SHIP TO SHIP (STS) OPERATIONS PLAN
S
A
in accordance with MARPOL Annex I Regulation 41 and taking into account the guidelines contained in the CDI, SIGTTO, ICS and OCIMF’s “Ship to Ship Transfer Guide for Petroleum, Chemicals and Liquefied Gases”, First Edition, 2013 and IMO’s “Manual on Oil Pollution, Section 1 - Prevention” as amended.
ALPHA MARINE CONSULTING P.C. MARINE CONSULTANTS & SURVEYORS T: +30 211 8881000, F: +30 211 8881039 mail@alphamrn.com | www.alphamrn.com
PLAN HISTORY DESCRIPTION Issued for Approval
DATE 01/01/2019
M
P
LE
REV. 0
TOTAL NINTY-EIGHT (98) SHEETS WITH COVER, EXCL. ATTACHMENTS
A
CAUTION
THIS DRAWING OR DOCUMENT IS THE PROPERTY OF ALPHA MARINE CONSULTING AND IT MUST NOT BE PARTIALLY OR WHOLLY COPIED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN PERMISSION OF AMC.
TITLE:
S
SHIP TO SHIP OPERATIONS PLAN
SHIP TYPE:
300,000 DWT CRUDE OIL TANKER
SHIP NAME:
CHECKED BY: DRAWN BY:
DF KA
IMO NO.:
VSLNAME
DWG NO.:
xxxx-STS-0
REV. NO.:
ALPHA MARINE CONSULTING P.C.
HULL NO.:
0
DATE: SIZE:
8184 9999999 01/01/2019 A4 / A3
MARINE CONSULTANTS & SURVEYORS T: +30 211 8881000, F: +30 211 8881039 mail@alphamrn.com | www.alphamrn.com
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 3 OF 98
AMENDMENT RECORD
Amendment Date
Description
Approved by
S
A
M
P
LE
Amendment Number
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 4 OF 98
DISTRIBUTION LIST
This document is to be distributed to ship’s personnel responsible for ship to ship oil transfer operations. Each holder should sign for having received and read the plan. Rank
Date Joined
Signature / Date
S
A
M
P
LE
Name
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 5 OF 98
TABLE OF CONTENTS PAGE
M
P
LE
GENERAL ........................................................................................................... 6 SCOPE ................................................................................................................ 6 MAIN PARTICULARS ......................................................................................... 7 DEFINITIONS...................................................................................................... 8 DUTIES AND RESPONSIBILITIES .................................................................. 10 ORGANIZERS................................................................................................... 10 PERSON IN OVERALL ADVISORY CONTROL (POAC) ................................. 10 MASTER ........................................................................................................... 12 STS SUPERINTENDENT ................................................................................. 12 ALLOCATION OF DUTIES ............................................................................... 13 PROCEDURES ................................................................................................. 15 CONDITIONS AND REQUIREMENTS ............................................................. 15 SAFETY ............................................................................................................ 18 COMMUNICATIONS ......................................................................................... 26 OPERATIONAL PREPARATIONS BEFORE MANOEUVRING ........................ 28 MANOEUVRING AND MOORING .................................................................... 29 PROCEDURES ALONGSIDE ........................................................................... 38 UNMOORING.................................................................................................... 43 EQUIPMENT ..................................................................................................... 45 EMERGENCY PREPAREDNESS .................................................................... 54 CONTINGENCY PLANNING ............................................................................ 54 EMERGENCY SIGNAL ..................................................................................... 54 EMERGENCY SITUATIONS............................................................................. 54 ADVICE ON SOME EMERGENCIES ............................................................... 55 STATE OF READINESS FOR AN EMERGENCY ............................................ 56 EMERGENCY DUTIES ..................................................................................... 56 RECORDS ........................................................................................................ 58 SAFETY CHECKLISTS ..................................................................................... 58 AUDIT CHECKLIST .......................................................................................... 66 NOTIFICATION FORM ..................................................................................... 70 SAMPLE RISK ASSESSMENT FORM ............................................................. 72 RECORD OF STS OPERATIONS .................................................................... 82 INFORMATION ................................................................................................. 83 LIST OF SHIP INTEREST CONTACTS ............................................................ 83 EXAMPLE STS MOORING EQUIPMENT MAP / COMPATIBILITY DATA SHEET AND GUIDELINES FOR DATA ENTRY............................................... 84 EXAMPLE INSTRUCTIONS FOR CONNECTIONS OF STS HOSES .............. 96 DRAWINGS....................................................................................................... 98
S
A
1. 1.1. 1.2. 1.3. 2. 2.1. 2.2. 2.3. 2.4. 2.5. 3. 3.1. 3.2. 3.3. 3.4. 3.5. 3.6. 3.7. 3.8. 4. 4.1. 4.2. 4.3. 4.4. 4.5. 4.6. 5. 5.1. 5.2. 5.3. 5.4. 5.5. 6. 6.1. 6.2.
6.3. 6.4.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 6 OF 98
1. GENERAL 1.1.
SCOPE
This booklet has been prepared in accordance with the requirements of Annex I of the International Convention for the Prevention of Pollution from Ships (MARPOL 73/78), as amended by Resolution MEPC.186 (59), adopted on 17 July 2009, as well as with the requirements of the ICS and OCIMF “Ship-to-ship Transfer Guide, Petroleum”, fourth edition, 2005 and IMO’s “Manual on Oil Pollution, Section 1 – Prevention” as amended.
LE
The purpose of this booklet is to provide guidance to the Master and officers directly involved in ship to ship (STS) oil transfer operations with respect to the steps to be followed when this operation is likely to occur. The procedures developed in this booklet aim at supporting the crew in establishing the safest and most efficient course of action to be taken when conducting STS operations. This booklet contains guidance on general conditions and operational requirements for when the ship is involved in STS operations, during which both ships involved should comply fully with the safety precautions required for normal cargo operations.
2. 3.
A
4.
Oil transfer operations associated with fixed or floating platforms including drilling rigs; floating production, storage and offloading facilities (FPSOs) used for the offshore production and storage of oil; and floating storage units (FSUs) used for the offshore storage of produced oil. Bunkering operations. STS operations necessary for the purpose of securing the safety of a ship or saving life at sea, or for combating specific pollution incidents in order to minimize the damage from pollution. STS operations where either of the ships involved is a warship, naval auxiliary or other ship owned or operated by a State and used, for the time being, only on government non-commercial service.
M
1.
P
The procedures contained in this booklet do not apply to the following:
A copy of this booklet should be available at the following locations onboard: the bridge; the cargo transfer control station; and the engine room.
S
1. 2. 3.
This plan has been approved by the Ship’s Classification Society / Flag Administration and, except as provided below, no alteration or revision shall be made to any part of it without the prior approval of the Classification Society / Flag Administration. Changes to Section 6 will not be required to be approved by the Classification Society / Flag Administration. Section 6 should be maintained up to date by the vessel's managers, owners and operators. The booklet is written in English, which is the working language of the crew.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
1.2.
PAGE 7 OF 98
MAIN PARTICULARS
Ship’s Name:
VSLNAME
Ship’s Type:
Crude Oil Tanker
Flag: Port of Registry: Call Sign: IMO Number:
9999999
INMARSAT Number:
LE
Classification: Gross Tonnage: Net Tonnage: Built by:
P
Year Built:
Length O.A.:
M
Length B.P.: Breadth (mld.): Depth (mld.):
S
A
Summer Load Draught (extr.):
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
1.3.
PAGE 8 OF 98
DEFINITIONS
At Sea The term "at sea" is intended to indicate offshore waters or partially sheltered waters. It may be, however, that an STS transfer operation at sea is to be conducted within the jurisdiction of a local (port) authority or national government. In such cases reference has to be made to local regulations and it may also be necessary to obtain local approval.
LE
Closed Operations Ballasting, loading or discharging operations carried out without recourse to opening ullage and sighting ports. In these cases ships will require the means to enable closed monitoring of tank contents, either by a fixed gauging system or by using portable equipment passed through a vapour lock. Constant Heading Ship During manoeuvring and mooring, the ship that maintains course and speed to allow the manoeuvring ship to approach and moor is referred to as the constant heading ship.
P
Dedicated Lightering Ship A dedicated lightering ship is a ship designed to perform multiple STS operations. These ships are usually fitted with adequate primary and secondary fenders, which upon completion of an STS transfer are capable of being lifted and stowed in onboard cradles. They are usually fitted with their own hoses and are generally capable of performing STS operations without external assistance such as support craft.
M
Discharging Ship The ship containing cargo for transfer to the receiving ship, and which may also be known as the Ship To Be Lightened (STBL). Displacement Ship's total weight including all cargo, ballast, fuel, water, stores, and light ship weight. It may be found for any draught from ship's hydrostatic tables.
A
Ice Covered Waters Means waters where local ice conditions present a structural risk to a ship
S
Manoeuvring Ship During manoeuvring and mooring, the ship that approaches the Constant Heading Ship for mooring operations is referred to as the manoeuvring ship. Organizers Organizers are shore-based operators responsible for arranging an STS transfer operation. The Organizer may be an STS service provider. Person in Overall Advisory Control The person agreed to be in overall control of an STS operation. It may be one of the Masters (generally the Master of the manoeuvring ship) or it may be an STS Superintendent. Primary Fenders Primary fenders are large fenders capable of absorbing the impact energy of berthing and wide enough to prevent contact between the ships should they roll while alongside one another.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 9 OF 98
Receiving Ship The ship to which cargo is transferred from the Discharging Ship. The Receiving Ship may also be known as the lightering ship. Secondary Fenders Secondary fenders are fenders used to prevent contact between the two ships, should they be rolling or not parallel to each other. They are especially effective when rigged towards the ends of a ship and are of most benefit during mooring and unmooring operations. Shipowner Includes an owner, manager or operator having day-to-day commercial and/or operational control of the ship.
LE
Ship-To-Ship (STS) Transfer Operation An STS transfer operation is an operation where crude oil or petroleum products are transferred between seagoing ships moored alongside each other. Such operations may take place when one ship is at anchor or when both are underway. In general, the expression includes the approach manoeuvre, berthing, mooring, hose connecting, safe procedures for cargo transfer, hose disconnecting, unmooring and departure manoeuvre.
P
STS Service Provider An STS service provider is a company or organisation that specializes in providing services for the safe control of STS operations. The service provider may also supply the essential personnel and equipment needed such as hoses, fenders and support craft.
M
STS Superintendent A person who may be designated to assist a ship's Master in the mooring and unmooring of the ships, and to co-ordinate and supervise the entire ship-to-ship transfer operation. He may also be known as Lightering Master or Mooring Master. SWL SWL or Safe Working Load is the operating limit to which equipment is tested for dayto-day use. Equipment should never be used beyond its SWL.
S
A
Transfer Area A transfer area is an area within which an STS transfer operation takes place. Transfer areas should be selected in safe sea areas (see Section 3.1). In coastal areas they will be agreed with nearby coastal authorities and, as appropriate, in accordance with specific port or national regulations. Transfer at Anchor The expression "transfer at anchor" describes an operation where a cargo transfer is carried out between ships when they are moored alongside each other and one of the ships is at anchor. The operation is an alternative to underway transfer. Underway By definition under the International Regulations for Preventing Collisions at Sea (COLREGS) a ship when underway is not at anchor, made fast to the shore or aground. However, she may be either steaming or drifting freely with current and weather.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 10 OF 98
2. DUTIES AND RESPONSIBILITIES
This Section outlines the duties and responsibilities of shipboard personnel (and STS service providers, where applicable) engaged in STS operations. An STS transfer operation should be under the advisory control of one individual (the person in overall advisory control), who will be either one of the Masters concerned, or an STS Superintendent. It is the duty of this person to supervise the STS operations, ensure that the procedures in this booklet are followed (see Sections 3 & 4). It is not intended that the person in overall advisory control in any way relieves the ship’s Master of any of his duties, requirements or responsibilities. ORGANIZERS
2.2.
PERSON IN OVERALL ADVISORY CONTROL (POAC)
S
A
M
P
LE
2.1.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 11 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
2.4.
STS SUPERINTENDENT
LE
MASTER
S
A
M
P
2.3.
PAGE 12 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
2.5.
PAGE 13 OF 98
ALLOCATION OF DUTIES
The titles, locations and duties of all persons involved in the STS operation are outlined below: POAC
M
S
A
Chief Officer
P
LE
Master
Chief Engineer
2nd - 3rd Engineer
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 14 OF 98
Deck Officer on duty:
Officer on Watch:
LE
Engineer Officer on duty: Officer w/ GO certificate
S
A
M
P
Ratings on duty
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 15 OF 98
3. PROCEDURES This Section provides specific procedures aimed at ensuring the safety of the personnel and the protection of the environment during STS operations. CONDITIONS AND REQUIREMENTS
S
A
M
P
LE
3.1.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 16 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 17 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
SAFETY
S
A
M
P
LE
3.2.
PAGE 18 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 19 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 20 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 21 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 22 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 23 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 24 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 25 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
COMMUNICATIONS
S
A
M
P
LE
3.3.
PAGE 26 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 27 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
OPERATIONAL PREPARATIONS BEFORE MANOEUVRING
S
A
M
P
LE
3.4.
PAGE 28 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
MANOEUVRING AND MOORING
S
A
M
P
LE
3.5.
PAGE 29 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 30 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 31 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 32 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 33 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 34 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 35 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 36 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 37 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PROCEDURES ALONGSIDE
S
A
M
P
LE
3.6.
PAGE 38 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 39 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 40 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 41 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 42 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
UNMOORING
S
A
M
P
LE
3.7.
PAGE 43 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 44 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
EQUIPMENT
S
A
M
P
LE
3.8.
PAGE 45 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 46 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 47 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 48 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 49 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 50 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 51 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 52 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
S
A
M
P
LE
PAGE 53 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 54 OF 98
4. EMERGENCY PREPAREDNESS This Section outlines the necessary precautionary measures in place required to ensure the safety of the ship and its crew, as well as the protection of the environment, in case of an emergency situation during STS operations. This Section should be read in conjunction with relevant Safety Management System procedures. CONTINGENCY PLANNING
4.2.
EMERGENCY SIGNAL
A
M
P
LE
4.1.
EMERGENCY SITUATIONS
S
4.3.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
ADVICE ON SOME EMERGENCIES
S
A
M
P
LE
4.4.
PAGE 55 OF 98
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 56 OF 98
STATE OF READINESS FOR AN EMERGENCY
4.6.
EMERGENCY DUTIES
LE
4.5.
In case of accidents that may arise during the transfer of oil, particularly in the case of spillages of oil, the guidance included in the ship’s SOPEP should be followed. However, the following table containing emergency duties assigned to designated members of the crew may be used as general guidance:
A
M
P
Master
Acting as a "SPILL RESPONSE OFFICER"
S
Chief Officer
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 57 OF 98
Chief Engineer
2nd - 3rd Engineer
LE
Deck Officer on duty:
P
Engineer Officer on duty:
S
A
Ratings on duty
M
Officer holding GO certificate
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 58 OF 98
5. RECORDS
Records relevant to the STS operations comprise the following: 1. Safety Checklists (see Section 5.1) 2. Audit Checklist (see Section 5.2 – where applicable) 3. Notification Forms (see Section 5.3) 4. Risk Assessment Form (see Section 5.4) 5. Records as required by Chapters 3 and 4 of the revised Annex I of MARPOL 73/78 (resolution MEPC.117(52)) (Requirements for recording bunkering and oil cargo transfer operations in the Oil Record Book) 6. Record of STS Operations (see Section 5.5)
5.1.
SAFETY CHECKLISTS
LE
The above records shall be retained onboard for a minimum period of three (3) years and shall be readily available for inspection by duly authorized Officers of the Flag State.
S
A
M
P
Safety Checklists No. 1-5 included in this Section are provided in chronological order and should be completed at the appropriate time and verified by the person in overall advisory control for each STS operation. Checklist No. 6 should be completed in case the oil transfer operation takes place in ice covered waters.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 59 OF 98
S
A
M
P
LE
SHIP-TO-SHIP TRANSFER CHECKLIST No.1 – PRE-FIXTURE INFORMATION (BETWEEN SHIP OPERATOR / CHARTERER AND ORGANIZER) Ship’s Name: IMO No. Ship Operator: Ship Charterer: STS Organizer: Preferred Contact No. Ship Operator's Remarks (e.g. INMARSAT) Confirmation 1. What is the LOA? What is the parallel body length at loaded and ballast draughts? 2. Will the transfer be conducted underway and, if so, can the ship maintain about five knots for a minimum of two hours? 3. Is the ship's manifold arrangement in accordance with OCIMF Recommendations for Oil Tanker Manifolds and Associated Equipment? 4. Is the ship's lifting equipment in accordance with OCIMF Recommendations for Oil Tanker Manifolds and Associated Equipment? 5. What is the maximum and minimum expected height of the cargo manifold from the waterline during the transfer? 6. Sufficient manpower will be provided for all stages of the operation? 7. Are enclosed fairleads and mooring bitts in accordance with OCIMF Mooring Equipment Guidelines and are they of a sufficient number? 8. Can the ship supplying the moorings provide all lines on winch drums? 9. If moorings are wires or high modulus synthetic fibre ropes, are they fitted with synthetic tails at least eleven meters in length? 10. Full-sized mooring bitts of sufficient strength are suitably located near all enclosed fairleads to receive mooring ropes eyes? 11. Both sides of the ship are clear of any overhanging projections including bridge wings? 12. The transfer area has been agreed? FOR DISCHARGING SHIP / RECEIVING SHIP (Delete as appropriate) Name: Rank: Signature: Date:
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 60 OF 98
S
A
M
P
LE
SHIP-TO-SHIP TRANSFER CHECKLIST No.2 – BEFORE OPERATIONS COMMENCE Discharging Ship’s Name: Receiving Ship’s Name: Date of Transfer: Discharging Receiving Remarks Ship Ship Checked Checked 1. The two ships have been advised by shipowners that Checklist No.1 has been completed satisfactorily? 2. Personnel comply with rest requirements of ILO 180, STCW or national regulations as appropriate? 3. Radio communications are established? 4. Language of operations has been agreed? 5. The rendezvous position off the transfer area is agreed? 6. Berthing and mooring procedures are agreed, including fender positions and number/type of ropes to be provided by each ship? 7. The system and method of electrical insulation between ships has been agreed? 8. The ships are upright and at a suitable trim without any overhanging projections? 9. Engines, steering gear and navigational equipment have been tested and found in good order? 10. Ship's boilers and tubes have been cleared of soot and it is understood that during STS operations, tubes must not be blown? 11. Engineers have been briefed on engine speed (and speed adjustment) requirements? 12. Weather forecasts have been obtained for the transfer area? 13. Hose lifting equipment is suitable and ready for use? 14. Cargo transfer hoses are properly tested and certified and in apparent good condition? 15. Fenders and associated equipment are visually in apparent good order? 16. The crew has been briefed on the procedure? 17. The contingency plan is agreed? 18. Local authorities have been advised about the operation? 19. A navigational warning has been broadcast? 20. The other ship has been advised that Check-list 2 is satisfactorily completed? FOR DISCHARGING SHIP / RECEIVING SHIP (Delete as appropriate) Name: Rank: Signature: Issue No. 1
Date: Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 61 OF 98
Remarks
S
A
M
P
LE
SHIP-TO-SHIP TRANSFER CHECKLIST No.3 – BEFORE RUN-IN AND MOORING Discharging Ship’s Name: Receiving Ship’s Name: Date of Transfer: Discharging Receiving Ship Ship Checked Checked 1. Checklist No.2 has been satisfactorily completed? 2. Primary fenders are floating in their proper place? Fender pennants are in order? 3. Secondary fenders are in place, if required? 4. Over side protrusions on side of berthing are retracted? 5. A proficient helmsman is at the wheel? 6. Cargo manifold connections are ready and marked? 7. Course and speed information has been exchanged and is understood? 8. Ship's speed adjustment is controlled by changes to revolutions and/or propeller pitch? 9. Navigational signals are displayed? 10. Adequate lighting is available? 11. Power is on winches and windlass and they are in good order? 12. Rope messengers, rope stoppers and heaving lines are ready for use? 13. All mooring lines are ready? 14. All mooring personnel are in position? 15. Communications are established with mooring personnel? 16. The anchor on opposite side to transfer is ready for dropping? 17. The other ship has been advised that Checklist No.3 is satisfactorily completed? FOR DISCHARGING SHIP / RECEIVING SHIP (Delete as appropriate) Name: Rank: Signature: Date:
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 62 OF 98
Remarks
S
A
M
P
LE
SHIP-TO-SHIP TRANSFER CHECKLIST No.4 – BEFORE CARGO TRANSFER Discharging Ship’s Name: Receiving Ship’s Name: Date of Transfer: Discharging Receiving Ship Ship Checked Checked 1. The ISGOTT Ship/Shore Safety Checklist has been satisfactorily completed? 2. Procedures for transfer of personnel have been agreed? 3. The gangway (if used) is in good position and well secured? 4. An inter-ship communication system is agreed? 5. Emergency signals and shutdown procedures are agreed? 6. An engine room watch will be maintained throughout transfer and the main engine ready for immediate use? 7. Fire axes or suitable cutting equipment is in position at fore and aft mooring stations? 8. A bridge watch and/or an anchor watch are established? 9. Officers in charge of the cargo transfer on both ships are identified and posted? 10. A deck watch is established to pay particular attention to moorings, fenders, hoses, manifold observation and cargo pump controls? 11. The initial cargo transfer rate is agreed with other ship? 12. The maximum cargo transfer rates agreed with the other ship? 13. The topping-off rate is agreed with other ship? 14. Cargo hoses are well supported? 15. Tools required for rapid disconnection are located at the cargo manifold? 16. Details of the previous cargo of the receiving ship have been given to the discharging ship? 17. The other ship has been advised that Checklist No.4 is satisfactorily completed? FOR DISCHARGING SHIP / RECEIVING SHIP (Delete as appropriate) Name: Rank: Signature: Date:
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 63 OF 98
Remarks
S
A
M
P
LE
SHIP-TO-SHIP TRANSFER CHECKLIST No.5 – BEFORE UNMOORING Discharging Ship’s Name: Receiving Ship’s Name: Date of Transfer: Discharging Receiving Ship Ship Checked Checked 1. Cargo hoses are properly drained prior to hose disconnection? 2. Cargo hoses or manifolds are blanked? 3. The transfer side of the ship is clear of obstructions (including hose lifting equipment)? 4. Secondary fenders are correctly positioned and secured for departure? 5. The method of unberthing and of letting go moorings has been agreed with the other ship? 6. Fenders, including fender pennants, are in good order? 7. Power is on winches and windlass? 8. There are rope messengers and rope stoppers at all mooring stations? 9. The crew is standing by at their mooring stations? 10. Communications are established with mooring personnel and with the other ship? 11. Shipping traffic in the area has been checked? 12. Main engine(s) and steering gear have been tested and are in a state of readiness for departure? 13. Mooring personnel have been instructed to let go only as requested by the manoeuvring ship? 14. Navigational warnings have been cancelled (when clear of other ship)? 15. The other ship has been advised that Checklist No.5 is satisfactorily completed? FOR DISCHARGING SHIP / RECEIVING SHIP (Delete as appropriate) Name: Rank: Signature: Date:
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 64 OF 98
S
A
M
P
LE
SHIP-TO-SHIP TRANSFER CHECKLIST No.6 – OPERATIONS IN ICE COVERED WATERS Discharging Ship’s Name: Receiving Ship’s Name: Date of Transfer: Discharging Receiving Remarks Ship Ship Checked Checked 1. Valves: Overboard discharge valves closed? Valves not in use secured? Transfer valves operate through full range? Transfer pipelines connections checked? Double checked arrangements with crew? Scuppers and freeing ports plugged? 2. Containment and absorbents: Permanent containment? Portable containment? Absorbent material? 3. Accommodation: Doors, deadlights / shutters / ports / vents closed? Air conditioning re-circulations mode? Accommodation ventilation shut? 4. Navigation bridge: Hoist appropriate signals? Announcement of impending transfer? 5. Restricted activities: Hot work? Smoking (except designated areas)? Matches and lighters? Portable electric lamps? Equipment on extension cords? 6. Unless intrinsically safe, restricted use of: Portable R/T sets. Lamps. Hand lamps. Flashlights. Other electrical devices. Portable domestic radio. Photographic flash equipment. Portable electronic calculator. Tape recorders. Wireless telephone. Other battery powered equipment. Radiating HF radios. Satcom and positioning systems. 7. Engine Room: Engine exhaust monitored for sparks? Spark arrestor functioning? Boiler soot blowing not permitted? Ground faults traced and isolated? Machinery spaces ventilation shut? 8. Emergency procedures: Crew should be versed and rehearsed in Emergency procedures & Fire fighting equipment. 9. Routine check of moorings and fenders 10. Safety equipment: Lifebuoys. Approved lifejackets/PFD. Appropriate cold weather clothing. Flashlights. First aid kit. Reflective material on personnel at night.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 65 OF 98
S
A
M
P
LE
SHIP-TO-SHIP TRANSFER CHECKLIST No.6 – OPERATIONS IN ICE COVERED WATERS (cont’d) 11. Fire fighting equipment: Fire extinguishers in place? Fire hose rolled out on deck? Fire fighting systems, main and emergency pumps on standby? 12. Lighting: Adequate lighting vessel & shore facilities? Work boat equipped with spotlight? 13. Transfer hoses: Valid hose certificate? Indelibly marked: - “For Oil’? Date of manufacture? Bursting pressure? Working pressure? Date of last test? Pressure applied under test? 14. Examine: Condition of “O” ring/joints. Hose to coupling clamps. Complete hose system. Hose strain relief system for floating hose. FOR DISCHARGING SHIP / RECEIVING SHIP (Delete as appropriate) Name: Rank: Signature: Date:
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
5.2.
PAGE 66 OF 98
AUDIT CHECKLIST
S
A
M
P
LE
The Audit Checklist included in this Section is to be completed by the person in overall advisory control or the Company for each STS operation in case an STS Superintendent is used.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 67 OF 98
SHIP-TO-SHIP TRANSFER CHECKLIST No.7 – STS SUPERINTENDENT AUDIT Company Name: Address: Tel.: Fax: E-mail: Primary Contact: Remarks / Answer STS Superintendent Company 1.
LE
2. 3. 4.
P
5.
7.
A
8.
M
6.
9.
S
10. 11. 12.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 68 OF 98
SHIP-TO-SHIP TRANSFER CHECKLIST No.7 – STS SUPERINTENDENT AUDIT (cont’d) Remarks / Answer 13. 14. 15.
LE
16. 17. 20.
P
21.
23.
A
24.
M
22.
25.
S
26.
1. 2.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 69 OF 98
SHIP-TO-SHIP TRANSFER CHECKLIST No.7 – STS SUPERINTENDENT AUDIT (cont’d) Remarks / Answer 3. 4. 5.
LE
6. 7. 8.
Date:
S
A
M
P
FOR THE COMPANY / SHIP (Delete as appropriate) Name: Rank: Signature:
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
5.3.
PAGE 70 OF 98
NOTIFICATION FORM
S
A
M
P
LE
The Notification Form included in this Section is to be completed by the person in overall advisory control for each STS operation conducted within the territorial sea, or the exclusive economic zone of a country, not less than 48 hours in advance of the scheduled STS operations. Where, in an exceptional case, all of the information required to be provided is not available not less than 48 hours in advance, the ship discharging the oil cargo shall notify the Party to the Convention, not less than 48 hours in advance that an STS operation will occur and the information specified above shall be provided to the Party at the earliest opportunity. Once the initial report for any Estimated Time of Arrival (ETA) has been made, it should, if possible, be updated when a variance of more than six hours is expected from the time given in the latest report. Each time stated in a report required by this section must be given in Greenwich Mean Time (GMT).
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 71 OF 98
SHIP-TO-SHIP TRANSFER NOTIFICATION FORM Ship’s Name: Flag: Ship Operator:
IMO No.: Call Sign:
Contact Details: Ship Charterer:
LE
STS Person in overall advisory control: Contact Details:
STS Service Provider (if applicable): Contact Details:
M
P
Ship’s estimated time of arrival (ETA): Date at the commencement of STS operations: Time at the commencement of STS operations: Geographical location at the commencement of STS operations:
At anchor
A
STS operations are to be conducted: Underway Identity of product and quantity to be transferred: a. Product: Quantity: b. Product: Quantity: Planned duration of the STS operations:
S
Remarks:
The undersigned declares that the vessel has onboard an STS Operations Plan in accordance with the requirements of Annex I of the International Convention for the Prevention of Pollution from Ships (MARPOL 73/78), as amended. FOR DISCHARGING SHIP / RECEIVING SHIP (Delete as appropriate) Name: Rank: Signature: Date:
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
5.4.
PAGE 72 OF 98
SAMPLE RISK ASSESSMENT FORM
ASSESSMENT DATE DD/ MM/YY
RISK ASSESSMENT (RA) SHORT NAME RA REFERENCE NO.
SHIP GENERATED RISK ASSESSMENT VESSEL’S NAME
STS OPERATION
MASTER
DATE NAME / SIGNATURE
SHORE GENERATED RISK ASSESSMENT DEPARTMENT TITLE
(DD/MM/YY)
DATE NAME / SIGNATURE
(DD/MM/YY)
PROBLEM DEFINITION AND SYSTEM DESCRIPTION - Define the vessel and/or the activity whose risk is to be studied
STEP 2
HAZARD / INCIDENT IDENTIFICATION (HAZID) - DEVELOPMENT OF HYPOTHETICAL SCENARIOS
A
M
P
LE
STEP 1
EXISTING CONTROL MEASURES
S
STEP 3
RISK ESTIMATION / EVALUATION OF PROBABILITY AND CONSEQUENCE UNDER EXISTING CONTROL MEASURES PROBABILITY CATEGORY (Based CONSEQUENCE CATEGORY (Based RISK 3 4 on the existing control measures) on the existing control measures) SCORE INITIAL PROBABILITY CONSEQUENCE Table 1 Table 2 Xmultiply INITIAL =equal 12 (FREQ’CY) ASSESSMENT: CATEGORY ASSESSMENT: score score
STEP 4
STEP 5
LEVEL OF RISK BASED ON EXISTING CONTROL MEASURES
Issue No. 1
Issue Date: DD/MM/YY
1–3 LOW
Amendment No. 0
4 –9 MEDIUM
>9 HIGH
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 73 OF 98
ADDITIONAL / NEW CONTROL MEASURES (Prevention / mitigation or alternative (control) measures) DESCRIPTION OF ADDITIONAL CONTROL DEPT. / PERSON MEASURES OR ALTERNATIVE MEASURES IN CHARGE
STEP 6
Masters / Person in overall advisory control (POAC) Operator Master / POAC
ACTION DATE
Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to the STS mooring operation Prior to the STS mooring operation Prior to the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS
LE
Master / POAC
TARGET DATE (COMPLETION)
Master / POAC Master / POAC
P
Master / POAC
S
A
M
Master / POAC Master / POAC Master / POAC Master Master / POAC Master Master Master / POAC Master / POAC Master Master / POAC
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 74 OF 98
ADDITIONAL / NEW CONTROL MEASURES (Prevention / mitigation or alternative (control) measures) DESCRIPTION OF ADDITIONAL CONTROL DEPT. / PERSON MEASURES OR ALTERNATIVE MEASURES IN CHARGE
STEP 6
Master / POAC Master / POAC Master / POAC
ACTION DATE
LE
Master / POAC
TARGET DATE (COMPLETION) mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation 24 hours prior to the STS mooring operation Prior to the STS mooring operation Prior to / during the STS mooring operation Prior to / upon receipt of hoses Prior to / upon receipt of hoses Prior to / upon receipt of hoses Prior to arriving at the STS area
Master / POAC Master / POAC
P
Master / POAC
S
A
M
Master / POAC Master / POAC Master / POAC Master / POAC Operator Master / POAC Chief Officer Chief Officer Chief Officer
Chief Officer, OOW Master / Chief Engineer / Chief Officer
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Prior to STS operation
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 75 OF 98
ADDITIONAL / NEW CONTROL MEASURES (Prevention / mitigation or alternative (control) measures) DESCRIPTION OF ADDITIONAL CONTROL DEPT. / PERSON MEASURES OR ALTERNATIVE MEASURES IN CHARGE
STEP 6
TARGET DATE (COMPLETION) During the STS operation
Master
Prior to STS operation
Master / POAC
Prior to / during the STS mooring operation
Master
During the STS operation
LE
Master / Chief Engineer
ACTION DATE
Master
Prior to the STS mooring operation
Master / POAC
Prior to the STS mooring operation
P
Master, OOW
S
A
M
Master
Issue No. 1
Issue Date: DD/MM/YY
Prior to / during the STS operation Prior to / during the STS operation
Master
Prior to STS berthing / unberthing
Master / POAC
Prior to the STS operation
Master / POAC
Prior to the STS operation
Master / POAC
Prior to the STS operation
Master / Chief Engineer
Prior to the STS operation
Chief Engineer
Prior to the STS operation
Master
When two vessels are alongside
Master
During the STS operation
Chief Officer
During the cargo transfer
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 76 OF 98
ADDITIONAL / NEW CONTROL MEASURES (Prevention / mitigation or alternative (control) measures) DESCRIPTION OF ADDITIONAL CONTROL DEPT. / PERSON MEASURES OR ALTERNATIVE MEASURES IN CHARGE
STEP 6
TARGET DATE (COMPLETION)
Master/ Ch.Officer
During the cargo transfer
Master / Ch.Officer
During the cargo transfer
ACTION DATE
Prior to / during the STS operation During planning of Master / the STS Ch.Officer operation Prior to / during Master / the STS Ch.Officer operation Upon berthing / Master / during the STS Ch.Officer operation Prior to / during the STS Master / POAC mooring operation Re-evaluate and re-define the consequence and frequency categories (see Tables 1 & 2 in Step 3) after implementation of PROPOSED ADDITIONAL CONTROL MEASURES
P
LE
Master
3
CONSEQUENCE CATEGORY (After prevention and mitigation measures)
M
PROBABILITY CATEGORY (After prevention and mitigation measures) PROBABILITY (FREQUENCY) ASSESSMENT:
Table 1
Xmultiply
CONSEQUENCE CATEGORY ASSESSMENT:
Table 2
score
A
LEVEL OF RISK BASED ON ADDITIONAL (NEW) CONTROL MEASURES
3
RISK SCORE
=equal
9
score
1–3 LOW
4 –9 MEDIUM
>9 HIGH
S
IF ADDITIONAL CONTROL MEASURES DO NOT REDUCE THE RISK IN ACCEPTABLE LEVEL, THE ASSESSMENT MUST BE REPEATED BY ADDING FURTHER CONTROL MEASURES. IN THIS CASE OFFICE ASSISTANCE MUST BE REQUESTED AND THE ACTIVITY UNDER ASSESSMENT SHOULD NOT BE CARRIED OUT UNTIL OFFICE INSTRUCTIONS AND/OR ASSISTANCE IS PROVIDED.
STEP 7
FOLLOW-UP
ADDITIONAL (NEW) / ALTERNATIVE (CONTROL) MEASURES IMPLEMENTATION (as described in STEP 6)
TARGET DATE COMPLE- PERSON IN CHARGE TION FOR VERIFICATION OF DATE (1) NEW CONTROL MEASURES NAME / TITLE / SIGNATURE
Prior to / during the STS mooring operation
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Masters / Person in overall advisory control (POAC)
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
STEP 7
PAGE 77 OF 98
FOLLOW-UP
ADDITIONAL (NEW) / ALTERNATIVE (CONTROL) MEASURES IMPLEMENTATION (as described in STEP 6)
TARGET DATE COMPLE- PERSON IN CHARGE TION FOR VERIFICATION OF DATE (1) NEW CONTROL MEASURES NAME / TITLE / SIGNATURE
Operator Master / POAC Master / POAC
S
A
M
P
LE
Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation
Issue No. 1
Issue Date: DD/MM/YY
Master / POAC Master / POAC Master / POAC Master / POAC Master / POAC Master / POAC Master
Prior to the STS mooring operation
Master / POAC
Prior to the STS mooring operation
Master
Prior to the STS mooring operation
Master
Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation
Amendment No. 0
Master / POAC Master / POAC Master
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
STEP 7
PAGE 78 OF 98
FOLLOW-UP
ADDITIONAL (NEW) / ALTERNATIVE (CONTROL) MEASURES IMPLEMENTATION (as described in STEP 6)
TARGET DATE COMPLE- PERSON IN CHARGE TION FOR VERIFICATION OF DATE (1) NEW CONTROL MEASURES NAME / TITLE / SIGNATURE
Master / POAC Master / POAC Master / POAC
S
A
M
P
LE
Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation Prior to / during the STS mooring operation 24 hours prior to the STS mooring operation Prior to the STS mooring operation Prior to / during the STS mooring operation Prior to / upon receipt of hoses
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Master / POAC Master / POAC Master / POAC Master / POAC Master / POAC Master / POAC Master / POAC Master / POAC
Master / POAC Operator
Master / POAC
Chief Officer
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
STEP 7
PAGE 79 OF 98
FOLLOW-UP
ADDITIONAL (NEW) / ALTERNATIVE (CONTROL) MEASURES IMPLEMENTATION (as described in STEP 6)
TARGET DATE COMPLE- PERSON IN CHARGE TION FOR VERIFICATION OF DATE (1) NEW CONTROL MEASURES NAME / TITLE / SIGNATURE
Chief Officer
Prior to / upon receipt of hoses
Chief Officer
Prior to arriving at the STS area
Chief Officer, OOW
Prior to STS operation
Master / Chief Engineer / Chief Officer
During the STS operation
Master / Chief Engineer
Prior to STS operation
Master
Prior to / during the STS mooring operation
Master / POAC
During the STS operation
Master
Prior to the STS mooring operation
Master
Prior to the STS mooring operation
Master / POAC
Prior to / during the STS operation
Master, OOW
Prior to / during the STS operation
Master
Prior to STS berthing / unberthing
Master
Prior to the STS operation
Master / POAC
S
A
M
P
LE
Prior to / upon receipt of hoses
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
STEP 7
PAGE 80 OF 98
FOLLOW-UP
ADDITIONAL (NEW) / ALTERNATIVE (CONTROL) MEASURES IMPLEMENTATION (as described in STEP 6)
TARGET DATE COMPLE- PERSON IN CHARGE TION FOR VERIFICATION OF DATE (1) NEW CONTROL MEASURES NAME / TITLE / SIGNATURE
Master / POAC
Prior to the STS operation
Master / POAC
Prior to the STS operation
Master / Chief Engineer
Prior to the STS operation
Chief Engineer
When two vessels are alongside
Master
During the STS operation
Master
During the cargo transfer
Chief Officer
During the cargo transfer
Master/ Ch.Officer
During the cargo transfer
Master / Ch.Officer
A
M
P
LE
Prior to the STS operation
S
Prior to / during the STS Master operation During planning of the STS Master / Ch.Officer operation Prior to / during the STS Master / Ch.Officer operation Upon berthing / during the STS Master / Ch.Officer operation Prior to / during the STS Master / POAC mooring operation (1) COMPLETION DATE: Declares the date that the implementation of additional control measures has been completed. This date must not be later than Target Date. If for any reason Completion Date will be later than Target Date, the RA team should inform Management in advance for immediate action/assistance in order to reach the Target date or to decide for an extension, if possible, after re-assessment. Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 81 OF 98
ASSESSOR (NAME): (TITLE/RANK):
SIGNATURE
LEGAL REVIEW REQUIRED? RISK ASSESSMENT RESULTS TO BE SHARED WITHIN THE FLEET IS RE-ASSESSMENT REQUIRED? DPT. HEAD / MASTER (NAME): (TITLE/RANK):
YES YES YES
NO NO NO
S
A
M
P
LE
SIGNATURE
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
5.5.
PAGE 82 OF 98
RECORD OF STS OPERATIONS
To be retained onboard for at least three years Location
Other vessel
Oil Type
Remarks
S
A
M
P
LE
Voyage no:
-
Checklists and other relevant records for each STS Operation attached Abstract from Loading / Discharge computer from each STS Operation attached for reference
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 83 OF 98
6. INFORMATION
6.1.
LIST OF SHIP INTEREST CONTACTS
Owners Operators: Address: Telephone:
Facsimile:
Administration:
LE
Address: Telephone:
Facsimile:
Classification Address:
Facsimile:
POSITION General Manager
SHIP MANAGEMENT NAME TELEPHONE
MOBILE
S
A
M
Operations Manager - Team Coordinator Deputy Operations Manager Technical Dept. Manager Deputy Technical Manager Senior Supt. Engineer Crew Dept. Manager
P
Telephone:
Deputy Crew Dept. Manager DPA Deputy DPA
Note: For Coastal State Contacts, refer to MSC-MEPC.6/Circ.X (published each year in December by IMO), which is to be kept updated by shipboard personnel.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
6.2.
PAGE 84 OF 98
EXAMPLE STS MOORING EQUIPMENT MAP / COMPATIBILITY DATA SHEET AND GUIDELINES FOR DATA ENTRY
IMO No : Summer Deadweight Summer Displacement Lightship Summer Draft Freeboard @ Summer dwt Normal Ballast Condition Deadweight Normal Ballast Condition Displacement Lightship (Check) FWA TPC Ballast Draft Aft Ballast Draft Forward Ballast Draft Mean Maximum Air-draft Normal Ballast condition No of Manifolds Per Side Distance manifolds to ship's rail Cargo Manifold Nominal Bore Height of manifold above W/L at summer dwt Ht of manifold above W/L in normal ballast condition Height of Manifold Centre above Keel Block Coefficient (Cb) @ Full Load Δ Distance stern to Aft Perpendicular Distance bow to Forward Perpendicular Main Engine Minimum Speed Maximum Duration at Minimum RPM Correlating Propeller Speed assuming zero slip
P
VLCC 334.071 Metres 320.000 Metres 58.040 Metres 58.00 Metres 31.250 Metres 67.80 Metres 270.010 Metres 164.061 Metres 111.00 Metres 84.00 Metres 27.00 Metres 152.00 Metres 94.50 Metres 57.50 Metres 173.90 Metres 94.50 Metres 79.40 Metres 105 889 160 216 151 168 N/A 2 20 Tonnes
S A
M
Vessel : Tonnage Band Length Overall Length B.P Extreme Breadth Moulded Breadth Moulded Depth Keel to Masthead Bow to mid-point manifold (B.C.M) Stern to mid-point manifold (S.C.M) Lightship P.B.L Lightship Forward P.B.L Lightship Aft P.B.L Normal Ballast P.B.L Normal Ballast Forward P.B.L Normal Ballast Aft P.B.L P.B.L at Summer Dwt Summer dwt Forward P.B.L Summer dwt Aft P.B.L Net Registered Tonnage Gross Tonnage Suez Tonnage Panama Tonnage Number of Hose Crane/Derrick(s) SWL of Hose Crane/Derrick Max Outreach of Hose Crane /Derrick outboard of ship's rail
LE
6.2.1. Particulars
Issue No. 1
Issue Date: DD/MM/YY
8.40
Metres
Amendment No. 0
Amendment Date: DD/MM/YY
306 497 348 818 42 321 22.524 6.962 109 820 152 240 42 420 504 173 12.42 9.10 10.76 55.38 3 4275 500 10.88 23.20 33.40 0.81407 6.0505 8.0205 20 12 4.4
Metric Tonnes Metric Tonnes Metric Tonnes Metres Metres Metric Tonnes Metric Tonnes Metric Tonnes mm Tonnes/cm Metres Metres Metres Metres mm mm Metres Metres Metres metres metres RPM Hours Knots
M/T “VSLNAME“ STS OPERATIONS PLAN
Mooring Ropes on Drums
Other mooring Lines
11 11 11 11
Metres Metres Metres Metres Metres Metres Metres Metres
0 2
220
Metres Metres Metres Metres
2 4
220
Issue No. 1
Material IWRC IWRC IWRC IWRC
Dia 40 mm 40 mm 40 mm 40 mm
Polyester/Polyprop
76 76 76 76
Issue Date: DD/MM/YY
Amendment No. 0
mm mm mm mm
103 103 103 103
M.B.L Metric Tonnes Metric Tonnes Metric Tonnes Metric Tonnes
143.8 143.8 143.8 143.8
Metric Tonnes Metric Tonnes Metric Tonnes Metric Tonnes
mm mm mm mm
Synthetic
68
Synthetic
68
mm mm mm mm
14 14 127
mm
Number of Shackles Port Anchor Cable Number of Shackles Starboard Anchor Cable Cable Diameter
S A
Anchor Cable Particulars
Length 275 Metres 275 Metres 275 Metres 275 Metres
LE
Mooring Wire Tails
No 6 4 4 6 20 6 4 4 6 20
P
Mooring Wires on Drums
Location Forecastle Forward Main Deck Aft Main Deck Poop Total Forecastle Forward Main Deck Aft Main Deck Poop Total Forecastle Forward Main Deck Aft Main Deck Poop Total Forecastle Forward Main Deck Aft Main Deck Poop Total
M
Description
PAGE 85 OF 98
Amendment Date: DD/MM/YY
Metric Tonnes Metric Tonnes Metric Tonnes Metric Tonnes
68.6
68.6
Metric Tonnes Metric Tonnes Metric Tonnes Metric Tonnes
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 86 OF 98
6.2.2. STS Compatibility Data Sheet Ship's Name
Ship's IMO No Manifold Height above waterline 10.89 metres 22.00 Total Parallel Body Length 174.93 metres 23.00 Forward Parallel Body Length 94.50 metres 22.50 Total Parallel Body Length 80.43 metres Unless otherwise stated all numerical values below refer to distances in metres Port Fairleads Distance from Vertical Vertical manifold mid point Height Size SWL Height Fairlead Type above (mm) (Tonnes) above Fwd or Distance Keel W/L Aft 30.49 Open Roller Fairlead 400x250 136.0 7.47 164.06 Aft 30.49 Closed Chock 500x400 136.0 7.48 162.12 Aft 30.49 Closed Chock 500x400 136.0 7.48 160.67 Aft 30.49 Closed Chock 500x400 136.0 7.48 159.71 Aft 30.49 Closed Chock 500x400 136.0 7.50 155.59 Aft 30.49 Closed Chock 500x400 136.0 7.50 153.66 Aft 30.49 Closed Chock 500x400 136.0 7.51 151.96 Aft 30.49 Closed Chock 500x400 136.0 7.51 151.24 Aft 30.49 Closed Chock 500x400 136.0 7.52 149.79 Aft 30.49 Closed Chock 500x400 136.0 7.52 148.58 Aft 31.45 Closed Chock 500x400 136.0 8.69 82.78 Aft 31.45 Closed Chock 500x400 136.0 8.69 81.33 Aft 31.45 Closed Chock 500x400 136.0 8.69 79.88 Aft 31.45 Closed Chock 500x400 136.0 8.71 74.06 Aft 31.45 Closed Chock 500x400 136.0 8.72 72.86 Aft 31.45 Closed Chock 500x400 136.0 8.72 71.41 Aft 31.45 Closed Chock 500x400 136.0 8.84 33.01 Aft 31.45 Panama Chock 500x400 Unknown 8.94 1.99 Aft 31.45 Panama Chock 500x400 Unknown 8.94 0.00 Aft 31.45 Panama Chock 500x400 Unknown 8.95 1.99 Fwd
0.00 9.43 10.16 10.40 12.82 13.79 14.51 15.24 15.97 16.69 29.00 29.00 29.00 29.00 29.00 29.00 29.00 29.00 29.00 29.00
Issue No. 1
Additional Information
P
C/L1 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 P18 P19
Transverse Dist from C/L
S A
Identity
Long’nal Distance from stern 0.00 1.94 3.39 4.35 8.47 10.40 12.10 12.82 14.27 15.48 81.28 82.73 84.18 90.00 91.20 92.65 131.05 162.07 164.06 166.05
M
Forward Aft Mean
LE
Drafts
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
STS Aft Manifold Manifold Manifold
Draft at Station 23.02 23.01 23.01 23.01 22.99 22.99 22.98 22.98 22.97 22.97 22.76 22.76 22.76 22.74 22.73 22.73 22.61 22.51 22.51 22.50
M/T “VSLNAME“ STS OPERATIONS PLAN
Identity S1 S2 S3 S4 S5 S6 S7 S8 S9 S10
Long'nal Distance from stern 1.94 3.39 4.35 8.47 10.40 12.10 12.82 14.27 15.48 81.28
Transverse Dist from C/L 9.43 10.16 10.40 12.82 13.79 14.51 15.24 15.97 16.69 29.00
Issue No. 1
Size (mm)
Vertical Height above Keel 30.49 30.49 30.49 30.49 30.49 30.49 30.49 30.49 30.49 31.45
Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock
500x400 136.0 500x400 136.0 500x400 136.0 500x400 136.0 500x400 136.0 500x400 136.0 500x400 136.0 500x400 136.0 500x400 136.0 500x400 136.0 500x400 136.0 500x400 136.0 500x400 136.0 600x450 204.0 Starboard Fairleads
Fairlead Type
Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock
Issue Date: DD/MM/YY
Amendment No. 0
Vertical Height above W/L 9.06 9.22 9.22 9.22 9.46 9.50 9.52 9.76 9.55 10.60 10.65 10.90 11.16 11.40
Distance from manifold mid point Fwd or Distance Aft 36.99 Fwd 87.04 Fwd 88.50 Fwd 89.71 Fwd 104.94 Fwd 106.39 Fwd 107.60 Fwd 139.77 Fwd 41.71 Fwd 157.68 Fwd 158.88 Fwd 160.84 Fwd 169.29 Fwd 169.77 Fwd
Vertical Height above W/L 7.48 7.48 7.48 7.50 7.50 7.51 7.51 7.52 7.52 8.69
Distance from manifold mid point Fwd or Distance Aft 162.12 Aft 160.67 Aft 159.71 Aft 155.59 Aft 153.66 Aft 151.96 Aft 151.24 Aft 149.79 Aft 148.58 Aft 82.78 Aft
LE
Fairlead Type
SWL (Tonnes)
P
29.00 29.00 29.00 29.00 28.78 28.72 28.67 22.01 21.29 14.51 13.55 12.58 3.29 0.97
Vertical Height above Keel 31.45 31.45 31.45 31.45 31.64 31.67 31.69 31.83 31.93 32.61 32.66 32.90 33.14 33.38
M
P20 P21 P22 P23 P24 P25 P26 P27 P28 P29 P30 P31 P32 P33
Transverse Dist from C/L
S A
Identity
Long’nal Distance from stern 201.05 251.10 252.56 253.77 269.00 270.45 271.66 303.83 205.77 321.74 322.94 324.90 333.35 333.83
PAGE 87 OF 98
Size (mm)
500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400
SWL (Tonnes) 136.0 136.0 136.0 136.0 136.0 136.0 136.0 136.0 136.0 136.0
Amendment Date: DD/MM/YY
Additional Information STS Forward
Additional Information
Draft at Station 22.39 22.23 22.23 22.23 22.18 22.17 22.17 22.07 22.38 22.01 22.01 22.00 21.98 21.98
Draft at Station 23.01 23.01 23.01 22.99 22.99 22.98 22.98 22.97 22.97 22.76
M/T “VSLNAME“ STS OPERATIONS PLAN
Issue No. 1
Size (mm)
Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Panama Chock Panama Chock Panama Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock Closed Chock
Issue Date: DD/MM/YY
Amendment No. 0
Vertical Height above W/L 8.69 8.69 8.71 8.72 8.72 8.83 8.94 8.94 8.95 9.05 9.22 9.22 9.22 9.46 9.50 9.52 9.76 9.55 10.60 10.65 10.90 11.16 11.40
Distance from manifold mid point Fwd or Distance Aft 81.33 Aft 79.88 Aft 74.06 Aft 72.86 Aft 71.41 Aft 35.00 Aft 1.99 Aft 0.00 Aft 1.99 Fwd 35.00 Fwd 87.04 Fwd 88.50 Fwd 89.71 Fwd 104.94 Fwd 106.39 Fwd 107.60 Fwd 139.77 Fwd 41.71 Fwd 157.68 Fwd 158.88 Fwd 160.84 Fwd 169.29 Fwd 169.77 Fwd
LE
Fairlead Type
SWL (Tonnes)
500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 500x400 600x450
136.0 136.0 136.0 136.0 136.0 136.0 Unknown Unknown Unknown 136.0 136.0 136.0 136.0 136.0 136.0 136.0 136.0 136.0 136.0 136.0 136.0 136.0 204.0
P
29.00 29.00 29.00 29.00 29.00 29.00 29.00 29.00 29.00 29.00 29.00 29.00 29.00 28.78 28.72 28.67 22.01 21.29 14.51 13.55 12.58 3.29 0.97
Vertical Height above Keel 31.45 31.45 31.45 31.45 31.45 31.45 31.45 31.45 31.45 31.45 31.45 31.45 31.45 31.64 31.67 31.69 31.83 31.93 32.61 32.66 32.90 33.14 33.38
M
S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24 S25 S26 S27 S28 S29 S30 S31 S32 S33
Transverse Dist from C/L
S A
Identity
Long'nal Distance from stern 82.73 84.18 90.00 91.20 92.65 129.06 162.07 164.06 166.05 199.06 251.10 252.56 253.77 269.00 270.45 271.66 303.83 205.77 321.74 322.94 324.90 333.35 333.83
PAGE 88 OF 98
Amendment Date: DD/MM/YY
Additional Information
STS Aft Manifold Manifold Manifold STS Forward
Draft at Station 22.76 22.76 22.74 22.73 22.73 22.62 22.51 22.51 22.50 22.40 22.23 22.23 22.23 22.18 22.17 22.17 22.07 22.38 22.01 22.01 22.00 21.98 21.98
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 89 OF 98
Port Bollards Size (mm)
Bollard Type
SWL (Tonnes)
Issue No. 1
Issue Date: DD/MM/YY
Additional Information
LE
Distance from fairlead 1.21 2.42 1.94 3.87 3.77 3.77 4.16 7.02 2.66 2.66 2.66 2.66 7.02 4.84 4.35 3.87 4.84 5.32
Double Bollards Double Bollards Double Bollards Double Bollards Double Bollards Double Bollards Double Bollards Double Bollards Single Cruciform Bollard Single Cruciform Bollard Single Cruciform Bollard Single Cruciform Bollard Double Bollards Double Bollards Double Bollards Double Bollards Double Bollards Double Bollards
Ø450 Ø600 Ø600 Ø600 Ø600 Ø600 Ø550 Ø500 Ø315 Ø315 Ø315 Ø315 Ø500 Ø550 Ø600 Ø600 Ø600 Ø600
115.0 115.0 115.0 115.0 115.0 115.0 101.0 77.0 40.0 40.0 40.0 40.0 77.0 101.0 115.0 115.0 115.0 115.0
P
Nearest Fairlead (No) C/L1 P2 P4 P9 P12 P15 P16 P17 P17 P17 P19 P19 P19 P20 P21 P24 P29 P32
S A
C/La Pa Pb Pc Pd Pe Pf Pg Ph Pi Pj Pk Pl Pm Pn Po Pp Pq
Long'nal Distance from stern 2.90 2.90 7.26 16.35 85.15 93.38 130.63 154.82 159.55 162.55 165.56 168.27 174.17 204.66 250.04 268.52 317.78 329.24
M
Identity
Amendment No. 0
Amendment Date: DD/MM/YY
STS Hose Handling Hose Handling Hose Handling Hose Handling STS
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 90 OF 98
Stbd Bollards Size (mm)
Bollard Type
SWL (Tonnes)
Issue No. 1
Issue Date: DD/MM/YY
Additional Information
LE
Distance from fairlead 2.42 1.94 3.87 3.77 3.77 4.16 7.02 2.66 2.66 2.66 2.66 7.02 4.84 4.35 3.87 4.84
Double Bollards Double Bollards Double Bollards Double Bollards Double Bollards Double Bollards Double Bollards Single Cruciform Bollard Single Cruciform Bollard Single Cruciform Bollard Single Cruciform Bollard Double Bollards Double Bollards Double Bollards Double Bollards Double Bollards
Ø600 Ø600 Ø600 Ø600 Ø600 Ø550 Ø500 Ø315 Ø315 Ø315 Ø315 Ø500 Ø550 Ø600 Ø600 Ø600
115.0 115.0 115.0 115.0 115.0 101.0 77.0 40.0 40.0 40.0 40.0 77.0 101.0 115.0 115.0 115.0
P
Nearest Fairlead (No) S2 S4 S9 S12 S15 S16 S17 S17 S17 S19 S19 S19 S20 S21 S24 S29
S A
Sa Sb Sc Sd Se Sf Sg Sh Si Sj Sk Sl Sm Sn So Sp
Long'nal Distance from stern 2.90 7.26 16.35 85.15 93.38 130.63 154.82 159.55 162.55 165.56 168.27 174.17 204.66 250.04 268.52 317.78
M
Identity
Amendment No. 0
Amendment Date: DD/MM/YY
STS Hose Handling Hose Handling Hose Handling Hose Handling STS
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 91 OF 98
6.2.3. Guidelines for Data Entry 1
Introduction The STS Plan Mooring Map has been developed as a tool to facilitate preoperational verification regarding the compatibility of two vessels scheduled to conduct an STS operation. In order to determine such compatibility the STS Plan Mooring Map captures key dimensional and mooring equipment related data for the named vessel. This enables concerned parties to compare the data captured for both vessels that are scheduled to conduct an STS operation to verify their compatibility to do so.
LE
1.1 Applicability The STS Mooring Map has been developed for tanker owners and operators and STS Resource Providers who have a vested interest in ensuring the operational integrity and safety of STS Operations conducted utilising their assets and/or for which they have accountability. Scope The STS Mooring Map is an element of the STS Plan developed in accordance with the standards describe in MARPOL Annex I, as amended by Resolution MEPC. 186(59), Chapter 8: Prevention of Pollution during Transfer of Oil Cargo between Oil Tankers at Sea, Regulations 40, 41, 42.
3
General Guidelines The data entry fields in both the particulars and map sheets are unprotected and have been configured to reproduce text in blue. Heading and formulated fields are protected and have been configured to reproduce data in black text.
M
P
2
Particulars Sheet The data in the 'Particulars' sheet of the STS Plan Mooring Map can be found in the SIRE Vessel's Particulars Questionnaire. Primarily such data is of a dimensional nature and is self explanatory by virtue of their individual heading descriptions.
A
3.1
Map Sheet The data in the 'Map' sheet of the STS Plan Mooring Map should be taken from the vessel's Mooring Arrangement Plans. The conventions for location mooring equipment items are as follows: • Longitudinal co-ordinates Measured from the aftermost extremity of the ship's structure towards the vessel's bow. • Transverse co-ordinates Measured from the Vessel's Centreline towards the ship's side referred to in the specific table heading, or in the case of the 'Structural Appendages' table, as per the description. • Vertical co-ordinates Measured from the Vessel's Keel upwards. The Table Headings are as follows: (i) Port Fairleads (ii) Starboard Fairleads (iii) Port Bollards
S
3.2
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
(iv) (v)
PAGE 92 OF 98
Starboard Bollards Structural Appendages
Details that should be included in the Structural Appendages table are items that overhang or are vertically above or proximate to the vertical taken from the vessel's sheer strake at the specific location in question. Examples of these may include bridge wings, lifeboats and aft stores crane gantries. 4
Descriptions for fairleads and bollards Fairleads Data entry for the Fairlead Type is facilitated by selection of the appropriate fairlead description from a drop down box. An example is shown hereunder:
P
LE
4.1
The dimensions for each type of fairlead can be determined as follows:
S
A
M
Panama Chock & Closed Chock Size in mm taken from W1 x W2 as per the diagram below:
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 93 OF 98
LE
Enclosed or Universal Roller Fairlead Size in mm taken from W x H as per the diagram below:
S
A
M
P
Open Roller Fairleads Size in mm taken from W1 x W2 as per the image below:
Open Chock Size in mm taken from W1 x W2 as per the image below:
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 94 OF 98
Fairlead Numbering system Whilst there is no fixed system for numbering the fairleads, naming each fairlead with its own unique alphanumeric identity assists the user to avoid any ambiguity. Furthermore it assists in the determination of the optimum pairing of bollards with their most appropriate fairleads for the purpose of effective mooring. For example, prefix the bollards on the Port Side with the letter P and number them from aft to forward. Similarly, fairleads on the starboard side could be prefixed with the letter S and numbered aft to forward. For fairleads on the Centreline, these could be prefixed by C/L numbered aft to forward. Bitts and Bollards Data entry for the Bollard Type is facilitated by selection of the appropriate Bollard description fro m a drop down box. An example is shown hereunder:
P
LE
4.2
M
Bollard dimensions Bollard size (mm) refers to the diameter of the bollard or bitt pins. Bollard Types are as follows:
S
A
Double Bollards
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 95 OF 98
LE
Single Cruciform Bollard
P
Double Cruciform Bollard
S
A
M
Bollard Numbering system Whilst there is no fixed system for numbering the bollards, naming each one with its own unique alphanumeric identity assists the user assists the user to avoid any ambiguity. For example, prefix the bollards on the Port Side with the letter P and alphabetically order them from aft to forward with lower case lettering. Similarly, bollards on the starboard side could be prefixed with the letter S and alphabetically ordered using lower case letters. For bollards on the Centreline, these could be prefixed by C/L and alphabetically ordered using lower case letters. In order to identify optimum pairing between bollards and fairleads a data entry field is available for recording the identity number of the nearest fairlead for each set of bollards or bitts. A further data entry field is available for capturing the distance form each set of bollard or bitts to its nearest fairlead.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
6.3.
PAGE 96 OF 98
EXAMPLE INSTRUCTIONS FOR CONNECTIONS OF STS HOSES
The following instructions shall be followed by ship’s personnel to connect the STS Hoses supplied by the STS Service Provider. Ideally this operation should be supervised throughout by the attending STS Superintendent, and should only be performed by the ship’s staff when requested in writing to do so by the STS Service Provider. If it is possible to do so, ship’s staff should endeavour to complete stages 1 thru 5 of the tightening process, leaving the final stage to complete under the supervision of the attending STS Superintendent following his arrival on site.
LE
Preparation Prior to connection of the two hoses, the flange faces should be inspected and cleaned to ensure all residues and debris from previous gaskets or fixatives are removed completely. For best results, use a metal flange scraper and an aerosol gasket remover and inspect the flange for damage. Be sure surface finish and flatness are satisfactory. Avoid using a wire brush for cleaning flange surfaces as this could result in surface scoring. Only the joints, nuts, bolts and torque wrench supplied with these hose sections are to be used for the purpose of hose connection.
P
Lubricate bolt and nut threads and nut bearing face (where it contacts the flange). Centre the gasket on the flange. Note: standard ANSI ring gaskets, when cut properly, should centre themselves with the bolts in place.
S
A
M
Flange Diagram
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
PAGE 97 OF 98
Tightening process After flange assembly and all nuts have been run down by hand with joint in place, start wrench tightening following the sequence of the numbers indicated on the flange diagram above (marking the number on the flange with a crayon aids in keeping track of the tightening process). During all of the following steps, keep any gap between flanges even all around the circumference, and nuts made up approximately the same amount on each end of the bolt. 1) First time around just snug the nuts with a hand wrench. 2) Second time around tighten the nuts firmly with the same wrench.
3) 4) 5) 6)
LE
Use a torque wrench for the following steps: Third time around apply approximately 25% recommended torque**. Fourth time apply approximately 75% of recommended torque**. Fifth time around, apply 100% of recommended torque**. Continue tightening nuts all around until nuts do not move under 100% recommended torque**.
P
If possible, re-torque after completion of each transfer operation as most of the short term bolt preload loss occurs within 24 hours after initial tightening.
ft lbs / Nm
S
A
xxx
M
** The recommended torque value is dependent upon the gasket manufacturer's recommendation and for the gasket supplied is:
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY
M/T “VSLNAME“ STS OPERATIONS PLAN
6.4.
PAGE 98 OF 98
DRAWINGS
The following information related to this plan is attached: No.
Title
Dwg. No.
General Arrangement Plan
2.
Capacity Plan (with Deadweight Scale)
3.
Anchor Handling & Mooring Arrangement Plan
4.
Diagram of Cargo Oil and Ballast Pipe
S
A
M
P
LE
1.
Issue No. 1
Issue Date: DD/MM/YY
Amendment No. 0
Amendment Date: DD/MM/YY