,501 1,o7L,578 903,247 t,797,298 4,3L6 36L,463 1,,25L
5,700 5,619
tL3,4o0
115,1OO
t,97L
2,OOO
2,O30
866 3L3 333 568 1,519 257 44
879 318 338 577 t,541. 26L 45
892 322 343 585
92
93
95
95
45t
94 8,331 2,395 458
t,L72,250
1,1"81.,625
t,172,85O
97 8,583 2,467 472 L,171,276
1",L66,282
35,757,4L7 36,58,4,522 37,366,0/62 38,23L,427
39,O48,49l¡
39,965,663
828 299 518 543 1,,452
246 42 89 9L
8,o87
2,324 445 1-,t74,7L4
t,9t3 304 323
552 1,474
250 43 90 93 8,208 2,359
308 328 560 L,496 254 44
l1:l
8,4s6
2,43t 465
1.,564
265 46 96 98 8,7LL 2,50.4
479
\\ \\ \\'.(l;lrì\'rll(.( iì.g()\
\()¡'tì ì rl I t,\l ll:lì,\\,\\,\\
þLl
ry
Budget Guide
ar
,Ll
Assumptions Assessed Vatue:
Actuat as reported by the County for 2oL6lL7 for the ïown increased to/oinFY 2OL711.8 and increased by 27o annuatlythereafter.
Property Tax:
Property Tax incl.udes the Motor Vehicl,e License Fee Swap (MVLF) from the State. Based upon actual receipts through March 2017 ptus estimated payments due through lune 30., 2Ot7, projections were increased by 6.50/o in FY 2O17l18 and 27o annually thereafter.
Property Tax Rate:
Used property tax rate of 7.6o/o.
Prop. Transfer Tax:
Based upon actual receipts through March 2017 pl.us estimated payments due through June 30,2oL7, projections were increased by 6.50/o in FY 2oL7l18 and 2olo ônnuôlty thereafter.
Sales Tax:
Based upon actuat receipts through March 2017 ptus estimated payments due through lune 30.,2OL7i FY 2ot7lt8 budget projections were decreased by Lo/o and increased by .O5o/o annuatly thereafter.
Transient Occupancy Tax:
Based upon actuat receipts through March 2017 ptus estimated payments due through lune 30,2Ot7, projections were increased by to/o from FY 2Ot7lt8 to FY 2O2O121. and increased by 1.5%o annualty thereafter.
Cable Franchise:
Based upon ðctuat receipts through March 2o17 pl.us estimated payments due through June 30., 2Ot7, budget projections were increased by to/o in FY 20L711.8 and increased by to/o from FY 2OaBl L9 to FY 202O 121. and t.So/o annuatly thereafter.
Gas
ffi
6 Etectric
Franchise:
Based upon actuat receipts through March 2017 plus estimated payments due through June 30,2oL7, budget projection was held ftat in FY 2o1,71t8. Future year projections were held flat annuatly thereafter.
Sol,id Waste Franchise:
Based upon contract with the Sotid Waste Authority and actual receipts through March 2017 plus estimated payments due through June 30,2ot7, projections were increased by 28.8o/oinFY 2oL7lt8; 2.5o/o in FY 2O1,81t9 to FY 2O2O121; 2Ùo/o in FY 202il22 and increased by 2.5o/o annuatty thereafter.
Motor Vehic[e ln Lieu:
Based upon actual receipts through March 2017 pl.us estimated payments due through June 30,2oL7, budget projection was held flat in FY 2O17l18 and increased by to/o from FY zotTlt$to FY 2o2ol2t and 1,.5o/o annualty thereafter.
lnterest lncome:
Based upon actual receipts through March 2017 ptus estimated payments due through June 30.,2ot7; projections were increased by 3o/o. tuture year projections were hetd flat annuatly thereafter.
RentaI lncome:
Rental income estimated at 51.58,770 in FY zot7ltg7based upon teases associated with the Sycamore Day School and various celtular sites; budget projection was hel,d fl,at in FY 2o16118 and increased by !o/ofrom FY 2O1.8ltg to FY 2O2O 12L and L.So/o annuatty thereafter.
llit
\\'\\'\\'.(liu
ì\'lil(
( lr.g()\
Assumptions Recreation Fees & Charges:
Based upon actual receipts through March 2ot7 plus estimated payments due through June 3o.,2Ot7, projections were increased by tOo/o in FY 2Ot7lt8 and increased by 2o/o annuatty thereafter.
Business Licenses:
Based upon actuat receipts through March 2oL7 ptus estimated payments due through June 30.,2Ot7, the amount was held ftat in FY 2ot7tt8 and heLd ftat annualty thereafter.
Fines and Forfeitures:
Based upon actual receipts through March 2ot7 ptus estimated payments due through June 30, 2Ot7, projections were decreased by t6.7o/o in FY 20tTltg and increased by to/o from FY 2018/19 to FY 2O2O|2L and t.So/o annually thereafter.
PEG ( Pubtic, Educational & Government) Fee:
Set at 5o.0o per subscriber, this fee was decreased by 1%o in FY
Fines / Abandoned: Vehictes
Based upon population.
Asset Seizure:
Based upon average historic receipts.
Police Services:
Based upon actual receipts through March 2017 ptus estimated payments due through June 3o., 2OL7 as we[[ as assessments on Alamo Springs homes which began in FY 2o11.
Buitding/Planning:
Based upon actual receipts through March 2017 pLus estimated payments due through June 30, 2Ot7. FYs 2OL7l18 through FY 2026127 are projected based upon projected buitding activity.
Engineering:
Based upon actuat receipts through March 2017 ptus estimated receipts through June 3O, 2Ot7. FYs 2OL7lt8 through FY 2026127 are projected based upon projected development activity.
Gas Tax:
Based upon actual. receipts through March 2oL7 pl.us estimated payments due through lune 30, 2OL7. lntergovernmental Prop 42 funds were reptaced with Section 2103 excise tax in FY 2ottlL2. Amounts for FY 2OtTlLB and FY 201.8119 are based on the source from the State Controtlers projections, and increased annuAlly by 2o/o thereafter.
Measure
J:
2OtTltg and increased by 1olo annuôlty thereafter.
Based upon actual receipts ptus estimated amounts due through June
30, 2Ot7 from Contra Costa Transportation Authority (CCTA),
FY
2ot711,8 projections are provided by CCTA and were increased 17o annuatty thereafter. Clean Water (SPCP):
Based upon actual receipts through March 2017 ptus estimated payments due through June 30,2oL7, projections are held fl.at in FY 2OL7 I tB and a nnuatty thereafter.
LLAD:
Based upon actua[ receipts through April 2oL7, projections are increased by .45 for zone A; hetd ftat for Zone B, C and D for FY 2ot7lt8 and increased by .3o/o annuàlty to reflect addition of new ProPerties.
Successor Agency RPTTF:
ffi
of ABxl 26 resulted in the dissotution of the CDA. Future revenues will match debt service through 2026. Passage
l7
(¡
\\'\\ \\'.(l;u ì\'r I l( .('ir.g()\
Fund Structure GENERAL FUND The Generat Fund is the general operating fund of the Town. lt is used to account for all financial resources except those required to be accounted for in another fund. The major revenue sources for this Fund are property taxes, sates taxes, franchise fees, unrestricted revenues from the State, fines and forfeitures and interest income, Expenditures are made for atl operating departments, designations and capitat appropriations.
SPECIAL REVENUE FUNDS Special Revenue Funds are used to account for the proceeds of specific revenue sources that are restricted by law to expenditures for specific purposes. Major Speciat Revenue funds for the Town include:
*
Lighting and Landscaping Assessment District (LLAD) (Zones A - D) - Assessments paid by property owners who receive street tighting services, and by atL residents for landscape and park maintenance services, are received into this Fund. The assessments are used to pay for the energy cost of the street tighting system, as well as community roadside, median and park [andscape expenditures.
..!. Buitding/Pl,anning Fund - This Fund receives buitding inspection, plan review and ptanning fees collected during the buitding permit process.
.!.
- Contract negotiations with the Town's cable service providers incl.ude a 50.60 per subscriber PEG fee for Public, Government and Educational programming. These fees are restricted to capitaL expenditures for the provision of these programming services.
*
Potice Speciat Revenue Funds: SLESF, Abandoned Vehicle and Asset Seizure - The Supptemental Law Enforcement Services Fund (SLESF) is estabtished by Government Code Sections 30061-30065. The Abandoned Vehicl,e and Asset Seizure Funds are estabtished by the State and distributed to participating agencies. The Canine Fund was established to account for the donations received by the Town for the funding of the police canine program and has been combined with the Donations Fund starting in FY 2OO8-09. These funds are restricted to the provision or enhancement of police services.
PEG Fund
.E Engineering Fund - This Fund receives engineering and subdivision devetopment fees cotlected during the buitding permit process.
ffi
*
Gas Tax Fund - This Fund is used to account for the portion of the taxes paid on the purchase of gasotine which the Town receives, and are restricted to street and related improvements and maintenance costs.
a
Clean Water (formerty known as SPCP or NPDES) - This Fund is used to account for assessments paid by property owners for administration, inspection and maintenance of the storm drain system and for street sweeping.
l-a
\\'\\'\\.(i:ĂŹrĂŹ\'t li( .(-r.g()\
Fund Structure *
Measure J Return To Source - In 1988, Contra Costa voters approved a one-half cent sales tax for transportation purposes. Eighteen percent of the funds cotlected throughout the County are distributed back to each [oca[ jurisdiction on the basis of poputation and road miles. The Town utitizes a portion of these funds for pavement management and transportation planning. Receipt of these funds is tied to comptiance with the Town's General Plan Growth Management Etement. ln 2OO4 voters approved Measure J which continues the one-half cent sates tax for an additional 25 years.
*
Donations/Contributions programs in the Town.
-
This Fund receives miscellaneous donations for various
CAPITAL PROTECTS FUNDS CapitaL Projects Funds are used to account for the financial resources acquisition and construction of major capitaI facitities.
to be used for the
{.
Capitat lmprovement Program General Purpose Revenue Fund - This Fund receives appropriations from the General Fund, based upon the poticy discretion of the Town Counci[, and is used to fund any high priority capitat project.
*
Civic Facitities Capitat Projects Fund - This Fund receives appropriations from the Generat Fund, based upon the poLicy discretion of the Town Councit, and is used to fund new civic facitities such as the Danvitl.e Library, Community Center, Viltage Theatre improvements and the Veterans' MemoriaL
Hatl..
*
Development lmpact Fees - Fees and charges cottected through AB 160O to mitigate impacts associated with new devetopment. Examples include SCC Regional and SubRegional fees, Park in-tieu fees, Chitd Care fees, Transportation lmpact Fees, Commercial Transportation lmpact Fees and Downtown Parl<ing in-tieu fees. AtL devetopment impact fees are coltected and tracl<ed in their own respective segregated accounts.
*
Park Gapitat Projects Fund - Parl< in-tieu fees paid by new development and outside grants for park development are deposited into this Fund for parl< capital improvements.
{. Asset Replacement Funds - General - Contributions
are made into this Fund from the Generat Fund and setected Speciat Revenue funds for the eventual replacement and refurbishment of vehictes, technotogy infrastructure, heavy equipment and office equipment.
.E Asset Reptacement Fund - Library/Community Center - Contributions are made into this Fund from the General Fund for the eventual replacement and refurbishment of the Library/Community Center and retated assets.
ffi
I1fj
r,'u *'-,1lrr rvt I l, -,-rr.g,rr
Fund Structure ĂĽ
Special Assessment District Capital, Projects Funds - During the period from 1985 to t99o, the Sycamore Vattey Assessment District (SVAD), Tassajara Ranch Assessment District (TRAD) and the Northeast Roadway lmprovement Assessment District (NERIAD) were formed within the Town of Danvilte to construct improvements in these areas. These three capital projects funds are used to account for the funds allocated for capitat improvements of the assessment districts. Construction is complete in the SVAD and TRAD, with the remaining funds being used for ongoing capitat improvements and maintenance. Certain capital projects have yet to be compteted in NERIAD.
DEBT SERVICE FUNDS Debt Service Funds are used to account for financial resources payment of, principal and interest on general long-term debt.
*
to be used for, and the
Former Community Development Debt Service/Successor Agency Fund - ln 2011, the former Community Development Agency was dissolved and the Successor Agency was created. Future revenues to the Successor Agency are limited to the amounts that are on the approved biannual Recognized Obtigation Payment Schedute submitted to and approved by the California Department of Finance. These funds wi[[ continue to pay for outstanding debt obligations associated with the 2o01 and 2oo5 COPs, the 2oo1 TRBs and the 2OLL Re-entered Cooperation Agreement.
TRUST AND AGENCY FUNDS Trust and Agency Funds are used to account for assets hetd by the Town in a trustee or agent capacity for individuals, private organizations, other governments and/or other funds. The monies deposited into these funds are not avaitable for municipal use.
ffi
*
Employee Deferred Compensation Plan - This Fund is used to account for assets hel.d for emptoyees in accordance with lnternal Revenue Code Section 457. This program allows employees to defer a portion of their salary until future years. The deferred compensation plan is voluntary, and the proceeds are not avaitable to employees until termination, retirement, death or unforeseeabte emergency. This P[an is administered by Lincotn National Life lnsurance Company, and is self-directed by each emptoyee.
*
Emptoyee Defined Contribution Pension P[an - This Fund is used to account for assets hetd for emptoyees in accordance with lnternal Revenue Code Section 4o1(a). The pension p[an, which is entireLy emptoyer funded, covers atl. etigibte employees. This Ptan is administered by Lincotn National Life Insurance Company, and is self-directed by each emptoyee.
l7
!)
tvrlrr'.tl;rrrvr Ilr ., ;r.gtlr
Fund Structure
ffi
*
Deposits Fund - This Fund is composed of money temporarity deposited with the Town. Examptes of deposits inctude cash improvement bonds posted by developers, performance bonds posted by contractors, and rentat deposits.
*
Speciat Assessment District Agency Funds - During the period from 1985 to 199O, the Sycamore Vatl.ey Assessment District (SVAD), Tassajara Ranch Assessment District (TRAD) and the Northeast Roadway lmprovement Assessment District (NERIAD) were formed within the Town of Danvitte to construct improvements in these areas. These agency funds are used to account for the special assessments levied on atl property within the Assessment Districts, and subsequentty paid against each Assessment District's long-term debt. The bonds of these Assessment Districts are payabte sotety from the annuaI special assessments. As of September, 2O15, the SVAD, TRAD and NERIAD bonds have matured with atl, property secured obl.igations ful,l,y paid.
I80
l
rvir'.,1',r,r,rll, -, l,.g,rr
M"jor Revenue Sources TAXES Property Tax - A tax based on the assessed value of reat and personal, property. Danvitte receives about 7.60/o of the to/o real property tax which homeowners pay. ne go property tax limit is set by Proposition 13. Since FY 2oo4-05, the State enacted revenue swap for 67Vo of the Motor Vehicl.e License Fees is considered property tax.
-
Redevelopment Property Tax Trust Fund (RPTTFì RPTTF revenues are received by the Successor Agency in amounts that meet annual debt obl.igations plus administrative costs as approved by the State. Property Transfer Tax - A tax imposed upon the transfer of real property, charged at a rate of 5o.Ss per $1,ooo of property vatue. Homeowner Tax Retief - The State grants homeowners up to a 57,OOO exemption against the assessed valuation when computing the real property tax if the owner occupies the dwel.l,ing. The State then reimburses cities and other tocat governments for their tax [oss. Sales and Use Tax - A tax tevied on goods and services at the point of sate. Sales tax in Danvi[[e is 8.25o/o, of which one percent(to/o) is returned to Danvilte.
Transient Occupancy Tax (TOT) - A tax levied on hotel room rentat income, to compensate [oca[ governments for additionat services to tourists. Danvitl.e's TOT is charged at a räte of 6.5o/o.
Franchise Tax on Utilities - A tax tevied on gross receipts generated by PG&E and TV cabte companies doing business in Danville for their use of Town's streets (right-of-way). The tax is tVo on PG&E and 5o/o on cabte companies. Tetephone companies are exempt by state taw.
Franchise Fee on Sotid Waste - A fee levied on gross receipts generated by sotid waste disposal companies doing business in Danvitle for their use of the Town's streets, currentty set at tOo/o of the gross receipts. Motor Vehicte ln-Lieu Fee (MVLF) - The Town portion of the total motor vehicle license fees cotlected throughout the State. Distributed to cities on the basis of poputation. During Fy 2oo4loï the State permanently reduced the MVLF by 670/o, and swapped the portion of revenues due to [oca[ agencies for property tax. As of FY zOLtltZ, "VLF in Excess" fees, altocated under R&T 11005(b), are altocated to [oca[ government by the State. Att other VLF fees were traded for Gas Tax.
-
Each city and county in Catifornia receives a portion of the gasoline tax cottected throughout the State, based upon a complex formuta using poputation and street miles. Gas Tax
Business license Tax - An annual tax imposed on businesses operating within Danvitle, generating gross receipts of Sto,ooo or more per year. The fee is generally 5roO, ptus Sfo per futt time employee.
ffi
lfil
r,r'rvir'.t1, r rr,¡ I lL -t ;r.gor
Major Revenue Sources FEES
AND CHARGES
Development lmpact Fees - Fees imposed upon buitders/devetopers under AB 1600, for the privitege of developing a parcel, of Land and thus reatizing a profit. These fees are generatty col.tectãd during the buitding permit process and are used to defray the cost of operating the Town's devetofment servicès functions, as we[[ as improve the Town's infrastructure that wil,t be used by new and current residents. The Fee Schedule that sets the rates is reviewed annuatty by the Town Councit. Development impact fees inctude fees for development ptanning, dãvelopment engineering, buitding permit processing, buitding ptan checl<ing, park dedication, chitd care, and storm water potlution controt. Recreation Rentals - Charges for the rental of Town-owned facitities, such as the Town Meeting Hatl, the Vil.tage Tñeatre, park facitities, sports fietds and tennis courts. These rates are set by the Town Council and are reviewed regutarty. Recreation Program Fees - Fees charged to participants of recreation and enrichment programs to fund the cost of the program. These incl,ude fees for youth, cutturat, and senior service programs. These rates are set by the Town Council and are reviewed regutarly. Parking and Traffic Fines - DanviLl.e uses Contra Costa County as the coltection agent for parkin! and traffic fines. The County retains an administrative fee and remits the batance to Danvitte.
Other Fines - lncl.ude DUl, abandoned vehicte and asset seizure fines. Danvitle uses Contra Costa County as the cottection agent. The County retains an administrative fee and remits the batance to Danvitte. Other Service Charges - Fees charged for miscettaneous services such as police services and financiat documents. These rates are set by the Town CounciI and are reviewed regularly.
MISCELLANEOUS REVENUES Grants - Federal or state government funds distributed for specific purposes, most typicatty on a reimbursement or cõmpetitive basis. Examptes incl.ude FEMA (disasters), ISTEA (roads), and Measure J (transportation).
lnterest lncome - lncome earned on invested cash. Danvitte is timited in the types of securities which it may invest in, regutated primarity by state law and locat poticy. Rentat lncome - Rent on property other than those used for recreational purposes. Examptes include revenue from celtular leases and rentat of real property for commercia[ use.
Contributions
-
Contributions from individuats
or
businesses, generatty
for a specific
purpose.
ffi
IU2
tt s'rr'.,11urt,tIl, , lt.go.
Mnjor Revenue Sources A55E55MENTS DISTRICTS Lighting and Landscaping Assessment District - An assessment Levied on homeowners to be used onty for operation, maintenance and improvements to the Town's street tighting and roadside and park landscaping. The assessment varies, depending upon the benefit recéived, and is collected on the property tax rol[. Assessment rates are approved by the property owners through a battoting procedure specifÌed by Proposition 218, and are l,evied annualty by the Town Councit.
Stormwater Pollution Control Program Assessment District - An assessment tevied on homeowners to be used onty for operation, maintenance and improvements of the Town's Stormwater Potlution Controi Program. The assessment is cotlected on the property tax ro[[. These rates are set by the Town Council and are rêviewed annuall.y.
Speciat Assessment Districts - To mitigate development retated impacts associated with development in certain areas of the Town, Speciat Assessment Bonds were sold and repaid through special assessments tevied against homeowners in those areas. The special. assessments were coltected on the tax ro[[ to be used only for the repayment of the special. assessment debt. These bonds were not an obtigation of the Town. The Town acted only as an agent to facilitate the cottection and payment of debt. The Town administers three Special. Assessment Districts, inctuding the Sycamore Val.tey Assessment District, Tassajara Ranch Assessment District (TRAD) and the Northeast Roadway Assessment District (NERIAD).
ffi
I
ft:ì
s'rvr\'.tl;irrvr IlL .i ;r.gtlr
Glossary Appropriation - An authorization by the Town Councit to mal<e expenditures and incur obtigations for a specific purpose. An appropriation is usualty timited in amount as to the time it may be expended Assessed Vatuation - A dottar value ptaced on real estate or other property by Contra Costa County as a basis for tevying property taxes.
Assessment Bonds - Debt issued by an Assessment District to finance [oca[ infrastructure improvements. Property owners are assessed for the benefit to their properties and make periodic instatlment payments to pay the debt service on these bonds. Assessment District - A group of property owners organized to finance the construction of infrastructure such as water, sewer or street improvements, or maintenance of [oca[ improvements such as landscaping, community facil,ities and street tighting. Typicatly, assessment bonds are sold to finance the capital costs of infrastructure construction projects. Annual assessments on the property owners are used to pay debt service on assessment bonds, or maintenance costs for operating expenditures. Asset - Resources owned or hetd by a government, which have monetary vatue.
Asset Replacement - A budget category which budgets all equipment having a unit cost of more than 55,ooo and an estimated useful tife of over one year. Capital. Outtay is budgeted in the operating budget.
Audit - A review of the Town's financial and accounting records and supporting documents by an independent auditing firm to substantiate revenues, expenditures, year-end funds, reserves and cash on hand.
Beginning/Ending Fund Balance - Resources avaitabte in a fund from the prior/current year after payment of the prior/current year's expenses. This is not necessarily cash on hand. Bond - A city may raise capitat by issuing a written promise to pay a specific sum of money, catled the face vatue or principal amount, at a specified date or dates in the future, together with periodic interest at specified rates.
Bond Refinancing - The payoff and re-issuance and/or bond conditions.
of bonds, to obtain better interest rates
Budget - A financiat pl,an tisting an estimate of proposed appropriations or expenses and the proposed means of financing them for a particular time period. The budget is recommended until it has been approved by the Town Council. Budget Message - A general discussion of the recommended budget as presented in writing by the Town Manager to the Town Councit.
ffi
t
fl4
,.'rt,tr'.,l,rt rt,r 11, ., ;,.g,rr
Glossary Capital Asset - Assets such as buitdings, machinery, furniture and other equipment that are of significant vatue and that have a useful Life of more than one year. Capital assets are atso calted fixed assets.
Capital lmprovement - A permanent addition to the City's assets, incl.uding the design, construction or purchase of [and, buildings, fåcil.ities or major renovations to these. Capitat lmprovement Program (ClP) - A mutti-year capital improvemenr pl.an inctuding project prioritization, identified funding sources and recommended expenditures. The Town's CIP ptans for five years and is updated annually. Capitat Projects - Physicat/infrastructure improvements general"Ly with a cost of Sto,ooo or more and a usefut tife of one year or more. Examples inctude a new parl<, building, streets and roads. Consumer Price lndex (CPl) - A statistical description of price levets provided by the U.S. Department of Labor. The index is used as a measure of the increase in the cost of l"iving.
Contingency - A budgetary reserve set aside for emergencies and unforeseen expenditures not otherwise budgeted. Contracted Services - Services rendered by private firms, individuats, or other governmentat agencies. Examptes inctude maintenance, plan checlç and professionaI consulting services.
Debt Service
-
Payment of the principat and interest on an obl,igation resuLting from the
issuance of bonds or notes.
Debt Service Requirements - The amount of money required to pay interest on outstanding debt and required contributions to accumutate monies for future retirement of term bonds.
Deficit - An excess of expenditures or expenses over resources or revenues. Designation - A budgetary reserve set aside for a specific project future time.
to be undertal<en at a
Emptoyee Benefits - Contributions made by the Town to meet commitments or obl.igations for the Town's share of costs for the aol(a) Defined Contribution Retirement P[an and medicat i nsu rance whil.e emptoyed. Encumbrances - An obtigation to pay funds, the expenditure of which has not yet occurred. They cease to be encumbrances when the obl.igations are paid or otherwise terminated.
Expenditure - The payment of cash on the transfer of property or services for the purpose of acquiring an asset, service or settling a [oss.
Fiscal Pol,icy - A government's policies with respect to revenues, spending, and debt management as these retate to government services, programs and capital investment.
ffi
I tì:-r
\\'\\'\\'.rlrìr rvi | ìr
.(
lì.g(l\
Glossary Fiscal poticy provides an agreed-upon set of principtes for the ptanning and programming of government budgets and their funding. Fiscal Year (FY) - A twetve-month period of time that runs from
luty
1
through June 3O.
Fixed Asset - Assets of significant vatue and having a useful tife of more than one year, such as buitdings, machinery, furniture, and other equipment (al,so cal,ted capitat assets).
Futl,-Time Equivatent Position (FTEI - The number of regular futl.- and part-time positions emptoyed Uy tne Town, converted to the decimal equivatent of futt-time positions based on 1950 hours per year. Fund - An independent fiscal and accounting entity used to record all financial transactions retated to the specific purpose for which the fund was created.
Fund Batance - As used in the budget, the amount of financiat resources available for use. Generatly, this represents the cumulative batance of al,t the annuat operating surpluses and deficits since the fund's inception.
GovernmentaI Accounting Standards Board. A private, non-governmentaI organization that is the source of generatly accepted accounting principtes used by State and GASB
-
Local governments.
General Fund - The general operating fund of the Town, used to account for atl financial resources except those required to be accounted for in another fund. The major revenue sources for this Fund are property taxes, sates taxes, franchise fees, unrestricted revenues from the State, fines and forfeitures and interest income. Goals - The expected result or achievements of a budget program.
Grant - Contribution or gifts of cash or other assets from another governmental entity to be used or expended for a specific purpose, activity or facility.
-
Monies appropriated from one fund to another to finance the operations of another fund or to reimburse the fund for expenses and overhead.
lnterfund Transfers
Municipat Code - A code containing atl Town Councit-approved ordinances currentty in effect; and defining Town standards for areas such as ptanning, zoning, building, etc. Annuat appropriation of funds for on-going service detivery costs, incl.uding-salaries and benefits, services and supp[ies, debt service, and capitat outlay.
Operating Budget
-
Operating Expenses - Expenditures for materials, suppties and services which are ordinarity consumeã wiihin a fiscaL year and which are not incl,uded in program inventories. Operating Reserve - A reserve against the General Fund balance which coul.d be used in the cise of Jfinancial emergency. The Town's policy is to reserve 2Ùo/o of the fiscat year's Generat Fund operating expenses.
ffi
Itì(r
*'rvs'.,llrr rvt lÌ, .r';t.gtr.
Glossary Operating Revenues - Funds received as income to pay for ongoing operations, including sources such as taxes, assessments, fees for services, interest income, and operating grant revenues. Ordinance - A format tegistative enactment by the Town Council, and included in the Municipat Code. lt is the fu[[ force and effect of Law within Town boundaries untess preempted by a higher form of [aw. An ordinance has a higher l'egal standing than a resolution. Overhead Attocations - A cost necessary for the functioning of the organization as a whole, but which cannot be directly assigned to one program. Examptes include the attocation of tegaL financia[ and personne[ services.
Pavement Management Program maintained pubtic streets.
- An ongoing
program
to repair and resurface
Town-
Personnel - FutL-time, part-time and temporary emptoyees of the Town, inctuding overtime, and att emptoyee benefits such as heatth insurĂŁnce and retirement. Program - A group of retated activities performed by one or more organizational units for the purpose of accomptishing a function for which the Town is responsible. Redevel,opment Property Tax Trust Fund (RPTTF) - With the passage of ABxl 26 in FY 2011l.2, property tax increment was etiminated and replaced with Redevetopment Property Tax Trust Fund revenues, which are received by the Successor Agency in amounts that meet approved annuaI debt obtigations.
Propositions 4 and 111- Laws that create a restriction on the amounr of revenue which can be appropriated in any fiscal year. The timit is based on actual appropriations during the !978-79 fiscat years and is increased each year using the growth of poputation and inflation. Not atl revenues are restricted by the limit, only those which are referred to as "proceeds of taxes". Reimbursement - Payment of remittance on behal,f of another party, department or fund. Reserve - An account used to Legatl.y segregate a portion of the fund balance for a specific use.
Resotution - A special order of the Town Council which has a tower lega[ standing than an ordinance Revenues - Amounts received for taxes, assessments, fees, permits, licenses, interest, intergovernmental and other sources during the fiscaI year. Service levellndicators - Services or products which comprise actual or expected output of a given program. Focus is on results, not measures of workload.
Study Session - A meeting of the Town Councit to review the draft Operating Budget and Capital.lmprovement Program in detait, prior to the budget hearing and final. adoption.
ffi
1ll7
rvrlrr.,1lrrrr,,rIl,, ;r-gor
ffi
l88
\\'\\,\\'.(lirr r\/r lle.( ir.g()\'
Town of Danville
Master Fee Schedule For User and Cost Recovery Fees Fiscal Year 20l7ll8 Ordinance No. 98-06 Resolution 52-2017
Adopted by the Danville Town Council June 6,2017 Effective July 1,2017 Development Services and Community Development Fees Effective August 7,2017
Master Fee Schedule 2017 118 MISCELLANEOUS Fee For Service $0.20 per sheet $50 per hour
Photo Copies Records Search
$2 per sheet $90 per document
Plan Size Copies
Off-Site Document Retrieval Fee
Administrative Citation Late Fee
s2s s200
Hartz Avenue Banner Permit Street Light Pole Banner Permit Electrical Vehicle (EV) Charging Station Feรง
sl00 $0.30 per kwh
CITY CLERK Fee For Service Notary Public City Clerk Certification Certified Copy
SlO/signature
Records on Flash Drive
$1
$1O/document 55 first page, $3 each additional page
FINANCE Fee For Service Town Financial Planl
s25
Town Comprehensive Annual Financial Reportl
s25
Business License Name Listing
s2s s2s
Business License Verification Letter
Retumed Payment Item Retumed Payment Item (second time)
s25 $3s
Other Business License fees per Ordinance 93-3
tThe
Torrn Financial Plan, the Town Comprehensive Annual Financial Report and the Town's Municipal Code are available on the Town's web site at www.danville.ca.gov
1
Master Fee Schedule 2017 118 POLICE Fee for Service Accident Reports
$5 each
Alarm Response Fee
No Fee $50
-
S300 Booking Fee Reimbursement Disturbance Call-back Failure to Obey Sigrr/Marking Fingerprinting (Livescan) Fingerprinting (ink and card) Oversized Vehicle Restricted Parking Towed Vehicle Release Trespass on Public Grounds Non-Resident Child Seat Inspection
first offense
second offense
$150
A.B.C. Letter for One Day Sale Permit
-
third offense thereafter
s3s County Charge $60 per hour/officer for second or more calls $4s $30 plus agency fee as required $10 per card $60 $4s
$l
l0
$2s
No Charge
Downtown Employee Parking Permits Zone
No Fee
7
Zone2
&3
DUI EmergĂŠncy Response Reimbursement
$5O/year
Personnel Cost
Officer:
$127 .35lhr.; S7 4.56 Overtime
Sergeant: Sl44.4l lhr.; $87.39 Overtime Fees Assessed by Outside Agencies
Actual cost to include but not limited to the following: Lab Costs to include: Urine Test Breath Test
Blood Test Blood tĂš/ithdrawal Services Toxicology Analysis to include: Acid,/Neutral Drug Screen Basic Drug Screen Comprehensive Drug Screen
Specialty Drug Screens Rush Analysis
2
Master Fee Schedule 2017 118 RECREATION, ARTS AND COMMUNITY SERVICES Resident Fee for Service Comm un ity Facilities (Resident)
Group lll Nonprofit
Group
lV
Private
Group V Group Vl Commercial Government*
Danville Gommunity Genter Valley Oak & Las Trampas Valley Oak Las Trampas Room
Kitchen Arts & Crafts Room Lounge Bandstand
Town Green Hourly Town Green Daily (fee based on use)
$ls7
s222
$140 $40 $68
$193
$s2
5272 s244
$el $80 $20 $34 $12 $12 $34 $23 $82
s24 s24
$74 $3s $35
$68 $4s $164
$5s $210
$64 $76 $40 $40 $76 $67 8263
$44
$62
$72
$23
$se
$86
$120
$30 $21 $33
s74
Library Mt. Diablo Room
Town Meeting Hall Auditorium
Village Theatre Art Gallery Hourly Ratel2 hour min. Pre-Production/Load-in Rate Ticket Surcharge
542
$s4
$66 $49
$84 $65
$67 $117 s88
Actual
Actual
Actual
Actual
$s7
s74
$70
$104
$98 $133
sl40
$le3
9244
$68 $60
574
$76 $120 $40 $28
$30 $34 $80 $34 $30 $12 $e
$2s
Veterans Memorial Building Main Hall (Small) Main Hall (Medium) Main Hall (Large) Kitchen (fee based on use) Classroom - Senior Wing Arts & Crafts - Senior Wing Conference Room
s24
$86 $35
$19
s24
$140
$193 $34 $s3 $86
Oak Hill Park Commun¡ty Genter Banquet Room Room (Small) Rooms (Medium) Rooms (Large) Kitchen (fee based on use) Large Grass Area Hourly Large Grass Area Daily (fee based on use)
5244 S44
$80 $12
fi77
$21
$30
s72
$r20 s74
$ss
$67
$33 $23
$210
s263
$82
$125 $834
$157 $1,070
$3 12
fi622
$12s $834
$157 $1,070
$3 12
$120 $806
$130 $1,036
st,27t
$104 s468 $70
$125
$139
$52
$5ls
$s42
s229
$76
977
$34
824 $41
$s9 $66 $4s $164
Hap Magee Ranch Park Swain House
Full Facility Hourly Full Facility Daily (fee based on use) Cottage Full Facility Hourly
Full Facilþ Daily (fee based on use)
$71
s622 $71
$36
$36
Magee House
Full Facility Hourly Full Facility Daily (fee based on use) Meadow Meadow Hourly Meadow Daily Gazebo
*Applicable to govemment agencies.
3
$164
$60 $403
Master Fee Schedule 2017 118 RECREATION, ARTS AND COMMUNITY SERVICES Non-Resident Fee for Service
Group
Gommunity Facilities (Non-Resident)
lll
Group
lV
Nonprofit Private
Group V Group Vl Gommercial Government*
Danville Community Center Valley Oak & Las Trampas Valley Oak Las Trampas Room
Kitchen
Arts & Crafts Room Lounge Bandstand Town Green Hourly Town Green Daily (fee based on use)
$191 $169
s273 s236
$s0
$65
$el
se2
$335 $300 $80 $9s
$44 $44
$s0 $s0
sez
$e5
$80 $20 $34 $12 $12 $34
$83
$23
$329
$82
$85 $30 $30 $85 $56 $20s
$70
5264
$ss
877
$e0
$23
$zs
$108
$150
$30
$s2
$67
$83
$l0s
$21 $33
Library Mt. Diablo Room
Town Meeting Hall Auditorium
Village Theatre Art Gallery Hourþ Ratel2 hour min.
$61
$81
$83 $146 $110
Actual
Actual
Actual
Actual
$71
$e2
$86 $169
st29
$123 $166 $300 $9s
Pre-Production/Load-in Rate
Ticket Surcharge
$2s
Veterans Memorial Building Main Hall (Small) Main Hall (Medium) Main Hall (Large) Kitchen (fee based on use) Classroom - Senior Wing Arts & Crafts - Senior Wing Conference Room
s44
$1s0 $s0
$30 $34 $80 $34 $30 $12
s24
$30
s35
$e
$169 $30
$300
$80 $12
$e3 $83
$33 $23
$82
s8s $75 $30
$236 $e2 $108
Oak Hill Park Gommun¡ty Center Banquet Room Rooms (Medium) Rooms (Large) Kitchen (fee based on use)
$sl
Large Grass Area Hourly Large Grass Area Daily (fee based on use)
$s6
$236 $44 $67 $108 $90 $70
s205
s264
$329
s88
Room (Small)
$7s $83
$ss se4 s150
$21
$30
Hap Magee Ranch Park Swain House
Full Facility Full Facilþ Cottage Full Facility Full Facility
Hourly Daily (fee based on use)
s778
$157 $1,043
$196 $1,338
$3
Hourly Daily (fee based on use)
$88 $788
$1s7 $1,043
$196 $1,338
$3
$1,008
$163 $1,295
$20s $1,589
$403
$129 $58s $88
$157 $64s $84
$174 $678 $97
$52 $229 $34
$36
l2
$36
l2
Magee House
Full Facility Hourly Full Facility Daily (fee based on use) Meadow Meadow Hourly
$ls0
Meadow Daily Gazebo
*Applicable to government agencies.
4
$60
Master Fee Schedule 2017
118
RECREATION, ARTS AND COMMUNITY FACILITIES Resident Fee for Service Comm unity Facilities (Resident)
Group lll Nonprofit
Group
lV
Private
Group V Group Vl Commercial Government*
Town-Managed SRVUSD Facilities Baldwin Elementary School
Multi-Use
Room
Diablo Vista Middle School Community Gym Los Cenos Middle School Community Gym Monte Vista High School Community Pool
Lifeguard
Tennis Courts A, B, C & Tennis Courts E, F, G &
D H
San Ramon Valley High School
Tennis
Courts
N/A SRVUSDT SRWSDI N/A SRVUSDT SRVUSDT N/A SRVUSDT SRWSDT N/A SRWSDT SRWSDT N/A $21 $21 $6/hour $81hour $lO/hour N/A SRWISDT SRVUSDT N/A
SRVUSDT
SRVUSDT
SRVUSDT SRVUSDT
SRVUSDI SRVUSDT $21
$6/hour SRVUSDT SRVUSDT
tRate based on the San Ramon Valley Unified School District Fee
Park Facilities Group Picnics
Diablo Vista, Hap Magee Ranch, Oak Hill, Osage Station & Sycamore Valley
Half Day per Table Sports Fields/Courts (hourly) Tennis Courts Bocce Ball Courts
Baseball/Softball Baseball with Grass Infield Soccer Other (hourly) Snack Shack (Sycamore Valley & Diablo Vist¿
Lighting Litter and Special Maintenance
$17
$20
$3s
$9
$6 $10 $10 $20 $10
$8 $1s $15 $30
$ll
$ls
$23
$6 $10 $10 $20 $10
$30
$43
822
s22
$s9 822
$48
$48
$23 $23
$44
$48
AllUses/ Groups
Miscellaneous Fees Security/Cleaning/Damage Deposit (refundable) Community Facilities (including meadow and grass areas) Group Picnics up to 150 Group Picnics over 150 Sports Fields
*Applicable to government agencies
5
$50O/ea.
$82lea. $124/ea. $250/ea.
s29 822 s48
Master Fee Schedule 2017 118 RECREATION, ARTS AND COMMUNITY FAGILITIES Non-Resident Fee for Service
Group
Gomm unity Facilities (Non-Resident)
lll
Group
lV
Group
V
Group Vl
Nonprofit Private Gommercial Government*
Town-Managed SRVUSD Facilities Baldwin Elementary School Multi-Use Room Diablo Vista Middle School
N/A SRVLISDT SRVUSDT N/A SRWSDT SRVUSDI N/A SRVUSDT SRWSDT N/A SRVUSDT SRVUSDT N/A S21 $21 $6/hour $8/hour $10/hour N/A SRWSDI SRWSDT
Community Gym Los Cerros Middle School Community Gym Monte Vista High School Community Pool
Lifeguard
Tennis Courts A, B, C & D Tennis Courts E, F, G & H San Ramon Valley High School
Tennis
Courts
N/A
SRVUSDT
SRVLJSDT
SRVUSDT SRVUSDT SRVUSDT SRVUSDT $21
$6/hour SRVUSDT SRVUSDT
tRate based on the San Ramon Valley Unified School District Fee
Park Facilities Group Picnics Diablo Vista, Hap Magee Ranch, Oak Hill, Osage Station & Sycamore Valley
Half Day per Table Sports Fields/Courts (hourly) Tennis Courts Bocce Ball Courts
Baseball/Softball Baseball with Grass Infield Soccer Other (hourly) Snack Shack (Sycamore Vly
$21
$2s
$44
$9
$6 $10 $10 $20 $10
s8
sl0
s14
$13 $13
$19
$2s
$38 $19
$29 $29 $5s
$13
& Diablo Vista)
$30
Lighting Litter and Special Maintenance
822 $48
Miscellaneous Fees Security/Cleaning/Damage Deposit (refundable) Community Facilities (including meadow and grass areas) Group Picnics up to 150 Group Picnics over 150 Sports Fields
*Applicable to government agencies.
6
sl9
sl9
$43 s22 $48
$s9 822 S48
AllUses/ Groups $500/ea. $82lea.
Sl24lea. 8250/ea.
s29 $22 $48
Master Fee Schedule 2017
118
RECREATION, ARTS AND COMMUNITY FACILITIES Miscellaneous Fees (cont.)
All Uses/Groups
Facility Attendants Attendant - Minimum 2 hours Attendant Overtime Box Office Attenclant Theatre Technician Theatre Technician Overtime
$24lhour $48/hour $24lhour $24lhour $48/hour
Equipment P.A. System
$43lhour
Screen (Portable)
$12luse
Flip Chart
$I
Overhead Projector Cocktail Tables Wooden Chairs or \iVhite Ceremony Chairs Piano Piano (weekend use)
$12luse
5/use
S1O/use
$3/each $50/use $100/use $12luse $28luse $28luse $32luse $28luse $28luse $100/use $37leach
Umbrellas dStands
TViDVD Table Top Lectem Full Length Lectern Additional Microphones with/without Stands Portable Hand-held Microphone Sound Unit Additional Sound Equipment (2 microphone/2 monitors) Follow Spot (including operator) Moving Lights - Theatre Moving Lights * Theatre (weekend use)
S27luse
$50/use $500/use
Lighting Design Fee
Faci I ity Reservations/Perm its Photography/Fi lming Permit Change Request Unscheduled Rental Use Insurance Administration Cancellation Charge Less than 30 days Less than 60 days Non-resident Surcharge
$342 S1S/each
Two times hourly rate $17lbooking $77 minimum of rental fee 50olo of rental fee
100o/o
s0
Sports Alliance Soccer/Lacrosse Fields Baseball/Softball Fields
$5.7O/hour $3.5O/hour
Adult Soccer
$26.70lhour $132lhour
Equipment Removal
7
Master Fee Schedule 2017 118 DEVELOPMENT SERVICES - Planning Environmental
Assessment
Fee Additional Fees
Initial Study leading to standard Declaration of Environmental $1,500 Significance (ND) Consultant fee to prepare EIR plus
Environmental Impact Report (EIR)
33%
Initial Study leading to Mitigated Negative Declaration Environmental Significance (MND) Consultant prepared Mitigated Negative Declaration Environmental Significance
of
$2,210.25
$130 hourly after 17 hours of staff
work
of
Consultant fee to prepare MND plus
33%
Notice of Exemption Projects
$s0
$50 to County Clerk with Notice Determination
of
Notice of Determination Department of Fish & Wildlife Notice of Determination Fee for $2,216.25 ND or MND Department of Fish & Wildlife Notice of Determination Fee for
EIR
Subject to annual increase in January
ofeach year
$3,079.25
to
Notice of Determination for County Clerk and remainder
F&W
$50
Development Plan Conceptual or Pre-submittal
$900
$130 hourly after 7 hours of staff
work Administrative - to include minor Scenic Hillside Public Hearing
-
Residential
-
Residential
$600-$1,200
-
Minor Projects
$5,100
-
Larger or More Complex
$7,650
$130 hourly after 40 hours of staff
work Public Hearing Public Hearing
$130 hourly after 60 hours
ofstaff
work
Projects
* Non-residential Minor
Projects
$5,100
$130 hourly after 60 hours of staff
work Public Hearing
-
Non-residential -Larger and/or More Complex $7,650
Projects
$130 hourly after 60 hours
ofstaff
work
Public Hearing- Scenic Hillside or Major Ridgeline
- Minor
$5,100
$130 hourly after 60 hours
Projects
work
Public Hearing - Scenic Hillside or Major Ridgeline - Larger $7,650 andlor More Complex Projects Fublic Hearing-Final Development Plan Processed with PUD $1,350
$130 hourly after 60 hours
ofstaff ofstaff
work
Application Public Hearing - Final Development Plan Processed with Application or as an amendment
Administrative
-
Single
PUD
Family
55,100
$130 hourly after 40 hours
ofstaff
work $2,400
$130 hourly after23 hours
ofstaff
work Second Dwelling Unit
-
Administrative
-
over 1000 sq.
ft.
$2,400
$1
30 hourly after 23 hours of staff
work
Traffic Study Review
$67s
I
Per Review
Master Fee Schedule 2017 118 DEVELOPMENT SERVICES - Planning Land Use Permit
- Recurring RequestĂ&#x2020;vent Use - Initial Request/Event
s0-$450
Temporary/Seasonal Use
$I
Temporary/Seasonal
$300-$600
Large Family Child Care Facility (8-14 childrcn)
$1,800
Temporary Mobile Home Minor Project without Public Hearing Minor ltem with Public Hearing
$1,200
Child Care Facility (>14 children)
$5,100
Congregate Care Facility
$5,100
$4s0-$900 s2,250 $130 hourly after 17 hours of staff
work $130 hourly after 40 hours
ofstaff
work 5130 hourly after 40 hours
ofstaff
work Major ltem with Public Hearing
$9,900
$130 hourly after 76 hours of staff
work Telecommunication Permit requiring No Public Hearing
$3,300
$ 130
hourly after 25 hours of staff
work Telecommunication Permit requiring Public Hearing
$5,100
$130 hourly after25 hours
ofstaff
work Telecommunication - Permit Extension Traffic Study Review LUP combination with other permit
$900 $350 per review after Znd review $600
I
Master Fee Schedule 2017
118
DEVELOPMENT SERVICES - Planning Subdivision Major Subdivision
-
Smaller and/or Less Complex Projects
Fee
Additional Fees
$5,100
$130 hourly after 40 hours
ofstaff
work
Major Subdivision - Larger and/or More Complex Projects
$7,650
Traffic Study Review
s97s
Minor Subdivision
-
Smaller and/or Less Complex Projects
$5,100
Minor Subdivision
-
Larger andlor More Complex Projects
$7,650
$130 hourly after 60 hours
ofstaff
work Per Review
$130 hourly after 40 hours
ofstaff
work $130 hourly after 60 hours
ofstaff
work Time Extension for Major or Minor Subdivision
$750
Rezoning PUD * Rezoning - for
$6,600
Smaller and/or Less Complex Projects
$130 hourly after 51 hours
ofstaff
work PUD
-
Rezoning
-
for Larger and/or More Complex Projects
$9,900
$130 hourly after 76 hours of staff
work
Traffic Study Review
s97s
Per Review
Rezoning - to standard Residential, Office, Industrial
$5,100
Sl30 hourly after 40 hours ofstaff work
Commercial ZoningDesignation
-
Minor Project
$5,100
Rezoning - to standard Residential, Office, Industrial - More Complex Project Commercial ZoningDesignation
-
More Complex Project
$9,900
$130 hourly after 40 hours
ofstaff
work $130 hourly afrer 76 hours of staff
work $9,900
$130 hourly after76 hours
ofstaff
work
Variance Commercial or submitted in conjunction with other
application
Single Family Residence Processed as Administrative Permit Complex - Moderate - Simple Public Hearing
$450-$900
$1s00 $r 1s0 $800
s2,250
10
For projects appealed to/or refered to Planning Commission for action Sl30 hourly after l1 hours ofstaff
work
Master Fee Schedule 2017
118
DEVELOPMENT SERVICES - Planning
Fee
Sign Freestanding sign (with or without Design Review Board
Additional Fees
s600
review) Fee per each face copy change not requiring Design Review
s22s
Board review Sign Requiring Design Review Board Review Master Sign Program less than five tenant spaces Master Sign Program five tenant spaces or more
$450-$9s0
Temporary Promotional Sign Permit
No charge
$1,200 s1,500
General Plan Amendment Land Use Designation Change Submitted with PUD Rezoning GPAs - Land Use Designation Change Submitted as StandGPAs
-
$7,650
GPAs
-
Text Amendment
ofstaff
work s12,000
$130 hourly after 92 hours of staff
work
alone Application
Traffic Study Review
$130 hourly after 60 hours
$97s
Per Review
$5,100
$130 hourly after 40 hours
ofstaff
work
Design Review Board Variance Conceptual or Pre-submittal
s7s0
Administrative Minor Commercial New SFR Hillside (Scenic Hillside or Major Ridgeline)
$600-$1,200 s600-$1,200 $3,000
$130 hourly after23 hours
ofstaff
work
NewMFR<5units
s2,700
$130 hourly after
2l hours
of staff
work
NewMFR>5units
$3,600
$130 hourly after 28 hours of staff
work Office, Commercial or Industrial
$3,300
$ 130
hourly after 25 hours of staff
work Consultant fee plus 33% administrative fee Consultant fee plus 33% administrative fee
Special Planning Studies Storm Water Control Plan Review Property Recordings lilot
Parcel Merger
$55
Lot Line Adjustment
$55 1/lot
11
Master Fee Schedule 2017 l1B DEVELOPMENT SERVICES - Planning Miscellaneous Time Extension required
Fee
-
Administrative Action - no site check
Additional Fees
$4s0
Time Extension - Administrative Action - site check and/or COA compliance review required Time Extension - Non-Administrative Action
$900
Appeals
$300
$1,200
Requests for Reconsideration
$1,200
Archaeological Review (Sonoma State Clearinghouse)
$56
ZoningCertificate Letter - Residential ZoningCertifi cate Letter - Commercial ZoningReview of Building Permit
$750
Pass through fee to Sonoma State
$1,200 $130 hourly after initial 2.5 hours of review
File Research
$130 hourly after2.5 hours of staff work
LaserFiche Files
No charge
Newspaper Advertising
$130 plus newspaper publishing cost $0.83 per-piece plus $130 per mail-out
Public Notice by Staff
Protected Tree Removal Permยกt Residential Commercial
s22s s600
Documents Capital Improvement Program
Document
522 Town of Danville Landscape and Irrigation Project Procedures $22 and Standards
Town-wide Trails Master General
Plan
$52
Plan
$30
General Plan Map, Beautification Guidelines, Base
Specific Plan Parks, Recreation and Arts Strategic
Map,
Plan
$7 $45
ZoningMap, Downtown Master Plan, Standard Plan Traffic and Engineering Survey Aerial Photo - Hard copy, upto 42-in x 60-in Aerial Photo - Computer file on CD or E-mail
12
$15 $3
$15 S3
Master Fee Schedule 2017 118 DEVELOPMENT SERVยกCES - Engineering Service Map Check
Fee 2-l0lots -52,320 + $219l1ot
Improvement Plan Check
>10 lots - $4,557 + $33/1ot 3.5% ofproject cost <=$50,000
landscaping work
3.25% of project cost >$50,000 3.0% ofproject cost >S100,000
Engineering Inspection
5.5% ofproject cost <=$50,000
Inspection of installation of streeto drainage and
5.25o/o of project cost >S50,000
landscaping improvements
5.0% ofproject cost >S100,000
Review of improvement plans - street, drainage and
& <=$100,000
& <=S100,000
Street Lighting
Operation of public street lighting system Encroachment Permit For work within the public right-of-way For Public
Utility Companies
One year operational cost + l0olo $179 for projects <=$2,000; 5.57o ofconstruction cost for projects >$2,000
$89.50/hour
Valet Permit
sl79
Oversize/V/ide Load Permit
$24
Drainage Permit
Sl79 for projects <:$2,000; 5.50lo of construction cost for projects >$2,000
For work within any public or private drainage
Grading Plan Check
Under 50 cy: $196. More than 49 cy: $196 + Percentage Construction Cost + Volume Fee Percentage of Construction Cost: $0 to $lo,o00 use 0.5% $10,001 to $100,000 use l.0olo $100,001 and greater use 1.5%
Volume Fee:
to 1,000 cy: $0.98 per 100 cy 1,001 to 10,000 cy: $0.21 per 100 cy + $196 (for soils report review) 10,001 or greater: $0.65 per 100 cy + $1,074 (for soils report review) 50
Grading Permit
Under 50 cy: 538.60 to 100 cy: $60.
l0l to 1,000 cy: $60 for first 100 cy plus $29 for each additional 100 cy to 10,000 cy: $316 for first 1000 cy plus $24 for each additional 1000 cy 10,001 to 100,000 cy: $529 for first 10,000 cy plus $107 for each additional 10,000 cy 100,001 cy or greater: $1,496 for first 100,000 cy plus $60 for each additional 10,000 cy 1001
13
of
Master Fee Schedule 2017 118 DEVELOPMENT SERVICES - Engineering Grading Inspection
Fee
Under 50 cy: $196 More than 49 cy: $196 + Percentage of Construction Cost * Volume Fee: Percentage of Construction Cost: $0 to $10,000 use 2.0%; $10,001 to $100,000 use 1.5%; $100,001 and greater use l.0olo Volume Fee: 50 to 1,000 cy: $9 per 100 cy 1,001 to 10,000 cy: $99 + $4 per 100 cy 10,001 or greater: $505 + $2 perl00 cy
Finish Grading lnspection Single family residential lot Multy family/Commercial Project
$81
198 per building
Deposit
Debris/Clean-up $325 per acre paid permit A deposit shall be at issuance fo assure the clean-up of the site and/or public right-of-way. This deposit shall be returned to the applicant if it can be determined at certification of occupancy that the site and surrounding areas have been restored. NPDES
(National Pollutant Discharge Elimination System) Prevention of Drainage Runoff Pollutant Residential $56
Storm Water Control Plan Review Underground Service Alert
Utility Location
Multi-residential $228 Commercial S464 Consultant Fee plus 33% Actual Cost (California Government Code 4216.5)
Fee
Base Map Revision
Revision of Town computerized Base Map Photography/Film ing Perm it Certificate of Conection or Amended Map Revise a recorded document Vacation of Right-of-Way or Easement Process a request to abandon a public right-of-way or easement
$94 for each new or revised lot or parcel
s342 $196 per document $2,1 l 6
14
Master Fee Schedule 2017 118 DEVELOPMENT SERVICES - Building
Building Permits Building Permit Fee
Fee As permitted by the California Building Code - shown in table
below Electrical Sub-Permit Plumbing Sub-Permit Mechanical Sub-Permit Swimming Pool, Spa or Hot Tub Permits
20% of building permit fee 17% of building permit fee 18% of building permit fee Equivalent to building permit plus any required electrical or plumbing permits
Plan Review Structural and Architectural Plan Review PlumbingĂ&#x2020;lectrical/Mechanical Plan Review
65% of building fee 55% of structural/architectural plan review
Master Plan Verification Review (subdivisions)
lSy"of structural/architectural plan review2
Planning Division - Plan Check Engineering Division - Plan Check (Includes Storm Water Review)
$150. Over $100,000 valuation, $300 $100. Over $300,000 valuation, $300
lnvestigations As determined by Chief Building Official
Fees AssessĂŞd by other Agencies
Not to exceed $1,000
Actual Cost
Building Permit Fee Table Total Valuation $1.00 to S500 $501 to $2,000
Fee
$23.s0 $23.50 for the first $500 plus $3.05 for each additional $100, or fraction thereof, to and including $2,000
$2001 to $25,000
$69.25 for the first $2,000 plus $14.00 for each additional $1,000, or fraction thereof, to and including $25,000
$25,001 to $50,000
8391.25 for the first $25,000 plus $10.10 for each additional $1,000, or fraction thereof, to and including $50,000 $643.75 for the first $50,000 plus $7.00 for each additional S1,000,
$50,001 to $100,000 S100,001 to $500,000
$500,001 to $1,000,000
or fraction thereot to and including $100,000 $993.75 for the first $100,000 plus $5.60 for each additional $1,000, or fraction thereof, to and including $500,000 $3,233.75 for the first $500,000 plus $4.75 for each additional ,000, or fraction thereof, to and including $ I ,000,000 $5,608.75 for the frrst $1,000,000 plus $3.15 for each additional $1,000 or fraction thereof. $I
$1,000,001 and up
15
Master Fee Schedule 2017 118 DEVELOPMENT SERVICES - Building Established Fees
Fee
Minimum Permit fee
$109
Kitchen Remodel/Alteration - Non Structural Bathroom Remodel/Alteration - Non Structural Powder Room Remodel/Alteration Residential Window Replacement Permit
$710
$s20 s330 $109 each (l-2 windows) $225 (3-13 $325 (14 - 26 windows) $430 (27 or more)
Residential Patio Door Replacement Permit Residential Home Demolition Permit Pool and/or Spa Remodel Pool Demolition Permit
$109 each (2 or less) $180 (3 or more) $480
$s20 $29s
Detached Storage Shed - with no trades Standard Residential Re-roof Permit
$275 (not to exceed 250 square feet)
Fumace and A/C Replacement Permit
$186
Water Heater, Furnace, A/C Replacement
$109/ea.
Photovoltaic Residential Photovoltaic Non-Residential
$290
s29s
ll3 of
1%o
of total valuation ($475 minimum)
Administrative Fees That Apply to All Permits Strong Motion Instrumentation Program
Residential Contmercial
0.013% of valuation (minimum $0.50) 0.028% of valuation (minimum $0.50) $1 per $25,000 oftotal valuation 0.1% of valuation (maximum $2,000) $10 plus $1 per page
Califomia Building Standards Fee Comprehensive Planning Fee Documentation Fee
Additional Fees That May Apply Inspections outside of normal business hours
$147 per
Reinspection Fees Inspections for which no fee is specifically indicated Additional plan review required by changes, additions or revisions to
$109 minimumr
hourfi] (4 hour minimum)
$109 minimumr $141 per hourl
plans
Permit Reactivation Request for Duplicate Plans Temporary Certificate of Occupancy Investigation fee for work without requisite permit or unauthorized
Determined by Chief Building Official not to
occupancy
exceed $1,000
I Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourĂž wages and fringe benefits ofthe employees involved.
16
$109 (minimum fee)2 $40 plus cost ofcopies $250 (commercial/industrial only)
2 only applies to eligible permits as determined by the Chief
Building Official.
Master Fee Schedule 2017 118 DEVELOPMENT SERVICES - Building Building Permit Valuation Table The unit costs are intended to comply with the definition of "valuation" in Section 223 of the 1997 Uniform Building Coderu and thus include architectural, structural, electrical, plumbing and mechanical work. except as specifically listed below. The unit costs also include the contractor's profit, which should not be omitted. The building permit fee is based on valuation and computed from the table below, approved on June 18,2002 and increased by applying the Engineering News Record (ENR) San Francisco Area Building Cost Index History (1915-201l) index.
Ave
APARTMENTHOUINew I or II F.R1 (Good)
Type
Type V
-
HOSPITALS New
Remodel
$182.09
$89.12
S224.rB $103.56
III) (Good)
$148.63 $182.09
$78.64
Frame (Good) Type I
$78.48
BasmlGarage $76.78
$39.77
l-Hour N Type III: l-Hour Type III-N Type V: l-Hour Type V: N
Type
II:
Tlpe II:
F.R. TypeII: l-Hour Type II: N Type III: l-Hour Type III-N TypeV:l-Hour Type V: N
$83.95
l-Hour Type II: N TypeIII:l-Hour Type III-N Type V: l-Hour II:
N Type III: l-Hour Type III-N Type V: l-Hour Type V: N Type II:
$100.11
s203.26
$99.55
V: l-Hour
$191.56
s92.32
s77.94
$r56.43
$87.86
V:N
$153.36
$73.03
PLANTS
$92.85
$198.93
$91.รณ7
$138.16
$83.21
I or II F.R.r II: l-Hour
$189.69
$89.19
$l16.81
$66.91
s81.32
$61.71
II: N
$74.72
$59.68
s6l.8l
III-N
$84.38
$s9.90
$88.85 $85.12
Bathrooms
$r50.43
$85.65
Basements:
$82.88
$61.59
$55.80
V: l-Hour
$84.38
s6l.4l
V: N
s77.2r
$56.65
up
$41.28
$39.20
(Good)
s47.63
$41.73
I
II F.R.
$326.63
$162.79
$29.97
$24.73
III: l-Hour
s298.72
$155.24
$36.33
s29.71
V: l-Hour
s224.00
$12รณ.88
$234.86
$119.82
$85.38 $82.62
$155.32
Semi-Finished
Unfinished
or
STATIONS: or II F.R.
$238.97
sr2r.20
$85.98
Type
Il: l-Hour
$174.90
$93.10
$83.65
Type
II: N
sr66.29
s87.47
$86.25
Type
III: l-Hour
$184.?7
s93.47
$161.97
$82.65
Type
$
175.53
$85.66
$158.69
$84.62
III-N Type V: l-Hour
s173.47
s92.24
l;150.48
$82.69
'l'ype V: N
$166.29
$79.88
$61.55
FORTHE ELDERLY: I or II F.R. s212.89
$109.80
MEDICAL OFFICES s245.32 Type I or II F.R.r
$133.53
$66.83
II: l-Hour
$172.86
$85.72
II:
$63.46
II: N III: l-Hour
$16s.48
$81.36
$179.87
$95.78
$180.05
$86.00
II: N III: l-Hour
$205.30
$103.86
III-N V: l-Hour
$16r.97
s76.42
III.N
$191.
l4
$96.85
$173.88
$83.39
V: l-Hour
$185.17
$99.94
s167.96
$80.23
V: N
$178.61
$94.91
$l 15.19
II
$123.90
II: l-Hour
F.R.
II: N III: l-Hour
5127.74 $125.20
III.N V: l-Hour
$128.12
$l17.09
$76.78
sl71.2l
$r50.43
1 or
$113.93 $106.54
$91.29
III-N V: l-Hour
$89.53
$128.14
.73
s179.64
III: l-Hour
V:N 597
$98.40
III: l-Hour
s122.46
$137.43
$104.71
Remodel
$207.35
$155.40
(Good)
$304.05 $224.00 $216.80 $24?.18 5238.37 5224.00 $214:53
HOTELS/MOTELS: New
(Major Remodel) Kitchen no structure With structure
$215.17 $101.70
$155.82 $147.39 S163.84 $155.40 $156.66 $146.18
-
Masonry
(Good)
566.22
$65.91
CHURCHES: Type I or II F.R. Type II: l-Hour
$198.32
Type V-Wood Frame
BOWLING ALLEYS: Type
II: l-Hour III: l-Hour
(Good)
BANKS: Type I or II
$139.07
V
$130.98 $168.34
AUDITORIUMS: Type I or II F.R.
Remodel
$87.55
Type V Wood
II F.R.r
&
$285.78
1 or
Masonry
(or Type
re Foot
Gost
$154.58
sl4s.76 $r69.r 7
1
1-Hour
$r89.28
$s9.ss
$203.65 $101.88
Type
$152.95 $145.35 5166.29 $158.89
$76.42
Type V: N
$70.83
HOSPITALS:
576.76
Type I or II F.R.r
$335.04
st 61.43
Type
III: l-Hour
s277.37
s136.47
I or II F.R. II: l-Hour
s219.27
$70.98
s146.79
s98.29
$155.40
576.37
Type
V: 1-Hour
s264.62
$13r.36
II: N
$139.83
$91.76
$146.18
$66.15
III: l-Hour
$158.48
$96.40
III-N V: l-Hour
$151.53
$91.91
$148.45
sgs.26
I Add
0.5% to total cost for each story over three. 2 Deduct 20%" for shell-only permits.
17
Master Fee Schedule 2017 118 DEVELOPMENT SERVICES - Building
Building Permit Valuation Table Average Gost per Square Foot by Occupancy & Type Occuoancv & Tvoe PRIVATE GARAGES: Wood Frame Masonry Open Carports
$t22.46
$35.04
$56.24
$35.37
l0
$23.21
s253.32
$134.63
$205.30
st02.67
$196.28
$98.87
$213.10 $205.69
$105.47 $98.53
$r95.03
$102.28
$188.07
$95.09
$34.
PUBLIC BUILDINGS: Type I or II F.R.r Type
II: l-Hour
Type II: N Type III: l-Hour Type Type
III-N V: l-Hour
Type V: N
PT]BLIC GARAGES:
II F.R.r Type I or II open p Type I or
Type II: N Type III: l-Hour Type Type
III-N V: l-Hour
III: l-Hour III-N
Type V: 1-Hour Type V: N
New
Remodel
5228.29
$136.84
$155.82
$108.08 s108.09
$166.70 $160.34
$94.65
$156.25
$r04.14
Sl4g.O7
$92.35
$137.95
$69.31
$143.93 5122.56
s72.s8 $69.20
857.49
$38.24
$100.37
s57.32
$75.34 $57.49 $75.9s
$53.43
$67.s4 $69.18
$51.16 954.12
$50.87 ss4.79
$199.97 S138.85 $183.13 S134.37 $183.13 $136.82 $175.93 $132.01
AREHOUSESI
II:N III:l-Hour V: l-Hour Canopies
Type Type Type
or
l-Hour rrr-N III:
F.R. l-Hour III-N Type V: l-Hour Type V:N Type Type
III:
$66.14
$60.14 $56.45
s39.64 $38.59
$68.15
s39.62
$64.89
$36.94
CONDITIONING: $8.62
$169'17
$7.1 8
System
porches
$103.46 $101.21 $125.85 $118.05 $105.95
(less than
s79.67
Wall (4' and more))
$77.70 s79.26 $92.06 $78.71
697.92
$75.84
5225.42
st22.t6
5164.24 $156.43
$96.36 $89.24
$154.58 $146.18
$94.48 $80.05
I Add 0.5% to total cost for each story over three. 2 Deduct 20%o for shell-only permits.
18
4')
$91.91
THEATERS: Type 1 or II
Remodel
$101.42
$5.33 s44.25
Wall
F.R.r Type II: l-Hour Type II: N Type III: l-Hour Tยกpe III-N Type V: l-Hour Type V: N Type I or II
New
II F.R. II or V: l-IIr II or V: N
I
SERVICE STATIONS:
STORES:
RESTAURANTS: Type Type
SCHOOLS: ll F.R. Type II: l-Hour Type III: l-Hour Type III-N Type V: l-Hour Type V: N Type I or
s76.19 $142.84 $53.
Trellis/Aยกbor
l0
$26.s4
\'--/
Overview lntroduction The Capital lmprovement Program (ClP) is a capital investment ptan that supports the quatity of tife in Danvitte by providing for the design, construction and renovation of major capitat projects that benefit a broad segment of the community. The CIP is presented as a revolving five-year program that acts as a guide for identifying current and future fiscaI requirements. The current year acts as the Town's annuaI capital budget. Projects in the CIP typicatty include:
. . o .
lmprovements that are debt-financed; Acquisition of [and; Construction of new buitdings, parl<s, improvements or facitities inctuding engineering, design, and other pre-construction costs; whose estimated cost exceeds St5,ooo; Major equipment or furnishings required for new buitdings.
Preparation of the CIP is a coordinated process that includes worl<ing with Town staff and commissions to compite and prioritize a tist of discretionary projects, devetop associated cost estimates and identify potentiaI funding sources. The Town CounciI reviews and approves the draft five-year CIP fottowing a series of pubtic study sessions and a pubtic hearing. Approval of the CIP inctudes appropriating funding for the current fiscaI year.
A number of criteria and/or considerations are apptied in determining the appropriateness of each CIP project, including:
ยก . o o . . ยก
ffi
Consistency with the Town's General Plan, and/or applicabte adopted and estabtished Town poticies; Benefit to the broader pubtic good and positive benefit to cost ratio; PotentiaI impact upon Town operating expenditures; The need to meet State, Federat or other tegal mandates and requirements; The need to mitigate an identified health or safety probtem; Consideration of geographic equity in providing improvements and facilities throughout the Town; and The need to batance project design, management and inspection with availabte CIP staffing.
CIPI
ir't's'.r1;rr rt,t llt.r-,,-!or
vervlew SummaryTables A five-year summary of al,t projects, funding sources and expenditures is presented within the foltowing tabtes:
Project Activity Currently active next-in-t¡ne projects New Projects New projects - 2Ot7lL8 Tabte Summary of Planned Appropriations - 2oL7lt$ Tabte Summary of Recommended Generat Purpose Revenue Appropriations -20 17118 Summary of Appropriations by Funding Source - zotT lLB Tabte 2021-122 Tabte Summary of Completed Projects from the prior fiscat year Tabte Summary of Estimated Fund Activity Tabte Projects funded prior to 2otT ltÙ Tabte Project Status and Priority - Priorítized ronking (Priority l through Priority 5l of all projects included ín the CIP Project Cost Summary by Park Site Tabte Project Cost Summary by Buitding Site Table Project Cost Summary for Downtown Projects Tabte Proposed Green lnfrastructure Projects Tabte Tabte Projects contributing to the Pavement Condition lndex
A B
C
-
D E F G
H I I K L
Pavement Management Program
The Pavement Management Program inctudes a tisting of all, pavement projects compteted in the prior year, pavement projects recommended for the current year and a tabte (Tabl.e L) tisting other individual CIP projects that contribute to the Pavement Management Program by providing improvements to existing paved streets. CIP
Projects
Potential CIP projects are classified into one of three categories: General lmprovements, Parks and Facilities or Transportation. Each project is presented on a dedicated project page that summarizes:
o . o . . o o
ffi
Project name and number Description, rationate and tocation Estimated cost, funding sources and prior expenditures
lnitiatingdepartment Project manager Project status ("ngw", "in progress" or "comp[ete") Changes from prior year
(]IP2
.r'n
rt'.,1lrr rtrt
Il, .t-l,.gor
vervlew Project costs are escatated (where appropriate) to indicate the impact of inftation on construction costs in future yeôrs, based upon a five percent annual rðte of inftation (untess more specific information was available). Cost escatation ensures that adequate funding is identified ðt the time the project is approved. Project Appropriations reftect funding amounts and sources attocated through formal Town CounciI action; Project Cost Estimates summarize prior, current and future year expenditures.
Funding Sources CIP projects are
funded and financed through a variety of revenue sources that are set aside, or received by the Town. These inctude: GeneraI Purpose
The Town Council annualty sets aside a portion of the total Generat Fund revenues received, and transfers these revenues into one of four funds that are used for CIP purposes. These include the:
o . . .
CtP General Purpose
- typical,ty appropriated and expended for any project or
improvement with no restrictions; Civic Facitities Fund - typical.ty appropriated and expended for construction, expansion or improvement of buitdings; Park Facitities - typicatty appropriated and expended for park or park facil.ity construction, improvement or expansion; and Pavement Management - appropriated and expended in combination with other speciat revenue funds received by the Town to maintain and upgrade the condition of the pavement associated with pubtic streets.
Speciat Purpose and Mitigation Funds
Speciat Purpose and Mitigation revenues are restricted to certain uses and are tracked and accounted for in separate funds. Speciat Purpose revenues are cottected either directly by the Town, or through one of severat Joint Powers Agreements (lPAs)that have been estabtished to mitigate specific sub-regionat or regional impacts. Special' Purpose - Town and Mitigation a
a
ffi
-
Chitd Care -These fees are paid by new developments. Expenditures are for the development or promotion of child care facitities within Danvilte. Commerciat TIP - Commercial Transportation lmpact Fees that are cottected and utilized to finance the instatlation of new streets, traffic signals, traffic signat interconnect and parking facitities.
CIlr:l
t'\\'u,.tlrrr n,i | ìr .r';r.gor
vervlew a
a
a
a
a
a
a
a
Lighting and Landscape Assessment District (LtADl - Assessments paid by property owners for street lighting, [andscape and park maintenance. Measure t Return to Source - The 18%o "return to source" share of the one-hatf cent sales tax for transportation purposes approved by Contra Costa voters in 1988 (Measure C) and 2004 (Measure l). The Town utilizes these funds for pavement management and other purposes tied directly to transportation. Receipt of these funds is tied to compliance with the Town's Generat Ptan Growth Management Element. Measure I Expenditure Plan - Another component of the one-hatf cent sales tax program is the Measure J Expenditure Plan (inctuding Major Streets and Contra Costa - Transportation for Livable Communities or CC-TLC). This ZOyear plan represents the Contra Costa Transportation Authority's ptan for capitaI spending on major projects throughout the County. Downtown Parking ln lieu - A development fee providing off-site parking for downtown businesses, by buitding and maintaining publ,ic parking facilities. Park Dedication (Quimby Act) - Atso known as Park Land ln Lieu fees, are paid by new development, including outside grants and transfers in. Residentiat TIP - Residential impact fees cottected in the Town {apart from assessment districts or benefit districts) are used for projects that mitigate the additional burden added to the street system by new devetopment. Town-wide Lighting and landscape Assessment District (LLAD) - Inctudes Transfers ln and property owner assessments from Zones A and B {roadside tandscaping), Zone C (street tighting), and Zone D (parks and buitdings) to be utitized for etigibte capitaI maintenance projects. Other - Other sources inctude donations, funds provided by the CSA R-74 (Contra Costa County), devetoper fees, NERIAD (North East Roadway lmprovement Assessment District), SVAD (Sycamore Vatley Assessment District, including Density lncrease, and Benefit District) and grants. These funding sources represent a significant portion of CIP funding on a cumutative basis. Gas Tax (lnctuding Highway Users Tax Account, and Road Maintenance and Rehabititation Accountf - State provided funding generated from excise and sales tax on fuel and vehicle ticense fees, to be used for transportation, street, and road maintenance purposes.
Special Purpose a
a
-
JPA
Southern Contra Costa (SCC) and Dougherty Vattey - Regional and subregional transportation impact fees coltected and shared by joint agreement between the Town of Danvi[te, City of San Ramon and Contra Costa County. Tri Val,ley Transportation Development (TVDT) - Regional transportation impact fees cotlected and shared by joint agreement between the Town of Danvilte, City of 5an Ramon, and Contra Costa County.
(;IP4
n'*,rr,.,ĂŹlrr rvt I I,..( :ĂŹ.g()\
g
-,,t
5yÉ
F
¡
I
J
t, ry
..
o
lt
p t
Ìtl.
I
¿' È I
!,
,Ít
I I
h
,#,;
l'
)"j
I
i
It
r#
.r''
4
I
F'l
I I I
l.î
4q
I
II
'ç,
I
l1
r
/ i'
)
o
//
úfl!
gflrl \ I
\ \
\
t.l.,
¡
¡'.
, ¡t
1
rr{
.rif,
I
Ì
Èü '
'{
I
'"
i
tt
'rólii l¡'
I
,t,
\
I
ì
,ç
".
,t
!i
t'
o
tt
T
r
,t
I
I
I
t
,t
$ ',
Ð
U) t>1
Project Activity
Pr*
Project Name
(il
: = .t:
Obligated as
Estimate*
of 4-25:2Of'7
Status
Drin#ir¡
A-492 CENTRAL IRRIGATION SYSTEM CAPITAL MAINTENANCE---.--A-513 CAMINO TASSAJARA PKWY/SYCAMORE VALLEY RD SOUND WALL MAINT.--..
Stto,tso
5689.610
Under Const.
Ssot,lzs
Su4.Bs6
Under Const. Maintenance
2/3 0ngoing
A-5¡5 TOWN.WIDE IANDSCAPE REPLACEM ENT4.579 TOWN-WIDE ROADWAY DAMAGE REPAIR------
5z¡l,otg
5g+,rc¡
Under Const. Maintenànce
1/2 Ongoing
B-101 PARK AIID RECREATION FACILITIES CAPITAL MAINTENANCE-------
-
CIP Funding
5z¡,¡tt
Under Const. Maintenance
3/4 Ongoing
5r,zs¡.¿eg
Under Const. Maintenance
2 ongoing
B-216 TOWN SERVICE CENTER CAPITAL MAINTENANCE.----------.-.:--
ists/++z
s116,968
Under Const. Maintenance
2 Ongoing
B-415 C]VIC FACILITIES CAPITAL MAINTENANCE PRO]ECTs---
5616,016
ísot,øgz
Under Const. Maintenance
2 ongoing
B-491 LIBRARY AND COMMUNIW CENTER CAPITAT MAINTENANCE-
s86s,460
Ssgâ,rao
Under Const. Maintenance
2 Ongoing
B-553 VIttAGE THEATRE CAPITAL MAINTENANCE---
Szso,ar¡
5zt,+zz
Under Const. MaintenðncÊ
2/3 Ongoing
c-017 TOWN-WI DE SIDEWALK REPAIRS----c-545 TRAFFIC SIGNAL CONTROLLER UPGRADE----------
Slos,lzt
Stzs,ztl Stot,tzz
Under Const. Maintenance
5 Ongoing
c-552 INTERNALLY ILLUMINATED
Støg,tzo
Ssg,goz
Under Const, Maintenance
5¡z,ooo
526,8s4
Under Const.
4
52,L64,763
Srgo,rgr
Under Const.
tl2
STREET NAME 5IGN LED RETROFIT-------
56s3,321.
Under Const.
2t3 3/4 Ongoing
c-566 TOWN-W|DE B|CYCLE plnKHC PRO]ECT------c-584 DANVILLE VARIOUS STREETS AND ROADS PRESERVATIO c-592 ROSE STREET PARKING
5s,r¡o,goz
5t,an,n+
Under Const.
1
c-595 PAVEMENT MANAGEMENT PROG
S6,022,208
Sr,o5r,ozr
Under Const.
7
*ClP Funding Estimate inctudes prior year appropriations plus current year appropriations, and for muttiphased or ongoing projects, it includes future year proposed appropriations.
Ë
il2
St,s+0,+t'ø
512o,ooo
9J
o412512077
-ì
cr
o (t
(n ,-1
New Projects ProÞosed Appropriations
Pr*
Project
tlame
RACK--A-612 TOWN SERVICE CENTER SLIDE DRAINAGE REPAIR--------
A-608 STARVIEW DRIVE STORM DRAIN TRASH
2o!71L8 $¡¡,OOO 528,OOO
5z¿,ooo
A-613 LOCH LOMOND WAYTRASH
5107,800
A-614 WESTRIDGE TRASH RACK MODI
REPLACEMENT. 582.630 $28O.OOO A-620 FIBER oPTIc cABLË INTERCONNECT 8-6llSYCAMOREVALLEYPARKDRAINAGEIMPROVEMENTS. ---- STZZ,SOO
A.615 CAMINO
ENCANTO AT DEL AMIGO STORM DRAIN
S2o,ooo
8-616 SKATE 8-617 TOWN GREEN MASTER
PLAN--_---
52o,ooo Sso,5oo
8-618 TOWN.WIDE WAYFINDING AND DIRECTIONAL SIGNAGE
8-619
-
GREEN VALLFY'ÍRAIL FROM HIGHBRIDGE I.ANE TO DIABLO
ROAD--------
5o
C-607 IRON HORSE TRAIL RAISED CROSSWALKS AND FLASHINC BEACONS-----------.
57o,ooo
C.609 TOWN.WIDE BICYCLE MAsTER
Szs,ooo
c-610
pAVEMENT
MANAGEMENT--------
-----52,600,000
20t8lL9 20L9120
5o 5o 5o 5o So 5o 5o $o 5o 5o 565,000 5o 5o 5o 5o 5o 5o 5o $o So Szr,ooo 5o
5216,000
5o
5o
5o
2020121
202L122
5o
5o
Total Pdotity $¡¡,ooo 712
4
5o
5o
528,ooo
5o
5o
J cr
524,ooo
!12 1
Sroz,eoo il2 582,630 1,12
$o
$o
5o
5o
5o
5o
$o
5o
$o
5o
5o
5o
5o
5o
52o,ooo tl2 Szo.ooo Llz $so,soo 213
5o
5o
s2tooo
$o
5o
5o
So
53,ooo,ooo 53.ooo,ooo 5¡,ooo,ooo SS,ooo,ooo
5¡¿g,ooo $rzz,soo
2 1
zl3 5286,000 Llz
575,ooo 213 514,600,000 1
TOTALS
o4125120t7
o (t)
U) Table A - Summary of Planned Appropriations Pr* Project Name 4.064
LOCAL GENERAL IMPROVEMENTS - DISABLED
?1Êac
LICENSE PLATE READER & SITUATIONAL AWARENESS CAMERT
A-608 STARVIEW DRIVE STORM DRAIN TRASH A-612 TOWN SERVICE CENTER SLIDE DRAINAGE REPAIR-.-...-A-613 LOCH LOMOND WAY TRASH D ^rv
A-614
WESTRIDGE TRASH RACK MODIFICATIO
4.615 4.620
CAMINO ENCANTO AT DEL AMIGO STORM DRAIN REPLACEMENT-
B.TOI
PARK AND RECREATION FACILITIES CAPITAL
2OtT I L8 Planned Appropriations
SSo,ooo ResidentialTlP
^
A-350 TOWN-WIDE STORM DRAIN SYSTEM MANAGEMENT. A-482 STREET LIGHT MAINTENA A-514 PUBLIC PLACES FOR A-579 TOWN-WIDE ROADWAY DAMAGE REPAIR---
A'606 AUTOMATED
,-1
5¡o,ooo
CIP Gen Purpose..Rev, Cleanwater Program
Szo,ooo 56o,ooo SrS.ooo 565,600
LLAD Zone C CIP Gen Purpose Rev CIP Gen Purpose Rev CIP Gen Purpose Rev
53¡,ooo CIP Gen Purpose Rev 5z8,ooo CIP Gen Purpose Rev Sz4ooo ClPGen Purpose Rev $ro7,8oo CIP Gen Purpose Rev 582.630 CIP Gen Purpose Rev 528o,ooo P.E.c.
FIBER OPTIC CABLE
MAINTENANCE-------
5¿r,ooo ParkFacilities
PrioriÇ
Fì
1/2 Ongoing
rJ
2 Ongoing
3/4 2/3 3/4 1/2
Ongoing Ongoing Ongoing 712 712 1
tl2 tl2 2 2 Ongoing
B-12O TOWN-WIDE TRAI
$¡9,ooo
Park Dedication lmpact
2/3 Ongoing
B-216 TOWN SERVICE CENTER CAPITAL MAINTENANCE--------.
S29.o00 CIP Gen Purpose Rev SzS,ooo Park Dedication lmpact
2 Ongoing
-
B-280
-l
B-328 TOWN OFFICES CAPITAL MAINTENANCE---.-B-400 HAP MAGEE RANCH PARK CAPITAL MAINTENANCE------:----------------:------. B-415 CIVIC FACILITI E5 CAPITAL MAINTENANCE PRO]ECTS-_-
5PO RTS FIELD
RENOVATION-------------
B-452 SYCAMORE DAY SCHOOL BUILDING REPAIRS----B-491 LIBRARY AND COMMUNITY CENTER CAPITAT MAINTENANCE-.-..---. B-493 SYNTHETIC TURF REPLACEM
8-494
B-495 SYCAMORE VALLEY PARK CAPITAL MAINTENANCE------.--
B-544 OAK HILL PARK CAPITAL MAINTENANCE B-556 DANVITLE SOUTH PARK CAPITAL MAINTENANCEB-560 DIABLO VISTA PARK CAPITAL MAINTENANCE 8-s82 VETERANS MEMORIAL BUILDING CAPITAL MAINTENANCE----..---
8-597 B-611
51o,0oo
CIP Gen Purpose Rev
581,0OO Grant Asset Repl.cmnt Library
----------:
56.000 Pðrk Facilities SlS,ooo Park Facilities Sre.ooo ParkFacil.ities Sros,ooo Civic Facitities
2 Ongoing 2 Ongoing
2/3 Ongoing 2 Ongoing 2 Ongoing 2 Ongoing
2/3 Ongoing 2/3 Ongoing 1/2 Ongoing 2 Ongoing
Fund
IMPROVEMENTS------55,16o,ooo CIP Gen Purpose Rev PARK DRAINAGE IMPR0VEMENTS---_--.-. 5172,500 Park Facil,ities
VILLAGE THEATRE PARKING LOT SYCAMORE VALLEY
2 Ongoing 2 Ongoing
2/3 Ongoing
SSS,ooo Park Facitities 59o,ooo civic Facilities Fund
B-553 VILLAGE THEATRE CAPITAL MAINTENANCE-.-
MAINTENANCE-
53o.ooo Civic Facilities Fund
Szzs,ooo Park Facitities 53o,ooo ParkFacitities Szz,ooo ParkFacilities
OSAGE STATION PARK CAPIIAL MAINTENANCE--
B-559 SCHOOL PARK FACILITIES CAPITAL
53r,ooo Civic Facilities Fund 5s3o,ooo R-7A, Park Facitities
2/3 Ongoing 3/4 Ongoing 1 1
Continued on next page o4125120t7
; .J:
Ë
Ongoing
--ì
cr
o (t)
(n
Ð Pr*
20t7lt8
Project Name
Szo,ooo Szo,ooo
B-616 SKATE B-617 TOWN GREEN MASTER
8-618 TOWN-WIDE WAYFINDING AND DIRECTIONAL SIGNAGE-*--c-o17 TOWN-WIDE SIDEWALK REPAIRS---.-c-418 TRAFFIC SIGNAL AND STREET LIGHT MAINTENANCE PROGRAM-.----
c-s62 c-584
TRAFFIC SIGNAL INTERCONNECT
5Y5TEM---------
DANVILLE VARIOUS STREETS AND ROADS PRESERVATION
c-588 BATTERY BACKUP REPLACEMENT c-598 PARK AND RIDE EXPANSION
FOR TRAFFIC
SIGNALs-**--
c-599 LA GONDA WAY BRIDGE IMPROVEMENÏS--_------
c-600
SAN RAMON VALLEY BOULEVARD IMPROVEMENTS (NORTH)------
c-602 DANVILLE BOULEVARD IMPROVEMENTS------__c-607 IROÑ HORSE TRAIL RAISED CROSSWALKS AND FLASHING BEACONS_--*c-609 TOWN-WIDE BICYCLE MASTER
c-610
PAVEMENT MANAGEM
tl2 tl2
Park Facilities Park Facitities
Szo,ooo
LlÂD Zone
51o,ooo
Meas
5to48,ooo Meas
Rtrn to Src
C
Major Arterial.s Rtrn to src
518,ooo Meas I
3 Ongoing 2 Ongoing
TIP
C
I
3 Ongoing 712 3
S1,825,ooo TVTD ResidentiaL TVTD CommerciaL Meas Meas I-CC-TLC (2017) S196,3s0
Grant, CIP Gen Purpose Rev
58t2¿7s
Meðs
J Sub Trans
712
Meðs J Rtrn to Src 5z5,ooo Meas l-CC-TLC (2017)
Szo.ooo
Meas
I
Rtrn to Src, CIP Gen
L 712
5+tø,ssø Meas J Major St 24c
52,6oo,ooo
28c,
tl2 tl2
I Major St 24c
zl3 Rev, Gas Tax
1
ô
: = a
.Ii
F)
Fl
2ts
Sso,soo CIP Gen Purpose Rev, CIP Gen Pur Reatlocated
5¡o,ooo CommerciaI TlP, ResidentiaI
;-¿
Priority
Ptanned Appropriations
o4l25l2017
4
J ct
Þ.)
o ct)
Ð
U) (;ì i
Table B - Summary of Recommended General Purpose Revenue App ropriations ProDosed
Appropriations
Pr*
ô
Project Name
20t7lLB
20L8lL9
A-330 A-514
TOWN-WIDE STORM DRAIN sYsTEM MANACEMENT-
Szs,ooo
Szs,ooo
PUBLIC PLACES FOR
S6o,ooo
5o
4.579 4.606
TOWN-WIDE ROADWAY DAMAGE REPAI
5r5,ooo
$r5,ooo
AUTOMATED L]CENSE PLATE READER & SITUATIONAL AWARENESS CAMERAS--
56s,ooo
56s,ooo
A.ó08
STARVIEW DRIVE STORM DRAIN IRASH
$¡¡,ooo
5o
Szg,ooo
5o
524.ooo SroT,eoo
5o So
D_-
A.6U
TOWN SERVICE CENTER SLIDE DRAINAGE REPAI
A-613 A-614
LOCH LOMONDWAYTRASH WESTRIDGE TRASH RACK
4.615
CAMINO ENCANTO AT DEL AMIGO STORM DRAIN REPLACEMENT-
8-216
TOWN SERVICE CENTER CAPITAL MAINTENANC
$82,630 5z9,ooo
8.452
SYCAMORE DAY SCHOOL BUILDING REPAI
51O,0OO
5¡o,ooo Slo,ooo
5¡,r6o,ooo
5o
MODIFICATION------
8.597 VILLAGE THEATRE PARKING LOT IMPROVEM 8-618 ÏOWN-WIDE WAYFINDING AND DIRECTIONAL SIGNAGE----C-599 LA GONDA WAY BRIDGE IMPROVEMENTS----------------C.610 PAVEMENT MANAGEMENT--------------
TOTAIS
$o
$so,soo
So
5¡t,¡so
56oo,ooo Sr,Too,ooo
51,8oo,ooo
Ê)
Proposed Future Appropriations
2019120 2020t2t 202il22 S25,ooo Szs,ooo 5z5,ooo
TOTAT
512s,ooo
5o $o Sr5,ooo Srs,ooo
5o 5o
5o 5o $o 5o 5o 5¡o,ooo Slo,ooo 5o 5o 5o
So Sgs,ooo 5o 52g,ooo 5o 5z4,ooo 5o 51o7,Boo 5o 582,6jo $o 58g,ooo So S3o.ooo 5o 5j,r6o,ooo So Sso,soo 5o S6j1,3so
$60,000 560,000
56s,0oo S6s,ooo S6s,6oo
5o 5o 5o 5o 5o 5o So 5o So 5o
SszS,ooo
Sr,zoo,ooo 5r,7oo,ooo Sr,zoo,ooo 58,600.000
$5,52r,880 $¿¿¿s,ooo 51,845,600 51,805,óOO
Sr,ZSO,OOO
$t3n¿og,z¡o
o412512017
e I'
4
-ì lu
cr
o ct)
U) Tabte C - Summary of Appropriations by Funding Source
).
Proposed Appropriations
Prior Years
Funding Sources
Library----
Asset Reptcmnt
s664,460
Sgtt,tt+
CIP Gen Pur Reallocated
5¡g,tz\oe+
CIP Gen Purpose
Fund-------
Civic Facitities
Cleanwater Program----------
CommercialTl Gas
Tax-----
LLAD Zone
Meas C Major
ô
Arterials-----
Meas
I Maþr 5t a r.?--
Meas
I
Rtrn to 5rc-------------
Meas ISub Trans Meas I-CC-TLC
t
28c------
-------'--------
20771------
OBAG 11tsÉR (2017
grant)--------
lmpact---Park FacilitiesResidentiaI
$sr,ooo Stz,ggz
Szs,sll,zzz
55,488,888 5z56,ooo
s879,9L3
5s.ooo
Sr,ssg,rgr St,ts4,ozg
57,ooo S2oo,ooo
5862,9s3
Srgs,ooo
s687.104
5¿o,ooo
5o
Sto4a,ooo
$goa,o¿o
51.228,811
Sg,ztl.stl
S698,000
S2oo,ooo
Sso,ooo
5o
Sr,szs,ooo
So
5o
5266,o43
S280,ooo
SS.¡0o,zsr
S6¿ooo
--5rO.Zer,SOr
5889,s00
P Ê
Park Dedication
20t7lL8
-
Sr,rse,rzs 5t,9o7,4t7
Szos,ooo 5z3,ooo
TVTD
Conrmerciat---------
5o
Sroo,ooo
TVTD
Residentia[-------------
5o
Srog,ooo
20t8lL9 20t9120 202012t S¡o,ooo 5¡o,ooo Sgo,ooo
5o
5o
52,884J7s 5L86s,6oo
5o
51,900.685 Ssz,ooo
5g¡,ooo 588,000
Ss,ooo Ss,ooo Ss,ooo 5z.ooo 5z,ooo 5z,ooo Szoo,ooo Szoo,ooo 57oo.ooo 5o So '',+lo,tgo $¿o,ooo Szo.ooo 5o 5o 5o 5o 50 5o 5t,662,4a6 5600,000 5610.000 5610,000 So 5o 5o 5o So 5o 5o 51,357,000 50 So 56¡,ooo 5o Sao.ooo Sao,ooo
SSo,ooo
S¿zo,soo 5z,oz7,ooo 5r,o9z,ooo
Szs.ooo S12,5oo 58z,ooo sa¡,ooo
5o 5o
$o 5o
Srz,soo $8s,ooo 5o 5o
2OZLI22 Totat 5¡o,ooo Srzr,ooo
5o
Ssz,ggz
S1,790,600 5r¡,9¡o,s¿a
53o,ooo
Ss,ooo
S5z¿,ooo
5z5,ooo
5o S28,ooo Szoo,ooo $¡,ooo,ooo 5o $¡,0¡r,rgo $o 51oo,ooo 5o $r,o¿g,ooo 5o Szßgt,zgz 5600,000 S¡,ug,ooo 5o S¡s,ooo So So
5o
Sr,szs,ooo Sr,gsz,ooo
58o,ooo
5¡¿g,ooo
5¡A¿ooo
5z¡z,soo i¡,ttt,soo
Srz,soo
so 5o 5o
S¡zz,soo 5¡z3.ooo 5106,000 Srog.ooo
TOTALS
osl2sl20t7
Ê)
4
-l
Ê)'
cr o (t)
Ð
U) ) ¿
Table D - Summary of Completed Projects from the Prior Fiscal Year Pr#
ProjectName
A-606
AUÏOMATED LICENSE PLATE READER & SITUATIONAL AWARENESS
B-490
05AGE STAT|ON PARK
c-s08 c-58s c.603
ELECTRIC VEHICLE CHARGING STATIONS AT TOWN-OWNED FACI
c-605
Fl
CAMERAS-----|MPR0VEMENTS-----CAMINO TASSAJARA/CROW CANYON SAFETEA-LU IMPROVEMENTS
___
.
DANVILLE AND EL CERRO BOULEVARD PARKING IMPROVEM RAILROAD AVENUE DECORATIVE CROSSWALKS AND PAVEMENT OVERLA
Budgeted
Expended
5T,767J60
5748,664
ss.r¡z,zso
Sz,otg,szt
57,882.745
57,666,t22
Srrs.og¿
Ssa,zoz
5¡¿.ooo
$1s.3Bj
ÊJ
ä
J
Ê)'
ct
S+tg,+oo
o cn
TOTAtS
ô
o4125170L7 a
J:
(n -l
T-e.þ.]e..E..:..S..u-mmEry.sf-.E.çÍ!.mo-ted..Ç!P..E.u.n.d.As.fit¿ity. 20L7lL8 20171!8 20t7lL8 Estimated CIP Funding Budgeted Recommended Estimated
Avaitabte
Sources
Fl
June 5o,2017
Transfers
ln
Project
from
202t122
Year-end
Appropriation Availabte
Proposed Commitments in 2018/19 through
2018119 2019120
CIP
General Purpose
Library--- 5667'294 So CIP Gen Pur Reatlocated---
Asset Reptcmnt
Facitities-
Szz,sgz
S5r,ooo
$ó1ó,t94
Slz,ggz
So
Ss,tst
:at
Fund-----------
53o,ooo 5o
S3o,ooo So
53o,ooo 5o
S1,86s,6oo 588,ooo 5z,o77,ooo
$L900,68s
S1,790,60o
Ssz,ooo
5¡o,ooo
(5z68.ooo)
51,097,00o
Szzt.soo
(5i,oo3,287)
ô
5144.69s
52s6,0oo
$o
52,884775 5s¡,ooo
5L,768,2L3
5o
5ga9,soo
5878,7tt
S47o,soo
$282,s60 52,2s3,449
$o
5o
5o
So
$zoo,ooo
Szoo,ooo
Szoo,ooo
57oo,ooo
(Ss46,5st)
Szaz,soo
5o
5o
5o
Grant---------
Srg5,ooo
5o
Szoo,ooo Srg5,ooo
LLAD Zone
$o
5¿o,ooo
5L,t7s,2s4
$1,048,000 5o
5o
51,575,000
N
5o
S1,228,811
S1,228,811
28c-----
5o
55o,ooo
Debt Service-----
S143,848
5o
519,181 S199,808
5o 5o
Ssgz,zoo
5o
C------------
$s¡s,zso
Meas C Major
Arterials----
5o
Meas J Rtrn to
src--------
Meas J-CC-TLC (zorZ)---Meas I Major St 24c------Meas I Sub Trans NERIAD
NERIAD----. Downtown Pkg ln Lieu---Park Dedication lmÞact---Cteanwater Program---------
5282,560
$o
5s,+3ø,tgo
So
5o
5o
(S5¿36,190)
S¿o,ooo
S2o,ooo
So
5o
5835.286
51.048,00o
$ags,zeo 5o
$o
5o
5o
5o
5o
5698,000
3tls,zst,
56ro,ooo
561o,ooo
5óoo,ooo
56oo,ooo
$t,s44,t+al
51,szs,ooo
5o
5o
5o
5o
5o
$o
So
5o
5o
5o (S1,662,486)
$o
5L,662,486 5o
So
5o
5o
5o
$s3,84E
5o
5o
5o
$o
$r¿¡,9¿a
5o
519,181
5o 5o
5o
$r9g,¡oa
5o 5o
So
5o
5o
519,181 5199,8o8
$64,000
$s¡¡,roo
58o,ooo Ss.ooo
58o,ooo 5s,ooo
SSo.ooo
58o,ooo Ss,ooo
5t,648,12s
5z,ooo S6r,ooo
$z,ooo
Sz.ooo 5o
5o
S16,026
5o
Stzz,zso
S82,ooo
$83,ooo
$8s,ooo
5o
(5223,0Oó)
55o.ooo 5o
5s,ooo
S1,ó68,125
5o
5s,ooo
S213,20o
5t,673,L2s
5o
Sttt 'ozø
so
5z.ooo
ígt,ozø
547s,7s6 599,994
$o
5z8o,ooo
So
S73,ooo
$19s,7só 126,994
5o¡,¡or
5o
5o
5o
So
5o
R-74--------
$o
5o S265,ooo
$o¡.¡or
52ó5,ooo
$o
S25,ooo
$12,500
Srz,soo
512,500
{S62.soo)
5CC Reeionat--
St,zL9,s4t
So
$o
Sr.z49,s L
5o
5o
5o
5o
$o
5o
5o
Mitigation Fees CommerciatTlP
P.E.G.-----Residentiat TIP
Speciat Purpose - JPA Doughertv Vattev
So _
S63,Jo1
t
5ub-Reeiona[-----------
S1L759
5o
5o
S1L739
5o
Commerciat------TWD Residentiat--------
Slo6,zro
5o
gzlo
5o
5o
5o
5o
Srzo,ooo
So
5106.ooo S169,000
SLz+g,st SLt,739 Szro
Sr,ooo
5o
5o
5o
5o
51,ooo
5CC
TWD
Note: The Estimated Year-end Avail.abte amount does not inch¡de appropriations proposed for future years.
t:
So
157,47e1
55,488.888
52,4s2,449
Gas
Ë
r--l 5496,294
53o,ooo 5o
Special Purpose - Town Chitd Care
2021122
Estimated Available
S1,8oo.ooo
Rev-*--'-- 572'123'069 CivicFacitities Fund______. S111,j05 CIP Gen PurÞose
Park
$o
2020121
2o2tl22
o4125120L7
cr
o (t)
Ð
(n
(Tabte
A-362
DOWNTOWN IMPROVEMENT
4443
DrA8L0 ROAD (EAST)
4.558
to ZOLTlLB
DRATNAGE
MITICATION ----_---- 515O.OOO SYSTEM--------- --- sss,¿a¡ PARKING LoT MATNTENANCE---------------.5139,6ó9 HAP MAGEE RANCH PARK SLIDE
TowN FACrLrry SECUR|TY MoN|ToR|NG
A-580
TOWN OFFICE IMPROVEM
B-550
MUNICIPAL SERVICE CENTER WASTE TRANSFER
B-574
VISTA GRANDE STREET/BRET HARTE PARK PEDEsTRIAN IMPROVEMENTS-- 5187,132
8.597
VILLAGE THEATRE PARKINC LOT
c-057 c-392
BRIDGE MAINTENAN
5g¿r,goo
AREA------...-----------
IMPROVEMENTS---*--.
J:
5r¿S,OOO
6.048,700
BLACKHAWK RD./HIDDEN OAK DR./MAGEE RANCH RD. TRAFFIC SIGNAL---.5193,570
c402
EL PINTADO OVERLAY
c-521
WEST EL PINTADO SIDEWALK IMPROVEM
-
Prior
Unexpended Project Project
Appropriations ExpendituresAppropriations Szzl,sga 5t67,493 Srsg,gos tMPRoVEMENTS----------------------- 5 !43,27 5 5o St+t,zls
EL CERRO BLVD. TO
I
ln Design
May 2015
5
Adopred
May 2017
415
Adopted
538,967
2
ln Design
$r¡o,o¡¿
z 0ngoing
ln Design
Sgoz,roo
tl2
ln Design
Srso.ooo
Jan2017 Aug 201
1
5r¿s,ooo Srsz,soz
4
Adopted
Apr 2017
5t+,ozs Sroz.zoo
2t3
ln Design
Apr 2016
5,946,000
t
Adopted
5o
Stgz,llo
5
Adopted
Jan20'17
5s+s,zgt
3
ln Design
Apr 2016
5¡or,o¡g
Srso,grg
5t++ltg
5
ln Design
Sep 2010
ShasJst
5o
5¿ss,¡sz
3
Adopted
Aug 2015
tl2 tl2 tl2
Out to Bid
Aug 2015
ln Design
May 2017
2
Adopted
1
Adopted
DANVILLE VARIOUS STREETS AND ROADS
c.596 c-598
SAN RAMON VALLEY CREEK FOOTBRIDGE AT DANVILLE
PRESERVATION -5gIz,gzl FRONT sTREET CREEK BANK STABILIZATION----5678,578
5o
5gs¡,0¿o
$rge.rgr
Stso,tto
Srso,so¡
$¿O¿,ZSO
5o
5+sz,otø S¿o4zso
Szoo,ooo
5o
Szoo,ooo
$fl,zrr,oog
Fl
4
-l
P
ct
5o
sAN RAMON VALLEY BOULEVARD I.ANE ADDITION AND OVERI.AY (SOUTH).5953,04ó
PARK AND RIDE EXPANSION
Status
2
$rrs,¿sr
c-578
GREEN--------
5o
Szo,srz 5s,o¡s 5¡g.zoo
Priority
Project Estimated Start
5t øo,lt¿
c-584 c-593
TOTAIS
a
,-¿
Prior
Project Name
A-540
qJ
Projects Funded Prior
Pr#
A-530
a)
F-
ln Design
o CN
U) ('
Ð
lFr
TabLe G - Project Status and Pr*
;-¿ CIP
VILLAGE THEATRE PARKING LOT
FACILITY---IMPROVEMENTS--------
ROSE STREET PARKING
8.611
SYCAMORE VALLEY PARK DRAINAGE
C.61O PAVEMENTMANAGEM LOCH LOMOND WAY TRASH
PARKAND RIDE EXPANSION PRO]ECT--
v STARVIEW DRIVE STORM DRAIN ÏRAsH RAC tA GONDA WAY BRIDGE IMPROVEM WESTRIDGE TRASH RACK MODI
ô À
STABILIZATION------_
IMPROVEMENTS------.--
C.6OO sAN RAMON VALLEY BOULEVARD IMPROVEMENTS (NORTH).---
C.6O1 CAMINO RAMON IMPROVEM
A.ó04 C.594 C.055 C.607 A-535 A-064
$o 50
5902,100 IAC/ln Plan/Design
5¡¡,ooo
SJ/ln Ptan/Design
54,686,549 Sl/ln Ptan/Design
5o 5o
5107.800 SJ/ln Plan/Design 5gS¡,0¿O Sculn Ptan/Design
528,ooo Dc/Notstarted 5689,610 58r'r¿oJT/underconst. 582,630 NNS/ln Ptan/Design 5416.536 NNS/NotStarted
582,630 s+tø,slø 58t2,275 s!,977,486
5O 5o $O 50
58L2,275 sJ/Not Started
51,971,486 NNs/Notstarted 5261,335 Sculn Plan/Design
5z0g,zøo 5l,gzs
LAUREL DRIVE BIOTREATMENT FACI STUDENT PARKING AT SAN RAMON VALLEY HIGH
SCHOOL"---
DIABLO ROAD TRAIL FROM ALAMEDA DIABLO TO TANK ACCEss IRON HOR5E TRAIL RAISED CROSSWALKS AND FLASHING
TOWN-WIDE LANDSCAPE REPLACEMENTLOCAL GENERAL IMPROVEMENTS - DISABLED
ROAD----_-
BEACONS-----.--.-'
Sr,¿so,ooo 5o Sr,¿so,ooo ¡AC/underconst. 5z'ozl,6.gt S0 52,037,691TJWNotStarted 5zg0,ooo 5o 5286.000 AD/Notstarted s247,049 Sgtt,t'+
5152,884AR/UnderConst. Maintenance
B.ó17 TOWN GREEN MASTER
iløs,lso Ssos,zos NNs/Maintenance 51,686,000 5o Sr,oso,ooo Scuon Hold S2o,o0o So Szo,ooo HRP/Notstarted 5z:.,ooo 5o S21,ooo HRP/Notstarted
Suhfnt¡l
$50,750,200 $5,892,2¡m $44,857,960
8.420 8.616
A.362 A.540 A.558 B-559
ACCESS----.
FRONT STREET CREEKSIDE SKATE
TOWN FACILIW SECURITY MONITORING PARKING LOT
57,275,455
s¿ge.ezo Stfi,ast
DOWNTOWN IMPROVEMENT
58o,ooo
sYsTEM----
S20,517
Sttg,lo+ ig,oss Szlt,uo 5+t,lo+
MAINTENANCE---.--_-
SCHOOL PARK FACILITIES CAPITAL MAINTENANCE-
*ClP Funding Estimate inctudes prior year appropriations ptus
SlZt,lZl
FK/ln Ptan/Design CP/on Hotd
Sss,¿A¡ 5L39,669 NNs/ Maintenance 5226,806 JJl Mai ntenance
curent year appropriations, and for muttiphased or on-
going projects, it inctudes future year ProPosed appropriations.
.J:
5¡¡,ooo s4,68654O S1o7,8oo 5gSl,O+0 Sllo,lso
MAINTENANCE---_.
CAMINO ENCANTO AT DEL AMIGO STORM DRAIN REPLACEMENT. DANVILLE BOULEVARD
Sl,eßJo+
SrZz,Soo 5o SrZZ,Soo lT/Notstarted 5r¿,0oo,ooo 5o 5r¿,0oo,oog NNS/ln Ptan/Design S24,0oo 5o 524,000 DC/ln Ptan/Design 5z,oz5,ooo 5o Sz,ozs,oo0 sl/Notstarted
S28,ooo 5o
TOWN SERVICE CENTER SLIDE DRAINAGE REPAIR----CENTRAL IRRIGATION SYSTEM CAPITAL
Ss,stl ,øsz
SEs¡'0oo 5722,784 5230,816 JTl Maintenance Szsz,¿oo 5196,503 SSSS,aS8 SJ/ln Ptan/Design
DANVILLE SOUTH PARK CAPITAL MAINTENANC FRONT STREET CREEK BANK
No7 No1 Not No1 No1 No1 No Llz No tlz No tlz No Ll2 No 1,12
51,644,578 Si/under const.
$g¿r,eoo s¡s,zoo
TOWN 0FFICE IMPROVEMENTS--------:---------------
C-578 sAN RAMON VALLEY BOULEVARD LANE ADDITION AND OVERLAY (SOUTH)-.--.
B-55ó C.593 A.612 A.492 A.615 C.602
Grant PrioriW
Sg,zog,zoo Sroz.zoo 59,ro0,oooSJ/NotStarted
IMPROVEMENTS------_
C.592
A.613 C.598 A-580 A.608 C.599 A.614
Funding Spent as of
Estimate* 4- a+2oa7 Remainder PM/Status
Project Name
8.597
>) Ft
Priority
No 1/2
Ongoing
No No No No No No No No No No Yes
tlz 1,12
tlT Ll2 1,12 1,12
tlz tlz 1,12
Llz
tlz
No L/2 Ongoing No 1/2 Ongoing
No No No
Ll2 LlL !12
No2 No2 No No
2 Ongoing
2 Ongoing
Continued on next page 05125120L7
Ê)
4 -ì Y
c).
o ct)
U)
(Pr* 8.495
CIP Funding Spent as
Project Name SYCAMORE VALLEY PARK CAPITAL MAINTENANCE-.
C.418 TRAFFIC SIGNAL AND STREET LIGHT MAINTENANCE PROGRAM-----C.305 TRAFFIC MANAGEMENT PROGRAM-.---.
8-495 4.620
SYNTHETIC TURF
Saat+go 522r,3t4 Sggz,ors Ssss,sgz
B-4OO HAP MAGEE RANCH PARK CAPITAL MAINTENANCE
C.596 sAN RAMON VALLEY CREEK FOOTBRIDCE AT DANVILLE GREEN-----A-330 TOWN-WIDE STORM DRAIN sYsTEM 8-280 SPORTS FIELD RENOVATION-*---.SERVICE CENTER CAPITAL MAINTENANCE.
8-120 TOWN.WIDE ÎD^lr c
s¡¿¡,ooo
cP/Not Started
Noz
$¡OA,¡Z¡ lPlunder Consr. Maintenance
S+sz,gsl Szol,ozz
5z+g,gtt
58ó5,460
it,st
5Sg¿,rAo ø,++o 51,283,489
Stot,zso
5o S865,119
51.255,630 51.191,458 Sggz,sos
Slt,ozs
Szo,ooo
$o
Szs,ooo Sso,soo
$o 5o
1
$1 0,028,203
5tø,stz
Sst+,oto
5L99,6a9
5169,720
$ss,¡oz
tED RETROFIT-
5ß9/fl
5l t,'Og
HRP/ln Plan/Design Maintenan
S858,892 lJl Maintenance
2 Ongoing
$rzz,0so
No 2/3
Ongoing
No 2/3 Ongoing No 2/3 0ngoing
No 2/3 Ongoing
5SZ0,A0S JTl Maintenance
Yes
BR/ln Ptan/Design
S+ss,zgz Ssso,gas
$us,¿sr
Sso,ooo
527,384
Slos,szl
Stzs,ztz
$o
SZS,OOO AD/Not Started SSO,SOO NR/Not Started SZllAgg KB/Under Const.
213
No 2/3 Ongoing
No No No Yes
213 213 213 213
$r2,33s,369
i¡gfigl
lAc/Not Started
No
3
Mainrenance
No
3
Not Srarred
No
3
5¡gO,f f¿ lPlUnder Const. Maintenance 582,492 AD/ Maintenance 5Zl tr,Z+l FK/ln Ptan/Design Maintenanc S110,418 KB/Under Const. Maintenance
No
3 Ongoing
No
3 Ongoing
5¿¿f,S¡g 5J/ln Ptan/Design 522,6rc AD/ln Ptan/Design
curent year appropriations, and for mul,tiphased or on-
going projects, it inctudes future year proposed appropriations.
2 Ongoing
No 2/3 Ongoing
$rsg,¡o¿
STREET NAME SIGN
No No No
Maintenance
$183,391 HRP/Under Consr. Mainrenanc 581,017 lP/ Maintenance $zo,ooo su
STREET LIGHT MAINTENA
DC
f
5fg¡.ggO tJl
2 Ongoing
Noz
5¿O¿,ZSO SCUNot Started 5¡gO,Sf SJ/ Maintenance
5256,813 Stz,+zz Stsz,tsg Stt,tzz
TRAFFIC SIGNAL INTERCONNECT SYSTEM..-.-----
TOWN.WIDE SIDEWALK REPAI
5262,957 lJlUnder Const. Maintenance
2 Ongoing
No 2/3 ongoing
4.482
BATTERY BACKUP REPLACEMENT FOR TRAFFIC SIGNAL5----.--
NR/Under Cons¿ Mainrenance
5264,7 os JJl Maintenance
$22,363,57
BRIDGE MAINTENAN
tzïo
2 ongoing
5368,304 5103,s99
C.521 C.592 C.588 C.017 C.562
*ClP Funding Estimate inctudes prior year appropriations ptus a
Szol,zls
56E3J2t S¡ot,+zl
WEST EL PINTADO SIDEWALK
Szl
Maintenðnce
2 Ongoing 2 Ongoing
5Sfg,A0S NNS/Under Const. Maintenanc
8-544 OAK HILL PARK CAPITAL MAINTENANCE----8.574 VISTA GRANDE STREET/BRET HARTE PARK PEDESTRIAN IMPROVEMENTS-.--.--. 8.494 OSA6E STATION PARK CAPITAL MAINTENAN
Subtotal
5837,i85 Dc/
No No No No No
2 Ongoing S lPlUnder const. Mainrenance BR/Under Const. ln PlanlDesign Yes z/3 Ongoing 5287,o79
Uì
UPGRADE-----------
IP/Prep. for Const. Môiñtenðnc
2 Ongoing
Szts,+t's Srro,gog Sszt,zto 56zt+,tgt 56:94,72s 5rz¿,aso
C-545 TRAFFIC SIGNAL CONTROLLER
2 Ongoing
5o
Srzo,ooo $¿e.¡gr SgtrS,zæ 586.391 s+tg,ozg 582,766
DIRECTIONAL SIGNAGE
2 Ongoing
5
5616.016 Slot,0gz
PUBL]C PLACES FOR
8.618 TOWN-WIDE WAYFINDING AND
Yes
JJlln Plan/Design
CAMINO TAssA]ARA PKWY/SYCAMORE VALLEY RD SOUND WALL MAINT..--..--.
C.609 TOWN-WIDE BICYCLE MASTER
SZgt,+Zø AD/ Maintenance
54,183.10j
A.514
8-555 VILLAGE THEATRE CAPITAL MAINTENANCE.-.-.---
2 Ongoing
S6,IBL7oz 52.001,599
4.51I
8.452 SYCAMORE DAY SCHOOL BUILDING REPAIRS.---8-619 GREEN VALLEY TRAIL FROM HIGHBRIDGE LANE TO DIABLO ROAD-*-------.
No No No
ô
B-560 DIABLO VISTA PARK CAPITAL MAINTENANCE-
5262,l7 6 JJl Maintenance KB/ Maintenance
51,210,366 Szlz,gat
8.491 LIBRARYAND COMMUNITY CENTER CAPITAL MAINTENANC E 8.101 PARK AND RECREATION FACILITIES CAPITAL MAINTENANCE-
C.552 INTERNALLY ILLUMINATED
>1 Grant Priority
tzl,gzl
S6s5,807 $srs.ss¿
SE¿¡,ooo
FIBER OPTIC CABLE INTERCONNECT
B-415 CIVIC FACILITIES CAPITAL MAINTENANCE PRO]ECTs----.. 8-328 TOWN OFFICES CAPITAL MAI
8.216 TOWN
of
Estimate* 4-25-zÛt7 Remainder PM/Status
No 3/4 Ongoing
No 3/4 Ongoing
Continued on next page 05125170L7
Fl Ê)
4
'l c).
o ct)
U) (' Pr*
CIP Funding Spent as
Project Name VETERAN5 MEMORIAL BUILDING CAPITAL
8-550 MUNICIPAL SERVICE CENTER
MAINTENANCE--_-.
WASTE TRANSFER
Çrhfat¡l C.566 TOWN-WIDE BICYCLE PARKING
8.515
SECURITY ACCEss CONTROL FOR TOWN BUILDINGS--".
A-530 HAP MA6EE RANCH PARK SLIDE M
(nhfnf¡l A-443 DTABLo RoAD ÍEAST) DRAINAGE IMPR0VEMENTS--------C-402 EL PINTADO OVERLAY. EL CERRO BLVD. TO I.680-----C.057 BLACKHAWK RD./HIDDEN OAK DR./MAGEE RANCH RD. TRAFFIC 5IGNAL--.---.
Çrrhfnf¡l B.¿89 BOCCE COURT sHADE STRUCTURES AND GROUP PICNIC
8.449 8.451
ô
AD
HAP MAGEE PARKING AND 5TAGING
HAP MAGEE RANCH PARK PLANNING - PHASE
512o,ooo
ist,+lt
Srgr,soo $r¿s,ooo
S25,oi9
¡3,157,273
$863,322
S¡z,ooo
S26.854
2---------
5z+l,soo
Stg,gzz
515o,ooo
5o
$434,500
$66,776
St+s,zt.s $¿sz,ssa
5o
5rg¡,¡zo
5o
$794,603
$156,919
J
No
415
IJJ
S sJ/Not stårted 5¡Or.O¡g 5CL/0n Hotd
No
5
No
5
Stgl,ll
No
5
No
1
No
1
Yes
1
Maintenanc
Szol,SlA 5r5o,ooo RE/Notstarted on Hotd
t+l,zl
o SCUNot Started
$637,68¡l
5¡sr.¡00
5o $o $o 5o
JJlComptete 2oo8
S¡ss,zsoNs/comPlete2oos 566,000 Ns/comptete 2oo8
$700,4,11
$3,s95,30s
2
2t3
No
213
$1,081,580
$o
$1,081,580
MONTE VISTA COMMUNITY POOL SHADE STRUCTURE-
C-517 IRON HORSE TRAIL CORRIDOR CONCEPT C¡rl¡+¡ârl
8.2S6VILLAGETHEATRERENOVATIONSANDIMPROVEMENTS--------
(ARRA)c'365 GREENVALLEYRoADSTREETREPAIR c-511
DTABLO AND GREEN VALLEY ROAD IMPROVEMENTS
5¿,zoo,ooo scL/comPtete 2oo9
No
1
51,284.553 JAc/Complete 2oo9 Slsz,tzz Ns/comPlete 2oo9
No
tl2
No
1,12
No
314
Yes
5
No1 Yes Yes
1
5o $0
5o
$74000
$0
s66,000
5o
$66,000
$o
$6,236,675 5Z¿,OOO Mucomplete 2009 $74,000
$66,000 Tlwcomptete 2oo9 $66,000
5o 5r.ssz,r0o MLs/comptete
2o1o
--- 51,008,063 S0 51,008,0ó5 RIA/Complete 2010 $zo'zoz 5o S2o'202 MAs/complete2olo
*ClP Funding Estimate includes prior year appropriations plus currentyear appropriations, and
going projects, it inctudes future yeðr proposed appropriations.
5o $0
5z¿,ooo
ST.SSZ,IOO
No
No
(rrh+ñtrl
C¡rlrl¡årl
No
No
$o 5o
8-543
tl2 tl2 tl2
5¡s,ooo Jllcomplete 2008
5246,580
$6'236'675
1
Yes
5o
A.464 ELCERRO BOULEVARD MEDIAN RENOVATION-
58oo,ooo
No
$2,894,862
5800,000 MUComplete 2008 Sz¿o.sao MH/complete 2oo8
DIABLO VISTA MIDDLE SCHOOL GYMNASIUM AND TEEN CENTER-
Yes
$367,724 5
588,000
s66,000
4
4 4
CP/ln Ptan/Design
S88,ooo Ns/complete zooS $834,150 MLs/ComPlete 2oo8
5¡s,ooo
(rrhraf¡l
J:
TV/UnderConst.
5o 5r,foo,S¿3 MLs/comptete 2oo8 5Zoo,¿¿r SSS,sss MucomPlete 2oog
5¡ss,zso
Ð
No
510,146
5o
PAVEMENTMANAGEMENTPROGRAMCHURCH-.--
a
No4
51,100,543 SSoo,ooo
5a¡¿,rso
No 3/4Ongoing No 3/4Ongoing
,-)
$2,293,951
Srso,grs
54,ZOO,OOO C.503 51,284,553 A-271 PARKING LOT MAINTENANCE AT EAST BAY FELLOWSHIP C.486 SYCAMORE VALLEY ROAD IMPROVEMENTs EAsT OF CAMINO RAMON------...-.-. SISZ,TZZ
a
585,569 Dc/Under Const. Maintenance
5tøø,+0t NR/ Maintenance 5r¿s,ooo cMC/on Hotd
5o
5¡¡r,¡oo
SYCAMORE VALLEY AND DIABLO VISTA PARKS PLAY AREA RENOVATION-------
C.518 FRONT STREET PEDESTRIAN IMPROVEMENTS----_-8.42S VISTA GRANDE sCHOOL/PARK PLAYFIELD RENOVATON--------ctr-tt^t c C-455 BATTERY BACK-UP 5Y5TEM5 FOR TRAFFIC C-483 INSTALLATION OF AUDIBLE PEDESTRIAN SIGNALS AT FIVE IN:TERSECTIONS----. Çrrh+nf¡l
8-276 8-496
Grant Prioritv
Estimate* 4-25-2017 Remainder PM/Status
4.579 TOWN.WIDE ROADWAY DAMAGE REPAIR----8-582
)
of
for muttiphased o¡ on-
1
Continued on next page 05125120t7
C' o (t)
U)
Pr* 4.4ó2
Estimate*
CLYDESDALE DRIVE MEDIAN IMPROVEMENTs
HAP MAGEE RANCH PARK GROUP PICNIC AREA SHADE
STRUCÍURE-----.---
4.316 DOWNTOWN
$r¡,zoo
DIRECTIONAL SIGNAGE--
BRIDGE REPLACEMENT AND PEDESTRIAN
WALKWAY.---
C-O46 ÏOWN-WIDE TRAFFIC SIGNAL INTERCONNECT----.
Subtotat C.457 DIABTO ROAD BRIDGESLOPE
Ll2
5165,000Jï/complete2olo Sgg,Soo Rc/complete 2o1o 5r¡.zoo lB/complete 2o1o
No
2
No
2
No
2t3
No
3
Yes
314
No
4
No
4 1
izn,zoo
5o 5o
$¿s,ooo lJlcomptete 2010 5690,584 NS/Complete 2010
$73s,584
So
$756,,129
$73s,584
5657,4t9 56s7,s76 Stsz,za+ 561s,868
rSZ)sct-lcomptete 2011
No
St!6,416 Scucomptete 2011
No
1
8.5 10 VETERANS MEMORIAL BUILDING.-.-.---
58,428,6s4 Ss,¿r¡,oea
S15,566 MLs/Complete 2011
No
C.487 SYCAMORE VALLEY ROAD AND I-680 ON-RAMP IMPROVEMENTS---..-----.-.---C.239 MA]OR ARTERIAL OVER C.546 HARTZ AND PROSPECT AVENUES INTER5ECTION IMPROVEMENTS-------.-.--..-..
5r,ogs,¡zr
C-450 WEST
REPAI
EL PINTADO SIDEWALK STRUCTURAL
REPAIR----_------
8-466 OSAGE PARKING LOTS PAVEMENT REPAIR AND EXPANSION--. 8.5ó5 SWIMMING POOL AT sAN RAMON VALLEY HIGH SCHOOL8.548 OAK HILL PARK COMMUNITY CENTER ÐOORs-----C-547 PAVEMENT MANAGEMENT PROGRAM--
$soo,ooo 5zo¿,ooo
$o 5o
$f 6,650,085 $14,479,131
C-554 ÏASSAJARA RANCH RD AND ZENITH RIDGE
STREET LIGHT IMPROVEMENT-.------
Subtotal C-240 TASSAJARA RANCH DRIVE MEDIAN AND BICYCLE LANE5----..---
4.565 DOWNTOWN
TRASH RECEPTACLE REPLAC
Subtotal 4.549 HIGHWAYADVISORY
RADIO (HAR)
Subtotal A-551 SoLAR PHOTOVOLTAIC
8.539 TOWN
5601,183
S¡or,¿os 5o Stzl;zo S!2g,zzo 56ß,282 5o
5¿,ooo,ooo 54,063,497
Subtotal
sYsTEM-----
8.557 sAN RAMON VALLEY H.5. 4.504 FRONT STREET REPAIR
No
t t
2ou
No
1
(5soo)r:wcomplete 2011
No
560E,,282 MAs/Comptete 20 1 1 SSOO,OOO MLS/Complete 2011
No
5zo¿,ooo AM/complete 2011
No
(565.497)RJA/ComPlete 2011
No
it+g
+JZA Ns/Complete
SSO,OOO
$o
$50,000
5850,546 5zo7,7gB
5205,519
$1,058,33¡f
120s,5f9
S12o,ooo
5o
$120,rxro
$o
5$39,579 5t,z+0,Ãa
LIGHTING-*-------..-. 582.500 5sr,¡os
iïl+,slA
No
L
tl2 tl2 Ll2 Ll2
$2, 170,654
5o 5o
20 11
5¡Or,¿OS Scucomptête
$50,000
SYSTEM----.-.. 5ZOO,O+I 5266,043 AT EL CAPITAN BRIDGE---.-.-5607,048 $O
TENNIS COURT REPLACEMENT
($
Sso,ooo
MEETING HALL AUDIO AND VISUAL PRO]ECTION
A.458 sAN RAMON CREEK REALIGNMENT
'J=
No
$2,6¡18,525
$¿s,ooo S690,s84
Ssos,sos
Grant Priori0
scL/complete 2o1o
5250,464 BR/complete 2o1o 5SoS,g0S MAs/complere 2o1o
$7s6,429
B-471 SPoRTs FtEtD LtGHTtNG UpGRADE---------:-------------*
5z¡,roo
5o 5o $0
Szso,+o+
Subtotal
a
$o
¡277,m0
8-507 RAILROAD 8.512 WOODBINE
-¡
5o $o 5o
5165,000 Sga,soo
Suhfof¡l
ô
$0
$2,6¿t8,525
8-423 VILLAGE THEATRE SECURIW IMPROVEMENT-
Remainder PM/Status
5o
5z¡,roo
Subtotal 8.520
of
CIP Funding Spent as
Project Name
lJlcomplete 2011
No3
5850,546 MAs/complete 2012
No
1
52,269 :e¡complete 2012
Yes
1
$852,815
Srzo,ooo cc/complete 2012
No2
$r20,000
scL/comptete2013
2013
No
No 50 Scl/Complete 'gl,¡øt 5607,048 MAs/comptere 2o1i Maintena yes
5¡r,rgr MH/complete2013
No
t tl2 tl2 tl2
112 55,826 Scucomptete 2013 Maintenan Yes *ClP Funding Estimate includes prior year appropriations plus cu¡rent year appropriations, and for muttiphased or onContinued on next page going projects, it incl.udes future year proposed appropriations. 0512512017
s880,402
(). i
Ë
r-ì lu
ct
o ct)
U) Pr*
of Estimate* 4-25-2Ot7 Remainder PM/Status
CIP Funding Spent as
Project Name
C.523 DOWNTOWN CROSSWALK ENHANCEMENTS------
A.585
SECURIW---
UTILIW VAULT ACCEss
(FEMA)-
A-505 EL P|NTO ROAD REPAIR
-
G¡rhraf¡l C,587 sAN RAMON VALLEY BOULEVARD GAP CLOSURE SOUND C.570 PAVEMENT MANAGEMENT PROGRAM--
WAIL-
5lS,0Zg AD/Complete 2013
s3,358,197
$2,581,0¡ß
j777,164
Slo,ooo
51o,ooo
$10,000
$10,000
St+t,StS
5280,827
$341'575
$280,827
PAVEMENT MANAGEMENT PROG
8.591
BOCCE BALI COURT EXPANSION AT 5YCAMORE VALLEY
HARTZ AVENUE
560,748 Scucomptete 2013
BEAUTIFICATION . LINDA BEAUTIFICATION . LINDA
MESA TO
RAILROAD---
PARK--.
No
ztl
Ë
Yes
3
No
1
Sz.ooo,ooo Sr,ggs,rze
5ß4,9n
No
L12
t9,015,128
i404,872
RjA/Comptete 2014
No
2
Yes
zt3
20 15
No
1
58,777,27158,693,098 524JßMAs/complete2o1s
Yes
1
Srg,go0 MAs/comptete 2o1s Szg,ero MAs/complete201s
No
1
Ssss,lzí Sløs/zo 52,27:,486
DN MESA TO DIABLO
RAILROAD AVENUE IMPROVEMENTS PROSPECT TO SCHOOL--------
i
$60,7,f8
58,452 R:vcomPtete 2014
$rz,zs
r
JB/Comptete 2014
$20,703
56,000,000 SzJ 00,0o1 Sz,zzl,zgl scucomptete
C-577 C.319 C.391 C.405
1.lz
$0
51,134.825 51,t26,373 S221.Boo 5zos,s¿s $1,356,625 $t,335,922
CROW CANYON ROAD SOUND
HARTZ AVENUE
So Dc/complete 2013
52,350,296
5!,473,4145r.,4:-3,3]-7 Szsg,ase
C.586 sAN RAMON VALLEY BOULEVARD WIDENI
SlsaJ+t
Yes
1
No
tl2
No
Ll2
S5.686 BR/comptete 2015
No
2
AD/complete 2015
No
2
53,274 AD/comptete 2015
No
2t3
NNS/COMPICtC 2016
No
t
NNS/under const.
No
L
Yes
tl2
No
1.12
560.097 BR/complete2ols 5t,157scL/complete201s
$t9,686,145 $16,268,669 13,417,476
Suhiot¡l B-45O PARK sYsTEM sIGNAGE LAWRENCE ROAD TRAFFIC SAFETY IMPROVEMENTs
C.589 C.527 SAN RAMON VALLEY BLVD. & IRON HORSE TRAIL SIGNAL ENHANCEMENT---c.rL¿^a-l
Szza,ooo Szs,ooo
5224,3l,4
Slo,ooo
56J26
$3r3,000
C.605 C.595 C.584 C.603
RAILROAD AVENUE DECORATIVE CROSSWALKS AND PAVEMENT
8.490
OSAGE STATION PARK
PAVEMENT MANAGEMENT PROG
DANVILIE VARIOUS STREFTS AND ROADS
(rrhlafrl
$288,247
Stl ,lgz ì24,753
OVERLAY---. 5I'Ig,I,OO 5¡IO,ggZ 51,2,¡OS 56,022,208 5r,o5r.ozr 5¿,gl\ßl
PRESERVATION--.-.-..
DANVILLEAND ELCERRO BOULEVARD PARKING
Ssz,zos
52,164,763
IMPROVEMENT5----_----.
5¡¿,OOO $8'700'371
Stgø,tgt 5!,968,572 Sl/under const. 515,383 5!8,677 AD/Complete 2016 $1,699,586 $7,000,785
Ss,r¡z,zso Sz,olg,szt 55,093,229
IMPROVEMENTS------
ELECTRIC VEHICLE CHARGING STATIONS AT TOWN.OWNED
FACILITIES-----.
5113,084 5g8,l0z
Hnpr
2
No
514,722 NR/comptete 2016 Maintenanc No
2 Ongoing
$5,245,834 $2,137,883 $3,107,951
c-508 cAMtNO TASSAIARA/CROW CANYON SAFETEA-LU A-606 AUTOMATED
LTCENSE PLATE READER
TMPROVEMENTS
Þ S|TUAT|ONAL AWARENESS CAMERAS--
Subtotal Totat
fi,AAZJrrS 51,000,t22 5276,623 sl/Complete 20u 5t,t0t,S0O 5l +A,00t, 5+ß,0gø 5S/ Maintenance $9'050,105
a J:
Yes
L
No 1/2 Ongoing
$635'319
$168'331'715 ¡74,124'912 t93,906'773
*ClP Funding Estimate inctudes prior year appropriations plus current year approprìations, and
going projects, it inctudes future year Proposed appropriations.
$8'414'786
-1
No
5¡OO,OOO Trwcomptete 2014
$9,420,000
A.266 TOWN-WIDE WAYFINDING AND DIRECTIONAL SIGNAGE
C.585
5142,996
SZ.¿ZO,OOO SZ,TZO,OOO
qrrhfñf¡l A.241
5182,625
Grant Prioritv
for multiphased or on05125120L7
n
lu
ct
o cn
Ð
U)
ll-¡
;-l
Table H - Project Cost Summary by Park Site
Pr#
ProiectName
PriorYears
>)
2OtTlLS 20.t$ltg
z0tglzo 2O2O|2L 2021,122
Status
PrioritV
Ê)
Bret Harte B-5
74
VISTA cRANDE STREET/BRET HARTE PARK PEDESTRIAN IMPRoVEM
ENT
S2o7 ,27
5
$o
TOTALS SZol,zls
5o
5o
5o
5o
4
$O ln Ptan/Design
5o
F.l
Danvitle South B-556DANVILLESOUTHPARKcAPITALMAINTENANCE...--.-..--------.
TOTALS
S185,600
S6,ooo
Sso,ooo $1oo,ooo
56,ooo
$g 0ngoing Maintenance 1/2 0ngoing
STAS,OOO
56,ooo
$se,ooo Sroo,ooo
S6,ooo
$o
5o
50
Diabl,o Road Trail,
C-055
DIABLO ROAD TRAIL FRoM ALAMEDA DIABLO TO TANK AccEss
5o 5r,o¿a,ooo 5o ir,o¿s,ooo
RoAD- 5989,691
TOTALS
SgSs,6gr
ínt,z$
Not Started
Ll2
$o
TOTALS
ô
Szra,ooo
$O Ongoing Maintenance 2/3 0ngoing
S125,28i Slg,ooo
s18,ooo s68,ooo 5r8,ooo $6a,ooo
$zrs,ooo
5o
5o
5o 5r,sao,ooo
5o
$o
it,586,ooo
DIABLO VISTA PARK CAPITAL MAINTENAN
SrB.ooo
Front Street 8-420 FR.NT
STREET .REEKSTDE
TRA'L---*-------
-_
;;;;l;
r:;.r.,
$o on ttotd
1_12
$o
Green Val.tey TraiI
8-619
CREEN VALLEY TRAIL FROM HICHBRIDCE LANE TO DIABLO
ROAD.....-.- 5O
c-596SANRAMoNVALLEYCREEKF0oTBRTDGEATDANV|LLEGREEN-----------
TOIAIS
S2O,OOO
5o
5o
So
s¿o¿,zso So
5o
5o
$o
S¿o¿.zso Szo,ooo
Hap Magee Ranch
A-530
HAP MAGEE RANCH PARK SLIDE MIIICATIO
Srso,ooo
5o
5o
5o
5o
B-400
HAp MAcEE RANcH pARK cAptTAL MATNTENANcE-------------------:------
5sss,¡00 $s¡o,ooo
Sso,ooo
$zs,ooo
Szs,ooo
SZS,OOo 0ngoing
szos,go6 Ss¡o,ooo
Sso,ooo
Szs,ooo
$zs,ooo
$zs,ooo
$o
5zr6,ooo $u r6,ooo
5o
5o
$o
TOIALS
415 $o NorStarted 0n Hotd Maintenance 2 0ngoing
lron Horse Trail C-607
IRON HORSE TRAIL RAISED CROSSWALKS AND FLAsHIN6 BEACONS-----
TOTALS
;
57o,ooo $zo,ooo
Not Started
tl2
5o
Continued on next page
=
05125120t7 C
: a,
J:
a
tlJ
ct rD
$o
Diabto Vista B-560
r{ J
CN
(n Pr*
Prior Years 2Ot7l18
Proiect Name
2O79l2O 2O2Ol2!
20L8lt9
202L/,22
Status
Muttipte Parks B-101
PARK AND RECREATION FACILITIES CAPITAL
B-120
TOWN-WIDE TRAI
MAINTENANCE---.---...-----5!,465'446
5lzz,zlo
54r,ooo
54o,ooo
5¡g,ooo
5¿o,ooo
$o
5o
5o Under
Construction
Prioritv 2 Ongoìng
0ngoing Maintenance
5¿o,ooo
$¿o,ooo
5¿o,ooo Under Construction ln 2/3 0ngoing Ptan/Design 0ngoirg Maintenance
8-280 spoRTs
FTELD
RENovATtoN--------------
8-493 syNTHETrc TURF REPLACEMENT-------------8-559 scHool
pARK FActLtTtES cAPtrAL
------------51,006,4s8 Szs,ooo
-------53'484'702 5225,ooo
MAINTENANCE------- 571t,t71
Srs,ooo
TOTALS s6,890,046s¡¿S,ooO
5¿o,ooo
5¿o,ooo
5¿o,ooo
$zzs,ooo $zzs,ooo
5225,000
Srs,ooo
5¿o,ooo 0ngoing Maintenance 2 0ngoing S225,ooo ln Plan/Design Ongoing 2 Ongoing Maintenance
Srs,ooo
$rs,ooo
5¡oo,ooo 5¡zo,ooo
53zo,ooo
5o
5o
$o 0ngoingMaintenarrce 20ngoing
5¡os,ooo
Oak Hitt
8-427
8.544
OAK HILL MASTER PLAN . PHASE 1
5o
OAK HILL PARK CAPITAL MAINTENANCE-
TOIALS c)
So
50 0n Xotd
5206,629
Sss,ooo
5¡o,ooo
S36,ooo
586,000
$9
Szoo,ozg
$is,ooo
5¡o,ooo
5¡e,ooo
S86,ooo
5o
$got,ooo 5r,7oz,ooo
5o
S0
Osage Station
8-490
N
5o
8-494
TMpROVEMENTSOSACE STATION PARK CAPITAL MAINTENANCE ----. OSACE STATTON pARK
52,469,750
$o
S¡OO,EO¿
53o,ooo
TOTALS 52,770,554
5¡o,ooo
5o
5o
Sycamore Valtey 8-479
SYCAMORE VALLEY PARK SITE STUDY
5gr¡.soo ir,zr¿,soo
Srz,soo
5o
5o
$0
Not Started Unfunded
5
$g
Ongoing Maintenarrce
2 0ngoing
526,000
5o
S21,ooo
$o
$21,ooo
Szz,ooo 5o
7
$g 0ngoingMaintenânce 2/5 0ngoìng
5o
8-522
SYCAMOREVALLEY PARK PICNIC AREA
2016
$rz,5oo
Szz,ooo
SYCAMORE VALLEY PARK CAPITAL
5
5rz,5oo
5rz,5oo
MAINTENANCE.--.-- 5SgS,+gO 5O RESTROOMS-ToTALS $¡g¡,¿So
8-495
Unfunded
Ongoing Maintenance 2/3 0ngoing
522,ooo
5o
522.ooo
522,ooo
s689,000
5o
S¿a,ooo STu,ooo
Szz,ooo
5o
5o
$o
50
s0
$0 0n
HoLd Unfunded
5
Town Green 8-617
TOWN 6REEN MASTER
TOTALS
GRAND 5t2,978,t82
TOTALS
51,096,000
Not Started
5o
$r,ras,soo
Sz,zoo,soo 5¿,seo,soo
5¡¡o,ooo
Co517.512077
c ñ
c
-H H r{ -) FJ Ë
-l
Ê)-
CT
o U)
Ð
(n l'H
Tabl,e I - Project Cost Summary by Buitding Site
Pr#
SYCAMoRE DAY 5CH00L BUtLDtNc
Library 8-491 LIBRARY
REpAtRs
AND CoMMUNIry CENTER CAP|TAL
Mul.tiple Buil.dings B-415 CIVIC FACILIT|ES
CAPTTAL MATNTENANcE
8-559
SCHoOL PARK FACtLtTtES CAP|TAL
C-585
ELECTRTC VEHTCLE CHARGTNG
tJ
8-544 oAK
H|LL PARK CAPITAL
Service Center B-216 ToWN SERVICE B-550
51o,ooo
TOTALS 5122,t39
$to,ooo
51o,ooo
5664,460
58r,ooo
5¡o,ooo
s664,46O
$81,ooo l¡o,ooo
5+ø0,o*
5¡o,ooo 5¡o.ooo 5¡o,ooo $¡o,ooo 5¡o,ooo Underconstrucrion
MATNTENANCE--TOTATS
pR0l
.52+l,soo
STATt0NS AT ToWN-oWNED FA€tLtTtES----.
S103,084
5L,O27,77O
5o
5o
$¿s,ooo
l¿s,ooo
$¿s,ooo
$ss,ooo i¡o,ooo
580,ooo 586,000
$55,ooo
$3ó,ooo
$56,ooo
5226,442 5r45,ooo
5z9.ooo
5¡o,ooo
5¡o,ooo
|MPR0VEMENTS------------MAINTENANCE---
BUILDING CAPITAL
MATNTENANCE----
ToTAIS Viltage Theatre
sg¿r,soo SZSS,SSS
MATNTENANCE-----
5o
5o
$29,ooo
$¡o,ooo
5o
5o
5¡r,ooo 5¡r,ooo
5O
$o 5o $3o,ooo $o
5o $¡r,ooo $3t,ooo
5o 5o
underconstruction
$O Maintenance
$o
Maintenance
$o
$g ln Ptan/Design $g Prep.forConst.
512,ooo
frz,ooo
Srs,ooo Srs,ooo $rs,ooo $rs,ooo
$O Maintenance
$tos,ooo Sgo,ooo
Szo,ooo
Srz,ooo
55,r6o,ooo
5o
$0 5o
5!22,873
$o
$3,UsO,OOO IZO,OOO $12,OOO
Ll2 2 Ongoing
Mairttenance
Sros,ooo
VTLLACE THEATRE pARKtNc LoT tMpRoVEMENTS__-__--__-_--__-,_____.--96,048,700
2/3 Ongoing
$O UnderConstruction 2 Ongoing gs on Hotd 4
$¿¿SOo
VTLLACE THEATRE CAp|TAL
4 2 Ongoing
$o
$¿¿,soo
B-597
2ongoing
$0ConstructionComplete 2Ongoing 2016
l¡r,ooo
8-553
2 0ngoing
$o
S12,ooo 5o
grZ,OOO
iF) Ê)
4
F,l ÞJ'
$5t,ooo
TOTALS $6,171,513
JA
$o
$zo0,0zg
TOTATS $1,501,735
e
5o
Srs,ooo
5¡o,ooo
ToWN oFFICES CAPITAL
Veterans Building 8-582 VETERANS MEMoRIAL
$o
5r5,ooo
5¡o.ooo
2/3 0ngoing
50 ln Ptan/Design
5o
Sss,ooo
MATNTENANCE-----:-----_-_
5O SfS.OOO SfO,OOO
Maintenance
$o
Srs,ooo
5206,629
CENTER CAP|TAL
$g
5¡o,ooo 5¡o,ooo $¡o,ooo $5o,ooo 5¡o,ooo i¡o,ooo
TOTALS
TOIATS illt,+tz B-j28
$1o,ooo $o
MATNTENANCE_-_____
MUNICIPAL SERVICE CENTER WASTE TRANSFER ADEA
Town Office A-580 TOWN OFFTCE
Sro,ooo 5o
Prioritv
Sro,ooo
TOTAL5
ô
ZOZOTZ! 2021/22 Status
StZZ,tSg
BUTLD|NGS___-__ MATNTENANCE------- S2!t,t7t
8-515
SECURTïY ACCESS CONTRoL FoR ToWN
Oak Hil,t Community Center
>)
PriorYears 2077lLg TOLglfg zOtglZO
Proiect Name
Day SchooL
8-452
F{
$o 3/4 0ngoing
$o Under Construction Not Started
2/3 0ngoing 1
$O
0512512017
c).
o ct')
U)
Ð TabLe
Fl
I - Downtown Projects Cost Summary
Pr*
PriorYears 2OL7ll'8 zÛtgltg zOLglzO 2O2O|7L2O21/22Status Prioritv
Proiect Name
SO PROJECT5æ8,SZO SO 8-597 VILLAGE THEATRE PARKING LOT IMPROVEMENTS----_-- 56,048,700 53,T6O,OOO SO
A-362 DOWNTOWN IMPROVEMENT
SIGNAGE BICYCTE PARKING PRO]ECÍ-
8-618 TOWN-WIDE WAYFINDING AND DIRECTIONAL C.566 TOWN.WIDE
C.585
ELECTRIC VEHICLE CHARGINC STATIONS AT TOWN.OWNED
c-592 RosE stREEr C.593 FRONT
PARKING
STREET CREEK BANK
C-596 sAN RAMON VilT"EY N t!'
---
5zr,ooo
5o
5o
Notstarted 50 Notstðned L12
$O SSO,SOO 5O 5O S¡Z,OOO 5O
5o
5o
$O
5o
So
50
SS,STZ,OAZ
STABILIZATION-------
CREEK FOOTBRIDGE AT DANVILLE
GREEN*------
IMPROVEMENTS-----.--C-6OO sAN RAMON VALLEY BOUTEVARD IMPROVEMENTS (NORTH)----.C-599 LA GONDA WAY BRIDGE
C-603 DANVILLEAND ELCERRO BOULEVARDPARKINGIMPROVEMENTS----*C-605 RAILROAD AVENUE DECORATIVE CROSSWALKS AND PAVEMENT OVERIAY
2
5o
FACILITIES--- 5TO¡,OA¿
FACILÍTY-------
$0 ln Ptan/Design
5o
5o
8.617 TOWN GREEN MAsÏER
5o
5o
SZSZ,¿OO STrO+,ZSO
$670,000 5O
5¡¿,OOO
5o
5o
5o 5o 5o
5o
5o
5o
5o
1
50
Notstarted
Under
213
4
Construction
$ro.ooo 5o
$O Construction
2 Ongoing
comptete 2016
50
t
Under
Construction
5o
5o
5o
$O ln Ptan/Design
5o
5o
5o
$o Notstarted
5rgo,¡so 5¡.gzo,rgo
5o
5o
$9 ln Ptan/Design
Ll2
SBr2,27s
5o
5o
5o
50
Not Started
tl2
5o
5o
5o
$o Construction
5O
SO
$O
5o
5+Ig,I,OO SO
1,12
2
tl2
complete 2016 1
$0 Construction Complete 2016
GRANDTOÏAI
05l3Ll20t7
J:
Fi ÊJ
4
J ct
o (t)
Ð
U) Fl
Tabte K - Proposed Green lnfrastructure Projects Proposed
Proposed Future Appropriations (including Green lnf rasture)
Appropriations (including Green
4
lnfrastructurel
Pr*
20!71L8
20L8lt9
2019120
202012t
ACCESS-_----
Sso,ooo
Sso,ooo
Sso,ooo
Sso,ooo
5o
A-550 TOWN.WIDE STORM DRAIN sYsTEM A-443 DrABro RoAD (EAsT) DRATNAGE TMPROVEMENTS---------
5¡o,ooo
S¡o,ooo
5¡o,ooo
Sgo,ooo
5¡o,ooo
So
5o
So
5o
5o
Project Name
4.064
LOCAL GENERAT IMPROVEMENTS - DISABLED
4.492
CENTRAL IRRIGATION SYSTEM CAPITAL MAINTENANCE
5o
5o
So
So
5o
A.533 A-558
TOWN-WIDE LANDSCAPE
5o
5o
5o
5o
$o
LOTMAINTENANCE--_-.---
5o
5o
$o
So
5o
4.580 4.604
TOWN OFFICE IMPROVEMENTS-.-----
5o
5o
So
5o
5o
I.AUREL DRIVE BIOTREATMENT
5o
Stt,tts
So
S8s,o85
5o
PARKING
A-612 TOWN SERVICE CENTER SLIDE DRAINAGE REPAIR-.------.B-120 TOWN-WIDE
N
!J
TRAILS-------
B-216 TOWN SERVICE CENTER CAPITAL MAINTENANCE B-280
5PO RTs FIELD
RENOVATION------_-
B-400 HAP MAGEE RANCH PARK CAPITAT MAINTENANCE-----B-415 CIVIC
FACI LITIES CAPITAL MAINTENANCE PRO]ECTs------
5ze,ooo
5o
5o
5o
So
5¡g.ooo
5¿o,ooo
S¿o,ooo
5¿o,ooo
5¿o,ooo
Szg,ooo
S¡o,ooo
5¡o,ooo
5o
5o
Szs.ooo
5¿o,ooo
5¿o,ooo
5¿o,ooo
5¿o,ooo
5s¡o,ooo 5¡o,ooo
Sso,ooo
Szs,ooo
Szs,ooo
Szs,ooo
5¡o,ooo
5¡o,ooo
5¡o,ooo
5¡o,ooo
5o
5o
Sr,sao,ooo
So
5o
Sro,ooo
Sro,ooo
Sro,ooo
5o
5o
58r,ooo
5¡o,ooo
S¡o,ooo
5¡o,ooo
8.420 8.452 8.491
SYCAMORE DAY SCHOOL BUILDING
8-493
SYNTHETIC TURF REPLACEMENT
Szzs.ooo
Szzs,ooo
Szzs,ooo
Szzs,ooo
5¡o,ooo $zzs,ooo
8.494 8.495 8.544 8.550 8.553 8.55ó 8.559
OSAGE STATION PARK CAPITAL MAINTENANCE---
5¡o,ooo
Srz,soo
5rz.soo
Srz,soo
5o
SYCAMORE VALLEY PARK CAPITAL MAINTENANCE--
Szz,ooo
522,ooo
$zz,ooo
Szz,ooo
5o
OAK HILL PARK CAPITAL MAINTENANCE--------------
Sss,ooo
$¡o,ooo
5¡o,ooo
s86,000
So
5o
5o
5o
$o
5o
Sgo,ooo
Szo,ooo
S12,ooo
Srz,ooo
5o
56,ooo
Sso,ooo
Sroo,ooo
56,ooo
5o
Srs,ooo
Srs,ooo
Srs,ooo
Srs,ooo
5o
FRONTSTREEICREEKSIDETRAI
REPAIRS-----
TIBRARY AND COMMUNIW CENTER CAPITAL
MAINTENANCE-_--
MUNICIPAL SERVICE CENTER WASTE TRANSFER ADE VILTAGE THEATRE CAPITAL MAINTENANCE----------.--. DANVILLE SOUTH PARK CAPITAL MAINTENAN
SCHOOI PARK FACILITIES CAPITAL MAINTENANCE----
-l
202t122
cr
o (t)
Continued on next page
= .J:
0513712017
U) Pr*
2lJt7lLB
zlJt&lL9
20L9120
2020,12L
20.2L122
S18,ooo
Srg,ooo $o
568,000 5o
Szra,ooo
So 8.574 VISTA GRANDE STREET/BRET HARTE PARK PEDESTRIAN IMPROVEMENTS---Sros,ooo 8-582 VETERANS MEMORIAL BUILDING CAPITAL MAINTENANCE------_5¡,roo,ooo 8.597 VILI.AGE THEATRE PARKING LOT IMPROVEMENTS-----_-Srzz,soo 8-611 SYCAMORE VALLEY PARK DRAINAGE IMPROVEMENTS-__--B.ó19 GREEN VALLEY TRAIL FROM HIGHBRIDGE LANE TO DIABLO ROAD.*.---------.-- Szo.ooo
Srz,ooo
Srs,ooo
5o 5o $o
5o 5o 5o
5o 5o 5o 5¿o,ooo 5o
Project Name 8.5óO DIABLO VISTA PARK
C.017
CAPITAL MAINTENANCE
TOWN.WIDE SIDEWALK REPAI DC_
__,_
t'J
À
ROAD-------'
C.592
BRIDGE
C.521
WESTET PINTADO SIDEWALK
C.552
INTERNALLY ILLUMINATED STREET NAME S¡GN LED RETROFIÏ
5o $o 5o 5o
C.5ó6
TOWN-WIDE BICYCI.I PARKING PROJECT.----
$o
C.O55 DIABLO ROAD TRAIL FROM ALAMEDA DIABLO
ô
5¡o,ooo TO TANKACCES5
5o C.578 SAN RAMON VALLEY BOULEVARD LANE ADDITION AND OVERLAY (sOUTH)----. C.584 DANV]LLEVARIOUS STREETS AND ROADS PRESERVATION-------------.5T,0¿g,OOO Srg,ooo C.588 BATTERY BACKUP REPLACEMENT FOR TRAFFIC SI 5o C.592 ROSE STREET PARKING FACILITY5o C.595 FRONT STREET CREEK BANK STABILIZATIO
c-596 c-598 c-600 sAN RAMON VALLEY BOULEVARD
C.óOl
= li
5o
5o
5o
5o
So
5o 5o 5o
So
5o
5o 5o
5o 5o 5o
5o
5o
So
5o
So
So
$o 5o
$o 5o
So
$o
'50 5o 5o
5o
$o 5o 5o
So
(NORTH)------:---------------- s8L2,275
So
5o
5o 5o
5o
it,glL¡eo
5o
5o
5o
CAMINO RAMON IMPROVEM
¿
4
5o
5o
TOTATS
a
5o
$¡g,ooo 5r,o¿g,ooo
So
Szso,ooo 5o $o 5o
VALLEY HIGH
IMPROVEMENTS
$o 5o
515.0o0 5o 5o 5o 5¿z,ooo 5o 5o
5o 5o 5o 5o
SCHOOL5O -. 5O SAN RAMON VALLEY CREEK FOOTBRIDGE AT DANVILLE GREEN----.---- 5T,825,000 PARK AND RIDE EXPANSION PRO¡ECT-
c-594 STUDENTPARKINGATSAN RAMON
So
So
So So
'-ì
ct
o ct)
t
/)
Pavement Management Program Pavement Management Program The Town of Danvitle Pavement Management Program provides maintenance history and a pavement condition index (PCl) for al,t pubtic streets in Danvil.te using software provided by the Metropolitan Transportation Commission (MTC). The MTC sofrware is used within the Bay Area region. The Town annuatly performs pavement maintenance on publ.ic streets to the extent that funds are availabLe. Streets are selected based on PCl, loäation, and type of maintenance application. Maintenance apptications are slurry seats and pavement overlays. Sturry seals are thin appLications of Liquid asphaLt mixed with sand or rocl< chips. Asphaft overtays are 1 to 4-inch thicl< layers of hot asphaLt appl.ied to the road surface.
Streets with the same type of maintenance apptication are grouped together to help to reduce the cost of the project. Streets are also selected based on the PCl. The PCI is determined by fiel.d inspection of the actual pavement condition. New streets start at 1oo and as streets age the rating drops. The Town Council's goat is an average PCI of 70 and an average annuaI expenditure of 52,92O,Ooo.
completed Pavement Maintenance Projects for Fiscat Year zot6 rt77: Ackerman Drive Atamatos Drive Alice Court Allegheny Drive Atta Loma Court Amigo Road Arroyo Drive Baja Loma Court Belgian Drive Betten Court Btemer Court Btemer Road Bolero Court Bolero Drive Buena Vista Drive Bueno Court Cameo Drive Camino Amigo Court Camino Court Camino Encanto Canary Court Castanya Court Clydesdale Drive
Constitution Drive Contada Circle Corte Encanto corte Nogal Danvitta Court Diablo Court Dotphin Court Dotphin Drive Donna Lane Dutch Mitt Drive E[ Cajon Drive E[ Capitan Drive E[ Cerro Court El Quanito Court E[ Quanito Drive El Rincon Road El Sobrante Drive Emeratd Drive Fairway Drive Fetiz Court Gelding Court Greenbrook Drive Hightree Court
La lotla Court La Questa Drive
Lehigh Vatl.ey Circte Lehigh Valtey Place Love Lane Maiden Lane Mary Court Matadera Circte Matadera way Meadowlark Court MiLtbrook Court Montana Drive Peartree Court Pescadero Court Redondo Way Rhett Ptace Roan Drive San Gregorio Court San Thomas Way San Ysidro Court Santa Ctara Court Santa Clara Drive Santiago Court
Santiago Drive Sierra Vista Place 5itver Chief Pl.ace Silver Chief Way Sorrel Court 5urrey Court Tim Court Tyrrel Court Tyson Court Uttima Court Vailwood Court
Vailwood Drive Valte Verde Court Veda Drive Verona Avenue Via Cima Court Via Hermosa Vista Del Diablo
Willowmere Road Wiltowview Court Woodbine Lane
l Expected completion date of May 2017
ffi
cllr25
rr rvtr'.tltrr rtrl
ll.
-r
;,.!o.
Pavement Management Program Proposed Pavement Maintenance Projects for Fiscal Year 2OLTlLB The fol,towing streets are candidates for a pavement maintenance treatment:
Scenic Court loaquin Drive Detta Ptace Wa! Shadow Tree Court lulid Court Del.ta Way Way Shady Oak Court l(ingston Drive Derbyshiie Ptace Couri Sheri Court Way La Gonda Drive Diam-ond Court Sheri Lane La Pera Circte Dotcita Court Court Sierra Ridgq Court La Pera Court Dunhil.l, Court Barcetona Court Sitver Ctoud Ptace Way La Vista Dutch Mil.l. Drive Barcelona Place Smokewood Court Cìrcle Larkwood Court Edgegate Barrenger Drive Sonora Avenue Las Barrancas Drive Btemer-Ptace Edfnbîurgh Circl.e Sorrento Court Laurel Drive El. Capitãn Drive Blemer Road Squirrel Ri_dge Way Court Lavette Et Cei'ro Boulevard Btue Rock Court St Teresa Court Avenue Linda Mesa Road Et Pintado Bonanza Way Stoddard Court Liverpool Street El. PortaL Road Boone Court Stoddard Ptace Loch Lomond Way Entrada Mesa Lane Borica Ptace Stone Court Lane Logan Estates Drive Bottl,e Brush Court Stone Va.[[ey Road Lane Love Lane Esther circl.e Bridgewater Stratford Court Lowel,l" Drive Everett Court Broo"kside Drive Strawberry.Lane Ptace Loyal. Dragon Everett Ptace Buckeye Lane ptace Summerfietd Street Cõurt Midera Lane Fairmayden Burteilh ThornhiLl' Court Manchester Street Fairview Street Cabooie Pl.ace Timberline Court Marigotd Court Farnham Ptace Cal"istoga Court Town_t Country Drive Court Mariþosa Fountain Springs Circte CambríCourt Tree Creek Ptace Court Blossom Meadow Coi.¡rt Foxhal.t Drive Cameo Tunbrid-ge Road Mia Court Franciscan Drive Camino Amigo Turrini Court Ptace Mikado Freitas Road Camino Ramãn Tuscany Way Place Montego Street Camino Ramon Ptace Front Drive Ridge Mountãin Circte Gtasgow Tassajara Camino ].yþurn Place North Ctear Cieek Ptace Vall'ey Vi_ew Court Gtaslow Drive Campbett Ptaée Velasco Court North Oak Court Gl.as[ow Ptace Carl,yl.e Court Viewpoint Court Drive Rios Ocho Court GLen-Meadow Castänada Court Vista Drive Otdham Court Gtenhitt Court Castitl.e Court Wabash Ptace Ol.ney Court Gol.d Poppy Court Castteford Circl.e Waingarth Way Road l-titl' Park Grandviäw-Court Chadborne Court Weatherly Court Pinecone Drive Greenbrool< Drive Chadborne Drive Pinnacle Ridge Court West E[ Pintado Hardester Court Chateau Court Western Star Place Podva Road Hartz Avenue Chel.ta Court Westwich Street Court Porttand Way Hartz Christine Drive Whispering Trees Lane Pro_spect Avenue Headl,and Court Ctãypoot Court Wil'd Fl'ower Court Lane Hearttand Street Quinterra Clifîiide Orive Witdwood Court Avenue Railroad Crest Court Hidden Como Way Wittiam Court Court Ramon Drive Hitl. Meadow Dorádo Corte Wittow Drive Rassani Drive Hitt Meadow Pl,ace Creighton Way Windchime Drive Bud Court Red Hittview Drive Cresiridge Coúrt Windsor Court Circte lsland Rocl< Drive Hotbrook Crestridle Drive Wood Ranch Circte Rock Ridge Court Hope Lane Daisy Cõurt Wood Ranch Road Rose Strãet óãnã ffight.nds Court Hoi¡ston Court Zephyr Circle Court Carlo San Danvitte"Boulevard Jensen Court Court Paulo San Circle Joaquin Dayl.ight Pl.ace San Vicente Court Joa{uin Court De[ A-migo Road
Atmadine Al.ta Vista Ashtand Auburn Avon
5ee Project C-610 for more information about expenditures and funding.
úl lp#
CIP2b
u'l's'.,1;rr
rrtr
Ll..t :t.grlt
FÚ 9J
o
Tabte L - Projects Contributing to Overall Town Pavement Condition lndex Pr*
20t6lL7
Proiect Name
A-362 DOWNTOWN IMPROVEMENT PRO]ECT----.--
c-402
c-578 sAN RAMoN VATLEY c-584
$¿s&szo
So
$o
sb
54s7,959
5o
5o
5o
(SoUTH)-- SgsS,o¿ø
5o
5o
$o
5o
5o
5o
So
5o 51,971,486
So
ELPINTADOoVERLAY-ELCERROBLVD.TOT-680------BOUIEVARD LANE ADD|T|ON AND oVERrAy
DANVILLE VARIOUS STREfis AND ROADS
c.600 sAN
PRESERVATION.-...-------.-----. 5L,LT6,763
RAMON VALLEY BoULEVARD |MPROVEMENTS
c-ó01
CAMINO RAMON IMPROVEMENTS-
(NORTH)---------------
5o 5o
IMPROVEMENTS---_.--.--. ENT--.-.-.ROSE AND LINDA MEsA 5TREET IMPROVEMENT5.-------.-----.-.-
c-602
DANVILLE BOULEVARD
5o
c-610
PAVEMENÏ MANAGEM
5o
c.315
FRONT,
A-351 sAN RAMON VALLEY BLVD,
STREET
REPAIR----*-
A-360 DANVILLE BLVD. STREEI REPAIR-...
A-¡83 cAMrNo RAMoN A-361
EL CERRO
oVERLAY
(N0RTH)-----------
SUBDRAIN------.-_--
A-t67 cAMtNo RAMoN
(sOUTH) STREEÍ
REpAtR-------
S1,048,ooo
s872,275 5416,s36
$o
5z,6oo,ooo 5¡,ooo,ooo
So
5¡,ooo,ooo
SO
5o
$o 5O $0 So $o
f-t
Notstarted
So
Notstàrred
50
Notstarted
$0
5747,s83
5o
5o
$o
$o
SO construction complete
$s¿s,sor
5o
$o
5o
5o
50 $0 50
5z3t,zzo
5o
5o
$o
So
5o
5o
5o
5o
F>r
¿
rnpran/Design
5o
s11s,830
7
Under Construction
5o
construction comPlete 1999 2ooo
Construction Complete zoo0 Construction Complete 2ooo Construction Comptete 2oo1
589,s89
5o
5o
5o
5o
SO
Construction Comptete 2oO1
WEST----..-.----....._
;ss+,tøl
5o
$o
5o
5o
Construction Comptete2oo2
REPAIR--.-----
50 50 50 50 50 50 50 50 50
$zza,ooo
$o
5o
5o
5o
CAMINO TASSAJARA STREET REPAIR--.----.-..-..-..-
Szrr.ooo
So
5o
5o
So
A-t8ó
CAMINO TASSAJARA STREEÎ REPAIR - OLD ORCHARD TO SYCAMORE VALLEY
Sflz,az6
5o
5o
5o
5o
c-30ó
PAVEMENT MANAGEMENT
5o
So
So
$o
A-411
HARTZ AVENUE PAVEMENT REPAIR
STREET
5zo9r,gor
A-431 CAMARITASWAY AND CAMARITAS COURT RECONSTRUCTION----------LA GONDA WAY STREET
tn ptan/Design
$0 50 50
$o
4.370
A-441
o
$o
¡.;
A-569 SYCAMORE VALLEY ROAD
tn ptan/Design
5o
Sstl,zlz
J
SO
$5,ooo,ooo 55,ooo.ooo
A-3óó DIABLO ROAD
STREET REPAIR
F.l
20t7lL8, 20t8tL9 2019120 2O2Ol2t 2021/22 stðtus
IMPROVEMENTS-.------
RECONSTRUCTION--------.--.
c-475
CENTURY CIRCLE ANO WAY PAVEMENT
4.364
DIABLO ROAD STREET REPAIR EAST PHASE
c-173
PAVEMENT MANAGEMENT PROG
2----
ô^l¡
C.505
PAVEMENT MANAGEMENI PROG D^l¡
C.365
GREEN VALLEY ROAD STREET REPAIR-..-.-...
C.511
DIABLO AND GREEN VALLEY ROAD IMPROVÊMENTs
C.239
MAJOR ARTERIAL
C-547
PAVEMENT MANAGEMENT PROGRAM.--------.
C-240
TASSA'ARA RANCH DRIVE MEDIAN AND BICYCLE LANES-.
Construction Complete 2oo2 Construction Complete 2oo3
5267,s98
5o
$o
5o
So
S36i,384
So
5o
5o
$o
$¡¿,sso
$o
$o
5o
5o
536¿,ooo
5o
So
5o
5o
S822,288
$o
5o
5o
$o
5o
$o
5o
$o
$4,zoo,ooo
So
5o
5o
Szo,zoz
5o
So
5o
51,008,063
5o
5o
5o
5o
50
Construction comptete 2o1o
5¡or¿os
$o
$o
5o
5o
S0
Construction Comptete 2011
S4ooo,ooo
5o
5o
5o
5o
$O
Construction Comptete 2011
s850,546
So
5o
So
So
Construction Comptete zo12
S1,o5o,ooo
OVERTAYS-.--.--.-...
Construction Complete zoo2 Construction Comptete zooz
construction Completè zoos Construction Complete 2oo5 Construction Comptete 2oo5 Construction Comptete 2oo5
50 50
Construction Complete zooó
$o
$0
Construction Comptete 2oo9
5o
50
Construction Complete 2o1o
Construction Comptete 2006
C.570
PAVEMTNT MANAGEMENT PROGRAM.----..---
$z,ooo,ooo
5o
5o
5o
5o
$0 $0
C.319
HARTZ AVENUE BEAUTIFICATION - TINDA MESA TO RAILROAD.
58,717,2t7
5o
5o
5o
5o
S0
Construction Complète 2015
C.391
HARTZAVENUE BEAUTIFICATION - LINDA MESA TO DIABLO
Szss,zzo
5o
5o
5o
5o
50
Construction Comptete 20t5
RD.-.--------.-.-.-.
Continued on next page
Construction Comptete 2014
0412512077
rc o ) ')
o f-l
rJ 4
ca
4 Fl
FÚ
Ð
Ê) Pr*
Proiect
¿
Name
PROCRAM---------. SAN RAMON VALLEY EOULEVARD WIDENING._--PAVEMENI MANAGEMENT PROGRAM-----*---.
20t6lt7 20t7lr8 20L8lt9
--_-.
20 t9120
20zol2! 202U22
56,000,000
5o
5o
5o
So
SISS,SSS
5o
5o
5o
5o
56,022,208
5o
5o
$o
$o
c-ó05 RAILROAD AVENUE DECORATIVE CROSSWALKS AND PAVEMENT OVERLAY-- 5+Ig,+OO
5o
5o
5o
5o
5o
5o
5o
5o
c-s77 c-586 c.595
PAVEMENT MANACEMENT
----.
c.s08 CAMINOTASSAJARA/CROWCANYONSAFEÍEA.LUIMPROVEMENTS.
TnrÀr
c
57,882,745 S6o^2ts"96o
50 50 50 50 50
Status Construction Complete 2015 Construction Complete 2015
UnderConstruction 201ó Construction Comptete 2016 Construction Complete 2017
54876¡11 s¿.9ñ¿96 Sr,ooo,ooo st¡oopos S¡,mo,oos
o ) )
o ) rì
7
9J
Ê)
oa
o F.¿
o )
ô
-t
lJ Ë
NJ
oa
4
ÊJ
),)
o4125120t7 e
it:
Projects lndex of General I Pr# Project Name
nts Þ.y
Number
P
Page Status
A-064 LOCAL GENERAL IMPROVEMENTS - DISABLED
ClP31 Design
A-33OTOWN-WIDE STORM DRAIN sYsTEM
ClP32 Design, Modified
A-362 DOWNTOWN IMPROVEMENT PROJECT--A-443 DIABLO ROAD (EAST)DRAINAGE IMPROVEM
ClP33 Design
A-482 STREET LIGHT MAINTENANC
ClP35 Design
A-492 CENTRAL IRRICATION sYsTEM CAPITAL MAI
ClP36 Construction
ClP34 Adopted
A-515 CAMINO TASSAIARA PKWY/SYCAMORE VALLEY RD SOUND WALL MAINT.-------- ClP37 Construction A-514 PUBLIC PLACES FOR ART----crP38 Design, Modified A-529 DIABLO RD RETAININC WALL REPLACEMENT CREEN VLY TO CLYDESDALE-------. ctP39 Adopted, Unfunded A-530 HAP MAGEE RANCH PARK SLIDE MITICATION-
ctP40 Adopted
A-553 TOWN-WIDE LANDSCAPE REPLACEMENT-_------.--....-;-.-A-54O TOWN FACILITY SECURITY MONITORINC SYSTEM---.-
clP4l Construction
A-558 PARKING LOT MAINTENANC
ctP43 Design
caP42 Design
A-561 I-680 INTERCHANCE LANDSCAPINC AT SYCAMORE AND DIABLO ROADS-----.---. caP44 Adopted, Modified, Unfunded A.579 TOWN.WIDE ROADWAY DAMAGE REPAIR-.-
ctP4s Construction
A-580 TOWN OFFICE IMPROVEM A-604 LAUREL DRIVE BIOTREATMENT
ctP46 Design
A-608 STARVIEW DRIVE STORM DRAIN TRASH RACK------
ctP49 New clP50 New
caP47 Design A-606 AUTOMATED LICENSE PLATE READER T SITUATIONAL AWARENESs CAMERAS-- ctP48 Comptete, Modified
A-612 TOWN SERVICE CENTER SLIDE DRAINAGE REPAIRA-613 LOCH LOMOND WAYTRASH A-614 WESTRIDGE TRASH RACK MODIFICATION------
ctP51 New
A-615 CAMINO ENCANTO AT DEL AMIGO STORM DRAIN REPLACEMENT--A-620 FI BER OPTIC CABLE INÏERCONNECT----_-_---
ctPs3 New ctP54 New
clP52 New
Cl
l,29
,,r'r' r,,'.,llrr rt,t I l, -,':,._gor
Projects lndex of General lmprovements by Project Name Pr# Project Name
Page
Status
A-606 AUTOMATED LICENSE PLATE READER É SITUATIONAL AWARENESS CAMERAS-{1P48 Complete, Modified A-615 CAMINO ENCANTO AT DEL AMICO STORM DRAIN REPLACEMENT------------{1P53 New A-513 CAMINO TASSA]ARA PKWY/SYCAMORE VALLEY RD SOUND WALL MAINT.----.-CIP37 ConstruCtiON A-492 CENTRAL IRRIGATION 5Y5TEM CAPITAL MAINTENANCE---------------------{lP3ó A-529 DTABLO RD RETA|NtNG WALL REPLACEMENT GREEN A-443 DIABLO ROAD (EAST) DRAINAGE IMPROVEM
Construction VLY TO CLYDESDALE------{1P39 Adopted, Unfunded lP34 Adopted
trt 3 Design arb 54 New
A-362 DOWNTOWN IMPROVEMENT PRO]ECT A-620 FIBER OPTIC CABLE INTERCONN
--------clP4o Adopted A.530 HAP MAGEE RANCH PARK SLIDE MITICATI A-561 l-680 INTERCHANCE LANDSCAPINC AT SYCAMORE AND DIABLO ROADS--------(1P44 Adopted, Modified, Unfunded
FACILITYACCESS---
A-604 LAUREL DRIVE BIOTREATMENT A-064 LOCAL GENERAL IMPROVEMENTS - DISABLED LOT MAINÏENAN l-ç
A-514 PUBLIC PLACES FOR
ART---
A-608 STARVIEW DRIVE STORM DRAIN TRASH
RACK---------
---'---ClP38
Design, Modified
(1P49 New 5 Design
A-482 STREET LIGHT MAINTENAN A.540 TOWN FACILIW SECURITY MONITORINC
Design Design
A-580 TOWN OFFICE IMPROVE
REPAIRREPLACEMENT-------
A-612 TOWN SERVICE CENTER SLIDE DRAINACE A-535 TOWN-WIDE LANDSCAPE A-579 TOWN-WIDE ROADWAY DAMAGE REPAI
---(lP5o New -*---ClP41 Construction P45 Construction
Design, Modified
A-33OTOWN.WIDE STORM DRAIN SYSTEM MANAGEMENT
A-614 WESTRIDGE TRASH RACK
Design
----------{1P31 Design. 51 New Design
A-613 LOCH LOMOND WAY TRASH
A.558 PARKING
----------{1P47
MODIFICATION-----
clP3t)
------(1P52 New
\\,\\'\\'.(l;ìI tvl IIr.( iì.g()\'
Projects TOCAL GENERAL IMPROVEMENTS - DISABIED ACCESS GlpNo: n-oo¿l STATUS:
lnDesign I cn¡¡xPRoIECT:Yes I pnlonlry, 1/2ongoing I
pno¡TcTMANAGER: NNS
PRO]ECT DESCRIPTION AND LOCATION:
This project includes annual construction of handicap ramps, sidewalks, traffic signal modifications, and public park access on an as-needed basis during the upcoming five-year period. lmprovements will be selected on the basis of pedestrian traffic volume and where handicap accessibility is needed.
lmprovements will be installed in locations not affected by new development that would otherwise build the improvement. The Town's ADA Transition Plan will be used to prioritize projects.
DESCRIPTION OF MODIFICATIONS:
2}18t1g 2O1gt2O 2O2Ot21 2021t22 Total Design/Plan Review $88,369 $4,000 $4,000 $¿,OOO $4,000 $O $104,369 Construction $967,1 32 $45,000 $45,000 $45,000 $45,000 $O $1 ,147 ,132 lnspection & Admin. $19,955 $1 ,000 $1 ,000 $1 ,000 $1 ,000 $O $23,955 Total Cost Estimate: $1,075,455 $50,000 $50,000 $50,000 $50,000 $O $1,275,455 Expenditure Category Prior
Total
-
Years 2017t18
Expenditure: $765,750
Unexpended: $309,705 on 4-25-2017
PR O IE CT- APP RO P. R IATIO N AÀ¡D. F.IJNDING Funding Source(s) Prior Years 2017118 2018119
2019120 2020121 2021122 Total Src $50,000 $O $O $O $O $O $50,000 Src ($5,000) $O $O $O $O $O ($S,OOO¡ Residential TIP $1,030,455 $50,000 $50,000 $50,000 $50,000 $O $1,230,455 TotalFunding: $1,075,455 $50,000 $50,000 $50,000 $50,000 $O $1,275,455 Meas J Rtrn to Measure J Rtrn to
RATIONALE FOR PROPOSED PROlECT:
This project provides funding for smaller projects that are typically not part of a major CIP project yet require capital investment.
ffi
CIP3l
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operating costs per year: $0 tt'
tvtt'.tllr l rtrt I 1...'ir.!or
Projects TOWN.WIDE STORM DRAIN SYSTEM MANAGEMENT ctP No:
l-E¡o I
sTATUS: ln
Design I cnrrx PRoJECT:Yes
I
pn¡onlrY'
2
ongoing I
pno¡gcr
MANAGER: 5J
This pro;ect has been modified from the previous year PRO¡ECT DESCRIPTION AND LOCATION:
This project provides for ongoing capital replacement and maintenance of the Town-wide drainage system. Ongoing and as-needed work includes: Cleaning and desilting ditches and pipes as needed town wide. Repair of broken pipes, catch basins, and concrete lined ditches. Repair broken curbs, gutters, and valley gutters. lnstall trash removal devices in the Downtown area ($200,000). Repair existing ditch (Lomitas Ditch) in rear yards north of old Camino Tassajara west of Lomitas Road. Begin easement acquisitions. Repair of failed outfall pipe into San Ramon Creek at North HarE Avenue/Danville Boulevard.
Fno¡eer
DESCRIPTION OF MODIFICATIONS:
Removed repair of culvert under Diablo Road at Alameda Diablo.
..PRCItEçI.çCI5I.E5.TlMATF.-....Expenditure Category Prior
....pßrNTEÞaN....vt?t!n17.......
2021122 Total $O $O 586,742
Years 2017118 2018119 2019120 2020121
Design/Plan Review 586,742 $O $O $O Construction $983,909 $30,000 $30,000 $30,000 $30,000 $30,000 $1 ,133,909 lnspection & Admin. $34,979 $0 $O $O $O $O $34,979
$1,105,630 $30,000 $30,000 $30,000 $30,000 $30,000 TotalExpenditure: $865,119 Unexpended:$206,494on4-25-2017 TotalGost Estimate:
.
PNOff CÏ.
A
P.
P ROP. R
IAÏIO
N AT.ID.
$1,255,630
FUNDING
Years 2017118 2018119 2019120 2020121 2021122 Total CIP Gen Purpose Rev $399,500 $25,000 $25,000 $25,000 $25,000 $25,000 $524,500 Funding
Source(s)
Cleanwater
Prior
Program $623,000 $5,000 $5,000 $5,000 $5,000 $5,000
Contribution $83, 1 30 $O $0 $0 $O $O TotalFunding: $1,105,630 $30,000 $30,000 $30,000 $30,000 $30,000
RATIONATE FOR PROPOSED PROJECT:
basis.
llffiI
$1,255,630
EXPECTED IMPACT ON OPERATING BUDGET:
Maintenance of the existing storm drain system is needed on an
G
$648,000 $83,'1 30
Developer
CTP32
Additional worker hours required to maintain per year: 0 Additional ïown direct costs $o
11' 11'
u'.1 l;¡
¡ ¡
vi
||
L'.(-:r . g(
)\'
Projects DOWNTOWN IMPROVEMENT PRO¡ECT ctPNo: n-¡oz
I
STATUS: ln
Design I Cn¡¡l PROIECT:No I pruOnlrVt
I
z
pno¡¡clMANAGER:
FK
PRO¡ECT DESCRIPTION AND LOCATION:
Project 1: Evaluate street lights on Hartz and Railroad and E. Prospect to identify locations for additional street lighting to increase illumination. Phase
I
- COMPLETE.
Phase 2 - COMPLETE. Phase 3 - Replace 31 street light poles with 62 double acorn LED street lights on Railroad Avenue from Prospect to Danville Boulevard, Hartz Way, Diablo Road, and Love Lane with new post top acorn street lights on decorative poles (Est. $21 1,000). Project 2: ldentiff appropriate locations and install street furniture, such as benches. 2014115 ($2r,000). Project 3: Repair or replace curb, gutter, sidewalk, brick banding, pavement, and new trees within the core downtown area (est. $20,000) Project 4: Replace Railroad Avenue Parking Lot Lights with LEDs (est. $3o,ooo). DESCRIPTION OF MODIFICATIONS:
..PRCIEç.I.ç0.S.T.ESI|!!14TF....... Expenditure Gategory Prior
Review $46,000 Construction $435,470 lnspection & Admin. $7,350 TotalGost Estimate: $488,820 Design/Plan
TotalExpenditure: $167,493
.
PROIE CT. A P. P ROP. R IAIIO Funding Source(s) CIP Gen Purpose Rev LLAD Zone C
TotalFunding:
$338,820 $150,000 $488,820
$O $O $O $O
$O $O $O $O
$o $O $O $O
2021122 Total $0 $46,000 $O $435,470 $0 $7,350 $O $488,820
Unexpended:$321,327 on4-25-2017
N AT.ID.
Prior Years
$O $O $O $O
FUNDING...
2017118
2018119
$o $o $o
$0 $0 $o
RATIONALE FOR PROPOSED PROTECT:
2019120 $o $o $0
2020121
2021122
$o $o $o
$o $o $o
Total $338,820 $150,000 $488,820
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct costs oer vear: $0
New street light globes will improve lighting. Benches will enhance the Downtown experience.
ffi
....rßturEne$....Æw!?.o.1t......
Years 2017118 2018119 2019120 2020121
Ct t):ì:ì
t.'tt'rr'-t]lrr rvr I l,r.( ;ì.g( )\
Projects DTABTO ROAD (EASTI DRATNAGE TMPROVEMENTS CIP
No:
¡-++ll
STATUS:
Adopred I cn¡¡x pRotEGT:Yes
I
I pnlonlryr ¡
pno¡¡clMANAGER: 5l
PROIECT DESCR¡PTION AND IOCATION:
ln storm situations Diablo Road, across from the Diablo Gountry Club, has extensive silt runoff from the uphill side of the road causing roadside ditches to overflow. This has necessitated street closures and significant inconvenience to residents.
This project will modify the exisling retaining wall, expand and improve the roadside ditches and install headwalls adjacent to existing storm drain crossings.
Connect existing storm drain line. $'l 1,000. Modify retaining wall. $44,000. lnstall 1000 L.F. of concrete lined ditch behind the retaining wall. $43,175. Repair existing metal guard rail. $22,000
DESCRIPTION OF MODIFICATIONS:
..PRCI¡.8çT.çASI.ESIIMATE....... Expenditurecategory PriorYears 2017118
..BRrNrEperü....
2018119 2019120
Review $98,175 $O $O $O Construction $40,900 $O $O $O lnspection & Admin. $4,200 $O $O $O Total Gost Estimate: 8143,275 $O $O $O Total Expenditure: $0 Unexpended.. $143,275 on 4-25-2017 Design/Plan
..PNOff CT. AP. P ROP. RIATIO Funding Source(s)
N
Total Funding:
$22,000 $121,275 9143,275
RATIONATE FOR PROPOSED
PROIE$:
2017118
2018119
2019120
$o $o $o
$o $o $o
$o $o $o
2020121 $0 $o $o
2021t22 $o $o $o
Total $22;000 $121,275 $143,275
EXPECTED IMPACT ON OPERATING BUDGET:
lmprovements to the roadside drainage will reduce emergency callouts and will reduce silt runoff into the storm drain system.
ffi
$O $O $g $O
Mtzt!Nr2.......
2021122 Total $O $98,175 $O $40,900 $O $4,200 $O $143,275
AI.ID. FIINNINC
Prior Years
CIP Gen Purpose Rev NERIAD
2020121
cll)34
Additional worker hours required to maintain per year: 0 Additional Town direct operating costs per year: $0
t.,s n'.,IturvtI1, .( :r.!()\
Projects STREET TIGHT MAINTENANCE clpNo: n-+ezl STATUS:
tnDesign I CnsENPROIECT:No
I
pnlOn¡rV' 5/4Ongoing
I
pnO¡¡CTMANAGER: FK
PRO¡ECT DESCRIPTION AND TOCATION:
The Town's deteriorating wood pole street lights will need to be replaced on an ongoing basis. ln addition, this project may be used for maintenance and repair of the Town's street lights system.
Replace remaining Town-owned street lights, parking lot lights, pathway lights, and park facilities lights with LED fixtures as appropriate ($f 02,708) at:
Village Theatre, Clock Tower Parking Lot, Town Library, Sycamore Valley Park, Hap Magee Ranch Park, Diablo Vista Park, Oak Hill Park, Town Offices, and Town Service Center.
DESCRIPTION OF MODIFICATIONs:
pRor.E
cr..çosr.85.ï illtaï 8 ...... Expenditure Category Prior Years 2017118 2018119
Design/Plan Review $O $O $O Construction $514,036 $20,000 $20,000 lnspection & Admin. $O $O $O
ÞRINTFTì
2019120 $O
$20,000 $O
Estimate: $514,036 $20,000 $20,000 $20,000 TotalExpenditure: $199,689 Unexpended:$314,347on4-25-2017 Total Cost
.PROIE CT. A P. P RO P. RIATIO N -AI.ID. FUNDTNG 2017118 2018119 Prior Years Funding Source(s) CIP Gen Purpose Rev LLAD Zone C
TotalFunding:
9276,281 s237,754 $514,036
$o $20,000 $20,000
$o $20,000 $20,000
RATIONALE FOR PROPOSED PROJECT:
2019120 So
$20,000
$2o,ooo
2020121 $o $o $o $o
2020121
$o $0 $0
202.1
fIN:
M!?7!?.0.17........
t22
Total
$o $o $o $o
$o $574,036 $o
2021122 $o $o $0
$574,036
Total $276,281 $297,754 $574,036
EXPECTED IMPACT ON OPERATING BUDGET:
Some wood pole streetlights are in need of replacement. Other street light maintenance is
(l I Pfl5
Additional worker hours required to maintain per year: Town direct costs $o
\\'\\'\\'.(ìilr
0
ì\,1
I
lL.rr;r.g()\
Projects CENTRAL IRRIGATION SYSTEM CAPITAT MAINTENANCE CIPNo: p.-tgzlSTATUS: lnConstruction
I
I cn¡¡¡¡PRoIECT¡Yes I pnlonlry, uz
pno¡¡clMANAGER:
rr
PROJECT DESCRIPTION AND LOCATION:
Replacement of existing antiquated central irrigation syslem. Provides for access to all units from a central location, computer to support necessary software and hardware, and replacement of field units to enable programming from a central location. System includes built-in capabilities for programming water features and lighting amenities at all park sites and is expandable to include addition of possible rain gauges and weather stations. Phase 1: Diablo Vista, Sycamore Valley, Osage Station, Oak Hill, and Hap Magee Parks are COMPLETE. Phase 2: Roadside Zones A and B are COMPLETE. Phase
3: Weather
Center for Maintenance Service Center or other
suitable location.
DESCRIPTION OF MODIFICATIONS:
Expenditure Gategory PriorYears
2017118 2018119 2019120 2020121
Review $30,000 Construction $740,750 lnspection & Admin. $O Total Gost Estimate: $770,750 Design/Plan
Totaf
.
Expenditure: $689,610
PROTE CT.
Funding
AP.
P RO
P.
R
Source(s)
IAIIO Prior
$O $0 $O $0
$O $O $O $0
$O $O $O $0
Unexpended: $81,140 on 4-25-2017
N
$O $O $O $0
2021122 Total $O $30,000 $O $740,750 $O $O $0 $770,750
F.UNDING
"AÀID. Years 2017118 2018119 2019120 2020121 2021122
Rev $73,612 Facilities $697,138 Total Funding: $770,750 CIP Gen Purpose Park
$O $O $0
$O $O $0
RATIONALE FOR PROPOSED PROJECT:
$O $0 $0
$O $O $0
$O $0 $0
Total $73,612
$697,138
$770,750
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operating costs per year: $o
ffi
CII'3tr
*'s,rr'.,ìrr rvl I l,
.r
:,.gtrr
Projects CAMINO TASSA]ARA PKWY/SYCAMORE VALTEY RD SOUND WAtt MA¡NT. CIP No: n-Sr¡ I STATUS: ln Construction I cn¡¡xpRotECT:No I pnloRlrv,2/3ongoing I pno¡¡cruINAGER:
NNS
PROJECT DESCRIPTION AND TOCATION:
Establish an ongoing maintenance program for the sound walls maintained by the Town, generally along Camino Tassajara Parkway and Sycamore Valley Road. Estimates of future wall maintenance costs based on last year indicated additional funding is needed to maintain current quality standards and repair failures. 2012113 - Added LLAD funding
DESCRIPTION OF MODIFICATIONS:
..PRQIEç.T.ç05I.ESI|M-4TF....... Expenditure Category Prior Design/Plan Review Construction
lnspection & Admin.
Total Gost Estimate: Total Expenditure:
$o $565,420
$17,30s $582,725 $174,856
$0 $o $o $0
$15,000 $85,000 $12,000 $112,000
Rev $457,725 B $125,000 TotalFunding: i582,725 CIP Gen Purpose LLAD Zone
ffi
$o $o $o $o
$0 $o $o $o
e.¡¿t?.5!?.o17.......
2021122
$o $o $o $o
Total
$15,000 $650,420 $29,305
$694,725
Unexpended: $0 on 4-25-2017
PRO IE CT. AP. P ROP- RIATIO N AI.ID. FUNDTNG Funding Source(s) Prior Years 2017118 2018119
I
..rßiNrEDoN:....
Years 2017118 2018119 2019120 2020121
$O $112,000 $o $o $O $112,000
RATIONATE FOR PROPOSED PROIECT:
2021122 Total $O $569,725 $O $O $125,000 $O $O $694'725 $O
201Sl2O 2020121
$O $o $O
EXPECTED IMPACT ON OPERATING BUDGET:
Ongoing maintenance is needed for the 20 year old infrastructure.
cll)37
Additional worker hours required to maintain per year: 150 costs oer vear: $o Additional Town direct
n'u'u'.,1r, t n'r I l, .,'r,.g,rr
Projects PUBLIC PLACE5 FOR ART clPNo;
n-sr¿l
@
STATUS:
tnDesign I cne¡npRoIEcT:No
pno¡¡cTMANAGER: HRp
Thrs prolect has been modified from the prevrous year PRO]ECT DESCRIPTION AND LOCATION:
,
t
,
#
tu'
'l
ri¡tf
I pnloRlry,2/Jongoing I
û'
'l íI
$t
This project has been recommended by the Arts Commission and the Parks, Recreation, and Arts Strategic Plan. This project will help develop a plan to integrate public art into parks and facilities which will include identifying potential places to exhibit both permanent and temporary art in public places. Methods may include: Commissioning artwork lntegrating art into play areas Artist designed or embellished site furnishings (benches, bollards, bike racks, etc.) Embellishing utility infrastructure.
':È¡' ;l*r'
-
i
{r rü:
a DESCRIPTION OF MODIFICATIONS:
Updated description. Added $60,000 to 2017118.
.PßA J.E ç.ï..ç.4 5.ï. E s.T ! M.Ar 8...... Expenditure Category PriorYears
..pRl NTEp- 9
2017118 2018119
Review $60,000 $60,000 Construction $O $O lnspection & Admin. $O $O Total Cost Estimate: $60,000 $60,000
$O $O $O $O
Design/Plan
Total
Expenditure: $48,391
2019120 $O
$O $O $O
¡t-.
-
-
9+ !?! !2-.0.1.!.....
2020121 2021122 $o $o $o $o
-.
Total
$t 20,000
$o $o
$o $o
$o $o
$120,000
Unexpended: $l f ,609 on 4-25-2017
..PROIE CT. AP. P RO P. R I ATIO N AI.ID. FUNDING Funding Source(s) PriorYears 2017118 2018119
Rev $60,000 $60,000 TotalFunding: $60,000 $60,000 CIP Gen Purpose
$0 $O
RATIONALE FOR PROPOSED PROJECT:
2019120 $o $o
2020t21
$o $o
Total
2021t22 $o $o
$120,000 $120,000
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operating costs per year: $0
Will provide the Town with a plan to deal with requests for displaying art in public spaces in a comprehensive fashion
CIP38
$'$'$,.r1
ir
r
rrri Il.-.(':r.g()\
Projects DIABTO RD RETAINING WALL REPLACEMENT GREEN VLYTO CLYDESDALE ctpNo: A-5291 srnrus:
Adopted
I cnesNpRotECT:Yes I pnloRlw, uz
I
pno¡¡crulNAGER: ScL
Thrs pro¡ecl is currently unfunded PRO¡ECT DESCRIPTION AND LOCATION:
Replace 1300 LF of 7 foot maximum height retaining wall along north side of Diablo Road between Green Valley Road and Clydesdale Drive. The existing wall provides structural support for the roadway and adjacent multiuse path. This project requires state and federal resource agency permits.
NFUNDED
DESCRIPTION OF MODIFICATIONS:
.-PßCILEçT-ç05I.85ï1M4T8......... Expenditure Gategory Design/Plan Review Construction lnspection & Admin.
Total Cost Estimate: Total Expenditure:
.............;.........................p8rul8ne$.....q{t?r!?.0:¿.......
PriorYears 2017118 2018119 2019120 2020121 $75,246 $451,473 $30,500 $557,219 $o
$o $o $o $o
$o $o $o $o
$o $o $o $o
$o $o $o $o
2021122 $o $o
$o $o
Total $75,246
$451,473 $30,500 $557,219
Unexpended: $0 on 4-25-2017
."PROIECT.AP.PROP.RIAIION.AI.ID.FUIìIDING. Funding
Source(s) Prior Years 2017118 2018119 2019120 2020121 2021122
Untunded-87 $557,219 $O Funding: $557,219 $O
Total
RATIONALE FOR PROPOSED PRO]ECT:
Existing retaining wall is failing leading to loss of trail and additional road maintenance.
ffi
$O $O
$o $O
$O $O
$O $0
Total
$557,219 $557,219
EXPECTED IMPACT ON OPERAÏING BUDGET:
Additional worker hours required to maintain per year: 38 Additional Town direct operatinq costs per year: $2,500
cll,39
\\'\\'\\
-(1;lr
rvlll(
.(
rì-!()\
Projects HAP MAGEE RANCH PARK STIDE MIT¡GATION crP No:
r-s¡o I sTATus:
Adopted
I
I
cn¡¡n PRoIECT:No I PRloRlrY: 4/5
pRo¡ecruANAGER:
RE
PRO'ECT DESCRIPTION AND TOCATION: Participate in the mitigation of a land slide on the northerly portion of Hap
Magee Ranch property and the adjacent former YMCA property. The amount shown in the CIP is the Town's maximum share. Reserve project and funding until status of former YMCA property is determined.
DESCRIPTION OF MODIFICATIONS:
.PRA#çÏ.ç95I.ESI|MATF..--... ExpenditureGategory PriorYears 2017118
.....BNNTEnpM.
Review $O $0 $O $O Construction $150,000 $O $O $O lnspection & Admin. $O $O $O $O Total Cost Estimate: $150,000 $0 $O $O Total Expenditure: $O Unexpended: $150,000 on 4-25-2017 DesignlPlan
"PROIECT.AP.PROP.RIAIION.AI.ID.F.UNDTNG.. Funding
Source(s)
Prior
Years 2017118
Rev $150,000 Totat Funding: $150,000 CIP Gen Purpose
2018119
$O $O
$O
$0
RATIONATE FOR PROPOSED PROJECT:
2019120 $0 $o
$o $O $O $0
2020121
$o $o
$O $O $O $O
Total $0
$150,000 $O
$150,000
Total
2021122
$150,000 $150,000
$o $o
EXPECTED IMPACT ON OPERATING BUDGET:
Mitigation will prevent future damage to Hap Magee Ranch Park property and the YMCA.
ffi
...e.u?t!?en.......
2018119 2O19l2O 2020121 2021122
CII'4O
Additional worker hours required to maintain per year: 0 Additional Town direct ooeratino costs oer vear: $0
\\'\\' \\'-(1ir¡
ì\,1 I ì(
-(-iì.!o\
Projects TOWN.WIDE LANDSCAPE REPLACEMENT CIP
No:
l-S¡¡ I
I
STATUS: ln Construction
cn¡rxpRolEGT:yes lpnton¡ryr 1/2ongoing
I
pnot¡clMANAGER:
AR
This pro¡ect has been modified from the previous year PRO]ECT DESCRIPTION AND IOCATION:
Re-landscaping and irrigation upgrades of roadside and turf areas to increase productivity and efficient use of water resources. Sites include: Camino Tassajara @ Gate Tree Drive. Camino Tassajara @ Tassajara Lane. COMPLETE W. Prospect Ave. @ lron Horse Trail. Front Street Mini-Park. San Ramon Valley Road @ lron Horse Trail. Crow Canyon Road (both sides). Anderson East and West shrubs. Cameo Crest shrubs. North Ridge shrubs. Messiah Lutheran Church shrubs and turf Danville Boulevard shrubs
DESCRIPTION OF MODIFICATIONS:
Remove drought restrictions.
..PRAl.Eç.T. ç05r.85.T !M4r8...,..... Expenditure Category Prior Years 2017118
Review $16,551 Construction $230,498 lnspection & Admin. $O Total Cost Estimate: $247,049 Design/Plan
TotafExpenditure: $94,164
PRO I E CI. A P- P RO
P.
Funding Source(s) CIP Gen Purpose Rev LLAD Zone A LLAD Zone B Park Facilities
TotalFunding:
R
PRINTED
2018119
$O $O $O $O
$0 $O $O $O
$o $o
$247,049
$o $o $o $o
$o $o $o $o
RATIONALE FOR PROPOSED PROIECT:
$O $O $O
$o $o $o $0
2021122
$o $o $0 $o
Total
$16,551 $230,4e8 $o
$247,049
2019t20 2020121
$o $o $o $o $0
$0 $o $o $o $o
Total
2021122 $0 $o $o $o $o
$226,013 $o $21,036 $o
$247,049
EXPECTED IMPACT ON OPERATING BUDGET:
Better use of the water resource and use of plant material native to this area.
ffi
$O
2020t21
0412712017
Unexpended:$152,885on4'25'2017
I ATIO N AÀID. FUNDTNG. 2018t19 Prior Years 2017t18 $o $o s226,013
$21,036
2019120
ON:
CIP4l
Additional worker hours required to maintain per year: Additional Town direct operati no costs oer vear: $0 rvrvrr'.tì:rr lvt
0
I
lt.t ;r.got
Projects TOWN FACILITY SECURITY MONITORING SYSTEM
I STATUS: lnDesign I
clPNo: ¡-s¿o
Cn¡gnpROtECT:No
I
pn¡ORlrVr z
PRO¡ECT MANAGER: CP
ù' PRO'ECT DESCRIPTION AND LOCATION:
Irt
Development of a comprehensive and integrated plan to monitor activities at town facilities that require additional security. Phase 1: Plan and development; installation of system infrastructure and surveillance equipment at Village Theatre. COMPLETE.
tr
.r'täå
'f,f*"'
i iit'
Fñ!¡ãT'
Phase
2:
lnstallation of system infrastructure and surveillance equipment at Oak Hill Park Community Center. COMPLETE.
Phase
3:
lnstallation of system infrastruclure and surveillance equipment at: Town Offices Danville Community Center Sycamore Valley Park Diablo Vista Park Library and Community Center Hap Magee Ranch Park Osage Station Park Park and Ride Facility
*h,i
'I
,,
.4 I
I r-'
r¡
tÜ
4¡f'-.
i\"',
'.;.
I
.-'a J rt, rt ' L'-
,.'.'.
I ilr'ii'",
DESCRIPT¡ON OF MODIFICATIONS:
q
..PRP.IEçI.ç05.T.8S.T1M4TF........ Expenditure Category PriorYears Design/Plan Review
$10,000 $70,000
Construction
lnspection & Admin.
$o
Total Cost Estimate: Total Expenditure:
.
PROIECT- APP RO Funding
$8o,ooo
$20,517
P.
RI
Source(s)
ATIO
Prior
....pß,nrrEp.aN;..
2017118 2018119 2019120 2020121
$o $o $o $o
$o $o $o $o
$o $o $o
$o
$o $o $o $o
...wr?tt2.et.....
2021122
$10,000 $70,000
$o $o $o $o
$o
$80,000
Unexpended: $59,483 on 4-25-2017
N
FUNDING
"AÀID. Years 2017118 2018119 2015120 2020121 2021122
Rev $80,000 Total Funding: $80,000 CIP Gen Purpose
Total
$O $O
$O $0
RATIONALE FOR PROPOSED PRO]ECT:
$o $O
$O $0
$O $O
Total $90,000 $80,000
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operatinq costs per year: $0
ffi
(-.Irt42
\\,\\'\\'.(lltr )\,t | ì( ( iì.g()\
Projects PARKING LOT MAINTENANCE CtP
No: n-sse
I
sTATUS: ln
Design
I
cn¡¡n PRoJECT:Yes
I
I
pruon¡ryt 2 ongoing
pno¡¡clMANAGER:
NNS
PRO¡ECT DESCRIPTION AND TOCATION:
Maintain the followin g town-owned facilities: Front Street Parking Lot Clocktower Parking Lot Railroad Depot Parking Lot Library and Community Center Parking Lot Village Theatre and Town Meeting Hall Parking Lot Municipal Service Center Parking Lot (including Church) Parking lots located in parks will be maintained with each park maintenance project. Ongoing maintenance includes landscaping, striping, surface repair, lighting, and irrigation. Maintenance and repair will be on an as-needed basis.
DESCRIPTION OF MODIFICATIONS:
Expenditure Gategory Prior
$O $O $149,304 $O SO $O $149,304 $O Total Expenditure: $9,635 Unexpended: 9139,669 on4'25'2017 CapitalMaintenance
Total Gost
Estimate:
PROIE CT. A P. P RO P. R IATIO N.AI.ID. FUNDING Funding
Source(s)
Src Funding:
Meas J Rtrn to
Total
Prior
2021122 Total $O $149'304 $O $O $O $149'304
Years 2017118 2O18l1S 2O19l2O 2O2Ol21
Years 2017118
$149,304 $149,304
$O $O
2018119 $O
$0
RATIONALE FOR PROPOSED PROIECT:
201
9t20
$o $0
2020121
2021122
$o
$o $0
$o
Total $149,304 $149,304
EXPECTED !MPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 costs oer vear: $0 Additional Town direct
ffi
cIP4:ì
tv*'..'.,]ru tt'r Il,
., ,t.q,rr
Projects I.680 INTERCHANGE LANDSCAPING AT SYCAMORE AND DIABLO ROADS clp No: A-561
| srnrus:
Adopred
I cn¡n
pRotECT:yes
I
pn¡onlryr
I
¿
pno¡¡cr
¡rarNAGER: BR
This prolect is unfunded and has been modified PRO¡ECT DESCRIPTION AND LOCATION:
*þ
Renovation and reiandscaping in the freeway interchanges at Sycamore Valley and Diablo Roads. Project includes new landscaping and irrigation system, repairs and upgrades. Project provides funds for low maintenance effort. This project requires adoption form the local California Garden Club and also needs Caltrans approval.
DESCRIPTION OF MODIFICATIONS:
Updated description to include California Garden Club and Caltrans
approval. Moved project 1o2020121. Changed to UNFUNDED.
.PRQLECT.C05I.H5Iil!{AT8......... Expenditure Category PriorYears 2017118
$o $o $o $o
Design/Plan Review Construction lnspection & Admin.
Total Cost Estimate: Total Expenditure:
$O
PRINTED
2018119
$0 $o $o $0
$o $o $o $o
2019120
2020121
$o
$o
$o $o $o
$367,000 $2,400 $369,400
ON:
04,12712017
2021122
$o
$204,000 $2,400 $206,400
Total
$o $571,000 $4,800 $575,800
Unexpended: $0 on 4-25-2017
.PROIECT.AP.PROP.RIAIION"AI.ID.F.UNDII.¡.G. Funding
Source(s)
Unfunded-87 Total Funding:
Prior
Years 2017118 2018119 2019120 2020121 2021122 Total $O $O $O $O $360,000 $215,800 $575,800 $O $0 $O $O $360,000 $215,800 $575,800
RAT¡ONAIE FOR PROPOSED PROJECT:
Beautification of Danville's freeway interchanges.
G mwt
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per Additional Town direct costs
c.lr'44
year:
210
*'tv rr'.,1¡ r rvl I l..r':r. gor
Projects TOWN-WIDE ROADWAY DAMAGE REPAIR GIPNo: ¡-SZS
I
I
STATUS: ln Construction
cn¡rrpRoJECT:No I pRloRlrv, J/4ongoing
I
pno¡¡cTMANAGER:
DC
PRO'ECT DESCRIPTION AND TOCATION:
Repair damage to guardrails, retaining walls, asphalt berms, street signs, town-owned street light poles, roadside irrigation controllers, traffic signals poles, landscaping, trash cans, and other roadside street infrastructure. Funds from this capital project may be used when cost recovery has failed.
DESCRIPTION OF MODIFICATIONS:
2021122 Total $O $120,000 CapitalMaintenance $60,000 $15,000 $15,000 $15,000 $15,000 $O $120,000 TotalCost Estimate: $60,000 $15,000 $15,000 $15,000 $15,000 Expenditure Category PriorYears
TotalExpenditure: $34,431
PROIE
CT. AP. P ROP. R
ÆTO
2017118 2018119 2019120 2020121
Unexpended:$25,569on4-25-2017
N AÀID.
FUNDING
Source(s) PriorYears 2017118 2018115 2019120 2020121 2021122 Total $O $120,000 CIP Gen Purpose Rev $60,000 $15,000 $15,000 $15,000 $15,000 $60,000 $15,000 $15,000 $15,000 $15,000 $O $120,000 Total Funding: Funding
PROIECT:
RATIONAIE FOR PROPOSED EXpECTED tMpACTON OpERAT¡NG BUDGET: Additional worker hours required to maintain per year: 0 Funding for damage repair caused by vehicular accidents, acts cosls ner vear: $0 nature, and vandalism when not covered by the operating budget. Additional Town direct
of
CII'45¡
tt rvrr'.tlrrtrVllit -t :r.gOr
Projects TOWN OFFICE IMPROVEMENTS clP No: n-sao
I STATUS:
tn
Design I cnr¡t pRo¡EcT:yes
I
pRloRtTy: 1/2
PROTECTMANAGER: IAC
PRO¡ECT DESCRIPTION AND LOCATION:
The public use portion of the Town Ofüces have not been remodeled or upgraded since the Town acquired the building in 1985. The front lobby, public hallway, restrooms and conference rooms are in need of repair and improvement. This project would + Expand and upgrade the public lobby and hallway, including expanding the permit counter, new windows and front doors; + Upgrade and renovate the public restrooms; + Add new office space to house the Chief Building Official and the Plans Examiner; + Expand the north conference room from 375 to 1,000 square feet in size; sufficient to accommodate meetings of 50-60 people and stateof{he-art video and audio systems; + Replace and upgrade HVAC systems, ceiling tiles and lighting.
DESCRIPTION OF MODIFICATIONS:
PRINTEDON:
Expenditure Gategory PriorYears Design/Plan
Review $154,000
Contingency Construction
$90,000 $697,800 $941,800
Total Cost Estimate: Total Expenditure:
.
PROIE CÏFunding
2017118 2018119
AP.
$39,700
Prior
Rev $941,800 Total Funding: $941,800
$O $O
$o $o
2021122
$o $0 $o $0
Total
$154,000 $e0,000 $697,800 $941,800
FUNDTNG
$0 $O
$O $0
PROIECT:
Enlarge the Town Office Lobby and work area, adds new and new offices. Adds to conference room capacity
ffi
2020t21 $0 $o
$O
0412712017
"AÀID. Years 2017118 2O1Sl19 2019120 2020121 2021122
CIP Gen Purpose
RATIONALE FORPRopoSED
$O $O $O $O
$0 Unexpended: $902,100 on 4-25-2017
P ROP. RIATIO N
Source(s)
$O $O $O $O
2019120
$O $O
$O $0
$O $O
Total
$941,800 $941,800
EXpECTED tMpACTON OpERATIN6 BUDGET:
furniture, Additional worker hours required to maintain per year: Additional Town direct operatino costs oer
CIP46
vear:
0
$0
\\ \\'\\'.(ìirr rVl I ìL -( ;l.g( )\
Projects TAUREL DRIVE BIOTREATMENT FACITITY ctp No: t-oo¿
|
5TATUS: tn
Design I cn¡rt pRotECT:Yes
I pn¡onry,
rrz
I
pno¡gcr MANAGER: ScL
PRO¡ECT DESCRIPTION AND TOCATION:
Biotreatment facilities satisfy the Municipal Regional Storm Water Permit requirements. Some capital projects, such as new parking lots or street widening may use offsite treatment facilities in lieu of onsite. This project provides a biotreatment facility in the existing improved channel located south of Laurel Drive and east of the Park and Ride Facilig. The existing improved channel is owned by the Town. lt currently transports storm water collected from the southwest quadrant of the Town. The biotreatment facility will consist of several biotreatment ponds constructed within the improved channel. (Refer to page 70 of the 6th Edition STORMWATER C.3 GUIDEBOOK, dated February 15,2012tor similar details.) The project is phased to accommodate the need for biotreatment capacity. Phase 1 will be constructed at the downstream end ofthe channel near Laurel Drive. Phases 2 through 6 will be constructed upstream as needed using development or project mitigation fees. DESCRIPT¡ON OF MODIFICATIONS:
.,Pß0.¡.8çT.ç95I.FSI|MAï8..... Expenditure Category Prior
EnvironmentalReview
Design Construction Total Gost
Estimate:
.....BRrNrEReN....Mt2t!?.017.......
2021122 Total $O $O $30,000 $0 $O $12,155 $O $40,180 $O $72,930 $O $199,080 $O $85,085 $0 $269,260
Years 2017118 2018119 2019120 2020121
$30,000 $17,000 $60,000 $107,000
$O $O $O $11,025 $O $66,150 $O 577,175
TotalExpenditure: $7,925 Unexpended:$99,075on4-25-2017
..PROIECT. A P. P ROP. RIATIO N Al,tD. F.t NDTNG Funding Source(s) Prior Years 2017118 2018119 CIP Gen Purpose Rev $107,000 TotalFunding: $107,000
$O $77,175 SO $77,175
RATIONALE FOR PROPOSED PROJECT:
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct ooeratinq costs per vear: $0
Provide bio retention capacity for CIP projects.
ffi
2021122 Total $O $85,085 $O $269,260 $O $85,085 $O $269,260
2015120 2020121
cTP47
s'rvu'.t1;rr rvr I lt .r-;r.gor
Projects AUTOMATED LICENSE PTATE READER & SITUATIONAL AWARENE5S CAMERAS CtPNo:
¡-oool
STATUS: compteted
zou I
GREENPRoIECT:No
I
pruoRlrYr
u2ongoing
I
pno¡ecTMANAGER: 55
Thrs pro¡ect has been modified from the prevrolrs year PROTECT DESCRIPTION AND IOCATION:
Fixed Automatic License Plate Readers (ALPRs) mounted on traffic signal or street light poles in key ingress locations. Situational Awareness Cameras (Sitcams) that capture real{ime footage in an intersection provide information in addition to ALPRS. This project provides for the installation of cameras at 13 intersections and 6 patrol vehicles. Sitcams will also be installed at Oak Hill Park. There will be a total of 36 ALPRs,18 Mobile ALPRs, and 33 Sitcams. Ongoing maintenance of the system is provided by this project.
f Êäî'ËffiK_ :.ä"ffiä DESCRIPTION OF MODIFICATIONS:
This is now an ongoing maintenance project.
..P
RAL.E
çÏ. ç9
5.Ï.
E
5.T
I
M.AI
Expenditure Category Prior
PRINTEDoN:
E.
Years 2017118 2018119
Equipment $839,360 $O $O Capital Maintenance $O $65,600 $65,600
2019120 $O
$65,600 $65,600
Estimate: $839,360 $65,600 $65,600 TotalExpenditure: $748,664 Unexpended:$90,696on4-25-2017 Total Cost
2020121
$o $65,600 $65,600
041î¿712017
2021122 Total $o $839,360 $65,600 $65,600
$328,000 $1,167,360
..PROIECT.AP.PROP.RIAIIONAI.ID.FUNDING-.-. Funding
Source(s)
Prior Years
2017118
2018t19
$839,360 $839,360
$65,600 $65,600
$65,600 $65,600
Rev TotalFunding: CIP Gen Purpose
RATIONATE FOR PROPOSED PROIECT:
Prevent property crimes and provide investigative information
ffi
2015120
$65,600 $65,600
2020121
2021122
$65,600 $65,600
$65,600 $65,600
Total $1,167,360 $1,167,360
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operatinq costs per vear: $74,000
CIP48
u'tt'u.,1lrr rt,r ll, r tr.gor
Projects STARVIEW DR¡VE STORM DRAIN TRASH RACK GIPNo:
n-ooal
I cns¡r
STATUS: New
PRoIECT:No
I
pRronrrvt
I
rlz
pno¡¡clMANAGER: sl
PROJECT DESCRIPTION AND LOCATION:
The existing drainage system receives forest debris during major storm events that cause the system to clog at the trash rack entrance causing flooding downstream. To prevent clogging a larger and more extensive trash rack is needed to replace the existing trash rack. The proposed trash rack will be approximately 6'wide by 20'long by 6'tall and will consist of large galvanized iron bars with approximately 10" gapé. Large debris, logs, and rocks will be filtered from the stream flow. The increased trash rack area will minimize clogging and allow for easier cleaning, both during and after the storm event.
DESCRIPTION OF MODIFICATIONS:
.PR9.r.EçT. çCI 5r..85.ïlMAï8...... Expenditure Category Prior
Construction lnspection & Admin. TotalGost Estimate: Total Expenditure:
Years 2017118
ÞRINTED
2018/19
$O $30,000 $O $3,000 $O $33,000
2019120
$O
$o $o
$O
$o
$O
2020121 $o $o $o
ON:
04'127n017
2021122
$o $o $o
Total $30,000 $3,000 $33,000
Not Available
.PROIECT-AP.PROP.RIAIION.AI.ID.FUNDING..-. Funding
Source(s)
CIP Gen Purpose Rev TotatFunding:
RATIONALE FOR PROPOSED
Prior
Years 2017118
2018119
$O $33,000 $0 $33,000
PROIECT:
$O $O
2019120
2020121
2021122
$o $o
$o $o
$o $o
Total $33,000 $33,000
EXpECTED tMpACT ON OpERATING BUDGET:
Excessive debris and silt contribute to flooding on Danville streets. Additional worker hours required to maintain per year: 25 Additional Town direct ooeratino costs oer vear: $'l,500
cIP4f)
tt'rvrr'.,
1:rr
rvt
ll. -,
".!,r.
Projects TOWN SERVICE CENTER STIDE DRAINAGE REPAIR €tPNo: n-orz
|
I cn¡¡r
STATUS: New
PRolEGT:Yes
I
PmoRrrY: 1/2
PRO,ECTMANAGER: DC
PRO¡ECT DESCRIPTION AND LO€ATION:
Due to lhe recent storm activity in 2017, there are several new land slide areas in the vicinity of the Town Service Genter. The existing concrete lined ditches and drainage pipes are no longer fully functional. The existing landslide is causing water to pond at the head scarp.
This project adds plastic pipe on the surface that will improve storm drainage, mitigate and stabilize the land slide areas to protect the Tovr¡'r Service Cenler.
DESCRIPTION OF MODIFICATIONS:
..Pß0¡.8 ç.T..ç95.T.8 5r I t{AT 8..... Expenditure Category Prior Years
Review Construction lnspection & Admin. Total Cost Estimate: Total Expenditure: Ðesign/Plan
.
P.
AOIECT.
Funding
AP.
$O $O $O $O
PRINTED ON:
2017118
2018119
$1,500 $25,000 $1,500 $28,000
$O
$o $o $o
$0
$0
$O $O
Not Available
PRO P. R IATIO N AÀID. F.UI.IDTNG Prior Years 2017118 2018119
Source(s)
Rev TotalFunding: CIP Gen Purpose
RATIONAIE FOR PROPOSED
$O $28,000 $0 $28,000
$O $O
PROIECT:
lmprovements to the storm drainage system and slide mitigation required to protect the Town Service Center
ffi
2019120
is
2020121
$o $o $o $o
2021122
$0 $o
$0 $0
x!?7!?91!.....
Total $1,500 $25,000 $1,500 $28,000
2021122 Total $O $O $28,000 $0 $O $28,000
2O19l2O 2O2Ol21
$O $0
EXpECTED tMpACT ON OPERAT¡NG BUDGET¡
Additional worker hours required to maintain per year: 0 Additional Town direct ooeratino costs oer vear: $0
CII'5o
u'rr'11'.¡];¡¡11,¡ I1, ., ;r-_gor
Projects LOCH LOMOND WAY TRASH RACK ctP No:
n-ors
I
I
I cn¡¡r PRoJECT:No I pRronlry, r
STATUS: New
pno¡eclMANAGER:
DC
PROTECT DESCRIPTION AND TOCATION:
Excessive silt and debris from major storm events clog and overflow the storm drain inlet at the end of Loch Lomond Way. Modlflcation and replacement of the existing inlet and pipe is needed to mitigate the debris collection and subsequent overflow of the drainage system.
DESCRIPTION OF MODIFICATIONS:
ç9.sr.Es.T l.M.Ar E....... Expenditure Category Prior Years
..p ß.p.t E ç.T.
Construction
Total Cost Estimate: Total Expenditure:
$O $0
.PN NTEp.
20'17118
2019t20
2018119
$24,000 $24,000
$o $o
$o $o
Not Available
..PROIE CT- AP- PROPR¡ATTON AÀID. FUNDTNG Funding Source(s) PriorYears 2017118 2018119 2019120
Rev Funding: Total CIP Gen Purpose
$0 $24,000 $O $24,000
$O $O
RATIONALE FOR PROPOSED PROJECT:
2020t21
2021122
$O
$o
$O
$0
$o $o
Total $24,000 $24,000
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 costs oer vear: $0 Additional Town direct
Excessive silt and debris cause downstream damage.
ÉÈ MW
0n.....q il?T !?p.17 - -.....
2021122 Total $o $24,000 $o $o $o $24,000
2020121
CIPs1
\\'\\'\\'.(ì:r
r
ì\11
llr'.( iì -g()\
Projects WESTRIDGE TRASH RACK MODIFICATION CIP
No: n-er¿
I
I
I cn¡¡¡¡PRorEcr:No I pRronrrv' uz
STATUS: New
pnor¡clMANAGER: sl
PRO]ECT DESCRIPT¡ON AND LOCATION:
The storm water from the Las Trampas area has been a significant maintenance issue for 30 years. Every 8 to 10 years there is a major storm event that floods the residential area. The major cause of the flooding is the inability of the storm drain system to manage the tremendous amount of debris that accumulates within the trash rack system installed by the Town. This prolect provides a final safety measure to capture storm water that bypasses the trash rack system during major storm events. lnstallation of additional catch basins on Westridge Avenue, and an additional flood control wall and inlet system can prevent future flooding
DESCRIPTION OF MODIFICATIONS:
_.PR9.I.E ç.ï..ç.9
5I.
E
5.T
I
MA.T 8...
Expenditure Gategory Prior
Construction lnspection & Admin. Total Cost Estimate: Total Expenditure:
....PBJ NrEp.qrü..
Years 2017118
201 9120
2018119
$O $102,800 $O $5,000 $O $107,800
$o $o $o
$O $O $O
Rev Funding:
CIP Gen Purpose
RATIONAIE FOR PROPOSED
$o $o $o
Not Available
..PROIECT. AP. P ROPR IATION AI.¡D. F.UNDTUG Funding Source(s) Prior Years 2017118 2018119 Total
2020121
$O $107,800 $O $107,800
PROIECT:
Prevent future flooding of the residential area during major events.
20 1
$0 $O
storm
".---,
91 !?! !n1! - -.
9t20 2020t21 2021t22
$o $o
$o $o
_ _ _ _
Total $107,800 $107,800
$o
$o
EX'ECTED tMpACT ON O'ERAT¡NG BUDGET: Additional worker hours required to maintain per
""'...å93i!icsalloJflJl$r"ç"9jp.p".9r.?$ns=se*i!-q
CIP52
.-
2021122 Total $0 $102,800 $o $5,000 $o $107,800
year: 0 peJJ'eg . .99-*--'.- .*. ri'u'u'.rl
;rr
lvi I lt.,'¿r.gor
Projects CAMINO ENCANTO AT DEt AMIGO STORM DRAIN REPTACEMENT clPNo:
l-ors I
J cn¡¡rpRorECT:No
STATUS: New
I
pnroRrtyt
rlz
I
pRorrcrMANAGER: NNS
PRO¡ECT DESCRIPTION AND TOCATION:
A 52" diameter corrugated metal storm drain has severe conosion that has rotted out the bottom of the pipe causing dirt to infiltrate the storm drain system. The resulting loss of dirt has caused the street to subside I to 10 inches over a 20 toot long area. Camino Encanto is a cul-de-sac that serves a neighborhood 47 houses. A complete failure of the storm drain pipe will result in access restrictions to the residents. Replacement of the storm drain pipe is required
ÐEsCRIPTION OF MODIFICATIONS:
..PRCI¡.8çI.ç05T.j5.T|MAÏF....... ExpenditureCategory PriorYears 2017118
Review Construction lnspection & Admin. Total Cost Estimate: Total Expenditure:
$O $O $o $O
Design/Plan
Source(s)
Rev Funding:
CIP Gen Purpose
Total
Prior
$12,000 $69,630 $1,000 $82,630
$O $O $O $O
$O $O $O $0
2021122 Total $O $12,000 $O $69,630 $0 $1,000 $O $82,630
N
A[ID. FUNDING
Years 2017118 2018119 2O19t2O 2O2Ot21 2021t22
$O $82,630 $O $82,630
$O $O
RATIONATE FOR PROPOSED PRO]ECT:
$O $0
$O $O
$O $0
Total $82,630 S82'630
EXPECTED IMPACT ON OPERATING BUDGET¡
Failing 52" storm drain is causing a collapse of lhe cul-de-sac entrance.
ffi
$O $O $O $O
2020121
Not Available
PROIE CT. A P. P RO P. RIATIO Funding
.......................¡BINrEp.gu;....e1¿?t!n1.7........
2018119 2019120
Additional worker hours required to maintain per year: 0 Additional Town direct operatinq costs oer vear: $0
(l II'5r ll
r'u
rr'.,1,,r rvr 11..,
r,.!,rr
Projects FIBER OPTIC CABTE INTERCONNECT CIPNo:
n-ozol
I
STATUS: New
cnrrN PRoTECT:No
I
I
pnroR¡rvt z
pno¡¡clMANAGER: cP
Treffc Sionsl lnlarconnðct Town Ofliccs to Downtown Þanv¡llo, Cel¡fom¡o
@ Town Ofl¡cae
I 'l
PRO'ECT DESCRIPTION AND IOCATION: This project will provide a fiber optic interconnect network for the various Town facilities. lt will facilitate the transfer of data, video, audio, and internet connectivity to give the town facilities the capability to provide Public - Educational - Govemmental (PEG) services to the community at large.
The use of existing traffic signal conduit as well as the construction of new conduit is included ¡n the project.
rfo*n MÉt¡0 llûf I .Vilr6so lh€¡tô I! . t ùrfiry
Monwsl ' lìu¡Krr0
La¡ond
DESCRIPTION OF MODIFICATIONS: a¡
.r
+r,:+
r!_r
..PRALEç.ï. çA5r.E5ï!tltAr8..... _. Expenditure Gategory Prior Years 2017118 Design/Plan Review Construction lnspection & Admin. Total Cost Estimate:
Total Expenditure:
$O $50,000 $0 $200,000 $O $30,000 $O $280,000
PRINTEDoN:
2018t19 $o $52,soo $10,500 $63,000
2019120
$o $o $o $o
0412712017
;;;;i;; 2021122 $o $o $o $o
$o $o $0 $0
Total
$50,000 $252,500 $40,500 $343,000
Not Available
-.PAOIE CT- A P. P RO P. R NilO N AI.ID. F.UNDING
Funding
Source(s) PriorYears 2017118 2018119 2O19l2O $O $280,000 $63,000 $o $O $280,000 $63,000 $0
P.E.c. Totat Funding:
RATIONATE FOR PROPOSED PROJECT:
2O2Ol21
2021122
$o
$o $o
$O
Total $343,000 $343,000
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct ooeratino costs oer vear: $0
Provide PEG services at Town facilities.
CIP54
i,,'u'*'-,1'Lr rvr I1,,( iì.g()\
Projects lndex of Parks and Facil,ities by Project Number Pr# ProjectNarne B-1O1 PARK AND RECREATION FACILITIES CAPITAL B-12O TOWN-WIDE TRAI B-21ó TOWN SERVICE CENTER CAPITAL MAI 8.280 sPORTs FIELD RENOVATIO
Page
Status
MAINTENANCE------.--- CIPs7 Construction ctPs8 Design c¡P59 Construction CIPóO Design
B-328 TOWN OFFICES CAPITAL MAINTENANCE..-.------.B-4OO HAP MAGEE RANCH PARK CAPITAL MAINTENANCE-------.--
clP61 Design
clP62 Construction, Modified CIPó5 Construction 8.42O FRONT STREET CREEKSIDE TRAIL-------ctP64 Adopted, Modified 8-427 oAK HILL MASTER PLAN - PHASE 2----------------¿-r-------. ctP65 Adopted, Unfunded 8-452 SYCAMORE DAY SCHOOL BUILDING REPAIRs..----_------ CIP66 Construction ---- CIP67 Adopted, Unfunded 8-479 SYCAMORE VALLEY PARK SITE STUDY-----B-49O OSAGE STATION PARI( IMPROVEMENTS------ CIP68 Comptete B-491 LIBRARY AND COMMUNITY CENTER CAPITAL MAINTENANCE-.------------ CIP69 Construction, Modified 8-495 SYNTHETIC TURF REPLACEMENT-------.---- CIPTO Design 8-494 OSAGE STATION PARI( CAPITAL MAINTENANCE-*_.--- .--_ CIP71 Construction 8-495 SYCAMORE VALLEY PARK CAPITAL MAINTENANCE----------- - CIP72 Construction B-515 SECURITY ACCESS CONTROL FOR TOWN BUILDING crP73 Design B-522 SYCAMORE VALLEY PARK PICNIC AREA RESTROO ctP74 Adopted, Modified, Unfunded 9-544 OAK HILL PARK CAPITAL MAINTENANCE------ctPTs Construction, Modified B-55O MUNICIPAL SERVICE CENTER WASTE TRANSFER AREA---------.-.--------. CIP76 Adopted 8-553 VILLAGE THEATRE CAPITAL MAINTENANCE--------- ...-.-_- C'P77 Construction, Modified B-556 DANVILLE SOUTH PARK CAPITAL MAINTENANCE-------clP78 Construction, Modified 8.559 5CHOOL PARK FACILITIES CAPITAL MAINTENAN ?Ê- , clP79 Construction B-560 DIABLO VISTA PARK CAPITAL MAINTENAN ctP80 Construction, Modified B-574VISTA GRANDE STREET/BRET HARTE PARK PEDE5TRIAN IMPROVEMENTS. ctP8l Design 8-582 VETERANS MEMORIAL BUILDING CAPITAL MAINTENAN ctP82 Construction, Modified B-597 VILLAGE THEATRE PARI(NG LOT lMPROVEMENTS_-ctP83 Adopted, Modified 8-611 SYCAMORE VALLEY PARK DRAINAGE IMPROVEMEN ctP84 New 8-616 SI(ATE CIP85 New 8-617 TOWN GREEN MASTER PLAN..----_ ctPsó New 8-618 TOWN-WIDE WAYFINDING AND DIRECTIONAL SIGNAGE--. ctP87 New 8-619 GREEN VALLEY TRAIL FROM HIGHBRIDGE LANE TO DIABLO ROAD---.-. CIP88 New 8-415 CIVIC FACILITIES CAPITAL MAINTENANCE PRO]
(ll l'5.-r
it'tvr.'.,lru,r,r I lt .t rr.gor
Projects lndex of Parks and FaciLities Prf Project Name
Pr-ois-ç-f Name Page Status
B-41s CtvtC FACtLTïES CAPITAL MAINTENANCE PROIECTS-------------------C!P63 lP78 B-55ó DANVILLE SOUTH PARK CAPITAL MAINTENAN 8-560 DIABLO VISTA PARK CAPITAL MAINTENANCE------ _---CIP8O B-420 FRONT STREET CREEKSIDE TRAIL8-619 GREEN VALLEY TRAIL FROM HIGHBRIDGE LANE TO DIABLO ROAD-----(IP88 B-4OO HAP MAGEE RANCH PARK CAPITAL MAINTENANCE--------..---------..--CIP62 8.49 1 LIBRARY AN D COMMUN ITY CENTER CAPITAL MAI NTENANCE--.-_-.--CIP69
Construction Construction, Modificd Construction, Modified Adopted, Modified New Construction, Modified Construction, Modified
P76 Adopted P65 Adopted, Unfunded P75 Construction, Modified I 1 Construction OSAGE STATION PARK IMPROVEMENTS-----_{IP68 Complete Construction PARI( AN D RECREATIO N FACILITI ES CAPITAL MAINTENANCE-------.-{IP57 SCHOOL PARK FACILITIES CAPITAL MAINTENANCE--.-----.- CIP79 Construction SECURtW ACC ESs CONTROL FOR TOWN BUI LDI NG5-----:----------------{|P73 Design --clP85 New st(ATE PARK-----SPoRTS FrELD RENOVATION--------------ClP60 Design --.------{IP66 Construction SYCAMORE DAY SCHOOL BUILDING REPAIRS---SYCAMORE VALLEY PARK CAPITAL MAINTENANCE----.- .<'P72 Construction New SYCAMO RE VALLEY PARK DRAINAG E I MPROVEMENTS--------.-------.---.-CIP84 SYCAMO RE VALLEY PARK PICN I C AREA RESTROO MS-_--- -.-----------..<IP7 4 Adopted, Modified, Unfunded .--{IP67 Adopted, Unfunded SYCAMORE VALLEY PARK SITE STUDY----.-.------.CIP7O Design SYNTHETIC TURF REPLACEMENT-.. .----------C!P86 New TOWN GREEN MASTER PLAN-----TOWN OFF¡CES CAPITAL MAINTENANCE------- *-.-----CIP61 Design TOWN SERVICE CENTER CAPITAL MAINTENANCE.----------- CIP59 Construction 8 Design TOWN-WIDE TRAI tP87 New TOWN-WIDE WAYFINDING AND DIRECTIONAL SIGNAGE VETERANS MEMORIAL BU¡LDING CAPITAL MAINTENANC E.---------*-<tP82 Construction, Modified lP77 Construction, Modified VILLAGE THEATRE CAPITAL MAINTENAN V¡LLAGE THEATRE PARKING LOT TMPROVEMENTS---- -.---CIP85 Adopted, Modified VISTA GRANDE STREET/BRET HARTE PARK PEDESTRIAN IMPROVEMENTfIPSl Design
B-55O MUNICIPAL SERVICE
CENTER WASTE TRANSFER AR
8-427 OAI( HILL MASTER PLAN . PHASE 2 8-544 OAI( HILL PARI( CAPITAL MAINTE 8-494 OSAGE STATION PARK CAPITAL MAINTENANCE B-490 B-101 B-559 B-515
B-6r-6 B-280
B-452 B-495 B-611
B-522 B-479
B-493 B-617
B-328 B-216 B-12O
8-618 B-582 B-553 8-597 B-574
CIP56
u,rr'rr,.,1rrrlvr I lt .( rì.g()\'
Projects PARK AND RECREATION FACILITIES CAPITAT MAINTENANCE ctp No:
e-ror
I sTATUS: tn Construction I
cn¡¡n PRolEcT:No I pnlonlw,
2
ongoing I
pno¡¡cr
MANAGER:
ll
PROTECT DESCRIPTION AND IOCAÏION: This is an ongoing Town-wide effort to address capital maintenance, repair and preventative maintenance of parks and community facilities.
Ongoing repairs: Sidewalk and pathway repairs. Ongoing lree work. BBQ replacement and picnic table replacement. Repairs to play area equipment. Repair and repaint restrooms. Drinking fountain repairs/replacement (including animal troughs). Repairs to cyclone fencing and metal rail fencing. Repair and seal wooden shaiJe structures. Repaint metal rail fence. Repairs and resurfacing of basketball and tennis courts (annually). Grub trealments on non-sports tuf ($30,000 annually). Playground safety surfacing repairs (annually) at Sycamore Valley, Diablo Vista, Hap Magee Ranch, Osage Station Parks and Danville South.
DESCRIPTION OF MODIFICATIONS:
Added $40,000 to fiscal year 2018119.
.PRCIIEçT.çCI5.T-ESIIMATF..-.... PriorYears 2017118 2}18t1g Review $59,951 $O $O Construction $1,405,495 $41,000 $40,000 lnspection & Admin. $O $O $O Total Gost Estimate: $1,465,446 $41,000 $40,000 Expenditure Gategory Design/Plan
Total
.
Expenditure: $1,283,489 Unexpended: $181,957 on
PROIE CT. APP Funding
|ATO
ROP. R
Source(s)
Prior
$O $O $O $O
2O2Ot21
$O $O $O $O
2021t22 Totat $O $59,951 $O $1,486,495 $0 $O $O $1,546,446
4-25-2017
N AI.ID. F.T'NDTNG
Years 2017118 2018119 2019120 2020121 2021122
Rev $556,000 $O $0 Pgm $22,000 $O $0 Program $12,771 $O $o D $O $31,500 $o $O $500,303 $O Park Facilities $342,872 $41,000 $40,000 TotalFunding: $1,465,446 $41,000 $40,000 CIP Gen Purpose City County Pmt Cleanwater LLAD Zone Park Dedication lmpact
RATIONAIE FOR PROPOSED PROIECT:
$O $O $O $O $O $o $O
$O $O $o $O $0 $O $O
$O $o $O $O $O $o $0
Total
$556,000 $22,000 $12,771 $31,500 $500,303
$423,872 $1,546,446
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct ooeratino costs Der vear: $0
This project allows timely response to specific repairs and renovation needs as they occur.
ffi
...PßlNrEp.aN;.... Mt?.6tntt.......
2O1gt2O
(lIP57
rvrvt.tilrt r'r ll,
-t ;r.gttr
Projects TOWN.WIDE TRAILS ctP No: 8-120
|
5TATUS: tn
Design I cnr¡n pRoIEGT:Yes
I pruontwr
2/J
ongoing
I
pno¡¡cr
MANAGER¡ BR
;þ t.
t:
t
f
'çi
tf.
Parks and Leisure Services Commission identified short{erm trail priorities on Green Valley Creek Trail and Sycamore Creek Trail.
rl¡
rrl .
.,1
I
,
.t '1tt!Í.,
q, I iç
'
.
âlt', " ,if.
.
Y 1¿;
PROIECT DESCRIPTION AND LOCATION:
ïhe
.l¡'
4
,.^. l!
Cost estimates range from $75 to $150 per foot for an eight-foot wide paved trail. Other costs include environmental studies, acquisition of ROW, license or easement agreements, trail markers, and mapping information (all sites). Trail maintenance: Westside trail renovation. Sycamore elementary School to Trish Lane rehabilitation. Hill Road to Blemer Road school path. Quintena Lane school path between Entrada Mesa and Ester Lane. Trail gap closures per the Town wide Trails Master Plan. Pack Trail (Tassajara Ranch Drive to Park Haven Drive).
Êl¿- !i
!.
Additional trail receptacles and doggie bag dispensers.
I
Wayfinding signs at trailheads (using standard distance measurements). DESCRIPTlON OF MODIFICATION5:
Added wayfinding signs at trailheads and maintenance on Pack Trail
PriorYears 2017118 2018119 2019120 2020121 2021122 Total Review $58,050 $O $O $O $O $O $58,050 Construction $661,630 $39,000 $40,000 $40,000 $40,000 $40,000 $860,630 lnspection & Admin. $2,590 $O $O $O $O $O $2,590 Expenditure Category Design/Plan
Estimate: 5722,270 $39,000 $40,000 $40,000 $40,000 $40,000 TotalExpenditure: $634,191 Unexpended:$88,078on4-25-2017 Total Cost
.
PRO I E CT. A P. P ROP. RI ATIO N.AI.ID. FUNDThIG Funding Source(s) Prior Years 2017t18 2018t19
Rev Facilities TotalFunding:
CIP Gen Purpose $37,826 Park Dedication lmpact $281,444 Park $403,000 5722,270
2019120
$39,000
$o $40,000
$o
$o
$39,000
$40,000
$o
RATIONALE FOR PROPOSED PROJECT:
2020121
2021122
$o
$o
$o
$40,000 $o $40,000
$40,000
$40,000
$921,270
Total
$o
$o
$37,826 $480,444 $403,000
$40,000
$40,000
s921,270
EXPECÏED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operating costs per year: $0
lmplementation of the Town-wide Trails Master Plan.
CIP5B
u'u'u'.tl;rr rrrt I ì, -i r¡.gor
Projects TOWN SERVICE CENTER CAPITAL MAINTENANCE CtpNo:
e-zrol
sTATUS:
tnConstruction I cn¡¡ì¡PRoIECT:Yes lpRtoRlrv,
zongoing I
pno¡gcTMANAGER: lP
PRO¡ECT DESCRIPTION AND TOCATION:
Periodic repairs, renovation, and preventative maintenance activities for the Town Service Center.
2014115 Replace 2 HVAC at Town Service Center. (COMPLETED) 2016117 Replace 1 HVAC unit at the Town Service Center. 2017118 Replace 'l HVAC unit at the Town Service Center. Future Projects: Relocate dumpsters per storm water requirements Hillside drainage repairs. This is an ongoing project.
DESCRIPTION OF MODIFICATIONS:
..pRCIt Eç.ï-.ç05ï.85ït MAT8........... Expenditure Gategory PriorYears 2017118 Design/Plan Review Construction lnspection & Admin.
$o $226,442 $o
Total Cost Estimate: Total Expenditure:
9226,42 $t 16,968
$o $o
2018/19 2019120
$o $o
$o $30,000 $o $29,ooo $3o,ooo $3o,ooo Unexpended: $109,475 on 4-25-2017
$29,000 $30,000
2020121 $o $o
$o $o
2021122
$o $o $o so
Total $o
$315,442 $o
8315,442
.PROIECT.AP.PROP.RhTTON.AI.ID.FUNDII{G..... Funding Source(s)
Prior Years
2017118
2018119
2019120
CIP Gén Purpose Rev LLAD Zone A
$217,058 $9,385
$29,000
TotalFunding:
i226,43
$29,000
$30,000 $o $30,000
$30,000 $o $30,ooo
$o
RATIONATE FOR PROPOSED PROIECT:
2020121
2021122
$o
$o
$o
$o
$o
$o
Total $306,058 $9,385 $315,443
EXPECTED ¡MPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: Additional Town direct operating costs per year: $0
(ìII'59
0
s rvrr,.,l;rr,r'r I l, -, :r.gor
Projects SPORTS FIELD RENOVATION ctPNo: e-zaol STATUS:
tnDesign I cneuPRotECT;Yes lpnlonlrvr 2ongoing I
pno¡¡cTMANAGER: Jl
PRO¡ECT DESCRIPT¡ON AND TOCATION:
Maintain sports fields and related amenities in a condition which provides a safe environment for user groups. Project may include over-seeding, topdressing and leveling of 12 Town-maintained baseball/sofrball natural turf
fields and 15 Town-maintained soccer/lacrosse fields each spring. Major maintenance activities related to field lighting, fencing, and grooming of synthetic turf will also be completed as needed, including purchase of equipment to complete this work. Sites included are: Osage Station Park, Sycamore Valley Park, and Diablo Vista Park. Annual Projects: Organic fertilizer program. Grub treatments and broadleaf spray Repair/replace sports field fencing.
2018119 Replace sports field eleclrical lighting panel at Sycamore Valley Park.
Chemicals used should conform to the approved list. DESCRIPTION OF MODIFICATIONS:
..Pß4ffçï..ç95ï.E5.TlMAïF.....-.. Expenditure Category PriorYears
2018/19 2019120 $O $O $O
2017118
..rNNrEp.qN:.... p.etzþ!N.rr.......
2021122 Total $O $O $30,000
2020121
Review $30,000 Construction $957,765 $25,000 $40,000 $40,000 $40,000 $40,000 $1,142,765 lnspection & Admin. $18,693 $O $O $0 $O $O $18,693 Design/Plan
$1,006,458 $25,000 $40,000 $40,000 $40,000 $40,000 TotalExpenditure: $997,568 Unexpended:$8,890on4-25-2017 Total êost Estimate:
.
PROIE CÏ. Funding
AP. P ROP. RIATIO N
A]ìID.
FUI{DII{G.
Source(s) PriorYears 2017118 2018/19 2O19l2O 2020121 2021122
Rev 5320,472 $O $O $O D $0 $o $59,686 $o $176,300 $25,000 $40,000 $40,000 Facilities $450,000 $0 $o $o Total Funding: $1,006,458 $25,000 $40,000 $40,000 CIP Gen Purpose LLAD Zone Park Dedication lmpact Park
RATIONALE FOR PROPOSED PROIECT;
Coordination with Sports Alliance field users to idenlify priorities on an annual basis.
ffi
$1,19'1,458
CIP6[I
$O $o
$40,000
$o
$40,000
Total
$O $o
$320,472 $59,686 $40,000 $361,300 $450,000 $40,000 $1,191,458
$o
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: Additional Town direct ooeratinq costs per vear: $0
\\'\\'\\'.(l
;l
0
nvr l lr -('lì. go\
Projects TOWN OFFICES CAPITAL MAINTENANCE CIP
No: e-tza
I STATUS:
ln Design
I
cn¡¡xpRorEGT:No lpnron¡rvr
2ongoing
I
pno¡¡ciMANAGER: Jp
PRO¡ECT DESCRIPTION AND LOCATION:
Routine preventative maintenance for general upkeep and preservation of the Town Offices and modification for accommodation of staff changes. 2017118 Paint building exterior. ($12,000). Repave and stripe parking lot. (coordinate timing with A-580 Town Offices lmprovement)
2}18t1g Replace 1 HVAC unit in server room.
DESCRIPT¡ON OF MODIFICATIONS:
.PR0.,IEçI.ç0.5I.ESI|M.AIE......
........................8ßrNrEp.qM....vr?.6!2..0t.......
2018119 2O19l2O
2020121
Review $35,700 $O $O $O Construction $323,633 $31,000 $31,000 $31,000 lnspection & Admin. $0OO $O $O $O Total Cost Estimate: $359,933 $31,000 $31,000 $31,000
$O $O $O $O
ExpenditureCategory PriorYears 2017118
Design/Plan
Totaf
Expenditure: i203,022
2021122 Total $O $35,700 $O $416,633 $O $600 $O $452,933
Unexpended: $156,911 on 4-25-2017
PROfi CT.AP.PROP.RIAÏIONAIIID.F.UNDING....Funding
Source(s)
Prior Years
Rev Fund TotalFunding: GIP Gen Purpose
Civic Facilities
$79,000 $280,933 $359,933
2017118
2018t19
$0
$o $31,000 $31,000
$31,000 $3'l,ooo
RATIONALE FOR PROPOSED PROIECT:
2020121
2021122
$o
$o
$31,000
$o
$o $o
$31,000
$o
$o
Total $79,000 $373,933 $452,933
EXPECTED ¡MPACT ON OPERAT]NG BUDGET;
Building maintenance and accommodation for changes in staff.
ffi
2019120
cIP{t1
Additional worker hours required to maintain per year: 0 Additional Town direct operating costs per year: $0
\\'\\'\\'.i1ilr rVl ll(
-(
;ì.g()\'
Projects HAP MAGEE RANCH PARK CAPITAL MAINTENANCE ctpNo: s-¿ool
STATUS:
I
tnConstruction
cng¡tPRoJECT:Yes
lpn¡onrv,2ongoing
I
pnol¡cTMANAGER: DC
Thrs prolect has been modified from the previous year PRO¡ECT DESCRIPTION AND TOCATION:
Routine preventative maintenance activities for the general upkeep and preservation of the site and non-routine repair and replacement. 2016117 Playground equipment replacement design. ($130,000). Large Dog Park surface. (COMPLETED) Play area safety repairs. (COMPLETED) Concrete repairs. ($2,500). 2017118 Playground equipment replacement. ($500,000) Safety surface repairs. Large Dog Park surface. Decomposed granite pathway maintenance. Replace fencing at Magee house. 2017118 ADA access at Canine Corral entrance. Future Projects: Gazebo Replacement
DESCRIPTION OF MODIFICATIONs:
Added $130,000 to fiscal year 2017118
..PR9I.-E ç.r..ç.9
5.
ï.
E 5..T
I.M.4.ï E....
...P Bl i{IFP.Q
_.
Years 2017118 2018119 2019120 2020121 Capital Maintenance $555,366 $530,000 $50,000 $25,000 $25,000 Total Cost Estimate: $555,366 $530,000 $50,000 $25,000 $25,000 Total Expenditure: $372,981 Unexpended: $182,385 on 4-25-2O17 Expenditure Category Prior
.
PROIE CT. A P. P RO P. R I AIIO Funding Source(s) CIP Gen Purpose Rev Park Facilities
R-74
Prior
N .AI.ID.
Years
2018t19
2021122 $o
$12,500 $12,500
$o
$o
$o
$12,500 $o
$50,000
$25,ooo
$25,000
$25,ooo
$o
$26s,000 $265,000
$25,000 $25,000
$O
$530,000
TotalFunding:
$555,366
RATIONALE FoR PROPOSED
PROIECT:
$25,000 $25,ooo
$o $12,500 $12,500
$o
$140,366
2021122
2020121
2019120
$O
YMCA Rental Rev
pA !?9!?.o-1.!
-
-
Total
$1,210,366 $1,210,366
FUNDING
2017118
$127,500 $92,500 $195,000
È{:- - - -
Major activity is needed for the site and buildings;
non-routine
Total $127,500 $420,000 $522,500 $140,366 $1,210,366
$12,500
EXpECTED ¡MpACT ON opERATtNG BUDGET:
Additional worker hours required to maintain per year: 50
-gp"3it:egl9.Pl*9-e"Htg:-9"S319-191-3:Æ.."J:9;....*.**-.-**.,-å#¡IigeeLl"es.qi!:ç*epseliss,eo**s-Bsl*så'"s;PL".":"-
ctPrì2
tvs, u'.tl
lr l
r
vt
II
r:.(r;ì. _g()\
Projects CIVIC FACITITIES CAPITAL MAINTENANCE PROTECTS CtP
No: s-¿rs
I
sTATUs; tn
construction I cntn PRoIECT:Yes I pnloRlwr
2
ongoing I
pno¡¡cr
MANAGER: tP
PRO¡ECT DESCRIPTION AND IOCATION:
This is an ongoing Town-wide effort to address capital maintenance, repair and preventative maintenance of aging civic facilities. Projects include such items as HVAC systems, roof replacements, lighting and alarm systems, major exterior and interior painting, door and equipment replacements.
2016117 lnstall ceiling-mounted projectors in both Town Office conference rooms. Add Town Logo to all lecterns ($5,000).
2017118 Town Meeting Hall alarm system. 2018119 lnstall
I
HVAC system at the Town Meeting Hall.
DESCRIPTION OF MODIFICATIONS:
.Pß9LEçT.çASI.E5.T|MAIF....... Expenditure Category Prior
...pNNTFRerù....
Design/Plan Review $O $0 $O $O consrruction $466,016 $30,000 $30,000 $30,000 lnspection & Admin. .$O $O $O $O
$a.6!2.pt.......
2021122 $O $O
Years 2017118 2018119 2019120 2020121
Total
$30,000 $30,000
$0 $616;016
Estimate: $466,016 $30,000 $30,000 $30,000 $30,000 $30,000 TotalExpenditure: $307,692 Unexpended:$158,323on4-25-2017
$616,016
$O
$O
Total Gost
$O
_PROIECT_AP.PROP.RlArroN.AltD.FUNDING................... Funding
Source(s)
Gen.
Asset Replcmnt CIP Gen Pur Reallocate CIP Gen Purpose Civic Facilities
Rev Fund
LLADZone D TotalFunding:
2017118
2018115
2019120
2020t21
2021n2
$o $o $o
$o $o $o
$45,194
s30,000
$30,000
$28,253 $466,016
$o
$0
$30,000
$30,000
$o $o $a $30,000 $o $30,000
$o $o $o $30,000 $o $30,000
$o $o $o $30,000 $0 $30,000
Prior Years $247,496 ($14,471| $159,544
RAT¡ONAIE FOR PROPOSED PROJECT:
Total $247,496 ($14,471) $159,544 $19s,194 $28,253 $616,016
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per yea[ Additional Town direct operating costs per year: $0
Maintenance of existing facilities.
C
Il'6:ì
0
t.'rr rt'.,l,rrrvtll,, :,.g,rr
Projects FRONT STREET CREEKSIDE TRAIL clP No: s-azo
| SÎATUS:
I
Adopred I Cn¡EN PROTECT:Yes I PRIORITY; r/2
pno¡rcr
MANAGER: ScL
Thrs pro¡ecT has been mocJified from the prevrous Vear PRO¡ECT DESCRIPTION AND TOCATION:
This project consists of construction of a cantilevered sidewalk over the creek from opposite the Town Meeting Hall to Diablo Road (approximately l/8 mi). Parks and Leisure Services Commission recommended moving this project to future years. Construction to include Concrete cantilevered trail section, approximately 8'wide, grading and drainage improvements and associated creek bank improvements. A consultant will be hired to prepare a preliminary project scope, architectural renderings, and a preliminary cost estimate inFY 2017118.
DESCRIPTION OF MODIFICATIONS:
Moved project out two years.
Expenditure Category PriorYears 2017118 Project Prep.
$100,000
Design/Plan Review
$o
Construction
$0
lnspection & Admin. Total Cost Estimate:
Total Expenditure:
PROlE
CT. AP. P ROP. R
Funding
Source(s)
$o $100,000 $o
IATIO Prior
2018119
2019120
$o
$o 1e,723 $0 $1,346,8e3 $1 1e,384 $0 $1,586,000 Unexpended: $l 00,000 on 4-25-2017
N AÀID.
$o $o $o $o $o
$o $o
$1
2020121
2021122
$o $o $o $o $o
$o $o
$o $o $o
Total $100,000 $119,723 $1,346,893 $119,384
sl,686,000
FUNDING
Years 2017118 2018115 2019120 2020121 2021122
Facilities $100,000 TotalFunding: $100,000 Park
$0 $0
$0 $0
RATIONAI-E FOR PROPOSED PROIECT:
$1,586,000 $O $1,586,000 $O
EXPECTED IMPACT ON OPERAIING BUDGET: Additional worker hours required to maintain per
lmprove pedestrian circulation and access to the Library and Community Center and Downtown.
Additional Town direct ooeratino costs Der
CIt)64
Total
$O $1,686,000 $O $1,686,000
year: ilO
vear:
$40,500
tt'tt tt-,1,t¡,t,tll, -,
',.!,tr
Projects OAK
HItt
. PHASE 2
MASTER PLAN
ctp No: 8-427
I STATUS: Adopted
I
cngr¡¡ PRotEcr:Yes
I
I pnlonlrv, s
pno¡¡clMANAGER:
HRP
This prolect rs cLrrrently unfundecl
iltÞ
PRO¡ECT DESCRIPTION AND TOCATION:
Evaluate the development potential of the undeveloped (southem) portion of Oak Hill Park to meet unmet community needs.
t Êa.
-"t.
.a
I
Development of the adjacent Weber property provides additional access to the property.
I
"
Based upon other planning/design/construction priorities for Town parks and community facilities, this project has been deferred.
LJ,
s,
...4) I
q)
t
:
¡
*
a
{rdl
r, l
t¿it
t
L
¿
a
)s a.
;
UNFUNDED DESCRIPTION OF MODIFICATIONS:
t ..Pß8¡.8 ç.T..ç0.5r.Es.T l MAï F....... Expenditure Category Prior Years
Review Construction lnspection & Admin. Total Gost Estimate: Total Expenditure:
Ðesign/Plan
$o $0 $O $O
$O $0 $O $O
$o $0 $O $O
Source(s)
Facilities Unfunded-87 Total Funding: Park
Prior
Years 2017118
$0 $O $O
2018119
$0 $O $O
$0 $O
$0
RATIONATE FOR PROPOSED PROTECT:
$O $0 $O $O
2020121
2021122
Total
$o $o $0
$o $o $o
$O $0 $O $O
$O
$o $O $O
2019120
$o $o $o
$o $o $o
EXPECTED ¡MPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Addiüonal Town direct operatinq costs peryear: $0
Help meet growing community needs for active recreational facilities.
ffi
Total
Not Available
.PROIECT.APPROP.RIAIIONA]ìTD.FUNDII{G-... Funding
2021122 $O $0 $O $O
2017118 2018119 2019120 2020121
CIP{i5
\\'\\' \\'.(1iu
ì\,1
lì( i ;r.g(l\
Projects SYCAMORE DAY SCHOOL BUILDING REPAIRS GIPNo: s-¿sz
I
STATUST
lnConstrucrion
I
cn¡¡tPRotEGT:Yes
I pn¡on¡rv,2/3ongoing
I
pno¡¡clMANAGER: lP
PRO¡ECT DESCRIPTION AND LOCATION:
Conduct routine preventative maintenance for general upkeep and preservation of the Town-owned building at this site. Items such as exterior painting, HVAC, window, floor, door and roof repair and/or replacement are included in this project.
2016117 Replace Linoleum tile floors. (COMPLETED) Replace 4 doors. (COMPLETED) Exterior repainting. (COMPLETED)
2017118 Drainage repairs. All costs are offset by rent revenue collected from the building tenant.
DESCRIPTION OF MODIFICATIONS:
.-PR0.tEçï.çCI5.T.E5.Ill!14TE ........r......-r¡J-¡r.................:... .....pßrulrp.en:....st?e!?et.... Expenditure Gategory PrlorYears 2017t18 2l18t1g 2O1gt2O 2O2Ot21 2021122 Total
Review $O $0 $o $O Construction $122,139 $10,000 $10,000 $10,000 lnspection & Admin. $O $0 $0 $O Totaf Gost Estimate: $122,139 $10,000 $10,000 $10,000 Design/Plan
TotalExpenditure: 571,122
.
$0 $O $0 $O
$0 $152,139 $O
$152,139
Unexpended: $51,017 on4-25-2017
PROIE CÎ- A P. P ROP. R IAIIO N AI.ID. FUNDII.I.G Fundlng Source(s) Prior Years 2017118 2018115 2019120 2020121 2021122 CIP Gen Purpose Rev $122,139 $10,000 $10,000 $10,000 TotalFunding: 5122,139 $10,000 $10,000 $10,000
RATIONATE FOR PROPOSED PROIECT:
Routine preventative ma¡ntenance is required to keep the building in good condition.
ffi
$O $O $0 $O
CI
l)(i {ì
$O $O
$O $O
.
Total
$152,139 S152,139
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operating costs per year: $0
rvtv rr'.rl;rr
r,,,r
ll,'.i ;r.q()\
Projects SYCAMORE VALLEY PARK SITE STUDY clP No¡ 8-479
| smfus, Adopted
I GREEN PROJECT:Yes
I
I
pnronrrv, s
pRo¡¡cr ¡,nNAGEk rI
Thts prolect ts currently unfunded PRO¡ECT DESCR¡PTION AND LOCATION:
The Parks and Leisure Services Commission rec¡mmends a study to address the unmet community needs that could be addressed in the area located at the front of the park adjacent to Camino Tassajaia.
UNFUNDED DESCRIPTION OF MODIFICATIONS:
Expenditure Category
PriorYears
DesignlPlan Review Construction lnspection & Admin. Total Cost Estimate: Total Expenditure:
$O $O $0 $0
2017118
2018t19
2019120
$O
$26,000
$o
$O
$o
$O
$o $26,000
$o $o $0
$O
Not Avallable
.-PAOIECT.AP.PROP.RIAITON.AI.ID.FUNDII{G. Funding
Source(s)
Unfunded-87 Funding:
Total
Prior
2021122
$o $o $o $o
$o $o $o $o
2D2lt22 $O $O $0 $O
Years 2017t18 2018119 2O19t2O 2020t21
$O $O
$O $26,000 $0 $26,000
RATIONALE IOR PROPOSED PRO]ECT:
This project addresses the need for future park uses.
ffi
2020121
$O $O
Total $26,000 $0
$o $26,000
Total $26,000 $26,000
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: Additional Town direct ooeratinq costs oer vear: $0
clP67
0
It t s.tllrrrvlllt t ;r.gor
Projects OSAGE STATION PARK IMPROVEMENTS CIP
zoro I
No: S-¿So | STATUS:
GREEN
FRoIECT¡yes
I
I
pnroRrrv, z
pno¡¡clMANAGER:
HRP
PROIËCT DESCRIPTION AND TOCATION:
This is a seven year six phase project to update and improve facilities. Phase 1 - Play area, water features, group picnic area, benches, drinking/dog fountain, memorial rose boxes, restroom, and pump house renovation. (COMPLETED) Phase 2 - Pathway improvements. $150,000. Phase 3 - South parking lot expansion and Orange Blossom sidewalk connection. $1,600,000. Phase 4 - Tennis courts replacement, diainage improvements, picnic area, and irrigation modificalions. $1,400,000.
Phase 5 - Community buildings and snack shack (201 8/19). $600,000.
#ÜMPLETE DESCRIPTION OF MODIFICATIONS:
ExpenditureCategory PriorYears 2017118
Review $329,750 Construction $2,140,000 lnspection & Admin. $O TotalcostEstimate: $2,469,750 Design/Plan
Total
.
2018119 2O19l2O
$0 $116,000 $O $O $752,000 $1,702,000 $O $33,000 $O $O $901,000 $1,702,000
Expenditure: $2,039,521 Unexpended:
$430,229 on 4-25-2017
$O $O $O $O
2021122 Total $O $445,750 $O $4,594,000 $O $33,000 $O $5,072,750
PROIE CT. A P. P ROP. R ATIO Funding
Source(s)
Park Dedication Park
I N AI.ID. F.UNDING. Prior Years 2017118 2018115 2019120
lmpact
Facilities Unfunded-87 TotalFunding:
$o $o
$699,750 ,770,000
$o $o
$O
$0
$901,000 $1,762,000
$2,469,750
$0
$9ol,0oo $1,762,000
$1
RATIONAI.E FOR PROPOSED PROJECT:
$o $o
2020121'
$o $0 $o $o
Total
2021122
$699,750 $1,770,000 $2,663,000
$o $o $0 $o
$5,t32,750
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operating costs per year: $0
Needed improvements to an existing town facility
ffi
2O2Ol21
cIP{i1l
ryrvs'.,irrr rvt lì, .r ;,-g,r.
Projects LIBRARY AND COMMUNITY CENTER CAPITAL MAINTENANCE ctpNo: g-+stl
STATUS:
lnConstruction I cn¡¡nPRotECT:Yes I pRlonlrv,2ongoing
I
pRo¡¡cTMANAGER:
NR
Thrs prolect has been modified from the prevtous year PRO]ECT DESCRIPTION AND LOCATION: ' This is an ongoing project that addresses renovation and repairs in these heavily used community facilities. .:.
tt
\*r
,i
2016117 Replace I HVAC units at Library. (COMPLETED). Replace 30 lounge chaiæ. (COMPLETED) Remodel men's and women's restrooms. (COMPLETED). Replace lighting system. (COMPLETED).
¿.J
\\
En*1'
r
.tu{t í
þ
Í4
b..{
2017118 Redesign Teen area with new fumiture and chairs. ($60,000, $25,000 from CounÇ, $5,000 from Friends of the Library, $5,000 from Library Technology Fund, $25,000 from Library Asset Replacement fund). Add video projector/display at the Community Center. ($20,000) Add new display in Community Center. ($1,OOO¡
I
hR
i
I .PR9.t
E
çT..ç9
5.T.
E
5.T
I
ælr Efifr lr
rl
DESCRIPT¡ON OF MODIFICATIONS:
Updated description.
l!'lAT F......
...p NNIED
PriorYears 2017118 2018119
Expenditure Category
Design/Plan Review $20,000 $O $O Construction $644,460 $81,000 $30,000 lnspection & Admin. $o $O $o
$O
$30,000 $O
$664,460 $81,000 $30,000
Total Cost Estimate: Total Expenditure:
.
2019120
$594,180
$30,000 Unexpended: $70,280 on 4-25-2017
2020121
$o $30,000 $o $30,000
AM
-. . 9' !?.5!?.01!...
---
-
2021122 Total $o $20,000 $30,000 $845,460 $o $0 $3o,ooo
$865,460
PROIE CT. A P. P ROP. R I ATION.AT.ID. FUNDTNG.. Funding
Source(s)
Asset Replcmnt
Prior Years
Library
Grant TotalFunding:
$664,460 $O
$664,460
2017118
2018/19
$51,000 $30,ooo $81,000
$30,000
2019120
$30,000
$o
$o
$30,000
$30,000
RATIONAIE FOR PROPOSED PROIECT:
2020t21
2021122
Total
$30,000 $o $30,000
$30,000 $o
$835,460
$3o,ooo
$865,460
$30,000
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operatinq costs per vear: $0
Ongoing preventative maintenance.
clPri9
,,r'rvrr'.r1:rr rvt
I
l, ., ;r.g,lr
Projects SYNTHETIC TU RF REPLACEMENT
lnDesign I cn¡rnPRotEGT:Yes I pruoRlryr 2ongoing I
clPNo: s-+gsl STATUs:
pno¡¡cTMANAGER:
ll
PROIECT DESCRIPTION AND LOCATION:
The useful life of the synthetic turf sports fields at Diablo Vista and Sycamore Valley Parks is projected to be 9 years. Diablo Vista renovation (86,700 s.f.) is anticipaledin2024125. Next renovation scheduled tor 2033134. Sycamore Valley renovation (225,000 s.f.) is anticipaled in 2O2Ol21 Next renovation scheduled lor 2O29130. Using today's replacement costs and a 9-year cycle the costs are: 33/34 $754,391 $1,255,000 $571,000 $1,255,000 $571,000
15/16 20t21 24t25 29t30
Using 2.5% inflation the future expenses are:
15t16 20t21
24t25 29t30
33t34
$754,39r $1,567,000 $689,000 $r,957,000 $835,000
DESCRIPT¡ON OF MODIFICATIONS;
RgLE ç.ï. ç0 5.ï.-E 5.T I t{AT F....... Expenditure Gategory Prior Years
PRINTED
..P
2017118 2018119 2019120
2020121
Design/Plan Review $72,675 $O $O $O $31,222 Construction $3,361,713 $O $O $O $148,819 Construction Encumb. $O $225,000 $225,000 $225,000 $O lnspection & Admin. $50,3'14 $O $O $44,959 $0
Total Cost Estimate: 53,484,702 $225,000 $225,000 $225,000 $225,000 Total Expenditure: $2,001,599 Unexpended: $1,483,103 on 4-25-2017
.
PROIE CT. Funding
A
P.
P RO
P.
R
Source(s)
IATIO Prior
N
OSl25l2O17
$o
Total
$103,897 $3,510,532 $900,000 $9s,273 $4,609,702
$o
$225,000 $o
$225,000
F.UNDING
"AI.ID. Years 2017118
Gen. $875,000 $O LLADZone D $87,500 $O Park Dedication lmpact $612,500 $O Park Facilities $1,875,311 $225,000 TRAD $34,3e1 $O TotalFunding: $3,484,702 $225,000 Asset Replcmnt
2018t15
2019t20
2020t21
2021t22
$o $o $o
$o
$o $o $o
$o $o
$225,000 $0 $225,000
RATIONATE FOR PROPOSED PROIECT;
Replacement of synthetic turf is needed as a part of routine maintenance.
ffi
ON:
2021122
clPTo
$o $o $225,000 $o $225,000
Total $875,000 $87,500 $612,500
$225,000
$o $225,000
$o
$o
$3,000,311 $34,391
$225,000
$225,000
$4,609,702
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operating costs per year: $0
rvtt'rr'.r1;r r rt,r I l( .r':ì.g()\
Projects OSAGE STATION PARK CAPITAT MAINTENANCE Ctp
No: g-+g4l STATUS: ln Construction
¡l'
I
cne¡¡¡ PRotECT:Yes
I
I pnlonlfv, 2/3 Ongoi
tl
pno¡¡clMANAGER:
I
.r,
.{'
t. PRO¡ECT DESCRIPTION AND TOCATION:
a
This is an ongoing project to provide repair and preventative maintenance for the preservation of Osage Station Park facilities.
)4
f
;
Project includes:
I I
l¡
f.
Pathway repairs. Tree maintenance. Replace windscreen on ball diamonds and tennis courts. RepainVrepairs to restroom building. Maintenance of tennis courts.
Note: Timing of project implementation is dependent on the outcome of
8490 Osage Station Park lmprovements.
) þ i
2017118 Sports field cyclone fencing repairs. (Ongoing) lnstallation of garage for golf cart. Potable water system repair.
$ '.j
Future Projects: Bio swale replanting in North parking lot.
.^F
flfq,.t{:-t,' '.
DESCRIPTION OF MODIFICATIONS:
t
l r.
1 -l
It
P RO.¡.E çT..ç 9.5T.
-
E
5.T
¡.. -
I
Added $17,500 to fiscal year 2017118.
-¿
MAT
E-.
Expenditure Category PriorYears
.
2017118 2018119 2019120
2020121
2021122
Design/Plan
Review $o $o $o $o Construction $300,804 $30,000 $12,500 $12,500 ' $O lnspection & Admin. $O $O $O
$o $12,500
Total Gost
Estlmate: $300,804 $30,000 $12,500 $12,500 TotalExpenditure: $103,599 Unexpended:$197,205on4-25-2017
$12,500
$o $o $o $0
2020121
2021t22
$o $12,500 $12,500
$o $o
PROIE CT. AP. P ROPRIATION AÀID. FUNDING Funding Source(s) Prior Years 2017118 2018/19
Rev $59,000 $O Facilities $241,804 $30,000 TotalFunding: $300,804 $30,000 CIP Gen Purpose Park
$O
$12,500 $12,500
RATIONATE FOR PROPOSED PROIECT:
2019t20 $o $12,500 $12,500
$O
$0
Total $o $368,304 $o $368,304
Total $59,000 $309,304 $368,304
EXPECTED IMPACT ON OPERAT¡NG BUDGETI
Ongoing maintenance and safety related to access to confined spaces.
cIP?1
Additional worker hours required to maintain per year: 0 Additional Town direct operatino costs per year: $0
r.'rvu.,lrrr rvr ll,
.(
;ì.g()\'
Projects SYCAMORE VALTEY PARK CAPITAT MAINTENANCE GIPNo:
a-¿ssl srATUS: lnconstruction
I
cn¡¡¡lPRolECT:Yes
#tI!Þ Y
: tf
dT
'\t1t.-.tf
I pnlonlry,2ongoing
I
pno¡¡cTMANAGER: lJ
PROIECT DESCRIPTION AND IOCATIONI
This is an ongoing project to address major repair and preventative maintenance issues for the upkeep and preservation of Sycamore Valley Park facilities.
2015116 Bocce ball lighting improvements. (COMPLETED)
?ç-,
2017118 Sports field fence repairs and tree pruning. Sidewalk repairs and repaint metal rail fencing. Concrete repairs. Tree work ($10,000). Sports field fence repair ($25,000).
\
#
'\\ t, ,, :{_ - r.'t,
Future planned projects: Major pond repairs or removal. Water feature repairs/upgrades. Safety surface repairs. Drainage improvements. Drinkin g fountain replacement.
I J¡
.iË
, .v tttt'"
DESCRIPTION OF MODIFICATIONS:
..PRQI.E çr..ç0.5T..8 5.T
Expenditure Category
illtAT F.......
Review $O $O $O Construction $395,490 $22,000 $22,000 lnspection & Admin. $O $O $O
Design/Plan
Total Gost Estimate: Total Expenditure:
2021t22 Total $O $O $O $0 $22,000 $22,000 $O $483,490 $O $0 $O $O $22,000 $22,000 $O $483,490
PriorYears 2017t18 2018119 2O1gt2O 2O2Ot21
$395,490 $22,000 $22,000 i221,314 Unexpended: $174,175 on 4-25-2017
."PBOIECT.AP.PROP.RIATIONAI.ID.F.UNDING... Funding Source(s) Prior Years CIP Gen Pur Reallocate ($100,000) CIP Gen Purpose $130,000 LLAD Zone $O Park $365,490 $395,490
Rev
D Facilities TotatFunding:
2017t18
2018119
2020t21
$0 $o $o
$o $o $o
$o $o $o
$o $o $o
$22,000 $22,000
$22,000 $22,000
$22,000 $22,000
$22,000 $22,000
RATIONATE FOR PROPOSED PROIECT:
Total
2021122
($1oo,ooo) $130,000
$o $o $o $o $0
$o
$453,490 $483,490
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operatinq costs per vear: $0
Preventative maintenance.
ffi
2019t20
(:lIr72
r. rr't.'.,1"rrr,tll, -( ir.g()\
Projects SECURIW ACCESS CONTROL FOR TOWN BUILDINGS clP No:
s-sr¡ I
STATUS: ln
Design I GREEN PROTECT:No I pnlOnlW, ¿
I
pno¡¡cr
MANA6ER: cP
PRO¡ECT DESCRTPTTON n¡¡O tOCmlOr,¡: Add key-card security access control system to the Town Library, Community Center, and the ïown Meeting Hall.
*þ
Project includes development of a written security program and installation of new hardware for key-card control systems, door hardware, conduits, service panels, and electrical supplies, as needed. Key-card control systems for main entry and certain internal doors eliminate the cost of re-keying due to lost or stolen keys, improve security by allowing access during specific time periods, and allow different levels of security for individual key-cards.
2013114 Town Library and Danville Community Center. Future Burglar and Fire Alarm Systems: Town Service Center burglar alarm. Village Theatre burglar alarm. Town Meeting Hall burglar alarm. Town Offices burglar alarm. DESCRIPTION OF MODIFICATIONS:
.PRAIEçT-.ç95.ï.H5.ï|MAïF.--....Expenditurecategory PriorYears 2017118
Review $O Construction $247,500 lnspection & Admin. $O Total Cost Estimate: $247,500
$O $O $O $O
Design/Plan
TotalExpenditure: $39,922
.
PROIE CT. AP. P ROP. RIAIIO Funding
Source(s)
Prior
$O $O $O $O
$O $O $O $O
$O $O $O $O
$O $O $O $0
Total $O
$247,500 $O
$247,500
Unexpended:$207,578 on4-25-2017
N AÀID.
FUNDING
Years 2017118 2018119 2019120
Fund $247,500 Total Funding: $247,500 Civic Facilities
$O $0
$O $0
RATIONALE FOR PROPOSED PRO]ECT:
$O $0
2020121
2021122
$O
$o $o
$O
Total $247,500 $247,500
EXPECTED IMPACT ON OPERATING BUDGET:
Additional woiker hours required to maintain per year: 0 Additional Town direct operating costs per year: $0
New service opportunities.
ffi
....pBrNrED.q¡ü....sne!?e:i........
2018119 2019120 2020121 2021122
CIP73
tvs'l'.ritrt rvi llt.r'lr.gtrr
Projects SVCAMORE VALLEY PARK PICNIC AREA RESTROOMS ctPNo: 8-522
| srlrusr Adopted I
cnr¡HPRotECT:Yes
I pnlontrv'
I
s
pno:¡cr
MANAGER:
BR
This prolcct rs unfundcd and has been modified PRO]ECT DESCRIPTION AND LOCATION: lnstall restrooms at the entrance to the Picnic Area at the west end of
Sycamore Valley Park. Restrooms will serve the picnic area, baseball field, and EBRPD êquestrian trail users.
The restroom facility will include men's and women's dual stall restrooms, sinks, and exterior water fountain. Sewer and water line extensions included.
t
i't
DESCRIPTION OF MODIFICATIONS:
f'¡
Moved out one year.
.PRAtEç.T..ç.05.ï.E5..ït.M.Aï8.................. Expenditure Category Prior
Total Cost Estimate: Total Expenditure:
$o $o $o $o $0
PROIE CÏ. A P. P ROP. R I AÏIO
N
Design/Plan Review Construction lnspection & Admin.
Funding
$o $o $o $o
- - - - - -
-
AI.ID. FUNDING.
$o $O
RATIONALE FOR PROPOSED PRO]ECT:
lÐ#
$o $76,000 $o $562,000 $o $51,000 $0 $689,000
tEP.qili.... 9! !?9!n1!
2021122 Total $o $76,000 $o $562,000 $o $51,000 $o $689,000
Unexpended: $0 on 4-25-2017
Provide restroom services for park and trail users.
Õ
$o $o $o $o
2020121
Source(s) PriorYears 2017118 2018119 2019120 2020121 2021122
Unfunded-87 Fundins:
Total
...PBJlt
Years 2017118 2018119 2019120
$o $O
$o $689,000 $o $0 $689'000 $O
$O $O
Total
$689,000 $689,000
EXPECTED IMPACT ON OPERATING EUDGET:
Additional worker hours required to maintain per yeâr: year: $o Additional Town direct
CIP74
0
*'rv u'.t l ir r rrri l lt
-a lì . g(
)\
Projects HItt
OAK
PARK CAPITAL MAINTENANCE
clpNo: B-s441
STATUS: ln
:f.l,j .:-äiÌî
I
construction
cne¡H PRoIECT:Yes
Vear
This is an ongoing project to address major repair and preventative maintenance for the preservation of Oak Hill Park amenities. Eliminate colored concrete decoration at front porch area and replace with new concrete. Pathway repairs. Refinish main hall floor (COMPLETED). Tree maintenance. Playground and water feature maintenance. Pond and pond related repairs. Barbeque and hardscape repairs and replacement. Pathway lighting repairs and replacement. Tennis court repairs and resurfacing.
:
-t I
'-llt
i)
ç
1' Ç
å
t,
t
'¡
^,
,'
pno¡¡cTMANAGER: lT
ïhrs pro¡ect has been modified from the prevrous
r.{
..|
I
PROIECT DESCRIPTION AND LOCATION:
Ër..
-!a
I pRlonlrv: 2/3 ongoing
¡
e .j"'
r. l
T
I
I
2017118 Pond repairs. Repair and replace audio-visual equipment ($f 0,000)
*
..t
)
2020121 Playground replacement design.
I
-.t
I
a
\'1
._r-
4
t.
?¡0
2021 122 Playground replacement construction. DESCRIPTION OF MODIFICATIONS:
Added playground equipment replacement design to 2020121. Added $25,000 to fiscal year 2O17118 and $50,000 to fiscal year 2O2Ol21 .
r.l
..PßOIEç.ï-ç95I.ESI|MATF...... Expenditure Category Prior
..--.....?RrNrçRett....st?e!?.o.1.t....,
Design/Plan Review $O $O $O $O Construction $206,629 $55,000 $36,000 $36,000 lnspection & Admin. $o $O $O $O TotalCost Estimate: $206,629 $55,000 $36,000 $36,000 Total Expenditure: $82,766 Unexpended: S123,863 on 4-25-2O17
.PR O IE CT- A
Funding
P-
PRO P, R|AITO N AI.ID. F.T'NDING Prior Years 2017118 2018119
Source(s)
Fund $97,129 $O Facilities $109,500 $SS,OOO TotalFunding: $206,629 $55,000 Civic Facilities Park
RATIONATEFOR PROPOSED
PROIECT:
Ongoing preventative maintenance and timely response specific repairs and renovation néeds as they occur.
ffi
2021122 Total $O $O $O $86,000 $O $419,629 $O $O $O $86,000 $0 $419,629
Years 2017118 2018119 2O19l2O 2O2Ol21
$O
$36,000 $36,000
ll,7
2020121
2021t22
$0 $36,000 $36,000
$o $86,000 $86,000
$o $o $o
EXpECTED tMpACT ON OpERATING BUDGETT Additional woker hours required to maintain per Addit¡onal Town direct operat
to
C
2019120
5
Total $97,129 $322,500 $419,629
year:
tvrr'tt.,1',ttvtìì,
0
., r,.g,rr
Projects MUNICIPAL SERVICE CENTER WASTE TRANSFER AREA crP No: e-sso I sTATUS: Adopted I cn¡rN PRotECT:Yes I pntonlw'
I
¿
pRo¡sclMANAGER: cMC
PRO'ECT DESCRIPTION AND TOCATION:
Municipal waste such as street sweepings and landscape debris require special handling to meet the Storm Water Pollution Control Prevention requirements. This project provides a waste transfer area for temporary storage and transfer of municipal waste in a safe and acceptable manner A transfer pad with appropriate drainage control, storm water f¡lters, debris bins, and access is needed at the Municipal Service Center.
The proposed 7S-foot by 1 50-foot paved transfer area will be at the northeast comer of the Service Center. . A storm water filter unit will be installed to treat storm water for discharge into the storm drain system.
DESCRIPTION OF MODIFICATIONS:
.PRALEçT.ç05I.85.T1M4TF....'. Expenditure Gategory Prior
.....pNNIEp-qNi. -...at!?.s!?.0.17.......
Years 2Û17ll8 2018119 2019120 2020121
Review $20,000 $O $O $O Construction $1 15,000 $0 $O $O lnspection & Admin. $10,000 $O $O $O Total Cost Estimate: $145,000 $O $O $O Total Expendlture: $0 Unexpended: $145,000 on 4-25-2017 Design/Plan
.
PROIE
CT. A
P.
P RO
P.
RI
AIIO
N
AI.ID. FUNDING.
Source(s) Prior Years 2017118 Cleanwater Program $145,000 $O Funding
Total
Funding:
$145,000
$O
2018119
2019120
$O
$o
S0
$o
RATIONATE FOR PROPOSED PROIECT:
$O $O $O $O
2020t21 $o $o
2021122 Total $O $20,000 $O $1 15,000 $0 $10,000 $O $145,000
2021122
Total
$o
$145,000
$o
$l45,ooo
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct oneratino costs ner veer: $o
ffi
(lIP7
(r
u u's'.tlrrrrvtIlt .t lr.gor
Projects VILIAGE THEATRE CAPITAT MAINTENANCE ctP No: e-ss¡
I
sTATUS: ln
construction I cn¡¡¡t PRoIECT:Yes I pnlonlry, 2/3 ongoing
I
pno¡¡cr
MANAGER: HRP
Thrs prolect has been modified from the prevrous Vear PRO'ECT DESCRIPTION AND TOCATION: 2017118 Replace carpets in lobby area with hard surface. Additional lobby art display lighting ($5,000) $10,000 per year for general maintenance. Exterior repaint of building. Convert stage lighting to LED. Replace light board and
projector. ($70,000) Future Projects: Replace inefficient and deteriorating lighting truss over the stage in the Village Theatre. The existing lighting truss is not rated or manufactured for the current uses. Modifications will utilize available space above up-stage right and upstage lefr wing. Add new movie screen in front of stage to allow usage on a more regular basis. ($40,000), HVAC unit replacement. DESCRIPTION OF MODIFICATIONS:
Modifed description by updating 2017118. Added $70,0001o 2017118.
çCIs.T.EsTIMAÏF. -,. -.. ExpenditureCategory PriorYears 2017118
PRCIT.E ç.T.
2018119 2019120 2020121 2021122 Total Gonstruction $'122,813 $90,000 $20,000 .$12,000 $12,000 $0 $256,813 Total Cost Estlmate: i122,813 $90,000 $20,000 $12,000 $12,000 $0 $256,813 Total Expenditure: Í73,422 Unexpended: $49,391 on 4-25-2017
.
PROIE CT. AP. P ROP. R ATIO N.AI.ID. FUNDII{G I
Funding
Source(s) PriorYears 2017118 2018119 2019120 2020121 2021122
Rev $16,000 $O $O $O $O Fund $101,300 $90,000 $20,000 $12,000 $12,000 D $5,513 $o $o $o $o TotalFunding: $122,813 $90,000 $20,000 $12,000 $12,000 CIP Gen Purpose Civic Facilities LLAD Zone
RATIONATE FOR PROPOSED PROIECT:
$16,000 $235,300
$5,513 $256,813
EXPECTED IMPACT ON OPERATING BUDGET:
Ongoing maintenance. Addresses safety, code requirements, and quality, and variety of performànces. rncreases
ffi
$O $O $0 $O
Total
("1P7 a
Additional worker hours required to maintain per year: 0 Additional Town direct costs
tt rr
rr'.tlrurt'rIlt.t lr.gor
Projects DANVILTE SOUTH PARK CAP¡TAL MAINTENANCE ctP No: s-sso
I
Construction
sTATUS: tn
I
cRern PRoIECT:Yes
I pRloRrv, il2 ongoing
I
pno¡rcr
MANAGER:
lT
Thrs project has been modified from the previous year PRO¡ECT DESCRIPTION AND LOCATION:
2016117 Tree work ($10,000).
2017fi8
Concrete walkway repairs. Play equipment repairs.
2O19l2O Play equipment replacement design. Resurface basketball courts.
2019120 Play equipment replacement. Future Projects: Replace portable restrooms.
DESCRIPTION OF MODIFICATIONS:
Added play equipment replacement design. Adjusted funding in 2018/19 to $56,000.
Years 2017118 2018119 2019120 2020121 2021122 Total $0 $353,600 $185,ô00 $6,000 $56,000 $100,000 $6,000 TotalCost Estimate: $185,600 $6,000 $56,000 $100,000 $6,000 $O $353,600 Totaf Expenditure: $122,784 Unexpended: $62,816 on 4-25-2017 Expenditure Category Prior
Construction
.
PROIE CT. A P. P ROP. R ATION AT.ID. F.UNDTIG I
Funding Source(s) CIP Gen Purpose Rev LLAD Zone D Park Facilities
TotalFundlng:
Prior Years $97,837 $61,763 $26,000 $185,600
2017118
2018t19
$o
$o $o $56,000 $56,000
$o
$6,000 $6,000
RATIONATE FOR PROPOSED PROIECT:
2020t21
2021t22
$o
$o
$o
$o $100,000 $100,000
$o
$6,000 $6,000
$o $o
2019120
Total $97,837 $61,763 $194,000 $353,600
$0
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct ooeratino costs per vear: $0
Ongoing maintenance.
CII'78
NrVrt'.tllrrtVt | ìr ('il.u()\
Projects SCHOOT PARK FACILITIES CAPITAT MAINTENANCE CIP
No: g-SsS
I
STATUS: ln
Construction
I
GREEN PROIECT:Yes
I
I
pruorurv, 2 ongoing
pno¡¡cTMANAGER: JI
PRO'ECT DESCRIPTION AND TOCATION:
Ongoing maintenance needed to maintain School Park facilities and sites Town-wide. Sites include: Baldwin, Green Valley, Montair, and Greenbrook Schools. Maintenance includes: 2016t17 -2019t20 - $125,000 Facilities related maintenance. Repairs to Teen Centers at Diablo Vista Middle, Los Cerros and Charlotte Wood Schools. Janitorial services for summer at Teen Centers. Replace carpet in all Teqn Centers. (COMPLETED) lnigat¡on pump maintenance. Fence and backstop repairs. (Annually)
DESCRIPTION OF MODIFICATIONS:
.-PROI-EçT.çOSI.E5-ï|MAïF....... Expenditure Category
CapitalMaintenance Total Gost
Estimate:
.....q$NTEp.eN. ...s.st?p!?.on.......
2021122 Total $211,17'l $15,000 $15,000 $15,000 $15,000 $O $271,171 $211,171 $15,000 $15,000 $15,000 $15,000 $0 $271,171
PriorYears 2017118 2O18l1S 2019120 2O2Ol21
TotalExpenditure: $44,364
Unexpended:$166,806on4-25-2O17
P.ROIECT.AP.PROP.RIAIIONAI.ID.FUNDII{G...... 2018t19 FundingSource(s) PriorYears 2017118
D $26,907 Park Dedication lmpact $87,500 Park Facilities $96,763 5211j70 Totat Funding: LLAD Zone
2019120
$o $o
$o $o
$0 $o
$15,000
$15,000 $15,000
$15,000 $15,ooo
$l5,ooo
RATIONALE FOR PROPOSED PROJECT:
2020121
2021122
$o $o $15,000
$o $o $o $o
$t5,ooo
Total $26,907 $87,500 $156,763
i271,170
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct ooeratino costs oervear: $0
Ongoing and one-time needs for Town maintained facilities.
c¡1,71,
*
tr rr'.ri;r rvl ll( .('ir.!()\
Projects DIABLO VISTA PARK CAPITAL MAINTENANCE clPNo:
s-sool
lnconstructìon I cn¡¡nPRolECT:Yes I pRloRIrvr 2/Jongoing
STATUS;
PRO¡ECTMANAGER:
I
lI
Thrs pro¡ect has been modified from the prevrous year PROIECT DESCR¡PTION AND IOCATION:
This project provides ongoing maintenance of Diablo Vista Park facilities including:
Ongoing: Major tree pruning Sports field and pathway lighting repairs. Restroom maintenance - painting and repairs. Cyclone fence and backstop repairs. Fence painting and repairs. Concrete repairs.
2017118 Safety surface repairs. Tennis/basketball court repairs. Windscreen repairs/replacement.
2O19l2O Playground equipment replacement design. 2O2Ot2'l Playground equipment replacement.
DESCRIPTION OF MODIFICATIONS:
Added play equipment replacement design. Adjusted funding in 2O'18119 to $68,000.
..PRQI E ç.T..çA5I.Es.TtMATE....... Expenditure Category Prior Years
-. -. -..
2O2Ol21
f Br ¡rrED 9n. 2021122
- - -
CapitalMaintenance $123,283 $f 8,000 $18,000 $68,000 $718,000
$o
TotalCost
$718,000
$o
Total
-
.
2017118 2018119 2019120
Estimate: $123,283 $18,000 $18,000 $68,000 Expenditure: $86,391 Unexpended: $36,892 on 4-25-2017
PROIE CT. Funding
AP. P RO
P.
RI
Source(s)
AIIO
Prior
N ÂI.ID.
-. - -$l?9/?.0-1?..
Total $945,283 $945,283
FUNDING
Years 2017118
2018119
2019t20
2020t21
2021122
D $26,907 $O $O Park Facilities $96,376 $18,000 $18,000 TotalFunding: $123,283 $18,000 $18,000
$o $68,000 $68,000
$o
$o
LLAD Zone
RATIONALE FOR PROPOSED PROIECT:
$718,000
$o
t718,000
$o
EXPECTED IMPACT ON OPERAT¡NG BUDGET:
Total $26,907 $918,376 $945,283
Additional worker hours required to maintain per year 0 Additional Town direct operatinq costs per vear: $0
Provide for ongoing repair.
CII'8o
-
-.
Projects VISTA GRANDE STREET/BRET HARTE PARK PEDESTRIAN IMPROVEMENTS GtPNo: s-sz4lSTATUS:
lnDesign I cn¡¡nPRoJECT:Yes
I
I pruonlwr zl¡
pno¡ecruANAGER:
BR
PRO¡ECT DESCRIPTION AND IOCATION:
Construct a S-foot wide, 300-foot long asphalt pathway adjacent to the Bret Harte parking area, to improve access to Vista Grande School. The project also includes the removal and replacement of parking bumpers, park boundary bollards, and the extension of the existing metal beam guardrail on Diablo Road for approximately 100 feet. Project in final design and under review by Caltrans. Utility relocations completed. Construction in 2017 pending Caltrans approval. This project funding through the OneBayArea Safe Routes to School Cycle 2 Grant Program.
DESCRIPTION OF MODIFICATIONS:
-.PRCIEçT.ç95.T.E5.T|MATF..-.-.. Expenditure Category
Review $25,000 Construction $176,275 lnspection & Admin. $6,000 Total Cost Estimate: $207,275 Design/Plan
Totaf
.
Expenditure: $34,625
PROIE CÏ.
A
P.
P RO
P.
RI
AÏIO
Safe Routes to
School
$157,275 5207,275
$O $O $O $O
$O $O $O $O
$O $O $O $O
2021122 Total $O $25,000 $O $176,275 $O $6,000 $O $207,275
F.UNDING
2017118
2018119
$o $o $o
$o $o $o
RATIONATE FOR PROPOSED PROJECT:
Enhance pedestrian circulation and safety along Vista Grande Street.
ffi
$O $O $O $O
Unexpended: $172,650 on 4-25-2017
N AÀID.
Source(s) Prior Years Park Dedication lmpact $50,000 Funding
TotalFunding:
.....88rìüEp..qr:. ....oAnç!?er.7......
PriorYears 2017118 2018119 2019120 2020121
CII'fl I
2019120
$o $o
$o
2020121 $o $o $o
Total
2021122
$o
$50,000
$o
$157,275
$o
i207,275
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operating costs per year: $0
\\'\\'\\'.(1¡r l\/t I lL-( :r.g()\
Projects VETERANS MEMORIAL BUILDI NG CAPITAL MAI NTENANCE ctpNo: s-saz
I
STATUS:
tnConstruction
I
cn¡¡nPRoIECT:Yes
I pntonlw' 3/4ongoing
I
pno:¡cTMANAGER:
NR
This proiect has been modified from the previous year
B-s82
PRO]ECT DESCRIPTION AND LOCATION:
Provide repair and preventative maintenance for the preservation of the Veterans Memorial Hall facilities.
il
Ongoing: HVAC repair. Door repair. Annual elevator maintenance and permits. Painting and other hardscape related repairs. 2017118 Garbage disposal install and sink replacement. Trim band repair (exterior). $60,000 Automatic ADA doors. $22,000 Audiotuisual Equipment upgrades. $1 5,000 Display monitor at Senior Center. $8,000
\
2019120 Refinish floors.
DESCRIPTION OF MODIFICATIONS:
Updated title. Added projects lo 2017118 and updated costs.
".ìì¡
PRINTEDoN:
Years 2017118 2018119 2019120 CapitalMaintenance $44,500 $105,000 $12,000 $15,000 Total Cost Estimate: $44,500 $105,000 $12,000 $15,000 TotalExpenditure: $25,039 Unexpended:$19,461on4-25-2017 Expenditure Category Prior
2020121
$15,000 $15,000
04126120'17
2021122
$o $0
Total
$1e1,500 $191,500
..pRolEcr.aP_PRoPRtaTIoNAND.F.UNDING.-..-........... Funding
Source(s)
Prior
Years 2017118 2018119 20'19120
Rev $22,000 $O $O $O Fund $22,500 $105,000 $12,000 $15,000 Total Funding: $44,500 $105,000 $12,000 $15,000 CIP Gen Purpose Civic Facilities
R,ATIONALE FOR PROPOSED PRO]TCT:
2020121
2021t22
$O
$o $o $o
$15,000 $15,000
Total $22,000 $169,500 $191,500
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: Additional Town direct operating costs per year: $0
Ongoing preventative maintenance and timely response to specific repairs and renovation needs as they occur.
CTPB2
u,rvu,.tl
¿r r
0
lvi I Ic.ca.g()\'
Projects VILLAGE THEATRE PARKING tOT IMPROVEMENTS ctP No:
e-sgz
I
STATUS:
Adopted I cn¡¡N PRoIECT:Yes I pnlonlrvt r
I
pno¡¡cr
MANAGER:
sl
Thrs prolecì has been moclified from the prevtous year PRO¡ECT DESCRIPTION AND TOCATION:
Land acquisition, design and construction of additional at-grade parking adjacent to, and east of the existing Village Theatre Municipal Lot. This project is expected to increase the number of parking spaces in the Village Theatre Municipal Lot by 131 spaces, from 69 existing to approximately 200 total spaces. The project will also include landscaping, C.3 bio retention facilities (including offsite), lighting and potential pedestrian connections to Hartz Avenue. Add 12 new parking spaces to the Village Theatre Parking lot by improving the efficiency ofthe parking layout at the southern end ofthe property.
One large tree located in the south east drive aisle will be removed.
DESCR¡PTION OF MODIFICATIONS:
Added adjacent property and improvements.
..PRCIT.EçT.çO5T-E5TIMATF....... Expenditure Category Prior
Years 2017118 2018119 2019120 2020121
EnvironmentalReview $O $300,000
ROW $5,850,000 $O Design/Plan Review $20,000 $250,000 Testing $O $25,000 Construction $175,000 $2,500,000 lnspection & Admin. $3,700 $75,000 Utilities $O $10,000 TotalGost Estimate: $6,048,700 $3,160,000 Land and
Total .
Expenditure: $102,700
$O $o $O $O $O $O $O $O
$O $O $O $o $O $O $O $0
Unexpended: $5,946,000 on 4-25-2017
PROIE CT. AP. P ROP. R IA TO N Aì¡D. F.UNDING
Prior Years 2017t18 2018119 2O19l2O CIP Gen Purpose Rev $6,048,700 $3,160,000 $O $O $0 TotalFunding: $6,048,700 $3,160,000 $0 Funding
$O $O $O $O $O $O $O $O
2021122 Total $O $300,000 $O $5,850,000 $O $270,000 $O $25,000 $O $2,675,000 $O $78,700 $O $10,000 $O $9,208,700
Source(s)
RATIONATE FON PROPOSED PROIECT:
2021122 Total $O $O $9,208,700 $O $O $9,208,700
2020121
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: Additional Town direct ooeratino costs oer vear: $0
ffi
cIPfl:ì
0
rt'r'u'.tllrr rvt I lt .r-lr.gr;r
Projects SYCAMORE VATLEY PARK DRAINAGE IMPROVEMENTS ctP No:
e-orr
I
I
STATUS: New
cne¡¡¡ PRoIECT:Yes
I
pnronrtY,
I
r
pno¡¡clMANAGER:
rr
PROTECT DESCRIPTION AND TOCATION:
During large storm events, extensive mud and silt runoff ovenn¡helms the existing drainage facilities at Sycamore Valley Park impacting the basketball courts, parking lot, bocce courts and play area.
This project will provide storm drainage improvements for Sycamore Valley Park to alleviate flooding and closure of park facilities.
DESCRIPTION OF MODIFICATIONS:
.PROr.Eç.r. ç.05..T.Es.T ! M.AI 8......... Expenditure Category Prior Years 2017118 2018119
Review Construction Inspection & Admin. Total Gost Estimate: Total Expenditure: Design/Plan
..PRO
$O $15,000 $O $150,000 $O $7,500 $O $172,500
........PBtNIgp.qùü.
$0 $O $O
$0
Facilities Total Funding:
2021122
$o $o $o $o
$o $o $o $o
$o $o $o $o
2019120
2020121
2021122
$o $o
$o $o
$o $o
.s1!?9!?.o:!!.....
Total $15,000 $150,000 $7,500 $172,500
I
Funding Park
2020121
Not Available
ff CT- A P ROP. R ATIO N A}¡D. F.UNDTNG Source(s) PriorYears 2017118 2018119 P.
2019120
$O $172,500 $O $172,500
RATIONALE FOR PROPOSED PROIECT:
lmprovements to the park drainage system will alleviate flooding and closure of park facilities.
CIP84
$O $O
Total $172,500 $172,500
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operating costs per year: $0
ri *,t'.tIlt rvi IIt.( ;r.g()\'
Projects SI(ATE PARK CIP
No: e-oro
|
I
STATUS: New
cn¡¡TPRoIEGT:No I
PRroRrrY: 1/2
PRO¡ECT MANAGER: HRP
PRO¡ECT DESCRIPTION AND LOCATION¡
The Parks and Leisure Services Commission recommends this as a high priority parks project The project is identified in the Parks, Recreation, and Arts Strategic Plan as an important enhancement to the Parks, Recreation, and Arts system. Study for potential locations will include search for a location and a conceptual design.
DESCRIPTION OF MODIFICATIONS:
ExpenditureGategory PriorYears 20171'18
Study
$o $20,000 $0 $20,000
Estimate: Total Expenditure: TotalGost
.
PROIE
CT- A
Funding
P.
P ROP. R
Source(s)
Facilities TotalFunding: Park
I
$o $O
N AÀ¡D-
F.UNDII{G..
Years 2017118
2019120
2018119
$0 $20,000 $O $20,000
$O
$0
RATIONALE FOR PROPOSED PROJECT:
$o $0
2020121
2021122
$o $o
$o $o
Total $20,000 $2o,ooo
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 50 Additional Town direct operating costs per year: $5,000
Provide recreation facilities for residents.
ffi
$o $0
2021122 Total $o $o $20,000 $O $O $20,000
2O2OI21
Not Available
ATIO
Prior
2018119 2019120
ClP[i5r
rvr,,, rr'.rl;rr rvr
I
lr
-r ;r.t-¡or
Projects TOWN GREEN MASTER PIAN ctPNo: g-orzl STATUS: New
I
I
cn¡¡rPRorECT:No I pRronrrv, uz
pno¡¡clMANAGER:
HRP
PROIECT DESCRIPTION AND LOCATION:
Develop a master plan for the Town Green that identifies a comprehensive set of improvements, activities, and arts programming strategies. The study may include a larger stage, seating options, a musical garden, and a climbable art structure.
Based on recommendations by the Parks and Leisure Services Commission and identified in the Parks, Recreation, and Arts Strategic Plan as an area which would enhance the Parks, Recreation, and Arts system.
DESCRIPT¡ON OF MODIFICATIONS:
.
pRarEç.T..ç95ï.85ïtMATF.... _.. Expendlture Gategory Prior Years 2017118
Study
Total Cost Estimate: Total Expendlture:
.
2018119 2019120 2020121 2021122
$O $21,000 $O $21,000
$o $0
Park
Facilities Funding:
$0 $O
$0 $21,000 $0 $21,000
RATIONATE FOR PROPOSED PROTECT:
$o $O
2021122 Total $0 $0 $21,000 $0 $O $21'000
2019120 2020121
$0 $O
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: l0 Additional Town direct operatino costs Der vear: $1,000
Provide planning opportunity for the Town Green
ffi
$O $0
Not Avallable
PRO IËCI- A P- P ROP. RIAIION.A}ID. FUNDTNG. Fundlng Source(s) Prlor Years 2017118 2018119 Total
$O $O
Total $21,000 $21,000
(
llPfl(r
rt'rv
tt.,],,,'r'r ll. -, lr.gtt.
Projects TOWN-WIDE WAYFIND¡NG AND DIRECTIONAT SIGNAGE ctPNo:
e-oral
I
sTATUS: New
cn¡¡xpRorECT:No I
@
pR¡oRrry:2/j
I
pno¡¡cTMANAGER: NR
PRO'ECT DESCRIPTION AND [OCATION:
A comprehensive town-wide wayfinding and signage system for motorists, cyclists, and pedestrians. Sites include: downtown and retail centerc, and points of interest. This project is a continuation of A-266 that included phases 1 and 2'. Development of a Waylinding Signage Master Plan (2010111); and Construction of Wayfinding and Signage Elements. This project continues with: Phase 3: lnterstate 680 signage (2017118\. lnstallation of signage along l680 directing motorists to downtown Danville. Estimated cost is $26,000 Phase 4: Update three kiosk maps (2017/18). Estimated cost is $24,500.
Ë
Phase 5: Expansion of wayfinding beyond downtown destinations (201 8/1 e).
The project cost is supplemented by a transfer of remalning funds (estimated to be $32,992) in A-266 to this project.
I
DESCRIPT¡ON OF MODIFICATIONS:
Pedestria n
D
irectional/Map
Expenditure Category Prior Design/Plan Review Construction Total Cost Estimate: Total Expenditure:
.
$O $2,250 $O $48,250 $O $50,500
$0 $0 $0
$O $O $O
Not Available
PROIE CT. A P. P ROP. R IAIIO N.AIìID. F.UNDING Funding
Source(s)
Prior
Years 2017118 2018119 2019120 2020121 2021122
Reallocate $O $32,992 Rev $O $17,508 $O $50,500 Total Funding:
$O $O $0
CIP Gen Pur CIP Gen Purpose
RATIONALE FOR PROPOSED PROIECT:
lmprove economic viability of the Town by providing signage for visitors, directing them to shopping areas and destinations.
ffi
2021122 Total $O $O $2,250 $O $O $48,250 $O $0 $50,500
Years 2017118 2018119 2019120 2020121
$O $O $0
$0 $O $0
$O $O $0
Total $32,992 $17,508 $50,500
EXPECTED ¡MPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operating costs per year: $0
(]IPB7
t.'tt'rt'.tl;rr rt,r ll,
.r
l'.!o.
Projects GREEN crP No:
VALLEYTRAII FROM HIGHBRIDGE LANE TO DIABLO ROAD
g-ors
I STATUS:
I
New
I
cn¡¡tt PRorEcr:Yes I pntonrrv, zlc
pno¡¡clMANAGER:
BR
PRO¡ECT DESCRIPTION AND LOCATION:
Prepare a feasibility study for a trail from the Green Valley Shopping Center (Woodbine Bridge at Highbridge Lane) to Diablo Road via Green Valley Creek.
DESCRIPTION OF MODIFICATIONS:
Expenditure Category Prlor
Study Totalcost Estimate: Total Expenditure:
2021122 Total $o $o $20,000 $0 $0 $20,000
Years 20171'18 2018119 2019120 2O2Ol21
$O $20,000 $0 $20,000
$O $O
$o $O
Not Avallable
.PROIECï.AP.PROP.RtAilON.AND.FUNDING............._.._.. Funding Park
Total
Source(s) PriorYears 2017118 2018119 2O19l2O 2020121 2021122
Facilities Funding:
$0 $20,000 $O $20,000
$0 $0
RATIONALE FOR PROPOSED PROIECT:
$0 $O
$0 $O
$20,000 $20,000
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct opefetils qosts pelfæ!:
Complete a trail gap. Provide alternate transportation mode
ffi
$0 $O
Total
$0
Cl1,88
s'u *'-rì;rrrt'r llt
_ .r ;r.gor
Projects mber lndex of Tran rpg,rf -a-lie n Þv- P-r9.9. çf , l! H Pr* Project Name C.OT7 TOWN.WIDE SIDEWALK REPAIRS-----
Page
.-.-CIP91
Status
C-O55 DIABLO ROAD TRAIL FROM ALAMEDA DIABLO TO TANI( ACCESS ROAD-.-----.CIP92
Construction Adopted, Modified
C-O57 BLACI(HAWI( RD./HIDDEN OAK DR./MAGEE RANCH RD. TRAFFIC SIGNAL----.--CIP93
Adopted
c-30s TRAFFTC MANAGEMENT PROCRAM------------c-392 BRIDCE MAINTENANCE-------c-402 EL PTNTADO OVERLAY - EL CERRO BLVD. TO l-680---------
---------.CtP94
Design
----------.ClP95
Design
--------CtP96
Design
PROGRAM--Construction C-508 CAMINO TASSA]ARA/CROW CANYON SAFETEA-LU IMPROVEMENTS----------CIP98 Comptete, Modified C-521WEsT EL PINTADO SIDEWALK IMPROVEMENT 9 Adopted C-545 ÏRAFFIC SIGNAL CONTROLLER UPGRADEoo Construction .CIP97
C-418 TRAFFIC SIGNAL AND STREET LIGHT MAINTENANCE
C-552 INTERNALLY ILLUMINATED STREET NAME SIGN LED RETROFIT.---.---------C¡P1O1 Construction, Modified 02 Construction, Modified C-5ó2 TRAFFIC SIGNAL INTERCONNECT sYSÏEM -ctPl03 Construction C-566 TOWN-WIDE BICYCLE PARKING PROJECT C-578 SAN RAMON VALLEY BOULEVARD LANE ADDITION AND OVERLAY (5OUTH)---.CIP1O4
C-584 C-585 C.588 C.592
Design
DANVILLE VARIOUS STREETS AND ROADS PRE5ERVATION-------.------..---'CIP1O5
Out to Bid, Modified
ELECTRIC VEHICLE CHARGING STATIONS AT TOWN-OWNED FACILITIES-------CIP1O6
Comptete, Modified
BATTERY BACKUP REPLACEMENT FOR TRAFFIC
SIGNALS-
-..---.---CIP1O7 Design
o8 Construction -----.C¡P1O9 Design C.sg STUDENT PARKING AT SAN RAMON VALLEY HIGH SCHOOL---.-----------------.CIP110 Adopted ------c¡P111 Construction C.595 PAVEMENT MANAGEMENT C-596 SAN RAMON VALLEY CREEK FOOTBRIDCE AT DANVILLE GREE PLLz Adopted ROSE STREET PARKING FACI
C-593 FRONT STREET CREEK BANK
STABILIZATION.--
L3 Adopted, Modified
C-598 PARK AND RIDE EXPANSION PRO¡ECT
PLL4 Design
C-599 LA GONDA WAY BRIDGE IMPROVEMEN C-6OO SAN RAMON VALLEY BOULEVARD IMPROVEMENTS
(NORTH).*--.--_-----.-C¡P115 Adopted P116 Adopted, Modified
C-601 CAMINO RAMON IMPROVEME C-6O2 DANVILLE BOULEVARD
IMPROVEMENTS.------
---'CIP117 Adopted
c-603 DANVTLLE AND EL cERRo BoULEVARD pARKrNc urrpRo'il¡[4e NTs---------------crpl18 C-605 RAILROAD AVENUE DECORATIVE CROSSWALKS AND PAVEMENT OVERLAY---CIP119 C-6O7 IRON HORSE TRAIL RAIsED CROSSWALKS AND FLASHING BEACONS-_--.----CIP12O
c-609 TowN-wtDE BtcYcLE
MASTER
PLAN------
--------C¡P121
C-6 1O PAVEM ENT MANAG EMENT--.-----------
ffi
Complete Complete New New
PL22 New
CIP89
n'rv*'.tl;rr rvr I ì..( ;r.g()\
Projects lndex of Transportation by Project Name
Pr#
Project
Name
Page Status
.-.-.-----CIP 1O7 Design C-588 BATTERY BACKUP REPLACEMENT FOR TRAFFIC SICNALSC.O57 BLACKHAWK RD./HIDDEN OAK DR./MAGEE RANCH RD. TRAFFIC SICNAL---.--.CIP 95 Adopted C-392 BRIDGE MAINTENAN
95
C-6O1 CAMINO RAMON IMPROVEME
C-508 CAM I NO TASSAJARA/CROW CANYO N SAFETEA-LU
I
M PROVEM
Design
--.clP 11รณ Adopted, Modified ENTS---.----.CIP 98 complete, Modified
C-6O3 DANVILLE AND EL CERRO BOULEVARD PARI(ING IMPROVEMENTS------.----.CIP 118 Complete
tLT Adopted
C.6O2 DANVILLE BOULEVARD IMPROVEME
C.584 DANVILLE VARIOUs sTREETS AND ROADS PRESERVATION-----_---.---.------CIP 1O5 Out to Bid, Modified
Adopted, Modified -------.ClP 96 Deslgn C-585 ELECTRIC VEHICLE CHARGING STATIONS AT TOWN-OWNED FACILITIES------ClP 106 Comptete, Modified 109 Design C-593 FRONT STREET CREEK BANK 5TABILIZATION--..---.C-552INTERNALLY ILLUMINATED STREET NAME SIGN LED RETROFIT-----.---------CIP 1O1 Construction, Modified C-O55 DIABLO ROAD TRAIL FROM ALAMEDA DIABLO TO TANI( ACCESS ROAD-----.CIP 92
c-4028L PTNTADO OVERLAY - EL CERRO BLVD. TO
l-680---------
C.6O7IRON HORSE TRAIL RAISED CROS5WALI(S AND FLASHING BEACONS---.-----CIP 12O New C-599 LA GONDA WAY BRIDCE IMPROVEMEN
.--CIP c-598 PARI( AND RIDE EXPANSION PRO]ECT----------.--CIP c-610 PAVEMENT MANAGEMENT--------------CIP c-595 PAVEMENT MANAGEMENT PROCRAM c-605 RAILROAD AVENUE DECORATIVE CROSSWALKS AND PAVEMENT OVERLAY--CIP C-592 ROSE 5TREET PARKING FACILITY--.--
c-6oo sAN RAMON VALLEY BOULEVARD IMPROVEMENTS (NORTH)---------*------ClP
LL4 Design tL3 Adopted, Modified L22 New 111 Construction 119 Complete 108 Construction 115 Adopted
C-578 sAN RAMON VALLEY BOULEVARD LANE ADDITION AND OVERLAY (SOUTH)---CยกP 1O4 Design
C.596 SAN RAMON VALLEY
CREEK FOOTBRIDGE AT DANVILLE GREEN
C-594 STUDENT PARKING AT sAN RAMON VALLEY HIGH SCHOOL-----C-6O9 TOWN-WIDE BICYCLE MASTER
PLAN-------
lP 112 Adopted IP 11O
lP 121 New
C-566TOWN-WIDE BICYCLE PARKINC PRO]ECT---------
103 Construction
---CIP 91 REPAIRS-----.------.CIP C-305 TRAFFIC MANAGEMENT PROGRAM--.-------94 CIP 97 C-418 TRAFFIC SIGNAL AND STREET LIGHT MAINTENANCE PROGRAM--C-545 TRAFFIC SIGNAL CONTROLLER UPGRADE. ----.-.---.CIP lOO
Construction
C-562 TRAFFIC SIGNAL INTERCONNECT sYSTEM--
Construction, Modifi ed
C-O17 TOWN-WIDE SIDEWALI(
C-52 1 WEST
ffi
Adopted
E
L PINTADO SI DEWALI( I MPROVEM ENT.-------
cIP90
99
Design
Construction Construction Adopted
rvrvn'.t];rr rt,รฌ I]r .t rยก.gor
Projects TOWN.WIDE SIDEWALK REPAI R5 ctP No:
c-orz
I STATUS:
ln
I
Construction
Cn¡¡n PRoIECT:Yes
I pnlonlw. 3 ongoing
I
pno¡¡cr
MANAGER: lP
PRO¡ECT DESCRIPTION AND LOCATION:
Design and construction of Town-wide sidewalk repair projects consistent with completed sidewalk survey and pursuant to the Municipal Code Section 12-6.3 and 6.4.
Ongoing repairs to address deficient sidewalk sections and reduce liability exposure.
DESCRIPTION OF MODIFICATIONS:
..PRO¡.E çT. çA5T.E5-T IMATF....
Expenditure Category Prior
.pRl NTED
Years 2017118 2018115
Review $O $O $o Construction $554,327 $30,000 $39,000 lnspection & Admin. $O $O $O Design/Plan
2019120
Total
.
$o
$o
$42,000
$O
$o $42,000
$o $o $o $o
Estimate: $554,327 $30,000 $39,000 $40,000 Expenditure: $325,213 Unexpended: $229,114 on 4-25-2017
PROIE CT. A P. P RO P. RIATIO Funding Source(s) CommercialTlP ResidentialTlP
TotalFunding:
N
"A}TD.
2021122
$40,000
TotalGost
9 M-. - -.q{ !?7 !?.o.17.......
2020121
Total $o $705,327 $o $705,327
FUNDING
Prior Years
2017118
2018119
2019120
2020121
2021122
$256,362 $297,965 $554,327
$7,000 $23,000 $30,000
$7,000
$7,000
$32,000 $39,ooo
$33,000 $40,000
$7,000 $35,000
$o $o $o
RATIONATE FOR PROPOSED PROJECT:
$42,000
Total $284,362 $420,965 $705,327
EXPECTED IMPACT ON OPERATING BUDGET:
lmplementing plans for correction of deficient sidewalk sections will reduce liability exposure.
CIP91
Additional worker hours required to maintain per year: 0 Additional Town direct ooeratino costs oer vear: $0
wN$'.rlr,,r,t I ì.,(-iì.g()\
Projects DIABLO ROAD TRAIT FROM ALAMEDA DIABTO TO TANK ACCESS ROAD clP No: c-oss
I
sTATUS:
Adopred
I cn¡¡t
PRoIEcr:Yes
I
I pnlonlrv, rlz
pno¡¡cTMANAGER: Trw
Thrs pro¡ect has been modified fronr the prevrous Vear PROJECT DESCRIPTION AND LOCATION:
This project is part of the North East Roadway lmprovement Assessment District (NERIAD). lt provides for an asphalt bicycle/walking path to be extended from Alameda Diablo to the EBMUD tank access road (1,200 feet west of Diablo Scenic). The project was deferred until right-of-way dedication was feasible. Right-of-way dedication will now occur in conjunction with the Davidon Homes development along Diablo Road. Preliminary design of the project has determined the most probable route and that a bridge will be necessary to cross Green Valley Creek. The trail is 3,500 feet from Alameda Diablo to the tank access road.
DESCRIPTION OF MODIFICATION5:
Updated funding sources and moved project out to 2018/19.
Expenditure Gategory PriorYears 2017118 Environmental Review Design/Plan Review Construction
lnspection & Admin. Total Gost Estimate:
Total Expenditure:
$487,075 $260,848 $231,000 $10,768 $989,691 $0
2018t19
$o $o
2019120
2020121
2021122
$o $o
$o
$o
$o
$o
$o $o $o
$o
$o
$0
$o $r,048,000 $o $o $o $1,048,000
$o $o
CT. APP RO P. RßITO N.AI.ID. FUI.IDIÌ{G Funding Source(s) Prior Years 2017118 2018119 2019120 2O2Ol21 Meas J Major St 24c $O $0 $1,048,000 $O $o
NERTAD
(2012) $75,000
$770,843 NERIAD Debt Service $143,848 TotalFunding: $989,691
$o $o $O $O $O $o $0 $1,048,000
RATIONATE FOR PROPOSED PROJECT:
This project mitigates the impacts of development within the NERIAD proiect boundaries.
ffi
$487,075 $260,848 $1,279,000 $10,768
$o
$o $0
$2,037,691
Unexpended: $989,691 on 4-25-2017
PROIE
Meas J-CC-TL3
Total
CIT'fI2
$o $O $O $0
$o $O $O $0
2021122 Total $O $1,048,000 $o $75,000 $O $770,843 $O $143,848 $O $2,037,691
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operátinq costs oer vear: $0
\\'\\'\\'-(1irr ì\,r I lL { ;ì.g()\
Projects BLACKHAWK RD./HIDDEN OAK DR./MAGEE RANCH RD. TRAFFIC SIGNAT clPNo:
c-oszl
sTATUS:
Adopted
I cn¡¡xPRolEcT:No lpn¡onlrv,
I
s
pRo¡¡cr
¡,,TANAGER:
scL
PRO¡ECT DESCRIPTION AND TOCATION:
Construction of a traffic signal and loop detectors at the main entrance to the Magee Ranch development. The project will avoid conflict with the existing trees. This signal would be operated and maintained by Contra Costa County. Funding for this signal is to be set aside for traffic signal installation at such time as signal warrants are met.
DESCRIPTION OF MODIFICATIONS:
..PRe¡.Eçr. ç9.5r..85.TtM4T8 ...... ExpenditureGategory PriorYears 2017118
2018119 2019120 2020121 2021122
Design/Plan Review $31,500 $O $O $0 Construction $157,500 $O $O $O lnspection & Admin. $4,370 $O $O $O Total Gost Estimate: $193,370 $0 $O $0 Total Expenditure: $O Unexpended: $193,370 on 425-2017
.
PROIE CÏ. Funding
AP.
P ROP. RIATION AÀID.
Source(s)
NERTAD Funding:
Total
Prior
$31,500 $157,500 $4,370 $193,370
FUNDIT{G
$O $O
RATIONATE FOR PROPOSED PROIECT:
rhis project r,routd mitisate trarric impacts associated
ffi
$O $O $0 $O
Years 2017118 2018119 2O19l2O 2O2Ol21 2021122
$193,370 $193,370
development within the NERIAD
$0 $O $O $O
Total
boundaries.
$O $O
with
$O $O
$O $0
$O $0
CII'f):l
$193,370 $193,370
Ãäåñi:Ïå?*X,iåFI"or|"o'38Í#Jånlòt å9PnÍ"TIio", Add¡tional Town direct operating costs per
Total
v""'''
vear:
rvn u
o
$S,OOO
.,1;r
rrvr
llt
, ;r.gtrr
Projects TRAFFIC MANAGEMENT PROGRAM clP No: c-¡os
I
I
sTATUS: ln Design
cn¡¡rpRorECT:No I
pn¡onlrv,2ongoing
I
pno¡TcTMANAGER:
KB
Thrs project has been modified from the prevtous year PROJECT DESCRIPTION AND IOCATION:
lmplement the Arterial Traffic Management and the Neighborhood Traffic Management Program (NTMP) through installation of traffic calming devices such as: Pavement undulations Mini-traffic circles Raised intersections Chicanes (street narrowing) Radar speed display signs Signing and striping Projects and devices will be installed with individual Town Council
approval. NTMP projects require neighborhood and Town Council approvals. Five radar signs will be installed or upgraded in 20171'18.
DESCRIPTION OF MODIFICAÏION5:
Updated project description.
.pRQr.E ç.r. ç.0 5.ï.
E
5r
PRINTED
t.M.Aï F....
Expenditure Category Prior
Years 2017118 2018119
Review $88,062 Construction $538,436 lnspection & Admin- $27,309 TotalCost Estimate: $653,807 Design/Plan
Total
.
Expenditure: $515,884
$O $O $O $0
$O $O $O $0
Rev TotalFunding:
2020121
$O
$o
$O
$o
$O
$o $o
$O
ON:
04.12712017
2021122 Total $o $88,062 $0 $538,436 $o $27,309 $0 $653,807
Unexpended: $137,923 on 4-25-2017
PRO rE CI. AP- P RO P. Rl AIIO N At lD. F.UNDTNG 2018119 Funding Source(s) Prior Years 2017118 CIP Gen Pur Reallocate ($75,000) CIP Gen Purpose $728,807 $653,807
2O19l2O
$o $o
$o $o
$o
$o
RATIONALE FOR PROPOSED PRO]ECT:
2019t20 $o $o $o
2020121
2021122
$o $o $o
$o $o $o
Total ($75,ooo) $728,807 $653,807
EXPECTED ¡MPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 400 Additional Town direct ooeratino costs Der vear: $1,500
lmplements program approved by Town Council to address arterial and neighborhood traffic problems.
CIP94
\\'\\'\\'.(l:u rVt I lL.( lì.g()\'
Projects BRIDGE MAINTENANCE ctPNo: c-sgzl STATUS:
lnDesign I cn¡elPRolECT:Yes lpRloRlrvt:
I
pno¡¡clMANAGER: sl
PRO¡ECT DESCRIPTION AND LOCATION:
A Caltrans biennial inspection conducted in January 2016 recommended scour repair to prevent damage to the bridge support systems town wide, including at the following locations: Paraiso Road Bridge - $176,400 Camino Ramon Bridge - $81 ,034 Various other bridges as needed. Prior year amounts adjusted for inflation and environmental studies added to costs.
DESCRIPTION OF MODIFICATIONS:
..PRAT.E çT..çCI
5Ï..85T I MAÏE...
Expenditure Gategory PriorYears Desígn/Plan Review Construction lnspection & Admin.
Total Cost Estimate: Total Expenditure:
.
P
ROfi
CT. A
Funding
P. P.
ROP.R
$28,459 $515,434 $13,096 $556,989
$l15,451
AITO
2017118 2018119 2019120 2020121
$0 $o $o $o
$o
$o
$o
$o
$o $o Unexpended: $441,538 on 4-25-2017
N AÀ¡D.
f.UNDING..
Source(s) PriorYears 2017118
Rev $425,476 $37,500 Src $94,013 Total Funding: $556,989 CIP Gen Purpose Community Dev Agncy Meas J Rtrn to
$o $o $o $o
$o $o
2021122
$o $o $o $o
Total
$28,459 $515,434 $1g,og0 $556,989
-
201 8t19
2019120
2020t21
2021t22
$O $O
$o $o
$0 $o
$o
$O
$o
$o
$o
$0
$o
$0
$o
$o $o $o $o
RATIONALE FOR PROPOSED PROJECT:
$o
Total $425,476 $37,500 $94,013 $556,989
EXPECTED IMPACT ON OPERATING BUDGET:
Caltrans recommended repairs will reduce damage to the bridge structures.
(llPf)i¡
Additional woker hours required to maintain per year: 0 $0 Additional Town direct costs
\\,\\' \\'.(lirì ì\,i I l( .( lr.g()\
Projects Et PINTADO OVERIAY. Et CERRO BLVD. TO I.680 CIPNo: C-aoz
|
STATUS: ln
Design
I
cne¡w PRoIECT:No
I pn¡oRrv'
PRO¡ECTMANAGER: SCL
s
PRO]ECT DESCRIPTION AND IOCATION: This project includes asphalt dig-out and repairs, an overlay with reinforcing fabric and some shoulder backing.
Funding for a portion of this project is proposed to come from defened improvement agreements. The defened improvement agreement funding has not been collected from the property owners.
A portion of this project was completed in April of 2011, spending all of the CIP General Purpose Revenue and Measure J Retum to Source funds. Currently the project is over-budget by $25,983.
DESCRIPTION OF MODIFICATIONS:
..PROIEç.I.çC5.T.E5.T1.M.4IF....... Expendlture Category Prior
Review $O Construction $457,958 lnspection & Admin. $O TotalCost Estlmate: $457,958 Design/Plan
Total
.
$O $O $0 $O
Expenditure: $156,919 Unexpended:
P ROIE CT. AP. P ROP. R
Funding
Source(s)
Rev
$O $O $O SO
Src TotalFunding:
$O $O $o $O
$301,039 on 4-25-2017
I AIIO N AI.ID. F.UNDIIúG.. 2018119 Prlor Years 2017t18
CIP Gen Purpose $80,376 Deferred lmpvt Agmts $327,582 Meas J Rtrn to $50,000 $457,958
2019120
$0 $o $0 $0
$o $o $o $o
RATIONATE FOR PROPOSED PROIECT:
This section of roadway is in poor condition and is in need of repair and overlay.
ffi
-....q$NrEpsr{i. ...Mt?7!?.0.9.....-
Years 2017118 2018119 2019120 2O2Ol21
CII'96
$o $o $o $0
$O $O $O $0
2020n1
$o $o $o $0
2021122 Total $O $o $O $457,95S $O $O $0 $457,958
2021t22 $o $o $o $0
Total $80,376
$327,s82 $50,000 $457,958
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operating costs per year: $0
\\'\\'\\'.rlrìr lVi I lr I ;ì.g()\
Projects TRAFFIC SIGNAL AND STREET LIGHT MAINTENANCE PROGRAM CIPNo:
C-aral
STATUS:
I
inConstruction I cn¡gNPRoIECT:No I pnlontfv,2ongoi
pRo¡¡clMANAGER: AD
PROTECT DESCRIPTION AND LOCATION:
Maintenance for 53 Town and County owned signalized intersections, repaint24l street lights, and 2 banner poles. Work includes:
1. Touch-up painting will continue on an annual basis as needed. Repainting maintenance is on a 5 to 10 year cycle. Priority for the Downtown Business District. Repainting locations and schedule will be determined in 2017118. Other Maintenance and upgrades: Replace or upgrade in-ground crosswalks with rectangular rapid flashing beacons at Parkhaven Drive and Rassani Drive trail crossings and at Front Street at the Library/Community Center.
DESCRIPTION OF MODIFICATIONS:
....pßtNTEp.a$..
Expenditure Category Prior
Years 2017118 2018119
Design/Plan Review $O $O $O Construction $927,018 $20,000 $20,000 lnspection & Admin. $O $O $O
2019120 $O
$20,000 $O
Estimate: $927,018 $20,000 $20,000 $20,000 TotalExpenditure: $595,592 Unexpended:$331,425on4-25-2017 Total Cost
PRO I E CT. A P. P RO P. R IAIIO N.AI.ID. FUNDING FundingSource(s) PriorYears 2017118 2018119
Src Grant Total Funding:
($200,000) $617,304 $249,350 $91,964 $168,400 $927,018
RATIONALE FoR PROPOSED
PROIECT:
CIP Gen Pur Reallocate CIP Gen Purpose LLAD Zone Meas J Rtrn to PG&E
C
Rev
$o
--*
2019120 $o
$20,000
$20,000 $o
$o
$o $o
$o $o
$2o,ooo
$2o,ooo
$2o,ooo
$o
$20,000 $o
Ongoing maintenance required for proper function, to
Jgl*litgÚtptou-eslh(Ìllg -
$o $o
2020121
$o $o $o $o
2020t21 $o $o $o $o $o $o
_.
9,!?.5!?p-17- - -. -.
2021122
$o $o $o $0
-.
Total $o
$s87,018 $o
$987,018
Total
2021t22 $o
($200,000) $637,304
$o $o $o $o
$289,350 $91,e64 $168,400 $987,018
$o
EXpECTED tMpACT ON OpERATtNc BUDGET:
extend Additional worker hours required to maintain per year: 40 * , Agdrtionalowlggç!9peralb-9o:tspetves,-$199-CIP97
ivrv ri'.rì;r l rvi I lt-.( iì.g()\'
Projects CAMINO TASSAJARA/CROW CANYON SAFETEA.TU IMPROVEMENTS clPNo: C-508
|
SmrUS: Compteted
I
zorj I GREENPROIECT:No I pn¡OnlrV. r
pnorrcrMANAGER: sl
Thts prolect has been modified from the previous year PRO¡ECT DESCRIPTION AND TOCATION:
Street repair and resurfacing work on Camino Tassajara from Sycamore Valley Road to the eastern town limit, and on Crow Canyon from Camino Tassajara to the southern town limit. Scope includes signal and drainage work, spot sidewalk and curb & gutter improvements and improvements to bike/pedestrian facilities. Matching funds will come from SCC Sub-Regional Fees. Phase 1 - Eastbound paving. (COMPLETE) Phase 2 - Overlay of the westbound lanes on Camino Tassajara from Sycamore Valley Road to Crow Canyon Road. Additional paving may be added east of Crow Canyon Road as funds permit. (COMPLEïED) Phase 3 - lnstallation of high visibility ("green") bicycle lane pavement marking treatments on Camino Tassajara, Crow Canyon Road and Sycamore Varr ey Roa{. Gp,I !! 8\j. '..'.' t :'a"i'i:i lr'a j j
,
;á i¡ ¡i r,r ll.,'.i.' : ;rl:'r' ^; !4'::iç:-F':Ï. .* i',':,,,,i ,il : ,
;'
:' '.i
:.+F¿l' ir*rl;....
DESCRIPTION OF MODIFICATIONS:
Added Phase 3 - green bike lanes to fiscalyear 2017118.
Expenditure Category Prior
Years 2017118 2018119 2019120 2020121
Design/Plan Review $746,141 Testins $e7,504 Construction $6,883,836 lnspection & Admin. $155,264 TotalCost Estimate: i7,882,745
$O $o $O $O $O
$O $0 $O $O $0
$O $o $O $O $O
$O $o $O $o $O
2021122 Total $O $746,14'l $o $97,504 $O $6,883,836 $O $155,264 $O $7,882,745
TotafExpenditure: $7,666,122 Unexpended:$208,071 on4-25-2017
.
PR OIE CT. A P. P RO P. R I AIIO N "A}¡D. FUNDTNG. Funding Source(s) Prior Years 2017118 2018119
$5,253,123 $2,629,200 svAD $341 TRAD $er TotatFunding: $7,882,745 SAFETEA-LU Grant SCC Sub-Regional
$o $O $O $O $O
RATIONATE FOR PROPOSED PROJECT:
SAFETEA-LU Federal grant for safety and pavement improvements.
ffi
$o $O $0 $O $0
2019120 2020121
$o $O $O $0 $O
$o $O $O $o $0
2021n2 Total $o $5,253,123 $O $2,629,200 $O $341 $o $st $O 57,882,745
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: Additional Town direct ooeratino costs oer vear: $0
CTP98
0
\\'\\'\\'.(lrr ì\,i I l( ..ll.g()\
Projects WEST Et PINTADO SIDEWALK IMPROVEMENT ctpNo:
c-szrl
sTATUS:
Adopted
I
cn¡¡xPRoIECT:Yes
I pnlonlrvr ¡
PRO¡ECTMANAGER: IAC
PROJECT DËSCR¡PTION AND LOCATION:
Completion of sidewalk improvements on West El Pintado Road between
Weller Lane & El Cerro Boulevard, including minor street reconstruction in selected areas, installation of sidewalks in currently unimproved areas, new paving, curb and gutter. Estimate does not include RAÂ/ acquisition costs (5,380 s.f.).
DESCRIPTION OF MODIFICATIONS:
PRINTEDoN:
Expenditure Gategory Prior
Years 2017118 2018119 2O19l2O
Review $71,833 $O Construction $393,296 $O lnspection & Admin. $20,268 $O Totat Gost Estimate: $485,397 $O Total Expenditure: $O Unexpended: Design/Plan
$O $O $O $O
$O $O $O $O
2020121 $O $O $O $O
$485,397 on 4-25-2017
ROIE CT. A P. P RO PR |AITO N "AÀID. F.UNDING Funding Source(s) PriorYears 2017118 2O18l1S
0412712017
2021122
$o $o $o $0
Total
$71,833 $3e3,296 $20,268 $485,397
.P
Rev $485,397 Total Funding: $485,397 CIP Gen Purpose
$O $0
$O $O
RATIONALE FOR PROPOSED PRO]ECT:
$o $o
2020t21
2021122
$o $o
$o $o
Total $485,397 $485,397
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 5 Additional Town direct ooeratino costs oêrveãr: $500
Sidewalk is needed to complete the pedestrian connection between El Cerro Blvd. and Diablo Rd.
ffi
20 1 9t20
ull,9l)
\\'\\'\\'.(111ì ì\,t
ll(
-(
t.g()\
Projects TRAFFIC SIGNAL CONTROLLER UPGRADE CIPNo:
c-s¿sl
STATUS:
,'Tl
i:tr-¡
a
'-:r
I
lnconstruction I cn¡¡lPRo]ECT:No I PRIoRITY:2/3
pno¡¡clMANAGER:
KB
PROJECT DESCRIPTION AND LOCAÏION: The Town's traffic signal system is aging and has reached the point where the signal controller computers and hardware need major upgrades and
replacement.
Proposition 'lB will fund this project.
>
ri
I,
;l
Þ
Projects will occur on an as needed based on signal performance and maintenance costs. Each signal upgrade will cost between $15,000 and $25,000 depending upon the type of controller. There are 35 signals targeted for upgrade,
t.'
I
o
This project was taken from C-4'18.
J
Twenty-five intersections have been upgraded through 2O16117. Five intersections will be targeted for cabinet replacement and controller upgrades in 2017118.
DESCRIPTION OF MODIFICATIONS:
..P R.0.¡.8 ç.T. ç.0.
5r..E
5ï
PRINTED
t.M_Ar E.....
Expenditure Category Prior
Years 2017118 2018119
Design/Plan Review $O Construction $629,011 Inspection & Admin. $4,310 Total Cost Estimate: $633,321
TotalExpenditure: $401,423
$O $O $O $0
$O $0 $O $O
2019120 $O
$0 $O
$0
2020121
$o $o $o $o
ON:
O4l27nO17
2021122
$o
$o $o $0
Total
$o $629,011
$4,310 $633,321
Unexpended:$231,898on4-25-2017
.PROff Cr_AP.PROP.RtAilONAl.lD.F_UI{DING................ Funding Source(s) Prior Years 2017118 2018119 2019120 2020121 Gas
Tax
18 Total Funding: Proposition
$453,698 $179,623 $633,321
$o $o $O
$o $0 $0
RATIONALE FOR PROPOSED PROJECT:
$o $O $0
2021122 Total $o $453,698 $o $O $179,623 $O $0 $633,321 $O
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: Additional Town direct ooeratino costs oer vear: $0
ffi
clPl
o0
u'rv s'.t
Itl
0
r
vt ì lr'.c l.l-r()\
Projects INTERNALLY ILLUMINATED STREET NAME SIGN tED RETROFIT €tP No:
c-ssz
I
sTATUS: tn
I
construction I cn¡¡n PRoIEcr:Yes I pn¡ontw= ¡l¿
ttîfi
MANAGER: r<s
Thrs prolect has been modified from the prevrous year PRO¡ECT DESCRIPTION AND LOCATION:
fl
lnternally illuminated street name signs were initially equipped with fluorescent lamps which required intensive maintenance and not energy efficient. This project replaces the fluorescent lamps with energy efficient LED lamps.
I
tç
pno¡¡cr
Í
This project will also replace street name sign panels that have reach the end of service life.
Twenty{hree intersections have been retrofitted with LED street name sign lamps to date. Ten intersections will be retrofitted with LED street name sign lamps and twenty intersections will receive new sign panels in 20'17l'18.
DESCRIPTION OF MODIFICATIONS:
T$m-ltnrFætnc,r
Updated description and number of intersections.
..PRAffiç.ï.ç.95.I.ESJ!MAïF....,.. Expenditure Category PriorYears
2017118 2018119
Review $8,620 Construction $161,100 Total Cost Estimate: $169,720 Design/Plan
TotafExpenditure: $59,302
$O $O $0
$O $O $0
.....8ßt{rgne*....sßrt?ptl-.....
2021122 Total $O $O $8,620 $0 $0 $161,100 $0 $0 $169,720
2019120 2020121
$O $O $0
Unexpended:$110,418on4-25-2017
PROIECT.AP.PROP-RIAIIONAIìID.F.UNDING ...........¿..,.... Funding Source(s) Prior Years 2017118 2018119 2019120 2020121 2021122
Src Total Funding: Meas J Rtrn to
$169,720 $169,720
$O $0
$O $0
RATIONALE FOR PROPOSED PRO]ECT:
$O $0
$O $0
Total
$169,720
$169,720
EXPECTED IMPACT ON OPERAT¡NG BUDGET:
Additional worker hours required to maintain per year: Additional Town direct operat¡ng costs per year: $0
lmprove efficiency and reduce costs.
ffi
$O $0
(;IPl
O1
0
u rr'rr'.,1;irrvr Il, -, :r.g,rr
Projects TRAFFIC SIGNAT ¡NTERCONNECT sYsTEM GtpNo: c-soz
I
sTATUS:
lnConstruction
I cn¡uPRotECT:No I pn¡onrYt J ongoing
I
pRo¡TcTMANAGER: AD
Thrs prolect has been modified from the prevrous Vear PRO'ECT DESCRIPT¡ON AND TOCATION:
Provide for ongoing traffic signal interconnect maintenance and upgrades for aging equipment.
A maintenance contract for the traffic signal monitoring software was purchased for 2012113 which needs to be renewed every year for software updates and remote diagnostics capability. The monitoring software and operating platform is aging and becoming less compatible with new computer operating systems. A significant software upgrade is required that will keep pace with cunent computer operating systems that will ensure the system continues to operate reliably. The software upgrade is approximately $50,000 and will be amortized over a 5-year period. This project includes periodic upgrades to the ¡nterconnecl equipment in each controller cabinet.
DESCRIPTION OF MODIFICATION5:
Added software upgrades.
.-PRA¡.8çï--ç.85ï.85ïIMAïF........ Expenditure Gategory Prior
CapitalMaintenance
-..BBtNrEp.q$:...
$159,304
$O
$O
$O
Total Gost Estimate: $159,304 $0 $O $0 Total Expenditure: $76,812 Unexpended: $52,492 on 4-25-2017
-
-PROIE Cr- A P- P ROP. R
IAIIO
Funding
Prior
Source(s)
Src Funding:
Meas J Rtrn to
Total
N
F.UNDTNG
"Al,lD. Years 2017118 2O18l1S 2019120 2020121 2021122 Total $O $159,304 $O $129,304 $10,000 $10,000 $10,000 $O $159,304 $O $129,30¡l $10,000 $10,000 $10,000
RATIONALE FOR PROPOSED PROIECT:
EXPECTED IMPACT ON OPERATING BUDGET:
Ongoing maintenance and monitoring of the traffic signal system and maior upgrade to monitoring software.
ffi
.et!?t!p.17.......
2021122 Total $O $159,304 $O $0 $0 $159,304
Years 2017118 2018119 2019120 2020121
cIPl
Additional worker hours required to maintain per year: 0 Additional Town direct ooeratino costs oer vear: $0
(ì2
rvu r..,1r,',r,tIì. t ;r.gt¡r'
Projects TOWN.WIDE BICYCLE PARKING PROJECT CIPNo:
c-sool
STATUS:
lnConstruction I cnr¡nPRoJECT:Yes lpnlonlrv,
PRO]ECT MANAGER: TV
¿
!
PRO]ECT DESCRIPTION AND LOCATION: {F
Phase 1: A planning study to determine the demand, identify the locations, select the appropriate style and plan for the phased installation of bicycle parking facilities. The study will generate bike parking standards townwide with a detailed focus on the downtown. COMPLETE.
{
au!. a
Phase 2A: lnstallation of bike racks at most of the locations identified in
l-¡ü
'-
the Bicycle Parking Assessment within the public right of way has been completed. Bike racks were purchased and installed through a TDM
.:€.
lJ
grant. Other identified public right of way locations within C-405 and C-
- -Êl
-
391 project areas will be included as part of those projects. COMPLETE Phase 28: This includes installation of bicycle parking at identified private property locations that are to be initiated by property owners.
-
Phase 3: Replace bicycle racks at the Library and Community Center and other new identified public right-of-way locations. ln 2017, research and deploy new bicycle rack design to promote increased bicycle trips to downtown.
@ .PROI.E ç.r. ç.9
5..T..E 5.T
Total Cost Estimate:
Total Expenditure:
DESCRIPTION OF MODIFICATIONS:
!.M.AI E.......
Expenditure Category Prior Design/Plan Review Construction
A Transportation Demand Management (TDM) grant will be used
_.eN NTED.
Years
$15,000 $22,000 $37,000 $26,854
2017118
2018119
$o $o $o
Unexpended:
$o $o $o
$1
.PROIECT-AP-PROPRIATION.AND.FUNDING--.-:.-.--..-. Funding Source(s) Prior Years 2017118 2018119
Rev $21,000 Grant $16,000 Total Funding: $37,000 CIP Gen Purpose TDM
RATIONALE FoR PROPoSED
$O $O $0
2020121
$o $o $o
$o
0,146 on 4-25-2O17
$0
$o $o
2019t20
2020t21
2021122
$O
$o
$o
$O
$o $o
$o $o
$o $o $o
$0
PRoIECT:
AN.... 9! !?! !?-o.1.7... - -.
2021122 Total $o $0 $15,000
2019120
$22,ooo $37,000
Total $21,000 $16,ooo $37,000
EXpECTED tMpACT ON OpERATING BUDGET:
Provide parking facilities for a multi-modal transportation network Additional worker hours required to maintain per year: 0 including design standards for Town-wide bicycle parking facilities. Additional Toqn direct operatlng costs per year: $0
dì
lll NAMM
CIPl03
11,11,11'.¡i i¡ ¡ 11r¡
| |
¡-(:il. g()\'
Projects sAN RAMON VALLEY BOULEVARD LANE ADDITION AND OVERLAY (SOUTH) clPNo: c-sze
|
STATUS: ln
Design I cne¡nPRolEGT:Yes
I] a" (J
GfÌ*
ô)
¡ÕÐ
'l
I L
Overlay and stripe 4 travel lanes and 2 bicycle lanes on San Ramon Valley Boulevard from 500 feet north of Elworthy Ranch Road to Podva Road.
:ì
I
Modifo San Ramon Valley Boulevard and Podva Road intersection by adding a northbound outside lane using Caltrans right-of-way. lntersection will accommodate 2 southbound lanes, 2 northbound lanes, a northbound left turn pocket and bicycle lanes in both directions.
I
¡
I
I /
I
l j
J
ë;1,
¡rt
pno¡¡clMANAGER: scL
PRO]ECT DESCRIPTION AND LOCATION:
,.4¡
tjs 'o
I
I pnlontw' rlz
:
The existing southbound right tum pocket will be removed.
i I
I
i
Additional right-of-way for one lane of traffic will be acquired from Caltrans.
I
:, -a
I
This project will eliminate the center left turn lane and parking on the west side for the entire length of the project.
t,. I
Parked cars on the west side of San Ramon Valley Boulevard were counted on 20 different aerial photographs that spanned a period of 4 years yielding an average of 7.3 parked cars during the day. The maximum number of parked cars was 17 and the minimum was '1.
ù
O-
o
DESCRIPTION OF MODIFICATIONS:
)
¿.I
-:
Expenditure Category Prior
Years 2017118 2018119
ROW $30,000 $o Review $10,000 $O Design $67,000 $o Construction $796,046 $O lnspection & Admin. $10,000 $0 Utilities $40,000 $o Total Cost Estimate: $953,046 $O Total Expenditure: $0 Unexpended:
$O $O $o $O $o $o $O
Land and Design/Plan
2019120
2020121
2021122
$O
$o
$o $o $o
$O
$o
$O
$o
$o
$o $o
$o $o $o $o $o $o $o
$O
$O
CIP Gen Purpose Rev Meas J Major St 24c
TotalFunding:
Prior Years $45,000 $e08,046 $953,046
2017118
2019120
2018119
$0 $o $o
$o $o $o
NATIONALE FOR PROPOSED PRO]ECT:
$o $o $o
2020121
$o $o $0
2021122 $o $o $0
EXPECTED ¡MPACT ON OPERAT¡NG BUDGET:
Eliminate the southbound constriction at Podva Road and complete the 4lane configuration on San Ramon Valley Road
ffi
$30,000 $10,000 $67,000 $796,046 $10,000 $40,000 $953,046
$953,046 on4'25'2017
.PROff CT.AP.PROP.RIATION.AI.ID-F.UNDING.-. Funding Source(s)
Total
Total $45,000 $908,046 $953,046
Additional worker hours required to maintain per year: costs oer vêar: $o Additional Town direct
CIP104
0
r,,'rr,tt,.tl;rr rvt
I
1..,'r.gor
Projects DANVILTE VARIOUS STREETS AND ROADS PRESERVATION clPNo:
c-ss¿l
STATUS:
outtoBid I cn¡¡t.¡PRoIECT:Yes I pntontTy! 1/2
I
pno¡¡cTMANAGER: 5l
Thts prolecl has been modified from the prevtous Vear PROIECT DESCRIPTION AND LOCATION:
This project includes two locations to facilitate using a single grant. Rehabilitate pavement on Sycamore Valley Road from San Ramon Valley Boulevard to Gamino Ramon. Repairs include abutment slab stabilization, curb, gutter, and sidewalk repair, overlay and restriping. lncluded is repair of the Sycamore Valley Park & Ride bus stop at Camino Ramon and Sycamore Valley Road. Repair includes concrete roadway to manage heavy bus traffic. Rehabilitate the pavement on El Ceno Boulevard from El Pintado Road to La Gonda Way.
These roadway segments are eligible for federal grant funding. Funding is from the One Bay Area Grant (OBAG), Surface Transportation Program (STP), and Local Streets and Roads Preservation (LSRP). The grant requires a 12o/o match. Phase ll: Extend the limits of the El Cerro Boulevard rehabilitation to the El Ceno Bridge using Measure C Major Arterial funding as funds permit. Funds must be expended by June 2018. DESCRIPTION OF MODIFICATIONS:
Updated project description. Added Phase Arterials tunding source and $1,048,000.
..PRAIEçT.ç05.ï.ESI!MATE....... Expendlture Category PriorYears
..PROTE CÏ. A
Fundlng
P.
P ROP. R
IATIO
$O $O $O $O
Unexpended:$920,573on4-25-2017
N AÀID.
$O $0 $O $0
$n7rns.......
2021122 Total $O $220/69 $O $1,394,000 $O $50,000 $O $2,164,763
F.IINÐING
Source(s) PriorYears 2017118 2018119 2019120 2020121 2021122
Rev $83,763 $0 MajorArterials $0 $1,048,000 Src $100,000 $O gr $e33,000 $o TotalFunding: $1,116,763 $1,048,000 CIP Gen Purpose Meas C Meas J Rtrn to OBAG I LS&R (2012
RATIONAIE FOR PROPOSED PROIECT:
Pavement maintenance. Sycamore Valley Road overcrossing approaches need maintenance.
ffi
$O $O $O $0
Added Measure C Major
..rntrrEp.er{;....
2017118 2018119 2019120 2020121
Design/Plan Review $220,763 $O Gonstruction $846,000 $1,048,000 lnspection & Admin. $50,000 $O Total Gost Estlmate: $l,116,763 $1,048,000
TotalExpenditure: S196,191
ll.
$O $O $0 $o $O
$O $O $O $o $0
$O $O $O $o $O
Total
$O $83,7G3 $O $1,048,000 $O $100,000 $o $e33,000 $0 $2,164,763
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours requlred to maintain per year: 0 per year: $o Additional Town direct
cll,105
rr,rvrr'.tl;r r rvr | ìt..(
r-!o\
Projects ELECTRIC VEHICLE CHARGING STATIONS AT TOWN.OWNED FACILITIES CIP
No: C-585
| sUfus:
Compteted o
I cn¡¡x
pRoJECT:Yes
I pnloRtry, 2 ongoing
I
pno¡¡cr
MANAGER: NR
Thrs pro¡ecl has been modified from the previous year PROJECT DESCR¡PTION AND IOCATION: This project is being continued to construct additional electric vehicle charging stations. Charging stations already completed include:
Clock Tower Parking Lot (2 COMPLETED 2013/14) Railroad Avenue Parking Lot (2 COMPLETED 2014115) Library and Community Center Parking Lot (1 COMPLETED 2015/16) Town Offices (9 town fleet chargers COMPLETED 2015116) Maintenance Service Center (2 town fleet chargers COMPLETED 2015116)
Cunently, the electric vehicle charging stations generate an annual revenue of $6,000 to offset costs. 2021122
Expansion of 2 additional stations at the Clock Tower Parking Lot Additional chargin g stations will b,e,,install,ed at,the $yærpore.Park expånsion nroject C-19[t I facititV;wiþ,fhe ?ârliri'S
a
nd
1 Ride
:1, DESCRIPTION OF MODIFICATIONS:
Updated title to reflect ongoing maintenance status. Added new chargers lor 2021122.
Expenditure Category Prior Project Prep. Construction
.
Years 2017118 2018119
$15,000 $o $88,084 $O $103,084 $O
Total Cost Estimate: Total Expenditure:
$98,362
PROIE
AITON -AND. f.UNDING.
Funding
CT- A
P.
P RO
CIP Gen Purpose
Totat
P.
RI
Source(s)
Prior
$o
$o
$O
$10,000 $10,000
$O
2021122 Total $o $15,000 $o $e8,084 $o $113,084
Years 2017118 2018119 2019120 2020121 2021122
$O $103,084 $0
RATIONATE FOR PROPOSED PRO]ECT:
Provide electric vehicle charging stations public use.
ffi
2020121
Unexpended:. $4,722 on 4-25-2017
Rev $103,084
Funding:
$o $O $O
2019120
$O $o
$O $10,000 $O $0 $10,000 $0
Total
$113'084 $113,084
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 20 costs $2,ooo Additional Town
cIP106
ivrvt'.,]
lrr
rvt
I
lt .aa.g()\
Projects BATTERY BACKUP REPLACEMENT FOR TRAFFIC SIGNALS GIP
No: C-see
I STATUS:
,,i{ '-3/
tn
Design I cn¡¡¡l pRolEcT:yes I pnlonlry, ¡ ,ii
.-1 .Å
I
pnor¡cTMANAGER: AD
ïhts prolect has been modified from the previous year PRO¡ECT DESCRIPTION AND TOCATION:
The Town's current battery backup systems for traffic signals, installed over 10 years ago, are in need of replacement and/or repair. All 54 signals are equipped with battery backup systems. A number of the systems have failed and have been replaced.
l:n
Ë-itl .¡É;f ,,Ê
,á.'
This project will replace the battery backup systems for eight intersections per year. Replaced batteries at 20 intersections and inverters at 5 intersections in 201 61 17.
r¡
tr
\-
Replace batteries at 10 intersections ($8,000), and replace inverters at 5 intersections (910,000) in2017118.
DESCRIPTION OF MODIFICATIONS:
Updated project description. Added additional funding in 20171'lB.
..PRA
ff ç.T_.ç05..T.85..T !.M.Ar 8 ...
Expenditure Category Prior
-PRJ
Years 2017118 2018119
Design/Plan Review $4,000 $0 Construction $28,000 $18,000 Total Cost Estimate: $32,000 $18,000
Total
$O $O $O
2019120 $O $O $O
Expenditure: $27,384 Unexpended: 94,616 on 4-25-2017
2020121
$o $o $o
Ì{.TED -At{:-
-.. -q{?! !?-o.17...
2021122
Total
$o $o $0
$4,000 $46,000 $50,000
---
-
.PROIECT.AP-PROP.RßITON.AT.ID.F.U}¡DIÌ{G...
Source(s) PriorYears 2017118 2018119 Src $32,000 $18,000 $O TotalFunding: $32,000 $18,000 $O Funding
Meas J Rtrn to
RATIONALE FOR PROPOSED PROIECT:
Battery backup is very important for intersection safety during
Õ
lõ#
2019t20 $o $o
2020121
2021122
$o $o
$o $o
Total $50,000 $50,000
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: direct costs $o
CIPIOT
0
\\'\\, \\,.(lir r r\/i I l(..ir. g()\
Projects ROSE STREET PARKING FACITITY c¡P No:
c-ssz
I
I
STATUS: ln Construction
cne¡n PRotECT:Yes
I
I pRlontrv' r
pno¡TclMANAGER: sl
PRO]ECT DESCRIPTION AND TOCATION: Land acquisition (3 sites), a feasibility study, design and construction of 79 street-level parking spaoes at the north west comer of Linda Mesa and
Rose Street. Project includes undergrounding of overhead utilities, landscaping, C.3 bio retention (including some ofisite), and lighting.
DESCR¡PTION OF MODIFICATIONS:
.
l!{ar E....... 2017118 PriorYears ExpenditureCategory
PRo.I.E çT. ç0.5r.E5.Tl
Acquisition 83,723,302 Abate. $10,000 Design $200,000 Construction $l,486,880 lnspection & Admin. $15,000 Utilities $82,500
$o $o
$o $o $o
$o $o
$o $o $o
$o $o $o
$o $o
$o
$o
$o
Source(s)
CIP Gen Purpose Civic Facilities Downtown Pkg ln
Rev
Prior Years $1,207,682
Fund $3,485,000 Lieu $825,000 TotatFunding: $5,517'682
$o
$o $o Unexpended: $1,257,698 on 4-25-2017
.PROIECT.AP.PROPRIAIIONAÀID. Funding
2020121
$o
$o
$3,873,104
2019120 $o
$o
Hazard
TotalExpenditure:
2018119 $o $o
Site
Total Cost Estimate: $5,517,682
...8N NrEp A
FUNDING... 2017118
$o $o $o $o
2018119
$o $o $0 $o
RATIONALE FOR PROPOSED PROTECT:
2019120 $o $o $o
$o
$o
2020121
$o $o $o $o
$...
-
p.ç !?.5!?-017.......
2021122 Total $0 $3,723,302 $o $10,000 $0 $200,000 $o $1,486,880 $o $15,000 $o $82,500 $0 $5,517,682
Total
2021122
$1,207,682
$o $o $o $o
$3,485,000 $825,000 $5,517,682
EXPECTED ¡MPACT ON OPERATING BUDGET:
Ãïit¡tioirãl woikeihours required to maintain per year: 156
Provide parking for downtown businesses.
Additional Town direct ooeratinq costs per
cil,1Ofl
vear:
$38'000
r'rvrr'.rlru rvr ll, .( ir.g()\'
Projects FRONT STREET CREEK BANK STABITIZATION GIP
No: c-SS¡
I
STATUS: ln
Design I cn¡¡n pRotEcT:yes I pntoRltV, PRO¡ECT DESCRIPTION AND
I
rlz
pno¡¡clMANAGER: 5l
IO(ATION:
Provide a feasibility study, design, and construction of a retaining wall on Front Street north of Diablo Road. Work includes retaining walls, curb, gutter, street work, and creek bank slope protection.
DESCRIPTION OF MODIFICATIONS:
.
PRA¡.E ç.T..ço.5I.E 5.T I tlt AT F....... Expenditure Category PriorYears Design/Plan
Review $202,400
Construction
$550,000 $752,400
Estimate: TotalExpenditure: $196,503 Total Gost
,
PROff
CT. AP. P RO
Funding
PRINTED
P.
R
|AITO
2}18t1g 2O1gl2O $O $O $O $O $O $O $O $O $O
2017t18
N
Rev $752,400 TotalFunding: $752,400
$O $O
oN:
Ul27l2O17
2021122
$o $o $o
Total
$202,400 $550,000 $752,400
FIINfìING
$O $O
2019120
$O
$o
SO
So
RAT¡ONALE FOR PROPOSED PROIECT:
2020121
$o $o
Total
2021t22
$752,400 $752,400
$0 $o
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct costs oer vear: $0
Existing slope failure.
ffi
$O
Unexpended:$555,898on4-25-2017
"AÀID. Source(s) PriorYears 2017118 2018119
CIP Gen Purpose
2O2Ot21
cll,10f)
\\'\\'\\'.(1
rì
r
ì\/t I lr -('lr. g()\
Projects STUDENT PARKING AT sAN RAMON VATLEY HIGH SCHOOL
I
GIPNo: C-Sg¿l STATUS: Adopted
cnr¡TPRoIECT:Yes
I
I PruomrY:1/2
pno¡¡clMANAGER: tAC
Thrs pro¡ect Ìras been modified from the prevlous Vear PRO'ECT DESCRIPTION AND LOCATION: Provide a contribution to the San Ramon Valley School District for a minimum of an additional 200 parking spaces at San Ramon Valley High School.
Additional parking will help reduce offsite parldng impacts to the community. The contingency shall be used for as needed to achieve the 240 parking space minimum addition. The contribution offer terminates on April 14,2020.
DESCRIPTION OF MODIFICATlONS:
Updated number of parking spaces from 200 to 240 and added additional funds to 2018119.
..pRQtEçT.ç.0.5.T.85.T11!í.AïF....... Expenditure Category Prior
-..........-.............................
Years 2017118 2018115 2019120 2020121
$o $O Contingency $200,000 $O Construction $1,000,000 $O $250,000 $O $O TotalCost Estimate: $1,200,000 $O $250,000 Total Expenditure: $O Unexpended: $1,200,000 on 4'25'2O17
..PROIECT.AP.PROP.RIATIONAND.FUNDING FundlngSource(s) PriorYears CIP Gen Purpose
Total
Rev $1,200,000
Funding:
$1,200,000
.e Bl
NIEP
9tt:.....ff
$O
$o $o
$200,000 $1,250,000
$O
$o
$l,450,ooo
$O
.;¡r.r..,..!..-.-.¡
2017118
2018119
2019t20
2020121
2021122
$o $o
$250,000 $250,000
$o
$o
$o
$o
$o $o
RATIONALE FOR PROPOSED PROIECT:
!?7!?.oJ!.......
Total
2 021122
Total $1,450,000 s1,450,000
EXPECTED ¡MPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 veâr: $o Additional Town direct ooeratino costs
Provide funding for additional parking at San Ramon Valley High School to help reduce student parking on Town streets.
clPl
Io
r*r.'rt'.,l,rr rvr 11..,
".g,,t
Projects PAVEMENT MANAGEM ENT PROGRAM clP No: c-sss
I
sTATUS: ln
Construction
I
cneg¡¡ pRotECT:No
G'., û.
ì
I
pruon¡rvt
I
r
pRo¡sclMANAGER: NNS
PROIECT DESCRIPTION AND TOCATION:
.* ;fl*'-**'ä
The pavement management program is an annual effort approved by the Town Council to maintain the Town's street system at a high level of service. A proactive approach to pavement maintenance prevenls more costly pavement repairs in the future. The planned level of expend¡tures is aimed at sustaining an overall pavement condition index (PCl) of 70 for Town streets.
DESCRIPTION OF MODIFICATIONS:
.
PRCI¡.E çT. çCIS.T..EsTI MATF.......
Expenditure Gategory Prlor
Years 2017118 2018119
Review $22,000 Construction $5,956,208 lnspection & Admin. $44,000 TotalGost Estimate: $6,022,208 Design/Plan
Total
Expenditure: $1,051,021
$O $O $O $O
$O $O $O $0
.g!?7!?.o17-------
201gl2Ù
2020t21
2021 t22
$O
$o $o
$o $o
$O
$o
$o
$O
$o
$o
2020121
2021122
$0 $0
$0
$O
Total $22,000 $5,956,208 $44,000 $6,022,208
Unexpended=$4,971,137 on4-25-2017
.PROIECT-AP.PROP.RIAIIONAIìID.F.UNDII{G.. Fundlng
Source(s)
Prior Years
2017t18
2018t19
$o $o $o $o
$o $o
CIP Gen Pur Reallocale $107,800 CIP Gen Purpose Rev $4,600,000 Meas J Rtrn to $900,000 SCC $300,000 SVAD Benefit $25,642 SVAD Ðensity $919 Tassajara Area $87,U7 $6,022,208
Src Regional District lncrease TIF TotalFunding:
RATIONATE FOR PROPOSED PROIECT¡
Maintain Town streets at a PCI level of 70 or better
$0 $o
$o $o
2019120 $o $o $o $o $o $o $o $o
$o $o $o $o $o $o
$o $o $o $o $o $o
$o $o
$o
Total $107,800 $4,600,000 $900,000 $300,000
$o $o $o
$25,M2
$o
$6,022,208
$st g
$87,U7
EXPECTED IMPACT ON OPERATING BUDGETT
Addítional worker hours required to maintain per year: 0 Additional Town direct costs pervear: $o
Cll,.l I I
\\'\\'\\'.(llr
r\,r I lL.( :ì.u()\
Projects SAN RAMON VALLEY CREEK FOOTBRIDGE AT DANVILTE GREEN ctP No: c-sgo
I
STATUS:
Adopted
I
cn¡¡N PRoIECT:Yes
I pnlonlw=
I
z
pno¡ecruANAGER:5c[
PRO'ECT DESCRIPTION AND LOCATION:
Place a pedestrian footbridge over San Ramon Valley Creek at the Danville Green. The footbridge will meet East Bay Regional Parks standards for width and capacity.
The cost of the project will be shared (50/50) with the adjacent development on the north side of the creek.
DESCRIPTION OF MODIFICATIONS:
..PRAI E çT. ç0.5r.85.T1 MATE Expenditure Gategory Prior Years
...PßlNIFP.QN:...
2017118
2018/19 $0 $o $O $O $O
2O19l2O
$o $105,000 $O $O $o $21,000 $O $O $241,500 $O $0 $36,750 $0 Total Cost Estimate: $404,250 $0 $0 Unexpended: $404,250 on4'25'2Û17 Totaf Expenditure:
Design/Plan Review Testing Construction lnspection & Admin.
.PROIE CT. AP. P ROP. RIATIO N AìID. FUNDING 2018t19 2017118 Funding Source(s) Prior Years
DeveloperContribution $202,000 Park
Total
Facilities Funding:
$o $o $o
$o $o $o
$202,250 $404,250
RATIONALE FOR PROPOSED PROIECT:
The footbridge satisfies the General Plan, Goal
17
, Policy 14.
2020t21 $o $o $o $o $o
.
!?7 !?.oL!.
-
-.,
2021122 $0 $105,000 $o $21,000 $o $24'1,500 $o $36,750 $0 $404,250 Total
2019120
2020121
2021t22
$o $o $o
$0 $o $o
$o $o $0
Total $202,000
$202,250 $404,250
EXPECTED IMPACT ON OPERATING BUDGET:
Ã'tiitä¡óñã'i,o*eihours required to maintain per year: Additional Town clirect ooeratino costs rrêr vêâr:
cIt,-l l2
9l
'10
$1,000
r.'tt'u'.,11,, rr,r
ll,
.,
:t.g,l.
Projects PARKAND RIDE EXPANSION PRO¡ECT ctPNo:
c-ssel
STATUS:
Adopted I cn¡¡¡¡pRotECT:yes I pntonlryr r
I
pno¡¡clMANAGER: sl
Thts prolect has been nrodified from the prevtous Vear PRO'ECT DESCRIPTION AND LOCATION:
The Sycamore Park and Ride is an important element in the multLmodal transportalion network that serves Danville and the San Ramon Valley. The facility helps reduce the number of vehicles and vehicle trips travelling on l-680 on weekdays and serves as a transit hub for the public and private bus services. Presently, the facilig is operating at close to capacity on weekdays. This project will expan{ the existing Park and Ride facility to the east, adding approximately 1 16 parking spaces. Existing landscape, mound, and wall will be relocated. Pedestrian access will be added at the north end of the project. Project includes: C.3 bio retention basins New landscaping Bicycle Facilig improvements Electric charging facilities for cars and buses.
DESCRIPTION OF MODIFICATIONS:
Modified funding to include CC-TLC Grant, Measure J Subregional 28c, TVTDF Residential and Commercial funding sources. Removed Measure J Major St 24c.
PßgT.H
çT-.ç05Ï.8
5.T
IMAT F.
PRINTEDON:
ExpenditureCategory PriorYears 2017118
2018119
2019120
Design $200,000 $o $o $o Construction $0 $1,815,000 $O $O lnspection & Admin. $O $10;000 $O $O Total Cost Estimate: $200,000 $1,825,000 $O $O Total Expenditure: $O Unexpended: $200,000 on 4.25-2017
.
PAOlECT.
AP. PßOP.
R|AITO
N AIìID.
2020121
$o $o $o $o
05125nO17
2021122
$o
$o $0 $o
Total
$zoo,oo0 ,815,000 $10,000 $2,025,000
$1
F.UNDING
Source(s) PriorYears 2017118 2018119 2019120 2020121 2021122 Total J Sub Trans 28c $200,000 $50,000 $O $O $O $O $250,000
Funding
Meas Meas J-CC-TL9
(2017) $0 $1,s00,000 Commercial $O $106,000 Residential $O $169,000 Total Funding: $200,000 $1,825,000 TVTD TVTD
RATIONALE FOR PROPOSED PROIECT:
Provide additional parking for altemate transportation modes.
ffi
$o $O $o $0
$o $O $O $O
$o $O $o $O
$o $1,500,000 $O $106,000 $O $169,000 $0 $2,025,000
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct costs per year: $o
cII'l l:l
\\'\\'\\'.(]i¡
ì\'l
|
ì( .r' ì 0(l\
Projects LA GONDA WAY BRIDGE IMPROVEMENTS clPNo:
c-sggl
STATUSI
lnDesign I Cn¡nPRolEGT:No
I
I pnlonlw, uz
pno¡¡clMANAGER: sl
PROIECT DESCRIPTION AND LOCATION:
The existing La Gonda Way bridge, built in 1950, is a three-span steel girder structure. The latest Caltrans inspection report performed in June 2014 classified the bridge as "structurally deficient" due to its poor deck condition. The bridge is also too nanow for existing traffic and pedestrian conditions.
The bridge will be replaced as part of the Caltrans Highway Bridge Program (HBP) making it eligible for federal reimbursement of 88.53% of participating costs. The replacement bridge will accommodate two lanes of traffic, bicycles, and pedestrians. A small amount of right-of-way easement may be needed on the north side of the bridge.
A large oak tree on the north side will require heavy trimming.
DESCRIPTION OF MODIFICATIONS:
..PR0¡.8 çT..çCI 5.ï.85.T l.M.Aï 8.... Expenditure Gategory Prior Years
.............PßtNIEDgrÍ.....q{l??/?9.1.7.....---
2017118 2018119
2019120
$O and'ROW $O $117,600 $0 $O $O Design $670,000 $O $O Testing $O $78,750 $0 Construction $0 $3,765,065 $O $O lnspection & Admin. $O $55,125 $0 $O Total Cost Estimate: $670,000 $196,350 $3,820,190 $O Totaf Expenditure: $o Unexpended: $670,000 on4'25'2017
PROü
CT. AP. P RO
P.
R
Grant Funding:
$600,000 $165,000 $3,220,190 $670,000 $f 96,350 $3,820,190
RATIONATE FOR PROPOSED PROJECT:
Total
$o $o
$o $o
$55,1 25
$0
$0
$4,686,540
2019t20
2020t21
2021122
$o
$o
$o
$o
$o $0
$0
$o $o
$o
$0 $o $o
ßTTON A}ID. F.UNDIIúG
Source{s) PriorYears 2017118 2018119 CIP Gen Purpose Rev $70,000 $31,350 $600,000 Fundlng
Total
2021t22
$117,600 $670,000 $78,750 $3,765,065
Land
.
2020121
$o
$o
Total $701,350 $3,985,190 $4,686,540
EXPECTED ¡MPACT ON OPERATING BUDGET:
Ãddiliõnãl worker hours required to maintain per year: 0 veâr: $0 Additional Town direct ooeratino costs
cll,l
I4
ir'\r'rr,.tl;rr rt,l I ì, .t ;t.g,rr
Projects sAN RAMON VALLEY BOULEVARD TMPROVEMENTS (NORTHI CIP
No: c-ooo
I STATUS:
Adopted
I
I cn¡¡t pRotECT:yes I piloRtTy: rl2
pno¡¡clMANAGER: sl
PRO'ECT DESCRIPTION AND TOCATION:
Provide a new pavement surface on San Ramon Valley Boulevard from Sycamore Valley Road to Hartz Avenue.
DESCRIPTION OF MODIFICATIONS:
.PRCIIEçT.çQ5.T.ESI|MATF....... Expenditure Category Prior Ðesign/Plan Review Contingency Construction Totaf Cost Estimate: Total Expenditure:
2018/19 2019120 $O $148,968 $O $O $o $162,455 $O $o $O $500,852 $O $O $0 $812,275 $0 $O
Years 2017118
Not Available
.....pnrnïFp.a$. ...e1t27!?p1.......
2O2Ot21
$O $O $O $O
2021122 Totat $O $148,968 $o $162,455 $O $S00,8S2 $0 ç912,275
PROIECI.AP.pROp.R|ATION.AND.F.UNDING................ Funding
Source(s) PriorYears 2017118 2018119 2O1gt2O 2O2Ot21 2021t22
24c TotalFunding: Meas J Major St
$O $812,275 $0 î812,275
$O $O
RATIONATE FOR PROPOSED PROIECT:
The pavement conditions index for this reach of San Ramon Valley Boulevard is below average at 66.
ffi
CIt'l l5
$O $0
$O $O
$O $0
Totat $812,275 $912,275
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct costs per year: $0
rt,rvu'.i1rrr rvr I lt .(
ir.!()\
Projects CAMINO RAMON IMPROVEMENTS ctp No: c-eor
|
STATUS:
Adopted
I
cn¡¡n
PRoIECT:Yes
I
pnrontrY,
I
rlz
pno¡¡clMANAGER:
NNS
Thrs prolecl has been modified from the prevlous vear PROIECT DESCRIPTION AND LOCATION:
Provide a new pavement surface on Camino Ramon from Kelley Lane to Fostoria Way. Provide sidewalk at bus stop locations.
This project is eligible for federal grant funding: 2017 OBAG ll Local streets and Roads and Measúre J Program 24c.
DESCRIPTION OF MODIFICATIONS:
Revised funding source.
..pRor.EçT..ç05r.E5.TllllaïF........ ExpendltureGategory PriorYears 2017118
Review Contingency Construction TotalGost Estimate: Total Expenditure: Design/Plan
.
S0 $O $O $O
2018119
$0 $O $0 $0
$149,355 $149,355 $1,672,776 S1,971,486
24c sr Total Funding:
$O $o $0
$O $614,486
$0 $1,357,000 $0 $1,971'486
RATIONATE FOR PROPOSED PROIECT:
2021122
$o $o $o $o
$o $o $o $o
Total $149,355 $14e,355
$1,672,V76 $1,971,486
2019120
$o $o $o
2020121
$o $o $o
2021122 $o $o $0
Total $614,486 $'1,357,000 $1,971,486
EXPECTED IMPACT ON OPERATING BUDGET:
Ãdð¡t¡óirãl wo*er hours required to maintain per year: 0 vear: $0 Add itional Town direct ooeratino costs
Camino Ramon has reached a pavement condition index of 65.
ffi
$o $o $o $o
2020121
Not Available
PßO IE CT. A P. P ROP. RNITO N AI'ID. F.UNDII{G Funding Source(s) PriorYears 2017118 2018119 Meas J Major St OBAG llLS&R (2017
2019t20
CIPI
I l)
u rvs-rllrrvrIlr , rr.gt;r
Projects DANVILTE BOULEVARD IMPROVEMENTS CIPNo: c-ooz
|
STATUS:
Adopted
I cn¡¡tpRotECT¡No I pruonlrvt uz
PROTECTMANAGER: NNS
PRO¡ECT DESCRIPTION AND LOCATION:
Provide a new pavement surface on Danville Boulevard from Del Amigo Road to El Portal.
DESCRIPTION OF MODIFICATIONS:
-Pß0LEçT.çA5.T.E5.TIMATF....... Expenditure Gategory Prior
Review Contingency Construction TotalGost Estimate: Total Expenditure: Design/Plan
.!.i.......r....,.!
.....eßrurFneu. ...Mr?'t!2.p.1.7.......
Years 2017118 2018119 2O19l2O 20ZOl21
$O $66¡646 $O $83,307 $O $266,583 $0 $416,536
$O $O $O $0
Not Available
$O $O $O $O
$O $O $0 $0
2021t22 Total $O $66,646 $O $83,307 $O $266,583 $O S416,596
.PROIECT.APPROP.RIATION"AT{D.fUNDING..... Funding
Source(s) PriorYears 2017118 2018119
24c TotalFunding: Meas J Major St
$O $416,536 $O $416,536
$O
$0
RATIONATE FOR PROPOSED PROIECT:
The Danville Blvd. PCI is 67 north of Del Amigo Road and 75 south of Del Amigo.
ffi
CII'I I ?
201 9120
$o $o
2020t21
$o $o
Total
2021t22 $o $o
$416,536 $416,536
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct costs Der vear: $0
\\'\\' \\'-(ilr ì\,r
I
l( ( iì.g()\
Projects DANVILLE AND EL CERRO BOULEVARD PARKING IMPROVEMENTS
I
I GREENPROIECT;Yes I PmoRtrY: 1/2
clPNo: C-6o31 SrnrUS: Comptetedzoro
pnorrcr
MANAGER: AD
PRO¡ECT DESCRIPTION AND LOCATION:
This project reconfigures and restr¡pes travel lanes on Danville Boulevard and El Cerro Boulevard providing 22 additional on-street parking spaces in the vicinity of San Ramon Valley High School. The project includes reducing the existing El Cerro Boulevard westbouñd double left turn pockets at the El Ceno Boulevard/Danville Boulevard ¡ntersection to one left turn lane.
The project also includes constructing curb bulb-outs on Danville Boulevard at Danville Oak Place. Prior to restriping a slurry seal will be applied to the project streets.
DESCRIPTION OF MODIFICATIONS:
.
PRO¡.E çT. ç.0 5T..EsT I.M.AT E- -. Expenditure Category PriorYears
..
2017/,18 2018119
Design Contingency Construction
$10,000 $5,000 $19,000 Total Cost Estimate: $34,000 TotalExpenditure: $15,383
.
PROIE CT. Funding
A
P.
P RO
P.
R
Source(s)
I
$o $o $0 $o
$0 $0 $O
Ep.
9
tl.:.
-..
Y !?!!?-o-1!
- - - - - -
-
Unexpended:$18,617on4'25'2017
Years 2017118
Rev $34,000 $34,000 Funding:
2019120
2018119
$0 $O
$o $o
$O $O
RATIONALE FOR PROPOSED PROIECT:
2020121
2021122
$o $o
$o
Total $34,000 $34,000
$o
EXPECTED IMPACT ON OPERATING BUDGET:
lncrease parking on Danville Boulevard near San Ramon Valley High School.
ffi
2020121
$o
t{.I
ATION.AI.ID. FUNDTNG.
Prior
CIP Gen Purpose
Total
$0 $O $O $0
$o $O $0 $O
2019/20
-P Bl
2021122 Total $0 $10,000 $5,000 $o $o $1e,000 $o $34,000
CIP1
Ãïðlt¡ohãl woiréihours required to maintain per year: Additional Town direct operating costs per
I8
vear:
0
$o
u'r's'-,1;rr rvl 11.., :t.got
Projects RAILROAD AVENUE DECORATIVE CROSSWATKS AND PAVEMENT OVERLAY clP No: c-6o5
I
SnrUSt
CompLeted
zors I
GREEN
pRoJECT:No
I
I pnlonlry, r
pno¡¡cruINAGER:
NNS
PRO'ECT DESCRIPTION AND LOCATION:
Provide decorative crosswalks on Railroad Avenue at Linda Mesa Avenue, mid-block, and Love Lane. Provide asphalt overlay from Linda Mesa Avenue to Hartz Avenue.
l¡
r r ii
i..
¡. ' I
i,
DESCRIPTION OF MODIFICATIONS:
.Pß0¡.8çL.ç.05I.8SI1M.4IF.................. Expenditure Category Prior
Construction $479,400 $0 Total Cost Estimate: $479,400 $O Totaf
Expenditure: $436,992
PRO IE CT. A P. P RO P. RIATIO Funding
N
$O $0
$O $0
Unexpended: 942,408 on 4-25-2017
AI.ID. fUNDTNG.
Rev $479,400
Funding:
$O $479,400 $O
RATIONALE FOR PROPOSED PROJECT:
Provide for decorative crosswalks and new pavement.
ffi
2021t22 Totat $O $O $479,400 $O $O $429,400
Source(s) Prior Years 2017118 2018119 2019120 2020121 2021t22
CIP Gen Purpose
Total
..........rsrxr8p..q\¡....Mt2!!?.o-s--....
Years 2017118 2018119 2019120 2O2Ol21
$O $O
$O $O
$O $O
$O $O
Total
$479,400 9429,400
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: Additional Town direct costs per vear: $0
CIP1 19
0
u'tt'rr,'.rllu rt¡t
I
lt.t lt.gor
Projects IRON HORSE TRAIL RAISED CROSSWALKS AND FTASHING BEACONS
I
I cn¡erPRotEcr;No I pRloruwt uz
ctPNo: c-oozl sTATUS: New
pno¡¡clMANAGER: AD
PROJECT DESCRIPTION AND LOCATION:
PHASE l: ($70,000) Remove and replace existing rectangular rapid flashing beacons (RRFB) on Greenbrook Dr., El Capitan Dr., and Paraiso Dr. at lron Horse Trail crossings. PHASE ll: ($226,800) install l8-foot raised crosswalks (platform), with 12-foot flares on both sides, modify existing drainage, and install storm drain inlets on Paraiso Dr., El Capitan Dr., and Greenbrook Dr. at lron Horse Trail crossings.
DESCRIPTION OF MODIFICATIONS:
9!!2!t?.0.17........
ExpenditureCategory PriorYears 2017118
Review Construction lnspection & Admin. Total Cost Estimate: Total Expendlture: Design/Plan
Pn OIE CT.
A PP ROP.
Fundlng Source(s) Grant Meas J Rtrn to Src
Total Funding:
2018119
$O $22,000 $O $O $22,000 $216,000 $O $26,000 $0 $0 $70,000 $216,000
2019120
$o $o $0
$o
2020121
$0 $o $o $0
Total
2021122
$22,000 $238,000 $26,000 $286,000
$o $o
$o $o
Not Available
N AtìlD. FUNDf NG 2017118 2018119 Prior Years
RIATIO
$o $o $o
$o $70,000 $70,000
2019120
$216,000
$0
$o
$o
$216,000
$o
RATIONATE FOR PROPOSED PROIECT:
2020121
2021122
$o $o $o
$o $o $o
Total $216¡000 $70,000 $286;000
EXPECTED IMPACT ON OPERATING BUDGET:
Ãrii,itiõhãl workéihoÙrs required to maintrain per year: 0 Additional Town direct ooeratinq costs peryear: $0
Provides for a safer pedestrian crossing.
CIPl20
rr',. rr'.,1;u rvt ll, ., r,-q,r.
Projects TOWN.WIDE BICYCLE MASTER PLAN GlPNor
C-oosl
I
STATUS: New
cn¡¡¡¡PRoTEGT:No
I
I
PRroRrrY: 2/3
pno¡¡clMANAGER: AD
PRO¡ECT DESCRIPTION AND LOCATION:
This project consists of the development of a comprehensive Bicycle Master Plan to support, encourage and enhance bicycle travel in Danville. The Master Plan will support and serve as a meohanism to set forth implemeniat¡on measures of the Goals and Policies deflned in the Town's General Plan related to multi-modal circulation, complete streets and mobility and neighborhood quality.
DESCRIPTION OF MODIFICATIONS:
-PRg¡.H çT. çCI 5.T. E 5.T I MATF..
-
ÞRINlED ON:
-
ExpenditureCategory PrlorYears 2017118 2018119 Design/Plan Review Construction lnspection & Admin. Total Cost Estimate: Total Expenditure:
-
$O $75,000 $O $O $0 $O $0 $75,000
$O
$o
$O
$O
$o $o
$0
$o
Not Available
PRO IE CÏ. A P. P ROP. R I AIIO N AI.ID. F.UNDTNG Funding Source(s) Prior Years 2017118 2018119 Meas J-CC-TIC (2017) $O $75,000 $O Total Funding: $O $75,000 $O
RATIONALE FOR PROPOSED PROIECT:
Study will provide guidance for implementation of programs, projects and policies related to bicycle safety and infrastructure.
ffi
2019120
("ll''l'21
2020t21
$o $o $o $o
2019120 2020121
$O $0
$O $O
Mn!!?.o17.......
Total
2021t22 $o
$75,000 $o $o $75,000
$o $o $0
2021122 Total $o $75,000 $0 $75,000
EXPECTED IMPACT ON OPERATING BUDGET:
Additional worker hours required to maintain per year: 0 Additional Town direct operatinq costs oer vear: $0
t
r. rr'.,1,utvrIl, .,';,.g,tr
Projects PAVEMENT MANAGEMENT clP No: c-610
I cn¡eTPRoIECT:No I pnroRrw, r
I stntusr H"*
Current PCI
I
pno¡ecr MANAGER:
NNS
PROJECT DESCR¡PTION AND TOCATION:
The pavement management program is an annual effort approved by the Town Council to maintain the Town's street system at a high level of service. A proactive approach to pavement maintenance prevents more costly pavement repairs in the future. The planned level of expenditures is aimed at sustaining an overall pavement condition index (PCl) of 70 for Town streets.
aç +l 2,15t2*1ï
DESCR¡PT¡ON OF MODIFlCATIONS:
PRINÏED ON:
Expenditure Category PriorYears
Review Construction lnspection & Admin. Total Cost Estimate: Total Expenditure: Design/Plan
.
PN
O
2017118 2018119
2019120 2020121 2021122
$O $11 ,000 $1 1,000 $1 1,000 $1 1,000 $1 1,000 $0 $2,567,000 $2,967,000 $2,967,000 $2,967,000 $2,967,000 $O $22,000 $22,000 $22,000 $22,000 $22,000 $0 $2,600,000 $3,000,000 $3,000,000
$3,000,000 $3,000,000
CIP Gen Purpose Rev Gas Tax Meas J Rtrn to Src
Total Funding:
Prior
Total $55,000 014,435,000 $110,000 $14,600,000
Not Available
lE CT. A P- P RO P- RIATIO N.AND. F.UNDTNG.
Funding Source(s)
ut27t2017
Years 2017118 2018119 2O1Sl20 2O2Ol21
2021122
$0 $1,800,000 $1,700,000 $1,700,000 $1,700,000 $1,700,000 $o $200,000 $700,000 $700,000 $700,000 $700,000 $o $600,000 $600,000 $600,000 $600,000 $600,000 $0 $2,600,000 $3,000,000 $3,000,000 $3,000,000$3,000,000
RATIONATE FON PROPOSED PROIECT:
Provide for maintaining the Town's PCI above 70.
Total $8,600,000
s3,000,000 $3,000,000 $14,600,000
EXPECTED IMPACT ON OPERATING BUDGETT
Additional worker hours required to maintain per year: 0 costs oer vear: $o Additional Town direct
CIP122
ivrvu'.,1
l'
lvi lle.(';ì. g()\
Main Index by Project Number CIP lndex by Project Number
Pr#
Page Status
Project Name
ACCESS--
----..----CIP3I LOCAL GENERAL IMPROVEMENTS - DISABLED A.35O TOWN-WIDE STORM DRAIN SYSTEM MANAGEMENT---.------..-- --.CIP32 A.064
A.362 DOWNTOWN MPROVEMENT A-44t DIABLO ROAD (EAST) DRAINACE
--ctP33
I
IMPROVEMENTS----------
MAINTENANCE.----
---------ClP34
---.-----C¡P35
A.4825TREET LIGHT A-492 CENTRAL IRRIGATION SYSTEM CAPITAL MAINTENANCE---------------------------ClP36 A.513 CAMINO TASSA]ARA PKWY/SYCAMORE VALLEY RD SOUND WALL MAINT.------CIP37 C¡P38 A.5T.4 PUBLIC PLACES FOR A.529 DIABLO RD RETAINING WALL REPLACEMENT GREEN VLY TO CLYDESDALE-----€IP39 ---------CIP4O A.53O HAP MAGEE RANCH PARK SLIDE
ART-----
MITICATION-
4.533 TOWN-WIDE
LANDSCAPE REPLACEMENT --------------CaP42 A-s40 TOWN FAC|L|TY SECURITY MONITORING ----.--CIP43 A.558 PARKING LOT A.561 I-680 INTERCHANGE LANDSCAPING AT SYCAMORE AND DIABLO ROADS-------CIP44
SYSTEM-----MAINTENANCE----..
A.579 TOWN-WIDE ROADWAY DAMACE A.580 TOWN OFFICE IMPROVEM
REPAIR----..-
-.---€IP45
----ctP46
7 LAUREL DRIVE BIOTREATMENT FACILITY------A.ó06 AUTOMATED LICENSE PLATE READER Û SITUATIONAL AWARENESS CAMERAS-CIP48 €IP49 A.608 STARVIEW DRIVE STORM DRAIN TRASH ----CIPsO CENTER SLIDE DRAINAGE A.6L2TOWN SERVICE
A.604
RACK------REPAIR-
A.613 LOCH LOMOND WAY TRASH RAC v
Design Design, Modified Design
Adopted Design
Construction Construction Design, Modified Unfunded Adopted Construction Design Design
Unfunded, Modified Construction Design Design Complete, Modified New New New
---4tP52
New
A.615 CAMINO ENCANTO AT DEL AMIGO STORM DRAIN REPLACEMENT--.----------CIP53 --------ClP54 A-620 FIBER OPTIC CABLE INTERCONNECT-----------8.1O1 PARK AND RECREAT¡ON FACILITIES CAPITAL MAINTENANCE.------.---------€IP57
New
A.61.4 WESTRI
DG E TRASH RACI( MODI FICATIO
-----------clP58 8.120 TOWN.WIDE T 8.216 TOWN SERVICE CENTER CAPITAL MAINTENANCE-.--..---.---. ----.--CIP59 --------ClP60 8-280 SPORTS FIELD RENOVATION------.CIP61 8.328 TOWN OFFICES CAPITAL MAINTENANCE.---.------
MAINTENANCE--..-----
B.4OO HAP MACEE RANCH PARI( CAPITAL 8.415 CIVIC FACILIT]ES CAPITAL MAINTENANCE
PRO]ECTs.
8.420 FRONT STREET CREEKSIDE TRAIL------.8.427 OAK HILL MASTER PLAN . PHASE 8.452 SYCAMORE DAY SCHOOL BUILDING REPAIRS----8.479 SYCAMORE VALLEY PARK SITE STUDY-.----8-490 oSAGE STATION PARI( IMPROVEMENTS---
--------C¡P62 -CIP63 --CIP64
-----CIP66
--------.--CIP67
--------------ClP68
LIBRARY AND COMMUNITY CENTER CAPITAL MAINTENANCE---.-----------..CIP69 -----------clP70 B-493 SYNTHETIC TURF -.--.-.--.---CIP71 8.494 OSAGE STATION PARI( CAPITAL --_.--CIP72 8.495 SYCAMORE VALLEY PARK CAPITAL tP73 8.515 SECURITY ACCESS CONTROL FOR TOWN BUILDI --------CIP74 8.522 SYCAMORE VALLEY PARK PICNIC AREA
8.49'.
REPLACEMENT-------------MAINTENANCE------
MAINTENANCE-.-.-------
RESTROOMS.-.----
8.544 8.550 8.553 8.55ó 8.559 8.560
¡P75
OAK HILL PARI( CAPITAL MAINTENANCE ------CIP76 MUNICIPAL SERVICE CENTER WASTE TRANSFER lP77 VILLACE THEATRE CAPITAL MAINTENANCE..-------DANVILLE SOUTH PARI( CAPITAL MAINTENANCE---------. ----.-.-.-CIP78 -----CIP79 SCHOOL PARI( FACILITIES CAPITAL -.-.--------CIP8O DIABLO VISTA PARK CAPITAL
AREA---.-----
MAINTENANCE-------..-. MAINTENANCE.--.-----
New
Construction Design
Construction Design Design
Construction, Modified Construction Adopted, Modified Unfunded Gonstruction Unfunded Complete
Gonstruction,
IU
odified
Design
Construction Construction Design
Unfunded, Modified Gonstruction, Modified Adopted Gonstruction, Modified Construction, Modified Construction Construction, Modified
Continued on next page CIP123
\\'\\'\\'.(l;u ì\,r IlL -( :ì.g()\
Main Index by Project Number CIP lndex by Project Number
Pr#
Page Status
Project Name
B.57AVI5TA GRANDE STREET/BRET HARTE PARK PEDESTRIAN IMPROVEMENTS----..CIP81
Design
P82 9.597 VILLAGE THEATRE PARI(ING LOT IMPROVEMENTS-----..-. ------..CIP83 8.611sYCAMORE VALLEY PARI( DRAINAGE IMPROVEMENTS----..- ------.cIP84
Construction, Modified Adopted, Modified
8-582 VETERANS MEMORIAL BUILDING CAPITAL MAINTENANC
8.616
-ctP85
SKATE
P86 8.617 TOWN GREEN MASTER PLAN-.---.-.-.---C¡P87 8.618 TOWN.WIDE WAYFINDING AND DIRECTIONAL SIGNAGE-.-.8-619 GREEN VALLEY TRAIL FROM HIGHBRIDGE LANE TO DIABLO ROAD-.-.----------CIP88 C.OI7TOWN-WIDE SIDEWALK
REPAIRS----.
---CIP91
C.O55 DIABLO ROAD TRAIL FROM ALAMEDA DIABLO TO TANK ACCE55 ROAD--.-----CIP92 C.O57 BLACKHAWI( RD./HIDDEN OAK DR./MAGEE RANCH RD. TRAFFIC 5IGNAL..---CIPg3
--ctP94
C.505 TRAFFIC MANAGEMENT PROG
----------ClP95 MATNTENANCE-------------------ClP96 EL PINTADO OVERLAY - EL CERRO BLVD. TO l-680----**CIP97 C.418 TRAFFIC SIGNAL AND STREET LIGHT MAINTENANCE PROGRAM---
c-392 c-402
BRTDGE
C-508 CAMINO TA55A]ARA/CROW CANYON SAFETEA-LU IMPROVEMENTS----------..€IP98
C.521WEsT
EL PINTADO SIDEWALK
IMPROVEMENT----------
UPGRADE---
C.545 TRAFFIC SIGNAL CONTROLLER C-552 I NTERNALLY ILLUM I NATED STREET NAM C.562 TRAFFIC SIGNAL INTERCONNECT
E SIGN LED
---------...CIP99 ------...CIPIOO
RETROFIT------*.-.-.-.---CIPI OI
sYsTEM-. c-566TOWN-W|DE BTCYCLE PARKTNG PROIECT----
.----------CIP102
--------clPl03
New New New New New
Gonstruction Adopted, Modified Adopted Design Design Design
Construction Gomplete, Modified Adopted Gonstruction Gonstruction, Modified Construction, Modified Gonstruction
C.578 SAN RAMON VALLEY BOULEVARD LANE ADDITION AND OVERLAY (5OUTH)----CIPî04 Design
C.584 DANVILLE VARIOUS sTREETS AND ROADS PREsERVATION----.----..--.--..-CIPIOs C.585 ELECTRIC VEHICLE CHARGING STATIONS AT TOWN-OWNED FACILITIES..-..--4IPI06 --.--...-CIPIOT C-588 BATTERY BACI(UP REPLACEMENT FOR TRAFFIC SIGNALS.. --€IP1O8 C.592 ROSE STREET PARKING FACILITY----109 C.593 FRONT STREET CREEI( BANI( STABILIZATION.
Design
IO Adopted 111 Gonstruction
PROG
C.596 SAN RAMON VALLEY CREEK FOOTBRIDGE AT DANVILLE GREEN------------.....€IPI
C.598
Construction
SCHOOL-------....------CIPî
C.5945TUDENT PARKING AT sAN RAMON VALLEY HICH
C.595 PAVEMENT MANAGEMENT
Out to Bid, Modified Complete, Modified Design
I2 Adopted 1',|.3
PARK AND RIDE EXPANS¡ON PRO]ECT---.-.
C-599 LA GONDA WAY BRIDGE IMPROVEMENTS--------
--ctPr15 C.6OO SAN RAMON VALLEY BOULEVARD IMPROVEMENTS (NORTH C-601 CAMINO RAMON IMPROVEMEN ..-...-.C1P117 C-602 DANVILLE BOULEVARD I8 PARKING IMPROVEMENTS--....-------CIPI C.603 DANVILLE AND EL CERRO BOULEVARD OVERLAY..-.CIP1I9 AND PAVEMENT RAILROAD AVENUE DECORATIVE CROSSWALKS C.605 C.6O7IRON HORSE TRAIL RAISED CROSSWALKS AND FLASHING BEACONS-..-------CIPI20 121 C.ó09 TOWN.WIDE BICYCLE MASTER .CIP122 C-61O PAVEMENT
TMPROVEMENTS-----
MANAGEMENT---..--....
CIP124
Adopted, Modified
114 Design
fi6
Adopted Adopted, Modified Adopted Complete Complete New New New
rvu,rt'.illu
r,,rl I le.,-r,.
grlr
Main Index by Project Name Ç-lP-
Pr#
lnd.çr.þv P-rpiççf l!p-nç
..
Page
Project Name
A-606 AUTOMATED
LICENSE PLATE READER
8
SITUATIONAL AWARENESS CAMERAS(IP48
---.-.---(IP1O7 c-588 BATTERY BACI(UP REPLACEMENT FOR TRAFFIC SIGNALS-. c-057 BLACKHAWK RD./HIDDEN OAK DR./MAGEE RANCH RD. TRAFFIC SIGNAL--.--CIP95 --.-{IP95 c-392 BRIDGE MAINTENANCE-.----.----
A-615 CAMINO ENCANTO AT DEL AMIGO STORM DRAIN REPLACEMENT----------..-.CIP53 P116 c-601 CAMINO RAMON IMPROVEMEN A-513 CAMINO TASSA]ARA PI(WY/SYCAMORE VALLEY RD SOUND WALL MAINT.--.--(IP37
c-508 CAMINO TASSA]ARA/CROW
CANYON SAFETEA.LU IMPROVEMENTS------------CIP98
Á,492 CENTRAL IRRIGATION SYSTEM CAPITAL MAINTENANCE--.---------------.--------CIP36
B'll5 c-603 c-602 B-556
c-584 A-529 A-443
c-055 B-560 A-362
c402 c-585 A-620
c-593 8.420 8-619
8,400 A-530 A-561
c-552 c-607 c-599 A-604 B-491
A-064 A-613 B-550
8,427 B-544 B-494
8490 B-l0l c-598 A-558
c-610 c-595
PRO]ECTs-
.---.---------{IP63 CIVIC FACILITIES CAPITAL MAINTENANCE DANVILLE AND EL CERRO BOULEVARD PARKING IMPROVEMENTS-------.---CIP118 PTLT DANVILLE BOULEVARD IMPROVEMENTS------.-.-. P78 DANVILLE SOUTH PARK CAPITAL MAINTENANCE-------------DANVILLE VARIOUS STREETS AND ROADS PRESERVATION----------.-------.-----CIP1O5 DIABLO RD RETAINING WALL REPLACEMENT GREEN VLY TO CLYDESDALE---.-CIP39 --------ClP34 DTABLO ROAD (EAsT) DRAINAGE DIABLO ROAD TRAIL FROM ALAMEDA DIABLO TO TANK ACCESS ROAD--------CIP92 P80 DIABLO VISTA PARK CAPITAL MAINTENANC Pt3 DOWNTOWN IMPROVEMENT PRO]ECT P96 EL PINTADO OVERLAY - EL CERRO BLVD. TO I-68 ELECTRIC VEHICLE CHARGING STATIONS AT TOWN.OWNED FACILITI E5------.-CIP106 P54 FIBER OPTIC CABLE INTERCONNECT 109 FRONT STREET CREEK BANI( STABILIZATION FRONT STREET CREEKSIDE TRAI GREEN VALLEY TRAIL FROM HIGHBRIDGE LANE TO DIABLO ROAD-------------.{IP88 .---.-.CIP62 HAP MAGEE RANCH PARK CAPITAL -------{IP4O HAP MAGEE RANCH PARK SLIDE I-680 INTERCHANCE LANDSCAPING AT SYCAMORE AND DIABLO ROADS--.--{IP44 I NTERNALLY ILLU M I NATED STREET NAME SIGN LED RETROFIT-------------<IP101 IRON HORSE TRAIL RAI5ED CROSSWALI(S AND FLASHINC BEACONS-----..-.---CIP12O -CIP114 LA GONDA WAY BRIDGE ...--.---<1P47 LAUREL DRIVE BIOTREATMENT LIBRARY AND COMMUNITY CENTER CAPITAL MAINTENANCE-----------------(!P69 .---------{IP31 LOCAL GENERAL IMPROVEMENTS - DISABLED -----------<1P51 LOCH LOMOND WAY TRASH -.--<IP76 MUNICIPAL SERVICE CENTER WASTE TRANSFER ----.-{P65 OAI( HILL MASTER PLAN PHASE ---CIP75 OAI( HILL PARK CAPITAL OSAGE STATION PARI( CAPITAL MAINTENAN OSACE STATION PARI( IMPROVEM PARKAND RECREATION FACILITIES CAPITAL MAINTENANCE-.----------------CIP57 {IP113 PARK AND RIDE EXPANSION PARKING LOT MAINTENAN 22 PAVEMENT MANAGEMENT 1 PAVEMENT MANAGEMENT
IMPROVEMENTS----------
MAINTENANCE.-..-.--.-
MITIGATION-
IMPROVEMENTS-------FACILIW-----
ACCEss.RACK-------AREA.-------2__----_-MAINTENANCE----..----PRO]ECT
------------(1P38 ART----OVERLAY.---CIP119 AND PAVEMENT AVENUE DECORATIVE CROSSWALI(S RAILROAD --CIP1O8 ROSE STREET PARI(INC FACILITY---.-
A-514 puBLtc
c-605 c-592
PLACES FOR
Status
Complete, Modified Design
Adopted Design New
Adopted, Modified Construction Complete, Modified Construction Construction Complete Adopted Construction, Modified Out to Bid, Modified Unfunded Adopted Adopted, Modified Construction, Modified Design Design
Complete, Modified New Design
Adopted, Modified New
Construction, Modified Adopted Unfunded, Modified Construction, Modified New Design Design
Construction, Modified Design New
Adopted Unfunded Construction, Modified Construction Complete Construction Adopted, Modified Design New
Construction Design, Modified Complete Construction
Continued on next page
clP125
\\'\\'\\'.(1
ii r ì\,1
I
l( -( ;r. g()\
Main Index by Project Name CIP
Pr#
lndex Þv Prgj ect Name Page
Project Name
(NORTH)
c-600 sAN RAMON VALLEY BOULEVARD IMPROVEMENTS -..(IP115 c-578 sAN RAMON VALLEY BOULEVARD LANE ADDITION AND OVERLAY (5OUTH)--{IP1O4 c-596 SAN RAMON VALLEY CREEK FOOTBRIDGE AT DANVILLE GREEN...---------CIP112 B-559 SCHOOL PARI( FACILIÏIE5 CAPIÏAL MAINTENAN B-515 SECURITY ACCEss CONTROL FOR TOWN 8-6r6 SKATE PARK--------B-280 5PORTs FIELD RENOVAÏION----A-608 STARVIEW DRIVE STORM DRAIN TRASH
BUILDING5..
RACK---------
rÊ
A,482
STREET LIGHT MAINTENAN
STUDENT PARI(ING AT 5AN RAMON VALLEY HIGH SYCAMORE DAY SCHOOL BUILDINC REPAI SYCAMORE VALLEY PARK CAPITAL SYCAMORE VALLEY PARI( DRAINAGE SYCAMORE VALLEY PARK PICNIC AREA RESTROO SYCAMORE VALLEY PARK SITE STUDY SYNTHETIC TURF TOWN FACILIÏY SECURITY MONITORING 5Y5T TOWN GREEN MASTER TOWN OFFICE IMPROVE
8-611
B-s22 8"479
8493 A-540
8-617
-......--.----CIP49
SCHOOL----------------..CIP110
MAINTENANCE------------- -_<'P72
IMPROVEMENT5----
REPLACEMENT-----.-
B-216 TOWN
MATNTENANCE--------- -------------ClPó1 MAINTENANCE--------- ......CIP59
REPLACEMENT---.---REPAIR----TOWN-WIDE SIDEWALI( REPAIRs..".
1
-------<IP1O5 ..-------.-----CIP41 -...-CIP45
A-330 TOWN-WIDE STORM DRAIN SYSTEM MANAGEMENÏ
8.120 TOWN-WIDETRAI 8-618 TOWN-WIDE WAYFINDINC AND DIRECTIONAL
c-305
c418 c-545 c.562 B-582 B-553 B-597
B-574 c-521 A-614
S]GNAGE----
.{IP91 2
8 .*..-{IP8 7
TRAFFIC MANAGEMENT PROGRAM TRAFFIC SIGNAL AND STREET LIGHT MAINTENANCE PROGRAM-----------------{IP97 TRAFFIC SIGNAL CONTROLLER -----.{IPlOO ------CIPlO2 TRAFFIC SIGNAL INTERCONNECT VETERANS MEMORIAL BUILDING CAPITAL MAINTENANCE----------'-------C|P82 VILLAGE THEATRE CAPITAL MAINTENAN ---.........{IP83 VILLAGE THEATRE PARI(ING LOT VISTA GRAN DE STREET/BRET HARTE PARI( PEDESTRIAN IMPROVEMENTS---...{IP81 ----------.(IP99 WEST EL PINTADO SIDEWALI( -------CIP52 WESTRIDGE TRASH RACK
UPGRADE-.. SYSTEM--
IMPROVEMENTS-----
IMPROVEMENT-.------MODIFICATION-----
CIP126
New
Construction
0
A-533 TOWN.WIDE LANDSCAPE A-579 TOWN-WIDE ROADWAY DAMAGE
Adopted Construction Construction
Design Desisn New Design Design
SERVICE CENTER CAPITAL
c-609 TOWN-WIDE BICYCLE MASTER PLA c-566 TOWN-WIDE BICYCLE PARKING PROJECT-----
Design
Adopted Construction
Unfunded, Modified Unfunded
--{IP86
A-612 TOWN SERVICE CENTER SLIDE DRAINAGE REPAIR
c-017
-----.CIP84 4
7 ----------------CIP7O
PLAN--------
A-580 B-328 TOWN OFF|CES CAPTTAL
Adopted
Design New Design New Design
-_-_-_-__------{tP35
c-594 B,452
8495
-------------C¡P73
Status
New New
Construction Construction Construction Construction Design, Modified Design New Design
Construction Construction Construction, Modified Construction, Modified Construction, Modified Adopted, Modified Design
Adopted New
n'rr,rl'.,ìlrr rrri Il, .( ;ì.g()\'
RENEE MORGAN MAYOR NEWELL ARNERICH VICE MAYOR LISA BIACKWELI COU NCI LMEM BER KAREN STEPPER COUNCILMEMBER ROBERT STORER COU NCI LMEM BER TOSEPH A. CATABRIGO TOWN MANACER IANI HA FINANCE MANACER/TREASURER STEVEN C. IAKE DEVELOPMENT SERVICES DIRECTOR/CITY ENCINEER Tcrwnof Danville l5roLaGondaWoy I Danville, CAga5z6 | www.danville.ca.gov