CESA Aon Engineering Excellence Awards 2020

Page 19

Projects with a value between R50 million and R250 milion

PROJECT TEAM

Client: Umgeni Water Principal design consultant and project manager: Hatch Main contractor: Icon Construction

T

Hatch for uMshwathi Regional Bulk Water Supply Scheme Phase 2, Wartburg in response, broken down into three

commissioning of a 58 Mℓ/day booster

distinct phases.

pump station on the Phase 1 pipeline

Hatch was appointed by Umgeni Water

(which was being constructed under a

to design and manage the construction of

separate contract) also formed part of the

he greater Wartburg and

Phase 2. This comprised a 15 km, 700 mm

Phase 2 contract.

Dalton area – including Albert

diameter steel pipeline between Wartburg

Falls, Mpolweni, Swayimana,

and Dalton, two booster pump stations and

with three pump sets each – two duty

a 10 Mℓ reservoir. Construction commenced

and one standby. The design philosophy

in July 2015, with completion in April 2020.

adopted was that the projected system

Trust Feeds, Schroeders, and

Cool Air – fall under the uMshwathi Local Municipality in KwaZulu-Natal. They were

The buried pipeline comprises a

The two pump stations were designed

demands from 2015 through to 2035

historically supplied with bulk water from

continuously welded steel pipe connecting

could be met using the same infrastructure

Umgeni Water’s upper uMgeni system via

a new 8 Mℓ reservoir in the town of

(including pumps) via the adoption of

the DV Harris Water Treatment Plant.

Wartburg (Part of Phase 1) to a new

variable-speed drives.

In 2007, Umgeni Water investigated

10 Mℓ reservoir in the town of Dalton (part

The Phase 1 pump station constructed

the feasibility of extending the existing

of Phase 2). A 41 Mℓ/day booster pump

under the Phase 2 contract was key to

Wartburg System to supply the

station was required about two thirds down

supplying the Wartburg reservoir and the

communities of Efaye, Ozwathini and

the pipeline route to boost pressure in order

completion of the Phase 2 infrastructure

Southern iLembe. This study confirmed

to supply the Dalton reservoir. The pipeline

was critical to supplying water for Phase 3

that the Wartburg System was reaching its

route required the driving of 5 number

and the downstream communities.

ultimate capacity and would need to be

2 130 mm diameter pipe-jacks under

The commissioning of the scheme and

augmented. The uMshwathi Regional Bulk

provincial roads and Transnet railway lines.

ultimately the delivery of water therefore

Water Supply Scheme was implemented

The design, construction and

relied on the Phase 2 project team.

C E S A A o n E n g i n e e r i n g E x c e l l e n c e Aw a r d s 2 0 2 0

17


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Nathoo Mbenyane Engineers

1min
page 37

Lloyd Fisher-Jeffes | Zutari

2min
pages 39-40

Naidu Consulting

2min
page 36

BVi Consulting Engineers

2min
pages 30-32

MENTOR OF THE YEAR Pierre Cronje | Naidu Consulting

1min
page 35

Daveng Consulting Engineers

2min
page 34

SMALL/MEDIUM COMPANY OF THE YEAR ROMH Consulting

1min
page 33

Zutari – Kashimbila Multipurpose Dam and Hydropower Station, Nigeria

4min
pages 27-28

Naidu Consulting

2min
page 29

Knight Piésold Construction of Neckartal Dam and Phase 1 Bulk Water Supply, Namibia

2min
page 26

SMEC South Africa – V&A Waterfront Swing Bridge

4min
pages 23-24

PROJECTS WITH A VALUE LESS THAN R50 MILLION Naidu Consulting – eZimbokodweni Pipe and Pedestrian Bridge

1min
page 22

Nathoo Mbenyane Engineers – Lusushwana Bulk Water Scheme, Bettysgoed

2min
page 21

Knight Piésold – Stock Road: Govan Mbeki to R300, Philippi

2min
page 20

VISIONARY CLIENT OF THE YEAR Western Cape Department of Health – Facility and Infrastructure

1min
page 9

SiVEST SA – Sappi Saiccor Mill – Woodyard Upgrade, Umkomaas

2min
page 15

Naidu Consulting – Mabhobhane River Bridge over the Tugela River

2min
page 18

Zutari – 144 Oxford Road, Office Building, Rosebank

2min
page 14

Hatch – uMshwathi Regional Bulk Water Supply Scheme Phase 2, Wartburg

2min
page 19

Hatch – Midmar Water Treatment Works Upgrade, Howick

2min
page 17

Zutari – Lower Thukela Bulk Water Supply Scheme

4min
pages 11-13

and Schools in eThekwini Municipality (Phase 3

2min
page 10

LIFETIME INDUSTRY ACHIEVEMENT AWARD Llewllyn Pike

2min
page 8

Aon – Forging a new way forward

5min
pages 5-7
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.