Aviation & Transportation

Page 1

AT AVIATION TRANSPORTATION



Beck is focused on making the experience of air travel more convenient for millions of passengers each day. From people mover systems to terminal expansions, we’ve built all sorts of aviation projects. Our team’s collaborative approach helps local governments and airport authorities deliver their critical projects securely and without interruption to ongoing airport operations. We keep America moving.


TAMPA INTERNATIONAL AIRPORT AIRSIDE C TERMINAL  TAMPA, FLORIDA | 315,000 SF, 16-GATE TERMINAL SERVING SOUTHWEST AIRLINES, INDEPENDENCE AIR AND SPIRIT AIRLINES, AUTOMATED BAGGAGE CONVEYOR SYSTEM, PASSENGER TRANSFER SYSTEM, CONCESSION AND RETAIL FACILITIES, EIGHT SECURITY SCREENING LANES | ALFONSO ARCHITECTS: ARCHITECTURE | BECK: CONSTRUCTION



TAMPA INTERNATIONAL AIRPORT CONRAC+APM  TAMPA, FLORIDA 5 STORY CONSOLIDATED RENTAL CAR FACILITY (CONRAC), AUTOMATED PEOPLE MOVER (APM) WILL BE BUILT TO LINK THE CONRAC TO THE MAIN TERMINAL | DEMATTEI WONG ARCHITECTURE: ARCHITECTURE | AUSTIN COMMERCIAL / BECK PARTNERSHIP: DESIGN AND BUILD TEAM



TAMPA INTERNATIONAL AIRPORT CONRAC+APM  TAMPA, FLORIDA 5 STORY CONSOLIDATED RENTAL CAR FACILITY (CONRAC), AUTOMATED PEOPLE MOVER (APM) WILL BE BUILT TO LINK THE CONRAC TO THE MAIN TERMINAL | DEMATTEI WONG ARCHITECTURE: ARCHITECTURE | AUSTIN COMMERCIAL / BECK PARTNERSHIP: DESIGN AND BUILD TEAM



TAMPA INTERNATIONAL AIRPORT COUNTER RELOCATION AND RENTAL CAR GARAGE  TAMPA, FLORIDA | 7-STORY, 360,000 SF, CAST-IN-PLACE CONCRETE, FLY-OVER BRIDGE OVER EXISTING AIRPORT PARKWAY | BECK: ARCHITECTURE, CONSTRUCTION


TAMPA INTERNATIONAL AIRPORT COUNTER RELOCATION AND RENTAL CAR GARAGE  TAMPA, FLORIDA | 7-STORY, 360,000 SF, CAST-IN-PLACE CONCRETE, FLY-OVER BRIDGE OVER EXISTING AIRPORT PARKWAY | BECK: ARCHITECTURE, CONSTRUCTION


TAMPA INTERNATIONAL AIRPORT COUNTER RELOCATION AND RENTAL CAR GARAGE  TAMPA, FLORIDA | 7-STORY, 360,000 SF, CAST-IN-PLACE CONCRETE, FLY-OVER BRIDGE OVER EXISTING AIRPORT PARKWAY | BECK: ARCHITECTURE, CONSTRUCTION



WESTMINSTER STATION TRANSIT  WESTMINSTER, COLORADO | TRANSIT PLAZA WITH PEDESTRIAN CONNECTIONS, PARKING AND PEDESTRIAN CONNECTION | BECK: ARCHITECTURE, CONSTRUCTION



DFW INTERNATIONAL AIRPORT TERMINAL A & C SKYLINK RESTROOM IMPROVEMENTS  DALLAS/FORT WORTH, TEXAS | TWO NEW PUBLIC RESTROOM FACILITIES LOCATED ADJACENT TO GATES A-29 AND C-28; RENOVATION AND CONVERSION OF A VACATED EXISTING GYMNASIUM | BECK: ARCHITECTURE, PRECONSTRUCTION, CONSTRUCTION


DFW INTERNATIONAL AIRPORT TERMINAL A & C SKYLINK RESTROOM IMPROVEMENTS  DALLAS/FORT WORTH, TEXAS | TWO NEW PUBLIC RESTROOM FACILITIES LOCATED ADJACENT TO GATES A-29 AND C-28; RENOVATION AND CONVERSION OF A VACATED EXISTING GYMNASIUM | BECK: ARCHITECTURE, PRECONSTRUCTION, CONSTRUCTION


ADMIRALS CLUB  AUSTIN, TEXAS | 6,000 SF CLUB AREA, 1,000 SF BUSINESS CENTER, 700 SF VIP LOUNGE | HARRIS DESIGN GROUP: ARCHITECTURE | BECK: CONSTRUCTION


ADMIRALS CLUB  AUSTIN, TEXAS | 6,000 SF CLUB AREA, 1,000 SF BUSINESS CENTER, 700 SF VIP LOUNGE | HARRIS DESIGN GROUP: ARCHITECTURE | BECK: CONSTRUCTION


CONRAC + APM AT TAMPA INTERNATIONAL AIRPORT  TAMPA, FLORIDA 5 STORY CONSOLIDATED RENTAL CAR FACILITY (CONRAC), AUTOMATED PEOPLE MOVER (APM) WILL BE BUILT TO LINK THE CONRAC TO THE MAIN TERMINAL | DEMATTEI WONG ARCHITECTURE: ARCHITECTURE | AUSTIN COMMERCIAL / BECK PARTNERSHIP: DESIGN AND BUILD TEAM



CONRAC + APM AT TAMPA INTERNATIONAL AIRPORT  TAMPA, FLORIDA 5 STORY CONSOLIDATED RENTAL CAR FACILITY (CONRAC), AUTOMATED PEOPLE MOVER (APM) WILL BE BUILT TO LINK THE CONRAC TO THE MAIN TERMINAL | DEMATTEI WONG ARCHITECTURE: ARCHITECTURE | AUSTIN COMMERCIAL / BECK PARTNERSHIP: DESIGN AND BUILD TEAM



AMERICAN AIRLINES MAINTENANCE HANGAR  FORT WORTH, TEXAS | 781,000 SF, SEVEN-BAY HANGAR| CORGAN: ARCHITECTURE | BECK: CONSTRUCTION


AMERICAN AIRLINES TERMINAL 3E RENOVATION  FORT WORTH, TEXAS | REMOVAL OF EXISTING CEILINGS, LIGHT FIXTURES AND FLOORING IN ALL PUBLIC AREAS OF TERMINAL | CORGAN: ARCHITECTURE | BECK: CONSTRUCTION


CORPORATE EXECUTIVE HANGAR INTERIOR RENOVATION  SAN ANTONIO, TEXAS | 47,000 SF HANGAR, 90,000 SF PAVEMENT, OFFICE SPACE, RESTROOMS, MEZZANINE, ELECTRICAL AND MECHANICAL | KELL MUNOZ WIGODSKY: ARCHITECTURE | BECK: CONSTRUCTION


CORPORATE EXECUTIVE HANGAR INTERIOR RENOVATION  SAN ANTONIO, TEXAS | 47,000 SF HANGAR, 90,000 SF PAVEMENT, OFFICE SPACE, RESTROOMS, MEZZANINE, ELECTRICAL AND MECHANICAL | KELL MUNOZ WIGODSKY: ARCHITECTURE | BECK: CONSTRUCTION


TAMPA INTERNATIONAL AIRPORT RATHEON CANOPY REPLACEMENT  TAMPA, FLORIDA | REPLACEMENT OF CANOPY AFTER DESTROYED FROM A HURRICANE, REPAIR AND REPLACEMENT OF STRUCTURAL CABLES, REPLACEMENT OF EXISTING SKYLIGHT | BECK: CONSTRUCTION



DALLAS AREA RAPID TRANSIT AUTHORITY - LIGHT RAIL SYSTEM  DALLAS, TEXAS | MAJOR UTILITY RELOCATION AND RECONSTRUCTION FOR TRACKWAY CONSTRUCTION, EXTENSIVE HARDSCAPE AND LANDSCAPE INSTALLATION, FOUR PASSENGER LOADING STATIONS | BECK: CONSTRUCTION


HARTSFIELD-JACKSON ATLANTA INTERNATIONAL AIRPORT DELTA CONCOURSE E  ATLANTA, GEORGIA | BACK TO BACK MODULE WITH AN OPEN-FRAMEWORK CANOPY, THREE ADDITIONAL SECURITY CHECKPOINT LANES | CORGAN: ARCHITECTURE | BECK: CONSTRUCTION


DFW AIRPORT DEVELOPMENT  D/FW AIRPORT, TEXAS | ESTIMATING AND SCHEDULING OF VARIOUS PROJECTS INCLUDING TENANT REMODELS, UTILITY AND ROADWAY RELOCATIONS, BUILDING AND GARAGE ADDITIONS AND TAXIWAYS | CORGAN: ARCHITECTURE | BECK: CONSTRUCTION



BOULDER TRANSIT VILLAGE  BOULDER, COLORADO | 3.2 ACRE MIXED-USE FACILITY | BECK: ARCHITECT OF RECORD



LOVE FIELD AIRPORT  DALLAS, TEXAS | PHASED WORK DATING BACK TO 1970’S: AA TICKET COUNTERS, RE-ROOFED EAST TERMINAL, HVAC FOR EAST TERMINAL, TICKET COUNTERS, TARMACK, STRIPING, DATA CENTER, SWITCH GEAR, AOA FENCE, GSE BUILDING FOR AA | BECK: CONSTRUCTION


LOVE FIELD AIRPORT  DALLAS, TEXAS | PHASED WORK DATING BACK TO 1970’S: AA TICKET COUNTERS, RE-ROOFED EAST TERMINAL, HVAC FOR EAST TERMINAL, TICKET COUNTERS, TARMACK, STRIPING, DATA CENTER, SWITCH GEAR, AOA FENCE, GSE BUILDING FOR AA | BECK: CONSTRUCTION


TAMPA INTERNATIONAL AIRPORT AIRSIDE F ADDITIONS AND RENOVATIONS  TAMPA, FLORIDA | 30,000 SF ADDITION, 50,000 SF RENOVATION, ADDITION OF TWO WINGS, BAGGAGE CLAIM DEVICES, TWO PASSPORT PROCESSING BOOTHS, TSA SCREENING | ALFONSO ARCHITECTS AND CORGAN AVIATION: DESIGN ARCHITECT | BECK: CONSTRUCTION



TAMPA INTERNATIONAL AIRPORT AIRSIDE F ADDITIONS AND RENOVATIONS  TAMPA, FLORIDA | 30,000 SF ADDITION, 50,000 SF RENOVATION, ADDITION OF TWO WINGS, BAGGAGE CLAIM DEVICES, TWO PASSPORT PROCESSING BOOTHS, TSA SCREENING | ALFONSO ARCHITECTS AND CORGAN AVIATION: DESIGN ARCHITECT | BECK: CONSTRUCTION



TAMPA INTERNATIONAL AIRPORT AIRSIDE F ADDITIONS AND RENOVATIONS  TAMPA, FLORIDA | 30,000 SF ADDITION, 50,000 SF RENOVATION, ADDITION OF TWO WINGS, BAGGAGE CLAIM DEVICES, TWO PASSPORT PROCESSING BOOTHS, TSA SCREENING | ALFONSO ARCHITECTS AND CORGAN AVIATION: DESIGN ARCHITECT | BECK: CONSTRUCTION



TAMPA INTERNATIONAL AIRPORT AIRSIDE F ADDITIONS AND RENOVATIONS  TAMPA, FLORIDA | 30,000 SF ADDITION, 50,000 SF RENOVATION, ADDITION OF TWO WINGS, BAGGAGE CLAIM DEVICES, TWO PASSPORT PROCESSING BOOTHS, TSA SCREENING | ALFONSO ARCHITECTS AND CORGAN AVIATION: DESIGN ARCHITECT | BECK: CONSTRUCTION



TAMPA INTERNATIONAL AIRPORT LANDSIDE C EXPANSION AND AIRSIDE A AND D REMODEL  TAMPA, FLORIDA | NEW AIRSIDE C, THE LANDSIDE C EXPANSION INCLUDED DOUBLING THE LENGTH OF TUNNEL, TURNING AIRSIDE D EXIT INTO AN EXTERIOR PEDESTRIAN AREA | ALFONSO ARCHITECTS: ARCHITECTURE | BECK: CONSTRUCTION



TAMPA INTERNATIONAL AIRPORT LANDSIDE C EXPANSION AND AIRSIDE A AND D REMODEL  TAMPA, FLORIDA | NEW AIRSIDE C, THE LANDSIDE C EXPANSION INCLUDED DOUBLING THE LENGTH OF TUNNEL, TURNING AIRSIDE D EXIT INTO AN EXTERIOR PEDESTRIAN AREA | ALFONSO ARCHITECTS: ARCHITECTURE | BECK: CONSTRUCTION




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.