1 minute read
PAPER CONSUMPTION - NRS RELIEF
S. Sheikh Noor-ud-Din & Sons (HSNDS) – production facilities in Pakistan
The last few years of the global pandemic and subsequent transportation bottlenecks, resource scarcities and slower supply chain reactions has forced NRS Relief to be ever-innovative to ensure the security of materials and the delivery to the disasterstricken areas in a timely manner.
Advertisement
Our production facilities have always operated lean, both to keep down costs and to ensure we don’t produce materials that will not be used.
As a result, NRS Relief has:
• Engaged in even more global partnerships for transportation and delivery of materials
• Increased the used of locally produced steel, over aluminium
• Continue to focus on in country value in Pakistan for our successful operations and ability to create stable jobs.
We Have Continued To Progress In These Environmental Aspects In The Period
JULY 2020 – JUNE 2021
•
•
•
•
•
The work on lowering water and waste has given positive results however we realize more work is needed over the coming years, as equipment is changed, and procedures overhauled.
In terms of waste management, we have made extensive changes to our procedures and have found partners that can use our off cuts, making it other companies’ raw material and therefore not waste. The work continues to ensure that the wasted resources are either recycled or used by another entity.
The energy consumption in the reporting period is increased due to a higher manufacturing volume. In this period an increase of emergency power generation from fossil-fuel energy sources (diesel and natural gas) have been noticed due to the intermittent energy supplies from the national grid.