volume 3d west clare municipal district settlement plans

Page 93

Inagh

Inagh Location and Context Inagh is situated on the main N85 national secondary route, between Ennis and Ennistymon. The village is identified as a Large Village in the Settlement Hierarchy of this plan. The village has grown on the western banks of the Inagh River and has an identifiable village centre. It has a number of services and facilities including a school, community centre, church and cemetery, shop, crèche, GAA club and a recycling centre. There is also a playground currently under construction in the village. The strategy for Inagh is to provide for small scale, well designed residential, commercial and community developments which have regard to the character of the village. The strategy is to concentrate development to the west of the busy N85, providing for safe and improved pedestrian circulation within the settlement. The Inagh River Estuary is a Special Area of Conservation. While the village of Inagh is not located in the SAC, it is situated upstream from the estuary. Any plan or project located within, adjacent to or which has the potential to impact on the integrity of an SAC or SPA, must be the subject of screening for appropriate assessment. Accordingly, objectives set out in Volume 1 of this Plan, relating to European sites and to appropriate assessment will apply to any future development proposals in this area. The Natura Impact Report accompanying this plan (Volume 10a) provides relevant mitigation measures and recommendations at site and project level. Water supply is sourced through the Inagh-Kilmaley Group Water Scheme. Inagh has a public wastewater treatment system with sufficient treatment capacity to serve the target population. General Objectives •

To facilitate and support the sustainable growth of the village to the west of the N85 which will support existing services and encourage further expansion of the service base.

To provide for safe pedestrian and vehicular access and movement within the settlement.

Employment and Enterprise Inagh and the surrounding hinterland have developed a reputation for artisan food production and such enterprises are encouraged. A key priority will be to support community and social facilities in the village and to encourage indigenous enterprises and service provision. In this regard, a new digital hub community facility is planned for the village which will be delivered through the Council’s DigiClare initiative in line with the Clare Digital Strategy 2023, and is a collaboration between Clare County Council in partnership with Inagh Development __________________________________________________________________________________ Draft Clare County Development Plan 2023-2029

87


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Tubber

3min
pages 256-258

Spanish Point

8min
pages 251-255

Ruan

3min
pages 248-250

Labasheeda

9min
pages 225-230

Querrin

5min
pages 244-247

Moyasta

8min
pages 239-243

Knockerra

2min
pages 222-224

Lissycasey

5min
pages 231-234

Moy

4min
pages 235-238

Knock

6min
pages 217-221

Kilshanny

3min
pages 214-216

Kilmurry McMahon

4min
pages 210-213

Fanore

4min
pages 191-194

Kilmaley

6min
pages 206-209

Inch

3min
pages 195-197

Kilbaha

7min
pages 198-202

Doonaha

5min
pages 187-190

Kilnaboy

3min
pages 203-205

Doolin (including Doolin Pier

12min
pages 180-186

Cross

4min
pages 176-179

Cooraclare

7min
pages 164-168

Creegh

5min
pages 172-175

Cranny

3min
pages 169-171

Connolly

4min
pages 161-163

Carron

3min
pages 158-160

Carrigaholt

11min
pages 152-157

Boston

2min
pages 149-151

Bellharbour

4min
pages 145-148

Ballynacally

7min
pages 140-144

Kilmihil

11min
pages 124-130

Ballyea

5min
pages 136-139

Killadysert

4min
pages 131-134

Killimer

9min
pages 118-123

Kilfenora

6min
pages 113-117

Liscannor

8min
pages 107-112

Quilty

9min
pages 101-106

Mullagh

4min
pages 97-100

Inagh

6min
pages 93-96

Doonbeg

12min
pages 85-92

Ballyvaughan

11min
pages 72-78

Miltown Malbay

10min
pages 64-70

Corofin

9min
pages 79-84

Lisdoonvarna

8min
pages 58-63

Kilkee

23min
pages 46-57

Kilrush (including Cappa village and Pier

37min
pages 24-44

Section 1: SERVICE TOWNS

1min
page 11

Ennistymon/Lahinch

20min
pages 12-23
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.