March 2013

Page 1

Historic Glenbrook Valley Civic Club

Officers President Ann Collum 713-645-0241 Vice President Shannon McNair 713-847-6685 Recording Secretary Allison Kennedy 713-855-4812 Membership Secretary Norma Navarro 713-645-3409 Treasurer Vicky Schoppe 713-643-7643

Directors at Large Jamie Oyler (NE) Roxanna Ramirez (NW) Saundra Hughes (SWI) Dolores Thacker (SWII) Gilbert Martinez (SE)

713-645-5936 713-644-5860 713-645-7617 713-645-1886 713-643-1735

Section Directors 1. Yvette Miles 2. Billimarie Gannon 3. Robert Searcy 4. Emma Valdes 5. Larry Rucker 6. Dianne Punch 7. Penny Frierson 7X. Fernando Cardoza 8. Karen Kemper 9. Bunnie O’Brien 10. Karen Carpenter 11. Cy Clark 12. Lorena Gomez

713-818-8987 713-644-8110 832-279-5332 713-644-0858 713-649-3535 713-641-4420 281-804-6231 713-645-6645 713-641-1469 713-880-3187 713-640-1336 713-855-8100 832-651-3943

Helpful Numbers Deed Restrictions Karen Carpenter 713-640-1336 Or Any Director CoH Deed Restriction Hot Line 832-393-6333 Citizens-on Patrol 713-645-1886 HPD Reports www.hpdsoutheastcom Non-Emergency Police 713-884-3131 Broadway Storefront 713-847-4155 Heavy Trash Pick-up 3rd Wednesday of each month

Neighborhood Protection/ Public Works 311

Airport Noise 713-845-6901

Street light problems 713-207-2222 District Council Member James Rodriguez 832-393-3011 E-mail: districtI@cityofhouston.net

State Representative Dist. 147 Garnet Coleman 713-520-5355 E-mail garnet.coleman@house.state.tx.us

State Senator Dist. 6 713-678-8600

“Glenbrook Valley Is A Deed Restricted Neighborhood” March

2013

ReBuild Houston Project Notification, Bellfort Asphalt Overlay Project from COH E-newsletter

Notificación Proyecto ReBuild Houston, Proyecto Bellfort recubrimiento de asfalto Del boletín-electrónico del Condado de Harris

"La iniciativa ReBuild Houston es el plan iniciado por votantes de Houston para reconstruir la infraestructura de calle y drenaje. ReBuild Houston ayudará a mejorar la calidad de vida y la movilidad para residentes por la reconstrucción y el mantenimiento apropiado del drenaje y mejoramientos de calle. El Proyecto Bellfort recubrimiento de asfalto, que comenzó en febrero 2013, es un ejemplo actual del trabajo de Rebuild Houston para mejor servirle.

"The ReBuild Houston Initiative is the City of Houston's voter-initiated plan to rebuild drainage and street infrastructure. ReBuild Houston will help improve the quality of life and mobility for residents through the reconstruction and proper maintenance of drainage and street improvements. The Bellfort Asphalt Overlay Project, which began in February 2013, is an active example of ReBuild Houston at El Proyecto Bellfort recubrimiento de asfalwork to better serve you. to mejorarála manejabilidad del superficie The Bellfort Asphalt Overlay Project will del camino y la accesibilidad mientras que improve road surface drivability and ac- extiende la vida de la calzada. El proyecto cessibility while prolonging the life of the provee por el recubrimiento de la calle Bellroadway. The project provides for the re- fort de Martin Luther King hasta la autopissurfacing of Bellfort Street from Martin ta 45 con recubrimiento de asfalto a la vez Luther King to Interstate 45 with asphalt de la reparación y mejoramientos a bordioverlay along with the repair and im- llos y rampas de acceso. Tiene que ver con provements to curbs and accessible ramps. el diseño y la construcción de hormigón asIt involves the design and construction of fálticode mezcla caliente, la reparación de hot mix asphaltic concrete, base repair and la base y marcas del pavimento como sean pavement markings as needed. The $2.4 necesarias. El proyecto de mejoramiento de million improvement project will be com- $2.4 millones se completaráa fines de pleted in late 2013." 2013." The City last did an overlay in 2004-5. They touted the excellence of the product and the fact its life expectancy was 5 years. By the end of the FIRST year there were holes. We've requested annually, through the Capitol Improvement Plan, to have streets in our area rebuilt. Having the overlay is better than nothing. After all, in 2003 the plan to rebuild Broadway was revealed and last we heard it's to start later this year, only 10 years later!

La Ciudad hizo un recubrimiento laúltima vez in 2004-5. Fanfarronearon la excelencia del producto y el hecho de que su esperanza de vida era 5 años. Al fin del PRIMER AÑO había agujeros. Hemos pedido anualmente, por el plan de mejoramiento de capital, que reconstruyan las calles de nuestra área. Tener recubrimiento es mejor que nada. Después de todo, se reveló el plan de reconstruir Broadway en 2003 y por fin oímos que debe comenzar este año, ¡solamente 10 años después!

@senate.state.tx.us

Glenbrook Valley Civic Club civicclub@glenbrookvalley.org

glenbrookvalley.org


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.