CESA Aon Engineering Excellence Awards 2020

Page 11

Mega projects with a value greater than R1 billion

Zutari for Lower Thukela Bulk Water Supply Scheme

I

ncreasing demands from a growing

The R1.6 billion scheme consists of an

population, combined with periodic

abstraction works from the Lower Thukela

droughts that are increasing in

River, which needs to provide a steady

intensity, have left northern KwaZulu-

supply of water from the river throughout

Natal’s water supply vulnerable. The Lower Thukela Bulk Water Supply

the year, while also removing as much of the sediment load from the water as possible.

System was conceived decades ago but

The abstracted water is then pumped up to

was shelved as a scheme because it had not

the water treatment works.

been deemed necessary. However, with an

A weir was installed across the river to

PROJECT TEAM

Client: Umgeni Water Consulting engineer: Zutari (previously Aurecon) Contractors: Group Five, Stefanutti Stocks Coastal, Veolia Water Solutions, Esor Franki

surrounding communities. Sediment collected on-site is then processed to landfill.

impending drought in 2010, Umgeni Water

direct flow to the abstraction works, where

One of the key ecological functions of

needed to move quickly to implement

the water will continually scour the riverbed

the Thukela River is the transportation of

the scheme.

to maintain a channel to the abstraction

nutrient-rich sediment to the estuaries at

works. The removal of sediment is achieved

the mouth of the river. Zutari modelled

as it needed to be executed within a short

through a sequence of boulder, pebble,

the river chemistry and sediment loads to

timeframe in order to meet the client’s

gravel and sand traps.

demonstrate the optimum return flow of

The design of the scheme was challenging,

delivery commitments. It also needed to be

The water treatment works uses three

sediment from the works to the river in order

sufficiently robust so that the client would

stages of sedimentation to further remove

to maintain the ecological service of the river,

achieve a 95% assurance of supply to their

solid particles from the water. The water is

without impacting on the quality of the water

customers. This required an unconventional

then polished through rapid gravity sand

in the river.

design, considering the seasonal flooding of

filters and disinfected before being pumped

the river and the associated deterioration in

from the water treatment works to a 30 Mℓ

treated flow per day, with the option to readily

river water quality.

reservoir, from which it is distributed to the

upgrade it in the future to 110 Mℓ/day.

The scheme presently provides 55 Mℓ of

C E S A A o n E n g i n e e r i n g E x c e l l e n c e Aw a r d s 2 0 2 0

9


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Nathoo Mbenyane Engineers

1min
page 37

Lloyd Fisher-Jeffes | Zutari

2min
pages 39-40

Naidu Consulting

2min
page 36

BVi Consulting Engineers

2min
pages 30-32

MENTOR OF THE YEAR Pierre Cronje | Naidu Consulting

1min
page 35

Daveng Consulting Engineers

2min
page 34

SMALL/MEDIUM COMPANY OF THE YEAR ROMH Consulting

1min
page 33

Zutari – Kashimbila Multipurpose Dam and Hydropower Station, Nigeria

4min
pages 27-28

Naidu Consulting

2min
page 29

Knight Piésold Construction of Neckartal Dam and Phase 1 Bulk Water Supply, Namibia

2min
page 26

SMEC South Africa – V&A Waterfront Swing Bridge

4min
pages 23-24

PROJECTS WITH A VALUE LESS THAN R50 MILLION Naidu Consulting – eZimbokodweni Pipe and Pedestrian Bridge

1min
page 22

Nathoo Mbenyane Engineers – Lusushwana Bulk Water Scheme, Bettysgoed

2min
page 21

Knight Piésold – Stock Road: Govan Mbeki to R300, Philippi

2min
page 20

VISIONARY CLIENT OF THE YEAR Western Cape Department of Health – Facility and Infrastructure

1min
page 9

SiVEST SA – Sappi Saiccor Mill – Woodyard Upgrade, Umkomaas

2min
page 15

Naidu Consulting – Mabhobhane River Bridge over the Tugela River

2min
page 18

Zutari – 144 Oxford Road, Office Building, Rosebank

2min
page 14

Hatch – uMshwathi Regional Bulk Water Supply Scheme Phase 2, Wartburg

2min
page 19

Hatch – Midmar Water Treatment Works Upgrade, Howick

2min
page 17

Zutari – Lower Thukela Bulk Water Supply Scheme

4min
pages 11-13

and Schools in eThekwini Municipality (Phase 3

2min
page 10

LIFETIME INDUSTRY ACHIEVEMENT AWARD Llewllyn Pike

2min
page 8

Aon – Forging a new way forward

5min
pages 5-7
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.