Wayfinding in ADM
Design Strategy Inspiration: Origami
Shapes | Folds | 3D | Diversity | Colours
Design Strategy Intuitive Design
Directory
Signage
Icons / Signs
+ Elevated floor plan with 3D mini structures for stairs illuminated with internal lightbox to give a sleek and artsy feeling.
+ Using 3D to express more possible directions that humans can intuitively understand and differentiate
+ Using origami shapes to create simple 3d icons that represent the function of the particular room
+ Using 3D to make the sign visibile when viewed in multiple directions (more than 3)
+ Using 3D to accentuate the space around ADM
+ Large directory to make process of wayfinding easy. + Shapes to differentiate between kinds and functions of rooms. + Directory placed close to stairs and entrances to enable easier identification
+ Using the concept of corners in origami to express arrow directions without the explicit drawing of arrows
+ Making use of pictograms for intuitive wayfinding for fast & prompt understanding of directions.
Directory
General Textual information
Basement 1 »
Lecture Theaters (ART B1-2, 3) • Crit Rooms (ART B1-13, 14) • Animation Studio (ART B1-5E, 5G • Animation Labs (ART B1-5A to 5E) • Foundation 3D Workshops (ART B1-21, 22) • Product Labs (ART B1-1, 17, 23) • Product Workshops (ART B1-20, 24, 25) • ACAD Office (ART B107 to B1-12) • Toilet
Level 1 »
General Office • Library • Gallery • Vis Comm Workshop (ART 1-2) • Film Editing Suites (ART 1-16, 23, 25, 26, 30) • Sound Stages (ART 1-19, 20) • CG Labs (ART 1-11, 12, 29) • IT Department (ART 1-13) • Film Equipment room (ART 1-14) • Crit Rooms (ART 1-7, 8, 9) • Toilet
Level 2 »
Photo Labs (ART 2-25, 26) • Photo Light Room (ART 2-32) • Dark Room (Art 2-33) • Drawing Studios (ART 2-27, 28, 29) • Photo Lighting Studio (ART 2-24b) • Publicity Outreach & Alumni • Auditorium • Vis Comm Labs (ART 2-2B, 23B) • Vis Comm CG Lab (ART 2-2A) • Post Grad Room (ART 2-1) • Foundation Workshop (ART 2-20A, 20B) • Foundation Labs (ART 2-21, 22A, 22B) • ACAD Offices (ART 2-1A, 3 to 11, 19) • IEM Labs (ART 2-17, 23A) • Toilet
Level 3 »
ACAD Office • Admin Office • Meeting Rooms (ART 3-24, 29, 32, 33) • Post Grad Rooms (ART 3-30, 31, 35-39) • Auditoriam (ART 3-28) • Toilet
Level 4 »
ACAD Office (ART 4-2 to 32) • Special Proj. Room (ART 4-1) • Toilet
Colour Palette Specification & Combination
ADM Colours Âť
Prosposed Âť Colours PANTONE
152 C
213 C
368 C
3265 C
299 C
Basement 1
Level 1
Level 2
Level 3
Level 4
+ Strong Colours representative of the vibrancy of the school + concept of origami + Complementary colours to show how different the majors are from each other but still cohesive. + School colour is only grey which makes it dull and monotonous
Typography Font Specification
Gotham HTF Light » The primary typeface for wayfinding is Gotham HTF Light. Substitute typefaces are not acceptable. Gotham HTF Light is the primary weight
Gotham HTF Book»
ABCDEFGHIJKLMNOP QRSTUVWXYZ 01234567890 abcdefghijklmnopqrstuvwxyz
For some signs, Gotham HTF Book can be used to emphasize lines of type.
ABCDEFGHIJKLMNOP QRSTUVWXYZ 01234567890 abcdefghijklmnopqrstuvwxyz
Gotham HTF Medium »
ABCDEFGHIJKLMNOPQRSTUVWXYZ abcdefghijklmnopqrstuvwx-
Signage Room Signage
ART
RAPID PROTOTYPING ROOM
B1-25
ART
POST GRAD ROOM
3-39
ART
ART
VISCOMM WORKSHOP
1-02 SPECIAL PROJECT ROOM
4-01
ART
VISCOMM STUDIO
ART
SPECIAL PROJECT ROOM
2-23b 4-01
Signage
Room Signage Specification
210mm
40mm
40mm 25째
10mm
210mm
10mm
ART
SPECIAL PROJECT ROOM 10mm
10mm
10mm
4-01
10mm
Signage
Room Signage Typesize Specification
210mm
Gotham HTF Light, UPPERCASE Kerning: -100 Size: 90pt Actual Size: 22mm
ART
SPECIAL PROJECT ROOM
4-01
Gotham HTF Light, UPPERCASE Kerning: -50 Size: 50pt Actual Size: 13mm
Gotham HTF Light, lowercase Kerning: -100 Size: 200pt Actual Size: 50mm
Signage
Room Signage Material
Acrylic
Vinyl Sticker
White Fret Cut
ART
SPECIAL PROJECT ROOM
4-01
Black Coated ACrylic
Fret Cut Painted White Inside
Signage
10cm
Room Signage Placement
ART
VISCOMM WORKSHOP
1-02
150cm
ART
VISCOMM WORKSHOP
1-02
Directory
Floor & Level Directory / BASEMENT ONE 80CM
55CM
B1 LEVEL 4
B1-4a
B1 -0 1
12
09 10
B1 -5 c
5b
CARPA RK
B1 -16
3 -2 B1
4 -2 B1
B122
LOAD IN BAY G
B121
-25 B1
ACAD OFFICE SPECIAL PROJ. ROOM TOILET
17 B1-
B1-20
4-2 TO 32 4-01
A A
3-24, 29, 32, 33 3-30, 31, 35-39 3-28
A A A A G
2-25, 26 2-32 2-33 2-27, 28, 29 2-24B
PHO PHO PHO FDN/G PHO
2-2B, 23B 2-2A 2-1 2-20A, 20B 2-21, 22A, 22B 2-1A, 3 TO 11, 19 2-17, 23A
G VIS VIS VIS FDN FDN A INT
1-01 1-03 1-06 1-02 1-16, 23, 25, 26, 30 1-19, 20 1-11, 12, 29 1-13 1-14 1-7, 8, 9
A G G VIS FIL FIL INT A FIL G
LEVEL 3 ACAD OFFICE ADMIN OFFICE MEETING ROOMS POST GRAD ROOMS AUDITORIAM TOILET
B1 -14
-13 B1
11
B1 -5 g
7 08 0
a -5 B1
2 -0 B1
B1 -5 e
B1-4b
03 B1-
LEVEL 2
CARPA RK
BASEMENT ONE PRODUCT DESIGN CG LAB 1.1 LECTURE THEATRE 1 LECTURE THEATRE 2
01 02 03
PRO G G
2D ANIMATION LAB PHD ANIMATION LAB STOP MOTION LAB SPECIAL TECHNIQUES LAB ANIMATION FYP LAB MOTION CAPTURE STUDIO 3D ANIMATION LAB
4a 4b 5a 5b 5c 5e 5g
ANI ANI ANI ANI ANI ANI ANI
ACAD OFFICES CRIT ROOM B1.1 CRIT ROOM B1.2
07 to 12 A G 13 G 14
PRODUCT DESIGN STUDIO HEAVY WORKSHOP FOUNDATION 3D WORKSHOP 1 FOUNDATION 3D WORKSHOP 2 PRODUCT DESIGN CG LAB 1.2 RAPID PROTOTYPING ROOM CONSTRUCTION WORKSHOP
16/17 20 21 22 23 24 25
VIS: VISUAL COMMUNICATION INT: INTERACTIVE MEDIA ANI: ANIMATION FIL: FILM MAKING
PRO PRO FDN FDN PRO PRO PRO
PRO: PRODUCT DESIGN PHO: PHOTOGRAPHY
PHOTO LABS PHOTO LIGHT ROOM DARK ROOM DRAWING STUDIOS PHOTO LIGHTING STUDIO PUBLICITY OUTREACH & ALUMNI AUDITORIUM VIS COMM LABS VIS COMM CG LAB POST GRAD ROOM FOUNDATION WORKSHOP FOUNDATION LABS ACAD OFFICES IEM LABS TOILET
FDN: FOUNDATION
LEVEL 1
G: GENERAL A: ADMIN
TOILETS
STAIRCASE
LIFTS
GENERAL OFFICE LIBRARY GALLERY VIS COMM WORKSHOP FILM EDITING SUITES SOUND STAGES CG LABS IT DEPARTMENT FILM EQUIPMENT ROOM CRIT ROOMS TOILET
175CM
Directory
Floor & Level Directory / LEVEL ONE 80CM
55CM
L1 LEVEL 4 1-01
1-06
1-03
1-0 4
1-02
ACAD OFFICE (ART 4-2 TO 32) SPECIAL PROJ. ROOM (ART 4-1) TOILET
4-2 TO 32 4-01
A A
3-24, 29, 32, 33 3-30, 31, 35-39 3-28
A A A A G
2-25, 26 2-32 2-33 2-27, 28, 29 2-24B
PHO PHO PHO FDN/G PHO
2-2B, 23B 2-2A 2-1 2-20A, 20B 2-21, 22A, 22B 2-1A, 3 TO 11, 19 2-17, 23A
G VIS VIS VIS FDN FDN A INT
B1-2, 3 B1-13, 14 B1-5E, 5G B1-5A TO 5E B1-21, 22 B1-1, 17, 23 B1-20, 24, 25 B1-07 TO B1-12
G G ANI ANI FDN PRO PRO A
LEVEL 3
0 1-3
ACAD OFFICE ADMIN OFFICE MEETING ROOMS POST GRAD ROOMS AUDITORIAM TOILET
5 1-29 2 8 1-2 26 27 1-
1-2 3 24
1-0 7 1 -08 1-09 1-10
1-17 1-1 6 1-18
1-19
1-14
LEVEL 2
1-11
1-12 1-13
1-21
1-20
LEVEL ONE GENERAL OFFICE VISUAL COMMUNICATION WORKSHOP LIBRARY CINEMA ROOM GALLERY FUNCTION
01 02 03 04 06
A VIS G G A
VIS: VISUAL COMMUNICATION INT: INTERACTIVE MEDIA ANI: ANIMATION FIL: FILM MAKING PRO: PRODUCT DESIGN PHO: PHOTOGRAPHY
CRIT ROOM 1.1 CRIT ROOM 1.2 CRIT ROOM 1.3 STUDENT CLUB ROOM CG LAB 1.1 CG LAB 1.2 AV/MEDIA DEPT IT DEPT
07 08 09 10 11 12 13 14
G G G A INT INT A A
EDITING A/V SUITE 1.1 SR ROOM 1.1 SR ROOM 1.2 SOUND STAGE 1 SOUND STAGE 2 REHEARSAL ROOM EDITING A/V SUITE 1.2 EDITING A/V SUITE 1.3 EDITING A/V SUITE 1.4 AV ROOM CG LAB 1.3 EDITING A/V SUITE 1.5
16 17 18 19 20 21 23 25 26 27 29 30
FIL G G FIL FIL FIL FIL FIL FIL FIL FIL FIL
PHOTO LABS PHOTO LIGHT ROOM DARK ROOM DRAWING STUDIOS PHOTO LIGHTING STUDIO PUBLICITY OUTREACH & ALUMNI AUDITORIUM VIS COMM LABS VIS COMM CG LAB POST GRAD ROOM FOUNDATION WORKSHOP FOUNDATION LABS ACAD OFFICES IEM LABS TOILET
FDN: FOUNDATION
BASEMENT 1
G: GENERAL A: ADMIN
LECTURE THEATERS CRIT ROOMS ANIMATION STUDIO ANIMATION LABS FOUNDATION 3D WORKSHOPS PRODUCT LABS PRODUCT WORKSHOPS ACAD OFFICE TOILET
TOILETS
STAIRCASE
LIFTS
175CM
Directory
Floor & Level Directory / LEVEL TWO 80CM
55CM
L2 03 04 05 06 07 08
a 01
3b 2-2
16 17
22b 2-22a 2-23a 2-
2-21
18
10
12 11 19
2-2 0b
3c 2-2
220 a
1 2-0
14 13
2-19
02a b 22 0 2-
LEVEL 4 09
2-3 3
2-3 2-3 2 4
2-24a
2-3 0
2-24b
A A
3-24, 29, 32, 33 3-30, 31, 35-39 3-28
A A A A G
1-01 1-03 1-06 1-02 1-16, 23, 25, 26, 30 1-19, 20 1-11, 12, 29 1-13 1-14 1-7, 8, 9
A G G VIS FIL FIL INT A FIL G
B1-2, 3 B1-13, 14 B1-5E, 5G B1-5A TO 5E B1-21, 22 B1-1, 17, 23 B1-20, 24, 25 B1-07 TO B1-12
G G ANI ANI FDN PRO PRO A
LEVEL 1 2-25
6 2-2
2-2 9 2-28
LEVEL TWO VISUAL COMMUNICATION IT DEPT POST-GRAD ROOM VISUAL COMMUNICATION STUDIO VISUAL COMMUNICATION CG LAB
4-2 TO 32 4-01
LEVEL 3 ACAD OFFICE ADMIN OFFICE MEETING ROOMS POST GRAD ROOMS AUDITORIAM TOILET
5 2-3
2-3 1
ACAD OFFICE SPECIAL PROJ. ROOM TOILET
01a 01 02b 02a
A VIS VIS VIS
VIS: VISUAL COMMUNICATION INT: INTERACTIVE MEDIA
GENERAL OFFICE LIBRARY GALLERY VIS COMM WORKSHOP FILM EDITING SUITES SOUND STAGES CG LABS IT DEPARTMENT FILM EQUIPMENT ROOM CRIT ROOMS TOILET
ANI: ANIMATION FIL: FILM MAKING
BASEMENT 1
PRO: PRODUCT DESIGN
ACAD OFFICES FOUNDATION OFFICES
03 to 10 A A 11 / 19
PHO: PHOTOGRAPHY FDN: FOUNDATION G: GENERAL
FOUNDATION 2D SILKSCREEN/DARK ROOM FOUNDATION 2D WORKSHOP FOUNDATION 4D STUDIO FOUNDATION 2D LAB FOUNDATION 4D LAB IEM LAB VISUAL COMMUNICATION STUDIO PRINT CENTRE
20a 20b 21 22a 22b 23a 23b 23c
FDN FDN FDN FDN FDN INT VIS VIS
PUBLICITY & OUTREACH COMMITTEE PHOTO LIGHTING STUDIO PHOTO ADVANCED DIGITAL LAB PHOTO LAB DRAWING ROOM 1 DRAWING ROOM 2 DESIGN STUDIO 2.1 PHOTO OFFICE & STORE PHOTO LIGHT ROOM PHOTO DARK ROOM
24a 24b 25 26 28 29 30 31 32 33
A PHO PHO PHO FDN/G FDN/G PHO PHO PHO PHO
AUDITORIUM
35
G
A: ADMIN
TOILETS
STAIRCASE
LIFTS
LECTURE THEATERS CRIT ROOMS ANIMATION STUDIO ANIMATION LABS FOUNDATION 3D WORKSHOPS PRODUCT LABS PRODUCT WORKSHOPS ACAD OFFICE TOILET
175CM
Directory
Floor & Level Directory / Specifications 80CM
55CM
B1 3CM
16CM
16CM
3CM
25CM 90˚
10CM 22CM LEVEL 4
B1-4a
B1 -0 1
12
09 10
5b
ACAD OFFICE ADMIN OFFICE MEETING ROOMS POST GRAD ROOMS AUDITORIAM TOILET
B1 -16
3 -2 B1
4 -2 B1
B122
LOAD IN BAY G
B121
-25 B1
CARPA RK
17 B1-
B1-20
4-2 TO 32 4-01
A A
3-24, 29, 32, 33 3-30, 31, 35-39 3-28
A A A A G
2-25, 26 2-32 2-33 2-27, 28, 29 2-24B
PHO PHO PHO FDN/G PHO
2-2B, 23B 2-2A 2-1 2-20A, 20B 2-21, 22A, 22B 2-1A, 3 TO 11, 19 2-17, 23A
G VIS VIS VIS FDN FDN A INT
1-01 1-03 1-06 1-02 1-16, 23, 25, 26, 30 1-19, 20 1-11, 12, 29 1-13 1-14 1-7, 8, 9
A G G VIS FIL FIL INT A FIL G
4CM
LEVEL 2
3.5CM
33CM 40CM
BASEMENT ONE 6CM PRODUCT DESIGN CG LAB 1.1
ACAD OFFICE SPECIAL PROJ. ROOM TOILET
LEVEL 3
B1 -14
-13 B1
11
B1 -5 c
B1 -5 g
7 08 0
4CM a -5 B1
2 -0 B1
B1 -5 e
B1-4b
03 B1-
CARPA RK
25˚
LECTURE THEATRE 1 LECTURE THEATRE 2
01 02 03
PRO G G
2D ANIMATION LAB PHD ANIMATION LAB STOP MOTION LAB SPECIAL TECHNIQUES LAB ANIMATION FYP LAB MOTION CAPTURE STUDIO 3D ANIMATION LAB
4a 4b 5a 5b 5c 5e 5g
ANI ANI ANI ANI ANI ANI ANI
ACAD OFFICES CRIT ROOM B1.1 CRIT ROOM B1.2
07 to 12 A G 13 G 14
PRODUCT DESIGN STUDIO HEAVY WORKSHOP FOUNDATION 3D WORKSHOP 1 FOUNDATION 3D WORKSHOP 2 PRODUCT DESIGN CG LAB 1.2 RAPID PROTOTYPING ROOM CONSTRUCTION WORKSHOP
16/17 20 21 22 23 24 25
7CM
6CM VIS: VISUAL COMMUNICATION INT: INTERACTIVE MEDIA ANI: ANIMATION FIL: FILM MAKING
PRO PRO FDN FDN PRO PRO PRO
PRO: PRODUCT DESIGN PHO: PHOTOGRAPHY
PHOTO LABS PHOTO LIGHT ROOM DARK ROOM DRAWING STUDIOS PHOTO LIGHTING STUDIO PUBLICITY OUTREACH & ALUMNI AUDITORIUM VIS COMM LABS VIS COMM CG LAB POST GRAD ROOM FOUNDATION WORKSHOP FOUNDATION LABS ACAD OFFICES IEM LABS TOILET
FDN: FOUNDATION
LEVEL 1
G: GENERAL A: ADMIN
5CM TOILETS
5CM STAIRCASE
LIFTS
GENERAL OFFICE LIBRARY GALLERY VIS COMM WORKSHOP FILM EDITING SUITES SOUND STAGES CG LABS IT DEPARTMENT FILM EQUIPMENT ROOM CRIT ROOMS TOILET
175CM
Directory
Floor & Level Directory / Typeface Specifications
B1
Gotham HTF Light, UPPERCASE Kerning: -50 Size: 530pt Actual Size: 13CM
LEVEL 4
B1-4a
B1 -0 1
12
09 10
B1 -5 c
CARPA RK
B1 -16
3 -2 B1
4 -2 B1
B122
LOAD IN BAY G
B121
-25 B1
ACAD OFFICE SPECIAL PROJ. ROOM TOILET
5b
B1 -14
-13 B1
11
B1 -5 g
7 08 0
a -5 B1
2 -0 B1
B1 -5 e
B1-4b
03 B1-
Gotham HTF Light, UPPERCASE Kerning: -50 Size: 40pt Actual Size: 1CM
17 B1-
B1-20
Gotham HTF Light, UPPERCASE Kerning: -50 Leading: 115pt Size: 80pt Actual Size: 2CM
A A
3-24, 29, 32, 33 3-30, 31, 35-39 3-28
A A A A G
2-25, 26 2-32 2-33 2-27, 28, 29 2-24B
PHO PHO PHO FDN/G PHO
2-2B, 23B 2-2A 2-1 2-20A, 20B 2-21, 22A, 22B 2-1A, 3 TO 11, 19 2-17, 23A
G VIS VIS VIS FDN FDN A INT
1-01 1-03 1-06 1-02 1-16, 23, 25, 26, 30 1-19, 20 1-11, 12, 29 1-13 1-14 1-7, 8, 9
A G G VIS FIL FIL INT A FIL G
LEVEL 3 ACAD OFFICE ADMIN OFFICE MEETING ROOMS POST GRAD ROOMS AUDITORIAM TOILET
LEVEL 2
CARPA RK
Gotham HTF Light, UPPERCASE Kerning: -50 Size: 100pt Actual Size: 2.5CM
4-2 TO 32 4-01
Gotham HTF Light, UPPERCASE Kerning: -50 Size: 100pt Actual Size: 2.5CM
BASEMENT ONE PRODUCT DESIGN CG LAB 1.1 LECTURE THEATRE 1 LECTURE THEATRE 2
01 02 03
PRO G G
2D ANIMATION LAB PHD ANIMATION LAB STOP MOTION LAB SPECIAL TECHNIQUES LAB ANIMATION FYP LAB MOTION CAPTURE STUDIO 3D ANIMATION LAB
4a 4b 5a 5b 5c 5e 5g
ANI ANI ANI ANI ANI ANI ANI
ACAD OFFICES CRIT ROOM B1.1 CRIT ROOM B1.2
07 to 12 A G 13 G 14
PRODUCT DESIGN STUDIO HEAVY WORKSHOP FOUNDATION 3D WORKSHOP 1 FOUNDATION 3D WORKSHOP 2 PRODUCT DESIGN CG LAB 1.2 RAPID PROTOTYPING ROOM CONSTRUCTION WORKSHOP
16/17 20 21 22 23 24 25
VIS: VISUAL COMMUNICATION INT: INTERACTIVE MEDIA ANI: ANIMATION FIL: FILM MAKING
PRO PRO FDN FDN PRO PRO PRO
PRO: PRODUCT DESIGN PHO: PHOTOGRAPHY
Gotham HTF Light, UPPERCASE Kerning: -50 Leading: 115pt Size: 60pt Actual Size: 1.5CM
PHOTO LABS PHOTO LIGHT ROOM DARK ROOM DRAWING STUDIOS PHOTO LIGHTING STUDIO PUBLICITY OUTREACH & ALUMNI AUDITORIUM VIS COMM LABS VIS COMM CG LAB POST GRAD ROOM FOUNDATION WORKSHOP FOUNDATION LABS ACAD OFFICES IEM LABS TOILET
FDN: FOUNDATION
LEVEL 1
G: GENERAL A: ADMIN
TOILETS
STAIRCASE
LIFTS
GENERAL OFFICE LIBRARY GALLERY VIS COMM WORKSHOP FILM EDITING SUITES SOUND STAGES CG LABS IT DEPARTMENT FILM EQUIPMENT ROOM CRIT ROOMS TOILET
Gotham HTF Light, UPPERCASE Kerning: -50 Leading: 115pt Size: 80pt Actual Size: 2CM
Wayfinding Signage Directional Signage Design
FRONT
Crit Rooms
ART 1-07 to 1-09
CG Labs AV & IT Dept
ART 1-11, 12
Sound Stages Editing Suites
ART 1-19, 20 ART 1-25, 26, 27
ART 1-13, 14 100˚
Toilets When view from lobby cafe
BACK
Editing Suites
ART 1-28 to 30
Library Lifts
Lifts Library Crit Rooms
100˚
ART 1-07 to 1-09
Toilets Product Design Workshops Foundation 3D Workshops
Wayfinding Signage Directional Signage Design
FRONT
Library Viscomm Workshop Toilets
ART 1-02
Library Viscomm Workshop 100˚
When view from side entrance
BACK
Exit to Shuttle A Bus Stop
Lifts Lobby Toilets
100˚
ART 1-02
Wayfinding Signage Directional Signage Design
FRONT
Viscomm Studios FDN 2D 4D Labs Toilets
ART 2-2a, 2b, 23b ART 22a, 22b
FDN 2D Workshops FDN 4D Studio ACAD Office
When view from intersection near handicap lift
ART 2-20a, 20b ART2-21 ART 2-03 to 2-11 100˚
BACK
Viscomm Studios FDN 2D 4D Labs Toilets
ART 2-2a, 2b, 23b
ACAD Office
ART 2-03 to 2-11
ART 22a, 22b 100˚
Wayfinding Signage Directional Signage Design
FRONT
ART 2-2a, 2b, 23b Viscomm Studios FDN 2D 4D Labs ART 22a, 22b FDN 2D Workshops ART 2-20a, 20b FDN 4D Studio ART 2-21 ACAD Office ART 2-03 to 2-11
Auditorium Photo Labs Photo Rooms Drawing Studios Toilets
Toilets
ART 2-25, 26 ART 2-30 to 33 ART 2-28, 29
SINGLE PANEL
When view from 2nd floor lift long walkway
Photo Labs
ART 2-25, 26
Lifts
Drawing Studios
ART 2-28, 29
Photo Dark & Light Room
Photo Lighting Studio
ART 2-24b
SINGLE PANEL When view from pathway to drawing studios
ART 2-32, 33
Wayfinding Signage Directional Signage Design
FRONT
Animation 2D Lab Animation Studios Toilets
ART B1-4a, 4b ART B1-5a to 5g
When view from intersection near B1 stairs entrance 100Ëš
ART B1-02, 03 BACK
Lifts Lecture Theatres Crit Rooms
ART B1-13, 14
Animation 2D Lab Lifts Product Workshops Product Labs Lecture Theatres FDN 3D Workshops Crit Rooms Animation 2D Lab Lifts Product Workshops Product Labs FDN 3D Workshops
ART 2-20a, 20b ART B1-20, 24, 25 ART B1-16, 23 ART B1-02, 03 ART B1-21, 22 ART B1-13, 14 ART 2-20a, 20b ART B1-20, 24, 25 ART B1-16, 23 ART B1-21, 22
Wayfinding Signage Directional Signage Specification
Animation 2D Lab
20˚
20˚
ART 2-20a, 20b
Product Workshops
Photo Lighting Studio
ART 2-24b
20˚
20˚
ART B1-20, 24, 25
20˚ 10˚
Foundation 3D Workshops
20˚
20˚ 10˚
10˚ 20˚
Wayfinding Signage Directional Signage Specification
Internal Light Box Fret-cut
2cm
Acrylic
Animation 2D Lab
10cm 2cm
4.5cm
ART 2-20a, 20b
1cm 4.5cm
2cm 4.5cm
2cm 130cm 2cm
Photo Lighting Studio
5cm
10cm 2cm
4.5cm
2cm
4.5cm 4.5cm
ART 2-24b
2cm
2cm
1cm
Gotham HTF Light Size: 240 pt Kerning: -50 pt Actual Size: 6 cm
Gotham HTF Light Size: 200 pt Kerning: -50 pt Actual Size: 5 cm
Mock Up / Superimpose Directory
Mock Up / Superimpose Directional Wayfinding Signs
Mock Up / Superimpose Room Signs