2022 Bishop Miege Fund-a-Need

Page 1

FUND-A-NEED

COMMONS RENOVATION NEW FLOORING & ACOUSTIC TILES

South School Entry Security & Commons Renovation

$430K

$105K

$535K

FROM DONOR MATCH ENLARGED WINDOW COSTS

SOUTH ENTRY, COMMONS + ENLARGED WINDOWS!

The renovation will update the much needed floor finish. New wall colors and acoustical panels are included in the project.

$430K to complete projects listed:

South Entry

Commons

• • • •

• Acoustic Panels • New Resinous Epoxy Flooring

New Guided Secure Vestibule Walk-off Carpet (w/ logo inlay) New Resinous Epoxy Flooring New LED Lighting and Ceiling

The Commons is one of our most important spaces for students and staff. It is the multi-purpose area for school gathering and events. It is the first impression to our visitors and guests when they visit.

Goal with Contingent Upgrade = $535K

SOUTH ENTRY SECURITY

CONTINGENT UPGRADE - NEW ENLARGED WINDOWS (Additional $105,000 already matched)

NEW GUIDED SECURE VESTIBULE To increase the safety and security for students, staff, and visitors is a priority.

A new guided secure entry will be added to the South Entry to allow visitors to enter the attendance office before entry into the school building. Creating a two-step entry to increase security is essential and considered a standard in school safety.

$105,000

GOAL

Reaching Goal of $430K becomes $535K!

New enlarged windows to bring in more natural light and showcase Sister Martina Courtyard.

DONATE NOW!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.