JE DUNN CONSTRUCTION
FEDERAL GOVERNMENT QUALIFICATIONS
Above: NREL Energy Systems Integration Facility, Golden, CO Left: GSA DOE National Nuclear Security Administration Campus, Kansas City, MO
JE DUNN CONSTRUCTION
FEDERAL GOVERNMENT QUALIFICATIONS
#11
#5
Military Construction
JE Dunn Construction has 94 years of experience with federal clients throughout the United States.
JE Dunn has significant experience with Small Business Plans, Quality Systems and Safety Procedures on complex projects for the federal government.
Courthouse Construction
With nearly 3,000 employees, JE Dunn is ranked as a national top Contractor by Engineering NewsRecord, providing Best Value, Design-Build, Early Contractor Involvement, General Construction and Cost Estimating services to agencies throughout the country.
As a local, regional and national builder, JE Dunn stays ahead of the curve with the latest construction technology. This allows the company to apply construction expertise to support the government’s mission.
BD+C RANKINGS
BY THE NUMBERS
#13
Government Construction
#25
Federal Construction
NATIONAL REACH
• General Construction • Design-Build • Early Contractor Involvement • Construction Management • Developer Lease-Back • Architecture and Engineering • Initial Outfitting • Energy Efficiency and LEED
FEDERAL FACILITY TYPES OFFICE GSA DOE National Nuclear Security Administration Campus National Renewable Energy Laboratory Energy Systems Integration Facility GSA Richard Bolling Federal Building GSA IRS Processing Center and Kansas City Main Post Office Relocation Federal Reserve Bank of Kansas City
COURTHOUSE
HEALTHCARE USACE AFMSA Medical MATOC Program USACE Lackland AFB Postgraduate Dental School and Clinic Replacement
MILITARY USACE Fort Leavenworth Command and General Staff College USACE Fort Leonard Wood Prime Power School
USACE Keesler AFB Medical Center
USACE Fort Carson MATES Facility
USACE Eglin AFB Hospital Realignment
USACE Fort Leavenworth Building 435
Department of Veterans Affairs Charlotte Healthcare Center
USACE Fort Leavenworth MP Battalion Headquarters & COF
USACE Offutt AFB Phases I & II Clinic Renovations
ENTRY GATE
OTHER
GSA Wayne Morse U.S. Federal Courthouse
GSA San Luis Commercial Border Station
NOAA Ted Stevens Marine Research Facility
GSA Christopher S. Bond U.S. Federal Courthouse
GSA Peace Arch Port of Entry
USPS Processing and Distribution Center
GSA Charles Evans Whittaker U.S. Federal Courthouse
USACE STRATCOM Entry Gate
Centers for Disease and Control Bldg 401 Laboratory
GSA Robert S. Dole U.S. Federal Courthouse
USACE Midwest Joint Regional Correctional Facility
GSA Historic Pioneer U.S. Federal Courthouse
USACE San Antonio Military Medical Center Department of Nutritional Medicine
OFFICE
GSA DOE NATIONAL NUCLEAR SECURITY ADMINISTRATION CAMPUS Kansas City, Missouri
Design-Build 1,572,278 SF $650 Million 6 Project Awards LEED Gold 2,500 Employees
NATIONAL RENEWABLE ENERGY LABORATORY ENERGY SYSTEMS INTEGRATION FACILITY Golden, Colorado
Design-Build 181,621 SF $107 Million 9 Project Awards LEED Platinum High-Performance Computing and Data Center (HPCDC)
GSA RICHARD BOLLING FEDERAL BUILDING PHASES I-IV RENOVATION Kansas City, Missouri
CM @ Risk 1,133,536 SF $258 Million 67.4% SBE Utilization LEED Silver 40+ User Agencies
GSA IRS PROCESSING CENTER AND KANSAS CITY MAIN POST OFFICE RELOCATION Kansas City, Missouri
Design-Build 2,528,012 SF $272 Million 8 Project Awards LEED Certified “Eye in the Sky” Security Monitoring
FEDERAL RESERVE BANK OF KANSAS CITY Kansas City, Missouri
CM @ Risk 941,442 SF $213 Million 17 Stories $5.8 Million in Savings
Top Left: NREL Energy Systems Integration Facility, Golden, CO Top Right and Left: GSA Richard Bolling Federal Building, Kansas City, MO Above: GSA Two Pershing Square Relocation, Kansas City, MO
MILITARY
USACE FORT LEAVENWORTH COMMAND AND GENERAL STAFF COLLEGE Fort Leavenworth, Kansas
Early Contractor Involvement (ECI) 420,447 SF $109.3 Million IT-Intensive Educational Building SCIF Space
USACE FORT LEONARD WOOD PRIME POWER SCHOOL Fort Leonard Wood, Missouri
GC 79,278 SF $27.2 Million LEED Gold Houses Army, Air Force, NAVY, FEMA, FE Facilities and State Department
USACE FORT CARSON MOBILIZATION AND TRAINING EQUIPMENT SITE (MATES) FACILITY Fort Carson, Colorado
GC 76,105 SF $14.9 Million Army National Guard Battalion Motorpool, Battalion Maintenance Shelter and Obstacle Course
USACE HISTORIC FORT LEAVENWORTH BUILDING 465 RENOVATION Fort Leavenworth, Kansas
Design-Build 35,780 SF $16.1 Million Historic Restoration Equipped with Virtual Auditorium LEED Gold
USACE FORT LEAVENWORTH MP BATTALION HEADQUARTERS & COF Fort Leavenworth, Kansas
Design-Build 175,403 SF $40.8 Million 40-Acre Site LEED Silver One of the First Pre-Engineered Metal Buildings to Pass USACE Air Barrier Test
Top Left: Fort Leavenworth Command and General Staff College, Fort Leavenworth, KS Left: Fort Leavenworth Building 465 Renovation, Fort Leavenworth, KS Above: Fort Leavenworth Building 120 Eisenhower Hall, Fort Leavenworth, KS
HEALTHCARE
USACE AIR FORCE MEDICAL SERVICES AGENCY MEDICAL MATOC PROGRAM Various Locations Joint Base Langley-Eustis Hospital Addition and CUP, VA
Design-Build Initial Outfitting 10 Years in the Program 16 Projects on 11 Air Force Bases All Facilities Designed to LEED Silver Lackland AFB Reid Medical Clinic, TX Whiteman AFB Clinic Renovation, MO Cannon AFB Medical Dental Clinic, NM Columbus AFB Medical Dental Clinic, MS
• Keesler AFB Medical Center [$80.6M] • Cannon AFB Medical Dental Clinic Replacement [$53.8M] • Eglin AFB Hospital Realignment {$71.4M] • Tynall AFB Repair Clinic [$47M] • Lackland AFB Ambulatory Care Clinic and Central Plant [$46M] • Lackland AFB Ambulatory Care Clinic Parking Garage [$24.3M] • Lackland AFB Postgraduate Dental School and Clinic Replacement [$32.5M] • Lackland AFB Reid Medical Clinic [$40.5M] • Lackland AFB Multiple Medical Facilities [$17.5M] • Columbus AFB Medical Dental Clinic [$23.9M] • Dover AFB Clinic Renovation [$14M] • Hurlburt Field Medical Complex Renovation [$49.3M] • Offutt AFB Clinic Renovation Phase I [$15.2M] • Offutt AFB Clinic Renovation Phase II [$22.6M] • Joint Base Langley-Eustis Hospital Addition and Central Utility Plant Replacement [$52M]
USACE LACKLAND AFB POSTGRADUATE DENTAL SCHOOL AND CLINIC REPLACEMENT Lackland AFB, Texas
Design-Build Initial Outfitting 55,615 SF $32.5 Million LEED Silver Won the Honor Award for the U.S. Air Force’s Design Awards Program
USACE KEESLER AFB MEDICAL CENTER Biloxi, Mississippi
Design-Build Initial Outfitting 172,394 SF $80.6 Million LEED Silver Hybrid Operating Room
USACE EGLIN AFB HOSPITAL REALIGNMENT Fort Walton Beach, Florida
Design-Build Initial Outfitting 144,966 SF $71.4 Million LEED Silver Multiple Project Awards First Hybrid Operating Room Built on an Air Force Base
DEPARTMENT OF VETERANS AFFAIRS CHARLOTTE HEALTHCARE CENTER Charlotte, North Carolina
Design-Build 426,261 SF $105.9 Million LEED Silver Largest Leased VA Facility $3 Million in Construction Savings from Waste Elimination
USACE OFFUTT AFB PHASES 1 AND 2 CLINIC RENOVATION Bellevue, Nebraska
Design-Build Initial Outfitting 103,221 SF (Total Phase I & II) $37.8 Million (Total Phase I & II) LEED Silver
COURTHOUSE
GSA WAYNE L. MORSE U.S. FEDERAL COURTHOUSE Eugene, Oregon
CM @ Risk 266,742 SF $78.9 Million LEED Gold Certified 25 Project Awards $11 Million in Savings
GSA CHRISTOPHER S. BOND U.S. FEDERAL COURTHOUSE Jefferson City, Missouri
CM @ Risk 118,294 SF $59.7 Million LEED Gold Certified $2 Million in Savings
GSA CHARLES EVANS WHITTAKER U.S. FEDERAL COURTHOUSE Kansas City, Missouri
Lump Sum 615,000 SF $106.5 Million 16 Courtrooms 5 Project Awards 115 Year-Old Bell
GSA ROBERT S. DOLE U.S. FEDERAL COURTHOUSE Kansas City, Kansas
CM @ Risk 276,603 SF $33.5 Million 10 Courtrooms
GSA HISTORIC PIONEER U.S. FEDERAL COURTHOUSE Portland, Oregon
CM @ Risk 57,000 SF $20 Million 4 Project Awards National Register of Historic Places
Top Left: Christopher S. Bond U.S. Federal Courthouse, Jefferson City, MO Left: Pioneer U.S. Federal Courthouse, Portland, OR Above: Wayne L. Morse U.S. Federal Courthouse, Eugene, OR
ENTRY GATE
GSA SAN LUIS COMMERCIAL BORDER STATION San Luis, Arizona
Design-Build 44,480 SF $32.6 Million LEED Gold Certified Fast-Tracked Project Houses Food and Drug Administration, Customs and Border Protection and Department of Transportation
GSA PEACE ARCH PORT OF ENTRY Blaine, Washington
CM @ Risk 75,682 SF $88.8 Million LEED Gold Certified Third Largest Border Crossing along Northern Border of U.S. Provided $6 Million in Value Added Services
USACE OFFUTT AFB STRATCOM ENTRY GATE Bellevue, Nebraska
Design-Build $11.4 Million Force Protection Entrance
Top Left: USACE Offutt AFB STRATCOM Entry Gate, Bellevue, NE Top Right, Above and Right: GSA Peace Arch Port of Entry, Blaine, WA
OTHER
NOAA TED STEVENS MARINE RESEARCH FACILITY Juneau, Alaska
CM @ Risk 69,000 SF $34 Million 100% Green Energy for Heat Alaska’s Largest Fisheries Research Facility
USPS PROCESSING AND DISTRIBUTION CENTER Philadelphia, Pennsylvania
CM @ Risk 937,910 SF $170.3 Million 62% Small Business Utilization SCIF Areas Largest Replacement Facility Built for USPS in the Country
CENTERS FOR DISEASE AND CONTROL BUILDING 401 LABORATORY AND OFFICE BUILDOUT Fort Collins, Colorado
Design-Build 34,700 SF $14.8 Million BSL=2 and BSL-3 Laboratory Space LEED Gold Certified Multiple Project Awards via Federal Energy Management Program (FEMP), Department of Health and Human Services and Associated General Contractors of Colorado
USACE MIDWEST JOINT REGIONAL CORRECTIONAL FACILITY Fort Leavenworth, Kansas
Early Contractor Involvement (ECI) 224,736 SF $92.5 Million LEED Silver Certified Geothermal Well Field
USACE SAN ANTONIO MILITARY MEDICAL CENTER DEPARTMENT OF NUTRITIONAL MEDICINE San Antonio, Texas
Design-Build 40,000 SF $40.3 Million LEED Project World-Class Kitchen and Dining Facilities
NT RA C
T
ST CO
CO
SIZ E/
RA TIN G
N CA TIO LO
PR OJ
EC
TN AM
E
FEDERAL EVALUATION SAMPLING
City/State
CCASS/CPARS
SF/$
#
Buildings 244/55 JAG Facilities
Ft Leavenworth, KS
Outstanding
17,000 SF • $13.3M
W912DQ-11-C-4041
Civilian Education System
Ft Leavenworth, KS
Outstanding
86,155 SF • $49.9M
W912DQ-07-C-0024
Prime Power School
Ft Leonard Wood, MO
Outstanding
79,278 SF • $27.2M
W912DQ-07-C-0016
Bolling Building Phase IV
Kansas City, MO
Outstanding
266,206 SF • $125.4M
GS-06-P08-GZC-0011
Bolling Building Phase III
Kansas City, MO
Outstanding
370,494 SF • $82.7M
GS-06-P07-GYC-0001
Bolling Building Phase II
Kansas City, MO
Outstanding
211,249 SF • $31.1M
GS-06P-05-GZC-0013
Offutt AFB Clinic Phase II
Bellevue, NE
Outstanding
59,100 SF • $22.6M
W9126G-08-D-0057
Lackland AFB Reid Medical Center
San Antonio, TX
Outstanding (Interim)
78,288 SF • $40.8M
W9127S-13-D-6001
Peace Arch Port of Entry
Blaine, WA
Outstanding
75,682 SF • $88.8M
GS-10P-06-LTC-3022
National Archives/Records Admin
Kansas City, MO
Outstanding
39,863 SF • $8.9M
N/A
Regional Correctional Facility
Ft Leavenworth, KS
Outstanding
224,736 SF • $92.5M
W912DQ-06-C-0049
Historic Union Station, Kansas City, MO
NOTABLE HISTORIC PROJECTS
Historic Kansas State Capitol, Topeka, KS
Historic Nelson-Atkins Museum of Art, Kansas City, MO
Historic Northrop Auditorium, University of Minnesota, Minneapolis, MN
Historic Liberty Memorial, Kansas City, MO
Historic Minnesota State Capitol, St. Paul, MN
www.jedunn.com
© 2018 JE Dunn Construction Group, Inc.
ATLANTA 770.551.8883
DENVER 303.753.8988
MINNEAPOLIS 952.830.9000
PORTLAND 503.978.0800
AUSTIN 512.329.9618
DES MOINES 515.698.4400
NASHVILLE 615.726.2611
SAVANNAH 912.354.1386
CHARLOTTE 704.554.0539
DICKINSON 701.761.0157
OKLAHOMA CITY 405.302.4500
SPRINGFIELD 417.877.7812
COLORADO SPRINGS 719.471.0217
HOUSTON 713.521.4664
OMAHA 402.384.5380
TAMPA 727.288.2809
DALLAS 214.651.7103
KANSAS CITY 816.474.8600
PHOENIX 602.443.2660
WILLISTON 701.609.5220