1 minute read
Plan to Create Lumber Center
on San Diego
Tidelands
From the San Diego "IJnion"
Construction of an apron wharf extending from the foot of Arctic street to the foot of Seventh street and costing approximately a quarter of a million dollars is included in the plans for a lrrrnlsi center to be built on tidelands there if the proposed bond issue providing for construction of a concrete bulkhead and dirt fill is approved.
Announcement of the apron wharf projct was made yesterday by Harbormaster Joe Brennah.
This apron wharf would be built out from the concretc bulkhead for the entire distance of 3000 feet between Arctic and Seventh street. Access to the wharf would be provided by a channel 30O feet wide and 22 feet deep, which rvould be dredged to obtain dirt for the fill behind the bulkhead.
Becatrse the channel rvould be dredged close to the bulkhead, it would be unnecessarv to extend the wharf apron out more than 45 feet. This would make unnecessary the transfer of lumber to barges and rehandling at the yards, as norv is being done at a number of yards here.
Lrunber Plants
Try Us For
OAK FI.OORING
GUM FL(X)RING
WHITE OAK TRIM
RED GUM TRIM
CASING BASE
OAK WAGON STOCK
BEECH FL(X)RING
AROMATIQUE CEDAR
LINING
R"ED OAK TRIM pAP GL'M TRIM
MOULDINGS
GUM R'RMTURE
STOCK
Furniture Stock in Sete CUT TO SIZE Rcadv to Assemble
Flafi Surfacer Har&tood Trim Sandcd