Projects with a value less than R50 million

WINNER

Naidu Consulting for eZimbokodweni Pipe and Pedestrian Bridge

PROJECT TEAM

Client: eThekwini Municipality Consulting engineer: Naidu Consulting

L

ocated in the Philani valley

Naidu Consulting subsequently undertook

The photoluminescent concrete handrails

of Umlazi, a sewer trunk

the design and construction supervision of

and posts illuminate the bridge at night,

line encased in reinforced

the 160 m long eZimbokodweni Pipe and

offering a much-needed solution to the

concrete and acting as

Pedestrian Bridge.

safety of pedestrians. In addition, the

a low-level pedestrian crossing was

The deck is pre-stressed and comprises

foot paths leading to the bridge also incorporate the same material.

rendered vulnerable and impassable. Due

six equal spans. Standing approximately

to illegal sand mining, the riverbed had

10 m above the existing riverbed, the box

been lowered to such an extent that the

girder deck accommodates a 1 000 mm

photoluminescent polymer concrete as a

structure was exposed to vandalism, flood

diameter HDPE gravity sewer pipeline. The

lighting solution will eliminate the high

action and heavy trucks driving over it.

bridge substructure is founded on piles.

costs of conventional electricity, as well

Restoring and protecting the existing

The pioneering adoption of

This technology utilising

as vandalism and cable theft. It is also a

sewer line from further damage was not

photoluminescent concrete polymers

solution that is maintenance free, with a

cost-effective. In addition, a pedestrian

added a new dimension to safety on the

long-term cost saving to the client.

crossing was desperately required by

eZimbokodweni Pipe and Pedestrian Bridge.

the communities.

It is the first bridge in South Africa to

The eZimbokodweni Pipe and Pedestrian Bridge delivers on improved

utilise photoluminescent ‘glow in the

sanitation facilities, as well as a safe

Consulting via a competitive open tender

dark’ polymer concrete handrails and

and secure pedestrian crossing for the

to deliver a much-needed solution for the

posts. The technology was envisaged

eZimbokodweni community. This bridge

safe crossing of the eZimbokodweni River in

by Naidu Consulting and developed by

redefines how form and function can

conjunction with an upgraded sewer line.

Resocrete Polymers.

come together.

EThekwini Municipality appointed Naidu

20 C E S A A o n E n g i n e e r i n g E x c e l l e n c e Aw a r d s 2 0 2 0


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Nathoo Mbenyane Engineers

1min
page 37

Lloyd Fisher-Jeffes | Zutari

2min
pages 39-40

Naidu Consulting

2min
page 36

BVi Consulting Engineers

2min
pages 30-32

MENTOR OF THE YEAR Pierre Cronje | Naidu Consulting

1min
page 35

Daveng Consulting Engineers

2min
page 34

SMALL/MEDIUM COMPANY OF THE YEAR ROMH Consulting

1min
page 33

Zutari – Kashimbila Multipurpose Dam and Hydropower Station, Nigeria

4min
pages 27-28

Naidu Consulting

2min
page 29

Knight Piésold Construction of Neckartal Dam and Phase 1 Bulk Water Supply, Namibia

2min
page 26

SMEC South Africa – V&A Waterfront Swing Bridge

4min
pages 23-24

PROJECTS WITH A VALUE LESS THAN R50 MILLION Naidu Consulting – eZimbokodweni Pipe and Pedestrian Bridge

1min
page 22

Nathoo Mbenyane Engineers – Lusushwana Bulk Water Scheme, Bettysgoed

2min
page 21

Knight Piésold – Stock Road: Govan Mbeki to R300, Philippi

2min
page 20

VISIONARY CLIENT OF THE YEAR Western Cape Department of Health – Facility and Infrastructure

1min
page 9

SiVEST SA – Sappi Saiccor Mill – Woodyard Upgrade, Umkomaas

2min
page 15

Naidu Consulting – Mabhobhane River Bridge over the Tugela River

2min
page 18

Zutari – 144 Oxford Road, Office Building, Rosebank

2min
page 14

Hatch – uMshwathi Regional Bulk Water Supply Scheme Phase 2, Wartburg

2min
page 19

Hatch – Midmar Water Treatment Works Upgrade, Howick

2min
page 17

Zutari – Lower Thukela Bulk Water Supply Scheme

4min
pages 11-13

and Schools in eThekwini Municipality (Phase 3

2min
page 10

LIFETIME INDUSTRY ACHIEVEMENT AWARD Llewllyn Pike

2min
page 8

Aon – Forging a new way forward

5min
pages 5-7
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.