CESA Aon Engineering Excellence Awards 2020

Page 9

Visionary Client of the Year

Western Cape Department of Health

T

RECOGNITION

he Western Cape Department of Health’s Facility

order to divert possible Covid-19 patients. In some instances,

and Infrastructure Covid-19 response programme

temporary structures were used to provide the quickest response.

stood out in terms of the plan, execution methodology and final delivery within tight time

and cost constraints, as well as limited internal resources. The combined Facility and Infrastructure response to the

Additional intermediate-care beds were identified and provided in line with the anticipated requirements and predictions, namely: • CTICC Hospital of Hope – 862 beds • Brackengate – 338 beds

Covid-19 pandemic demonstrates the province’s readiness to

• Harry Comay – conversion of 38 beds and addition of 20 beds

deal with health needs and provide effective service delivery.

• Sonstraal TB Hospital – conversion and extra beds provided a

In doing so, the department’s visionary and innovative

total of 150 Covid-19 beds.

thinking, planning and execution serve as an example to all

The CTICC and Brackengate beds will only be temporary,

clients, both public and private, in the delivery of infrastructure

whereas the infrastructure at Sonstraal and Harry Comay

for the betterment of society, industry and the country during

will be used to permanently address some of the backlog in

a pandemic.

infrastructure requirements.

The department identified the Covid-19 hotspot areas where

As the requirements and pressures escalated, further containers

urgent infrastructure interventions – such as triage and testing

and roof structures are being constructed as waiting areas and

areas, additional medical gas points and additional beds – were

additional screening areas. Going forward, these additions will

required, based on the predicted curve. Triage and testing

address insufficient space needs at these facilities over the short

stations were introduced in both the metro and rural areas in

and medium term.

C E S A A o n E n g i n e e r i n g E x c e l l e n c e Aw a r d s 2 0 2 0

7


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Nathoo Mbenyane Engineers

1min
page 37

Lloyd Fisher-Jeffes | Zutari

2min
pages 39-40

Naidu Consulting

2min
page 36

BVi Consulting Engineers

2min
pages 30-32

MENTOR OF THE YEAR Pierre Cronje | Naidu Consulting

1min
page 35

Daveng Consulting Engineers

2min
page 34

SMALL/MEDIUM COMPANY OF THE YEAR ROMH Consulting

1min
page 33

Zutari – Kashimbila Multipurpose Dam and Hydropower Station, Nigeria

4min
pages 27-28

Naidu Consulting

2min
page 29

Knight Piésold Construction of Neckartal Dam and Phase 1 Bulk Water Supply, Namibia

2min
page 26

SMEC South Africa – V&A Waterfront Swing Bridge

4min
pages 23-24

PROJECTS WITH A VALUE LESS THAN R50 MILLION Naidu Consulting – eZimbokodweni Pipe and Pedestrian Bridge

1min
page 22

Nathoo Mbenyane Engineers – Lusushwana Bulk Water Scheme, Bettysgoed

2min
page 21

Knight Piésold – Stock Road: Govan Mbeki to R300, Philippi

2min
page 20

VISIONARY CLIENT OF THE YEAR Western Cape Department of Health – Facility and Infrastructure

1min
page 9

SiVEST SA – Sappi Saiccor Mill – Woodyard Upgrade, Umkomaas

2min
page 15

Naidu Consulting – Mabhobhane River Bridge over the Tugela River

2min
page 18

Zutari – 144 Oxford Road, Office Building, Rosebank

2min
page 14

Hatch – uMshwathi Regional Bulk Water Supply Scheme Phase 2, Wartburg

2min
page 19

Hatch – Midmar Water Treatment Works Upgrade, Howick

2min
page 17

Zutari – Lower Thukela Bulk Water Supply Scheme

4min
pages 11-13

and Schools in eThekwini Municipality (Phase 3

2min
page 10

LIFETIME INDUSTRY ACHIEVEMENT AWARD Llewllyn Pike

2min
page 8

Aon – Forging a new way forward

5min
pages 5-7
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.