

AVIATION
100 YEARS OF PARTNERSHIP
As the 9th largest domestic general building contractor in the U.S., with offices in 26 locations, JE Dunn Construction is dedicated to being an indispensable business partner. We start by understanding our clients’ purpose, goals, and customers, and then deliver transformational solutions with guaranteed results.
Our commitment to clients and their building goals is unwavering, guided by our family and employee-owned philosophy.
Something about Building Authentic Partnerships….
100 .35 90% 10 YEARS IN BUSINESS EMR REPEAT CLIENTS BUILDER BY ENR TOP


JE Dunn brings proven expertise in aviation construction, delivering large-scale airside and landside projects nationwide. Our airside portfolio includes premium airport lounges, terminals, and baggage handling systems, while our landside expertise covers terminal parking garages, maintenance and ground service facilities, ARFF stations, Consolidated Rental Car Facilities (CONRAC), and hangars.
With a client-first approach, we prioritize exceptional service and seamless execution. Backed by a national network of 26 offices, our dedicated aviation specialists unite with our local market experts to deliver customized solutions that meet each client’s unique needs. Every project is supported by in-house specialists in mechanical, electrical, and low-voltage systems, along with subject matter experts in baggage handling and other critical aviation infrastructure.
AIRPORTS OF AVIATION CONSTRUCTION REVENUE DEDICATED AVIATION TEAM YEARS
DELIVERY CMAR SIZE
195,000 SF VALUE
$185.5 Million
ARCHITECTS
Perkins+Will C-Design
CHARLOTTE-DOUGLAS
INTERNATIONAL AIRPORT
CONCOURSE A EXPANSION PHASE II CHARLOTTE, NORTH CAROLINA
COMPLETED ON-TIME
DELIVERED WITHIN BUDGET
MAINTAINED PASSENGER TRAFFIC ZERO MISSED FLIGHTS EXCEEDED DBE GOALS SUSTAINABLE ELEMENTS
The new two-level concourse features ten gates and an upgraded baggage handling system that integrates with the existing system. Passengers benefit from an 825-foot connector equipped with moving sidewalks. The glazing system features 600 pieces of glass, each with a lowvoltage driver that automatically adjusts during peak sunlight. This improves occupant comfort and reduces the carbon footprint by reducing energy costs.
A custom terrazzo floor showcases a bronze outline of a life-size plane, while displays celebrate North Carolina's aviation legacy,
highlighted by an immersive "First in Flight" light and sound wall. A life-sized DC-9-82 T-Tail aircraft is embedded in the floor near Gate
A31, adding to the visual experience.
The exterior sunshade lighting system boasts 100 lights, ranging from 4 to 30 feet in height, capable of creating 17 million color combinations. This impressive project also achieved two Green Globe Certifications under the Green Building Initiative (GBI), underscoring its commitment to sustainability.







XWA
WILLISTON BASIN INTERNATIONAL AIRPORT
DELIVERY CMAR SIZE
180,000 SF
COST
$71.2 Million
ARCHITECT
Alliance AWARDS
Best Projects
Engineering News-Record
Mountain States
Excellence in Safety Award
Airport Engineering News-Record
Mountain States
2020 Project of the Year
Airport Business
NEW AIRPORT TERMINAL
WILLISTON, NORTH DAKOTA
COMPLETED ON-TIME
DELIVERED WITHIN BUDGET
ZERO MISSED FLIGHTS
EXCEEDED DBE GOALS
Since 2017, JE Dunn has successfully completed two projects at the Williston Basin International Airport. The first project involved a 70,000 SF Rescue Firefighting and Snow Removal Equipment Facility. More recently, we delivered a new 110,000 SF, two-level international airport passenger terminal building. This comprehensive project features a new entry hall, TSA offices, inbound and outbound baggage handling systems, rental car and ticket counters, restrooms, passenger boarding bridges, passenger screening areas, and various vertical circulation elements such as stairways, escalators, and elevators.

MAINTAINED
PASSENGER TRAFFIC
SUSTAINABLE ELEMENTS
During our initial estimate, we pinpointed $10 million in cost reduction ideas, with the owner and design team accepting $7 million of those suggestions. Throughout the preconstruction process, we continuously assisted with budgeting and reviewed plans during the redesign. An early foundations bid package, enabled construction to begin before winter set in. This strategic move kept the project on track as the design team finalized their construction documents. Their proactive approach ultimately saved six months on the project schedule and minimized the risk of lost time during the redesign phase.






DEDICATED AVIATION
At JE Dunn, we provide a dedicated and fully integrated team of aviationfocused experts to support every phase of your project. Our specialized personnel—including design managers, preconstruction specialists, and baggage handling systems coordinators—ensure precision, efficiency, and compliance from concept to completion.
Our safety and security teams collaborate closely with TSA and airport staff to uphold strict safety protocols in active airport environments. Meanwhile, our DEI team drives inclusive engagement throughout the project, fostering meaningful participation and diverse partnerships.
With in-house construction professionals seamlessly integrated into every stage, we leverage collaborative construction approaches to deliver high-quality results tailored to your needs. Backed by the necessary expertise and resources, we are committed to helping you achieve your project goals with confidence.
DESIGN MANAGEMENT
Our licensed architects, specializing in airport design, conduct in-depth reviews and lead early collaboration sessions to identify and develop solutions before construction begins. This approach ensures adherence to project scope, budget, and industry compliance throughout the project.

PRECONSTRUCTION
With expertise in medium to large hub airport projects, our Preconstruction team delivers precise estimates and transparent pricing from concept to completion. By integrating innovative strategies with proven methods, we enhance cost certainty, optimize material procurement, and ensure maximization of the project program within the established budget.
SUPPORT SERVICES

BAGGAGE HANDLING SYSTEMS COORDINATION
Our team has experience successfully managing baggage handling projects at 26 airports,including system expansions, upgrades, and replacements. Our capabilities include coordination of CBIS, EDS, and TSA-mandated testing to ensure operational efficiency and compliance.
SAFETY AND SECURITY
We mitigate airport construction risks through strategic planning and rigorous safety protocols. Our team develops and enforces CSPPs, collaborates with TSA and airport staff, and implements measures to ensure secure access, debris control, and compliance with OSHA regulations.
DIVERSITY, EQUITY, AND INCLUSION
We are committed to fostering diversity in our workplace, workforce, and marketplace. Our DEI team works alongside project teams from preconstruction onward, tailoring scopes to enhance minority participation and maximize engagement through outreach, mentorship, and capacity-building strategies.
INNOVATION

Our team leverages extensive experience in managing complex aviation projects to deliver innovative, tailored solutions that drive schedule and quality while minimizing disruptions in active airport environments. By applying lessons learned and industry best practices, we proactively address challenges, ensuring seamless execution and collaboration with our clients and design partners.
SELF-PERFORM
Our skilled workforce and in-house resources enable us to efficiently manage various scopes of work, ensuring quality and adaptability. By self-performing critical tasks, we maintain control over schedule, cost, and labor challenges, delivering seamless project execution in active aviation environments.
PREFABRICATION / MODULARIZATION
Prefabrication helps mitigate labor constraints and tight schedules in secured terminals by shifting work offsite. Our expertise in modular fabrication, including finished components, streamlines installation, minimizes disruptions, and accelerates project delivery.
M/E ENGINEERING SERVICES
Our in-house mechanical and electrical experts support early estimating, system analysis, and value engineering to optimize project efficiency. We ensure seamless integration of building systems, from construction through commissioning, for long-term performance and reliability.

DIRECT PURCHASE
Effective equipment procurement is essential for project success. Our structured process manages bidding, purchasing, logistics, and installation, ensuring all equipment meets specifications, stays on schedule, and integrates smoothly into operations.
LOW-VOLTAGE AND SYSTEMS COORDINATION
Our specialized low-voltage and systems integration team, Aptitude, delivers seamless technology solutions for aviation projects. With expertise in structured cabling, security, audiovisual, and smart controls, we help create connected, hightech airport environments tailored to our clients’ needs.








