CESA Aon Engineering Excellence Awards 2020

Page 14

Projects with a value between R250 million and R1 billion

WINNER COMMENDATION

A

Zutari for 144 Oxford Road, Office Building, Rosebank

visionary client, a strong

144 Oxford Road is a truly iconic

professional team and

development. While surrounded by a

a commitment to best

leafy residential neighbourhood, it is also

sustainability practices have

across the road from trendy retail centres,

created a striking landmark development that will offer additional green prime office space in Gauteng. The 35 000 m2 premium-grade 144 Oxford

hotels and the Rosebank Gautrain Station. Designed by Paragon Architects, the wrapped in high-performance glazed facades, which mirror the bustling

Johannesburg, was undertaken to capitalise

traffic on Oxford Road, to the west of

on the demand for office space in the

the development. During design development and

2015, developer Growthpoint Properties

construction, Zutari worked closely with

appointed Zutari (previously Aurecon)

the client, the architects, the professional

for the provision of mechanical and

team and the contractors through the

environmentally sustainable design services.

various iterations to ensure that the

In 2019, the project was awarded a 5-Star

Client: Growthpoint Mechanical engineer and ESD consultant: Zutari Main contractors: WHBO and Tiber JV Architect: Paragon

building constitutes a bespoke shape

Road office development in Rosebank,

sought-after central Rosebank precinct. In

PROJECT TEAM

mechanical services and the sustainability

• energy-efficient lighting throughout the building, with circadian capability in the occupied areas • water-saving sanitary fittings, a rainwater harvesting system, and water-efficient landscaping • extensive glazing to maximise external views and access to natural light • a mechanism using weighing cells to

Green Star Design rating by the Green

objectives were seamlessly aligned with

continuously monitor the weight of the

Building Council South Africa and, upon

the proposed design.

chillers, enabling the detection of even a

completion of the fit-out, the project

Some of the key sustainability features of

small leak of refrigerant.

will target similarly high As-built and

the project include:

In addition, a facilities manager was

Interiors ratings.

• an energy-efficient air-conditioning

appointed during the design phase, which

Featuring two extended office towers

system with a full economy cycle, which

will ensure that the operational intent of

connected by a central atrium, the

means that it supplies totally fresh air to

the sustainability initiatives is effectively

development consists of nine occupiable

cool the space when external conditions

implemented after the commissioning of

floors and six basement levels for parking.

are favourable

the building services.

12 C E S A A o n E n g i n e e r i n g E x c e l l e n c e Aw a r d s 2 0 2 0


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Nathoo Mbenyane Engineers

1min
page 37

Lloyd Fisher-Jeffes | Zutari

2min
pages 39-40

Naidu Consulting

2min
page 36

BVi Consulting Engineers

2min
pages 30-32

MENTOR OF THE YEAR Pierre Cronje | Naidu Consulting

1min
page 35

Daveng Consulting Engineers

2min
page 34

SMALL/MEDIUM COMPANY OF THE YEAR ROMH Consulting

1min
page 33

Zutari – Kashimbila Multipurpose Dam and Hydropower Station, Nigeria

4min
pages 27-28

Naidu Consulting

2min
page 29

Knight Piésold Construction of Neckartal Dam and Phase 1 Bulk Water Supply, Namibia

2min
page 26

SMEC South Africa – V&A Waterfront Swing Bridge

4min
pages 23-24

PROJECTS WITH A VALUE LESS THAN R50 MILLION Naidu Consulting – eZimbokodweni Pipe and Pedestrian Bridge

1min
page 22

Nathoo Mbenyane Engineers – Lusushwana Bulk Water Scheme, Bettysgoed

2min
page 21

Knight Piésold – Stock Road: Govan Mbeki to R300, Philippi

2min
page 20

VISIONARY CLIENT OF THE YEAR Western Cape Department of Health – Facility and Infrastructure

1min
page 9

SiVEST SA – Sappi Saiccor Mill – Woodyard Upgrade, Umkomaas

2min
page 15

Naidu Consulting – Mabhobhane River Bridge over the Tugela River

2min
page 18

Zutari – 144 Oxford Road, Office Building, Rosebank

2min
page 14

Hatch – uMshwathi Regional Bulk Water Supply Scheme Phase 2, Wartburg

2min
page 19

Hatch – Midmar Water Treatment Works Upgrade, Howick

2min
page 17

Zutari – Lower Thukela Bulk Water Supply Scheme

4min
pages 11-13

and Schools in eThekwini Municipality (Phase 3

2min
page 10

LIFETIME INDUSTRY ACHIEVEMENT AWARD Llewllyn Pike

2min
page 8

Aon – Forging a new way forward

5min
pages 5-7
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.