teame-alpes rhu么rbnan Links
2012 nt 3 pme # le lo ion rabDeve,PD#3 entat e v li n 3 um 1 De esig , PM#p doc 4-201 D R#3 sho er 1
D Di elive , PD#1 prelimin march 0 ary webpage 2-2011
Deliv Schemeraable #1 Docum tic Design PR#1, P entation M#1
GRA Virginien MESSA Aur茅lie a NIRLO Vaness Deliverab
le Construction#4 Documentation
PR#4,PM#4,PD#4 february 8-2012
D U elive Dopcdatedrable PR um Co #5 app #5,PM enta nstr ma roval #5,PD tion uctio y 2 do n # 3-2 cum 5 012 en ts
ts ts en #6 men n um ble jus ion tio oc era Ad at #6 nta al d liv n ent , PD me rov e #7 nts De esigum M#6 docu , app rabl ume D c P r 2 elivueilt DocPD#7 ort D Do R#6, Solaisual -2012 As b7, PM#7,input rep P la v 4 PR# ulation 7-2012 Vil udio st 1 a ugu sim ember 1 a nov
mo sse rab apr del, wmina le #2 il 1 eb tio 3-2 pa n 011 ge, Ma aud ter iov ial isu al 1
P ork mb w pte se
RSamuel CHAPNUGIESRBREYTON
Project Drawings #1 [PD#1]
Table of Contents Sommaire 1. GENERAL / GÉNÉRAL GE-001 GE-101 GE-201 GE-401
Cover sheet / Couverture Sheet List / Sommaire General Symbols / Symboles généraux Exterior Renderings / Rendus extérieurs
-
Ecole Nationale Supérieure d’Architecture de Grenoble www.solardecathlon.fr info@solardecathlon.fr
2. ARCHITECTURAL / ARCHITECTURE
PHASE 1 # 1 Schematic Design Documentation March 02 - 2011
AR-012 Site Plan/ Plan masse AR-022 House floor plan / Plan de plancher de la maison AR-102 Site elevations / Élévations du site AR-201 Longitudinal section / Coupe longitudinale AR-211 Transversal section / Coupe transversale AR-301 Wall-Roof detail/ Détail AR-341 Wall-Floor detail/ Détail
1:100 1:50 1:100 1:50 1:50 1:10 1:10
Localization
3. STRUCTURAL / STRUCTURE Professional seal
ST-201 Prefabrication system / Système de préfabrication ST-202 Blow up/ Système éclaté global
4. INTERIOR / INTERIEUR
INDEX
DESCRIPTION
IN-601 Interior view / Vue intérieure
Component
General Description
Sheet list Drawing Number
GE-101
SCALE
PLAN TITLE CODE
INDICATIONS
North arrow
Title tag Ecole Nationale Supérieure d’Architecture de Grenoble
Graphic scale Drawing #
Drawing english title
A
North elevation
GE-101
Sheet #
1
m
10
5
PHASE 1
Ft
Elévation nord
2
www.solardecathlon.fr info@solardecathlon.fr
1' 2'
5'
10'
20'
# 1 Schematic Design Documentation March 02 - 2011
Drawing french title
Localization
Legends 1 2 3
CROSS REFERENCING
LOCALIZATION
Elevation tags
Key floor plan Professional seal
Elevation identification A
A
A
A
GE-101
GE-101
GE-101
GE-101
Sheet where elevation is drawn
INDEX
DESCRIPTION
SCALE
Section tags Section identification A
A
GE-101
GE-101
A GE-101
Key longitudinal section
Key transversal section
A GE-101
Sheet where section is drawn
Component
Detail identification A GE-101
Sheet where detail is drawn Area detail references
Elevation tag
A
Section tag
A
Detail tag Perspective tag
A
A
General
A
A A
A
A
A
Description A
A
Detail tag
General symbols
A Drawing Number A
GE-201
A GE-401
Perspective of the project from above Perspective du projet vu d’en haut
Ecole Nationale Supérieure d’Architecture de Grenoble www.solardecathlon.fr info@solardecathlon.fr
PHASE 1 # 1 Schematic Design Documentation March 02 - 2011
Localization A
Professional seal
INDEX
DESCRIPTION
A
SCALE
Perspective #2
Component
General Description
Exterior renderings Drawing Number
GE-401
-
Site plan
Plan masse 2,45
0,9
10,8
4
0,6
2,5
0,5
1,25
Ecole Nationale Supérieure d’Architecture de Grenoble
A AR-102
www.solardecathlon.fr info@solardecathlon.fr
PHASE 1
2,4
# 1 Schematic Design Documentation March 02 - 2011
1,6
Localization
B
A
AR-103
AR-103
10,37
Professional seal
INDEX
DESCRIPTION
A
Site plan
1,53
AR-012
Component
Architectural
0,6 0,5
A
Description
Site plan
B AR-102
m Ft
1 2 5 PLAN MASSE 1' 2'
5'
10'
10 20'
Drawing Number
AR-012
SCALE
1:100
House floor plan
Plan de plancher de la maison
A GE-101
1,55
9,25 Ecole Nationale Supérieure d’Architecture de Grenoble www.solardecathlon.fr info@solardecathlon.fr
PHASE 1
2,4
# 1 Schematic Design Documentation March 02 - 2011
2,41
1
Localization
Professional seal
1,76
AR-022
INDEX
DESCRIPTION
A
SCALE
House floor plan
0,43
A
Component
Architectural Description
House floor plan 1
m Ft
1'
2'
5
2 5'
10'2
Drawing Number
0'
AR-022
1:50
0,55
Architectural footprint Empreinte architecturale
2,8
5,45
1,94
AR-101
0,55
A
0,71
20 1,25
3,35
1,55
9,25
4
Ecole Nationale Supérieure d’Architecture de Grenoble
0,6
www.solardecathlon.fr info@solardecathlon.fr
0,6
PHASE 1 # 1 Schematic Design Documentation March 02 - 2011
2,41
1
2,4
2,4
Localization
1,76 0,43
20
Professional seal
INDEX
Architectural footprint
8,17
A
DESCRIPTION
Total footprint: 92.20 m² Empreinte totale: 92.20 m²
Component
Architectural Description
Site Plan
Ft
1' 2'
2 5'
5 10'
0,83
1
m
20'
10
Drawing Number
AR-101
SCALE
1:100
A AR-102
North site elevation Élévation Nord du site
4,6 0,9
6,48
1,2
3,12
0,9
2,45
1,25
0,55
2,32
4,6
Ecole Nationale Supérieure d’Architecture de Grenoble www.solardecathlon.fr info@solardecathlon.fr
1,95
0,55
0,6 0,78
10,8
PHASE 1
Localization
1,3
5,45
0,6 0,89
# 1 Schematic Design Documentation March 02 - 2011
0,71
B
B AR-102
South site elevation Élévation Sud du site
A
Professional seal
4,6 2,45
0,9 0,74
4,36
4,6 5,7
0,9
2,32
0,78 0,6
0,55
1,25
10,8
DESCRIPTION
1:100
B
South site elevation
1:100
0,64
North site elevation
0,71
Component
Architectural Description
Site elevations 1
m Ft
1' 2'
2 5'
10
5 10'
20'
SCALE
A
2,15
5,45
1,94
INDEX
Drawing Number
AR-102
AR-102
East site elevation Élévation Est du site
9 8,18
4
3 2,4
4
0,6
Ecole Nationale Supérieure d’Architecture de Grenoble www.solardecathlon.fr info@solardecathlon.fr
1,94
0,55
0,83
8
0,55
A
PHASE 1
Localization
0,71
2,8
5,45
# 1 Schematic Design Documentation March 02 - 2011
B
A
B AR-102
West site elevation
Élévation Ouest du site Professional seal
3 2,4
4
9 4
8,18
0,83
0,55
0,55
0,6
8
DESCRIPTION
SCALE
A
East elevation
1:100
B
West elevation
1:100
0,71
2,8
5,45
1,94
INDEX
Component
Architectural Description
Site elevations 1
m Ft
1' 2'
2 5'
10
5 10'
20'
Drawing Number
AR - 103 AR-102
A AR-201
Longitudinal section Coupe longitudinale
4,6 0,9
1,55
0,51
8,2
0,54
0,9
2,32
3,35
0,7 0,69 0,55
2,45
4,6
0,71
5,45
0,55
1,25
10,8
1
m Ft
1'
2'
5
2 5'
10'2
0'
Ecole Nationale Supérieure d’Architecture de Grenoble
Localization
A
Professional seal
INDEX
DESCRIPTION
A
www.solardecathlon.fr info@solardecathlon.fr
SCALE
Section
1:50
Component
Architectural
Description
Longitudinal section
PHASE 5 - Closure # 7 Updated Construction Drawings and Specifications As Built September 22 - 2010
Drawing Number
A
AR-201
0,78
A AR-211
Transversal section Coupe transversale
3 0,43
3,57
3,46
0,54
8,17
0,
0,61 0,55
2,4
9
0,71
2,36
5,45
1,76
0,55
0,6
8
1
m Ft
1'
2'
5
2 5'
10'2
0'
Ecole Nationale Supérieure d’Architecture de Grenoble
Localization
Professional seal
INDEX
DESCRIPTION
A
www.solardecathlon.fr info@solardecathlon.fr
A
A
SCALE
Section
1:50
Component
Architectural
Description
Transversal section
PHASE 5 - Closure # 7 Updated Construction Drawings and Specifications As Built September 22 - 2010
Drawing Number
AR-211
A AR-301
Window detail - Wall/Roof Détail Mur/Toiture
Ecole Nationale Supérieure d’Architecture de Grenoble www.solardecathlon.fr info@solardecathlon.fr
Wooden cladding (40x40 or 80x40mm) Bardage bois (40x40 or 80x40mm)
PHASE 1
Vertical batten 30x30 mm
# 1 Schematic Design Documentation March 02 - 2011
Liteau bois 30x30 mm
Waterproofing cover Pare-pluie
Localization
Wooden pannel insulation 10mm Panneau d’isolation fibre de bois 10 mm
A
Wood post I section, 200x45 mm,6 mm cross section Fiberwood insulated Poteau bois en I, 200x45 mm, âme de 6 mm - Isolée en fibre de bois
OSB panel 18 mm Panneau OSB18mm
Professional seal
INDEX
DESCRIPTION
A
SCALE
Detail
1:20
Component
Architectural Description
Window detail - North Corridor/Bathroom Drawing Number
AR-301
A AR-341
Walls details
Détails de murs
Ecole Nationale Supérieure d’Architecture de Grenoble www.solardecathlon.fr info@solardecathlon.fr
PHASE 1 # 1 Schematic Design Documentation March 02 - 2011
Localization
A
Professional seal
INDEX
DESCRIPTION
A
Details
Component
Architectural Description
Walls details Drawing Number
AR-341
SCALE
1:10
A ST-201
3 prefabrication systems
3 systèmes de préfabrication envisagés
ADVANTAGES: few elements speed of assembly little workforce
DISADVANTAGES: reduced possibility of drilling
PREFABRICATION BY KLH ADVANTAGES: dimensions of panels Adapted to a traditional construction site
The house is composed of prefabricated wood panels reassembly on site. Different openning are included to the panels to guaranty a good raise and etancheity.
www.solardecathlon.fr info@solardecathlon.fr
The frame is made with insulated beam to lower their conductivity and their weight. A woodwool insulation is between beams. Walls are closed and braced by OSB panels of both side. To higher the resistance an insulation is added on exterior face, it’s polystyren panels. They are used for their better capicity than diferrent wool.
multiplication of the connections precision of the prefabrication
The stability is don eby cable hooked of both wall of the house. They avoid the separation of them when the roof is raise.
ADVANTAGES:
The siding is composed of laths placed on field at regular intervals. The siding is the same on wall and roof to give homogeneity at the house.
DISADVANTAGES:
PREFABRICATION BY PANELS
Reduction of the assemblies Stability of the set(group)
DISADVANTAGES:
Ecole Nationale Supérieure d’Architecture de Grenoble
PHASE 1 # 1 Schematic Design Documentation March 02 - 2011
Localization
Professional seal
INDEX
DESCRIPTION
A
Blow up
Component
Structural
Dimensions during the transport Description
Blow up Drawing Number
PREFABRICATION BY SECTION
ST-201
SCALE
-
A ST-201
Blow up
1
SIDING (wood)
2
JOISTS
3
INSULATION (polystyrene)
4
OSB
Vue éclatée
5
Ecole Nationale Supérieure d’Architecture de Grenoble www.solardecathlon.fr info@solardecathlon.fr
INSULATION BETWEEN STUDS (woodwool)
PHASE 1
6
# 1 Schematic Design Documentation March 02 - 2011
OSSATURE STEICO
Localization
9
5
7
OSB
8
CABLE
9
CONNECTING PIECE
4
3
2
1
Professional seal
INDEX
DESCRIPTION
A
Blow up
Component
Structural Description
8
7
Blow up
6 Drawing Number
ST-201
SCALE
-
A IN-601
Living-room, view from south Séjour, vue du sud
Ecole Nationale Supérieure d’Architecture de Grenoble www.solardecathlon.fr info@solardecathlon.fr
PHASE 1 # 1 Schematic Design Documentation March 02 - 2011
Localization
A
Professional seal
INDEX
DESCRIPTION
SCALE
A
Living-room from south
-
B
Living-room from north
-
Component
Interiors Description
Interior renderings Drawing Number
IN-601