AVIATION
WE ARE DESIGNERS BUILDERS SUSTAINABILITY LEADERS TECHNOLOGY INNOVATORS PRECONSTRUCTION EXPERTS
1912 CENTRAL CONTRACTING COMPANY
1946 HENRY C. BECK COMPANY
1912
+840
8
FOUNDED BY HENRY C. BECK, SR.
EMPLOYEES IN US
OFFICE LOCATIONS
Founded in 1912, The Beck Group has worked in 42 states and nearly a dozen countries after 108 years in business. From the first meeting, you will notice Beck has a unique approach. We create teams across all departments and areas of expertise to work on a common goal – your project. We believe a better process and outcome result from working together. We focus on building long-term relationships with our clients and seek every opportunity to bring quality, value and integrity to each project we touch.
1981 HCB CONTRACTORS
1997 THE BECK GROUP
+165
ENR
+90%
ARCHITECTURAL AND DESIGN STAFF
TOP 100 DESIGN-BUILD FIRMS
AVERAGE 10 PROJECTS
ATLANTA AUSTIN DALLAS CHARLOTTE DENVER FORT WORTH TAMPA & MEXICO CITY
+600
PROJECTS DESIGNED AND BUILT TOGETHER
Because we are builders, we are more knowledgeable architects. Because we are architects, we are contractors who better understand the nuances of design.
01
INTEGRATION A UNIFIED VISION
02
03
04
05
INSPIRING DESIGN
BUILDING INNOVATION
SETTING THE STANDARD
CREATING THE FUTURE
ARCHITECTURE
CONSTRUCTION
SUSTAINABILITY
TECHNOLOGY
A UNIFIED VISION INTEGRATED ENTERPRISE
DECISION TO BUILD TRADITIONAL DELIVERY SD
DD
CD
CONSTRUCTION & CA
SCHEDULE INTEGRATED ENTERPRISE
DESIGN + CONSTRUCTION
DECISION TO BUILD
DESIGN-BUILD [ CHANGE ORDERS ]
6%
LESS THAN DBB
4.5%
LESS THAN CM@R
25% LESS TIME
E
O
E G R ATI O N
INTEGRATING INTO PROCUREMENT
FU
ND
AM
N
LS A T
T F IN
TOTAL TEAM MANAGEMENT
ENHANCED INFORMATION COORDINATION
+600
PROJECTS TOGETHER DEFINE BEFORE WE DESIGN
EARLY CORE TEAM ENGAGEMENT CO-LOCATE KEY TEAM MEMBERS
IMMERSIVE TEAM CO-LOCATION
COST ESTIMATION CONCURRENT WITH DESIGN ITERATIONS ELIMINATING THE GAP
DESTINI PROFILER MACRO BIM SOLUTION
COST/SCHEDULE CERTAINTY DESIGNERS AND PRECONSTRUCTION TEAM WORKING TOGETHER
BIM DETAIL/ COORDINATION
DESIGNERS AND PRECONSTRUCTION TEAM WORKING TOGETHER
CLIENT
IMMERSED TEAM BIM DETAIL / COORDINATION SPEED TO MARKET COST CONTROL
TARGET VALUE DESIGN Establish the key integrated team members early, and keep them together
DESIGN
THINK CONCEPTUAL
SD
BUILD
DD
CD
CONSTRUCTION
GO/NO GO DECISION ALIGNMENT
Team + Owner define the criteria: basis of design, owner's value Develop team working structure and process: IPL, co-location, technology, process
DEFINITION
Define the project using conceptual massing studies in Sketchup/Revit. Use DESTINI Profiler to generate the EC(expected cost) and line item budgets for the project: Structure, exterior wall, MEP, etc.
VALIDATION
Validate with the owner and the team: program, quality, and schdule. Comparison of the AC(allowable cost) to the EC(expected cost) to determine whether to continue, redulce scope, or end the project.
DBIA PART 1A CONFIRMATION
Develop the buiding desgin based on component budgets | Get Subcontractor involvement | Co-locate | Optimize systems | Maximize value
GMP/ IGMP
GMP may occur at the end of the confirmation phase, or it may be an IGMP with GMP at the end of documentation
DBIA PART 1B DOCUMENTATION
Integrated Project Financial Plan | Continue to optimize systems and maximize value | Establish document package content and schdule
BUYOUT
Involve precon in the buyout | Maintain a consistent cost structure between precon and construction
DBIA PART 2 CONSTRUCTION DESTINI PROFILER REVIT SKETCH UP NAVISWORKS
INSPIRATIONS
CHARRETTE
PreFabrication
BUILD FASTER, SMARTER AND SAFER
SCHEDULE ASSURANCE
INCREASED PRODUCTION
INTENSE COLLABORATION
REDUCED MANPOWER
SAFETY COST/INJURY AVOIDANCE
MATERIAL WASTE REDUCTION
CONSISTENT QUALITY
TECHNOLOGY
Beck leads the design and building industry in innovation by developing and advancing technology. That’s because technology helps us increase the availability of information, reduce risk, clarify scope, improve quality and reduce cost for design and construction projects. Our technical abilities range from designing and adapting custom architectural elements to coordinating geographically distant teams. Whether we’re helping our clients visualize project design to verifying proper field installation, technology is a part of how we work.
COLLABORATIVE PROJECT MANAGEMENT
identify, inspect & report
by Procore
VISUAL DOCUMENTATION as-builts, live-motion & real time 04/13/15
LASER SCANNING CLASH DETECTION
UP
EXAM 03 933 STAIR 928
LV 927
EXAM 07
DATA 926
EXAM 02 932
STAIR NO. 2 1160
ELEC 930
CORR 939
TRIAGE 2 902
STAIR 929
TRIAGE 1 901 SEATING 1110C
SECURITY 1004
EXAM 01 931
CORR 980
TRIAGE 3 903
EQ 925
ENT EXAM 23 923
ALCOVE 907
BED CO. 904
PAT TOILET 924 HSKP 914
NURSE STATION 981
CORR 922
PASSAGE 906 WORK 905
ALCOVE 913
CORR 921
EXAM 22 972
REG 2 911
PASSAGE 912
STAFF CONFERENCE 919
OFFICE 917
NOUR 965
ED
RECEPTION 1115
DRY S.P.
ISOL EXAM 15 1054
EMS WORK 1062
MASS DECONTAM 984
MMMC Expansion
ELEC 1104
PTS
EXAM 7 1048
CORR 1050
PFT
SOILED UTIL 1047
CTRL 1044
RAD 1046
CARDIAC 12 1066
LOUNGE 1101
TLT 1051
CORRIDOR CO
EXAM 11 1067
EXAM 9 1069
EXAM 10 TREATMENT 982 1068
TREATMENT 981
ED/ICU OFFICE 1071
Tech Alcove
BLOODGAS ROOM 1072
CLEAN SUPPLY 1098
ANTE ROOM 1073
RT EQ 801
FAMILY HAND WASH 1093
CONSULT CONF 1092
NOUR 1097
CENTRAL RT MONITOR WORK ROOM 1096 802
MON SERV 1094
EQ ALCOVE 803
PHOTOGRAMMETRY REG 1160
Ante Room
PTS
RT Decontam Echo TEE
EEG
CORR 1099
by Revit Phasing HAZ. MAT. STORAGE 983
Clean Supply
STAFF LOCKER 1102
PHASING PLAN COMMUNICATION EXAM 8 1049
EQ
EEG
STAFF TLT 1103
CORR 1106
ANTE ROOM 1053
ISOL PATIENT ROOM 8 1074
W12B
build faster and smarter
CT 976 CTRL 978
ISOL EXAM 14 1059
CARDIAC 13 1064
EMS STOR 1063
PHLEB NO.2 1130
Lobby Phased Construction Respiratory Director
CORR 1070
2"PVC
WC STORAGE 1135A
CORRIDOR 1100
ELEV NO.13
NURSE WORK 1038
P.O.C. TEST 1052
AMBULANCE VEST 1061
HOLTER WORK 1128
SPEC TLT 1149
ELEV NO.12
CORR 1065
TLT 1058
STAFF TLT 1129
V ELEV NO.111 ELEV NO.15
?
EXAM 16 1037
TLT 1056
DECON 1057
RT REPORT ROOM 1126
ELEV NO.14
EXAM 6 1039
2"PVC
CORRIDOR 1109
LOUNGE/ LOCKERS 1127 SERVICE ELEVATOR CORRIDOR 1105
CLEAN SUPPLY 975 HSKP 1019
CORR 1030
RISER HAZARD RM MATERIAL STOR 966 1034
PREFABRICATION
Elevator Lobby WORKROOM withConstruction Tower LobbyOpen Phased 1108
GYN EXAM 5 1021
STAFF TLT
2"PVC
? ?
CORR 968
PAT 967 TLT 1036
UP
GRAB 'N' GO 1113
SEATING 1110A
PAT TLT 1022 EXAM 4 1029
PATIENT TLT 916
EXAM 20 964
PUBLICC FEMALEE TOILETT 1114
? ?
CR/CR CR/CR CR/CR
EXAM 19 963
Atrium Space with Tower Lobby Open Phased Construction SEATING 1002
DATA 1020B
PAT TLT 1023
Phase 4 start 11/9 end 11/24
OFFICE 918
CORRIDOR 1112
PUBLIC MALE TOILET 1111
LOW VOLT. 1020A
CORR 1024
EXAM 21 971
CORR 976
interim public/staff access
ED Lobby Waiting Renovation - Phase 1 Approx 9 Weeks 8/3/15 - 10/5/15
REG 1 910
staff access
CORR 975
UP
ELEV NO.17
Phase 3 : 3 days start 11/3 : end 11/6
Phase 2b 10 days start CORR10/19 end 100811/2
REC 909
ELEV NO.18 (FUTURE)
VESTIBULE 1001
Phase 2a 8 days start 10/7 end 10/16
staff access
TRIAGE WORK 908
CORR 1142
PAT TLT 1174 ELEC 1172
NUC MED 1173
HC PATIENT ROOM 1 1091
ALOVE 1075B
PATIENT ROOM 7 1076
CORRIDOR 1095
CENTRAL WORK 1089
ALOVE 1085B
CORR 1185
PATIENT ROOM 2 1087
Phasing Plan - Level 2 Penetrations
surveying and mapping by ReCap SUB WAIT 1176
PASS 1175
REF. TO PAT. RM. 4 FOR EQUIPMENT DETAILS
STRESS 1186
H.C. DRESS 1184
PATIENT PREP 1188
DRESS 1183
RAD VIEW 1182
HOT LAB 1189
_________
SITE LOGISTICS PHOTOGRAMMETRY OVERLAY
8/10/2016
DESIGN. BUILD. TOGETHER. BECK DIVERSITY AND INCLUSION
BECK BETTER TOGETHER BECK EMPLOYEES’ FORUM TO CELEBRATE AND FOSTER BECK’S DIVERSITY
At The Beck Group, we are committed to building and lifting up our communities. This means, hiring, developing and promoting a diverse workforce and harnessing a culture of inclusion. It also means proactively working with minority- and women-owned business enterprises.
We do this because we care. We do this because it allows us to be better innovators and problem-solvers, and to have a broader perspective.
+25%
WOMEN AND MINORITIES HIRE RATE INCREASE IN 2018
BECK SCHOOL OF CONSTRUCTION CONSTRUCTION PROGRAM FOR MINORITY BUSINESS ENTERPRISES
WE’RE COMMITTED TO DIVERSITY AND INCLUSION BECK-EJ SMITH PARKLAND HOSPITAL AMERICAN AIRLINES HOSPITALITY COMPLEX AT&T DISCOVERY DISTRICT
MENTOR PROTÉGÉ PROGRAM
SEVEN MONTH PROGRAM
BECK-ENVISION PARTNERSHIP EVOLVED FROM MENTOR PROGRAM
TURNING UNCONSCIOUS BIAS INTO CONSCIOUS THOUGHT 4-HOUR INCLUSION WORKSHOP
COMMITMENT
2030
ENERGY MODELING CONSULTING RESEARCH & EDUCATION
130/49 COMPLETED
12/7
SEEKING
40/25
71/15
7/2
REPRESENTATIVE CLIENTS
AUSTIN-BERGSTROM INTERNATIONAL AIRPORT CORPORATE EXECUTIVE HANGAR DALLAS LOVE FIELD AIRPORT DENVER INTERNATIONAL AIRPORT DFW INTERNATIONAL AIRPORT HARTSFIELD-JACKSON ATLANTA INTERNATIONAL AIRPORT SACRAMENTO COUNTY AIRPORT SYSTEM TAMPA INTERNATIONAL AIRPORT
STEVE KIMBALL  NATIONAL AVIATION DIRECTOR / 469 859 3787 / STEVEKIMBALL@BECKGROUP.COM