Portfolio 2013 - 2017

Page 1

YEH-SEN SU PORTFOLIO PROFESSIONAL

WORKS



SELECTED WORKS 2013-2017


Eason has designed successful and innovative projects for a range of luxury residential, institutional hospitality, landscape design, retail projects and culture projects in Taiwan, New York, and Shanghai. He has been project architect in SPAN Architecture New York since 2013. He has also been involved with young architectural designers exhibition in New York, the goal is to enhance communication between Eastern and Western design. Selected works explore the relationship between artistic expression,mass media and graphic culture that has flourished from the 1980s. Being fascinated by East and West artictic culture, we belong to a generation that perfectly knows how individual desires can become collective opportunities.


CONTENTS Professional Works 01. 150 CPS

page. 07-25

02. Gotham West

page. 26-45

03. CK Concept

page. 46-65

04. Pet Cemetary

page. 66-75

Others 05. Details

page. 78-85

06. Resume

page. 86-87



150 CPS REDEFINE ARCHITECTURAL SPACE


150 CENTRAL PARK SOUTH

OV E RVIEW

OW NE R

Withheld at Owners Request L OCAT IO N

New York City PA R T ICI PAT E AS

Project Architect

ARCHITECT SPAN Architecture, LLC

T EAM BlueSky, LLC ABS Engineering, LLC

S T R UCT U R AL EN GI N EER , M E P E N G I N EER ,

G ENE RA L CON T RAC TO R Silver Lining, Inc

8

The 7,500-square-foot, four-bedroom condominium includes four full bathrooms, two half bathrooms, large terraces, a spa, a 1500-square-foot terrace, and 2000-square attic space in front of central park. The main concept is to transform a storage space into residential penthouse. A clean, modern and serene aesthetic provides a haven in which this dynamic group can flourish. In addition, the visually stimulating, urban industrial landscape visible from the large bay windows of the main spaces created a desire for the office space to act as a simple background for the creative process. The minimalist approach to the furniture inhabiting the library, as well as the bookshelves surrounding the perimeter, add to the calm atmosphere. The communal and cavernous space of the library gives way to the organization of the various adjacent spaces, which are centered around the special requirements of various teams. Within this calm series of spaces and orderly arrangement of anchored functional elements with cross views through cut-outs in walls and overlapping corridors, enliven and energize the environment.


BUIL DIN G D E TA IL S SI Z E 7,500 Sq Ft P ROGRA M E L E ME N T S Master Bedroom Guest Bedroom (s) Library Living Room Dining Room Kitchenette Bathroom SPA Outdoor Terrace(s) Storage Room Private Elevator

9


View of Building Penthouse from Central Park RE N D E RI N G 10


11


AB OV E L E FT

Penthouse Section(North to South) Penthouse Section(West to East)

AB OV E RI G HT 12


13


AB OV E RIGH T

14

Building Exterior North Terrace


15


BE L OW RIGH T

16

View of Sky Walk Connection Corridor Detail Section


150 C

3/4" SOLID WOOD FLOOR, REFER TO FLOOR TYPES

A

T.O. FIN. 39TH FLOOR EL. 43'-10"

CURTAIN WALL HORIZONTAL MULLION, , REFER TO A-432 WINDOW DETAILS PROVIDE ALLOWANCE FOR ROLLER SHADE LUTRON ROLLER 200CW

11 B New T: (2

Cod

NEW DECK CONSTRUCTION WHERE REQUIRED SHALL BE 2 1/2" L.W. CONCRETE ON 1 1/2" - 18 GAGE LOK-FLOOR WITH W6X6 W2.0X2.0 WWF 1" BELOW TOP. REFER TO S-103.00 EXISTING BEAM, REFER TO S-103.00. W10X26, REFER TO S-103.00. W18X97, REFER TO S-103.00.

Stru

CURTAIN WALL EXTERIOR FACADE

121 W

5/8" GYPSUM WALL BOARD

MEP

39 W CURTAIL WALL VERTICAL MULLION, REFER TO A-432 WINDOW DETAILS

Faca

FIN. CLG. 38TH FLOOR EL. 40'-4 3/4"

PROVIDE ALLOWANCE FOR SPOT LIGHTING EKLIPSE MINI LED SPOT

Elev

PROVIDE ALLOWANCE FOR HVAC DIFFUSER

30

PROVIDE ALLOWANCE FOR COVE LIGHTING

Own

3

DETAIL SECTION - 39TH FLOOR CURTAIN WALL SILL 1 1/2" = 1'-0"

UNFACED FIBERGLASS OR MINERAL WOOL INSULATION (EQUAL TO DEPTH OF CAVITY) IN 7/8" MTL. STUDS 16" 0.C., TYP. CURTAIN WALL EXTERIOR FACADE

CURTAIN WALL VERTICAL MULLION

(2) LAYERS 1/2" GYPSUM WALL BOARD (1) LAYER 3.2MM AUDIMUTE PEACEMAKER FOR NOISE REDUCTION

© COP

Drawing remain project not. Th or Gene addition project and app

(1) LAYER 1/2" GYPSUM WALL BOARD (1) LAYER 3.2MM AUDIMUTE PEACEMAKER FOR NOISE REDUCTION

(1) LAYER 1/2" GYPSUM WALL BOARD 3/4" SOLID WOOD FLOOR, REFER TO FLOOR TYPES

NEW DECK CONSTRUCTION WHERE REQUIRED SHALL BE 2 1/2" L.W. CONCRETE ON 1 1/2" - 18 GAGE LOK-FLOOR WITH W6X6 W2.0X2.0 WWF 1" BELOW TOP. REFER TO S-102.00

T.O. FIN. 38TH FLOOR EL. 27'-6 3/4"

CURTAIN WALL HORIZONTAL MULLION, REFER TO A-432 WINDOW DETAILS MC12X31 AT BASE OF CURTAIN WALL, REFER TO S-102.00. STEEL OUTRIGGERS FOR CURTAIN WALL SUPPORT, REFER TO S-102.00. DEAD LOAD ANCHOR AT NEW STRUCTURAL STEEL, REFER TO STRUCTURAL DWGS FOR SIZES. EXISTING BEAM, REFER TO S-102.00. METAL CLOSURE PANEL FILLED WITH INSULATION, REFER TO A-432 WINDOW DETAILS. C10X20, REFER TO S-102.00.

W16X67, REFER TO S-102.00.

EXISTING BEAM, REFER TO S-102.00.

01

0

No.

1

SCALE:

DETAIL SECTION - 38TH FLOOR CURTAIN WALL SILL

DATE: PAGE:

1 1/2" = 1'-0"

JOB INFO

17


N 2.16 1

A310

C26

N 2.14

N 2.15

C11

1H

C11

C

C15 8'-0 3/8" C.O.

C43

EXISTING WAT

C16 C44

C18

STAIR 2.11

C15

C16

C28

U P

CONSTRUCTION - (FILING) C7

C8

C44

C11

6'-0" C.O.

W 2.13

1 A451

LIVING ROOM 2.07

1F 1A

NEW SHOWER; SEE PLUMBING SCHEDULE, SHEET G-004.

C5

NEW TUB; SEE PLUMBING SCHEDULE, SHEET G-004. W 2.12

C30

5'-11 7/8" C.O. NEW ROOF DRAIN IN EXISTING LOCATION; REFER TO PLUMPING DRAWINGS. C44 C7

C6

NEW KITCHEN SINK; SEE PLUMBING SCHEDULE, SHEET G-004.

C31

C7

NEW SPRINKLER HEAD SMOKE/ CARBON MONOXIDE DETECTOR HARDWIRED AND INSTALLED IN ACCORDANCE WITH LL 7/04.

C32

C8

NEW SMOKE BAFFLE 18" FROM CEILING

C33

NEW KEMPER ROOFING SYSTEM OVER EXISTING OR NEW STRUCTURE, PROVIDE PAVERS ON PEDESTALS SYSTEM; REFER TO ROOF DETAILS C16 EXISTING BUILDING FIRE TANK TO REMAIN. 204 C1

C9

C11

C27

A411 EXISTING BUILDING PIPING TO REMAIN; REFER TO PLUMPING DRAWINGS.

C28

EXISTING WATER TANK TO REMAIN.

C29

C7 AS REQ'D. EXISTING DECORATIVE PRECAST PEDESTALS AT ROOF TO REMAIN. PROTECT

REFER TO DIVISION 1 OF SPEC MANUAL FOR GENER

D N

2

ELEVATOR 0.00

A440

1F

203 C24

1A NEW PRECAST COPING STONE; REFER TO ROOF TERRACE DETAILS.

C34

NEW SPIRAL STAIR FOR ROOF ACCESS.

NEW DOOR & FRAME, SEE DOOR SCHEDULE, SHEET A-420.

C35

C11

NEW WINDOW IN NEW OPENING; SEE WINDOW SCHEDULE, SHEET A-430.

C36

NEW APARTMENT FIRE TANK, REFER TO MEPC6 DRAWINGS. WET BAR NEW FLOOR STRUCTURE; REFER 2.12 TO STRUCTURAL DRAWINGS.

C12

NEW WINDOW IN EXISTING OPENING; SEE WINDOW SCHEDULE, SHEET A-430.

C37

NEW ROOF HATCH.

C13

NEW MILLWORK - SEE MILLWORK DRAWINGS.

C38

EXISTING BUILDING HOISTWAY TO REMAIN.

C14

NEW GLASS ENCLOSED HOME ELEVATOR; REFER TO SHEET A-440

C39

PLUMPING OFFSET; REFER TO PLUMPING DRAWINGS. C1

C15

EXISTING STRUCTURAL COLUMNS TO REMAIN, PROTECT DURING COURSE OF CONSTRUCTION.

C40

POWDER ROOM 2 2.06 NEW ROOF DRAINS BELOW PEDESTALS SYSTEM; REFER TO PLUMBING DRAWINGS.

C16

NEW STRUCTURAL COLUMNS/ POSTS; REFER TO STRUCTURAL DRAWINGS.

C41

EXISTING ROOF CHIMNEY C11 TO REMAIN, REPOINT AS REQ'D.

C17

NEW RESIDENTIAL ELEVATOR W/ CUSTOM CAB INTERIOR IN RATED SHAFT CONSTRUCTION. PROVIDE ALL NECESSARY FRAMING & SUPPORT.

C42

NEW GAS FIREPLACE; REFER TO MEP DRAWINGS.

C18

EXISITNG ELEVATOR CONTROL PANEL TO REMAIN.

C43

C19

NEW APARTMENT STAIR WITH HANDRAILS.

C20

NEW DUCTWORK; REFER TO MEP DWGS.

C45

NEW GLASS AND STEEL WALKWAY - SEE DETAILS. S 2.10 NEW FRAMELESS GLASS RAILING, 36" AFF - SEE DETAILS. C40 C31 NEW MASONRY PARAPET W/ COPING STONE; REFER TO ROOF DETAILS.

C21

MECHANICAL UNIT, REFER TO MEP DRAWINGS.

C46

NEW BOILER FLUE OFFSET BELOW ROOF TERRACE + APT. FLOOR; REFER TO ROOF/ FLOOR DETAILS.

C22

NEW FRAMELESS GLASS RAILING, 42" AFF - SEE DETAILS.

C23

NEW FIRE EGRESS STAIR WITH GUARDRAILS.

C24

NEW ELEVATOR DOOR; SEE DOOR SCHEDULE, SHEET A-420.

C25

NEW EXHAUST GRILLE; REFER TO MECHANICAL DRAWINGS

1

C3

FIRE-STOP ALL PENETRATIONS THROUGH THE FLOO C45

ALL DEMISING WALLS SHALL BE 2-HR RATED CON ISOLATION, TYP. PROVIDE FIRESTOPPING AS REQUIRED

C15 C2

C40

C11

FOR ALL WALL AND CEILING MTD. ACCESS PANEL

S 2.09

CABINETRY SHOWN IS FOR REFERENCE ONLY. SEE C31

GENERAL CONTRACTOR IS TO SUBMIT SHOP DRAW STONEWORK, CUSTOM FABRICATIONS, ETC.

1C

1H

3 PROTECT ALL EXISTING WINDOWS MARKED TO REM

14 PROTECT EXISTING FLUES, ENCLOSURES & ALL ASS

TAKE CARE TO NOT DAMAGE EXISTING EXPOSED C C22

PROVIDE WATERPROOFING THROUGHOUT BATH AN

SOUND PROOFING AS REQ'D IN CHAPTER 12 ARTIC C45

ALL WALLS AND CEILINGS TO RECEIVE LEVEL 5 FI

C22

C33

DIMENSIONS ARE SHOWN TO FINISH FACE OF WAL

REFER TO ENLARGED PLANS AND DETAILS FOR CR

2

C44

A450

S 2.11

A308

C10

A411

C11

11

C13

VERIFY EXISTING ELECTRICAL PANEL 1E LOCATIONS A METERING ELECTRICAL FOR CONSTRUCTION. HALLWA 2.05 PRIOR TO ORDERING AND INSTALLATION OF ALL PL REFER TO FIXTURE MANUFACTURER SPECIFICATIONS F

INFORM ARCHITECT OF ANY DISCREPANCIES IN PLA S2 REFER TO SPECIFICATIONS FOR EXACT DOOR HARD ARE TO BE NO EXCEPTIONS TO THIS REQUEST. IF ANY ARCHITECT IMMEDIATELY.

1C

EXISTING FPSC DOOR & FRAME TO REMAIN.

C10

1H

GC TO SURVEY EXISTING SPACES AND ALL EXISTIN DISCREPANCIES ARISE, GC TO CONTACT ARCHITECT IM C16 VERIFY AND CONFIRM ALL EXISTING WASTE STACK WATER SUPPLY LINES PRIOR TO START OF WORK.

1F

6'-0" C.O.

C4

C26

EXISTING ELEVATOR MOTOR TO REMAIN.4

C17

C3

C2

STONE TOLERANCES SHALL CONFORM TO JOINTS

CONSTRUCTION PLAN - 38TH FLOOR 1/4" = 1'-0"

38th Main Floor Plan 39th Masters Floor Plan 1

A450

LOWE R

LINE OF CLEAR HEAD HEIGHT 8'-0" AFF

1E

NEW APPLICANCE; SEE EQUIPMENT SCHEDULE, SHEET G-004. C40 NEW TOILET; SEE PLUMBING SCHEDULE, SHEET G-004. C33 C31 NEW LAVATORY; SEE PLUMBING SCHEDULE, SHEET G-004.

C1

UP P E R

C20

C19

C22

1

C16

C22 C29

1

A450

C30

N 2.15

N 3.05

C11

C11

WET BAR 3.07

C13

1H

3'-0"

307

3'-0"

MASTER BEDROOM 3.08

C13

C15

C10

3'-0"

A440

W 3.03

306

C13

POWDER ROOM 3.05

305 1F

C3

C16

304 1F

6

HALLWAY 3.04

C24

A411

A314

C2 C10

5'-4 3/8"

1A

D N C10

10

1F

C17 ELEVATOR 0.00

C11

C32

C1

1F

STAIR 3.06

C20

C15

C6 3

C13

C19

LINE OF CLEAR HEAD HEIGHT 8'-0" AFF

C27

1E

C13

C11 1A

W 3.04

A314 C1

C13

C13

11

1A

1H

5'-0"

1H

C16

S2 1C

1H

1H

C11

2

A411

S 2.10

1

18

CONSTRUCTION PLAN - 39TH FLOOR 1/4" = 1'-0"

C15

1

A316

1

A315


Tel. (212) 317-2361 Facade Consultant

AMODAL INC. 7168 Overbrook Drive Niwot, CO 80503 Tel. (720) 314-5154

Elevator Consultant

Vertical Systems Analysis 307 West 36th Street, 8th Fl New York, NY 10018 Tel. (212) 989-5525

Owner

1

A306

C26

C38

N 2.01

C15

N 2.02

C11

3D

TER TANK ROOM

C11

Yellow Stones Road LLC C/O Guy Bluchman 7 Beechwood Ln Scarsdale, NY 10583

1H

C13

C15 1E

C18

© COPYRIGHT SPAN ARCHITECTURE, 2015

C13 FAMILY ROOM 2.01

Drawings, as instruments of services, are and shall remain the property of the Architect, whether the project for which they are made is executed or not. The drawings shall not be used by the Owner or General Contractor for other projects, for additions to this project, or for completion of this project by others, except by agreement in writing and appropriate compensation to the Architect.

1 A452

C11 E 2.03

C42

1E

C33

M07

U P

C27

RAL CONDITIONS AND GUIDELINES. C27

C46

LINE OF CLEAR HEAD HEIGHT 8'-0" AFF

5

C10

A410

COORDINATE CONSTRUCTION OPERATIONS TO ASSURE EFFICIENT AND ORDERLY INSTALLATION OF EACH PART OF THE WORK. COORDINATE CONSTRUCTION OPERATIONS THAT DEPEND ON EACH OTHER FOR PROPER INSTALLATION, CONNECTION, C23 C13 AND OPERATION. SCHEDULESTAIR CONSTRUCTION OPERATIONS IN THE SEQUENCE REQUIRED TO OBTAIN THE BEST RESULTS WHERE C10 INSTALLATION OF ONE PARTM2.01 OF THE WORK DEPENDS ON INSTALLATION OF OTHER COMPONENTS, BEFORE OR AFTER ITS OWN DINING ROOM INSTALLATION. COORDINATE INSTALLATION OF DIFFERENT COMPONENTS TO ASSURE MAXIMUM ACCESSIBILITY FOR REQUIRED

C40

C22

D N

NG BASE BUILDING SERVICES PRIOR TO CONSTRUCTION. iF ANY MMEDIATELY. C16 1EWELL AS KS, VENT STACKS, GAS LINES, VENTILATION DUCTS, AS

C31

2.02 MAINTENANCE, SERVICE AND REPAIR. MAKE PROVISIONS TO ACCOMMODATE ITEMS SCHEDULED FOR LATER INSTALLATION. 2 A410 DINING ROOM 202 BEFORE CONSTRUCTION, VERIFY THE LOCATION AND POINTS OF CONNECTION OF UTILITY SERVICES. LOCATE WORK AND COMPONENTS ACCURATELY, IN CORRECT ALIGNMENT AND ELEVATION. MAKE VERTICAL WORK PLUMB AND HORIZONTAL 1 WORK LEVEL. CONCEAL PIPES, DUCTS, AND WIRING IN FINISHED AREAS UNLESS OTHERWISE INDICATED. A308

AND SERVICE PRIOR TO START OF WORK. GC TO PROVIDE MEANS OF

AY

LUMBING AND KITCHEN FIXTURES, GENERAL CONTRACTOR SHALL FOR SPECIFIC ITEM REQUIREMENTS AND CONFIGURATIONS (TYP).

C11

WOODWORK: THE QUALITY STANDARDS OF THE ARCHITECTURAL WOODWORK INSTITUE, "QUALITY STANDARDS C13 C16 ILLUSTRATED" LATEST EDITION, SHALL APPLY TO ALL WORKMANSHIP FOR ARCHITECTURAL WOODWORK. ALL WORK SHALL CONFORM TO "PREMIUM" GRADE REQUIREMENTS OF THE AWI STANDARDS. ALL HINGES & SLIDERS TO BE SELF-CLOSING, SOFT CLOSE UNLESS OTHERWISE NOTED. KITCHEN 4A C1 2.03 GLASS/ GLAZING: COMPLY WITH PUBLISHED RECOMMENDATIONS OF GLASS PRODUCT MANUFACTURERS AND ORGANIZATIONS BELOW UNLESS GOVERNING AUTHORITIES OR THE BUILDING MANAGEMENT REQUIRE C6 MORE STRINGENT 6 REQUIREMENTS: A308 - GANA PUBLICATIONS, "GANA'A "GLAZING MANUAL" C6 - SIGMA PUBLICATIONS, SIGMA TM-3000 "VERTICAL GLAZING GUILDELINES FOR SEALED INSULATING GLASS UNITS" PANTRY 2.04 GYPSUM DRYWALL: 1. COMPLY WITH PUBLISHED GYPSUM DRYWALL CONSTRUCTION HANDBOOK, LATEST EDITION, US C15 RECOMMENDATIONS OF THE201 C13 GYPSUM CO. AS WELL AS ASTM C645, A568, C1396, C475, C840, C919, C954, C1002, C754, C1178, C1278.

ANS OR UPON FIELD VERIFICATIONS (TYP). 2.08 DWARE. G.C. TO SUBMIT SAMPLES PRIOR TO INSTALLATION. THERE Y PROBLEMS ARISE SECURING SPECIFIED ITEMS, G.C. SHALL NOTIFY 1 A309

OR SLAB & RATED CONSTRUCTION, WHERE APPLICABLE.

NSTRUCTION AND SHALL BE LINED IN BATT INSULATION FOR SOUND D TO MEET NYC CODE LOCATIONS, REFER TO ENLARGED PLANS AND ELEVATIONS.

1 A211

150 CENTRAL PARK SOUTH, NEW YORK

E 2.04

Architecture

C1

11 Broadway, Suite 1500 New York, NY 10004 T: (212) 732-7012

2.C11 ALLOWABLE TOLERANCES AREC13 1/32" OFFSETS BETWEEN PLANES OF BOARD FACES, AND 1/16" IN 8'-0" FOR PLUMB, DW SLEVEL, 2.07 WARP, AND BOW.

MILLWORK DRAWINGS FOR CONFIGURATIONS AND DIMENSIONS.

INSTALL ALL STONE & TILE C1MATERIAL APPLICABLE 4AIN ACCORDANCE WITH THE RECOMMENDATIONS CONTAINED IN THE HANDBOOK FOR CERAMIC TILE INSTALLATION FOR CERAMIC TILE OF THE TILE COUNCIL OF AMERICA INC, LATEST EDITION. 4B 3D JOB SITE, SUBMIT SAMPLE PANELS APPROX. 12"X12" MOUNTED ON BEFORE ANY STONE OR TILE IS DELIVERED TO THE HARDBOARD BACK UP WITH SELECTED GROUT COLOR FOR EACH COLOR AND PATTERN C11OF STONE OR CERAMIC TILE.

WINGS FOR APPROVAL OF ALL MILLWORK, CABINETRY, COUNTERTOPS,

MAIN, WINDOW CONTROLS & RADIATORS VALVES AS ALL TIMES.

Code Consultant

1H

C11

SOCIATED EQUIPMENT, MARKED TO REMAIN. S 2.06

COLUMNS, STAIRS OR STUCTURE TO REMAIN (WHERE APPLICABLE).

ND KITCHEN. SEE DETAILS.

C46

C31

C22

FIRE RATED PARTITION

1

1

A213

RITICAL LAYOUT DIMENSIONS.

New York, NY 10007 SPAN Tel. (212) 791-4578 Issued For By Fax (212) 513-0637

38TH FLOOR CONSTRUCTION New York, NY 10001 PLAN

NEW PARTITION

C33

Date

BlueSky Design, Inc. 121 West 27th Street, Suite 904

EXISTING PARTITION TO REMAIN

A450

LL, TYP, UON.

06/06/16 DOB 12/21/15 FILING SET DEMOLITION SET

Structural Engineer

C40

INISH. PREPARE AS REQ'D.

299 Broadway, Fl 04/29/16 PRELIM. PRICING SETFifth SPAN

01 No.

S 2.05

C31

CLE 9 OF THE NEW YORK CITY BUILDING CODE, AND IN THE OAA.

WVA, LTD

02

Tel. (646) 230-9900

SCALE:

MEP Engineer

OF 1/16" AND OFFSETS THAT DO NOT EXCEED PLUS OR MINUS 1/32".

ABS Engineering, PLLC. 06/06/16 39 West 29th Street, Suite 304 A-112.00 New York, NY 10001 Tel. (212) 317-2361 JOB INFO: DATE: PAGE:

1326

Facade Consultant

AMODAL INC. 7168 Overbrook Drive Niwot, CO 80503 Tel. (720) 314-5154

Elevator Consultant

Vertical Systems Analysis 307 West 36th Street, 8th Fl New York, NY 10018 Tel. (212) 989-5525

C33

C29

Owner C30

Yellow Stones Road LLC C/O Guy Bluchman 7 Beechwood Ln Scarsdale, NY 10583

C31 1

A312 N 3.06

C11

C27

N 2.01

C11

3D

C5

EXISTING FIRE TANK ROOM

3D

© COPYRIGHT SPAN ARCHITECTURE, 2015 Drawings, as instruments of services, are and shall remain the property of the Architect, whether the project for which they are made is executed or not. The drawings shall not be used by the Owner or General Contractor for other projects, for additions to this project, or for completion of this project by others, except by agreement in writing and appropriate compensation to the Architect.

4A

C15

301 4C

TOILET 3.02

C15

C27

4A

C16

C10

E 3.01

3D

MASTER SHOWER 3.03

C23

C3

U P

U P

MASTER BATHROOM 3.01

4C

STAIR M3.01 4 A410

C11

C3

A410

D N

C10

C21

6

M08 1E

A410

LINE OF CLEAR HEAD HEIGHT 8'-0" AFF

C2

4A

4

C10

1E

303

2 A410

1 A211 C11

C4 302 C16

C13

C13

E 3.02

LINE OF CLEAR HEAD HEIGHT 8'-0" AFF

2.08 1C

1H

C11

1H

C15 S 2.06

02

04/29/16 PRELIM. PRICING SET

SPAN

01

06/06/16 DOB 12/21/15 FILING SET DEMOLITION SET

SPAN

1

A213

No.

Date

Issued For

By

39TH FLOOR CONSTRUCTION PLAN SCALE: DATE: PAGE: JOB INFO:

06/06/16

A-113.00

1326

19


AB OV E RIGH T

20

38th Floor Main Living Room Slanted Pocket Door Detail


EXISTING ENCASED STEEL BEAM; REFER TO STRUCTURAL DRAWINGS

HVAC DIFFUSER, REFER TO MEP DRAWINGS LINE OF EXISTING STRUCTURE BEHIND; REFER TO STRUCTURAL DRAWINGS

1/2" ACCOUSTICAL CHAULKING, TYP.

FIN. CEILING 38TH FLOOR EL. 40'-4 3/4"

COVE LIGHTING, SEE DETAIL; REFER TO LIGHTING SCHEDULE FOR TYPES

(2) 3/4" LAYERS DOW CORINING VACUUM INSULATED PANEL (VIP)

(1) 5/8" LAYER GYPSUM WALL BOARD

EXISTING CONCRETE WALL

1 EXISTING COPPER ROOF PANEL

LINE OF COPPER ROOF BATTEN BEYOND

ALIGN

NEW SLOPED SLIDING DOOR, REFER TO WINDOW TYPES & SCHEDULE

2

A452 STAINLESS STEEL METAL HANDRAIL CAP

NEW SLOPED SLIDING DOOR, REFER TO WINDOW TYPES & SCHEDULE NEW LED LIGHT FIXTURE; SEE LIGHT SCHEDULE

NEW STONE PAVERS ON ADJUSTABLE PEDESTAL SYSTEM, REFER TO FINISH SCHEDULE NEW KEMPER ROOFING AS REQUIRED

5/8" LAMINATED SAFETY GLASS RAILING IN ALUMINUM SHOE, CR LAURENCE OR EQ, CAULK AND FLASH AS NECESSARY.

T.O. FIN. 38TH FLOOR

EL. 27'-6 3/4"

NEW PRECAST STONE COPING

WALL CAP FLASHING AS REQ'D.

SUM WALL BOARD

NEW 12" THICK BRICK WALL NEW LIGHT-GAGE STUD WALL, REFER TO STRUCTURAL DRAWINGS

NSULATION

RIGID INSULATION BOARD

CORINING VACUUM P)

(2) LAYERS OF WATERPROOF PLYWOOD

ER TO STRUCTURAL 3/4" DIAM. ST. STL ROODS 2'-0" O.C.,

NTO EXISTING

NEW FILLER BLACK WITHIN BEAM

F PANEL BATTEN BEYOND

DOOR, REFER TO SCHEDULE

NEW EXTERIOR WALL PAINT TO MATCH EXISTING WALL AS REQ'D. BO. 38TH FL. LOWER LEVEL EL. 24'-2 1/2"

NEW BRICKS TOOTH INTO EXISTING BRICKS

1

S

DETAIL SECTION - 38TH FLOOR EAST TERRACE & NEW SLIDING DOOR

D

P

1 1/2" = 1'-0"

J

21


22


TOP LEF T M IDDL E L E F T B OTTOM L E F T R IGH T

Dining Room Master Bedroom Master SPA Master Bathroom

23


View of Central Park from Terrace RE N D E RI N G 24


25



GOTHAM WEST VOID AS SPACE


GOTHAM WEST OW NE R

Gotham Organization L OCAT IO N

New York, New York PA R T ICI PAT E AS

Design Team

OVE RVIE W Gotham West, located on West 45th Street in Manhattan, transforms a previously condemned block in Hell’s Kitchen into one of the largest residential developments in Manhattan in decades. The project demonstrates that complex, large-scale affordable housing developments are difficult, but also still possible in New York. The $520 million project has 1,258 apartments in four buildings, including 556 market-rate rentals in a 31-story tower that will help pay for the affordable units and generate $20 million for affordable housing elsewhere in the city.

S ITE / CO N T E X T In 1975, just as New York City was spiraling toward a fiscal collapse, it condemned most of a square block of warehouses, factories and stables in Hell’s Kitchen for a housing development. Thirty-seven years later, the site on West 45th Street is at last transformed into one of the largest residential developments in Manhattan in decades, following years of tenacious community lobbing for “affordable” housing.

28


BUIL DIN G D E TA IL S SI TE 150 W 45th St STO R IE S 32 Floors UNI T S 1,258 P ROGRA M E L E ME N T S Fully Landscaped Courtyard 2nd Floor Roof Deck with Fireplace 32nd Floor Sky Terrace Business Center Game Room Curated Art Gallery with Rotating Exhibits Fully-equipped Demonstration Kitchen Playroom and Outdoor Playground Health Club with Cycling and Yoga Studio

29


Main lobby entrance with view toward the reflection pool Ab ove 30


31


Elevator Cab Detail (top) & Corridor (bottom) R I GH T Void Space LEF T

32


33


A B OVE R IG HT

34

Interior looking towards Skylight Terrace looking towards Skylight


35


AB OV E RIGH T 36

Outdoor Deck & Stair Section Axonometric Model


37


LE F T

Fireplace Detail

RIGH T

Main Amenity Lounge

EXISTING STRUCTURE BY OTHER, VERIFY W/ BLDG ARCHITECT

LIGHT COVE AND FIXTURE, SEE RCP

FINISHED WOOD CEILING, SEE RCP

38 AILS - FIREPLACE/STAIR

7'-7"

V.I.F.

7'-7"

V.I.F.

LIGHT WT. CONCRETE PANEL ON CLIPS PER CONCRETE MANF.

PROVIDE STEEL STUD FRAMING FROM UNDERSIDE OF EXISTING SLAB AS REQ'D PER STRUCTURAL ENGINEER

CUSTOM FIREPLACE HOOD, SMOKE CHAMBER AND FLUE, SEE FIREPLACE DWGS

3'-6"

1/2" THICK METAL LINING FOR LINTEL

V.I.F.

10 1/2"

5 1/2"

1/2" THICK METAL LINING FOR HEARTH LIGHT WT. CONCRETE PANEL FINISHED FLOOR, SEE FINISH SCHEDULE

EXISTING STRUCTURE BY OTHER, VERIFY W/ BLDG ARCHITECT

4

SECTION DETAILS - FIREPLACE/STAIR 3/4" = 1'-0"


39


Main lobby with lounge and fireplace 40


41


To the east of the 31-story tower lies another one of the Gotham West buildings with its own entrance and amenity spaces. The scale of these spaces is much smaller than that of the large lounge, but the focus on using local fabricators and artists remains. We worked with New York based stone and wood workers to develop new furniture pieces, a banquette, a table and a console. Gilded and matte surfaces blend to create varied textures throughout the space. A silver leafed ceiling and a shell mosaic wall are paired with blackened steel and grey wood to align with, yet not mimic, the aesthetic developed in the larger building.

RIGH T 42

31th Floor Entry


43


View from terrace lounge looking down onto courtyard.

44


45



CK LIGHT & SALON


CALVIN KLEIN CONCEPT STORE OW NE R / C LI EN T

Calvin Klein, Inc. L OCAT IO N

Forum 66, Shenyang, Liaoning, China PA R T ICI PAT E AS

Project Architect

CO L L E C T IO N CON C E P T We began our concept design with a reverence for the original architecture intents of the Calvin Klein Collection stores. That architecture expressed a luxury that was at once discreet and sensual. Calvin Klein Collection has developed a serene and prismatic vocabulary of signature elements: niches, case goods, and lighting that are immediately identifiable with the brand. It was our intent to “evolve” this iconic language into a new paradigm. We proposed a twofold design strategy: firstly, we proposed a new spatial element in the form of a “salon” that acts s both bridge and filter between the programmatic elements of the store. Secondly, we proposed the merging of many of the original “details” and elements into a series of “regulating lines” that are both iconic and flexible.

48


BU IL D IN G D E TA IL S S IZ E 165 M TY PE Free Standing Store in Shopping Mall

PR OGRA M E L E ME NTS Main Salon Changing Room Storage Checkout

49


LE F T RIGH T

Lighting Detail Salon Concept

Marina Bay Sands Singapore

10MM THICK TOP PLATE WELDED TO STRUCTURAL STEEL TUBE SOFFIT FRAME AND FASTENED INTO STRUCTURAL CONCRETE SLAB WITH RIGID CONNECTION

11 Broadway, Suite 1500 New York, NY 10004 T: (212) 732-7012 PROVIDE DIAGONAL BRACING @ SOFFIT FRAMING AS REQUIRED

Calvin Klein Creative Services Store Planning 218 West 40th Street, 8th Floor New York, NY 10018 T: (212) 478-8766

ADJUSTABLE RECESSED CERAMIC METAL HALIDE DOWNLIGHT. SEE LIGHTING SCHEDULE.

75MM X 75MM X 5MM STRUCTURAL STEEL TUBE FRAME FASTENED INTO STRUCTURAL CONCRETE SLAB ABOVE WITH RIGID CONNECTION FIN. CLG. EL. +3965MM

56

º

75MM X 75MM X 5MM STRUCTURAL STEEL TUBE L-SHAPED FRAME W/ MITERED BEND FASTENED INTO STRUCTURAL STEEL BRACED FRAME W/ RIGID / MOMENT CONNECTION.

ALIGN

20MM HAT CHANNEL STRAPPED TO CHICAGO BAR SUSPENDED CEILING SYSTEM FIN. CLG. EL. +3800MM

146º OUTSIDE CORNER BEAD

ALIGN W/ TOP OF TYPICAL LIGHT SLOT POCKET

LIGHT GAUGE STEEL STUDS (TYP) 20MM STRUCTURAL PLYWOOD SHEATHING L3 FLUSH-MOUNT FLUORESCENT LIGHTING STRIP SET OUTSIDE VIEW ALONG KNIFE EDGE BOUNDARIES.

150

GWB W/ LEVEL 5 FINISH OVER LIGHT GAUGE METAL STUDS (TYP)

90

L3 FLUSH-MOUNT FLUORESCENT LIGHTING STRIP SET OUTSIDE VIEW ALONG KNIFE EDGE BOUNDARIES.

© COPYRIGHT SPaN, 2013

146º OUTSIDE CORNER BEAD

215

34.0 0°

Drawings, as instruments of services, are and shall remain the property of the Architect, whether the project for which they are made is executed or not. The drawings shall not be used by the Owner or General Contractor for other projects, for additions to this project, or for completion of this project by others, except by agreement in writing and appropriate compensation to the Architect.

34º KNIFE EDGE OUTSIDE CORNER BEAD (TYP, SOFFITS) MAXIMUM 1MM RADIUS

B.O. SOFFIT

305

EL. 2200MM

305

25MM X 25MM POLISHED STAINLESS STEEL SOFFIT-MOUNTED GARMENT ROD W/ SHARP CORNERS SLIPPED OVER 1WALL MOUNTED STEEL POSTS AND BASE PALTES .SET BASE PALTES AND FASTENERS BENEATH GWB .FASTENED WITH STAINLESS STEEL SPANNER HEAD COUNTERSUNK MACHINE SCREWS ON SIDE FACING AWAY FROM STORE SPACE WIRE BRUSH TOP FACE OF GARMENT ROD (TYP) T.O.BAR EL. 1700MM

SINGLE LEG REVEAL REGLET TO PROVIDE 3MM REVEAL BETWEEN GWB WALL AND STONE BASE PROVIDE PLYWOOD BLOCKING BETWEEN STUDS AS REQUIRED FOR BASE TRIM SUPPORT. POLISHED 20MM THICK MANUFACTURED STONE FLOOR ON MUDSET OVER BASE BUILDING STRUCTURAL CONCRETE SLAB T.O.F.F. EL. 0MM

2

9/30/13 BULLETIN #1

SPAN

1

7/31/13 LANDLORD REVIEW

SPAN

No.

T.O.S.

Date

Issued For

By

EL. -100MM V.I.F.

TYPICAL STORE DETAILS

50

SCALE: DATE:

DETAIL - AT GARMENT NICHE

PAGE:

1:25 07/31/2013 8 OF 10

A-500.00


51


52


Main Salon

53


A SAL ON

A Salon is defined as a gath one another and partly to re conversation and display. T in France throughout the 17 educated patron.

Our design embeds this con elements of the entire collec takes the form of a series o through the center of the st scrims, fixtures and furnitur also creates a semi-permea accessories.

AB OV E RIGH T

54

Changing Room Accessories Display


hering of people under the roof of an inspiring host, held partly to amuse efine taste and increase their knowledge of the participants through The salon was an Italian invention of the 16th century, which flourished 7th & 18th centuries, often galvanized by the presence of a beautiful and

ncept at the store’s center. It allows us to create a curated space where ction can exist in a more intimate environment. Architecturally the salon of blackened steel ribs that repeat at different dimensions and intervals ore. The interior is populated with an almost residentially scales series of re shapes that invite close inspection of the items displayed. This salon able filter separating the men’s and women’s collection, as well as the

55


TH E FIL TER

We have also tried to ca of the new elements tha in the current store desi were interested in devel monolithic lit plane at th as a device to animate w conceived as a mere ter band of light has a magn of pedestrian traffic, esp over-crowded visual reta mediate this back band the salon concept to fram the lit back plane. The s sophisticated social and a visual filtering device compelling view into the

As a supporting feature developed a more opaqu that focuses visual activ band. We put forward m counterpoint to the edgi scrim/frame structure of

The lighting scheme, as supports the salon filter above. These lines also what tends to be a very at the typical store ceilin

AB OV E RIGH T

56

Salon Salon Sportswear


arefully evolve some at work successfully igns. In particular, we loping the idea of the he back of the store what is usually only rminus. This back netic effect in terms pecially in a typically ail environment. To of light, we have used me, filter, and highlight salon, then, is at once a d sales space, as well as providing a nuanced and e store.

to this idea, we ue storefront system vity on the central steel marble as a classical er, more contemporary f the interior.

s a regulating lines, scheme developed serve to help unclutter complicated visual ng. Finally, we have

57


LE F T

3MM THICK POLISHED STAINLESS STEEL WALL CAP. PROVIDE 5MM REVEAL BETWEEN CAP AND GWB

Salon Light Cove Detail Entry Display Window

RIGH T

CENTER PIVOT DOOR CLOSER BELOW SET MANUFACTURERS COVERPLATE IN CARPET PAD THICKNESS BENEATH CARPET.

50MM THICK SOLID CORE DOOR WITH MATTE LACQUER FINISH SEE FINISH SCHEDULE

DOOR PULL (TYP) SEE DOOR HARDWARE SCHEDULE ALIGN

FAUX LEATHER WRAPPED WALL PANELS ON Z-CLIPS OVER PLYWOOD WALL SHEATHING SEE FINSH SCHEDULE

BLOCKING AS REQUIRED

3MM THICK POLISHED STAINLESS STEEL FRAME

THREADED ROD WELDED TO MIRROR POLISHED STAINLESS STEEL FRAME AND FASTENED INTO SOLID BLOCKING FAUX LEATHER WRAPPED WALL PANELS ON Z-CLIPS OVER PLYWOOD WALL SHEATHING SEE FINSH SCHEDULE

ALIGN 230

FIN. CLG.

ALIGN

230

P3

T.O LIGHT COVE. +4020MM

P2

P2

P3

STAGGERED STRIP FLUORESCENT LUMINAIRE SEE LIGHTING SCHEDULE

65

120

0° 34.0

34.0 0°

TAPE-IN FLANGE P3

P3

P2

200

120

P2

200

50

120

EL. +3000MM 65

FIN. CLG.

ALIGN

210

PAINTED GWB CEILING WITH LEVEL 5 FINISH OVER BLACK IRON SUSPENSION SYSTEM TANGENT FIN CUSTOM KNIFE EDGE PROFILE AND LIGHT POCKET SEE WALL DETAILS A-500.00 MAXIMUM 1MM RADIUS

FIXED TRANSOM PANEL W/ MATTE LACQUER FINISH CENTER HUNG TOP PIVOT SEE DOOR HARDWARE SCHEDULE 3MM THICK POLISHED STAINLESS STEEL FRAME 50MM THICK SOLID CORE DOOR WITH MATTE FINISH CENTER PIVOT DOOR CLOSER BELOW SET SEE FINISH SCHEDULE MANUFACTURERS COVERPLATE IN CARPET PAD THICKNESS BENEATH CARPET.

VESTIBULE 1.06

FITTING ROOM 1.07 CARPET OVER PAD ON SELF-LEVELING CONCRETE TOPPING OVER BASE BUILDING STRUCTURAL CONCRETE SLAB

80

20

EL. +0MM T.O.F.F V.I.F EL. -100MM V.I.F T.O.S

58

ION - DOOR TO FITTING ROOM


59


60


Accessories Display

PH OTOGR APH

61


62


Main Salon

PH OTOGR APH

63


64


Main Salon

PH OTOGR APH

65



Eternal Land-Pet Memorial Park REMEMBRANCE SPACE


ETERNAL LAND-PET MEMORIAL PARK OW NE R / C LI EN T

Lungyen, Inc. L OCAT IO N

New Taipei City, Taiwan PA R T ICI PAT E AS

Project Architect

OVE RVIE W Lungyen Group consists in the concept- Professional, Reliable, Compassionate - to pursue for excellence and offer the service beyond customers’ expectations. In order to expand the range of service and extend Company’s business area for delivering more completed service to our customers, we launch funeral service and Pet Memorial Park for every beloved pet. After consulting pet specialist and understanding the needs of pet owners, we provide the service of Preneed Funeral Contract for Pet and Pet Columbarium Tower to deliver the last blessing to our dearest baby. After years of researching, we build a castle for our dearest pets. There are bright and open internal spaces and garden with sunlight. Above the sky, at the other edge of the rainbow, there is a world with everlasting cheer and happiness, full of flowers and lawns. The facilities in the building is completed and dedicated. Several spaces are divided in accordance with its function, such as public lobby, service desk, praying area, memorial area…etc. Every space is designed in a unique concept. The bright space, friendly service staffs, considerable management, and the knowledge of cemetery management that Lungyen Group has accumulated for years will provide the best service for the pet owners and their pets.

68


BU IL D IN G D E TA IL S S IZ E 1,000 square meters TY PE Ground Up Cemetery + Landscape PR OGRA M E L E ME NTS Memorial Hall Memorial Park Columbarium Tower Entry Lobby

69


LE F T RIGH T

70

Wall Section Detail View of Exterior


71


TOP LEF T BOTTOM LEF T R I GH T

72

Entry Window Detail View of Exterior


Main Salon

73


SPACE & L IG H T

In Pet Memorial Hal create a cheerful an owner have more tim This is a new journe can meet more frien welcomes the pet ow toy, have a chat with him/her.

LE F T MI D D L E RIGH T

74

Stair Detail View of Memorial Hall View of Memorial Hall


ll, the fresh interior design and colorful decoration nd rich environment. The individual room let the pet me and space to enjoy personal memorial moment. ey for the pet toward another new world, where all pets nds and happily play together. Pet Columbarium Tower wner to visit this place with the pet’s favorite snack and h your pet, and share something new in your life with

75



Details Architectural Detail

Resume About Eason Su


G R E E NL A N D TOW E R S Classic patterns and forms have been reinterpreted and modernized in the projects’ key architectural features and custom furniture pieces. Bridging the gap between the existing neighborhood’s rich history and the new emergent downtown was crucial in creating a rooted sense of place to this internationallyminded project.

View of Exterior Amenity Kitchen BOTTO M Amenity Lobby A BOVE

M IDDLE 78


5

LM FESTNING

150/1582

CHRISTIANSHO

ˇstre havn

52B

Bendiksbukta

150/1745

150/1745

150/1745

ˇstre havn

150/1745

5

73/*/1

73/*/2

25B

150/1744

25C

8

115

105

Bendiksbukta 33 festivalplass

15

101

vei Rosenvolds Wilhelm

1

150/1115

25

15

150/1112

36

150/1113

150/1856 150/1759 150/1540

OdderØya 10

150/1724

15

46

20

150/1803

150/173

5

150/1847

a

5

Nodevig

ga

11

1A

eien

150/1833

150/1804

70030

D40N86

150/1526

299/203

6

Nodevi

150/1784

150/1114

150/1751 150/1750

150/1534

150/617

150/1649 150/1541

150/1547

150/1662

150/1545 150/73

150/958

150/680

150/1846

150/1548

Otterdalsparken 150/1649

150/1550

150/1558 150/1549

150/1783

150/1544

150/1533

150/2010 150/954

150/686

150/27

150/959

20 15

OdderØyv

yveien

10

11

Nodeviga

1

150/685

4

veien

150/675

ne 14

150/1650

150/1728

26 150/341

4

150/1462

150/1304

3

Fiskebry

150/1467

6

150/1473

2A

9 18 FØnix kino

20

8

1

2B

22

5

13

150/1469

2

150/21

7

Strand Vestre 150/342

9

150/1112

150/1468

2

6

150/1306

Trafo

150/1773

150/341

150/1725

Grava

12

10

7

gate

150/1736

4

242/1

6

2

150/1748

1

150/20

7

2

3A

5

150/672

2

18

299/208

3B

7B

150/673

150/340

14

gga

150/1463

150/1524 150/1465

8 150/22

1

ne Grava

4

8

12

5

4

e

2A

7A

150/674

2B

Gravan

9

150/683

2

SjØlyst

iga Nodev

2

4

24

150/615

150/687

150/1537 150/684

150/956 150/960

150/682

3

150/963

62B 62A

9

5

4B

241/3

64A

5

48

8

29

150/15

8

150/967

5

5

gate

150/968

64B 10

90

12

ns

Konge

150/173 3

150/955

10 150/24

60B

60A

7

299/202

44

14

150/970

36

68

15

10

OdderØ

150/23

ien

42

30

14

9B

150/974

rØyve

a

43

150/15

gate

Strand

9A

gate

233/1

Odde

14A

ˇstre

150/1762

16

6

1

5

150/1302

rØyve Odde

70

38

34

5

32

150/68

150/1478

150/1474

150/1729

150/1482

2A

150/1303

3

19A

19B

150/1483

2

150/1484

150/1018

16

299/206

21

299/209

150/1307

ien

20

Nodevig

18

150/1539

11

150/1542

16A

OdderØyveien

12A

46

150/15

13

150/961

9

16B

3B

OdderØ

52

80

22

150/616

15

150/17

ngens

10

Dronni

150/26

150/962

58/*/9

150/15 58/*/10

58/*/2

24

17

80

1

3

5

9

110

20

20A

150/15

150/15 20B

4A

4B

112

85

47

41

25

1A

2A

1

15

150/1305

hall

Idretts

27

21

yveien

gate

3A

6

11

25

23

38

58/*/20

2

s

13

35B

150/15

Marken

8

35A

53

42

58/*/1

150/15

28

58/*/49

150/15

58/*/48

26

150/15

19

58/*/46

150/15

30

12 150/964

31

8

34

21

150/1563

32

15B 150/1488

150/1495

150/1493

150/1485

150/1772

150/1489

150/1497

PLAN 1/5000

HISTORISK KARTA SOM VISAR KONSTGJORD MARK.

5

HonnØrbrygga

29

241/2

299/204

7

150/1486

23

27

150/930

150/929

8

PAS27

10

150/1671

6

Krutthuset

31

150/1499

150/1744

150/1570

150/622

36

15C

Erfarenheterna av detta nya landskap är 3 dimensionell skapa en serie ögonblick där varje ö refererar en annan genom rumsliga och visuella anslutningar. En serie av mellanliggande utrymmena skapas mellan

0

44

58/*/21

15A

menter. Ett nytt landskap är möjlig.

58/*/34 58/*/22

150/15 150/15

150/15

17

The proposal utilizes several uncompromising cuts to the silo’s interior, in order to open the space up to more light and create a sense of character for the new museum. The existing space is considered to be one of Norway’s finest examples of Functionalism and was additionally one of the first grain silos in the country to be constructed with cylindrical cells made of reinforced concrete.

Med nautisk precision en serie axel spåras hela webbplatsen på flera nivåer, ansluter till befintliga stadsnät som förbinder alla öar dåtid, nutid och framtid till större städer. En ö en gång uppfattas som en isolerad del är nu en del av kontinuerlig urbana campus.

150/1744

40

150/1567

150/1269

40

150/1565

114

58/*/35 150/15

150/69

samman; ett gemensamt utrymme där konstnärer, natur och allmänheten

118

2C 37

1C

1B

1A

kan vara aktiva deltagare, och inte bara passiva exponenter eller konsu-

14

38

08

2A

1

som en plats där stad, Landskap insamling och allmänheten kan vävas

10

10

150/18

2D

150/62

5

150/17

naden

1

0 150/62

5

30 prome

Strand

150/157

Trafo

1

23

Webbplatsen är på gränsen av den urbana ockuperar att orolig kanten på den inbyggda och naturlandskapet. Vi ser det nya museet campus

5

73/*/3

150/15

150/15

150/15 25A

varje ö som möjliggör en mångfald av funktioner och interaktioner. dessa angripna utrymmen blivit en kulturell offentliga sfären på omfattningen av staden.

21A

SIL O MUS E UM

Programmet är fragmenterad och spridda över platsen bildar en serie islands.This kultur skärgård fortsätter ambitionen fastställts av nya kvartal grundstötning den urbana inom natural.3 öarna är smidda definieras av organ av interstitiell vatten. En ö för det förflutna är ockuperat av historiska silon bygga bostäder den permanenta samlingen, är en ö tillägnad närvarande en samtida konst utrymme heroically definiera kusten och slutligen en ö för framtiden där utbildning finner sin byggnad.

150/1745

150/1571

3 150/157

74 150/15

upplöses genom en serie av snitt och den resulterande tömma ett fast föremål i riktning mot ett rumsligt område, historia reifierat medan samtidigt eroderat in i fluid kontinuitet tid.

8A

Utsikt Från Havet

Konstgalleri Interiör PLAN

NY MARK

1/500

View of Museum M IDDLE View of Silo BOTTO M Museum Interior A BOVE

79


FL OATIN G S TA IR The main challenge given was how to bring clean modern aesthetics to a building with a rich and luxurious history. We responded by using a great deal of restraint in detailing the space while trying to stay true to the original character of the building. Rich luxurious wood stone materials and textures were deployed to bring life and a sense of sobriety, prominence and gravitas.

FINISHED FLOOR @ 11TH FLOOR, SEE 2/A401

PRE-DRILLED HOLE @ STEEL TO RECEIVE FIXTURE WIRING. ROUTE WIRE TROUGH STEEL THIS LOCATION; COORD. W/ ELECTRICIAN, TYP.

3'-3"

2"

SOLID OAK TREAD, TYP. ROUTE WIRE THROUGH TREAD; COOR. W/ ELECTRICIAN, TYP. 3/8" BLACKENED STEEL PLATE TREAD, SEE STRUCTURAL

PRE-DRILLED HOLE @ STEEL TREAD TO RECEIVE FASTENER, TYP.

2"

LED LIGHTING FIXTURE, TYP. FASTENERS FROM BELOW, TYP.

CONTINUOUS 3/8" THICK BLACKENED STEEL PLATE BENT AT END, MATTE FINISH; ATTACH TO LVL BLOCKING, SEE STRUCTURAL 3/4" PLYWOOD SUBFLOOR, SEE STRUCTURAL LVL BLOCKING (BEYOND), SEE STRUCTURAL

EXISTING CONCRETE STAIR

LIGHTING DRIVERS LOCATE @ UNDERSIDE OF CONCRETE STAIR

2

VE

80

A BOVE RIG H T

View of Stair Stair Tread Detail

DETAIL @ CONTINUOUS STAIR LIGHT COVE 3" = 1'-0"

CONTINUOUS 3/8" THICK BLACKENED STEEL PLATE BENT AT END, MATTE FINISH; ATTACH TO LVL BLOCKING, SEE STRUCTURAL 3/4" PLYWOOD SUBFLOOR, SEE STRUCTURAL LVL BLOCKING (BEYOND), SEE STRUCTURAL


POOL HOUS E The wall references the materiality of the existing stone house and rubble landscape walls bounding the property. The beams are a tour-de-force of milling pushing the limits of length for a single piece of cedar. They frame an interior/ exterior series of spaces of which only the changing room, bath and sitting room are weatherized. The sitting room is a transformable space capable of being enclosed or fully opened to the exterior through a series of sliding wood and glass walls. There is an exterior fireplace adjacent to the dining area and a sunken lounge from which the hot tub also can serve as another seating zone.

View of Exterior View of Exterior BOTTO M Section Diagram A BOVE

M IDDLE

81


G U E ST H O US E

AUGUS

GUEST

A

STONELY PELSINSKI

11 Broa New Te Fax Contractor:

TOP OF CHIMINEY - EL. +26'-8" (EL. +62'-2" ABV SEA LEVEL)

Brian D. Shaw B Mt.

4

3

A401

A401 Surveyor:

Plisga & Da

B

6'-9 1/2"

4

2 A401

Structural Enginee

Consulting S Sea 6 6

4

1

2

A501

2 2

2

4

2

A401

BOTTOM OF GIRDER (HIGH) - EL. +19'-10 1/2" 1'-10 1/2"

(EL. +55'-4 1/2" ABV SEA LEVEL)

9

MASTER BED 2.04

BOTTOM OF GIRDER (LOW) - EL. +18'-0" (EL. +53'-6" ABV SEA LEVEL)

8'-0"

A502

BATH 2.02

8 A502 2

4

2

4

2

12

2

12

1 A501

TOP OF 2nd FLOOR - EL. +10'-0" 2

2

6

L

L

V

V

S

L

L

L

(EL. +45'-6" ABV SEA LEVEL) 3

12

2

2

L 12

2

5 A400

Drawings, as instrumen remain the property of project for which they a not. The drawings shal or General Contractor f additions to this projec project by others, exce and appropriate compe

A400

12 L

L

V

V

L

L

L

V

L 12

2

10'-0"

JOINT LINE OF BRECKENRIDGE SIDING BEYOND, TYP. 12

GARAGE 1.01

2 A400

5

12.04.09 PRO

4

09.28.09 STR

3

09.01.09 PRO

2

08.24.09 FOU

1

06.17.09 PRO

No.

Date

Issue

TOP OF SLAB - EL. + 0'-0" (EL. +35'-6" ABV SEA LEVEL) 1 A400

4 A400

BUIL CROSS SCALE:

1/2" = 1'-0

1

View of Exterior Section Drawing

BUILDING SECTION - EAST/WEST 1/2" = 1'-0"

A BOVE RIG HT

82

B 24'-0"

2

Overlooking the original structures’ historic gardens, the guesthouse is nestled into the hillside by a stone and cedar plinth housing a potting shed, garage and storage. A two-bedroom cottage is set above and is sheathed in glass, blackened metal, and dark cedar. Furniture is considered an integral part of the architecture and every custom designed piece, from beds, to tables, to steamer trunks, tactilely and conceptually engages an adjacent architectural surface.

165 INDIA BAR HARBO

DATE:

06.03.2009

JOB INFO:

0722 PAGE:

©


TOWN H O US E METAL COPING T.O. SKYLIGHT EL.10'-9 1/4" BLOCKING, AS REQUIRED SKY LIGHT; SEE WINDOW TYPES

SLO

BLOCKING AS REQUIRED

PE PITC

METAL COPING H

BLOCKING, AS REQUIRED

STEEL BEAM, SEE STRUCTURAL DWGS.

4

A540

!

NEW SKYLIGHT WITH ANODIZED ALUMINUM FRAME

BLOCKING AS REQUIRED 3/4" EXTERIOR GRADE PLYWOOD

STEEL POST @ CORNER; SEE STRUCTURAL DWGS.

STEEL POST @ CORNER; SEE STRUCTURAL DWGS.

(1) LAYER 5/8" GWB

3/4" EXTERIOR GRADE PLYWOOD

METAL COPING + GUTTER, PROVIDE FLASHING AS REQUIRED

6 1/2" R22 MINIMUM BATT INSULATION (2) LAYERS 1/2" GWB

NEW STUCCO WALL, SEE PARTITION TYPES

METAL STUDS AS NOTED IN STRUC. DWGS.

STEEL BEAM, SEE STRUCTURAL DWGS.

METAL STUDS AS NOTED IN STRUC. DWGS. 6 1/2" R22 MINIMUM BATT INSULATION

4

SECTION D 1-1/2" = 1'-0"

BLOCKING AS REQUIRED STEEL POST @ CORNER; SEE STRUCTURAL DWGS. 3/4" EXTERIOR GRADE PLYWOOD

6 1/2" R22 MINIMUM BATT INSULATION

ROOF DRAIN, SEE PLUMBING DWGS. KEMPER ROOFING SYSTEM

3/4 " EXPOSURE 1GRADE PLYWOOD SHEATHING

(1) LAYER 5/8" GWB

METAL STUDS AS NOTED IN STRUC. DWGS.

C-JOISTS, REFER TO STRUC. DWGS.

INSULATION TO BE R-19 MIN. (2) LAYERS 1/2" SHEETROCK

3

TYPICAL D 1-1/2" = 1'-0"

KEMPER ROOFING SYSTEM 3/4 " EXPOSURE 1GRADE PLYWOOD SHEATHING

NEW FLASHING, AS REQUIRED C-JOISTS, REFER TO STRUC. DWGS.

TOP OF EXISTING PARAPET WALL

INSULATION TO BE R-19 MIN. (2) LAYERS 1/2" SHEETROCK

NEW KEMPER ROOFING, TURN UP MIN 8" AT WALL

2

NEW STONE PAVERS ON PEDESTAL, SEE FINISH SCHEDULE T.O. LANDING

TYPICAL D 1-1/2" = 1'-0"

VARIES

EL. 0'-0"

8"

3/4"

NEW STRUCTURAL STEEL, SEE STRUC. DWGS.

1"

To create a gallery setting with residential detailing and warmth which as a whole would provide a modern and equally sophisticated back drop to these free standing elements. This was accomplished by ensuring spaces were seamlessly connected, that material application was sublime and that the details were taut and rigorously simple. There is a balance which results in the sum being greater than the parts.

STEEL BEAM, SEE STRUCTURAL DWGS.

5

1

SECTION DETAIL - STAIR BULKHEAD + SKYLIGHT 1-1/2" = 1'-0"

A BOVE RIG HT

Sky Light at Stair Well Section Detail

83

TYPICAL D 1-1/2" = 1'-0"


S TAIR AS A CO UN T ER A clean, modern and serene aesthetic provides a haven in which this dynamic group can flourish. In addition, the visually stimulating, urban industrial landscape visible from the large bay windows of the main spaces created a desire for the office space to act as a simple background for the creative process.

84

A BOVE RIG HT

View of Stair Section Perspective


STONE SLAB W3 ON 3/8 THIN SET, SEE FINISH SCHEDULE

STONE SLAB W3 ON 3/8 THIN SET, SEE FINISH SCHEDULE M25 PTD WALL, SEE FINISH SCHEDULE

3/16" RECESSED STEEL CHANNEL REVERSE 180 DEGREE W/ BLOCKING AS REQUIRED

7

1 - 1/2"

4" MIN

PROVIDE WATERPROOFING MEMBRANE AS REQ.

3" = 1'-0"

6

STONE SLAB F3.1 ON 3/8 THIN FINISH SCHEDULE

PROVIDE WATERPROOFING MEM REQ.

PROVIDE 4" MIN. FOR LOWERING FLOOR AS REQ.

6

DETAIL SECTION - @ GLASS DOOR W/ CURBLESS TRANSITION

3" = 1'-0"

3/16" RECESSED STEEL CHAN BLOCKING AS REQUIRED

PROVIDE WATERPROOFING MEMBRANE AS REQ.

STONE SLAB F3.1 ON 3/8 THIN SET, SEE FINISH SCHEDULE

PROVIDE 4" MIN. FOR LOWERING FLOOR AS REQ.

DETAIL SECTION - @ GLASS DOOR W/ CURBLESS TRANSITION

3/8" FIXED SATIN ETCHED GLA SEE FINISH SCHEDULE

ALIGN

STONE SLAB F3.1 ON 3/8 THIN SET, SEE FINISH SCHEDULE

4" MIN

PROVIDE 4" MIN. FOR LOWERING FLOOR AS REQ.

7

3/16" RECESSED STEEL CHANNEL REVERSE 180 DEGREE W/ BLOCKING AS REQUIRED

ALIGN

PROVIDE WATERPROOFING MEMBRANE AS REQ.

1 - 1/2"

M25 PTD WALL, SEE FINISH SCHEDULE

STONE SLAB F3.1 ON 3/8 THIN SET, SEE FINISH SCHEDULE

STONE SLAB W3 ON 3/8 THIN FINISH SCHEDULE

3/16" RECESSED STEEL CHANNEL W/ BLOCKING AS REQUIRED

ALIGN

4" MIN

1 - 1/2"

4" MIN

ALIGN

PROVIDE 4" MIN. FOR LOWERIN AS REQ.

DETAIL SECTION - @ GLASS W/ CURBLESS TRA 3" = 1'-0"

DETAIL SECTION - @ GLASS W/ CURBLESS TRANSITION 3" = 1'-0"

B.O. FIN CLG. EL.8'-4"

B.O. FIN CLG. EL.8'-4"

RAIN SHOWER SET, SEE PLUMBING SCHEDULE

RAIN SHOWER SET, SEE PLUMBING SCHEDULE

SHOWER SET, SEE PLUMBING SCHEDULE

CL BENCH

1'-5"

4'-1"

4 1/2"

1'-6"

SHOWER SET, SEE PLUMBING SCHEDULE

PROVIDE WATERPROOFING MEMBRANE AS REQ. PROVIDE SAMPLE FOR APPROVAL

6

A506 2"

T.O. FIN. FLOOR EL.0'-0"

SLOPED SHOWER FLOOR & LINEAR DRAIN, SHOWER DRAIN SEE PLUMBING SPECS

M IDDLE BOTTO M

1 1/2" = 1'-0"

View of Master Shower Transition Detail Sectiom Detail PROVIDE WATERPROOFING MEMBRANE AS REQ. PROVIDE SAMPLE FOR APPROVAL

6

A506 2"

T.O. FIN. FLOOR EL.0'-0"

SLOPED SHOWER FLOOR &

2

DETAIL SECTION - CURB 1 1/2" = 1'-0"

1'-5" 3'-4"

ABOVE

RADIANT HEAT FLOOR, SEE MEP DRAWING

DETAIL SECTION - CURBLESS MASTER SHOWER

1'-6"

7

4'-1"

It was designed to be like an urban cave with surfaces all clad with marble. Light is diffused through custom drapes by Ravi Design, bringing natural light in with the continued layered “wave” idea from the lobby. This will give guests a sense of open space and yet still allows privacy. Neutral colors mixed with bold dark tones helps to divide rooms while horizontal lines on wall panels throughout the spa offers the cave like oasis.

3/8" FIXED SATIN ETCHED GLASS PANEL, SEE FINISH SCHEDULE STONE SLAB W3 ON 3/8 THIN SET, SEE FINISH SCHEDULE

1 - 1/2"

SEAML E S S G L AS S

85


YEH-SEN SU/

RESUME Name Date of birth Addrese Mobile Email

Information

Yeh-Sen Su(Eason) 1986/01/23 Da’an Garden Apartment 1103, No. 59 Tower, Shanghai, China 200002 +86-173-1637-5411 yehsen.su@gmail.com

Language

Mandarin(Chinese) Native / English Proficient

2012-2013 2004-2008

2015 2013 2011 2008 2008 2006

2015 2008

86

Education

Master of Science in Advanced Architectural Design Graduate School of Architecture Planning and Preservation (GSAPP) Columbia University Bachelor of Architecture College of Planning & design, National Cheng-Kung University (NCKU), Taiwan

Honors

AIA Award - CK Concept Store - Project within SPAN Architecture ABSTRACT Selected of GSAPP, all three semesters, Columbia University Government Scholarship to Study Abroad Proposal of Study Abroad First Prize in The National Award for Architecture Graduation Thesis Design Asia Student Award ”Young Talent Architectural Design Awards” Graduation Thesis Design Award of Superior Architectural Design Graduation Thesis Design Second Prize in “ Court of Design School” Design Competition “Light Up“ Design

Exhibitions

Young architectural designers exhibition in New York Vice President “All For the Beautiful Scenery” Graduation Tainan, Taipei Exhibition Manager of Graduation Exhibition Affairs


2017-Current 2013-2017

2010-2011

2008-2009 2008 Summer 2007 Spring Summer 2006 Summer

2016 2013 2010 2008 2007 2006

Professional Experiences

Project Architect at Metrics Architecture Studio, Shanghai, China - Jinjiang Library (SD-DD) Project Architect at SPAN Architecture, New York City, U.S.A - Gotham West (DD-CA) - CK Concept Store (SD-CA) - Guest House (CD-CA) - Pool House (CD-CA) - West Village Loft (SD-CA) - 150 Central Park South (SD-CD) Architect at Straight-Square Design, Taipei, Taiwan - Green Toilet (SD-CA) - Pet Cemetery (SD-CA) - House Cheng (SD-CA) Serving the Duty in the Engineering Troop Service, Taipei, Taiwan Second Lieutenant Working in Green Field Architects, Taipei, Taiwan Assistant Designer Practical Training at Yu-lin Chen Architects, Tainan, Taiwan Intern Practical Training at Artonics+Bau Architects, Taipei, Taiwan Intern

Competitions & Workshops

“KUNSTSILO” International Competition by Sørlandet Kunstmuseum Final List for Death of Remembrance Competition by Designboom “Design for Death Architecture” The” Taiwan Tower” International Competition by Taichung City Government “Recombinant International Workshop” held in NCKU, Taiwan and host Grahame Shane, GSAPP, Columbia University “Tessellation Workshop” held in NCKU, Taiwan The“ court of design school” design competition by School of Planning and Design, NCKU 87


YEH-SEN SU PORTFOLIO 2013-2017

88


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.