TAYLORS UNIVERSITY SCHOOL OF ARCHTITECTURE BUILDING STRUCTURE PROJECT 2 STRUCTURAL ANALYSIS OF A BUNGALOW Tutor: Ms. Norita Student name and ID: 1.Wong Carol 0317742 2.Neoh Jia Wen 0318228 3.Tang Ju Yi 0317335
1
Brief description In this project, in a group of three, we are required to design a double storey bungalow according to the plans provided. After that, we are required to produce structural plan drawings to ease us in analyzing and identifying the beams and columns of the bungalow. Each of our group member will select a minimum of 6 beams and 3 columns from ground floor to first floor. We will calculate and identify the slab system and load distribution for beams and columns.
Slab system Ly/Lx > 2 (One way slab system) Ly/Lx < 2 (Two way slab system) Beam calculation Beam self-weight = beam size x density of reinforced concrete Slab dead load =thickness x density of reinforced concrete x Lx/2 x 2/3 (Triangular) Slab live load = live load (UBBL) x Lx/2 x 2/3 (Triangular) Brick wall dead load = wall height x thickness x density of bricks Column calculation Beam self-weight = beam size x density of reinforced concrete x length Slab dead load =thickness x density of reinforced concrete x Tributary area Slab live load = live load (UBBL) x Tributary area Brick wall self-weight = thickness x wall height pf bricks x length Column self-weight = width x length x height x density of reinforced concrete
2
FIRST FLOOR PLAN SCALE 1:100
GROUND FLOOR PLAN SCALE 1:100
FOUNDATION PLAN SCALE 1:100
FIRST FLOOR STRUCTURAL PLAN SCALE 1:100
GROUND FLOOR STRUCTURAL PLAN SCALE 1:100
ROOF STRUCTURAL PLAN SCALE 1:100
Structural plan
9
Design Brief Summarize weight of material Height of the floors= 3m Brick wall 150mm thick Dead Load= 3m x 0.15m x 19kN/m3 = 8.55kN/m Beam size (primary ) 150mm x 350m Dead Load= 0.35m x 0.15m x 24kN/m3= 1.26 kN/m Beam size (secondary ) 150mm x 300m Dead Load= 0.3m x 0.15m x 24kN/m3= 1.08 kN/m Slab thickness is 150mm Dead Load= 0.15m x 24kN/m3= 3.6kN/m2 Column size= 300 x 400mm Dead Load=0.3m x 0.4m x 3m x 24 kN/m3= 8.64 kN
Quantity Live Loads Acting on Different Space Bedrooms
= 1.5 kN/m2
Living Rooms
= 1.5 kN/m2
Dining room
= 1.5 kN/m2
Laundry
= 3.0 kN/m2
Piano area
= 2.0 kN/m2
Toilet
= 1.5 kN/m2
Kitchen
= 1.5 kN/m2
Study room
= 1.5 kN/m2
Storage
= 1.5 kN/m2
Balcony
= 1.5 kN/m2
Stairs
= 1.5 kN/m2
10
11
12
13
TANG JU YI
NEOH JIA WEN
WONG CAROL
14
TANG JU YI
NEOH JIA WEN
WONG CAROL
WONG CAROL 0317742
• BEAM 3/G-H (Ground Floor) • BEAM G/1-4 (Ground Floor) • BEAM E/6-8 (First Floor) • BEAM 6/D-F (First Floor) • BEAM 8/F-G (First Floor) • BEAM G/6-8 (First Floor)
15
Beam 3/G-H (Ground Floor) Secondary beam to Beam G/1-4
PIANO AREA
LIVING AREA
Beam 3/G-H carriesDead load from beam self weight: Gridline G-H Dead load from slab: Gridline G-H/1-3 , G-H/3-6 Live load from slab: Gridline G-H/1-3 , G-H/3-6
Dead Load -Beam Self Weight (150mm x 300mm) = 0.15m x 0.3m x 24 kN/m = 1.08 kN/m -Dead load on slab G-H/ 1-3 = [3.6 kN/m3 x (4/2)] 2/3 =[7.2 kN/m3] = 4.8 kN/m -Dead load on slab G-H/ 3-6 = [3.6 kN/m3 x (4/2)] 2/3 =[7.2 kN/m] 2/3 =4.8 kN/m Total dead load =1.26 + 4.8 + 4.8 = 10.68 kN/m
H
G 4M 1.08KN/m
4.8KN/m
4.8KN/m
Beam Self Weight
Slab G-H/1-3
Slab G-H/3-6
10.68KN/m Total Dead load
16
Live Load Living Area -Live load on slab G-H/ 1-3 = [1.5 kN/m2 x ( 4/2)] 2/3 =[3 kN/m ] 2/3 = 2kN/m
H
G 4M 2kN/M
Living Area -Live load on slab G-H/3-6 =[1.5 kN/m2 x (4/2)] 2/3 =[3 kN/m] 2/3 2 kN/m
G-H/1-3
2kN/M
Slab G-H/3-6
4kN/M
Total Live Load
Total live load 2+2 =4 kN/m Ultimate Load = 10.68 +4 =14.68 kN/m
H
G 4M 14.68kN/M
Ultimate Load
58.72kN
Load diagram
Total load =14.68 kN/m x 4m =58.72kN Reaction force (symmetrical beam) =58.72/2 =29.36 kN 29.36 kN from secondary beam will react as point load at G/3 from beam G/1-4 (refer to pg 18)
Ra=29.36kN
Rb=29.36kN
29.36kN/M
Shear Force diagram
(+) (-)
-29.36kN/M 29.36kN
Shear Force Diagram 29.36 kN- 58.72 kN =-29.36 kN Bending Moment Diagram Positive area 29.36 x 2 x ½ = 29.36
Bending moment diagram 0kN
0kN
Negative area 29.36 x 2 x ½ = 29.36
17
Beam G/1-4 (Ground Floor) Primary beam
PIANO AREA
LIVING AREA
Beam G/1-4 carriesDead load from beam self weight: Gridline 1-4 Dead load from slab: Gridline F-G/1-4, G-H/1-3 , G-H/3-6 Live load from slab: Gridline F-G/1-4, G-H/1-3 , G-H/3-6 Point Load at point G/3 from beam G/1-4 (refer to pg 16) 1 Dead Load -Beam self weight (beam size is 150mmx 350mm) = 0.15m x 0.35m x 24 kN/m3 = 1.26 kN/m
3 4.785m
4 1.36m
1.26kN/m
Beam Self Weight
6.93kN/m
Slab F-G/1-4
-Dead load on slab F-G/ 1-4 = 3.6 kN/m2 x (3.85/2) =6.93 kN/m -Dead load on slab G-H/1-3 =3.6 kN/m2 x (4000/2) =7.2 kN/m
7.2kN/m
-Dead load on slab G-H/3-6 =3.6 kN/m2 x (4000/2) =7.2 kN/m Total dead load 1-3 =1.26+ 6.93 +7.2 =15.39
Total dead load 3-4 =1.26+ 6.93+ 7.2 =15.39
Slab G-H/1-3
7.2kN/m
15.39kN/m
15.39kN/m
Slab G-H/3-6
Total Dead Load 18
Live load -Live load on slab F-G/1-4 Living Area =1.5 kN/m2 x (3.85/2) =2.89 kN/m
1
3 4.785m
4 1.36m
2.89kN/m
-Live load on slab G-H/1-3 Living Area =1.5 kN/m2 x (4/2) =3 kN/m
Slab F-G/1-4
3kN/m Slab G-H/1-3
-Live load on slab G-H/3-6 Living Area =1.5 kN/m2 x (4/2) =3 kN/m
3kN/m Slab G-H/3-6
Total live load For - =2.89+3 =5.89 For - =2.89+3 =5.89
5.89kN/m
1 Ultimate Load Ultimate dead load at 1-3 =15.39kN/m x 1.4 =21.55 kN/m
5.89kN/m
3
Total Live Load
4
4.785m
1.36m
30.97kN/m
30.97kN/m
Ultimate load
Ultimate dead load at 3-4 =15.39kN/m x 1.4 =21.55 kN/m Ultimate live load at 1-3 =5.89kN/m x 1.6 =9.42 kN/m Ultimate live load at 3-4 =5.89kN/m x 1.6 =9.42 kN/m Ultimate dead load at 1-3 =21.55+ 9.42 =30.97 kN/m Ultimate dead load at 3-4 Total Load 3-4 =21.55+ 9.42 30.97 kN/m x 1.36 =30.97 kN/m =42.12 kN/m Total Load 1-3 30.97 kN/m x 4.78 =148.04 kN/m
19
Reaction Force ΣM= 0 =Ra (6.15) – 148.04 (3.75) 29.72(1.36) – 42.12 (0.68) =6.15 Ra- 555.15- 40.42- 28.64 6.15 Ra =624.21 Ra =101.5kN ΣFy=0 =101.5- 148.04- 29.72- 42.12+ Rb Rb= 148.04+29.72+42.12-101.5 =118.38kN Shear Force Diagram (101.5- 148.04)kN= -46.54kN (-46.54- 29.36)kN= -75.9 kN (-75.9- 42.12)kN= -118.02kN
1
3
4
4.785m
1.36m
Reaction force from 5/A-D (pg 16) 29.72kN 148.04kN
42.12kN
Ra=101.5kN
Rb=118.38kN
101.5kN
Shear Force diagram (+) 0kN -46.54kN -75.9kN
166.97kN
Positive area .
(-)
-118.02kN
Bending Moment Diagram
=
Load diagram
. .
Bending moment diagram 0kN
x= 1.50 4.785
148.04 46.34
0.5 x 3.29 x 101.5= 166.97 Negative area 0.5 x 1.5 x (-46.54) = -34.91 -[ 0.5 x (75.9 + 118.02) x 1.36] = -131.86 34.9 + 131.86 = 166.77
20
Beam E/6-8 (First Floor) Secondary beam to Beam6/D-F
LIVING AREA
Beam E/6-8 carriesDead load from beam self weight: Gridline 6=8 Dead load from slab: Gridline D-E/6-8, E-F/6-8 Live load from slab: Gridline D-E/6-8, E-F/6-8 Dead Load -Beam self weight (beam size is 150mmx 300mm) = 0.15m x 0.30m x 24 kN/m3 = 1.08 kN/m -Dead load on slab D-E/ 6-8 = [3.6 kN/m2 x (2.75/2)] 2/3 =(4.95 kN/m2)2/3 =3.3 kN/m -Dead load on slab E-F/6-8 =[3.6 kN/m2 x (2.14m/2)] 2/3 =[3.85 kN/m2] 2/3 = 2.568 kN/m Total dead load =1.26+3.3+2.568 =7.13 kN/m
6
8 4M 1.08kN/m
3.3kN/m
2.568kN/m
Beam Self Weight
Slab D-E/6-8
Slab E-F/6-8
6.95kN/m Total Dead load
21
Live Load -Live load on slab D-E/6-8 Living Area =[ 1.5 kN/m2 x (2.75/2)]2/3 = 2.06 kN/m] 2/3 = 1.38 kN/m
6
8 4M 1.38kN/m
-Live load on slab E-F/ 6-8 Living Area = [1.5 kN/m2 x (2.14/2)] 2/3 =(1.61 kN/m)2/3 =1.07 kN/m
Slab D-E/6-8
1.07kN/m
Slab E-F/ 6-8
2.45kN/m
Total Live Load
Total live load =1.38 + 1.07 =2.45 kN/m Ultimate Load = 9.4 kN/m x 4m =37.6 kN
6
Reaction force (symmetrical beam) = 37.6 / 2 = 18.8 kN 18.8 kN from the secondary beam will react as point load at beam 6/D-F (refer to pg 23)
8 4M 9.4kN/m
Ultimate Load
9.4kN/m
Load diagram
Ra=18.8kN
Rb=18.8kN
18.8kN/M
Shear Force diagram
Shear Force Diagram 18.8 kN- 37.6 kN =-18.8 kN
0kN -18.8kN/M
Bending Moment Diagram Positive area 18.8 x 2 x ½ = 18.8
18.8kN
Bending moment diagram
Negative area 18.8 x 2 x ½ = 18.8 0kN
22
Beam 6/D-F (First Floor) Primary beam
LIVING AREA
Beam 6/ D-F carriesDead load from beam self weight: Gridline 6/D-F Dead load from slab: Gridline D-F/5-6, D-E/6-8, E-F/6-8 Live load from slab: Gridline D-F/5-6, D-E/6-8, E-F/6-8 Point Load at point E/6 from beam E/6-8 F Dead Load -Beam self weight (beam size is 150mmx 350mm) = 0.15m x 0.35m x 24 kN/m3 = 1.26 kN/m
E 2.14m
D 2.75m
1.26kN/m
Beam Self Weight
5.89kN/m
Slab D-F/5-6
-Dead load from slab D-F/5-6 = 3.6 kN/m2 x (3.27/2) = 5.89 kN/m 4.95kN/m
-Dead load from slab D-E/6-8 = 3.6 kN/m2 x (2.75/2) = 4.95 kN/m -Dead load from slab E-F/6-8 = 3.6 kN/m2 x (2.14/2) = 3.85 kN/m Total dead load F-E= 1.26+ 5.89+ 3.85= 11 E-D= 1.26+ 5.89+ 4.95= 12.1
3.85kN/m
Slab D-E/6-8
Slab E-F/6-8
12.1kN/m 11kN/m
Total Dead Load 23
Live Load -Live load on slab D-F/5-6 Living Area =1.5 kN/m2 x (3.27/2) = 2.45 kN/m
F
E 2.14m
2.75m
2.45kN/m
-Live load on slab D-E/ 6-8 Living Area = 1.5 kN/m2 x (2.75/2) = 2.1 kN/m
Slab D-E/6-8
1.61kN/m Slab E-F/6-8
Total live load F-E =2.45 + 1.61 = 4.06 kN/m E-D =2.45 + 2.75 = 5.2 kN/m
5.2kN/m
4.06kN/m
F
Total Live Load
E 2.14m
Ultimate dead load at E-D = 21.1kN/m x 1.4 = 16.94 kN/m
Slab D-F/5-6
2.1kN/m
-Live load on slab E-F/ 6-8 Living Area = 1.5 kN/m2 x (2.14/2) = 1.61 kN/m
Ultimate dead load at F-E =11kN/m x 1.4 =15.4 kN/m
D
21.9kN/m
D 2.75m 25.26kN/m Ultimate load
Ultimate live load at F-E =4.06kN/m x 1.6 = 6.50 kN/m Ultimate live load at E-D =5.2kN/m x 1.6 = 8.32 kN/m Total ultimate load at F-E = 15.4 + 6.5 = 21.9 kN/m Total ultimate load at E-D = 16.94 + 8.32 = 25.26 kN/m Total Load F-E = 21.9 kN/m x 2.14 =46.9 kN/m Total Load E-D = 25.26 kN/m x 2.75 = 69.47 kN/m
24
Reaction Force ΣM= 0 =Ra (4.89) – 46.9 (3.82) -18.8(2.75) – 69.47 (1.38) =4.89 Ra- 179.16- 51.7- 95.87 4.89 Ra =326.73 Ra =66.82kN ΣFy=0 =66.82- 46.9- 18.8- 69.47+ Rb Rb= 46.9+18.8+69.47-66.82 =68.35kN Shear Force Diagram (66.82 - 46.9)kN= -19.92kN (19.92 - 18.8)kN= -1.12 kN (1.12 - 69.47)kN= -68.35kN
F
E
D
2.14m
2.75m
Reaction force from 5/A-D (pg 16) 18.8kN 46.9kN
69.47kN
Ra=66.82kN
Rb=68.35kN
66.82kN (+)
Load diagram
1.12kN
Shear Force diagram
19.92kN (-)
0kN -68.35kN
Bending Moment Diagram 1.12
92.85kN
69.47
2.75 Positive area
Bending moment diagram 0kN
0.5 x 2.14 x (66.82+19.92) =92.82 0.5 x 1.12 x 0.044 =0.025 92.82 + 0.025 =92.85
.
=
. .
x = 0.044 Negative area 0.5 x 68.35 x 2.706 =92.5 25
Beam 8/F-G (First Floor) Primary beam
MASTER BEDROOM
BALCONY
Beam 8/ F-G carriesDead load from beam self weight: Gridline F-G Dead load from brick weight: Gridline F-G Dead load from slab: Gridline F-G /6-8, F-G/ 8-9 Live load from slab: Gridline F-G /6-8, F-G/ 8-9
Dead Load -Beam self weight (beam size is 150mmx 350mm) = 0.15m x 0.35m x 24 kN/m3 = 1.26 kN/m
G
3.85M
F
1.26kN/m
Beam Self Weight
-Dead load from brick wall weight = 19 kN/m2 x 3m x 0.15m = 8.55 kN/m
8.55kN/m
Brick Wall Weight
-Dead load from slab F-G/6-8 = [3.6 kN/m2 x (3.85m/2)] 2/3 = 4.62 kN/m
4.62kN/m
-Dead load from slab F-G/8-9 = [3.6 kN/m2 x (3.85/2)] 2/3 = 4.62 kN/m
4.62kN/m
Total dead load 1.26 kN/m2 + 8.55 kN/m2 + 4.62 kN/m2 + 4.62 kN/m2 =19.05 kN/m2
Slab F-G/8-9
Slab F-G/8-9
19.05kN/m Total Dead load 26
Live Load -Live load on slab F-G/6-8 Master Bedroom =[1.5 kN/m2 x (3.85/2)] 2/3 = 1.925 kN/m
G
F 3.85M 1.925kN/m
-Live load on slab F-G/ 8-9 Balcony = [1.5 kN/m2 x (3.85/2)] 2/3 = 1.925 kN/m
Slab F-G/6-8
1.925kN/m
Total live load =1.925 + 1.925 = 3.85 kN/m
Slab F-G/ 8-9
3.85kN/m
Total Live Load
Ultimate load =19.05 +3.85 = 22.9 kN/m Total Load = 22.9 kN/m x 3.85 = 88.165 kN/m
6
Reaction Force (symmetrical force) 88.165 kN/m /2 =44.08kN Shear Force Diagram 44.08kN- 88.165 kN =-44.08 kN
8 4M 22.9kN/m
Ultimate Load
88.165kN/m
Load diagram
Ra=44.08kN
Rb=44.08kN
44.08kN/M
Shear Force diagram
Bending Moment Diagram Positive area 44.08 x 1.925 x ½ = 42.427 Negative area 44.08 x 1.925x ½ = 42.427
0kN 44.08kN/M 42.427kN
Bending moment diagram 0kN
27
Beam G/6-8 (First Floor) Primary beam
MASTER BEDROOM
BALCONY
Beam G/6-8 carriesDead load from beam self weight: Gridline 6-8 Dead load from brick weight: Gridline 6-8 Dead load from slab: Gridline F-G /6-8, G-H/ 6-8 Live load from slab: Gridline F-G /6-8, G-H/ 6-8
Dead Load -Beam self weight (beam size is 150mmx 350mm) = 0.15m x 0.35m x 24 kN/m3 = 1.26 kN/m2
6
8 4M 1.26kN/m
Beam Self Weight
-Dead load from brick wall weight = 19 kN/m2 x 3m x 0.15m = 8.55 kN/m2
8.55kN/m
Brick Wall Weight
-Dead load from slab F-G/6-8 = [3.6 kN/m2 x (3.85m/2)] 2/3 = 4.62 kN/m2
4.62kN/m
-Dead load from slab G-H/6-8 = [3.6 kN/m2 x (4/2)] 2/3 = 4.8 kN/m2
4.8kN/m
Total dead load 1.26 kN/m2 + 8.55 kN/m2 + 4.62 kN/m2 + 4.8 kN/m2 =19.23 kN/m2
Slab F-G/6-8
Slab G-H/6-8
19.23kN/m Total Dead load 28
Live Load -Live load on slab F-G/6-8 Balcony =[1.5 kN/m2 x (3.85/2)] 2/3 = 1.925 kN/m
6
8 4M 1.925kN/m
-Live load on slab G-H/ 6-8 Balcony = [1.5 kN/m2 x (4/2)] 2/3 = 2 kN/m
Slab F-G/6-8
2kN/m
Total live load =1.925 + 2 = 3.93 kN/m
Slab F-G/ 8-9
3.93kN/m
Total Live Load
Ultimate load =19.05 +3.93 = 23.15 kN/m Total Load = 23.15 kN/m x 4 = 92.62 kN/m
6
8 4M
Reaction Force (symmetrical force) 92.62 kN/m /2 =46.31 kN
23.15kN/m
Ultimate Load
92.62kN/m
Load diagram
Ra=46.31kN
Shear Force Diagram 46.31 kN- 92.62 kN =-46.31 kN Bending Moment Diagram Positive area 46.31 x 2 x ½ = 46.31
Rb=46.31kN
46.31kN/M
Shear Force diagram 0kN 46.31kN/M 46.31kN
Negative area 46.31 x 2 x ½ = 46.31
Bending moment diagram 0kN
29
NEOH JIA WEN 0318228
• BEAM B/3-5 (Ground Floor) • BEAM A-D/3 (Ground Floor) • BEAM 5/A-D (Ground Floor) • BEAM 3-6/A (Ground Floor) • BEAM 7-8/C (Ground Floor) • BEAM 7/A-D (Ground Floor)
30
Beam B/3-5 Secondary beam to Beam 3/A-D and 5/A-D
BATHROOM BEDROOM 02
BEDROOM 03 BATHROOM
Beam B/3-5 carriesDead load from beam self weight: Gridline 3-5 Dead load from brick wall weight: Gridline 3-5 only Dead load from slab: Gridline A-B/3-5 , B-D/3-5 Live load from slab: Gridline A-D/1-3 , A-B/3-5 Dead Load -Beam Self Weight (150mm x 300mm) = 0.15m x 0.3m x 24 kN/m = 1.08 kN/m -Brick Wall Weight (wall height is 3000mm) = 0.15m x 0.3m x 19 kN/m = 8.55 kN/m
3
5 2.79m 1.08kN/m
Beam Self Weight
8.55kN/m Brick Wall Weight
-Dead load on slab A-B/ 3-5 = 3.6 kN/m2 x (2.48/2) = 4.464 kN/m
4.464kN/m
-Dead load on slab B-D/ 3-5 = 3.6 kN/m2 x (2.63/2) =4.734 kN/m
4.734kN/m
Total dead load 3-5 =1.08 + 8.55 + 4.464 + 4.734 = 18.828 kN/m
18.828kN/m
Slab A-B/3-5
Slab B-D/3-5
Total Dead load
31
Live Load
3
5 2.79m
Study Room -Live load on slab A-D/ 1-3 = [1.5 kN/m2 x ( 2.48/2)] = 1.86kN/m
1.86kN/m
Toilet -Live load on slab B-D/3-5 =[1.5 kN/m2 x (2.63/2)] = 1.9725 kN/m
1.9725kN/m
Total live load 3-5 =1.86+1.9725 = 3.8325 kN/m
3.8325kN/m
Ultimate Load at 3-5 = 26.3592 + 6.123 = 32.49 kN/m
A-D/1-3
B-D/3-5
Total Live Load
3
5 2.79m 32.49kN/m
Ultimate Load
90.65kN
Load diagram
Total load = 32.49 kN/m x 2.79m = 90.65kN Reaction force (symmetrical beam) = 90.65/2 = 45.325 kN 45.325 kN from secondary beam will react as point load at 3/B (refer to pg33) and 5/B (refer to pg36)
Ra=45.325kN
Rb=45.325kN
45.325kN
Shear Force diagram
(+) (-)
45.325kN
Shear Force Diagram 45.325kN â&#x20AC;&#x201C; 90.65kN = -45.325kN -45.325kN + 45.325kN = 0
31.614kN
Bending Moment Diagram Positive Area 45.325 x (2.79/2) x 0.5 = 31.614 Negative Area 45.325 x (2.79/2) x 0.5 = 31.614
Bending moment diagram 0kN
0kN
32
Beam A-D/3 Primary beam
BATHROOM BEDROOM 03
BEDROOM 02 BATHROOM
Beam A-D/3 carriesDead load from beam self weight: Gridline A-D Dead load from brick wall weight: Gridline A-D only Dead load from slab: Gridline A-D/1-3, A-B/3-5 , B-D/3-5 Live load from slab: Gridline A-D/1-3, A-B/3-5 , B-D/3-5 Point Load at point B/3 from beam B/3-5 (refer to pg 31) Dead Load -Beam self weight (beam size is 150mmx 350mm) = 0.15m x 0.35m x 24 kN/m3 = 1.26 kN/m -Brick Wall Weight (wall height is 3000mm) = 0.15m x 0.3m x 19 kN/m = 8.55 kN/m -Dead load on slab A-D/ 1-3 = 3.6 kN/m2 x (4.785/2) = 8.613 kN/m -Dead load on slab A-B/3-5 =3.6 kN/m2 x (2.48/2) x (2/3) =2.976 kN/m
A
B
D
2.48m
2.63m
1.26kN/m
8.55kN/m
8.613kN/m
Brick Wall Weight
Slab A-D/1-3
2.976kN/m Slab A-B/3-5
-Dead load on slab B-D/3-5 =3.6 kN/m2 x (2.63/2) x (2/3) =3.156 kN/m
3.156kN/m Slab B-D/3-5
Total dead load A-B =1.26 + 8.55 + 8.613 + 2.976 = 21.399kN/m Total dead load B-D = 1.26 + 8.55 + 8.613 + 3.156 = 21.579kN/m
Beam Self Weight
21.399kN/m
21.579kN/m Total Dead Load 33
Live load -Live load on slab A-D/1-3 Bedroom 2 =1.5 kN/m2 x (4.785/2) =3.589 kN/m
A
B 2.48m
2.63m
3.589kN/m
-Live load on slab A-B/3-5 Bathroom =1.5 kN/m2 x (2.48/2) x (2/3) =1.24 kN/m
Slab A-B/3-5
1.315kN/m Slab B-D/3-5
Total live load For A-B =3.589 kN/m + 1.24 kN/m =4.829 kN/m
Ultimate Load Ultimate dead load at A-B =21.399 kN/m x 1.4 =29.9586 kN/m
Slab A-D/1-3
1.24kN/m
-Live load on slab B-D/3-5 Bathroom =1.5 kN/m2 x (2.63/2) X (2/3) =1.315 kN/m
For B-D =3.589 + 1.315 = 4.904 kN/m
D
4.904kN/m
4.829kN/m
A
Total Live Load
B
D
2.48m 37.69kN/m
2.63m 38.057kN/m
Ultimate load
Ultimate dead load at B-D =21.579 kN/m x 1.4 =30.2106 kN/m Ultimate live load at A-B =4.829 kN/m x 1.6 =7.7264 kN/m Ultimate live load at B-D =4.904 kN/m x 1.6 =7.846 kN/m Ultimate dead load at A-B =29.9586 + 7.7264 =37.69 kN/m
Ultimate dead load at B-D =30.2106 + 7.8464 =38.057 kN/m
Total Load AB =37.69 kN/m x 2.48 =93.4712 kN/m
Total Load BD =38.057 kN/m x 2.63 =100.09 kN/m 34
Reaction Force ΣM= 0 0 = Ra (5.11) – 93.471 (3.87) – 45.325 (2.63) – 100.09 (1.315) 0 = 5.11 Ra- 361.734 – 119.205 – 131.618 5.11 Ra = 612.557 Ra = 119.874kN ΣFy=0 0 = 119.874 + Rb - 93.471 -45.325 – 100.09 Rb = 119.012 kN
1
3 2.48m
4 2.63m
Reaction force from B/3-5 (pg 31) 45.325kN 93.471kN
100.09kN
Ra=119.874kN
Load diagram
Rb=119.012kN
119.874kN
Shear Force Diagram (119.874 – 93.471)kN= 26.403kN (26.403 – 45.325)kN = -18.922 kN (-18.922 – 100.09)kN= -119.012kN
26.403kN (+)
Shear Force diagram 0kN
(-) -18.922kN -119.012kN
Bending Moment Diagram
119.874
179.271kN A B Bending moment diagram 0kN
2.48
Positive area A = 93.471 x 2.48 x (1/2) = 115.904 B = 26.403 x 2.4 = 63.367 A + B = 179.271 2.6 C
18.922 D
100.09
Negative area C = 18.922 x 2.6 = -49.197 D = 100.09 x 2.6 x (1/2) = -130.117 C+D = 179.314
35
Beam 5/A-D Secondary beam to beam 3-6/A
TOILET LAUNDRY ROOM
BEDROOM 01
STUDY ROOM TOILET
Beam 5/A-D carriesDead load from beam self weight: Gridline A-D Dead load from brick wall weight: Gridline A-D Dead load from slab: Gridline 3-5/A-B, 3-5/B-D, 5-7/A-D Live load from slab: Gridline 3-5/A-B , 3-5/B-D, 5-7/A-D Point load at Point 5/B from Beam B/3-5 (refer to pg 31) Dead Load -Beam Self Weight (150mm x 300mm) = 0.15m x 0.3m x 24 kN/m = 1.08 kN/m -Beam Wall Weight (wall height is 3000mm) = 0.15m x 0.3m x 19 kN/m = 8.55 kN/m -Dead load on slab 3-5/ A-B = 3.6 kN/m2 x (2.48/2) x (2/3) = 2.976 kN/m
A
B
D
2.48m
2.63m
1.08kN/m
8.55kN/m
2.976kN/m
-Dead load on slab 3-5/ B-D = 3.6 kN/m2 x (2.63/2) x (2/3) = 3.156 kN/m
Beam Self Weight
Brick Wall Weight
Slab 3-5/A-B
3.156kN/m Slab 3-5/B-D
-Dead load on slab 5-7/ A-D = 3.6 kN/m2 x (3.81/2) x (2/3) = 6.912 kN/m
6.912kN/m Slab 5-7/A-D
Total dead load A-B = 1.08+8.55+2.976+6.912 = 19.518 kN/m Total dead load B-D = 1.08+8.55+3.156+6.912 = 19.698 kN/m
19.518kN/m
19.698kN/m Total Dead Load 36
Live Load
A
B 2.48m
-Live load on slab 3-5/ A-B Toilet = 1.5 kN/m2 x (2.48/2) x 2/3 = 1.24 kN/m
2.63m
1.24kN/m
-Live load on slab 3-5/B-D Toilet =1.5 kN/m2 x (2.63/2) x 2/3 = 1.315 kN/m
Slab 3-5/B-D
2.858kN/m Slab5-6/A-D
Total live load For A-B = 1.24 + 2.858 = 4.718 kN/m
4.173kN/m
4.718kN/m
A
Total Live Load
B 2.48m
Ultimate Load Ultimate Dead Load For A-B 19.518kN/m x 1.4 = 27.325 kN/m For B-D 19.698 kN/m x 1.4 = 27.577 kN/m
Slab 3-5/A-B
1.315kN/m
-Live load on slab 5-7/A-D Bedroom 01 =1.5 kN/m2 x (3.81/2) = 2.858 kN/m
For B-D = 1.315 + 2.858 = 4.173kN/m
D
34.874kN/m
D 2.63m
34.254kN/m
Ultimate load
Ultimate Live Load For A-B 4.718 kN/m x 1.6 = 7.549 kN/m For B-D 4.173 kN/m x 1.6 = 6.677 kN/m Total Ultimate Load For A-B 27.325 kN/m + 7.549 kN/m =34.874 kN/m For B-D 27.577kN/m + 6.677 kN/m =34.254 kN/m 37
A
Total Load For A-B 34.874 kN/m x 2.48 = 86.488kN
B 2.48m
D 2.63m
Reaction force from B/3-5 (pg 31) 45.325kN
For B-D 34.254 kN/m x 2.63 = 90.088kN
86.488kN
Reaction force ΣM= 0 Ra=112.012kN 0 = (Ra x 5.11) – (86.488 x 3.87) – (45.325 x 2.63) – (90.088 x 1.315) 5.11 Ra = 572.379 112.012kN Ra = 112.012 kN
90.088kN
Rb=109.889kN
25.524kN
(+)
ΣFy=0 0 = 112.012 + RD – 86.488 – 45.325 – 90.088 RD = 109.889 kN
Load diagram
Shear Force diagram 0kN
(-) -19.801kN -109.899kN
112.012 kN from secondary beam will react as point load at 5/A (refer to pg39) 170.545kN
Shear Force Diagram (112.012 – 86.488) kN = 25.524 kN (25.524 – 45.325) kN = -19.801 kN (-19.801 – 90.088) kN = -109.889 kN (-109.889 + 109.889) kN = 0
Bending moment diagram 0kN
Bending Moment Diagram
2.63 119.874
19.801
A
90.098
B
C D
109.899
2.48
Positive Area A = 86.488 x 2.48 x (1/2) = 107.245
Negative Area C = 2.63 x 19.801 = 52.077
B = 25.524 x 2.48 = 63.3
D = 90.098 x 2063 x (1/2) = 118.479
A+B = 63.3 + 107.245 = 170.545
C+D = 52.077 + 118.479 = 170.556 38
Beam 3-6/A Primary beam
TOILET BEDROOM 01
STUDY ROOM
LAUNDRY ROOM
TOILET
Beam 3-6/A carriesDead load from beam self weight: Gridline 3-6 Dead load from brick wall weight: Gridline 3-6 Dead load from slab: Gridline 3-5/A-B, 5-6/A-B Live load from slab: Gridline 3-5/A-B, 5-6/A-B Point Load at point 5/A from beam 5/A-D (refer to pg 36) Dead Load -Beam self weight (beam size is 150mmx 350mm) = 0.15m x 0.35m x 24 kN/m3 = 1.26 kN/m -Beam Wall Weight (wall height is 3000mm) = 0.15m x 0.3m x 19 kN/m = 8.55 kN/m -Dead load on slab 3-5/ A-B = 3.6 kN/m2 x (2.48/2) = 4.464 kN/m -Dead load on slab 5-6/A-D =3.6 kN/m2 x (3.81/2) x (2/3) =4.57 kN/m
A
B 2.79m
D 3.275m
1.26N/m
8.55kN/m
4.464kN/m
Beam Self Weight
Brick Wall Weight
Slab 3-5/A-B
3.92kN/m Slab 5-6/A-D
Using Ratio, . = .
/
.
X = 3.92 kN/m
39
Total Dead Load For 3-5 1.26 + 8.55 + 4.464 = 4.464kN/m
3
5 2.79m
6 3.275m 13.73kN/m
4.464kN/m
Total Dead Load
For 5-6 1.26 + 8.55 + 3.92 = 13.73 kN/m Live Load Live Load on Slab 3-5/ A-B Toilet 1.5kN/m x (2.48/2) =1.86kN/m
3
5 2.79m
3.275m
1.86kN/m
Slab 3-5/A-B
Live Load on Slab 5-6/ A-D Bedroom 01 1.5kN/m x (3.81/2) x (2/3) = 1.905 kN/m Using Ratio, .
/
=
6
1.638kN/m Slab 5-6/A-D
. .
1.638kN/m
1.86kN/m
X = 1.638 kN/m
Total Live Load
Total Live Load For 3-5 = 1.86 kN/m For 5-6 = 1.638 kN/m Ultimate Dead Load For 3-5 14.274kN/m x 1.4 =19.984 kN/m For 5-6 13.73kN/m x 1.4 =19.222 kN/m
3
5 2.79m
22.96kN/m
6 3.275m
21.843kN/m
Ultimate load
Ultimate Live Load For A-B 1.86 kN/m x 1.6 = 2.976 kN/m For B-D =1.638 kN/m x 1.6 =2.621 kN/m Total Ultimate Load at 3-5 =19.984kN/m + 2.976 kN/m = 22.96 kN/m Total Ultimate Load at 5-6 = 19.222kN/m + 2.621 kN/m = 21.843 kN/m
40
Total Load At 3-5 22.96 kN/m x 2.79m = 64.058 kN At 5-6 21.843 kN/m x 3.275m = 71.536 kN Reaction Force ΣM= 0 0 = (R3 x 6.065) – (64.058 x 4.67) – (112. 012 x 3.275) – (71.536 x 1.638) 6.065 R3 = 703.166 R3 = 129.129 kN ΣFy=0 0 = 129.129+ R6 – 64.058 – 112.012 – 71.536 R6 = 118.477 kN
3
5 2.79m
6 3.275m
Reaction force from 5/A-D (pg 36) 112.012kN 64.058kN
71.536kN
R3 =129.129kN
Load diagram
R6 =118.477kN
129.129kN Shear Force diagram
65.071kN (+)
0kN (-)
Shear Force diagram (129.129 – 64.058) kN = 65.071 kN (65.071 – 112.012) kN = -46.941 kN (-46.941 – 71.536) kN = -118.477 kN
-46.941kN -118.477kN
270.909kN
Bending moment diagram 0kN
Bending Moment Diagram 3.275 129.129
46.941
A
71.536
B
C D
118.477
2.79
A = 64.058 x 2.79 x (1/2) = 89.361
C = 46.941 x 3.275 = 153.732
B = 65.071 x 2.79 = 181.548
D = 71.536 x 3.275 x (1/2) = 117.14
A+B = 89.361 + 181.548 = 270.909
C+D = 153.732 + 117.14 = 270.87
41
Beam 7-8/C Secondary beam to beam 7/A-D
LAUNDRY ROOM
TOILET STUDY ROOM
BEDROOM 01 TOILET
Beam 7-8/C carriesDead load from beam self weight: Gridline 7-8 Dead load from brick wall weight : Gridline 7-8 Dead load from slab: Gridline 7-8/A-C, 7-8/C-D Live load from slab: Gridline 7-8/A-C, 7-8/C-D Dead Load -Beam Self Weight (150mm x 300mm) = 0.15m x 0.3m x 24 kN/m = 1.08 kN/m -Brick Wall Weight (wall height is 3000mm) = 0.15m x 0.3m x 19 kN/m = 8.55 kN/m -Dead load on slab 7-8/A-C = 3.6 kN/m2 x (3.305/2) = 5.949 kN/m
7
8 3.465m 1.08kN/m
8.55kN/m
5.949kN/m
Beam Self Weight
Brick Wall Weight
Slab 7-8/A-C
3.249kN/m Slab 7-8/C-D
-Dead load on slab 7-8/C-D = 3.6 kN/m2 x (1.805/2) =3.249 kN/m Total dead load 1.08 + 8.55 + 5.949 + 3.249 = 18.828 kN/m
18.828kN/m Total Dead Load
42
Live Load Live Load on Slab 7-8/A-C Laundry room 3kN/m x (3.305/2) =4.958kN/m
7
8 3.465m 4.958kN/m
Live Load on Slab 7-8/C-D Kitchen 1.5kN/m x (1.805/2) = 1.354 kN/m
7-8/A-C
1.354kN/m
Total Live Load 4.958kN/m+1.354kN/m = 6.312kN/m
7-8/C-D
6.312kN/m
Ultimate Load Ultimate dead load at 7-8 18.828 x 1.4 =26.359 kN/m
Total Live Load
7
8 3.465m
Ultimate live load at 7-8 6.312 x 1.6 = 10.099kN/m Total ultimate load at 7-8 26.359 + 10.099 = 36.458 kN/m Total Load 36.458 kN/m x 3.465m =126.33 kN/m
36.458kN/m
Ultimate Load
126.33kN
Load diagram
Ra=63.165kN
Rb=63.165kN
63.165kN
Reaction force (symmetrical beam) R7/C = R8//B= 126.33 kN x (1/2) = 63.165 kN
(+)
63.165 kN from secondary beam will react as point load at 7/C (refer to pg44)
(-)
Shear Force diagram 0kN
-63.165kN
54.717kN
Shear Force Diagram 63.165 kN â&#x20AC;&#x201C; 126.33 kN = -63.165 kN Bending Moment Diagram Positive area = 63.165 x (3.465/2) x (1/2) = 0kN 54.717 Negative area = 63.165 x (3.465/2) x (1/2) = 54.717
Bending moment diagram 0kN
43
Beam 7/A-D Primary beam
TOILET STUDY ROOM
LAUNDRY ROOM
BEDROOM 01 TOILET
Beam 7/A-D carriesDead load from beam self weight: Gridline A-D Dead load from brick wall weight: Gridline A-D Dead load from slab: Gridline 7-8/A-C, 7-8/-C-D, 5-7/A-D Live load from slab: Gridline 7-8/A-C, 7-8/-C-D, 5-7/A-D Point Load at point 7-C from beam 7-8/C (refer to pg42) Dead Load -Beam self weight (beam size is 150mmx 300mm) = 0.15m x 0.30m x 24 kN/m3 = 1.08 kN/m -Brick Wall Weight (wall height is 3000mm) = 0.15m x 0.3m x 19 kN/m = 8.55 kN/m -Dead load on slab 7-8/A-C = 3.6 kN/m2 x (3.305/2) x (2/3) = 3.966 kN/m
A
C 3.305m
D 1.805m
1.08N/m
8.55kN/m
3.966kN/m
-Dead load on slab 7-8/ C-D = 3.6 kN/m2 x (1.805/2) x (2/3) = 2.166 kN/m
2.166kN/m
-Dead load on slab 5-7/A-D =3.6 kN/m2 x (3.81/2) x (2/3) =4.572 kN/m
4.572kN/m
Beam Self Weight
Brick Wall Weight
Slab 7-8/A-C
Slab7-8/C-D
Slab 5-7/A-D 44
Total Dead Load For A-C 1.08 + 8.55 + 3.966 + 5.895 = 19.491 kN/m
A
C 3.305m
D 1.805m 17.691kN/m
19.491kN/m
Total Dead Load
For C-D 1.08 + 8.55 + 2.166 + 5.895 = 17.691 kN/m Live load -Live load on slab 7-8/A-C Laundry room = 3 kN/m2 x (3.305/2) = 4.958 kN/m
A
C 3.305m
D 1.805m
4.958kN/m
Slab 7-8/A-C
-Live load on slab 7-8/C-D Kitchen =1.5 kN/m2 x (1.805/2) =1.354 kN/m
1.354kN/m Slab 7-8/C-D
-Live load on slab 5-7/A-D Bed room 03 =1.5 kN/m2 x (3.81/2) x (2/3) =1.905 kN/m
1.905kN/m Slab 5-7/A-D
Total live load For A-C 4.958 + 1.905 = 6.863 kN/m
6.863kN/m
3.259kN/m Total Live Load
For C-D 1.354 + 1.905 = 3.259 kN/m Ultimate Load Ultimate dead load at A-C = 19.491kN/m x 1.4 = 27.287 kN/m Ultimate dead load at C-D = 17.691 kN/m x 1.4 = 24.767 kN/m
A
C 3.305m
38.268kN/m
D 1.805m
29.981kN/m
Ultimate load
Ultimate live load at A-C = 6.863 kN/m x 1.6 = 10.981 kN/m Ultimate live load at C-D = 3.259 kN/m x 1.6 = 5.214 kN/m Total ultimate load at A-C 27.287 + 10.981 = 38.268 kN/m
Total ultimate load at B-D 24.767 + 5.214= 29.981 kN/m
45
Total Load For A-C 38.268 kN/m x 3.305m = 126.48 kN For B-D 29.981 kN/m x 1.805m = 54.116 kN
A
B 3.305m
D 1.805m
Reaction force from 7-8/C (pg 42) 63.165kN 126.48kN
54.116kN
Reaction Force Ra=117.465kN ΣM= 0 0 = (Ra x 5.11) – (126.48 x 3.458) – 117.465kN (63.165 x 1.805) – (54.116 x 0.903) 5.11Ra = 600.247 kN Ra = 117.465
Rb=126.296kN
Shear Force diagram
(+)
ΣFy=0 0 = 117.465 + RD – 126.48 – 63.165 – 54.116 RD = 126.296 kN Shear Force Diagram (117.465-126.48) kN = -9.015 kN (-9.015 – 63.165) kN= -72.18 kN (-72.18-54.116) kN= -126.296 kN Bending Moment Diagram
Load diagram
-9.015
0kN (-)
-72.18kN -126.296kN
179.193kN
Bending moment diagram 0kN
9.015 117.465
3.305 Positive area Using Ratio, . = . . x= 0.254 117.465 x (3.305-0.254) x (1/2) = 179.193 Negative area [(1/2) x (126.296 + 72.18) x (1.805)] + 126.296 [(1/2) x 9.0115 x 0.254)] = 180.269
46
TANG JUYI 0317735
• BEAM C/6-8 (FIRST Floor) • BEAM 6/A-D (Ground Floor) • BEAM 4/FG (Ground Floor) • BEAM G/3-6 (Ground Floor) • BEAM E/1-3 (First Floor) • BEAM 3/DF (First Floor)
47
Beam C/ 6-8 Secondary beam to Beam 6/AD
BEDROOM 03 STORAGE
Beam C/6-8 carriesDead load from beam self weight: Gridline 6-8 Dead load from brick wall weight = Gridline 6-8 Dead load from slab: Gridline AC/6-8, CD/6-8 Live load from slab: Gridline AC/6-8, CD/6-8 Dead Load -Beam Self Weight (150mm x 300mm) = 0.15m x 0.3m x 24 kN/m = 1.08 kN/m -Brick Wall Weight (wall height is 3000mm) = 0.15m x 0.3m x 19 kN/m = 8.55 kN/m
6
8 4m 1.08kN/m
Beam Self Weight
8.55kN/m Brick Wall Weight
-Dead load on slab AC/6-8 = 3.6 kN/m2 x (3.3/27) = 5.94 kN/m
5.94kN/m
-Dead load on slab CD/6-8 = 3.6 kN/m2 x (1.8/2) = 3.24 kN/m
3.24kN/m
Total dead load 1.08 + 8.55 + 5.94 + 3.24 =18.81 kN/m
18.81kN/m
Slab A-B/3-5
Slab B-D/3-5
Total Dead load
48
Live Load -Live load on slab AC/6-8 Storage = [1.5 kN/m2 x ( 3.3/2)] = 2.48kN/m
6
8 4m 2.48kN/m
-Live load on slab CD/6-8 Storage = [1.5 kN/m2 x (1.8/2)] = 1.35 kN/m
1.35kN/m
Total live load 2.48 + 1.35 = 3.83 kN/m
C-D/6-8
3.83kN/m
Ultimate Load Ultimate dead load at 6-8 18.81 x 1.4 = 26.33 kN/m
Total Live Load
6
8 4m
Ultimate live load at 6-8 3.83 x 1.6 = 6.13 kN/m Ultimate Load 26.33 + 6.13 = 32.46 kN/m Total load = 32.46 kN/m x 4m = 129.84kN
A-C/6-8
32.46kN/m
Ultimate Load
129.84kN
Load diagram
Ra=64.92kN
Rb=64.92kN
64.92kN
Reaction force (symmetrical beam) = 129.84 kN/2 = 64.92 kN
Shear Force diagram
(+) (-)
-64.92kN
64.92 kN from secondary beam will react as point load at 6/AD (REFER TO PG50)
64.92kN
Shear Force Diagram 64.92kN â&#x20AC;&#x201C; 129.84kN = -64.92kN -64.92kN + 64.92kN = 0 Bending Moment Diagram Positive Area 64.92 x (4/2) x 0.5 = 64.92 Negative Area 64.92 x (4/2) x 0.5 = 64.92
Bending moment diagram 0kN
0kN
49
Beam 6/AD Primary beam
BEDROOM
STORAGE
Beam 6/AD carriesDead load from beam self weight: Gridline A-D Dead load from brick wall weight: Gridline C-D only Dead load from slab: Gridline AD/5-6, AC/6-8 Live load from slab: Gridline AD/5-6, AC/6-8 Point Load at point C/6 from beam C/6-8 (refer to pg48) Dead Load -Beam self weight (beam size is 150mmx 350mm) = 0.15m x 0.35m x 24 kN/m3 = 1.26 kN/m
A
C 1.26N/m
-Brick Wall Weight (wall height is 3000mm) = 0.15m x 0.3m x 19 kN/m = 8.55 kN/m -Dead load on slab AD/5-6 = 3.6 kN/m2 x (3.7/2) = 6.66 kN/m -Dead load on slab AC/6-8 = 3.6 kN/m2 x (3.3/2) = 3.96 kN/m Total dead load For AC 1.26 + 6.66 + 3.96 = 11.88 kN/m For CD 1.26 + 8.55 + 6.66 = 16.47kN/m
D 3.305m
1.805m
8.55kN/m
6.66kN/m
Beam Self Weight
Brick Wall Weight
Slab A-D/5-6
3.96kN/m Slab A-C/6-8
11.88kN/m
16.47kN/m Total Dead Load
50
Live load -Live load on slab A-D/5-6 Bedroom = 1.5 kN/m2 x (3..7/2) = 2.78 kN/m
A
C 1.805m
D 3.305m
2.78kN/m
-Live load on slab A-C/6-8 Storage = 1.5 kN/m2 x (3.3/2) = 1.65 kN/m
Slab A-D/5-6
1.65kN/m Slab A-C/6-8
Total live load For AC 2.78 + 1.65 = 4.43 kN/m
4.43kN/m
2.78kN/m Total Live Load
For CD 2.78kN/m Ultimate load Ultimate dead load at AC 11.88 kN/m x 1.4 = 16.63 kN/m Ultimate dead load at CD 19.71 kN/m x 1.4 = 27.59 kN/m
A
C 1.805m
23.72kN/m
D 3.305m
34.2kN/m
Ultimate load
Ultimate live load at AC 4.43 kN/m x 1.6 = 7.09 kN/m Ultimate live load at CD 4.13 kN/m x 1.6 = 6.61 kN/m Total ultimate load at AC 16.63 + 7.09 = 23.72 kN/m Total ultimate laod at CD 27.59 + 6.61 = 34.2 kN/m Total load For AD 23.72 kN/m x 1.8m = 42.7 kN For CD 34.2 kN/m x 3.3 = 112.86 kN
51
Reaction Force ΣM= 0 0 = (Ra x 5.1) – (42.7 x 4.2) – (64.92 x3.3) – (112.86 x 1.65) 5.1Ra = 579.8 kN Ra = 113.69 kN/m
3
5 3.3m
1.8m
Reaction force from C/6-8 (pg 48) 64.92kN 23.72kN
ΣFy=0 0 = 113.69 + RB – 42.7 – 112.86 – 64.92 = 106.79 kN
Shear Force Diagram (113.69 – 42.7) kN = 70.99 kN (70.99 – 64.92) kN= 6.07 kN (6.07 – 112.86) kN= -106.79 kN Bending Moment Diagram Positive area [(1/2) x (113.69 + 70.99) x (1.805)] + [(1/2) x 6.07 x 0.18)] = 166.76 Negative area 1/2 x (-106.79) x (3.030 –.1.8) = -166.59
6
34.2kN
Ra =113.69kN
Load diagram
Rb =106.79kN
113.69kN Shear Force diagram
70.99kN (+)
6.07kN (-)
0kN
-106.79kN
166.76kN
Bending moment diagram 0kN
Using Ratio, .
=
. .
.
x= 0.18
52
Beam 4/FG Secondary beam to beam G/3-6
Beam 4/FG carriesDead load from beam self weight: Gridline F-G Dead load from brick wall weight: Gridline F-G Dead load from slab: Gridline FG/2-4, FG/4-6 Live load from slab: Gridline FG/2-4, FG/4-6 Dead Load -Beam Self Weight (150mm x 300mm) = 0.15m x 0.3m x 24 kN/m = 1.08 kN/m -Brick Wall Weight (wall height is 3000mm) = 0.15m x 0.3m x 19 kN/m = 8.55 kN/m
F
G 3.85m 1.08kN/m
Beam Self Weight
8.55kN/m Brick Wall Weight
-Dead load on slab FG/ 2-4 = [3.6 kN/m3 x (3.5/2)] = 6.3 kN/m
6.3kN/m
-Dead load on slab FG/4-6 = [3.6 kN/m3 x (3.9/2)] 2/3 = 4.68 kN/m
4.68kN/m
Total dead load = 1.08 + 8.55 + 6.3 + 4.68 = 20.61 kN/m
20.61kN/m
Slab F-G/2-4
Slab F-G/4-6
Total Dead load
53
F
Live Load -Live load on slab F-G/2-4 = [1.5 kN/m2 x ( 3.5/2)] = 2.63 kN/m
G 3.85m 2.63kN/m
-Live load on slab FG/4-6 = [1.5 kN/m2 x (3.9/2)] 2/3 = 1.95 kN/m
1.95kN/m
Total live load 2.63 + 1.95 =4.58 kN/m
4.58kN/m
Ultimate Load Ultimate dead load at F-G 20.61 kN/m x 1.4 =28.85 kN/m
E-F/1-3
F-G/4-6
Total Live Load
F
G 3.85m 36.18kN/m
Ultimate Load
141.1kN
Load diagram
Ultimate live load at F-G 4.58kN/m x 1.6 =7.33kN/m Ultimate load 28.85 + 7.33 = 36.18 kN/m Total load =36.18 kN/m x 3.9m = 141.1 kN
Ra=70.55kN
Rb=70.55kN
70.55.kN
Reaction force (symmetrical beam) = 141.1/2 = 70.55 kN
Shear Force diagram
(+) (-)
-70.55.kN
70.6 kN from secondary beam will react as point load at G/3-6 (refer to pg55) Shear Force Diagram 70.55 â&#x20AC;&#x201C; 141.1 = -70.55 -70.55 + 70.55 = 0 Bending Moment Diagram Positive area 70.55 x (3.9/2) x (1/2) = 68.79 kN/m Negative area 70.55 x (3.9/2) x (1/2) = 68.79 kN/m
60.46kN Bending moment diagram
0kN
54
Beam G/3-6 Primary beam
Beam G/3-6 carriesDead load from beam self weight: Gridline 3-6 Dead load from brick wall weight: Gridline 3-6 Dead load from slab: Gridline F-G/3-4, F-G/4-6 Live load from slab: Gridline F-G/3-4, F-G/4-6 Point Load at point G/4 from beam FG/4 (refer to pg53) Dead Load -Beam self weight (beam size is 150mmx 350mm) = 0.15m x 0.35m x 24 kN/m3 = 1.26 kN/m -Brick Wall Weight (wall height is 3000mm) = 0.15m x 0.3m x 19 kN/m = 8.55 kN/m -Dead load on slab F-G/ 3-4 (dead load on slab FG/2-4) = (3.46/2) x (2/3) = 4.15 kN/m
3
4
6 4.705m
1.36m 1.26N/m
8.55kN/m
1.63kN/m
Beam Self Weight
Brick Wall Weight
Slab F-G/3-4
Using Ratio, . = . . x= 1.63 kN/m
55
Dead load on slab FG/4-6 = [3.6KN/m2 x (3.9/2)] = 7.02 kN/m
3 1.36m
4.705m Slab F-G/4-6
16.83kN/m 11.44kN/m
For 4-6 1.26 + 8.55 + 7.02 =16.83 kN/m
Total Dead Load
3
4 1.36m
6 4.705m
0.69kN/m
(Live load on slab FG/2-4) (dead load on slab FG/2-4) 1.5 x (3.46/2) x(2/3) = 1.73 kN/m
Slab F-G/3-4
2.93kN/m Slab F-G/4-6
Using Ratio, . = . . x= 0.69 kN/m Live load on slab FG/4-6 =1.5 kN/m2 x (3.9/2) = 2.93kN/m
6
7.02kN/m
Total dead load For 3-4 1.26 + 8.55 + 1.63 =11.44 kN/m
Live load -Live load on slab FG/3-4 0.69 kN/m
4
2.93kN/m 0.69kN/m Total Live Load
Total live load For 3-4 0.69 kN/m For 4-6 2.93kN/m Ultimate load Ultimate dead load at 3-4 11.44 kN/m x 1.4 =16.02 kN/m Ultimate dead load at 4-6 16.83 kN/m x 1.4 = 23.56 kN/m Ultimate live load at 3-4 = 0.69 x 1.6 = 1.1 kN/m Ultimate live load at 3-4 = -2.93 kN/m x 1.6 =4.69 kN/m
56
3
Total ultimate load at 3-4 16.02 + 1.1 = 17.12 kN/m
4
6
1.36m
Total ultimate load at 4-6 4-6 = 23.56 + 4.69 =28.25kN/m
4.705m Ultimate load
28.25kN/m
17.12kN/m
Total load For 3-4 17.12 x 1.36 =23..2 kN For 4-6 = 28.25x 4.7 = 132.78 kN Reaction Force ΣM= 0 =Ra (6.06) – 23.28 (5.38) – 70.6(4.78) – =4.9 Ra- 98.49 – 141.51 – 47.743 4.9 Ra = 287.73 Ra =126.9kN
3 1.36m
6 4.705m
Reaction force from 4/F-G (pg 53) 70.6kN
ΣFy=0 = 58.72 + Rb - 25.58 – 50.54 – 34.10 Rb= = 99.76 kN/m Shear Force Diagram (1269-23.28)kN= 103.62kN (103.62 – 70.6)kN= 33.02 kN (33.02–- 132.78) = -99.76kN
4
17.12kN
28.25kN
Ra =126.9kN
Load diagram
Rb =99.76kN
126.9kN Shear Force diagram
103.62kN (+)
33.02kN
Bending Moment Diagram Positive area [0.5 / 156.75 + 33.14) x (2.1) + [0.5 x 1.17 x 19.31) = 176.06
(-)
0kN
-99.76kN
176.06kN
Negative area 0.5 x (-99.76) (4.7-1.17) =0.5 x (-352.15 ) = - 176.08
Bending moment diagram 0kN 57
Beam E/1-3 Secondary beam to beam 3/DF
STAIRCASE LIVING AREA
Beam E/1-3 carriesDead load from beam self weight: Gridline 1-3 Dead load from brick wall weight: Gridline 1-3 Dead load from slab: Gridline EF/1-3 Live load from slab: Gridline DF/ 3-5 Dead Load -Beam Self Weight (150mm x 300mm) = 0.15m x 0.3m x 24 kN/m = 1.08 kN/m -Brick Wall Weight (wall height is 3000mm) = 0.15m x 0.3m x 19 kN/m = 8.55 kN/m
1
3 4.785m 1.08kN/m
Beam Self Weight
8.55kN/m Brick Wall Weight
-Dead load on slab EF/1-3 = [3.6 kN/m3 x (2.1/2)] = 3.78 kN/m
3.78kN/m
Total dead Load = 1.08 + 8.55 + 3.78 = 13.41 kN/m
13.41kN/m
Slab E-F/1-3
Total Dead load
58
Live Load -Live load on slab EF/1-3 = [1.5 kN/m2 x (2.1/2)] = 1.43kN/m
1
3 4.785m 1.43kN/m
E-F/1-3
Total live load 1.43 kN/m 1.43kN/m
Total Live Load
Ultimate Load Ultimate dead load at 1-3 13.41 kN/m x 1.4 = 18.77 kN/m Ultimate live load at 1-3 1.43 kN/m x 1.6 = 2.29 kN/m
1
3 4.785m
Ultimate Load 18.77+2.29 = 21.06kN/m
21.06kN/m
Ultimate Load
101.09kN
Load diagram
Total load 21.06 kN/m x 4.8m =101.09kN Reaction force (symmetrical beam) =101.09/2 = 50.545 kN 50.54kN from secondary beam will react as point load at 3/DF (refer to pg60)
Ra=50.545kN
Rb=50.545kN
50.545kN
Shear Force diagram
(+) (-)
Shear Force Diagram 50.545 â&#x20AC;&#x201C; 101.09 = -50.545 -50.545 + 50.545 = 0 Bending Moment Diagram Positive area 50545 x (4.785/2) x (1/2) =60.46 Negative area 50.545 x (4.785/2) x (1/2) = 60.46
-50.545.kN
60.46kN Bending moment diagram
0kN
59
Beam 3/DF Primary beam
STAIRCASE LIVING AREA
Beam 3/DF carriesDead load from beam self weight: Gridline D-F Dead load from slab: Gridline DF/3-5 Live load from slab: Gridline DF/3-5 Point Load at point E/3 from beam E/1-3 (refer to pg 58) Dead Load -Beam self weight (beam size is 150mmx 350mm) = 0.15m x 0.35m x 24 kN/m3 = 1.26 kN/m
D
2.790m
1.26N/m
Beam Self Weight
5.04kN/m
Total dead load =1.26 + 5.04 = 6.3 kN/m
Total live load 2.1kN/m
F
4.785m
-Dead load on slab DF/3-5 = 3.6 kN/m2 x (2.8/2) = 5.04 kN/m
Live load -Live load on slab DF/3-5 Living area =[1.5 kN/m2 x (2.8/2)] =2.1 kN/m
E
5.04kN/m
1.26kN/m
D
Slab D-F/3-5
Total Dead Load
E 2.140m
F 2.75m
2.1kN/m
Slab D-F/3-5
2.1kN/m Total Live Load 60
Ultimate Load Ultimate dead load at D-F = 6.3 kN/m x 1.4 = 8.82 kN/m
D
E
F
214m
2.75m
12.18kN/m
Ultimate live load at D-F = 2.1kN/m x 1.6 = 3.36 kN/m
Ultimate load
Total ultimate load at D-F 8.82 + 3.36 = 12.18 kN/m Total Load For D-E 12.18 kN/m x 2.1 = 25.58 kN/m For D-F 12.18 x 2.8 = 34.1 kN/m Reaction Force ΣM= 0 =Ra (4.9) – 25.58 (3.85) -50.54 (2.8) – 34.1 (1.4) =4.9 Ra- 98.49 – 141.51 – 47.743 4.9 Ra = 287.73 Ra =58.72 kN ΣFy=0 = 58.72 + Rb - 25.58 – 50.54 – 34.10 Rb= = 51.5kN Shear Force Diagram (58.72 – 25.58)kN= 33.14kN (33.14)kN= -17.4 kN (-17.4 – 34.1)kN= -51.5kN Bending Moment Diagram Positive area 0.5 x (58.72 + 33.14) x (2.1) = 0.5 x 91.86 x 2.1 = 96.45
3
5
6 3.3m
1.8m
Reaction force from E/1-3 (pg 58) 50.54kN 12.18kN
12.18kN
Ra =58.72kN
Load diagram
Rb =51.5kN
58.72kN Shear Force diagram
33.14kN (+) -17.4kN
(-)
0kN
-51.5kN 96.45kN
Negative area 0.5 x (-17.14 – 5105) x (2.8) = 0.5 x (-68.9) x 2.8 = 96.46
Bending 61 moment diagram 0kN
Design Brief Summarize weight of material Height of the floors= 3m Brick wall 150mm thick Dead Load= 3m x 0.15m x 19kN/m3 = 8.55kN/m Beam size (primary ) 150mm x 350m Dead Load= 0.35m x 0.15m x 24kN/m3= 1.26 kN/m Beam size (secondary ) 150mm x 300m Dead Load= 0.3m x 0.15m x 24kN/m3= 1.08 kN/m Slab thickness is 150mm Dead Load= 0.15m x 24kN/m3= 3.6kN/m2 Column size= 300 x 400mm Dead Load=0.3m x 0.4m x 3m x 24 kN/m3= 8.64 kN
Quantity Live Loads Acting on Different Space Bedrooms
= 1.5 kN/m2
Living Rooms
= 1.5 kN/m2
Dining room
= 1.5 kN/m2
Laundry
= 3.0 kN/m2
Piano area
= 2.0 kN/m2
Toilet
= 1.5 kN/m2
Kitchen
= 1.5 kN/m2
Study room
= 1.5 kN/m2
Storage
= 1.5 kN/m2
Balcony
= 1.5 kN/m2
Stairs
= 1.5 kN/m2
62
63
TANG JU YI
NEOH JIA WEN
WONG CAROL
64
TANG JU YI
NEOH JIA WEN
WONG CAROL
65
TANG JU YI
NEOH JIA WEN
WONG CAROL
66
TRIBUTARY AREA FIRST FLOOR PLAN SCALE 1:100
TANG JU YI
NEOH JIA WEN
WONG CAROL
WONG CAROL 0317742
• COLUMN G/4 (Ground Floor- First Floor) • COLUMN F/8 (First Floor- Roof) • COLUMN G/8 (First Floor- Roof)
67
N = 0.4fcuAc + 0.8 fyAsc Ac = 300 x 400 = 120,000 Asc = 2 % x 120,000 = 2,400 N = 0.4fcuAc + 0.8 fyAsc = 0.4(30)(120000) + 0.8(460)(2400) = 1440,000 + 883,200 = 2323200 N = 2323.2kN Thus, this column can sustain any ULTIMATE load below 26323kN
68
Column G/4 (Ground floor- First floor)
Piano Area
Living Area GROUND FLOOR Ground floor Dead Load -Slabs (5.83m2+ 4.5m2+ 6.06m2+ 4.78m2) x 3.6 kN/m2 =76.212 kN
Live Load -Living Area 5.83 x 1.5 kN/m2= 8.75 kN 4.78 x 1.5 kN/m2= 7.17 kN 6.06 x 1.5 kN/m2= 9.09 kN
-Beams [(1.9m+ 2.4m+ 1.36m+ 2.4m) x 1.26 kN/m + (2 x 1.08 kN/m)} = 10.16 +2.16 =12.32kN
-Piano Area 4.5 x 2 kN/m2= 9 kN
-Column = 8.64 kN/m Total Dead Load = 76.212 kN+ 12.32kN+ 8.64 kN/m = 97.17 kN
Total Live Load = 8.75 kN+ 7.17 kN+ 9.09 kN+ 9 kN = 34.01 kN
Total Dead Load x 1.4 factor = 136.04 kN
Total Live Load x 1.6 factor = 54.42 kN
Ultimate Load acting on column G/4= 190.46 kN 69
Column F/8 (First floor- Roof)
ROOF STRUCTURAL PLAN
LIVING AREA
FIRST FLOOR STRUCTURAL PLAN
MASTER BEDROOM
BALCONY
PIANO AREA
GROUND FLOOR STRUCTURAL PLAN
CAR PORCH 70
Roof Dead Load -Slabs (4.28m2+ 7.84m2) x 3.6 kN/m2 =43.63 kN -Beams (2.14m+ 1.93m+ 2m+ 2m) x 1.26kN/m = 10.17 kN Total = 43.63 kN+ 10.17 kN = 53.8 kN First floor Dead Load -Walls (2.14m+ 1.93m+ 2m) x 8.55 kN/m = 51.9 kN -Slabs (4.28m2+ 7.84m2) x 3.6 kN/m2 =43.63 kN
Live Load -Living Area 4.28 x 1.5 kN/m2= 6.42 kN -Bed Room 3.86 x 1.5 kN/m2= 5.8 kN -Balcony 3.86 x 1.5 kN/m2= 5.8 kN
-Beams (2.14m+ 1.93m+ 2m+ 2m) x 1.26kN/m = 10.17 kN -Column = 8.64 kN/m Total = 51.9 kN+ 43.63 kN+ 10.17 kN+ 8.64 kN/m = 105.7 kN
Total Live Load = 6.42 kN+ 5.8 kN+ 5.8 kN = 18.02 kN
71
Ground floor Dead Load
Live Load
-Walls 4.14m x 8.55 kN/m =35.40kN
-kitchen 4.28m2 x 1.5 kN/m2= 6.42 kN
-Slabs 4.28m2 x 3.6 kN/m2 =15.408 kN -Beams 4.14m x 1.26kN/m = 5.216 kN -Column = 8.64 kN Total = 35.40kN+ 15.408 kN+ 5.216 kN+ 8.64 kN = 64.66 kN
Total = 18.02 kN+ 6.42 kN =16.837 kN
Total dead load = 53.8 kN+ 105.7 kN+ 64.66 kN =224.16 kN
Total live load = 16.837 kN+ 6.42 kN =23.26 kN
Total dead load x 1.4 factor =313.82kN
Total live load x 1.6 factor =37.21 kN
Ultimate Load acting on column F/8= 351.312 kN
72
Column G/8 (First floor- Roof)
ROOF STRUCTURAL PLAN
FIRST FLOOR STRUCTURAL PLAN
FIRST FLOOR STRUCTURAL PLAN 73
Roof Dead Load -Slabs (3.86m2+ 3.86m2 + 4m2 + 4m2) x 3.6 kN/m2 =56.6 kN -Beams (1.93m+ 2m+ 2m+ 2m) x 1.26kN/m = 10 kN Total = 56.6 kN+ 10 kN = 66.6 kN First floor Dead Load -Walls (2m+ 1.93m) x 8.55 kN/m = 33.6 kN
Live Load
-Slabs (3.86m2+ 3.86m2 + 4m2 + 4m2) x 3.6 kN/m2 =56.6 kN
-Balcony 3.86 x 1.5 kN/m2= 5.8 kN 4 x 1.5 kN/m2= 6 kN 4 x 1.5 kN/m2= 6 kN
-Bed Room 3.86 x 1.5 kN/m2= 5.8 kN
-Beams (1.93m+ 2m+ 2m+ 2m) x 1.26kN/m = 10 kN -Column = 8.64 kN/m Total = 33.6 kN+ 56.6 kN+ 10 kN+ 8.64 kN/m = 108.84 kN Total dead load = 108.84 kN+ 66.6 kN
Total Live Load = 5.8 kN+ 5.8 kN+ 6 kN+ 6 kN = 23.58 kN
Total dead load x 1.4 factor =245.62 kN
Total Live Load x 1.6 factor = 37.728 kN
Ultimate Load acting on column G/8= 283.35 kN 74
NEOH JIA WEN 0318228
• COLUMN A/3 (Ground Floor- Roof) • COLUMN A/6 (Ground Floor- Roof) • COLUMN D/3 (Ground Floor- Roof)
75
N = 0.4fcuAc + 0.8 fyAsc Ac = 300 x 400 = 120,000 Asc = 2 % x 120,000 = 2,400 N = 0.4fcuAc + 0.8 fyAsc = 0.4(30)(120000) + 0.8(460)(2400) = 1440,000 + 883,200 = 2323200 N = 2323.2kN Thus, this column can sustain any ULTIMATE load below 26323kN
76
Column A/3 (Ground floor- Roof)
ROOF STRUCTURAL PLAN
FIRST FLOOR STRUCTURAL PLAN
GROUND FLOOR STRUCTURAL PLAN
77
Roof Dead Load -Slabs =9.677m2x 3.6 kN/m2 =34.837 kN -Beams (2.39m+ 1.40m+ 2.55m) x 1.26kN/m = 7.992 kN Total = 34.837 kN+ 7.992 kN = 49.172 kN First Floor Dead Load -Walls 6.343mx 8.55 kN/m =54.233 kN -Slabs 9.677m2 x 3.6 kN/m2 =34.837 kN -Beams 6.343m x 1.26kN/m = 7.992 kN -Column = 8.64 kN Total = 54.233 kN+ 34.837 kN+ 7.992 kN+ 8.64 kN = 105.702 kN
Live Load -Study Room 6.113m2 x 1.5 kN/m2= 9.17 kN -Toilet 3.4596m2x 1.5 kN/m2= 51.894 kN -Bedroom 02 6.113m2 x 1.5 kN/m2= 9.1695 kN -Bedroom 3.564m2 x 1.5 kN/m2= 5.3415kN Total = 9.17 kN+ 51.894 kN+ 9.1695 kN+ 5.3415kN =75.575 kN
78
Ground floor Dead Load
Live Load
-Walls 6.343mx 8.55 kN/m =54.233 kN
-Study Room 6.113m2 x 1.5 kN/m2= 9.17 kN
-Slabs 9.677m2 x 3.6 kN/m2 =34.837 kN -Beams 6.343m x 1.26kN/m = 7.992 kN
-Toilet 3.4596m2x 1.5 kN/m2= 51.894 kN -Bedroom 02 6.113m2 x 1.5 kN/m2= 9.1695 kN -Bedroom 3.564m2 x 1.5 kN/m2= 5.3415kN
-Column = 8.64 kN Total = 54.233 kN+ 34.837 kN+ 7.992 kN+ 8.64 kN = 105.702 kN
Total = 9.17 kN+ 51.894 kN+ 9.1695 kN+ 5.3415kN =75.575 kN
Total dead load = 49.172 kN+ 105.702 kN+ 105.702 kN =260.576 kN
Total live load = 75.575 kN+75.575 kN =151.15 kN
Total dead load x 1.4 factor =364.806 kN
Total live load x 1.6 factor =241.84 kN
Ultimate Load acting on column A/3= 606.646 kN 79
Column A/6 (Ground floor- Roof)
ROOF STRUCTURAL PLAN
FIRST FLOOR STRUCTURAL PLAN
GROUND FLOOR STRUCTURAL PLAN
STORAGE
80
Roof Dead Load -Slabs =7.044m2x 3.6 kN/m2 =25.3584 kN -Beams (1.905m+ 1.728m+ 2.195m) x 1.26kN/m = 7.35 kN Total = 25.3584 kN+ 7.35 kN = 32.708kN First Floor Dead Load
Live Load
-Walls (1.905m+ 1.728m) x 8.55 kN/m =31.101 kN
-Bedroom 01 4.181m2 x 1.5 kN/m2= 6.271 kN
-Slabs 7.044m2 x 3.6 kN/m2 =25.358 kN
-Bedroom 03 7.044m2 x 1.5 kN/m2= 10.566 kN
-Beams 5.833m x 1.26kN/m = 7.35 kN -Column = 8.64 kN Total = 31.101 kN+ 25.358 kN+ 7.35 kN+ 8.64 kN = 72.449 kN
Total = 6.271 kN+ 10.566 kN =16.837 kN
81
Ground floor Dead Load
Live Load
-Walls 5.833m x 8.55 kN/m =49.872 kN
-Bedroom 01 4.181m2 x 1.5 kN/m2= 6.271 kN
-Slabs 4.181m2 x 3.6 kN/m2 =15.052 kN
-Bedroom 03 7.044m2 x 1.5 kN/m2= 10.566 kN
-Beams (2m + 1.638m) x 1.26kN/m = 4.583 kN -Column = 8.64 kN Total = 49.872 kN+ 15.052 kN+ 4.583 kN+ 8.64 kN = 78.147 kN
Total = 6.271 kN+ 10.566 kN =16.837 kN
Total dead load = 32.708 kN+ 72.449 kN+ 78.147 kN =183.304 kN
Total live load = 16.837 kN+ 16.837 kN =33.674 kN
Total dead load x 1.4 factor =256.626 kN
Total live load x 1.6 factor =53.88 kN
Ultimate Load acting on column A/6= 310.504kN 82
Column D/3 (Ground floor- Roof)
ROOF STRUCTURAL PLAN
FIRST FLOOR STRUCTURAL PLAN
GROUND FLOOR STRUCTURAL PLAN 83
Roof Dead Load -Slabs =22.937m2x 3.6 kN/m2 =82.573 kN -Beams (2.3925m+ 1.395m+ 2.445m+ 2.555) x 1.26kN/m = 11.072 kN Total = 82.573 kN+ 11.072 kN = 93.645kN First Floor Dead Load -Walls (2.4m+ 1.4m+2.55) x 8.55 kN/m =54.228kN -Slabs 22.937m2 x 3.6 kN/m2 =82.573 kN -Beams 8.788m x 1.26kN/m = 11.037 kN -Column = 8.64 kN Total = 54.228 kN+ 82.573 kN+ 11.037 kN+ 8.64 kN = 156.503 kN
Live Load -Bedroom 6.113m2 x 1.5 kN/m2= 9.17 kN -Stairs 5.85m2 x 1.5 kN/m2= 8.775 kN -Bathroom 3.56m2 x 1.5 kN/m2= 5.34 kN -Living Area 7.414m2 x 1.5 kN/m2= 11.121 kN Total = 9.17 kN+ 8.775 kN+ 5.34 kN+ 11.121 kN =34.406 kN
84
Ground floor Dead Load
Live Load
-Walls (2.4m+ 1.4m+2.55) x 8.55 kN/m =54.228kN
-Study room 6.113m2 x 1.5 kN/m2= 9.17 kN
-Slabs 22.937m2 x 3.6 kN/m2 =82.573 kN -Beams 8.788m x 1.26kN/m = 11.037 kN
-Stairs 5.85m2 x 1.5 kN/m2= 8.775 kN -Toilet 3.56m2 x 1.5 kN/m2= 5.34 kN -Living Area 7.414m2 x 1.5 kN/m2= 11.121 kN
-Column = 8.64 kN Total = 54.228 kN+ 82.573 kN+ 11.037 kN+ 8.64 kN = 156.503 kN
Total = 9.17 kN+ 8.775 kN+ 5.34 kN+ 11.121 kN =34.406 kN
Total dead load = 93.645kN+ 156.503 kN+ 156.503 kN =406.651 kN
Total live load = 34.406 kN+ 34.406 kN =68.812 kN
Total dead load x 1.4 factor =569.31 kN
Total live load x 1.6 factor =109.78 kN
Ultimate Load acting on column D/3= 679.091kN 85
TANG JUYI 0317735
• COLUMN F/4 (Ground Floor- First Floor) • COLUMN F/6 (Ground Floor- Roof) • COLUMN D/1 (Ground Floor- Roof)
86
N = 0.4fcuAc + 0.8 fyAsc Ac = 300 x 400 = 120,000 Asc = 2 % x 120,000 = 2,400 N = 0.4fcuAc + 0.8 fyAsc = 0.4(30)(120000) + 0.8(460)(2400) = 1440,000 + 883,200 = 2323200 N = 2323.2kN Thus, this column can sustain any ULTIMATE load below 26323kN
87
Column F/4 (Ground floor- First floor)
GROUND FLOOR STRUCTURAL PLAN Ground floor Dead Load -Slabs (7.42m2+ 5.92m2+ 4.53m2) x 3.6 kN/m2 =64.33 kN -Beams [(1.93m + 3.07m+ 2.35m)] x 1.26 kN/m = 7.35 x 1.26 kN/m = 9.26 kN
Live Load -Living Area 5.92 x 1.5 kN/m2= 8.88 kN -Piano Area 4.53 x 2 kN/m2= 9.06 kN -Dining Area 7.42 x 1.5 kN/m2= 11.13 kN
-Column = 8.64 kN/m -Walls = 2.35m x 8.55 kN/m =20.09 kN Total Dead Load = 64.33 kN+ 9.26kN+ 8.64 kN/m+ 20.09 kN = 102.32 kN Total Dead Load x 1.4 factor = 143.248 kN
Total Live Load = 8.88 kN+ 9.06 kN+ 11.13 kN = 29.07 kN Total Live Load x 1.6 factor = 46.51 kN
Ultimate Load acting on column F/4= 189.76 kN 88
Column F/6 (First floor- Roof)
ROOF STRUCTURAL PLAN
FIRST FLOOR STRUCTURAL PLAN
Dining area
GROUND FLOOR STRUCTURAL PLAN
Kitchen
Living area Car porch
89
Roof Dead Load -Slabs (4m2+ 2.14m2 + 4.54m2 + 3.86m2) x 3.6 kN/m2 = 52.34 kN -Beams (2.352m+ 2.445m+ 2m+ 1.925m) x 1.26kN/m = 10.99 kN Total = 52.34 kN+ 10.99 kN = 63.33 kN First floor Dead Load -Walls (2.352m+ 2m) x 8.55 kN/m = 37.21 kN -Slabs (4m2+ 2.14m2 + 4.54m2 + 3.86m2) x 3.6 kN/m2 = 52.34kN
Live Load -Living Area (4.0 + 2.14) x 1.5 kN/m2= 9.21 kN -Bed Room (4.54 + 3.86) x 1.5 kN/m2= 12.6 kN
-Beams (4.352m+ 2.445m+ 1.925m) x 1.26kN/m = 10.99 kN -Column = 8.64 kN/m Total = 37.21 kN+ 52.34 kN+ 10.99 kN+ 8.64 kN/m = 109.18 kN
Total = 9.21kN+ 12.6 kN = 21.81 kN
90
Ground floor Dead Load -Walls (2.35m+ 2m + 1.925) x 8.55 kN/m = 53.65 kN -Slabs (4m2+ 2.14m2 + 4.54m2 + 3.86m2) x 3.6 kN/m2 = 52.34kN -Beams (6.275m+ 2.445m) x 1.26kN/m = 10.99 kN
Live Load -Dining Area 4.0 x 1.5 kN/m2= 6.0 kN -Kitchen 2.14 x 1.5 kN/m2= 3.21 kN -Piano Area 4.54 x 1.5 kN/m2= 6.81 kN -Car Park 3.86 x 1.5kN/m2 = 57.9kN
-Column = 8.64 kN/m Total = 53.65 kN+ 52.34 kN+ 10.99 kN+ 8.64 kN/m = 125.62 kN Total dead load = 63.3 kN+ 109.18 kN + 125.62kN = 298.1kN Total dead load x 1.4 factor = 417.34 kN
Total = 6.0 kN+ 3.21 kN+ 6.81 kN+ 57.9 kN/m = 73.92 kN
Total live load = 21.81 kN+ 73.92 kN = 95.73kN Total live load x 1.6 factor =153.17kN
Ultimate Load acting on column F/6= 570.51 kN 91
Column D/1 (Ground floor- Roof)
ROOF STRUCTURAL PLAN
FIRST FLOOR STRUCTURAL PLAN
GROUND FLOOR STRUCTURAL PLAN 92
Roof Dead Load -Slabs (6.11m2+ 5.85m2) x 3.6 kN/m2 = 43.06 kN -Beams (7.393m+ 1.261m) x 1.26kN/m = 9.32 kN Total = 43.06 kN+ 9.32 kN = 52.38 kN
First floor Dead Load -Walls (2.445m+ 2.555m + 2.392m) x 8.55 kN/m = 63.21kN
Live Load -Bed Room 6.11 x 1.5 kN/m2= 5.8 kN
-Slabs (6.11m2) x 3.6 kN/m2 =22 kN -Beams (2.75 + 2.555m+ 2.392m) x 1.26kN/m = 9.7 kN -Column = 8.64 kN/m Total = 63.21 kN+22kN + 9.7 kN+ 8.64 kN/m = 103.55 kN
Total = 5.8 kN
93
Ground Floor Live Load
Dead Load -Walls (2.445m+ 2.555m + 2.392m) x 8.55 kN/m = 63.21 kN
-Study Room 6.11 x 1.5 kN/m2= 9.165kN -Stairs 5.85 x 1.5kN/m2 = 8.775kN
-Slabs (6.11m2+ 5.85m2) x 3.6 kN/m2 = 43.06kN -Beams (2.445m+ 2.555m+ 2.392m) x 1.26kN/m = 9.32 kN Column = 8.64 kN/m Total = 65.81 kN+ 43.06 kN + 9.32 + 8.64 = 124.77 kN
Total dead load = 52.3 kN+ 103.55 kN+ 124.77 kN = 280.62 Total dead load x 1.4 factor =392.868 kN
Total live load = 5.8 kN+ 9.165 kN+ 8.775 kN = 23.74kN/m Total Live Load x 1.6 factor = 14.737
Ultimate load acting on column D/1= 407.61 kN 94