Team8

Page 1

The City in the Sta,on CODE ATHENS Group 8 15-­‐20 June 2015

CECILIA BRAUN – ALEXANDROS CHAREAS – GEORG MÜLLER – DIMITRIOS THEODOROU – KONSTANTINA TZEMOU – ASTRID WEISS – KONSTANTINOS-­‐ORFEAS YENIAS COACH: PROF. DR. KONSTANTINOS MORAITIS


Overview – Concept – Proposals – Measures

CODE ATHENS

GROUP 8


Challenges Observa(on perimeter (A2ca Region)

Opera(onal perimeter (Rouf – Tris Gefires Corridor)

In-­‐depth perimeter (Larissis Sta(on)

Lack of an overall strategy for (public) transport

Overlay of different traffic means (cars, trains, pedestrian, cyclists)

Li_le awareness of the staaon as a central node within the city

Lack of coordinaaon between means of transport

Lack of integraaon of immigrants to public life of the city

Overdimensioned supply of plaborms in Larissis staaon

Central node within the railway network missing (Central Athens Railways Staaon)

Disintegraaon of the neighbourhoods surrounding the railway zone

Larissis staaon as a barrier between east and west (social, mental and physical)

CODE ATHENS

OVERVIEW – CONCEPT – PROPOSALS – MEASURES

GROUP 8


THESSALONIKI

PATRAS

ATHENS CENTRAL STATION

EL. VENIZELOS

PIRAEUS CODE ATHENS

OVERVIEW – CONCEPT – PROPOSALS – MEASURES

GROUP 8


Proposals 1.  Observaaon Scale 2.  Operaaonal Scale 3.  In-­‐depth Scale

CODE ATHENS

OVERVIEW – CONCEPT – PROPOSALS – MEASURES

GROUP 8


THESSALONIKI

ATHENS CENTRAL STATION: STRATEGIC NODE OBSERVATION SCALE

ANO LIOSSIA SKA KIATO

OBSERVATION PERIMETER

DOUKISSIS PLAKENTIAS

M

OPERATIONAL PERIMETER

IN-DEPTH PERIMETER LARISSIS STATION

AIRPORT PIRAEUS

EXPRESS AIRPORT / KIATO - L.S. SUBURBAN LINE INTERCITY LINE METRO LINE DURATION EXPRESS

CODE ATHENS

OVERVIEW – CONCEPT – PROPOSALS – MEASURES

GROUP 8


Suburban Timetable Ana Liossia

Doukissis Plakenaas

SKA

M

Kiato

Athens Central St.

Piraeus CODE ATHENS

Airport

M

M

Airport Suburban Express (2x/hr) Kiato Suburban Express (1x/hr) Thessaloniki Intercity (1x/hr) North-­‐South Suburban (2x/hr) East-­‐West Suburban (3x/hr)

OVERVIEW – CONCEPT – PROPOSALS – MEASURES

GROUP 8


REDEFINING THE RAILWAY CORRIDOR OPERATIONAL SCALE

TRIS GEFIRES

NEW ATHENS CENTRAL STATION

KSYL

GREEN - RAILWAY CORRIDOR ROUF

URBAN GREEN NETWORK CROSSOVER [PEDESTRIAN] UNDERPASS NEW BUS STATION - KSYL NEW ATHENS CENTRAL STATION

CODE ATHENS

CULTURAL POLES

GROUP 8


CODE ATHENS

GROUP 8


CODE ATHENS

GROUP 8


CODE ATHENS

GROUP 8


The City in the Sta,on Fragmented continuity

Masterplan 0

CODE ATHENS

20

60

120

140m

OVERVIEW – CONCEPT – PROPOSALS – MEASURES

GROUP 8


The City in the Sta,on Flea market New station facilities Railway platforms Railway tracks

Vertical crossover Green corridor

Zoom in

The elements

CODE ATHENS

OVERVIEW – CONCEPT – PROPOSALS – MEASURES

GROUP 8


The City in the Sta,on

Circulation Sketches

CODE ATHENS

OVERVIEW – CONCEPT – PROPOSALS – MEASURES

GROUP 8


References Sketches

Theater square, Studio Bernardo Secchi, Paola Viganò, Antwerp, Belgium, 2009

CODE ATHENS

OVERVIEW – CONCEPT – PROPOSALS – MEASURES

GROUP 8


Stages of Development Intervenaons on different scales of analyses and sectors of planning (traffic, landscape, urban) 1.  Planning phase (2015-­‐2020) 2.  Planning phase (2020-­‐2030) 3.  Planning phase (2030-­‐2040)

CODE ATHENS

OVERVIEW – CONCEPT – PROPOSALS – MEASURES

GROUP 8


Stages of Development Regional scale compleaon of 2 track system on corridor purchase new rail stock study urban green network/ potenaals Urban scale plan and new bus staaon at Eleonas

Site scale

operate upgraded corridor and eletrificaaon (north) construct green corridor (north)

Introduce new suburban ametable

intensify connecaon between public and green spaces merge bus staaons in Eleonas operate new central bus staaon

proceed with OSE tunnel planning (north) plan pedestrian crossings

construct tunnel (north)

study social disintegraaon

build mental bridges by sustaining social mix

study new exit metro staaon

demolish old tracks

open tunnel for public use

connect green corridor and neighbourhoods

open connecang bridges for public

plan new overpass for cars (south) analyse green potenaals outside staaon plan new staaon and market square (roofed) 2015 Stage 1

establish new overpass

landscape intervenaons

operate electrified (south)

construct green corridor (south)

maintanance of new train staaon Maintanance of parks and green infrastructure build neighbourhood partnerships

create new bypass (kiss&ride)

traffic intervenaons

establish new exit for metro

CODE ATHENS

build new park maintain green spaces in front of staaon redesign exisang staaon, build new 2020 2025 Stage 2

variable schedule for the cultural market

2030

Stage 3

2040

urban intervenaons

OVERVIEW – CONCEPT – PROPOSALS – MEASURES

GROUP 8


The City in the Sta,on

CODE ATHENS

OVERVIEW – CONCEPT – PROPOSALS – MEASURES

GROUP 8


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.