M/T “VSLNAME” IMO No: 9999999 MOORING SYSTEM MANAGEMENT PLAN
M
P
(incl. LINE MANAGEMENT PLAN)
S
A
Prepared in accordance with OCIMF MEG4 Section 1.9 and SIRE VIQ7 Chapter 9
ALPHA MARINE CONSULTING P.C. MARINE CONSULTANTS & SURVEYORS T: +30 211 8881000, F: +30 211 8881039 mail@alphamrn.com | www.alphamrn.com
PLAN HISTORY DESCRIPTION Issued as Final Booklet
DATE 01/01/2019
M
P
LE
REV. 0
A
TOTAL SIXTY (60) SHEETS WITH COVER (EXCL. APPENDIX)
CAUTION
THIS DRAWING OR DOCUMENT IS THE PROPERTY OF ALPHA MARINE CONSULTING AND IT MUST NOT BE PARTIALLY OR WHOLLY COPIED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN PERMISSION OF AMC.
MOORING SYSTEM MANAGEMENT PLAN
S
TITLE:
SHIP TYPE:
(incl. LINE MANAGEMENT PLAN)
158,000 DWT CRUDE OIL TANKER
SHIP NAME:
CHECKED BY: DRAWN BY:
IMO NO.:
VSLNAME PT GD
DWG NO.: REV. NO.:
xxxx-MMP-0 0
ALPHA MARINE CONSULTING P.C.
HULL NO.:
DATE: SIZE:
8184 9999999 01/01/2019 A4 / A3
MARINE CONSULTANTS & SURVEYORS T: +30 211 8881000, F: +30 211 8881039 mail@alphamrn.com | www.alphamrn.com
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 1 OF 60
DOCUMENT CONTROL
Holder
1
Master of M/T “VSLNAME”
2
HSQE Manager
Approved by HSQE Manager HSQE Manager
S
A
M
P
LE
Manual / Copy No.
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 2 OF 60
RECORD OF REVISIONS
Issue Revision Number Number 0
Reference to Sections – Description of Revision
01/01/2019
Issued as Final Drawing
Approved by HSQE Manager
S
A
M
P
LE
1
Effective Date
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 3 OF 60
TABLE OF CONTENTS PAGE DOCUMENT CONTROL ................................................................................................. 1 RECORD OF REVISIONS .............................................................................................. 2 TABLE OF CONTENTS .................................................................................................. 3 DEFINITIONS AND ABBREVIATIONS ........................................................................... 6 GENERAL ........................................................................................................... 9 SCOPE (MEG4 1.9.1) ......................................................................................... 9 SHIP DETAILS (MEG4 1.9.2.1) .......................................................................... 9 1.2.1. Particulars................................................................................................ 9 1.2.2. Ownership / Management ....................................................................... 9 1.2.3. Changes .................................................................................................. 9
2. 2.1. 2.2. 2.3. 2.4. 2.5. 2.6. 2.7. 2.8. 2.9.
MOORING EQUIPMENT DESIGN PHILOSOPHY (MEG4 1.9.2.2) ................. 10 DESIGN CONSIDERATIONS ........................................................................... 10 2.1.1. Design Basis.......................................................................................... 10 2.1.2. Optimal Mooring Pattern........................................................................ 10 MOORING FORCE CALCULATIONS ............................................................... 10 RESTRAINTS.................................................................................................... 10 DESIGN LOADS ............................................................................................... 10 REDUNDANCY CONSIDERATIONS................................................................ 10 SELECTION PROCESS ................................................................................... 11 SERVICE LIFE EXPECTATIONS ..................................................................... 11 ALTERNATE MOORING PATTERNS .............................................................. 11 DESIGN LIMITATIONS ..................................................................................... 11
3.
MOORING EQUIPMENT LIST (MEG4 1.9.2.3) ................................................ 12
4. 4.1. 4.2.
INSPECTION, MAINTENANCE AND RETIREMENT (MEG4 1.9.2.4) ............. 13 SURVEY REQUIREMENTS.............................................................................. 13 INSPECTION AND PLANNED MAINTENANCE FOR FIXED EQUIPMENT .... 14 4.2.1. General .................................................................................................. 14 4.2.2. General Windlass and Winch Condition ................................................ 14 4.2.3. Brake Drum Repair ................................................................................ 15 4.2.4. Checking of Brake Linkages .................................................................. 15 4.2.5. Windlass and Winch Brake Lining Replacement ................................... 15 4.2.6. Mooring Winch Brake Testing ............................................................... 16 4.2.7. Emergency Towing Systems ................................................................. 16 4.2.8. Bow Stopper(s) ...................................................................................... 17 INSPECTION AND MAINTENANCE FOR LOOSE MOORING GEAR ............. 17 (INCL. MOORING LINES) ................................................................................. 17 4.3.1. General .................................................................................................. 17 4.3.2. Synthetic Mooring Lines ........................................................................ 18 4.3.3. Mooring Wires ....................................................................................... 19 4.3.4. Wire Tails and Shackles ........................................................................ 20 CRITICAL EQUIPMENT.................................................................................... 21 4.4.1. Critical Equipment ................................................................................. 21 4.4.2. Specialist Equipment ............................................................................. 21
S
A
M
P
LE
1. 1.1. 1.2.
4.3.
4.4.
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 4 OF 60
PAGE
5.2. 5.3.
RISK AND CHANGE MANAGEMENT (MEG4 1.9.2.5) .................................... 31 RISK ASSESSMENT ........................................................................................ 31 5.1.1. Mooring Fittings’ Design ........................................................................ 31 5.1.2. Operational Safeguards for Mooring Equipment ................................... 32 CRITICAL EQUIPMENT.................................................................................... 32 MANNING AND TRAINING............................................................................... 33 5.3.1. Responsibilities for Mooring Operations ................................................ 33 5.3.2. Manning During Mooring Operations ..................................................... 33 5.3.3. Training for Mooring Operations ............................................................ 34 5.3.4. Communication with Manufacturers ...................................................... 34 HUMAN FACTORS AND PERSONNEL RISK MANAGEMENT ....................... 35 5.4.1. Guidance for Safe Mooring Operations ................................................. 35 5.4.2. Evaluation of Existing Mooring Fittings’ Design ..................................... 36 5.4.3. Safety Precautions during Mooring Operations and While at Berth ...... 36 5.4.4. Handling Fatigue during Mooring Operations ........................................ 40 5.4.5. Freezing Weather Precautions .............................................................. 40 MOORING OPERATIONS PLANS AND PROCEDURES ................................ 41 5.5.1. Weather Limits....................................................................................... 41 5.5.2. Working with Tugs and Line Handling Boats ......................................... 42 5.5.3. Berthing at Buoy Moorings .................................................................... 44 5.5.4. Mooring at Conventional Multi-Buoy Moorings ...................................... 44 5.5.5. Mooring at Single Point Moorings .......................................................... 45 5.5.6. Ship-to-Ship (STS) Operations .............................................................. 46 5.5.7. Reverse STS Operations ....................................................................... 46 5.5.8. Double-banking Operations ................................................................... 47 5.5.9. FPSOs and FSOs Operations ............................................................... 47 5.5.10. Mooring with Vacuum Mooring System (“MoorMaster”) ........................ 52 5.5.11. Mooring Monitoring and Tending Mooring Lines While at Berth ............ 55 5.5.12. Actions to Be Taken to Reduce High Mooring Line Loads and Handle an Emergency Case.................................................................. 56 5.5.13. Communications during Mooring Operations ........................................ 56
S
A
5.4.
LE
5. 5.1.
P
4.6.
LINE MANAGEMENT PLAN ............................................................................. 21 4.5.1. Line Installation...................................................................................... 22 4.5.2. Storage .................................................................................................. 22 4.5.3. Repair .................................................................................................... 23 4.5.4. Line Maintenance .................................................................................. 23 4.5.5. Wear Zone Management ....................................................................... 24 4.5.6. Deployment Inspection .......................................................................... 24 4.5.7. Routine Inspection ................................................................................. 25 4.5.8. Detailed Inspection ................................................................................ 25 4.5.9. Determination of Expected Service Life ................................................ 26 4.5.10. Residual Strength Testing and Condition Analysis ................................ 27 4.5.11. Planned Retirement Criteria Policy ........................................................ 28 MAINTENANCE RECORDS ............................................................................. 29 4.6.1. Documentation of Formal & Mandatory Inspections .............................. 29 4.6.2. Certification of Mooring Ropes, Wires and Wire-Tails ........................... 29 4.6.3. Planned Maintenance and Inspection Activities .................................... 29 4.6.4. Winch Brake Rendering Capacity Tests ................................................ 29 4.6.5. Condition Monitoring of Mooring Lines .................................................. 30 4.6.6. Records of Minimum Spares Onboard .................................................. 30
M
4.5.
5.5.
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 5 OF 60
PAGE 5.6.
CHANGE MANAGEMENT ................................................................................ 58
6. 6.1. 6.2.
RECORDS AND DOCUMENTATION (MEG4 1.9.2.6) ..................................... 59 OEM DOCUMENTATION ................................................................................. 59 RECORDS ........................................................................................................ 59
7.
MOORING SYSTEM MANAGEMENT PLAN REGISTER (MEG4 1.9.2.7) ........ 60
S
A
M
P
LE
APPENDIX – SHIP-SPECIFIC INFORMATION ......................................................... A-1 1. SHIP IDENTIFICATION .................................................................................. A-1 2. COMPANY IDENTIFICATION ......................................................................... A-1 3. MOORING SYSTEM MANAGEMENT PLAN REGISTER .............................. A-2 4. MOORING ARRANGEMENT PLAN ............................................................... A-6
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 6 OF 60
DEFINITIONS AND ABBREVIATIONS .1
DEFINITIONS
Deadweight (DWT)
The carrying capacity of a ship, including cargo, bunkers and stores, in metric tons. It can be given for any draught, but here it is used to indicate summer deadweight at summer draught.
Design Basis Load (DBL)
The design load on a fitting given by multiplying the mooring ship design Minimum Breaking Load (ship design MBL) by the Geometric Factor (GF).
LE
High Modulus A manufactured fiber based on Ultra High Molecular Weight Polyethylene (HMPE) Polyethylene (UHMWPE). Manmade, continuous filament synthetic fiber with modulus in the range of 50- 150GPa.
Independent Wire Rope Core (IWRC)
A type of construction of steel wire rope that has an independent wire rope core, as opposed to steel wire rope having a fiber rope core.
Line Design Break Force (LDBF)
The minimum force that a new, dry, spliced mooring line will break at when tested according to MEG4 Appendix B.
M
P
High Modulus Synthetic Fiber (HMSF)
Contains the ship operator's requirements for the management of mooring line maintenance, inspection and retirement during the operational phase of the mooring line lifecycle.
Multi Buoy Mooring (MBM)
A facility where a tanker is usually moored by a combination of the ship's anchors forward and mooring buoys aft and held on a fixed heading. Also called Conventional Buoy Mooring (CBM).
Safe Working Load (SWL)
Generally, a load less than the yield or failure load by a safety factor defined by a code, standard or good engineering practice. SWL is not in relation to cordage or steel wire mooring lines. Based on MEG4, the SWL of a fitting is greater than or equal to the ship design MBL that contacts the fitting.
S
A
Line Management Plan (LMP)
Ship Design MBL
The minimum breaking load of new, dry mooring lines for which a ship's mooring system is designed, to meet OCIMF standard environmental criteria restraint requirements (defined in section three). The ship design MBL is the core parameter against which all the other components of a ship's mooring system are sized and designed with defined tolerances.
Safety Management System (SMS)
means a structured and documented system enabling company personnel to implement effectively the company safety and environmental protection policy, as defined in paragraph 1.1 of International Safety Management Code.
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 7 OF 60
An integrated mooring arrangement for bow mooring a conventional tanker. For example, conventional tanker bow mooring arrangements to a Catenary Anchor leg Mooring (CALM) system, Single Anchor Leg Mooring (SALM) system, Floating (Production) Storage and Offloading unit (F(P)SO) or Floating Storage and Offloading unit (FSO).
Ship-to-ship (STS)
An STS transfer operation is an operation where crude oil or petroleum products are transferred between seagoing ships moored alongside each other. Such operations may take place when one ship is at anchor or when both are underway. In general, the expression includes the approach manoeuvre, berthing, mooring, hose connecting, safe procedures for cargo transfer, hose disconnecting, unmooring and departure manoeuvre.
ABBREVIATIONS
P
All Buoy Berth As Low as Reasonably Practicable British Standards Institution Conventional Buoy Mooring Chemical Distribution Institute Chief Engineer Chief Officer Common Structural Rules Code of Safe Working Practices for Merchant Seamen Design Basis Load Diameter of bend divided by diameter of line Designated Person Ashore Deadweight Tonnage Equipment Number Estimated Time of Arrival Geometric Factor Human-Centered Design Human Factors Engineering High Modulus Polyethylene High Modulus Synthetic Fiber Health, Safety, Quality and Environment High Tensile Steel International Association of Classification Societies International Maritime Organization International Safety Guide for Oil Tankers and Terminals International Organization for Standardization Inspection and Test Plan Independent Wire Rope Core Length Between Perpendiculars Liquid Crystal Polymer Line Design Break Force Line Management Plan Liquefied Natural Gas Lube Oil Length Overall
S
A
ABB: ALARÎĄ: BSI: CBM: CDI: C/E: C/O: CSR: CSWP: DBL: D/d: DPA: DWT: EN: ETA: GF: HCD: HFE: HMPE: HMSF: HSQE: HTS: IACS: IMO: ISGOTT: ISO: ITP: IWRC: LBP: LCP: LDBF: LMP: LNG: LO: LOA:
M
.2
LE
Single Point Mooring (SPM)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
P
LE
Minimum Breaking Load Multi Buoy Mooring Mooring Equipment Guidelines, Third Edition Mooring Equipment Guidelines, Fourth Edition Marine Oil Terminal Engineering and Standards Mooring System Management Plan Mooring System Management Plan Register Marine Terminal Information System Non-Destructive Testing New Straight Break Force Oil Companies International Marine Forum Original Equipment Manufacturer Officer of the Watch Planned Maintenance System Personal Protective Equipment Safety Critical Equipment Ship Inspection Report Program Specified Minimum Yield Stress Single Point Mooring Ship-to-Ship (transfer operations) Safe Working Load Tail Design Break Force Ultimate Tensile Strength Ultraviolet Vessel Particulars Questionnaire Working Load Limit
S
A
M
MBL: MBM: MEG3: MEG4: MOTEMS: MSMP: MSMPR: MTIS: NDT: NSBF: OCIMF: OEM: OOW: PMS: PPE: SCE: SIRE: SMYS: SPM: STS: SWL: TDBF: UTS: UV: VPQ: WLL:
PAGE 8 OF 60
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
1.
GENERAL
1.1.
SCOPE (MEG4 1.9.1)
PAGE 9 OF 60
This Mooring System Management Plan (MSMP) has been created to help the ship’s Operators ensure that the mooring system is properly inspected, maintained while in service and operated safely and in accordance with the original design basis. It contains information that can be available to anyone onboard who needs to review it.
LE
The purpose of this Plan is to ensure that all assessed risks are effectively managed through the design and operation of the mooring system. Its aim is to ensure that during mooring operations, no harm comes to ship or terminal staff or damage to the ship or terminal / facility it is interfacing with and that the mooring system meets applicable regulations, codes and recommended practice.
1.2.
P
This Plan is intended to be a complementary component of the ship's SMS and it is recommended to remain onboard the ship throughout the ship’s life as part of the management of change records. As such, this Plan is an integrated system that uses links and / or references to existing systems and records. SHIP DETAILS (MEG4 1.9.2.1)
1.2.1. Particulars
M
Reference is made to Appendix – Ship-Specific Information. 1.2.2. Ownership / Management
Reference is made to Appendix – Ship-Specific Information.
A
1.2.3. Changes
S
Reference is made to the ship’s Continuous Synopsis Record for any changes in the ship’s Ownership / Management. It is also recommended to maintain onboard an updated, detailed SIRE Vessel Particulars Questionnaire (VPQ).
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
2.
PAGE 10 OF 60
MOORING EQUIPMENT DESIGN PHILOSOPHY (MEG4 1.9.2.2)
The purpose of this Section is to provide comprehensive details of the ship's original design philosophy and show how the philosophy demonstrates that the ship can be effectively and safely moored against standard environmental criteria. 2.1.
DESIGN CONSIDERATIONS
2.1.2. Optimal Mooring Pattern
LE
2.1.1. Design Basis
MOORING FORCE CALCULATIONS
2.3.
RESTRAINTS
A
M
P
2.2.
DESIGN LOADS
S
2.4.
2.5.
REDUNDANCY CONSIDERATIONS
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
SELECTION PROCESS
2.7.
SERVICE LIFE EXPECTATIONS
2.8.
ALTERNATE MOORING PATTERNS
2.9.
DESIGN LIMITATIONS
S
A
M
P
LE
2.6.
PAGE 11 OF 60
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
3.
PAGE 12 OF 60
MOORING EQUIPMENT LIST (MEG4 1.9.2.3)
Reference is made to the Appendix, where the following information is included:
.3 .4 .5
Specifications for permanent fittings (mooring fittings, rollers, fairleads, etc.). Specifications for permanent machinery installations (winch motors / drives, etc.). Specifications for loose equipment (mooring lines, tails, pennants, joining shackles, etc.). Specifications for critical and specialist equipment (e.g. winch brake testing equipment) including tools to undertake maintenance and repairs of this equipment. Performance standards / requirements for above equipment.
LE
.1 .2
S
A
M
P
Details of ship structure and under deck strengthening may be found in the ship’s construction file (structural and outfitting drawings of the ship).
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 13 OF 60
INSPECTION, MAINTENANCE AND RETIREMENT (MEG4 1.9.2.4)
4.1.
SURVEY REQUIREMENTS
S
A
M
P
LE
4.
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
4.2.
PAGE 14 OF 60
INSPECTION AND PLANNED MAINTENANCE FOR FIXED EQUIPMENT
M
P
LE
4.2.1. General
S
A
4.2.2. General Windlass and Winch Condition
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 15 OF 60
4.2.3. Brake Drum Repair
LE
4.2.4. Checking of Brake Linkages
S
A
M
P
4.2.5. Windlass and Winch Brake Lining Replacement
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 16 OF 60
A
M
P
LE
4.2.6. Mooring Winch Brake Testing
S
4.2.7. Emergency Towing Systems
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 17 OF 60
INSPECTION AND MAINTENANCE FOR LOOSE MOORING GEAR (INCL. MOORING LINES)
S
A
M
4.3.1. General
P
4.3.
LE
4.2.8. Bow Stopper(s)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
S
A
M
P
4.3.2. Synthetic Mooring Lines
PAGE 18 OF 60
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
PAGE 19 OF 60
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
S
A
M
P
4.3.3. Mooring Wires
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
S
A
M
P
4.3.4. Wire Tails and Shackles
PAGE 20 OF 60
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
4.4.
PAGE 21 OF 60
CRITICAL EQUIPMENT
S
A
M
P
4.4.2. Specialist Equipment
LE
4.4.1. Critical Equipment
4.5.
LINE MANAGEMENT PLAN
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 22 OF 60
A
M
P
LE
4.5.1. Line Installation
S
4.5.2. Storage
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 23 OF 60
4.5.3. Repair
S
A
M
P
LE
4.5.4. Line Maintenance
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 24 OF 60
A
M
P
LE
4.5.5. Wear Zone Management
S
4.5.6. Deployment Inspection
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 25 OF 60
P
LE
4.5.7. Routine Inspection
S
A
M
4.5.8. Detailed Inspection
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
PAGE 26 OF 60
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
S
A
M
P
4.5.9. Determination of Expected Service Life
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 27 OF 60
S
A
M
P
LE
4.5.10. Residual Strength Testing and Condition Analysis
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 28 OF 60
S
A
M
P
LE
4.5.11. Planned Retirement Criteria Policy
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
4.6.
PAGE 29 OF 60
MAINTENANCE RECORDS
4.6.1. Documentation of Formal & Mandatory Inspections
M
P
LE
4.6.2. Certification of Mooring Ropes, Wires and Wire-Tails
A
4.6.3. Planned Maintenance and Inspection Activities
S
4.6.4. Winch Brake Rendering Capacity Tests
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 30 OF 60
4.6.5. Condition Monitoring of Mooring Lines
S
A
M
P
LE
4.6.6. Records of Minimum Spares Onboard
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
RISK AND CHANGE MANAGEMENT (MEG4 1.9.2.5)
A
M
P
LE
5.
PAGE 31 OF 60
RISK ASSESSMENT
S
5.1.
5.1.1. Mooring Fittings’ Design
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
PAGE 32 OF 60
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
S
A
M
P
5.1.2. Operational Safeguards for Mooring Equipment
5.2.
CRITICAL EQUIPMENT
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
5.3.
PAGE 33 OF 60
MANNING AND TRAINING
A
M
P
LE
5.3.1. Responsibilities for Mooring Operations
S
5.3.2. Manning During Mooring Operations
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 34 OF 60
A
M
P
LE
5.3.3. Training for Mooring Operations
S
5.3.4. Communication with Manufacturers
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
5.4.
PAGE 35 OF 60
HUMAN FACTORS AND PERSONNEL RISK MANAGEMENT
S
A
M
P
LE
5.4.1. Guidance for Safe Mooring Operations
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 36 OF 60
LE
5.4.2. Evaluation of Existing Mooring Fittings’ Design
S
A
M
P
5.4.3. Safety Precautions during Mooring Operations and While at Berth
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
PAGE 37 OF 60
S
A
M
P
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
PAGE 38 OF 60
S
A
M
P
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
PAGE 39 OF 60
S
A
M
P
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 40 OF 60
A
M
P
LE
5.4.4. Handling Fatigue during Mooring Operations
S
5.4.5. Freezing Weather Precautions
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
5.5.
PAGE 41 OF 60
MOORING OPERATIONS PLANS AND PROCEDURES
S
A
M
P
LE
5.5.1. Weather Limits
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 42 OF 60
S
A
M
P
LE
5.5.2. Working with Tugs and Line Handling Boats
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
PAGE 43 OF 60
S
A
M
P
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 44 OF 60
LE
5.5.3. Berthing at Buoy Moorings
S
A
M
P
5.5.4. Mooring at Conventional Multi-Buoy Moorings
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 45 OF 60
S
A
M
P
LE
5.5.5. Mooring at Single Point Moorings
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 46 OF 60
S
A
M
P
5.5.7. Reverse STS Operations
LE
5.5.6. Ship-to-Ship (STS) Operations
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
S
A
M
P
5.5.8. Double-banking Operations
PAGE 47 OF 60
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
5.5.9. FPSOs and FSOs Operations
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
PAGE 48 OF 60
S
A
M
P
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
PAGE 49 OF 60
S
A
M
P
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
PAGE 50 OF 60
S
A
M
P
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
PAGE 51 OF 60
S
A
M
P
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 52 OF 60
S
A
M
P
LE
5.5.10. Mooring with Vacuum Mooring System (“MoorMaster”)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
PAGE 53 OF 60
S
A
M
P
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
PAGE 54 OF 60
S
A
M
P
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 55 OF 60
S
A
M
P
LE
5.5.11. Mooring Monitoring and Tending Mooring Lines While at Berth
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 56 OF 60
A
M
P
LE
5.5.12. Actions to Be Taken to Reduce High Mooring Line Loads and Handle an Emergency Case
S
5.5.13. Communications during Mooring Operations
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
PAGE 57 OF 60
S
A
M
P
LE
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
CHANGE MANAGEMENT
S
A
M
P
LE
5.6.
PAGE 58 OF 60
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE 59 OF 60
RECORDS AND DOCUMENTATION (MEG4 1.9.2.6)
6.1.
OEM DOCUMENTATION
6.2.
RECORDS
S
A
M
P
LE
6.
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
MOORING SYSTEM MANAGEMENT PLAN (MSMP)
MOORING SYSTEM MANAGEMENT PLAN REGISTER (MEG4 1.9.2.7)
S
A
M
P
LE
7.
PAGE 60 OF 60
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
M/T “VSLNAME” MOORING SYSTEM MANAGEMENT PLAN (MSMP)
PAGE A-1
APPENDIX – SHIP-SPECIFIC INFORMATION 1.
SHIP IDENTIFICATION
Ship’s Name:
VSLNAME
Ship’s Type:
Crude Oil Tanker
Flag:
Greece
Port of Registry: Call Sign: 9999999
LE
IMO Number: Gross Tonnage: Net Tonnage: Built by: Keel Laying Date:
P
Length O.A.: Length B.P.: Breadth (mld.):
M
Depth (mld.):
Summer Load Draught (extr.): Deadweight at SLD:
COMPANY IDENTIFICATION
A
2.
Company’s Name:
COMPANYNAME
S
Address:
Email Address:
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
M/T “VSLNAME” MOORING SYSTEM MANAGEMENT PLAN (MSMP)
MOORING SYSTEM MANAGEMENT PLAN REGISTER Functional Requirement Scope Listing of permanent mooring equipment
Location
Items
Comments
S A
M
P
MEG4 MSMP Part C.1
LE
3.
PAGE A-2
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
M/T “VSLNAME” MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Comments
LE
Loose (nonpermanent) mooring equipment
Items
P
C.3
Location
M
Functional Requirement Scope Machinery installations
S A
MEG4 MSMP Part C.2
PAGE A-3
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
M/T “VSLNAME” MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Location
Items
Comments
LE
Functional Requirement Scope Critical or specialist equipment
S A
M
P
MEG4 MSMP Part C.4
PAGE A-4
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
M/T “VSLNAME” MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Location
Items
Comments
LE
Functional Requirement Scope Performance standards and requirements
S A
M
P
MEG4 MSMP Part C.5
PAGE A-5
Issue No. 1
Revision No. 0
Effective Date: 01/01/2019
M/T “VSLNAME” MOORING SYSTEM MANAGEMENT PLAN (MSMP)
Mooring equipment and arrangement plan of the deck complementing the above lists where appropriate
4.
Items
Comments
LE
C.7
Location
P
Functional Requirement Scope Ship structure
M
MEG4 MSMP Part C.6
PAGE A-6
MOORING ARRANGEMENT PLAN
S A
The ship-specific mooring arrangement plan is attached herein, together with relevant emergency towing systems’ information.