Wayfinding In ADM

Page 1

Wayfinding in ADM


Design Strategy Inspiration: Origami

Shapes | Folds | 3D | Diversity | Colours


Design Strategy Intuitive Design

Directory

Signage

Icons / Signs

+ Elevated floor plan with 3D mini structures for stairs illuminated with internal lightbox to give a sleek and artsy feeling.

+ Using 3D to express more possible directions that humans can intuitively understand and differentiate

+ Using origami shapes to create simple 3d icons that represent the function of the particular room

+ Using 3D to make the sign visibile when viewed in multiple directions (more than 3)

+ Using 3D to accentuate the space around ADM

+ Large directory to make process of wayfinding easy. + Shapes to differentiate between kinds and functions of rooms. + Directory placed close to stairs and entrances to enable easier identification

+ Using the concept of corners in origami to express arrow directions without the explicit drawing of arrows

+ Making use of pictograms for intuitive wayfinding for fast & prompt understanding of directions.


Directory

General Textual information

Basement 1 »

Lecture Theaters (ART B1-2, 3) • Crit Rooms (ART B1-13, 14) • Animation Studio (ART B1-5E, 5G • Animation Labs (ART B1-5A to 5E) • Foundation 3D Workshops (ART B1-21, 22) • Product Labs (ART B1-1, 17, 23) • Product Workshops (ART B1-20, 24, 25) • ACAD Office (ART B107 to B1-12) • Toilet

Level 1 »

General Office • Library • Gallery • Vis Comm Workshop (ART 1-2) • Film Editing Suites (ART 1-16, 23, 25, 26, 30) • Sound Stages (ART 1-19, 20) • CG Labs (ART 1-11, 12, 29) • IT Department (ART 1-13) • Film Equipment room (ART 1-14) • Crit Rooms (ART 1-7, 8, 9) • Toilet

Level 2 »

Photo Labs (ART 2-25, 26) • Photo Light Room (ART 2-32) • Dark Room (Art 2-33) • Drawing Studios (ART 2-27, 28, 29) • Photo Lighting Studio (ART 2-24b) • Publicity Outreach & Alumni • Auditorium • Vis Comm Labs (ART 2-2B, 23B) • Vis Comm CG Lab (ART 2-2A) • Post Grad Room (ART 2-1) • Foundation Workshop (ART 2-20A, 20B) • Foundation Labs (ART 2-21, 22A, 22B) • ACAD Offices (ART 2-1A, 3 to 11, 19) • IEM Labs (ART 2-17, 23A) • Toilet

Level 3 »

ACAD Office • Admin Office • Meeting Rooms (ART 3-24, 29, 32, 33) • Post Grad Rooms (ART 3-30, 31, 35-39) • Auditoriam (ART 3-28) • Toilet

Level 4 »

ACAD Office (ART 4-2 to 32) • Special Proj. Room (ART 4-1) • Toilet


Colour Palette Specification & Combination

ADM Colours Âť

Prosposed Âť Colours PANTONE

152 C

213 C

368 C

3265 C

299 C

Basement 1

Level 1

Level 2

Level 3

Level 4

+ Strong Colours representative of the vibrancy of the school + concept of origami + Complementary colours to show how different the majors are from each other but still cohesive. + School colour is only grey which makes it dull and monotonous


Typography Font Specification

Gotham HTF Light » The primary typeface for wayfinding is Gotham HTF Light. Substitute typefaces are not acceptable. Gotham HTF Light is the primary weight

Gotham HTF Book»

ABCDEFGHIJKLMNOP QRSTUVWXYZ 01234567890 abcdefghijklmnopqrstuvwxyz

For some signs, Gotham HTF Book can be used to emphasize lines of type.

ABCDEFGHIJKLMNOP QRSTUVWXYZ 01234567890 abcdefghijklmnopqrstuvwxyz

Gotham HTF Medium »

ABCDEFGHIJKLMNOPQRSTUVWXYZ abcdefghijklmnopqrstuvwx-


Signage Room Signage

ART

RAPID PROTOTYPING ROOM

B1-25

ART

POST GRAD ROOM

3-39

ART

ART

VISCOMM WORKSHOP

1-02 SPECIAL PROJECT ROOM

4-01

ART

VISCOMM STUDIO

ART

SPECIAL PROJECT ROOM

2-23b 4-01


Signage

Room Signage Specification

210mm

40mm

40mm 25째

10mm

210mm

10mm

ART

SPECIAL PROJECT ROOM 10mm

10mm

10mm

4-01

10mm


Signage

Room Signage Typesize Specification

210mm

Gotham HTF Light, UPPERCASE Kerning: -100 Size: 90pt Actual Size: 22mm

ART

SPECIAL PROJECT ROOM

4-01

Gotham HTF Light, UPPERCASE Kerning: -50 Size: 50pt Actual Size: 13mm

Gotham HTF Light, lowercase Kerning: -100 Size: 200pt Actual Size: 50mm


Signage

Room Signage Material

Acrylic

Vinyl Sticker

White Fret Cut

ART

SPECIAL PROJECT ROOM

4-01

Black Coated ACrylic

Fret Cut Painted White Inside


Signage

10cm

Room Signage Placement

ART

VISCOMM WORKSHOP

1-02

150cm

ART

VISCOMM WORKSHOP

1-02


Directory

Floor & Level Directory / BASEMENT ONE 80CM

55CM

B1 LEVEL 4

B1-4a

B1 -0 1

12

09 10

B1 -5 c

5b

CARPA RK

B1 -16

3 -2 B1

4 -2 B1

B122

LOAD IN BAY G

B121

-25 B1

ACAD OFFICE SPECIAL PROJ. ROOM TOILET

17 B1-

B1-20

4-2 TO 32 4-01

A A

3-24, 29, 32, 33 3-30, 31, 35-39 3-28

A A A A G

2-25, 26 2-32 2-33 2-27, 28, 29 2-24B

PHO PHO PHO FDN/G PHO

2-2B, 23B 2-2A 2-1 2-20A, 20B 2-21, 22A, 22B 2-1A, 3 TO 11, 19 2-17, 23A

G VIS VIS VIS FDN FDN A INT

1-01 1-03 1-06 1-02 1-16, 23, 25, 26, 30 1-19, 20 1-11, 12, 29 1-13 1-14 1-7, 8, 9

A G G VIS FIL FIL INT A FIL G

LEVEL 3 ACAD OFFICE ADMIN OFFICE MEETING ROOMS POST GRAD ROOMS AUDITORIAM TOILET

B1 -14

-13 B1

11

B1 -5 g

7 08 0

a -5 B1

2 -0 B1

B1 -5 e

B1-4b

03 B1-

LEVEL 2

CARPA RK

BASEMENT ONE PRODUCT DESIGN CG LAB 1.1 LECTURE THEATRE 1 LECTURE THEATRE 2

01 02 03

PRO G G

2D ANIMATION LAB PHD ANIMATION LAB STOP MOTION LAB SPECIAL TECHNIQUES LAB ANIMATION FYP LAB MOTION CAPTURE STUDIO 3D ANIMATION LAB

4a 4b 5a 5b 5c 5e 5g

ANI ANI ANI ANI ANI ANI ANI

ACAD OFFICES CRIT ROOM B1.1 CRIT ROOM B1.2

07 to 12 A G 13 G 14

PRODUCT DESIGN STUDIO HEAVY WORKSHOP FOUNDATION 3D WORKSHOP 1 FOUNDATION 3D WORKSHOP 2 PRODUCT DESIGN CG LAB 1.2 RAPID PROTOTYPING ROOM CONSTRUCTION WORKSHOP

16/17 20 21 22 23 24 25

VIS: VISUAL COMMUNICATION INT: INTERACTIVE MEDIA ANI: ANIMATION FIL: FILM MAKING

PRO PRO FDN FDN PRO PRO PRO

PRO: PRODUCT DESIGN PHO: PHOTOGRAPHY

PHOTO LABS PHOTO LIGHT ROOM DARK ROOM DRAWING STUDIOS PHOTO LIGHTING STUDIO PUBLICITY OUTREACH & ALUMNI AUDITORIUM VIS COMM LABS VIS COMM CG LAB POST GRAD ROOM FOUNDATION WORKSHOP FOUNDATION LABS ACAD OFFICES IEM LABS TOILET

FDN: FOUNDATION

LEVEL 1

G: GENERAL A: ADMIN

TOILETS

STAIRCASE

LIFTS

GENERAL OFFICE LIBRARY GALLERY VIS COMM WORKSHOP FILM EDITING SUITES SOUND STAGES CG LABS IT DEPARTMENT FILM EQUIPMENT ROOM CRIT ROOMS TOILET

175CM


Directory

Floor & Level Directory / LEVEL ONE 80CM

55CM

L1 LEVEL 4 1-01

1-06

1-03

1-0 4

1-02

ACAD OFFICE (ART 4-2 TO 32) SPECIAL PROJ. ROOM (ART 4-1) TOILET

4-2 TO 32 4-01

A A

3-24, 29, 32, 33 3-30, 31, 35-39 3-28

A A A A G

2-25, 26 2-32 2-33 2-27, 28, 29 2-24B

PHO PHO PHO FDN/G PHO

2-2B, 23B 2-2A 2-1 2-20A, 20B 2-21, 22A, 22B 2-1A, 3 TO 11, 19 2-17, 23A

G VIS VIS VIS FDN FDN A INT

B1-2, 3 B1-13, 14 B1-5E, 5G B1-5A TO 5E B1-21, 22 B1-1, 17, 23 B1-20, 24, 25 B1-07 TO B1-12

G G ANI ANI FDN PRO PRO A

LEVEL 3

0 1-3

ACAD OFFICE ADMIN OFFICE MEETING ROOMS POST GRAD ROOMS AUDITORIAM TOILET

5 1-29 2 8 1-2 26 27 1-

1-2 3 24

1-0 7 1 -08 1-09 1-10

1-17 1-1 6 1-18

1-19

1-14

LEVEL 2

1-11

1-12 1-13

1-21

1-20

LEVEL ONE GENERAL OFFICE VISUAL COMMUNICATION WORKSHOP LIBRARY CINEMA ROOM GALLERY FUNCTION

01 02 03 04 06

A VIS G G A

VIS: VISUAL COMMUNICATION INT: INTERACTIVE MEDIA ANI: ANIMATION FIL: FILM MAKING PRO: PRODUCT DESIGN PHO: PHOTOGRAPHY

CRIT ROOM 1.1 CRIT ROOM 1.2 CRIT ROOM 1.3 STUDENT CLUB ROOM CG LAB 1.1 CG LAB 1.2 AV/MEDIA DEPT IT DEPT

07 08 09 10 11 12 13 14

G G G A INT INT A A

EDITING A/V SUITE 1.1 SR ROOM 1.1 SR ROOM 1.2 SOUND STAGE 1 SOUND STAGE 2 REHEARSAL ROOM EDITING A/V SUITE 1.2 EDITING A/V SUITE 1.3 EDITING A/V SUITE 1.4 AV ROOM CG LAB 1.3 EDITING A/V SUITE 1.5

16 17 18 19 20 21 23 25 26 27 29 30

FIL G G FIL FIL FIL FIL FIL FIL FIL FIL FIL

PHOTO LABS PHOTO LIGHT ROOM DARK ROOM DRAWING STUDIOS PHOTO LIGHTING STUDIO PUBLICITY OUTREACH & ALUMNI AUDITORIUM VIS COMM LABS VIS COMM CG LAB POST GRAD ROOM FOUNDATION WORKSHOP FOUNDATION LABS ACAD OFFICES IEM LABS TOILET

FDN: FOUNDATION

BASEMENT 1

G: GENERAL A: ADMIN

LECTURE THEATERS CRIT ROOMS ANIMATION STUDIO ANIMATION LABS FOUNDATION 3D WORKSHOPS PRODUCT LABS PRODUCT WORKSHOPS ACAD OFFICE TOILET

TOILETS

STAIRCASE

LIFTS

175CM


Directory

Floor & Level Directory / LEVEL TWO 80CM

55CM

L2 03 04 05 06 07 08

a 01

3b 2-2

16 17

22b 2-22a 2-23a 2-

2-21

18

10

12 11 19

2-2 0b

3c 2-2

220 a

1 2-0

14 13

2-19

02a b 22 0 2-

LEVEL 4 09

2-3 3

2-3 2-3 2 4

2-24a

2-3 0

2-24b

A A

3-24, 29, 32, 33 3-30, 31, 35-39 3-28

A A A A G

1-01 1-03 1-06 1-02 1-16, 23, 25, 26, 30 1-19, 20 1-11, 12, 29 1-13 1-14 1-7, 8, 9

A G G VIS FIL FIL INT A FIL G

B1-2, 3 B1-13, 14 B1-5E, 5G B1-5A TO 5E B1-21, 22 B1-1, 17, 23 B1-20, 24, 25 B1-07 TO B1-12

G G ANI ANI FDN PRO PRO A

LEVEL 1 2-25

6 2-2

2-2 9 2-28

LEVEL TWO VISUAL COMMUNICATION IT DEPT POST-GRAD ROOM VISUAL COMMUNICATION STUDIO VISUAL COMMUNICATION CG LAB

4-2 TO 32 4-01

LEVEL 3 ACAD OFFICE ADMIN OFFICE MEETING ROOMS POST GRAD ROOMS AUDITORIAM TOILET

5 2-3

2-3 1

ACAD OFFICE SPECIAL PROJ. ROOM TOILET

01a 01 02b 02a

A VIS VIS VIS

VIS: VISUAL COMMUNICATION INT: INTERACTIVE MEDIA

GENERAL OFFICE LIBRARY GALLERY VIS COMM WORKSHOP FILM EDITING SUITES SOUND STAGES CG LABS IT DEPARTMENT FILM EQUIPMENT ROOM CRIT ROOMS TOILET

ANI: ANIMATION FIL: FILM MAKING

BASEMENT 1

PRO: PRODUCT DESIGN

ACAD OFFICES FOUNDATION OFFICES

03 to 10 A A 11 / 19

PHO: PHOTOGRAPHY FDN: FOUNDATION G: GENERAL

FOUNDATION 2D SILKSCREEN/DARK ROOM FOUNDATION 2D WORKSHOP FOUNDATION 4D STUDIO FOUNDATION 2D LAB FOUNDATION 4D LAB IEM LAB VISUAL COMMUNICATION STUDIO PRINT CENTRE

20a 20b 21 22a 22b 23a 23b 23c

FDN FDN FDN FDN FDN INT VIS VIS

PUBLICITY & OUTREACH COMMITTEE PHOTO LIGHTING STUDIO PHOTO ADVANCED DIGITAL LAB PHOTO LAB DRAWING ROOM 1 DRAWING ROOM 2 DESIGN STUDIO 2.1 PHOTO OFFICE & STORE PHOTO LIGHT ROOM PHOTO DARK ROOM

24a 24b 25 26 28 29 30 31 32 33

A PHO PHO PHO FDN/G FDN/G PHO PHO PHO PHO

AUDITORIUM

35

G

A: ADMIN

TOILETS

STAIRCASE

LIFTS

LECTURE THEATERS CRIT ROOMS ANIMATION STUDIO ANIMATION LABS FOUNDATION 3D WORKSHOPS PRODUCT LABS PRODUCT WORKSHOPS ACAD OFFICE TOILET

175CM


Directory

Floor & Level Directory / Specifications 80CM

55CM

B1 3CM

16CM

16CM

3CM

25CM 90˚

10CM 22CM LEVEL 4

B1-4a

B1 -0 1

12

09 10

5b

ACAD OFFICE ADMIN OFFICE MEETING ROOMS POST GRAD ROOMS AUDITORIAM TOILET

B1 -16

3 -2 B1

4 -2 B1

B122

LOAD IN BAY G

B121

-25 B1

CARPA RK

17 B1-

B1-20

4-2 TO 32 4-01

A A

3-24, 29, 32, 33 3-30, 31, 35-39 3-28

A A A A G

2-25, 26 2-32 2-33 2-27, 28, 29 2-24B

PHO PHO PHO FDN/G PHO

2-2B, 23B 2-2A 2-1 2-20A, 20B 2-21, 22A, 22B 2-1A, 3 TO 11, 19 2-17, 23A

G VIS VIS VIS FDN FDN A INT

1-01 1-03 1-06 1-02 1-16, 23, 25, 26, 30 1-19, 20 1-11, 12, 29 1-13 1-14 1-7, 8, 9

A G G VIS FIL FIL INT A FIL G

4CM

LEVEL 2

3.5CM

33CM 40CM

BASEMENT ONE 6CM PRODUCT DESIGN CG LAB 1.1

ACAD OFFICE SPECIAL PROJ. ROOM TOILET

LEVEL 3

B1 -14

-13 B1

11

B1 -5 c

B1 -5 g

7 08 0

4CM a -5 B1

2 -0 B1

B1 -5 e

B1-4b

03 B1-

CARPA RK

25˚

LECTURE THEATRE 1 LECTURE THEATRE 2

01 02 03

PRO G G

2D ANIMATION LAB PHD ANIMATION LAB STOP MOTION LAB SPECIAL TECHNIQUES LAB ANIMATION FYP LAB MOTION CAPTURE STUDIO 3D ANIMATION LAB

4a 4b 5a 5b 5c 5e 5g

ANI ANI ANI ANI ANI ANI ANI

ACAD OFFICES CRIT ROOM B1.1 CRIT ROOM B1.2

07 to 12 A G 13 G 14

PRODUCT DESIGN STUDIO HEAVY WORKSHOP FOUNDATION 3D WORKSHOP 1 FOUNDATION 3D WORKSHOP 2 PRODUCT DESIGN CG LAB 1.2 RAPID PROTOTYPING ROOM CONSTRUCTION WORKSHOP

16/17 20 21 22 23 24 25

7CM

6CM VIS: VISUAL COMMUNICATION INT: INTERACTIVE MEDIA ANI: ANIMATION FIL: FILM MAKING

PRO PRO FDN FDN PRO PRO PRO

PRO: PRODUCT DESIGN PHO: PHOTOGRAPHY

PHOTO LABS PHOTO LIGHT ROOM DARK ROOM DRAWING STUDIOS PHOTO LIGHTING STUDIO PUBLICITY OUTREACH & ALUMNI AUDITORIUM VIS COMM LABS VIS COMM CG LAB POST GRAD ROOM FOUNDATION WORKSHOP FOUNDATION LABS ACAD OFFICES IEM LABS TOILET

FDN: FOUNDATION

LEVEL 1

G: GENERAL A: ADMIN

5CM TOILETS

5CM STAIRCASE

LIFTS

GENERAL OFFICE LIBRARY GALLERY VIS COMM WORKSHOP FILM EDITING SUITES SOUND STAGES CG LABS IT DEPARTMENT FILM EQUIPMENT ROOM CRIT ROOMS TOILET

175CM


Directory

Floor & Level Directory / Typeface Specifications

B1

Gotham HTF Light, UPPERCASE Kerning: -50 Size: 530pt Actual Size: 13CM

LEVEL 4

B1-4a

B1 -0 1

12

09 10

B1 -5 c

CARPA RK

B1 -16

3 -2 B1

4 -2 B1

B122

LOAD IN BAY G

B121

-25 B1

ACAD OFFICE SPECIAL PROJ. ROOM TOILET

5b

B1 -14

-13 B1

11

B1 -5 g

7 08 0

a -5 B1

2 -0 B1

B1 -5 e

B1-4b

03 B1-

Gotham HTF Light, UPPERCASE Kerning: -50 Size: 40pt Actual Size: 1CM

17 B1-

B1-20

Gotham HTF Light, UPPERCASE Kerning: -50 Leading: 115pt Size: 80pt Actual Size: 2CM

A A

3-24, 29, 32, 33 3-30, 31, 35-39 3-28

A A A A G

2-25, 26 2-32 2-33 2-27, 28, 29 2-24B

PHO PHO PHO FDN/G PHO

2-2B, 23B 2-2A 2-1 2-20A, 20B 2-21, 22A, 22B 2-1A, 3 TO 11, 19 2-17, 23A

G VIS VIS VIS FDN FDN A INT

1-01 1-03 1-06 1-02 1-16, 23, 25, 26, 30 1-19, 20 1-11, 12, 29 1-13 1-14 1-7, 8, 9

A G G VIS FIL FIL INT A FIL G

LEVEL 3 ACAD OFFICE ADMIN OFFICE MEETING ROOMS POST GRAD ROOMS AUDITORIAM TOILET

LEVEL 2

CARPA RK

Gotham HTF Light, UPPERCASE Kerning: -50 Size: 100pt Actual Size: 2.5CM

4-2 TO 32 4-01

Gotham HTF Light, UPPERCASE Kerning: -50 Size: 100pt Actual Size: 2.5CM

BASEMENT ONE PRODUCT DESIGN CG LAB 1.1 LECTURE THEATRE 1 LECTURE THEATRE 2

01 02 03

PRO G G

2D ANIMATION LAB PHD ANIMATION LAB STOP MOTION LAB SPECIAL TECHNIQUES LAB ANIMATION FYP LAB MOTION CAPTURE STUDIO 3D ANIMATION LAB

4a 4b 5a 5b 5c 5e 5g

ANI ANI ANI ANI ANI ANI ANI

ACAD OFFICES CRIT ROOM B1.1 CRIT ROOM B1.2

07 to 12 A G 13 G 14

PRODUCT DESIGN STUDIO HEAVY WORKSHOP FOUNDATION 3D WORKSHOP 1 FOUNDATION 3D WORKSHOP 2 PRODUCT DESIGN CG LAB 1.2 RAPID PROTOTYPING ROOM CONSTRUCTION WORKSHOP

16/17 20 21 22 23 24 25

VIS: VISUAL COMMUNICATION INT: INTERACTIVE MEDIA ANI: ANIMATION FIL: FILM MAKING

PRO PRO FDN FDN PRO PRO PRO

PRO: PRODUCT DESIGN PHO: PHOTOGRAPHY

Gotham HTF Light, UPPERCASE Kerning: -50 Leading: 115pt Size: 60pt Actual Size: 1.5CM

PHOTO LABS PHOTO LIGHT ROOM DARK ROOM DRAWING STUDIOS PHOTO LIGHTING STUDIO PUBLICITY OUTREACH & ALUMNI AUDITORIUM VIS COMM LABS VIS COMM CG LAB POST GRAD ROOM FOUNDATION WORKSHOP FOUNDATION LABS ACAD OFFICES IEM LABS TOILET

FDN: FOUNDATION

LEVEL 1

G: GENERAL A: ADMIN

TOILETS

STAIRCASE

LIFTS

GENERAL OFFICE LIBRARY GALLERY VIS COMM WORKSHOP FILM EDITING SUITES SOUND STAGES CG LABS IT DEPARTMENT FILM EQUIPMENT ROOM CRIT ROOMS TOILET

Gotham HTF Light, UPPERCASE Kerning: -50 Leading: 115pt Size: 80pt Actual Size: 2CM


Wayfinding Signage Directional Signage Design

FRONT

Crit Rooms

ART 1-07 to 1-09

CG Labs AV & IT Dept

ART 1-11, 12

Sound Stages Editing Suites

ART 1-19, 20 ART 1-25, 26, 27

ART 1-13, 14 100˚

Toilets When view from lobby cafe

BACK

Editing Suites

ART 1-28 to 30

Library Lifts

Lifts Library Crit Rooms

100˚

ART 1-07 to 1-09

Toilets Product Design Workshops Foundation 3D Workshops


Wayfinding Signage Directional Signage Design

FRONT

Library Viscomm Workshop Toilets

ART 1-02

Library Viscomm Workshop 100˚

When view from side entrance

BACK

Exit to Shuttle A Bus Stop

Lifts Lobby Toilets

100˚

ART 1-02


Wayfinding Signage Directional Signage Design

FRONT

Viscomm Studios FDN 2D 4D Labs Toilets

ART 2-2a, 2b, 23b ART 22a, 22b

FDN 2D Workshops FDN 4D Studio ACAD Office

When view from intersection near handicap lift

ART 2-20a, 20b ART2-21 ART 2-03 to 2-11 100˚

BACK

Viscomm Studios FDN 2D 4D Labs Toilets

ART 2-2a, 2b, 23b

ACAD Office

ART 2-03 to 2-11

ART 22a, 22b 100˚


Wayfinding Signage Directional Signage Design

FRONT

ART 2-2a, 2b, 23b Viscomm Studios FDN 2D 4D Labs ART 22a, 22b FDN 2D Workshops ART 2-20a, 20b FDN 4D Studio ART 2-21 ACAD Office ART 2-03 to 2-11

Auditorium Photo Labs Photo Rooms Drawing Studios Toilets

Toilets

ART 2-25, 26 ART 2-30 to 33 ART 2-28, 29

SINGLE PANEL

When view from 2nd floor lift long walkway

Photo Labs

ART 2-25, 26

Lifts

Drawing Studios

ART 2-28, 29

Photo Dark & Light Room

Photo Lighting Studio

ART 2-24b

SINGLE PANEL When view from pathway to drawing studios

ART 2-32, 33


Wayfinding Signage Directional Signage Design

FRONT

Animation 2D Lab Animation Studios Toilets

ART B1-4a, 4b ART B1-5a to 5g

When view from intersection near B1 stairs entrance 100Ëš

ART B1-02, 03 BACK

Lifts Lecture Theatres Crit Rooms

ART B1-13, 14

Animation 2D Lab Lifts Product Workshops Product Labs Lecture Theatres FDN 3D Workshops Crit Rooms Animation 2D Lab Lifts Product Workshops Product Labs FDN 3D Workshops

ART 2-20a, 20b ART B1-20, 24, 25 ART B1-16, 23 ART B1-02, 03 ART B1-21, 22 ART B1-13, 14 ART 2-20a, 20b ART B1-20, 24, 25 ART B1-16, 23 ART B1-21, 22


Wayfinding Signage Directional Signage Specification

Animation 2D Lab

20˚

20˚

ART 2-20a, 20b

Product Workshops

Photo Lighting Studio

ART 2-24b

20˚

20˚

ART B1-20, 24, 25

20˚ 10˚

Foundation 3D Workshops

20˚

20˚ 10˚

10˚ 20˚


Wayfinding Signage Directional Signage Specification

Internal Light Box Fret-cut

2cm

Acrylic

Animation 2D Lab

10cm 2cm

4.5cm

ART 2-20a, 20b

1cm 4.5cm

2cm 4.5cm

2cm 130cm 2cm

Photo Lighting Studio

5cm

10cm 2cm

4.5cm

2cm

4.5cm 4.5cm

ART 2-24b

2cm

2cm

1cm

Gotham HTF Light Size: 240 pt Kerning: -50 pt Actual Size: 6 cm

Gotham HTF Light Size: 200 pt Kerning: -50 pt Actual Size: 5 cm


Mock Up / Superimpose Directory


Mock Up / Superimpose Directional Wayfinding Signs


Mock Up / Superimpose Room Signs


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.