1 minute read

LANDSCAPE DESIGN

Next Article
PROJECT OVERVIEW

PROJECT OVERVIEW

1 Main Church Building

2 Parking area

Advertisement

Supporting building A (Office, prayer room, meeting room, learning room)

3 Supporting building B (Multifunction room, gallery, classes, guest house)

GEREJA AYAM STREET Existinng Kiosk

Distingushable and simple facade of supporting buildings

Distingushable and simple facade of supporting buildings

Supporting Buildings As The Church Background

Two supporting buildings which are located on around the church shall act as the church background. Therefore, the facade of the building shall show the different character compared to the main church so it will be easier to differentiate the additional buildings and the church. This concept is based on Burra Charter point.

Emphasize The Symmetry Concept

Two supporting buildings which are located on around the church shall emphasize the symmetry concept. The length of two sides shall be similiar to each other.

Emphasize The View To Church By Redesigning Building Mass

The view to Pniel Church from H. Samanhudi street is intruded by the existing building. To respond that condition, existing building which is located near H. Samanhudi street shall be redesigned by subtracting the mass.

Add New Function To Support Church As Tourism Destination

In order to develop Pniel Church as a historical tourism destination, new function such as gallery will be added into the supporting building. As can be seen from the pictures on the left, the gallery shall be placed near the entrance. This gallery will act as a visitor center as well.

SUPPORTING BUILDING A | GROUND FLOOR

PRECAUTION TO PREVENT FLOOD

Since the flood that had happened in the past was harmful to church’s physical condition, it is important to prevent flooding from outside of the site coming in. New design of fence is proposed so it will be able to prevent flooding for coming in. Hydraulic flood barrier is also proposed to be placed near the gate.

Circulation of visitor Sump pump system

Other proposal to prevent flood coming in is developing sump pump system near the connection of church site and city drainage system.

Adding more green areas to act as rainwater catchment.

FULFILLING CHURCH’S NEEDS by adding functional rooms as requested. The supporting buildings are proposed to be two floors buildings.

1

SUPPORTING BUILDING A 1st FLOOR

2 Higher fence design

3 New fence design (pink lines) and the flood barrier future position (yellow lines)

SUPPORTING BUILDING B | GROUND FLOOR

CREATE MORE GAP between the Church and supporting building A in order to make the historical chruch wall able to “breathe” more easily.

SUPPORTING BUILDING B 1st FLOOR

CROSS VENTILATION shall be initiated by designing facade that will let air getting through, like ventilation block and louvre,

Revitalization Project

This article is from: