Public-Private Partnerships in Urban Bus Systems

Page 149

11

Defining the Essential Elements of a Bus Project’s Concession Contract

Planners are not expected to draft a concessions contract at the preparation stage; however, essential elements should be identified and preliminarily defined by the end of this stage. Drafting concession contracts is part of the structuring stage. This chapter supports the preparation stage by listing and briefly d ­ iscussing the essential elements of a bus project’s concession contract, which is the most ­common contract in urban bus public-private partnerships (PPPs).1

TECHNICAL ELEMENTS Operators’ remuneration plans Remuneration plans are used to pay operators or concessionaires for ­providing the transportation service as incentives to provide an adequate level of ­service and to reduce risk to the concessionaire’s income. Despite the diverse range of procurement and payment mechanisms used, there are some core ­elements (Wallis, Bray, and Webster 2010; Wallis and Hensher 2007). These core elements are characterized by some mixture of demand and supply baseline and incentive-linked contracts: • Fixed payments. This type of payment covers the passenger transportation ­services provided without considering the kilometers traveled and the demand served. Fixed payments protect operators from fluctuations in demand and thus make the operator’s revenue profile less risky (which is especially important if the operator needs to access finance). They do not necessarily provide an incentive to the operator to maintain the quality of service, but they can serve to increase demand, improve services, and decrease the possibility of default. • Payments based on operational variables. Payments per seat-kilometer or vehicle-kilometer are set at a fixed price for the number of kilometers ­traveled while providing the service. These payments depend not on demand but on the offer made by the concessionaire for the number of vehicles and seats used to provide the service. Therefore, they assure the operator stable ­revenue during the project term. This mechanism represents a risk to the quality of  131


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

A.16 Lessons learned from the business collaboration agreements in Singapore

10min
pages 179-186

partnership

5min
pages 188-190

A.13 Lessons learned for urban mobility in Port-au-Prince, Haiti A.14 Lessons learned from the TransOeste bus rapid transit project in

2min
page 175

C.4 Essential elements of an operation concession contract

2min
pages 192-195

A.15 Lessons learned from the business collaboration agreements in Medellín, Colombia

2min
page 178

Rio de Janeiro, Brazil

5min
pages 176-177

A.11 Lessons learned from the Metrobús-Q System in Quito, Ecuador A.12 Lessons learned from the Avanza Zaragoza concession in Zaragoza,

2min
page 173

Spain

3min
page 174

A.8 Lessons learned from the SYTRAL integrated public transportation system in Lyon, France

2min
page 170

A.9 Lessons learned from the DART Phase I bus rapid transit project in Dar es Salaam, Tanzania

3min
page 171

Cali, Colombia

2min
page 169

Acapulco, Mexico A.7 Lessons learned from the Metrocali bus rapid transit project in

3min
page 168

Monterrey, Mexico A.6 Lessons learned from the Acabús bus rapid transit project in

5min
pages 166-167

Mexico City, Mexico A.5 Lessons learned from the Ecovía bus rapid transit project in

3min
page 165

Bogotá, Colombia A.4 Lessons learned from the Metrobús bus rapid transit project in

5min
pages 163-164

A.2 Lessons learned from the Transantiago bus rapid transit project in Santiago, Chile A.3 Lessons learned from the TransMilenio bus rapid transit project in

3min
page 162

in Lima, Peru

5min
pages 160-161

11.2 Situations affecting economic equilibrium A.1 Lessons learned from the Metropolitano bus rapid transit project

2min
page 156

Economic and financial elements

2min
page 155

Institutional and regulatory elements

7min
pages 152-154

11.1 Remuneration arrangements and incentives

4min
pages 150-151

Technical elements

1min
page 149

Setting up subsidies

4min
pages 145-146

Funding sources

9min
pages 141-144

Private financing instruments

12min
pages 135-139

10.1 Summary of the World Bank Group’s instruments

2min
page 140

Structuring a project’s capital

4min
pages 131-132

Model 4: Private finance and operation of electric buses

2min
page 125

Model 1: Bundled private finance and operation of buses

1min
page 115

bundled or unbundled

2min
page 122

Topical bibliography

5min
pages 108-114

Macroeconomic risks

1min
page 101

Topical bibliography

4min
pages 96-100

7.13 International lessons for achieving quality and level of service

2min
page 89

7.8 International lessons for managing fare evasion and cash risk

2min
page 85

7.7 International lesson for managing affordability risk

2min
page 84

7.1 International lessons for acquiring land

2min
page 80

Planning

1min
page 79

6.5 International lessons for defining technology components

2min
page 77

6.2 International lesson for dealing with incumbent operators

2min
page 71

5.1 Categories and types of direct risk, organized by project stage

2min
page 63

5.2 Definition of direct project risks

2min
page 64

Dealing with incumbent operators

1min
page 69

Identifying project risks

2min
page 62

Overview and guiding principles

1min
page 61

Institutional and regulatory elements

2min
page 56

Fiscal capacity

2min
page 55

Implement punctual infrastructure-related interventions

2min
page 47

Technical elements

2min
page 54

Support private sector initiatives to promote user-friendly technologies

2min
page 46

References

4min
pages 50-53

References

3min
pages 43-45

and Tendering

2min
page 41

2.2 Examples of the objectives and restrictions of key stakeholders

2min
page 42

References

2min
pages 39-40

public or private

2min
page 31

1.2 A public-private partnership: Three reasons why

2min
page 36

Notes

2min
page 38

What is a public-private partnership in urban bus systems?

4min
pages 29-30

Notes

2min
page 24

References

0
pages 25-26

Further discussion

2min
page 37

Key Messages

5min
pages 22-23
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.