MILNERTON SOMETHING FOR EVERYONE
ONLY
CRAZY PLASTICS BELLVILLE
FOLLOW OUR SOCIAL PAGES:
170 Durban Road, Bellville, Cape Town 021 949 8900
Woensdag, 18 Maart 2020 | Tel: 021 910 6500 | e-pos: nuus@tygerburger.co.za
@TygerBurger
5 DAYS LEFT !
Valid @ all branches until Sunday 22 March - While stocks last
BELLVILLE - 021 944 3330
NETWERK24. ALLES OP EEN PLEK.
TygerBurger
E&OE
Teken in by www.netwerk24.com.
Lego fans get arty! The CapeLUG hosted a brick show and MOC (My Own Creation) exhibition on Saturday 14 March at the Table Bay Mall in Sunningdale. They have created a space and display for Lego fans to get together and share their love and knowledge of building. On display were the Ghostbusters fire station, Old fishing store and Haunted House, along with members’ amazing MOCs, including Bat Band and Harry Potter. The Star Wars fans enjoyed a dedicated area with many great sets including the Ewok Village, First Order Star Destroyer, Millennium Falcon and Saturn V rocket ship. Visitors were enthralled by every detail, including the CapeLUG members. Pictured is Natasha van der Merwe with her animal mosaic creations. PHOTOS: KAILIN DANIELS
INSPECTION: UPGRADES AT WASTEWATER TREATMENT WORKS
Mayor visits Potsdam KAILIN DANIELS @k10daniels
M
ayor Dan Plato inspected the progress on the major R1.75 billion upgrade at the Potsdam Wastewater Treatment Works (WWTW) last week in the hope of ensuring the project remains fasttracked.
This comes after numerous complaints by residents and organisations on the pollution at the Milnerton Lagoon and Diep River Estuary. Plato inspected progress on the upgrade, which is taking place alongside critical repair work. He was joined by mayco member for water and waste services, Xanthea Limberg, and
officials on a plant walkabout on Tuesday 10 March. According to the Potsdam plant manager, Janet Chunderduri, critical repair work is nearing completion within one to two months and will result in a higher quality effluent. Maintenance teams are currently on site completing urgent repairs to belt press and
UV-light machinery, critical functions in the wastewater treatment process. Phase 1 of the plant upgrade was completed in January, with a major demolition operation to clear large portions of the property. New technology and capacity will be progressively added to Potsdam over the next five years. To page 2
SPEND LESS – GET MORE. COMPOST 15 DM
HEN & CHICKEN
WAS 16.95
NOW
9.95
www.stodels.com
COCO PEAT
WAS 59.95
NOW
19.95
GERANIUM MAVERICK
YELLOW VYGIE
WAS 29.95
NOW
14.95
WAS 49.95
NOW
21.95
SUNPATIENS
WAS 69.95
NOW
26.95
GROUNDCOVER SEEDLINGS 6 PACK
WAS 34.95
NOW
21.95
Bellville 021 919 1106 | Milnerton 021 528 4000 | Kenilworth 021 671 9050 | Bergvliet 021 794 2221 | Somerset West 021 852 7400
DIANTHUS
BUY 4 FOR
100.00
WAS 69.95
NOW
26.95
Offers valid until 22 March 2020. While stocks last. X1W44QMR-AL180320