Southwestern College Landscape Master Plan & Design Guidelines

Page 125

LANDSCAPE MASTER PLAN AND DESIGN VIGNETTES

3

FUTURE PROJECTS RING ROAD AND PARKING LOT IMPROVEMENTS The Ring Road development can be broken into two phases. The first phase includes the area on the north and west side of campus. This section of the road should incorporate unified planting, Ulmus parvifolia street trees, and shared bike lanes with appropriate markings until it links up to the new Ring Walk, refer to Appendix D, at the core of campus. Phase two along the south and east sides includes the relocation of the road from the center of campus to the perimeter of campus. All pedestrian and bike traffic is removed from this section of the road and pedestrians and bikes are encouraged to utilize the Ring Walk to create a safe separation of vehicles and people. The Ulmus parvifolia street tree should continue as the street tree in this phase as well to help define the Ring Road. Refer to Appendix D for more information on the Ring Walk. In addition to establishing the Ring Road, all parking lots on campus should be enhanced to ensure proper vehicle shading either with canopy trees or solar arrays to reduce the heat island effect. Center islands and end aisles with planting will help mitigate the visual experience of large expanses of asphalt parking areas. Parking lots shall have a consistent planting theme and trees shall be spaced so there is one tree within 30’ of each parking space. All parking lots on campus should include end islands and opportunities at every fifth parking spot to include trees to reduce heat island effect. Planting should be integrated to help define the parking lots.

All parking lots should incorporate shade trees or PV panels to help reduce solar heat gain.

113


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

ENTRY GATEWAY, BUS STOP, & LANDSCAPE ENHANCEMENTS

1min
page 162

PARKING STRUCTURE/ INSTRUCTIONAL BUILDING PLAZA

1min
pages 164-165

GATEWAY ENHANCEMENTS

0
page 155

ENTRY LANDSCAPES

1min
page 157

AUTO TECHNOLOGY

0
page 150

QUAD ENHANCEMENTS

1min
pages 152-154

GATEWAY ENHANCEMENTS

0
page 143

RENOVATED PERIMETER LANDSCAPE

0
page 142

WHEEL DISMOUNT ZONES

1min
page 138

ADDITIONAL FUTURE PROJECTS

1min
page 135

STUDENT UNION

0
page 121

TRANSIT STATION

0
page 124

RING ROAD AND PARKING LOT IMPROVEMENTS

1min
pages 125-127

INSTRUCTIONAL BUILDING 1

1min
pages 122-123

LANDSCAPE + NURSERY TECHNOLOGY (LNT

1min
page 118

IT BUILDING AND QUAD

0
page 120

TENNIS FACILITY

0
page 119

WHEEL DISMOUNT ZONE

1min
page 113

FIGURE 1-9: SPEND THE MOST TIME ON CAMPUS - NATIONAL CITY CAMPUS

0
pages 38-39

FIGURE 1-20: OPPORTUNITIES TO IMPROVE RELAXATION AND REFLECTION - SAN YSIDRO CAMPUS

0
pages 60-61

FIGURE 1-23: SPEND THE MOST TIME ON CAMPUS - SAN YSIDRO CAMPUS

2min
pages 66-71

FIGURE 1-11: OPPORTUNITIES TO IMPROVE INNOVATION AND COLLABORATION - NATIONAL CITY CAMPUS

0
pages 42-43

FIGURE 2-3: EXISTING VEHICULAR CIRCULATION AND PARKING- SAN YSIDRO CAMPUS

0
page 74

FIGURE 1-18: OPPORTUNITIES TO IMPROVE RELAXATION AND REFLECTION - OTAY MESA CAMPUS

0
pages 56-57

FIGURE 1-21: OPPORTUNITIES TO IMPROVE SUSTAINABILITY - SAN YSIDRO CAMPUS

0
pages 62-63

FIGURE 1-12: OPPORTUNITIES TO IMPROVE RELAXATION AND REFLECTION - NATIONAL CITY CAMPUS

0
pages 44-45
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.