3.6. Cross Section
SECTION FOUR
WBS, ESTIMATES, SCHEDULES AND CASH FLOW
Section Four provides the must-see pieces of information for the 620 N 3rd St project: the detailed and summarized descriptions of the project’s baseline budget, schedule and cash flow. The general conditions subsection lists all the costs related to the project that are not subcontracted work related, but rather the conditions through which Fit Construction enables the subcontractors to perform the work packages. The work packages are each subcontractor’s specific contract pertaining their scope of work, this information can be found under the “Procurement and Buy-Out Log” subsection. As provided on Section Two under the “Project Delivery Method Analysis” subsection, the cash flow commits to show PRDC transparent cost information month by month.
Additionally, Fit Construction provides an alternative estimate for LEED Silver certification. PRDC has the opportunity to review the base and the alternate estimate and make an educated decision whether to pursue the certification or not.
The schedule is another critical portion of Section Four. A milestone report, the most important dates for the project, is provided under this section. Lastly, it contains the master scheduled with a detailed plan for the 620 N 3rd St project, as well as the critical path.