K-12 EDUCATION
A COLLECTION OF JE DUNN K-12 PROJECTS
COMPANY OVERVIEW
THE BETTER THE RELATIONSHIPS, THE BETTER THE BUILDING
We believe that the best built construction projects rely on strong client relationships and excellent communication. That belief has become our philosophy and the very reason that we are a service-oriented, professional quality management firm. Our clients are strategic partners in building success.
More than 80% of JE Dunn’s business is with repeat clients or through referrals.
JE Dunn Construction, founded in 1924, and is one of the largest domestic general building contractor in the United States today with offices in 26 locations. Our vision is to be an indispensable business partner for our clients by first understanding their purpose, goals and their customers goals and then delivering transformational solutions with certainty of results. We maintain a commitment to our clients and their building goals while being true to our guiding principles. JE Dunn’s purpose is to enrich lives through inspired people and places. 7 TOP 50 DOMESTIC BUILDER (ENR RANKING 2021) TOP (IN THE PAST 15 YEARS) IN GOVERNMENT CONSTRUCTION
$ 3.8 billion 100 YEARS IN BUSINESS
JE Dunn Office Locations
FLORIDA OVERVIEW
Locally, we have had a strong presence in Florida since1994, with our Tampa office officially opening in 2015. We have had longstanding relationships with the respective government agencies and are intimately aware of the details of the local trade partner market in Pasco County. We also dedicate our personal time and funds to giving back to the communities in which we live and work, supporting causes that empower the local population/environment in a positive way.
LOCAL PRESENCE, NATIONAL RESOURCES.
Backed by 26 offices across the nation, JE Dunn employs construction experts who specialize in building K-12 construction projects. From elementary to high schools, JE Dunn has completed over 650 K-12 education projects. During the entire timeline of your project, our local Tampa teammates will confer and coordinate with this framework of national experts to ensure your project is a success.
35 YEARS IN FLORIDA
306
PROJECTS COMPLETED IN FLORIDA
1,500 + QUALIFIED LOCAL TRADE PARTNERS
JE Dunn’s motto of “pursuit of building perfection” was clearly evident as this project was seamlessly and successfully delivered. The result was a highquality product that the whole JE Dunn team can be proud of. I truly look forward to working with JE Dunn Construction again in the future.
Krause Principal, Clearwater High School
COMMUNITY IMPACT
JE Dunn’s commitment to giving back and serving others can be traced to our very origin. John Ernest Dunn (Ernie), founder of JE Dunn, established a culture of giving within the company long before our cranes reached skyward, and our offices stretched from coast to coast.
JE Dunn’s corporate philanthropy impacts the many markets around the nation where we build, investing 10% of net income and empowering our employees to make an impact through volunteerism and an Employee Match Program.
LOCAL TAMPA COMMUNITY
The JE Dunn Tampa team has a big heart that loves to make a community impact. One of our favorite activities from this year was Feeding Tampa Bay. Our office served warm meals at Trinity Café to over 150+ people each day. Between our office team and family members, we had 20 volunteers participate in this activity. This engaging activity includes offering and serving someone who needs a warm complete meal along with a conversation or simple company which might be the best thing that person could have that day, or maybe that week. Serving and making a positive impact on someone else gives a sense of purpose and belonging to the community, and that’s only part of our commitment from the Tampa office.
“Service at its most basic level is, in fact, leadership. It is our job and our privilege to serve in the communities where we live, work, and play. Our projects have significant impacts on the lives of our clients. Our legacy is the impact we make through our servant leadership and most importantly, how we make them feel.”
– Jake Nellis, Tampa Office Leader
TRUSTED TEAMS. PROVEN PARTNERSHIPS.
JE Dunn understands that maintaining the integrity of the design intent is of utmost importance. We put our knowledge to work to help you get the facility you want – one that is constructible, at the level of quality you expect, and all within the budget you have established.
We have cultivated trusted relationships with designers, both locally and across the nation to deliver some of Florida’s premier places and spaces.
A list of our trusted partners can be found on the page that follows.
Architection
Lyle Engineering
Baker Barrios Architects Lyman Davidson Dooley
BAL Engineering Maxwell Johanson Maher
Bermello Ajamil & Partners
McIntosh Architecture
BranchPattern MGE Architects
CFP Group
MRI Architectural Group
Communications Engineering Consultants MSA Architects
Consultant Firm - Company Multistudio
Davis Stokes Collaborative Nobles & Associates
Earl Swensson Associates Inc PBA Design Group
Ernie O Mastin Architect Perkins&Will
ESa Powell Design Group
Flad Architects
Preston Partnership
FleischmanGarciaMaslowski Ramski & Company
Gould Turner Group Ranon & Partners
Gresham Smith Rees Associates
Harvard Jolly Clees & Toppe
HASTINGS Architecture
Renker Eich Parks Architects
Rowe Architects
Hepner Architects Schenkel Shultz Architects
HKS SGM Engineers & Architects
Hoefer Welker Architecture Smallwood
HOK Sousa Architecture
Howard Davis Associates
HuntonBrady Architects
IA Interior Architects
James E Toth Architects
Stantec
Stengel Hill Architecture
Thomas Miller Partners
Urban Studio Architects
Jenkins Hancock Sides Wannemacher Jensen Architects
Jerel McCants Architecture WGI
Kasper Architecture
Wilder Architecture Inc.
KSQ/Peterson Williamson Design Associates
Lindsay Pope Brayfield Clifford & Associates Williamson Dacar
Lyle Engineering WJE
Lyman Davidson Dooley
K-12 EXPERIENCE
Building on the trend of open, collaborative areas in the K-12 segment, our teams continue to build daptable spaces that feature contemporary designs to integrate with a modern, studentcentered approach to teaching. With creativity at the heart of all educational spaces, implementing a 21st Century school design benefits teachers and students alike, giving them more shared areas to collaborate, new technology with different ways to use it, and the flexibility to modify spaces for all educational needs. With educating the next generation at the center of our purpose, we build places to learn, dream, experiment, grow, connect, and to be inspired.
Our signature blue cranes dot the skylines of 26 major cities in the United States. Our depth of experience, coupled with working relationships with the most qualified trade partners in the region, puts us in a powerful position to deliver certainty of results on complex construction projects.
By
the
Numbers
JE Dunn’s project team exhibited great determination, innovation, and creativity by meeting each of the project’s challenges head-on.
Marti, Giancola, Principal Richard O. Jacobson Technical High School
CLEARWATER HIGH SCHOOL
Clearwater, FL
JE Dunn was selected by Pinellas County Schools for the Clearwater High School campus-wide Modernization project.
The project involves the demolition of existing structures and interconnecting walkways across 17 buildings. New construction includes 142,343 square feet of two-story buildings, comprising an administration/media building, three classroom buildings, a science classroom building, a cafeteria/nutrition building, and a central plant. Additionally, 81,181 square feet of existing buildings will undergo renovations, including spaces for chorus, band, auditorium, vocational education, and the gymnasium. The total area affected by construction and renovation is 223,524 square feet. An alternate scope initially included 11,609 square feet for adult education renovation, but this was later removed in favor of more extensive interior renovations to the gym and vocational education buildings.
The project also includes the installation of a new competition running track and the replacement of the grass football field with synthetic turf. Upgrades to track and field facilities will enhance the long jump, triple jump, high jump, and pole vault areas. The project will completely replace sidewalks and walkway covers and upgrade underground utilities, including plumbing, sanitary sewer, and natural gas. Significant renovations to the stormwater system are planned. Furthermore, a new visitor parking lot will be constructed, existing drop-off and staff/student parking areas will be reconfigured, and new courtyards and gathering spaces will be created within the reconfigured campus.
Size
220,000 SF
Cost
$58.6 million
Architect Hepner Architects
Delivery Method CMAR
TAMPA HEIGHTS ELEMENTARY SCHOOL
Tampa, FL
Tampa Heights Elementary School is a historic building that burned in the aftermath of Hurricane Irma. JE Dunn worked closely with Hillsborough County Schools to provide reconstruction services for a new, three-story 51,941 square foot facility.
All three floors contain classroom space with a multi-purpose cafeteria and administrative office spaces on the main floor. The overall project scope includes completion of the structural bracing for the East Wing and modification of the bracing at the South elevation, demolition of the existing damaged wood framed roof, interior wood framed structural/non-structural walls and floor assemblies, non-impact windows, and the concrete slab on grade at Level 1.
The exterior brick was restored to the greatest extent possible. New windows, roof, three stairwells, and additional classrooms were added. The existing kitchen was replaced, and a new dining/event space was added adjacent to the kitchen and servery.
Garcia Maslowski
PINELLAS CENTRAL ELEMENTARY SCHOOL
Pinellas Park, FL
JE Dunn performed a remodel and renovation of Pinellas Central Elementary School which consisted of 35 classrooms, a media center, administration area, and dining/multipurpose space. The major campus-wide renovations included the installation of permanent classroom walls and new casework in classrooms. Additionally, the team added full new MEP systems and fire sprinkler system to the Elementary School. New underground mains for fire, water, power, and low voltage were also installed.
BROOKSVILLE ELEMENTARY SCHOOL
Brooksville, FL
As our first project partnering with the Hernando County School Board, JE Dunn is currently completing the Brooksville Elementary School HVAC Replacement Project.
The project scope includes a full replacement of existing HVAC systems including a new chilled water system, cooling towers, and air handlers. Additionally, JE Dunn is performing miscellaneous electrical and low voltage system upgrades.
TARPON SPRINGS HIGH SCHOOL
Tarpon Springs, FL
Tarpon Springs High School’s Leadership Conservatory for the Arts is a nationally acclaimed, award-winning music and arts program. During the nine months following Summer 2018, JE Dunn coordinated closely with the school to give this program a new home at the front of campus. This 12,561 square foot new building provides new classroom and teacher work spaces, with rooms for individual and group practice and instruction. The existing multi-purpose room and gymnasium were also fully renovated while the new addition was being constructed. These renovated spaces, in addition to the new space, include upgraded acoustics and state-of-the-art audio/visual technologies.
Overall, the Tarpon Springs project includes renovations in nine buildings on campus. Work on the Tarpon Springs campus also included a covered space for the color guard to practice.
RICHARD O. JACOBSON TECHNICAL HIGH SCHOOL
Seminole, FL
JE Dunn built a 38,000 SF new building and delivered 17,500 SF of renovations to an existing building on the occupied campus of Pinellas Technical High School.
The new building includes an administration wing, classrooms, labs,restrooms, and multi-purpose/cafeteria space. Renovations to the existing building include the replacement of all ceilings and light fixtures, as well as new paint in all rooms. The administrative office area in that building was converted into a laboratory teaching space.
The scope also included demolition of four buildings, the addition of a new bus loop and renovation of the front entrance of the school’s campus.
HUDSON ACADEMY
Hudson, FL
JE Dunn renovated 140,000 SF at Hudson Middle School by first demoing existing exterior CMU ADA ramp, floors, windows, ACT, misc. millwork, light fixtures, gym flooring, and bleachers. Our team replaced exterior windows with partial stucco infill, installed new doors and reused salvaged door hardware, installed new flooring, light fixtures, misc. plumbing fixtures, ACT, interior/exterior paint, exterior covered walkway, millwork, new security cameras.
In addition to being the Construction Management firm for the Pasco County Hudson Middle School project, we have also been selected as the preferred contractor to bid on projects under $5,000,000 with Pasco County Schools for small projects.
CHAMBERLAIN HIGH SCHOOL
Tampa, FL
As part of Hillsborough County School District’s Referendum work, JE Dunn renovated a 75,000 SF high school. The HVAC upgrades at this campus included installing seven new complete VRF systems, including at least six classrooms on each system.
The central energy plant was renovated, and new air-cooled chillers were installed along with new chilled water pumps. All rooftop air handling equipment and exhaust fans were replaced, and the existing air handling equipment was replaced to match the existing design.
HILLSBOROUGH COUNTY PUBLIC SCHOOLS NUTRITION PROGRAM 2023
Tampa, FL Size 30,000 SF
Renovation of twelve separate school kitchens/cafeterias including the following campuses: Annderson, Canella, Citrus Park, Jefferson High, Lutz, Maniscalco, Madison, McKitrick, Monroe, Twin Lakes, Webb, and Woodbridge.
Upgrades include the replacement of existing kitchen equipment, walk-in coolers and freezers, and serving lines. Additionally, the team performed the renovation and relocation of interior walls to accommodate more functional layouts, new finishes including flooring, ceilings, coiling doors, and minor electrical upgrades to support the new equipment.
million
HILLSBOROUGH COUNTY PUBLIC SCHOOLS NUTRITION PROGRAM 2024
Tampa, FL
JE Dunn is responsible for renovating fourteen school cafeteria and eatery spaces in the Hillsborough County Public Schools sytem. DeSoto, Lomax Magnet, Mintz, Riverhills, Springhead, Thonotosassa, Woodson K-8 Upper and Lower campuses are all to be renovated during the 2024 summer. Boyette Springs, Carrollwood, Folsom, Martinez, Pizzo, Shore, and Town & Country campuses are to be renovated during the Fall 2024 semester.
Upgrades include the replacement of existing kitchen equipment, walk-in coolers and freezers, and serving lines. Additionally, the team performed the renovation and relocation of interior walls to accommodate more functional layouts, new finishes including flooring, ceilings, coiling doors, and minor electrical upgrades to support the new equipment.
Size
DUNBAR ELEMENTARY SCHOOL
Tampa, FL
As part of Hillsborough County Public School’s Referendum work, JE Dunn performed the demolition full HVAC replacement of Dunbar Elementary School.
The renovations also included ceiling/lighting work, facade improvements, all associated electrical work and a campus-wide repainting.
The exterior of the campus was repainted and supporting activities to patch masonry/drywall were performed to facilitate the HVAC replacement. All HVAC equipment on the campus was demolished, removed, and replaced with new, similar equipment.
WESTCHASE ELEMENTARY SCHOOL
Tampa, FL
As part of Hillsborough County School District’s Referendum work, JE Dunn completed demolishing and renovating a 110,218 SF elementary school. The work included ceiling/ lighting work, complete HVAC replacement, and associated electrical upgrades, including air handlers, VAV boxes, heaters, fans, and other miscellaneous equipment. Additional scope of repainting the entire interior was added.
The team worked through the existing ceiling grid at Westchase Elementary and replaced all VAV boxes. New electrical wiring and control wiring was run to each VAV box. The existing air handling units in the mechanical rooms were swapped, and all existing rooftop condition equipment and exhaust fans.
Size
110,000 SF
Cost
$3.9 million
Delivery Method CMAR
SLIGH MIDDLE SCHOOL
Tampa, FL
The Sligh Middle School project was a 2,074 SF remodel and addition, primarily focused on rejuvenating the school’s lobby and parking facilities. In addition, our team executed the installation of a robust support structure, specially designed to accommodate repurposed bleachers sourced from the University of Florida.
The new lobby was completed as a substantial precast structure with punched openings and a curtainwall front entrance. A metal panel facade was added to the adjacent media center and includes new backlit school identification signage. The site surrounding the new entrance was updated as well to include a new porte cochere canopy, asphalt paving, sidewalks, flag pole, benches, planters, and decorative concrete accent walls.
Size
2,074 SF
Cost
$3.6 million
Architect
Harvard Jolly Clees & Toppe
Delivery Method
CMAR
BROWARD ELEMENTARY SCHOOL
Tampa, FL
As part of Hillsborough County School District’s Referendum work, JE Dunn renovated the HVAC system at Broward elementary school.
This project primarily consisted of the replacement of all HVAC equipment on campus, replacement of the campus phone and intercom system, replacement of the casework, and replacement of selective floor and base finishes. In conjunction with the major scopes of work, a majority of the walls were painted on campus as well. After observing existing moisture infiltration issues, the exterior walls were remediated and all exterior window and masonry caulking was replaced.
Size
55,000 SF
Cost
$3 million
Architect
Renker Eich Parks
Delivery Method
CMAR
HILLSBOROUGH HIGH SCHOOL
Tampa, FL Size
JE Dunn has been selected to perform the campus-wide HVAC system upgrade of Hillsborough High School.
The project scope includes the replacement of the existing HVAC system with a new system, new chiller plant, cooling towers, and air handlers.
348,000 SF
Cost
$8 million
Architect
Engineering Matrix, Inc.
Delivery Method CMAR
Size
180,000 SF
BRANDON HIGH SCHOOL
Brandon, FL
The Brandon High School HVAC Renovation project includes a 180,000 SF campus-wide HVAC system upgrade of the historic Brandon High. The project scope includes new chiller plant, cooling towers, and air handlers. Additionally, JE Dunn is connecting Building 2 to the upgraded system. Previously, this building was not connected to the existing chilled water.
Cost
$12.8 million
Architect BAL Engineering
Delivery Method CMAR