ARCHITECTURE PORTFOLIO David Prentice
David Prentice Education:
Contact:
University of Cincinnati: Architecture student, Class of 2019 École Spéciale d’Architecture: Paris Foreign exchange, Fall 2018 Granville High School: Class of 2015 (3.849 GPA 4.116 weighted)
740-641-7479 prentidd@mail.uc.edu https://issuu.com/davidprentice1/docs/portfolio_5.0
Experience: BHDP: Student Intern (May - Aug 2018) Supervisor: Mark Rebholz (mrebholz@bhdp.com) Job Summary: In this position I worked almost exclusively in Revit, modeling existing buildings before a renovation, updating the model to reflect changes, and occasionally making new Revit families. Wright Heerema Architects: Student Intern (Aug - Dec 2017) Supervisor: Scott Zatt (szatt@wharchs.com) Job Summary: In this position I did a substantial amount of work in Revit, modeling the existing building before a renovation, updating the model to reflect changes, and making new Revit families, among other tasks. Morris Architects/Huitt-Zollars: Student Intern (Jan - Apr 2017) Supervisor: Douglas Oliver (doliver@huitt-zollars.com) Job Summary: In this position I produced renderings, marketing documents, diagrams, website mock-ups, and helped with Revit files, among other tasks. Note: the firm changed its name during my time there. Triangle Fraternity - Cincinnati: House Manager (2019) and Interim House Manager (May - Aug 2018) Position Summary: I am responsible for the mainenance and cleanliness of the chapter house and I will be heavily involved in the planning and design of a major renovation to the main bathroom. Order of the Arrow (Boy Scouts of America): Various Positions (2013 - 2017) I have served in the following positions: -Lodge Chief (2016) -Section Chief (Feb 2017 - June 2017) -Lodge Vice Chief of Chapters (2015) -Section Vice-Chief (June 2016 - Feb 2017) -Lodge Honors Committee Chairman (2017) -Area Leadership Training Conference Chairman (2017) -Chapter Chief (2014) -Conclave Vice-Chief (2017) -Chapter Vice-Chief of Troops (2013)
Awards:
-Eagle Scout with 4 Eagle Palms, Boy Scouts of America -Vigil Honor, Order of the Arrow -Founder’s Award, Order of the Arrow -Member of the National Society of Leadership and Success -Member of the Alpha Lambda Delta Honor Society
-Honor Roll throughout High School -Member of the Granville High School Cum Laude Society -Member of the Granville High School National Honor Society -Member of the Société Honoraire de Français
Ski l l s/Softwa r e: Adobe Photoshop Illustrator InDesign Premiere Pro Audition After Effects Media Encoder Lightroom Acrobat
2
Microsoft Office 2013 Word PowerPoint Excel Architectural Software Revit Rhino V-Ray
Miscellanious Laser Cutting Wood shop tools 3D Printing Photography French B2 (pending C1), 9 years of classes, 6 week study abroad in Normandy, semester long foreign exchange in Paris
Table of Contents Academic Work 4 Fondation Avicenne Renovation 8 Trammel Fossil Park Visitor’s Center 12 Riverside Rowhouse
Professional Work
16 Lamar University Baseball Field 18 Prairie Glen Miscellaneous 20 100+1
3
Fondation Avicenne Renovation Academic Work
I did a foreign exchange program at l’École Spèciale d’Architecture in Paris for the fall semester of 2018. This was my studio project at that school. All units are in the metric system. The project was to renovate a 10 story dorm building by Claude Parent, notable for its suspended structure, that has been largely abandoned for over 10 years. We were required to keep the primary superstructure and the exterior stair Project Information: Class: Atelier Date: Fall TYPOLOGIE 2018 Professor: Gaston Tolila SAISON 1 (1925-1938)
SAISON 2 (1952-1965)
PRESERVER et RENFORCER �����e �e �� ���te ��tt��t Fondation Hellènique Nicolas Zahos - 1932
Maison du Japon Pierre Sardou - 1929
Maison d’Italie Piero Portaluppi - 1958
M Le
Split the two existing horizontal boxes behind the supersturcture to form additional boxes.
Prolonger les murs aux façades est et ouest jusqu’au aligné avec la côté extérieur du colonnes. Prolonger les murs aux façades nord et sud 3 mètres
0 100
100
200
200
300
300
400
400
m
500
m
500
4
0
Extend the facade out in line with the superstructure to make more space and reinforce the new boxes.
Espac Public Ground floor oriented N/S/E/W, other floors oriented 18.47 degrees.
5
Plan Masse - 1/500
Coupe Perspective - 1/100 0
David PRENTICE Semestre 5 Automne 2018- Atelier G. Tolila - K. Ceballos - A. Lazo Urbain et Paysages : M. Ghorayeb & C. de BoiscuillĂŠ
6
5
10 m
Salle de Conférence 2 501B 16.62 m²
Salle de Conférence 3 501C 16.62 m²
Hommes 504 11.50 m²
10
0.205
Mastic
Plaque de Mur de Gypse
2 Bloc du Bois
Étancheité Plaque de Mur de Gypse Vitrage
Montant en Métal
Meneau
Isolation en Mousse
Bloc du Bois
Plaque de Mur de Gypse
3
4
CMP Mur Vitré 1 : 20
2
0.737
0.750
0.737
0.750 2.180
Vitrage Étancheité
Meneau Plaque de Mur de Gypse
Plan 5e Étage - 1/200 Mastic Montant en Métal
Plaque Mur de Gypse Isolationde Rigide
Bloc du Bois Isolation en Mousse
Étancheité
Vitrage
Montant en Métal
Meneau
Isolation en Mousse
Bloc du Bois
Plaque de Mur de Gypse
0.521
3
Étancheité
10
Vitrage
20 m
Mastic
Plaque de Mur de Gypse
Isolation Rigide
CMP Vitré 1 : 20
2
Meneau
Isolation en Mousse
Jointure
0.500
0
Montant en Métal
Panneau Aluminum
0.500
Plaque de Mur de Gypse
Plaque de Mur de Gypse
CMP Mur TYP 1 : 20
4
CMP Mur Vitré 1 : 20
Bloc du Bois
Plaque de Mur de Gypse Vitrage
Montant en Métal
Meneau
Isolation en Mousse
Bloc du Bois
Plaque de Mur de Gypse
0
2
Simple 103 19.82 m²
10
CMP Vitré 1 : 20
3
Simple 109 22.43 m² Double 105 40.74 m²
20 m
CMP Mur TYP 1 : 20
4
Triple 102 59.44 m²
Wall Detail Elevation 1 : 20
Femmes 5.24 m²
Simple 106 20.07 m²
Simple 107 18.72 m² Simple 110 20.10 m²
CMP Mur Vitré 1 : 20 Hall d'Ascenseur 100 36.38 m²
Double 101 39.20 m²
Simple 115 22.58 m²
Simple 111 21.01 m²
Simple 114 22.79 m² Simple 113 22.58 m²
Simple 112 20.00 m²
Cafétéria 216.50 m²
Hommes 5.24 m²
Cuisine / Passe Plat 94.22 m² Hall 79.49 m²
Projecteur 26.54 m²
Salle de Cinema 338.61 m²
Plan Courant - 1/200 0
Élévation Est - 1/200 10
20 m
20 m
Escalier de Secours 003 42.30 m²
Accueil 000 119.79 m²
Salle de Musculation 211.18 m²
Bureau 001 8.17 m²
Mail 002 8.66 m²
Hommes 20.00 m² Femmes 20.00 m² Accueil 35.82 m²
DN
Hommes 12.28 m²
Femmes 12.28 m² Exposition 361.32 m²
Plan Rez-de-Chaussée - 1/200 0
2
10
20 m
Logement Coupe 1 : 33
2
Logement Plan 1 : 33
2
Logement Plan 1 : 33
1
Plan et Coupe d’un Logement Typique 1/33 David PRENTICE Semestre 5 Automne 2018- Atelier G. Tolila - K. Ceballos - A. Lazo Urbain et Paysages : M. Ghorayeb & C. de Boiscuillé
pe
2
10
Salle de Conférence 3 501C 16.62 m²
0
2
ommes 504 1.50 m²
1
CMP Mur TYP 1 : 20
Plaque Mur de Gypse Isolationde Rigide
Plaque de Mur de Gypse
Mastic
ÉLÉVATION EST
CMP Vitré 1 : 20
Buanderie 502 16.47 m²
Isolation Jointure en Mousse
Étancheité
0.500 0.205
Jointure
0.500
0.121 0.016 0.038 0.014
0.205
0.121 0.016 0.038 0.014
0.016
0.500
Isolation Rigide
Mastic
2
0.500
0.500
Jointure
Isolation Mousse Panneauen Aluminum
Hall d'Ascenseur 500 22.72 m²
Isolation Rigide
Mastic
Meneau
Isolation en Mousse
0.521 0.121 0.016 0.038 0.014
Vitrage
Montant en Métal
0.500
20 m
Plaque de Mur de Gypse
0.016
2
2.193
2.180
0
Plaque Plafondde Mur de Gypse
Femmes 503 11.76 m²
Salle de Conférence 1 Montant Métal 501A Panneauen Aluminum 16.62 m²
Plaque de Mur de Gypse
0.500
0.016
Isolation en Mousse
Étancheité
Panneau Aluminum
Isolation en Mousse
Panneau Aluminum
Montant Plafond en Métal
Coworking 501 256.61 m²
Étancheité Plancher
Montant en Métal
Montant en Métal
Isolation Rigide
11.50 m²
Isolation Rigide Revêtement de Sol
Plaque de Mur de Gypse
Plaque de Mur de Gypse
Jointure
Plaque de Mur de Gypse
Étancheité
CMP TYP 1 1 : 20
Étancheité
Panneau Aluminum
Plaque de Mur de Gypse
Hommes Plaque de Mur de Gypse Plancher 504
Jointure
Isolation Rigide
Hall d'Ascenseur 500 22.72 m²
Salle de Conférence 3 501C 16.62 m²
Étancheité Revêtement de Sol
Jointure
Isolation Rigide
Plafond
Isolation en Mousse
0.521
0.205
Panneau Aluminum
Plancher
Plaque de Mur de Gypse
CMP TYP 1 : 20
Panneau Aluminum
0.500
Salle de Conférence 1 501A 16.62 m²
Isolation Rigide
0.205
Plafond Salle de Conférence 2Panneau Aluminum 501B 16.62 m²
Plaque de Mur de Gypse
0.500
Femmes 503 11.76 m²
Panneau Aluminum
Plancher
Isolation en Mousse
0.205
0.737
Isolation Rigide Étancheité
Plafond
Plafond
0.205
Montant en Métal
0.500 Revêtement de Sol
Revêtement de Sol
Plaque de Mur de Gypse
Plancher
Montant en Métal
1
Étancheité
CMP TYP 1 1 : 20
Jointure
0.750
0.205
0.500
Isolation Rigide
2.193
Revêtement de Sol
Panneau Aluminum
0.500
Jointure
0.500
2.193
0.205
0.500
Buanderie 502 16.47 m²
2.180
0.205
0.500
Hall d'Ascenseur 500 22.72 m²
Coworking 501 256.61 m²
Plancher
Panneau Aluminum
0.500
Détails et Élévation de Façade - 1/20
0.205 Revêtement de Sol
Coworking 501 256.61 m²
Femmes 503 11.76 m² Salle de Conférence 1 501A 16.62 m²
Salle de Conférence 2 501B 16.62 m²
0.205
7
Buand 502 16.47
Trammel Fossil Park Visitor’s Center Academic Work
Cincinnati is well known in the geological community for the ancient fossils that can be found here. One of the places where these fossils are found is the Trammel Fossil Park. Our assignment was to design a visitor’s center for this park. The images on the bottom left represent the design process. The image on the top left is the edrioasteriod Isorophus cincinnatiensis, a fossil that influenced the design of an existing display (top right). I modeled my building off the same precedent. Project Information: Class: Design Lab IV Date: Summer 2017 Professor: Elizabeth Riorden
8
9
10
11
Riverside Rowhouse Academic Work
The objective was to create a row house on a small property in Covington KY, right next to the Ohio River. My building was designed as a co-house, able to house 4 people each with their own private space while still sharing public space. Project Information: Class: Design Lab V Date: Spring 2018 Professor: Ryan Ludwig
12
13
14
DN
Open to Below
Level 3
UP
DN
Open to Below
Level 2
UP
DN
DN
Level 1
15
Lamar University Baseball Field Professional Work - Morris / Huitt-Zollars
Huitt-Zollars was commissioned to do renovations to their baseball field including a new coaches office/locker room building, a shade over a portion of the stands, and a sort of entry plaza with a bar outside the stadium. I produced all the concept images for this project taking into consideration structural and design recommendations from my supervisor and coworkers. Project Information: Firm: Morris Architects/Huitt-Zollars Date: Spring 2017 Supervisors: Doug Oliver and Chris Manthei
16
17
FCI Glenview - Prairie Glen
Professional Work - Wright Heerema Architects
This building is a new clinic being constructed outside of Chicago. WHA was hired to do the building shell while another firm does the interior. My involvement in this project was to do the bulk of the Revit work, I would guess that I did about 90% of the work in Revit for this project. I modeled a majority of the building from the designer’s drawings, did all the file set up, and worked closely with the project manager to do some of the details. The image on the lower left is all the elevations, the top right is the roof plan, and the bottom right is the first floor plan. Project Information: Firm: Wright Heerema Architects Date: Fall 2017 Supervisors: Cary Chandler
A
B
T.0. SCREEN 22'-0" T.O. UPPER PRECAST 19'-0"
C
PC-4 PC-2
PC-1
C.7
D
10 A502
PC-4
GL-1
T.O. PRECAST 16'-6"
WRIGHT HE E R E MA | A R C H I T E C T S 140 S. Dearborn St. Suite 200 C h i c a g o , I l l i n o i s 6 0 6 03 312.913.10 10 Fax 913.19 17 www.wrightheeremaarchitects.com
SHELL PLAN 0'-0"
NORTH ELEVATION
PC-3
PRECAST COLOR 1
GL-2
PC-3
PRECAST COLOR 2
Scale: 1/8" = 1'-0"
D
C.7
T.O. UPPER PRECAST 19'-0" T.O. PRECAST 16'-6"
Structural Engineering CS Associates 4532 W. 103rd St. Oak Lawn, IL, 60453 708-422-5306
62'-9 3/16"
C.5
PC-4
PC-4
C
B.5
B
A.5
A
PC-1 PC-2
PC-1
GL-1 GL-1
PC-1
SHELL PLAN 0'-0"
PRECASE COLOR 2 PC-4
2
8
AXON VIEW Scale:
OWNER
PRECASE COLOR 1 PC-6
GL-2
PC-2
GL-2
Clarius Partners, LLC Eric Johnson 200 W. Madison St, Suite 3410 Chicago, IL, 60606 312-386-7150
PC-3
SOUTH ELEVATION Scale: 1/8" = 1'-0"
9
8
7
6
5
4
T.0. SCREEN 22'-0" T.O. UPPER PRECAST 19'-0"
PC-2
3
2
1.1
1
PC-1
T.O. PRECAST 16'-6"
SHELL PLAN 0'-0" PC-3
3
Scale: 1/8" = 1'-0"
1
1.1
2
GL-3
PC-4
4
5
GL-1
6
4 A301
GL-1
PC-4
3 A301
7
PC-1
2 A301
PC-2
8
GL-1
4 A301
9
Sim
1 A301
PC-4
PC-4
PC-1
T.O. PRECAST 16'-6"
3'-0"
SHELL PLAN 0'-0"
PC-3 GL-2
PC-3
FIRE DEPARTMENT CONNECTION AND SIGNAGE
GL-2
4
PC-6
GL-2 PC-2
PRECAST COLOR 2
GL-1
PC-4
PRECAST COLOR 1
PRECAST COLOR 2
WEST ELEVATION Scale: 1/8" = 1'-0"
Architect's Project Number:
20170530
Issue Date:
G.1 MP-1
G.2
G.3 7 A301
GL-5
T.0. SCREEN 22'-0" T.O. UPPER PRECAST 19'-0"
1 ISSUED FOR SHELL PERMIT 9/29/2017 2 ISSUE FOR CONTRACT DOCUMENTS 11/03/2017
G.4 GL-5
6 A301
MP-1 GL-2
T.0. SCREEN 22'-0" WS-2
GL-2
5
SHELL PLAN 0'-0"
11'-5" PRECAST COLOR 2 MP-3
FRONT ELEVATION Scale: 1/8" = 1'-0"
GL-5
GL-2
MP-3
GL-5
GL-2
Sheet Title:
4"
GL-2
SHELL PLAN 0'-0"
ELEVATIONS
1'-2" 5'-0"
G:\School\College\Year 3\FS17\FS17 CO-OP\20170530 Prairie Glen - CENTRAL_2017-12-8_17.26.40\20170530 Prairie Glen - CENTRAL.rvt 1/27/2018 3:47:15 PM
3
5 A301
T.0. SCREEN 22'-0" T.O. UPPER PRECAST 19'-0"
18
PC-2
PRECAST COLOR 1
EAST ELEVATION
FCI - GLENVIEW 2555 PATRIOT BLVD GLENVIEW, IL ISSUE FOR CONTRACT DOCUMENTS
1
CONSULTANTS
GL-2
N Sheet Number:
GL-2
6
SW SCREEN ELEVATION Scale: 1/8" = 1'-0"
7
TRASH ENCLOSURE Scale: 1/8" = 1'-0"
A251
3 A251
1
1.1
2
5'-0"
3
31'-4 1/4"
4
30'-0"
A
5
30'-0"
HP
6
30'-0"
7
30'-0"
8
30'-0"
HP
9
30'-0"
31'-4 1/4"
HP
HP
WRIGHT HE E R E MA | A R C H I T E C T S 140 S. Dearborn St. Suite 200 C h i c a g o , I l l i n o i s 6 0 6 03 312.913.10 10 Fax 913.19 17 www.wrightheeremaarchitects.com
CONSULTANTS
46'-4 1/4"
31'-4 1/4"
Structural Engineering CS Associates 4532 W. 103rd St. Oak Lawn, IL, 60453 708-422-5306
1'-2"
15'-0"
A.5
B
HP
LP
HP
LP
HP
LP
A-3
1'-2"
4'-0"
TYP.
LP
2 A251
OWNER
15'-0"
4'-0"
5'-11"
A-7
1 A251 30'-0"
A-2 A-1
15'-0" 30'-0"
15'-0"
C.5
F.1
C.7
2
A-5
16'-4 1/4"
16'-4 1/4"
HP
1 3/4"
7'-6"
10 A502
A-6
HP
D
4'-0 1/4"
HP2
5'-6 "
A-4 8'-0"
HP
3
A-6
2'-1
1/4"
10 '-0 "
10 '-2 "
A-4
8'-0 "
G.2
9'-5 "
G.1
A-5
HP
HP
A-5
LP 2
G:\School\College\Year 3\FS17\FS17 CO-OP\20170530 Prairie Glen - CENTRAL_2017-12-8_17.26.40\20170530 Prairie Glen - CENTRAL.rvt
FCI - GLENVIEW 2555 PATRIOT BLVD GLENVIEW, IL ISSUE FOR CONTRACT DOCUMENTS
15'-0"
B.5
C
F.2
Clarius Partners, LLC Eric Johnson 200 W. Madison St, Suite 3410 Chicago, IL, 60606 312-386-7150
HP
10 '-2 "
4 A251
G.3 5 A251
G.4 Architect's Project Number:
ELEVATION KEY 1
Scale: 1/8" = 1'-0"
20170530
Issue Date:
KEY NOTES
A-X 1 2 3 4 5 6 7
HP = 16' 4" HP2 = 16' 5 1/4" HP3 LP = 14' 8 1/2" LP2
ROOF PLAN
1 ISSUED FOR SHELL PERMIT 9/29/2017 2 ISSUE FOR CONTRACT DOCUMENTS 11/03/2017
UNIT-MOUNTED SCREEN WALL SYSTEM RTU LOCATION REFER TO MECH DWGS ROOF DRAIN - SEE PLUMBING DRAWINGS LINE OF CANOPY BELOW FORMED MTL COPING ALUMINUM COMPOSITE COPING INSULATED ROOF HATCH - FIXED LADDER BELOW BY TENANT BUILD-OUT
Sheet Title:
ROOF PLAN
N
1/27/2018 3:47:01 PM
Sheet Number:
A114
3 A251
1
1.1
2
3
4
5
6
7
8
9
249'-4 1/2" 31'-4 1/4"
1'-0"
2'-10 1/4"
30'-0"
27'-0"
1'-6"
1'-6"
30'-0"
27'-0"
1'-6"
TYPICAL A
27'-0"
30'-0" 1'-6"
1'-6"
30'-0"
27'-0"
TYPICAL A
1'-6"
1'-6"
TYPICAL A
30'-0"
27'-0"
1'-6"
1'-6"
30'-0"
27'-0"
TYPICAL A
1'-6"
1'-6"
31'-4 1/4" 1'-6"
27'-0"
TYPICAL A
1'-6"
27'-0"
TYPICAL A
2'-10 1/4"
1'-0"
TYPICAL A
1'-0"
TYPICAL A
1'-6"
2'-10 1/4"
5'-0"
A
5 A501
1'-0"
8"
140 S. Dearborn St. Suite 200 C h i c a g o , I l l i n o i s 6 0 6 03
8'-6"
2'-10 1/4"
WRIGHT HE E R E MA | A R C H I T E C T S
106
312.913.10 10 Fax 913.19 17 www.wrightheeremaarchitects.com
5'-0" 27'-0" 5'-0"
Structural Engineering CS Associates 4532 W. 103rd St. Oak Lawn, IL, 60453 708-422-5306
3'-6"
1'-6"
5'-0"
31'-4 1/4"
TYPICAL A
46'-4 1/4"
27'-0"
CONSULTANTS
1'-6"
5'-0" 5'-0" 3'-6"
FCI - GLENVIEW 2555 PATRIOT BLVD GLENVIEW, IL ISSUE FOR CONTRACT DOCUMENTS
1'-6"
125'-6 1/2"
15'-0"
27'-0"
TYPICAL A 15'-0"
1'-6"
1'-6" 27'-0" A-1
10 '-2 "
5'-0 1'-1 " 0 3/ 4" 6'-0 "
G.1
8'-0 "
3'-6"
4'-6" 8'-0"
4'-6" 1'-0"
4'-6" 9'-0"
8'-0" 1'-0"
8'-0"
3'-6" 1'-6"
1'-11 1/2"
26'-6 1/2"
1'-6"
1'-6"
5'-0"
1'-10 3/4" 1'-10 3/4" 6'-2 1/2" 5'-0" 27'-0"
3'-6" 1'-6"
A-1
3'-6" 1'-6"
27'-0"
1'-6"
TYPICAL A
1'-6"
5'-0"
5'-0"
5'-0"
5'-0"
27'-0"
3'-6" 1'-6"
3'-6" 1'-6"
TYPICAL A
5'-0"
5'-0"
5'-0" 27'-0"
5'-0"
16'-4 1/4"
3'-6" 1'-6"
1'-6"
27'-0"
TYPICAL A
2'-10 1/4"
1'-10"
TYPICAL A
1'-1 0 3/ 4" 5'-0 " 10 '-2 "
G.2
4'-0 " 1'-7 "
G.3 5 A251
SHELL PLAN
4 A501
1'-10"
3/4" 2'-9
A-2
101 4'-0 "
104
103
102
1'-7 "
1 A501
A-2 3 A501
1'-1 0 1/ 4"
1
2 A501
15'-0" 9'-4 1/16" W.P.
2'-10 1/4"
2'-6 "
8'-5 "
7 5/ 16 "
4'-8
1'-7 "
1'-1 0 1/ 4"
4 A251
G.4 Architect's Project Number:
Scale: 1/8" = 1'-0"
GENERAL NOTES
8'-8"
REFERENCE LOCATIONS A.1 REFER TO SHEET A001 FOR DRAWING SYMBOLS AND LEGEND, AND SHEET A002 FOR PROJECT GENERAL NOTES.
SLOPED CONCRETE PAD 8'-0"
7'-4"
6'-11"
8"
PRECAST ENCLOSURE
GALVANIZED PAINTED TUBES FOR GATE HINGE CONNECTIONS
8"
A.2
REFER TO ELEVATIONS FOR ADDITIONAL INFORMATION.
A.3
REFER TO SHEET A701 FOR PARTITION TYPE DETAILS.
A.4
REFER TO SHEET A652 FOR DOOR ASSEMBLY INFORMATION AND SCHEDULES.
DIMENSIONS / LAYOUT B.1 DO NOT SCALE PLANS. SHOULD INFORMATION BE MISSING, OR IF DISCREPANCIES SHOULD ARISE, CONTACT THE ARCHITECT FOR CLARIFICATION PRIOR TO CONSTRUCTION.
8"
G:\School\College\Year 3\FS17\FS17 CO-OP\20170530 Prairie Glen - CENTRAL_2017-12-8_17.26.40\20170530 Prairie Glen - CENTRAL.rvt
D
1/27/2018 3:46:58 PM
8'-0 "
1/4"
16'-4 1/4"
30°
TYPICAL A
15'-0"
1'-0"
4'-6"
8'-0"
3'-6" 9'-5 "
C.7
2'-10"
F.1
Clarius Partners, LLC Eric Johnson 200 W. Madison St, Suite 3410 Chicago, IL, 60606 312-386-7150
1'-6"
4'-6" 9'-0"
4'-6"
1'-6" 8'-0"
3'-6" 3'-6" 4'-6" 4'-6"
9'-0"
C.5 4'-6"
30'-0"
1'-0"
8'-0" 1'-6"
C
F.2
OWNER
B.5
1'-0"
30'-0"
2 A251 15'-0"
3'-6" 1'-0"
8'-0"
4'-6"
A-2
4'-6"
1 A251
15'-0"
5'-0" 105
27'-0"
8"
A-3
5'-0"
107
1'-6"
B
8'-0 1/2"
1'-11 1/2"
11'-6 1/2"
3'-6"
3'-6"
3'-0"
A.5
EMBEDED PAINTED BOLLARDS B.2
PREFINISHED METAL PANEL GATE DOORS WITH GALVANIZED STEEL ANGLE SUPPORT, WHEELS, PULL/LATCH, LOCKABLE HARDWARE, AND CANE BOLTS. PROVIDE IN GROUND BOLT RECIEVER HOLES FOR BOTH OPEN AND CLOSED DOOR POSITIONS
ALL VERTICAL DIMENSIONS ARE NOTED FROM TOP OF FINISHED FLOOR (A.F.F.)
PARTITIONS C.1 THE CONTRACTOR IS RESPONSIBLE FOR THE BRACING OF WALLS AT ALL DOOR AND WINDOW ASSEMBLIES.
COORDINATION WITH EXISTING SYSTEMS D.1 REPAIR, REPLACE OR CORRECT FINISHES OF ALL EXTERIOR WINDOW SYSTEMS, DOOR ASSEMBLIES, AND ETC. TO A LIKE NEW CONDITION RESULT Of CONSTRUCTION ACTIVITIES. SURFACES SHALL BE CONTINUOUSLY FLUSH AND SMOOTH - FREE OF DEFECTS.
A-X 1 2 3
KEY NOTES PROFILE OF CANOPY DRAIN LEADER FROM ROOF/CANOPY DRAINS - SEE PLUMBING DRAWINGS STRUCTURAL COLUMNS - SEE STRUCTURAL DRAWINGS
20170530
Issue Date: 1 ISSUED FOR SHELL PERMIT 9/29/2017 2 ISSUE FOR CONTRACT DOCUMENTS 11/03/2017
COORDINATION WITH OTHER TRADES E.1 THE ARCHITECTURAL DIMENSIONS SHALL GOVERN THE PLACEMENT OF MECHANICAL WHERE INDICATED E.2
GENERAL CONTRACTOR TO COORDINATE WORK AND PHASING OF WORK WITH CLIENT'S VENDORS.
BLOCKING F.1 PROVIDE FIRE TREATED WOOD BLOCKING OR 16 GAUGE SHEET METAL PANELS AS REQUIRED TO ANCHOR WALL OR ROOF ITEMS
Sheet Title:
SHELL PLAN
N Sheet Number:
2
TRASH ENCLOSURE PLAN Scale: 1/4" = 1'-0"
A110
19
100+1
Miscellaneous The task was to choose 100 ordinary household objects and bind them together with a single item. I chose toy soldiers and string. The idea was to create an American flag out of these soldiers, who are bound together, to symbolize the idea that our country only exists thanks to the soldiers throughout our history who gave their lives for the United States. The country is, in this case literally, held together by our fallen soldiers. I took the flag with me to Normandy, France, in order to document it in its “ideal location,� the Normandy American Cemetery and Memorial. Project Information: Class: Design Lab I Date: Fall 2015 Professor: Kory Beigle
Flag Project at the American Cemetery in Normandy, France
20
21
THANK YOU
prentidd@mail.uc.edu 740-641-7479