Barlow, Mark

Page 1

Mark Barlow 2020 Portfolio

Master of Architecture Liverpool School of Art and Design

2020 Portfolio First Name Surname

i


Mark Barlow I am a 25 year old part two architect graduating Liverpool John Moores University in 2020. Over the past two years studying MAarch Architecture, I have been given the support to progress my learning and creativity, pushing my boundary and helping me to create designs which once where unthinkable. I am a very active person who is ready to adapt and collaborate from the start on projects. I work extremely well with a team, as shown in multiple different architecture firms (Studio RBA) and entrainment facilitates (Alton Towers Resort).

Mark Barlow 2020 Portfolio ii First Name Surname 2020 Portfolio


Contents MAarch Year 2 Semester 2: Thesis Design Project - Accelerate Factory MAarch Year 2 Semester 1: Group Design Work - New Chester Development MAarch Year 1 Semester 2: Housing Project - Urban Update MAarch Year 1 Semester 1: Ellesmere Port Urban Master planing - The Blue Route Curriculum Vitae

2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname iii


A C C E L E R A T E

F A C T O R Y

Accelerate Factory is a state of the art urban sports facility, offering a selection of extreme sports, retail units, spa and a unique dining experiences right within the heart of the new Chester development, situated on the site of Chester golf course and the River Dee. Accelerate Factory is the only urban sports centre of its kind within the North West, making this a hot spot for extreme athletes and users who want to learn a new sport. When users enter the centre they will have the option to choose from a selection of sports such as; rock climbing and bouldering, indoor sky diving and also a number of different water sports, which make excellent use of the sites location on the river.

Mark Barlow 2020 Portfolio iv First Name Surname 2020 Portfolio


2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname v


Mark Barlow 2020 Portfolio vi First Name Surname 2020 Portfolio


2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname vii


Mark Barlow 2020 Portfolio viii First Name Surname 2020 Portfolio


1.

Accelerate Factory has been designed in a way where it will be seen as a vista or

landmark

from

multiple

points

around

Chester

and

the

new

development.

Without being directly next to the building, users will see its iconic concrete stacks towering above the Chester skyline; the visuals shown depict the centre from a number of angles and times of day, showing how the building can have a different feeling from where and when the users look at the centre. Image

one

shows

a

view

from

opposite

the

River

Dee,

on

this

side

to

the

river there sits a wildlife reserve for wild and wetland birds, and also allows p e o p l e t o w a l k a r o u n d t h e g r o u n d s . W h e n u s e r s w a l k a r o u n d t h e w a t e r ’s e d g e , the centre can be framed though small breaks within the wild trees and bushes. Image

two

shows

a

view

from

the

through

road

passing

under

the

centre

at

night. Since the material for the centre has been chosen as Reglit, once the lights on the inside are used it creates a glowing effect from the outside. T h e l a s t t w o i m a g e s , T h r e e a n d F o u r, s h o w t h e c e n t r e f r o m t h e a r e a d i r e c t l y i n front. Three shows a view as if the user was standing within the flood zones located

next

to

the

development;

when

this

section

is

not

flooded,

the

wild

grass and trees create an ‘Urban Forest’ within the busy environment. Finally, image

Four

shows

one

of

the

paths

leading

directly

to

the

entrance

of

the

centre, which is lined with rows of trees on either side, as well as one of the multiple apartment blocks which is located adjacent to the Accelerate Factory.

1

2.

2

4 3

3.

4.

2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname ix


PLAN 02 : Retail Space

PLAN 04 : ROCK CLIMBING

Accelerate Factory sits within a new and exciting urban development just west from

back of the building sit half on the current waters edge, and half semi-submerged

t h e c i t y c e n t r e o f C h e s t e r, w h e r e i t i s c u r r e n t l y h o m e t o C h e s t e r g o l f c o u r s e . T h e

i n t h e r i v e r. T h e c e n t r e t u b e h a s t w o f u n c t i o n s ; t h e f i r s t t o a l l o w u s e r s o n t h e w a t e r

centre comprises seven different floors, which include; a double height reception/

sports training floor to safely cross over the top of the road which passes under the

entrance

space

sports centre and lets the user enter the water via a staircase. The second function

for water sports training where users will learn how to correctly exit their kayaks

is to house the indoor skydiving, which users will enter by a suspended path above

safety

t h e r o c k c l i m b i n g f l o o r. W i t h i n t h e t u b e , p a r t i c i p a n t s w i l l h a v e 2 5 m e t e r s o f h e i g h t

once

bouldering,

they a

space are

for

on

suspended

the

two

retail

River

walkway

shops

Dee,

a

allowing

including

triple

height

the user

- 1:400 A3

P L A N 0 3 : WAT E R S P O R T S

- 1:400 A3

PLAN 05 : INDOOR SKY-DIVING

- 1:400 A3

N

P L A N 0 1 : E N T R A N C E A N D R E TA I L U N I T S - 1 : 2 0 0 A 3

space,

- 1:400 A3

a

mezzanine

space

access

to

for the

f l o o r,

rock

climbing/

skydiving

tube

to practice their skills within this state of the art space.

l o c a t e d 1 0 m e t e r s a b o v e t h e r o c k c l i m b i n g f l o o r, a n d f i n a l l y , t w o d e d i c a t e d f l o o r s for Spa treatments and pools which include a feature double height pool space.

Finally, the two tubes on either side of this will be home to vertical rock climbing. The users of

these

spaces

will

be

able

to enter

from

the

rock

climbing

floor

and

Also featured are four prominent tubes rising though the centre and towering over

then be able to climb fully down the tube to the ground, and then ascend to the top

the top, each of these play a vital role in the design and structural meaning of the

of the tube 55 meters upwards. Unlike most rock climbing centres, the tubes and

centre. The smaller of the tubes towards the east of the building will house a lift

boulders within will be made from a mixture of granite and limestone, giving users

shaft and also the main staircase within the centre. The larger tubes towards the

the most realistic climbing experience within a safe space. P L A N 0 6 : S PA F LO O R 1

Mark Barlow 2020 Portfolio x First Name Surname 2020 Portfolio

- 1:400 A3

P L A N 0 7 : S PA F LO O R 2

- 1:400 A3


5.

Accelerate Factory has a very different architectural design than most sports centres

was taking over the framework, almost as a double frame. The colour pallet for the

found

centre was carefully selected to use the correct materials for form and function. The

around

design,

the

similar

to

UK.

The

those

main

which

design can

be

example found

for

when

the

centre

looking over

was the

typical

factory

river opposite,

which serve as a precedent to the centre here. On the exterior of the building a frame

Reglit

centre

was

used

to

bring

as

much

natural

light

into

the

space

without

over-

lighting or over heating the space.

wraps around, as if this was a cage containing the interior sports. The Reglit material is a key part within the building, not only in the day but once Sections of the building such as the Reglit middle centre, start to protrude outwards

night

from this cage as if the sports cannot be contained within, rather they are attempting

effect,

to break free and push outwards. Small panels around the frame have been placed to

bottom.

grow climbing plants such as Vine and Ivy. These will create an effect as if nature

together without becoming cluttered.

falls,

the

almost

lights as

if A,

from

the

mid

shows

the

interior

section a

was

detailed

shine

though

floating look

of

the

above

how

Reglit the

these

creating

hard

a

concrete

materials

link

glowing top

and

and work

East Elevation Section

-

1:300

East Elevation Section

-

1:100

At A1

Elevation

At A1

2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xi


Section A - A

:

1:250 At A1

Section B - B

:

1:250 At A1

B C A

Section

C

B

A

A-A

shows

how

the

road

passing

through

will

be

addressed,

the

cars

will

pass

under

the

water

sports

Section

B-B

shows

what

will

happen

in

each

tube,

which

will

be

home

for

activities

such

as

rock

climbing

and

training floor with a clearance of 10m allowing almost all cars and lorries to pass through with ease. This section

indoor skydiving. The users will enter on the different floors within the centre, and from there the user will have

also shows how users within the rock climbing/bouldering floor will be able to climb to the top, interacting with

the option to use the space. Section C-C is the large section spanning across the bottom, which shows a full site

t h e s p a f l o o r. U s e r s o f t h e s p a f l o o r w i l l e n j o y a m a z i n g v i e w s f r o m t h e l a r g e g l a s s w i n d o w s s p a n n i n g t h e l e n g t h

section of the development. This will explain how the waterfront is addressed; the road passes under the sports

o f t h e w a l k w a y a b o v e , a l l o w i n g a l l u s e r s , n o m a t t e r w h a t a c t i v i t y , t o i n t e r a c t w i t h e a c h o t h e r.

centre and displays how the different floors interact with each of the activities. One of the more interesting spaces within is the double height space (A), which connects the two spa floors and also brings light down into the pool from the fully glazed roof located directly above the pool.

A.

Section C - C

:

1:250 At A1

Mark Barlow 2020 Portfolio xii First Name Surname 2020 Portfolio


2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xiii


Mark Barlow 2020 Portfolio xiv First Name Surname 2020 Portfolio


.05

S p a F l o o r Tw o

The

final

floor

in

the

centre,

with

multiple outdoor sky garden spaces with stunning views over the Chester and the development.

.04

Spa Floor One

First

of

the

two

spa

floors,

this

will

include multiple treatment rooms, sauna, steam

room,

bar/restaurant

and

also

a

feature double hight pool space.

.Section cut showing how the two spa floors interact with each other

This

floor

is

the

largest

section

of

the

building, this will be home to the indoor rock

climbing

and

also

the

indoor

sky

diving.

.02

Wa t e r S p o r t s Tr a i n i n g Po o l

The

water

sports

training

floor

will

be

where users come to train how to safely exit

the

kayak,

before

they

then

moving

onto the lake.

Entrance and Retail Space The

.01

Exploded Axonometric Showing the Diffrent FLoors

.03

Rock Climbing and Indoor Sky Diving

ground

double the main

hight

two

centre.

floor

will

entrance

retail

public

units

be

home

space which

walkway

in

as

to well

address front

of

the as the the .Detailed section showing how users will use the feature double hight pool space

2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xv


Mark Barlow 2020 Portfolio xvi First Name Surname 2020 Portfolio


2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xvii


1. 2. 3.

Ea r t h / Groun d Soil

4. 5. 6. 7. 8. 9.

Block Pa t h in g

10.

19.

18.

Rock 300mm Con cret e Wit h Reb a r Sup p or t s R ivers Ed ge Con cret e Tub e Foun d a t ion 300mm St a in les s St eel Ca ge Ex t er n a l Tub e Con cret e Wa l l In t er n a l Tub e Con cret e Wa l l Wit h R a b a e Sup p or t St ruct ure 100mm Con cret e Fin is h

11. 12. 13. 14. 15. 16. 17. 18. 19. 20.

150mm In s ula t ion Sla b

21. 22. 23. 24. 25.

675mm Pos t Ten t ion Con cret e

Wa t erp roof Men b ra in Pos t Ten t ion Rod s R a b a r Fra me 425mm Pos t Ten t ion Con cret e St eel Fra me For Regl it 250mm Regl it Pa n n els - U Sh a p e Wild Gra s s Roofin g 300mm Ex t er n a l Wa l l Build - up In t era l Pool 1

2.

17.

H id d en Floor Ser vies Sla t e / St on e Fea t ure Wa l l 675mm Pos t Ten t ion Roof D oub le Gla z in g Sky Ligh t

0 1 . Po s t Te n t i o n C o n c r e t e S l a b w i t h R e g l i t

-

1:10

At A1

12.

10. 1.

Accelerate Factory is a complex design for a building due to its height, function and also the spans it will create. One of the main details of the structure is the use of a 675mm slab of post-tension concrete flooring for each floor of the building. This allows the

concrete

slab

to

span

over

a

far

greater

distance

than

a

traditional

slab

would,

h i g h l i g h t s h o w t h e f l o o r s w i l l i n t e r a c t w i t h e a c h o t h e r, h o w t h e l a r g e c o n c r e t e t u b e s will

address

the

ground

and

water

they

are

stood

on,

and

also

how

the

frame

will

interact with the rest of the design. On the ground, it shows the through road passing under the centre; since the site is currently in a flood prone zone, a concrete water barrier will stop the ground from collapsing on itself. 7. T h e g r a p h i c a l s o s h o w s h o w t h e c o n c r e t e t u b e m e e t s w i t h t h e g r o u n d a n d t h e w a t e r. A

6.

round slab foundation will be placed on the bottom of the tube, letting the foundation bare the weight of the 65 meter tube. The main flood build up will consist of; 675mm post-tension panels 5.

and

concrete a

75mm

slabbing; concrete

20mm outer

to

waterproof compact

membrane, all

of

the

150mm

rigid

components

of

insulation the

floor

t o g e t h e r. The

details

important

labelled

sections

of

01 the

and

02

show

building.

01

two

typical

shows

how

details the

from

Reglit

some

panels

of

will

the fix

more to

the

concrete flooring slab with the use of a metal frame to hold the panels in place. 02 shows a slightly larger detail of how the feature double height space within the centre will work. This highlights the pool and how the edge will have a different material to t h e r e s t o f t h e f l o o r, t o h i g h l i g h t f o r u s e r s w h o a r e h a r d o f s i g h t w h e r e t h e w a t e r s e d g e is, how the thicker two meter floor slab on floor seven will have space to house some of the services for the spa such as the pool water and heating, and finally how the sky light within the roof will create a flush fit to the flat concrete roof of the centre.

Mark Barlow 2020 Portfolio xviii First Name Surname 2020 Portfolio

-

To t h e l e f t , s h o w s a 3 D e x a m p l e o f a d e t a i l e d s e c t i o n c u t o f t h e b u i l d i n g . T h i s g r a p h i c

02. Section though the double stor y Pool/Spa area

more room for the sports taking place within.

!:20

At A1

meaning the floor plans within the centre can be free of support where not needed and


1. 2. 3.

Ear t h / Groun d Soil

4. 5. 6. 7. 8. 9.

Block Pat h in g

10.

25.

24 .

Rock 300mm Con crete Wit h Rebar Suppor ts Rivers Edge Con crete Tube Foun dat ion 300mm Stain less Steel Cage Ex ter n al Tube Con crete Wal l In ter n al Tube Con crete Wal l Wit h Rabae Suppor t Structure 100mm Con crete Fin ish

11. 12. 13. 14. 15. 16. 17. 18. 19. 20.

150mm In sulat ion Slab

21. 22. 23. 24. 25.

675mm Post Ten t ion Con crete

Waterproof Men brain Post Ten t ion Rods Rabar Frame 425mm Post Ten t ion Con crete Steel Frame For Regl it 250mm Regl it Pan n els - U Sh ape Wild Grass Roofin g 300mm Ex ter n al Wal l Build-up In teral Pool 1

23.

19.

22.

18.

2.

20.

21. 17.

Hidden Floor Ser vies Slate / Ston e Feature Wal l 675mm Post Ten t ion Roof Double Glazin g Sky Ligh t

16. 0 1 . Po s t Te n t i o n C o n c r e t e S l a b w i t h R e g l i t

15.

-

1:10

At A1

12. 14. 11.

10.

13.

1.

Accelerate Factory is a complex design for a building du also the spans it will create. One of the main details of 675mm slab of post-tension concrete flooring for each floo the

9.

concrete

slab

to

span

over

a

far

greater

distance

tha

meaning the floor plans within the centre can be free of su more room for the sports taking place within. To t h e l e f t , s h o w s a 3 D e x a m p l e o f a d e t a i l e d s e c t i o n c u t

h i g h l i g h t s h o w t h e f l o o r s w i l l i n t e r a c t w i t h e a c h o t h e r, h

8.

will

address

the

ground

and

water

they

are

stood

on,

a

interact with the rest of the design. On the ground, it sho under the centre; since the site is currently in a flood p barrier will stop the ground from collapsing on itself. 7. The graphic also shows how the concrete tube meets with

6.

round slab foundation will be placed on the bottom of the

bare the weight of the 65 meter tube. The main flood buil post-tension panels 5. 4.

and

The

details

important

3.

concrete a

75mm

slabbing; concrete

20mm outer

waterproof

to

compact

membra all

of

t

t o g e t h e r. labelled

sections

of

01 the

and

02

show

building.

01

two

typical

shows

how

deta the

R

concrete flooring slab with the use of a metal frame to h

shows a slightly larger detail of how the feature double he 2.

will work. This highlights the pool and how the edge will t h e r e s t o f t h e f l o o r, t o h i g h l i g h t f o r u s e r s w h o a r e h a r d o f

is, how the thicker two meter floor slab on floor seven wi 1.

of the services for the spa such as the pool water and hea light within the roof will create a flush fit to the flat con

2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xix


C h e s t e r

D e v e l o p m e n t

Working as part of a group, the new Chester development was a scheme to create a new hub within the city centre of Chester without disturbing the fabric of the city centre. The development is compromised of a number of different islands, located on the site of the Chester golf course. Each sub-island consists of a number of different activities, including; retail, bars and restaurant space, apartments, schools, office space, low cost public housing and numerous different public spaces, interacting with the islands design.

Mark Barlow 2020 Portfolio xx First Name Surname 2020 Portfolio


Initial Sketch : 1

Initial Sketch : 2

2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xxi


Mark Barlow 2020 Portfolio xxii First Name Surname 2020 Portfolio

Initial Sketch : 1

Initial Sketch : 2

Initial Sketch : 3

Initial Sketch : 4

Initial Sketch : 5

Initial Sketch : 6

Initial Sketch : 7

Initial Sketch : 8

Initial Sketch : 9

Initial Sketch : 10

Initial Sketch : 11

Initial Sketch : 12


Image One : Main Public Space

Image Two : Aerial Shot Showing The Flooding Area

2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xxiii


Mark Barlow 2020 Portfolio xxiv First Name Surname 2020 Portfolio


Ph a s e o n e o f t h e p ro j e c t wi l l b e t h e i n i t i a l s t a r t o f t h e i s l a n d d e ve l o p m e n t , We p l a n t o s t a r t b y d e ve l o p i n g t h e n o r t h o f t h e g o l f co urs e , t h e m a i n f o c us wi l l i n c l ud e o f f i ce s p a ce s , a l a rg e h o t e l , h i g h e n d wa t e r f ro n t a p a r t m e n t s a n d a l s o a n um b e r o f d i f f e re n t b a rs a n d re s t a ura n t s .

Phase 1 : Business / Leisure Hub N

1

-

Year 1

2

Ye a r s

Th i s s e c t i o n h a s b e e n c h o s e n t o b e d e ve l o p e d f i rs t s i n ce i t wi l l b ri n g b us i n e s s i n t o t h e d e ve l o p m e n t f i rs t , wh i c h t h e n wi l l s t a r t t o f l o o d t h e i s l a n d wi t h wo rke rs . B a r a d d e d s o t h a t t h e re wi l l b e s p a ce f o r t h e m t o e n j o y a f t e r wo rk a n d a p a r t m e n t s f o r t h e us e rs o n t h e wa t e r f ro n t .

Ph a s e t wo o f t h e p ro j e c t wi l l f o c us o n t h e ce n t re r o f t h e i s l a n d . Th i s s p a ce wi l l b e h o m e t o m o re o f f i ce a n d a p a r t m e n t s t h a n t h e re s t o f t h e wh o l e p ro p o s a l , i n t h e ce n t re t h e re wi l l a l s o b e a p ub l i c s p a ce , run n i n g d o wn t h e wh o l e o f t h e i s l a n d co n n e c t i n g p h a s e o n e t o p h a s e t wo.

Phase 2 : High End Apartments / Public Mall N

2

-

3

Year 2 - 3

Ye a r s

Two b ri d g e s wi l l a l s o b e us e d o n t h e ri n g ro a d o f t h e i s l a n d a s we l l a s o n e l a rg e f e a t ure b ri d g e a t e a c h e n d o f t h e m a l l . Th i s wi l l d ra w p e o p l e d o wn i n t o t h e g re e n s p a ce s .

Th e f i n a l s t a g e o f t h e d e ve l o p m e n t wi l l b e Ph a s e t h re e . Th i s wi l l i n c l ud e t wo s m a l l i s l a n d s t o t h e s o ut h o f t h e i s l a n d wh i c h wi l l b e h o m e t o a n um b e r o f d i f f e re n t a c t i vi t y, s uc h a s a s p o r t s ce n t re , e ve n t ce n t re , b a rs , re s t a ura n t s , a p a r t m e n t a n d a l s o a n um b e r o f d i f f e re n t t e rra ce h o us e s . Th e s e t wo s e c t i o n s wi l l f o c us m a i n l y o n l i vi n g a n d h o us i n g , t h e i d e a b e i n g t o h a ve a s e c t i o n wh e re f a m i l y’s a n d yo un g p e o p l e wi l l b e a b l e t o l i ve o ut s i d e t h e b us y b us i n e s s s e c tion.

Phase 3 : Terrace Housing / Wild Bird Sanctuary Year 3+

N

2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xxv


U r b a n

U p d a t e

Urban Update is new housing scheme, located in a prime location just a five minute walk north from the city centre. The scheme is comprised of four different apartment types with a run of retail units along the floor, facing the main road passing the site. The apartments within the site have been deigned to incorporate every user, no matter what their ability, with the single, double and triple hight apartment spaces Urban Update had to offer.

Mark Barlow 2020 Portfolio xxvi First Name Surname 2020 Portfolio


2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xxvii


urban

update

Up d a t in g a n d imp rovin g L i v erpool ’s unus ed urban S paces

Ground Floor Plan 1:250

Mark Barlow 2020 Portfolio xxviii First Name Surname 2020 Portfolio

N

First Floor Plan 1:250

N

Third Floor Plan 1:250

N

Second Floor Plan 1:250

Roof Plan 1:250

N

N


2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xxix


B

D

B

A

D B

:

A

B

Sq m

D

Ca n b e cha nged in t o a n ev ent s p a ce

D

B

B

A

Sqm

:

A

D A B

75m2 : Sq m

Apartment Block Floor Plan 1:250

Mark Barlow 2020 Portfolio xxx First Name Surname 2020 Portfolio

Ty p e

B

18

C

D

C

Ty p e

C

00 0m m

C

A p a r t m e n t

D

75m2

C

D

A pa r tm en t

230 00m m

75 m 2

D

Eve nt

A

B

C

Ty p e

75 m 2 : S q m

C

Ty p e

C

A p a r t m e nt

D

Ap a r tm e nt

5000mm

Sp a ce

update

Usa b l e

urban

U pdat ing and im prov ing Li ver pool ’s u n u sed u r ban S pac es


2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xxxi


urban

update

U pdating a nd im p ro v ing L i v e r p o o l ’s u n u s e d u r b a n S p a c e s

Side Elevation

Front Elevation

Mark Barlow 2020 Portfolio xxxii First Name Surname 2020 Portfolio


Front Elevation

Section : A - A

Section : B - B B N

A

A

B

2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xxxiii


urban

update

Up d a t in g a n d im p ro v in g L iv e r p o o l’s u n u s e d u r b a n S p a c e s

The d e s ig n o f e a c h a p a r t m en t f ul l y i n c o rpo rates l i g ht i n to the s pac e, w i th t he u s e o f la rg e , fu ll le n g t h w i n do w s w hi c h s tretc h o ver t w o f l o o rs , m ax im is in g t he n a t u ra l s u n lig ht an d ven ti l ati o n w i thi n the des i g n . The m a t e r ia ls u s e d w it hin t he devel o pm en t l i n k i n w i th the c urren t bui l din g s in t he a r e a , m a kin g s u r e they do n o t al i en ate the c o m m un i t y. The red t o n e s o f t he b r ic k o n t he m id s ec ti o n o f the des i g n m atc h c urren t ho us es , w hile t he b la c k b r ic k o n t he c o m m erc i al s ec ti o n o n the g ro un d f l o o r hel p t o m a s k a n d d is g u is e n a t u ral di rt w hi c h w i l l o c c ur f ro m vehi c ul ar an d f o o t t ra f fic . The ‘ To p p e r ’ o f t he b u ild in g w i l l i n c o rpo rate a ro o f to p g arden , l et ti n g us e rs ex p e r ie n c e s t u n n in g v ie ws o f the c i t y, w hi l e the bi -f o l di n g do o rs w i l l flo o d t he ro o m w it h n a t u ra l ai r an d pus h o ut the ho t ai r. Zin c w ill b e a d d e d t o t he ‘ To pper’ c reati n g a c o n tras t f ro m eac h f l o o r. The s e le c t io n o f d if fe r e n t m ateri al s us ed i n the des i g n have been c aref ul ly c ho s e n fo r t he L iv e r p o o l c l i m ate, to hel p keep the des i g n o n e w i th the c it y b u t a ls o m e rg in g t he d es i g n i n to the c urren t di vers e c o m m un i t y.

Plan

Internal Partition Wall Build-up

Main External Wall Build-up (Brick)

50.

49.

Section 2

48.

47.

44. 43. 42.

46.

45.

41. 40.

39.

38.

Exploded Axonometric - Facade

Section 2

37.

36.

35.

34.

33. 32. 31. 30. 29.

Exploded Axonometric - Internal Wall and Flooring

28. 27. 26.

25. 24.

21.

16.

23. 18.

20.

Zinc Panels, Joined With Stand and Seam 12.5mm Plaster Board Grey Aluminium Bi-Fold Head Double Glazing Grey Aluminium Bi-Fold Cil Grey Outdoor Patching Blocks Structural Glass Aluminium Glass Fixing

Section 1

50. 49. 48. 47. 46. 45. 44. 43. 42. 41. 40. 39. 38. 37. 36. 35. 34. 33. 32. 31. 30. 29. 28. 27. 26. 25. 24. 23. 22. 21. 20. 19. 18. 17. 16. 15. 14. 13. 12. 11. 10. 9.

22. 19. 17.

Black Aluminium Capping 12.5mm Plaster Board 150mm Sound Proof Insulation Light Stone Cil 50mm x 200mm Timber Block 75mm Insulation 75mm x 75mm Timber Beam Dark Reclaimed Timber Board Black Aluminium Window Head Double Glazing Black Aluminium Window Cil 12.5mm Plaster Board Light Stone Cil Wooden Skirting Board 12.5mm Plaster Board 150mm Sound Proof Insulation 12.5mm Plaster Board Steel ‘I’ Beam 50mm x 200mm Timber Block DPC 100mm Sound Proof Insulation 12.5mm Plaster Board Typical 65mm Brick (Black) 50mm x 50mm Timber Block 150mm Insulation 50mm x 200mm Timber Block Black Aluminium Window Head Triple Glazing Black Aluminium Window Cil 12.5mm Plaster Board 50mm x 200mm Timber Block Typical 65mm Brick (Black) 10mm Insulation

15.

30mm Insulation

14. 13.

12.

8. 9.

10.

11.

7. 6. 5.

8. 7. 6. 5. 4. 3. 2. 1.

Exploded Axonometric - Foundation

Poured Concrete, Finished by Polishing 150mm Insulation 4.

Concrete DPC

2.

3.

1.

Poured Concrete Concrete Fill 100mm Block Concrete Foundation

Mark Barlow 2020 Portfolio xxxiv First Name Surname 2020 Portfolio

1:20 Detail

Front Elevation

Main External Wall Build-up (Corrugated Zinc)


2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xxxv


T h e

B l u e

R o u t e

The Blue Route, an extension of the Ellsemere Port connection project, developing the site north of the connection route. The site will be home to a number of different apartments, restaurants, bars and social spaces. The main design feature of this project is the use of the water canals within the site. Users will be able to use boats as transport around the site, and further along the canal routes highlighted within the plan.

Mark Barlow 2020 Portfolio xxxvi First Name Surname 2020 Portfolio


2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xxxvii


Mark Barlow 2020 Portfolio xxxviii First Name Surname 2020 Portfolio


2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xxxix


Canal

Close up showing the different levels, leading to the canal and also the raised level park and car park.

A.

A. B. C. D. G. M.

High-End Apartment Blocks Bars and Restaurants Shopping Complex Yacht Club Gardens With Car Park Under Marina Floating Reed Garden

Mark Barlow 2020 Portfolio xl First Name Surname 2020 Portfolio

G.

A.

G.

A.

M.

C.

M.


View of the whole development, showing the differnt spaces created by the buildings and canal.

B.

D.

C.

G.

A.

G.

A.

G.

Section AA 1:500

2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xli


The

BLUE Route.

This highlights the main central hub of the proposed development, this will house the different activity’s, like the marina, giving people the option to take part in boating. Bars and restaurants for people to come and relax around, socialise with friends. A.

A.

B.

B.

C.

D. A.

C.

Sketch showing one of the routes along the front of the development covered in a thick line of trees.

A.

A. P.

P.

A view looking from one of the bars outdoor seating, towards the steps over the marina and the thick tree line at the front.

M.

G.

P. Looking in towards the main hub of the development, where the bars, resturants, shopping and marina will sit. P.

Looking at the seating area outside, under the canopy. This will be one of the main social hubs in the whole project.

A. B.

One of the many gardens / green spaces in the site, this shows the top-level garden above the car parking for the residents.

C. D. G. M. P.

Mark Barlow 2020 Portfolio xlii First Name Surname 2020 Portfolio

High-End Apartment Blocks Bars and Restaurants Shopping Complex Yacht Club Gardens With Car Park Under Marina Car Park

Exploded view of the site, showing the different routes around the development.


The

BLUE Route.

Sketch Looking Towards the Marina and Dock Area

Looking From the Waterfront, Towards the High Level Garden

Walking Towards the Marina From the High End Apartment Blocks

A.

D. B.

C.

E.

A. High-End Apartment Block B. Stepped up Garden / Park C. Underground Car Park D. Floating Dock E. Floating Reef Garden

Section BB 1:200

2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xliii


E l l e s m e r e

P o r t

The Ellesmere Port project was a development scheme to connect Ellesmere port together as one, rather than its current, slip state. The project uses a route on both sides of the main express way within the area, creating a route for users to walk/cycle from one of the main hubs of the area, Cheshire Oaks, bringing them out at this new development north of the route. The idea was to lower the need for cars within the area, since there is currently a high build-up of them using the roads around the area.

Mark Barlow 2020 Portfolio xliv First Name Surname 2020 Portfolio


2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xlv


Mark Barlow 2020 Portfolio xlvi First Name Surname 2020 Portfolio


2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xlvii


Mark Barlow 2020 Portfolio xlviii First Name Surname 2020 Portfolio


2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname xlix


Mark Barlow 2020 Portfolio l First Name Surname 2020 Portfolio


2020 Portfolio Mark Barlow 2020 Portfolio First Name Surname li


Contact Email : Markus.barlow@googlemail.com Tel : 07712408806 Address : WA8 7QN, Widnes, Cheshire

Mark Barlow 2020 Portfolio lii First Name Surname 2020 Portfolio


Personal Info

2020 Portfolio Mark Barlow


CV

Mark Barlow 2020 Portfolio


CV

2020 Portfolio Mark Barlow