BBR Construction | April 2021

Page 72

DEPSA

The mutual support relationship bet ween DEPSA and its suppl ie r s keeps eve r y p roject demand in stock , avoid i ng any stoppage befo re completion

The Portal Residencias phase has been completed and currently DEPSA is adding

DIGITAL RESOURCES BECOME HELPING HANDS

The current management at

finishing touches to the Portal

DEPSA makes the most out of

San Isidro III phase.

its embracing of technology at

Other projects have been

every level, starting with the

completed in the vicinities of

deployment of the SKO ERP

the highway to El Salvador,

software since taking over in

where Toscana Campestre and

2015. SKO is a customizable

Villa Campestre are located

program based in the O4B

(both Grupo Campestre

(Open for Business) software

developments). Both were built

developed in Costa Rica. SKO’s

with blocks, just like San Isidro,

advantage is its offering of local

keeping a balance between

technical support. The system

block and concrete construction. is based in the Oracle platform,

72


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.