Integrating Infrastructure and City Final Presentation 19th June 2015
Team 7 Alexandros Skoutas Panagis Marketos Christos Kritikos Cornelia Sutter Christina H端rzeler Christiane Dasen Coach: Felix G端nther
Overview • Challenges and Concept • Observation Perimeter • Operating Perimeter • In Depth Perimeter
19.06.2015 ¦ Athens
Team 7 – Integrating Infrastructure and City
2
Integrating Infrastructure and City Concept
Challenges •
•
Fast, frequent and direct connections between ports, airports and city
unsatisfying intermodal connectivity (plane, train and ship)
•
infrastructure as a barrier between urban neighbourhoods
•
Crucial role of the train system
•
Larissa as the main station
• •
Integrating infrastructure to the city fabric
Goal
integrated public transport as a substitute to car, both for commuters and travellers 19.06.2015 ¦ Athens
Team 7 – Integrating Infrastructure and City
3
Attica Region
19.06.2015 ¦ Athens
Team 7 – Integrating Infrastructure and City
4
Short Term Goal
19.06.2015 ¦ Athens
Team 7 – Integrating Infrastructure and City
5
Short Term Goal
1 train per hour
19.06.2015 ¦ Athens
Team 7 – Integrating Infrastructure and City
6
Short Term Goal
19.06.2015 ¦ Athens
Team 7 – Integrating Infrastructure and City
7
Short Term Goal
1 train per hour
4 trains per hour
19.06.2015 ÂŚ Athens
Team 7 – Integrating Infrastructure and City
8
Short Term Goal
19.06.2015 ¦ Athens
Team 7 – Integrating Infrastructure and City
9
Short Term Goal
1 train per hour
4 trains per hour 2 trains per hour
19.06.2015 ÂŚ Athens
Team 7 – Integrating Infrastructure and City
10
Long Term Goal
1 train per hour adding a 3rd track
4 trains per hour
4 2 trains per hour
19.06.2015 ÂŚ Athens
Team 7 – Integrating Infrastructure and City
11
19.06.2015 ¦ Athens
Team 7 – Integrating Infrastructure and City
12
Operation Perimeter
19.06.2015 ¦ Athens
Team 7 – Integrating Infrastructure and City
13
Operation Perimeter
19.06.2015 ¦ Athens
Team 7 – Integrating Infrastructure and City
14
19.06.2015 ¦ Athens
Team 7 – Integrating Infrastructure and City
15
In-Depth-Perimeter around Larissis Goals • Unification of east and west side • Connection of green/open spaces • Use of potential of intermodal node • Creation of new urban centrality Strategy • Pedestrian streets (connection and accessiblity) • Redesign of squares • Main bridge via station and tracks
19.06.2015 ¦ Athens
Team 7 – Integrating Infrastructure and City
16
In-Depth-Perimeter around Larissis
19.06.2015 ÂŚ Athens
Team 7 – Integrating Infrastructure and City
17
Integrating Infrastructure and City
19.06.2015 ÂŚ Athens
Team 7 – Integrating Infrastructure and City
18