Mega projects with a value greater than R1 billion

WINNER

B

SMEC South Africa for the Provision of Water and Sanitation Services to Informal Settlements and Schools in eThekwini Municipality (Phase 3)

PROJECT TEAM

Client: eThekwini Municipality, Water and Sanitation Unit Consulting engineer: SMEC South Africa

efore 2007, the eThekwini Health Department was tasked with the rolling out of a project aimed at providing communal

ablution share blocks to informal settlements, aligning to the United Nations Millennium Development Goals, particularly MDG 7. With infrastructure delivery not being the Health Department’s core business, service delivery was slow and deemed unacceptable. Thus, in January 2008, eThekwini Water and Sanitation issued a variation order to the existing large-scale AC Water Mains Relay Project to undertake a pilot exercise to efficiently and rapidly address the ablution requirements. basic human needs. This is demonstrated

the facilities once completed. Only local

and the approach proved to rapidly and

through the delivery of over 430 communal

suppliers and local labourers within the

effectively address the provision of water

ablution facilities to over 34 informal

affected communities were used, as far as

and sanitation services to the human

settlements, serving more than 118 000

possible, across all functions throughout the

settlements concerned.

people across the city.

implementation of the project.

The pilot exercise was a great success

Subsequently, Phase 2 of the Ablution

In totality, the project comprised the

Programme commenced in 2012 on a

R1.7 billion and continued over a four-and-

programme management and overall

larger scale, followed by Phase 3, which is

a-half-year period. The project was geared

programme governance and control for

currently under way, having commenced in

towards contributing to the municipality’s

Phase 3 of the sanitation programme over

August 2015.

social and economic agenda and

a period of four years. The project team

demonstrated this successfully through

consisted of more than 50 companies,

addresses the need to remedy the

the inclusion of labour-intensive

including a substantial entity development

severely adverse conditions experienced

construction methods and thereby the

component in both construction and

by the inhabitants of numerous informal

provision of economic opportunities for

design aspects, thus contributing to

settlements within eThekwini Municipality

the local community.

eThekwini Municipality and national

The Sanitation Phase 3 project directly

8

The overall project budget exceeded

through the provision of basic water and

This also included the recruitment of

sanitation facilities and in turn servicing

community members for supervision of

C E S A A o n E n g i n e e r i n g E x c e l l e n c e Aw a r d s 2 0 2 0

government’s drive towards radical economic transformation.


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Nathoo Mbenyane Engineers

1min
page 37

Lloyd Fisher-Jeffes | Zutari

2min
pages 39-40

Naidu Consulting

2min
page 36

BVi Consulting Engineers

2min
pages 30-32

MENTOR OF THE YEAR Pierre Cronje | Naidu Consulting

1min
page 35

Daveng Consulting Engineers

2min
page 34

SMALL/MEDIUM COMPANY OF THE YEAR ROMH Consulting

1min
page 33

Zutari – Kashimbila Multipurpose Dam and Hydropower Station, Nigeria

4min
pages 27-28

Naidu Consulting

2min
page 29

Knight Piésold Construction of Neckartal Dam and Phase 1 Bulk Water Supply, Namibia

2min
page 26

SMEC South Africa – V&A Waterfront Swing Bridge

4min
pages 23-24

PROJECTS WITH A VALUE LESS THAN R50 MILLION Naidu Consulting – eZimbokodweni Pipe and Pedestrian Bridge

1min
page 22

Nathoo Mbenyane Engineers – Lusushwana Bulk Water Scheme, Bettysgoed

2min
page 21

Knight Piésold – Stock Road: Govan Mbeki to R300, Philippi

2min
page 20

VISIONARY CLIENT OF THE YEAR Western Cape Department of Health – Facility and Infrastructure

1min
page 9

SiVEST SA – Sappi Saiccor Mill – Woodyard Upgrade, Umkomaas

2min
page 15

Naidu Consulting – Mabhobhane River Bridge over the Tugela River

2min
page 18

Zutari – 144 Oxford Road, Office Building, Rosebank

2min
page 14

Hatch – uMshwathi Regional Bulk Water Supply Scheme Phase 2, Wartburg

2min
page 19

Hatch – Midmar Water Treatment Works Upgrade, Howick

2min
page 17

Zutari – Lower Thukela Bulk Water Supply Scheme

4min
pages 11-13

and Schools in eThekwini Municipality (Phase 3

2min
page 10

LIFETIME INDUSTRY ACHIEVEMENT AWARD Llewllyn Pike

2min
page 8

Aon – Forging a new way forward

5min
pages 5-7
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.