Ops Talk Magazine Spring 2011

Page 24

The right structure + creative thinking = BY ROY COLLVER Too bad these ideal opportunities don’t come along more often. When McLeod Road Elementary school in Surrey (SD no. 36) was due for a seismic upgrade, it was also due for an HVAC makeover as well. By the time Robert Cenedese of Rocky Point Engineering finished examining the structure, he knew this job could result in an enhanced heating system that would deliver superior energy savings and comfort, as well as a significant improvement in indoor air quality. The existing heating system was primarily gas-fired unit ventilation heaters for the classrooms, along with a bit of perimeter baseboard supplied by a small boiler. Ventilation air was supplied through fixed dampers in the unit heaters, resulting in the classic dilemma of how best to set them up. (You are likely to get either extra heat loss when not needed, or inadequate ventilation in heavily occupied classrooms.) Having experience and expertise in LEED® design, the Rocky Point team was used to thinking about energy savings first and foremost. This project presented some interesting possibilities not often available in school retrofit situations: • The building provided heated crawlspaces so as to allow hydronic distribution piping to be run unobtrusively throughout the structure. • The seismic upgrade process meant the school was going to be literally torn apart inside, so a radical redesign was possible without adding to the disruption. • Replacing all of the worn-out heating equipment meant that new equipment selection could be designed to be compatible with the most efficient type of heating plant

24 Ops Talk • Spring 2011

available – multiple-staged, lowtemperature condensing boilers. • There was a local boiler manufacturer, IBC Technologies, that was willing to work with Rocky Point and School District 36 to provide equipment and control solutions to meet the stringent requirements of the school district. They required high-efficiency boilers to be mounted on a seismically rated, factory-engineered racking system, and the boilers had to be Native BacNet® capable in order to fit into the district’s operating system. Discussions between the district, Rocky Point and IBC Technologies resulted in the perfect boiler plant, married with the ideal heating system for this building. • They had the ability to provide an appropriately sized space to house an all-new boiler plant.

McLeod boiler room.

So how do you design the ideal system for this type of building? Mr. Cenedese made the following decisions: • Use hydronic unit ventilators, with coils sized to be able to heat the spaces at design conditions, with maximum water temperatures of 160°F. • Choke the fluid flow rate to the heaters down so that they operate on a 40°Fs stee, optimizing condensation (efficiency) in the boilers at design temperatures (by returning 120°F s, the water). BONUS! With a 40°Fs pumps can be smaller, the pipes can be smaller and the power required to drive the water around the building can be less. • Provide variable-volume fresh-air dampers to the unit ventilator heaters – tied to CO2 sensors in the classrooms – to optimize the amount of


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Keep fit through play

3min
pages 56-57

Firestone introduces sustainable, innovative vegetative roof system

4min
pages 58-61

The new sports floor finish: R.J.C. Moisture Cured Urethane

3min
pages 54-55

Understanding MERV air filter ratings for HVAC systems

3min
pages 52-53

FortisBC helps the Delta School District reduce its carbon footprint

2min
page 51

Stutters: licensed to haul asbestos from job sites

3min
pages 48-49

Are you properly maintaining your turf fields?

3min
page 50

Reducing downtime, one freeze at a time

4min
pages 46-47

V = Velocity – Chuck Morris

4min
page 45

Shelter Industries launches first of 138 modular kindergarten classrooms

5min
pages 42-44

THOUGHTS ON: Succession – Chuck Morris

2min
pages 30-31

Four steps to successful roofing projects

9min
pages 38-41

FAM3: Facility Asset Management Maturity Model

3min
pages 28-29

The bio-based solution for your asphalt – and your budget

3min
pages 26-27

The right structure + creative thinking = a showcase system for efficiency & IAQ

3min
pages 24-25

School exteriors get a facelift with concrete repairs

4min
pages 22-23

Reuse before you recycle: a better approach

3min
pages 20-21

Climate action: leading by example – Doug Wall

6min
pages 18-19

Winter driving: how much more fuel are you using?

5min
pages 14-15

Profile on Doug Stewart

2min
page 13

Let Western Bus’s team help you with your next bus repair

1min
pages 16-17

What’s in a name? (A lot

3min
page 12

Rethinking leadership – Donna Howes, CHRP

4min
pages 8-11

President’s Message – Bruce MacLean

2min
page 7
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.