Assembly Procedure PC3000-6
2.13
Putting the Central Lubrication System into operation (Z 24031) In order to ensure adequate pre-lubrication of all attachment bearings. It is necessary to manually lubricate the attachment bearings by applying a grease gun to the grease fittings on each grease injector. To this, remove protection cap (3) and press in grease until a grease collar appears at the connected bearing. Be sure to repeat the procedure until all pivot bearings of the attachment and cylinder bearings are lubricated.
W
• Before handing over the excavator to the customer the first PM Clinic Service has to be carried out according to the Inspection Procedure Manual.
AS PC3000-6 rev7 Edition October 2005
71