LANDSCAPE MASTER PLAN AND DESIGN VIGNETTES
3
ADDITIONAL FUTURE PROJECTS There are several additional projects planned for campus which include both the modernization or improvement to existing facilities including, One-Stop Modernization, New Student Services, Track + Field Improvements, Campus Entry Landscape Improvements, and Tradewinds Cafe Landscape Improvements. While some of the projects are interior tenant improvements to the buildings and facilities, outdoor improvements should be consolidated into the projects as well. Consideration for the outdoor areas surrounding the buildings and facilities will ensure that they are integrated into the adjacent areas of campus including all newly constructed projects. Considerations for accessible pedestrian circulation, vehicular circulation, and emergency access should be reviewed to maintain connectivity. Outdoor amenities such as tables and chairs, benches or seating, landscape and irrigation, shade trees or structures will help to activate the spaces around these buildings. All planting should consider the long-team maintenance goals as well as a reduction in potable water use. The approved planting palette can be found in Appendix B. Modern and sustainable site furnishings should be integrated and match the other areas of campus. Materials and furnishings, when and where appropriate, should be re-purposed. For more information on site finishings, materials and sustainability refer to Appendix A and C.
While the existing Caesar Chavez building will remain, site conditions should be modified to unite and connect this buildings with the new IT Building and Quad, the new Instructional Complexes, and the new Student Union.
123