O9;!9(;>

640 STUDENTS (CURRENT) 10.35 ACRES 77,576 SQUARE FEET 81 PARKING SPACES

East Avenue Middle School is the oldest of the three middle schools in the District, primarily built in the mid 1950’s. The current enrollment is between 625 and 640 students, and approximately ten students per year transfer to Mendenhall Middle School from the East Avenue a@endance area. There are 13 buildings on the 10.35 acre site, with three of those being portable classrooms, and the rest permanent construc•on. Many of the buildings were renovated in 1976 and then again in minor fashion in the late 1990’s.

EAST AVE. PARKING

P!"#!$% C$&$'()*

The campus is bordered by East Avenue to the north, residences to the east, a baseball field and park to the south, and a cemetery to the west. The parking lot and two lane student drop off area are along East Avenue. The front entry to the school is dated. A new entry scheme would address safety and security issues as well. Currently, the public can walk into the school without checking in at the administra•on office and many of the classrooms open directly to the street.

J

G

H

The following represents the assumed program to achieve the desired capacity for East Avenue Middle School. The program spaces were iden•fied for all Middle Schools in the District. "% &

#

" ' ( '

PARKING " ) " )

A

D

E

* ( * &

East Avenue was specifically iden•fied as a priority project for the District to bring it in parity with other middle school campuses. B

$

C

K

F L CEMETERY

! "# $

$

M

N

P!("!()(;/ In order to address aging infrastructure, code and ADA compliance issues with the buildings and restrooms throughout campus as well as the lack of integrated technology for 21st Century Learning, a thorough renova•on is warranted. The Bond Implementa•on Plan recommends: • High level renova•on of all permanent buildings. • A new permanent classroom wing to replace portables. • A new (or relocated) exercise building.

65


E#$%&$'( I')*'&+-/ The inventory summarizes the building square footage and classroom count per building. Addi!onally, the diagram provides, for a fixed point in !me, the actual assigned use for the spaces on campus and were derived from an assessment of the master schedule. The matrix below summarizes building area as well as the assumed number of available classrooms. #

(

$

!

"

###

$

$

"

'

"

#$

"

() +

*

'

,

$

$

!

$

!

$

$

!"

"

& !

$

& $

#' .1)

"

"

$

$ ### " #!# " '$# !

$

$

$

! !

$

" " "#

& $ $

$

$

#

Administration Art Cafeteria Classroom Gymnasium Kitchen Library Media Multi-Purpose

66

$

& !

&

)2 &3 4 5

!#

$

'$#

- (. / 0

!!

!

$

$

$

&

"

&

!

%

&

!

Music Restroom

&

$ Stage Science Classroom ! Support $ Technical Theater

$

$ !

"

%

Not in Scope

ĚŵŝŶŝƐƚƌĂƟŽŶ

Gymnasium

DƵůƟͲWƵƌƉŽƐĞ

^ĐŝĞŶĐĞ ůĂƐƐƌŽŽŵ

Art

Kitchen

Music

^ƵƉƉŽƌƚ

Cafeteria

Library

ZĞƐƚƌŽŽŵ

Technical

ůĂƐƐƌŽŽŵ

Media

Stage

Theater

EŽƚ ŝŶ ^ĐŽƉĞ


B!"#$"%& T'() The majority of the buildings on campus are permanent buildings. The three portable buildings on the edge of campus house special educa*on programs and an exercise space. Where applicable, leased portable buildings have been iden*fied.

WĞƌŵĂŶĞŶƚ ŽŶƐƚƌƵĐƟŽŶ

ZĂŵƉĞĚ WŽƌƚĂďůĞƐ ; ŶŚĂŶĐĞĚͿ

DŽĚƵůĂƌ ŽŶƐƚƌƵĐƟŽŶ ; ƚ 'ƌĂĚĞͿ

ZĂŵƉĞĚ WŽƌƚĂďůĞƐ ;dLJƉŝĐĂůͿ

East Avenue Middle School 67


C#$%&'&#$ A(()((*)$' This overview shows the general condi!on of the exis!ng facili!es, and was completed based on informa!on gathered from mee!ngs with the district facili!es, maintenance and opera!ons staff, a review of exis!ng drawings, and a walk through with district personnel and the architectural and engineering teams. The results are summarized here and color coded by likely need for, and level of, renova!on. The matrix outlines the original construc!on date as well as subsequent renova!on, however minimal. Photos presented here speak to the range of issues that exist on campus.

%&' ++ , + -./1& 2 3 (, &0+& 6 /7

68

()

! !

$*

, , , , ,

,

$ * ! ### $ $ $* $#" * "#

) ! ! ! ! ! !$

# " ### 4 #!# "# 4

! $! 5 $

2

"##$ "##$ !)"### !)"###

0

$ !)

0

!

džĐĞůůĞŶƚ ŽŶĚŝƟŽŶ

&Ăŝƌ ŽŶĚŝƟŽŶ

'ŽŽĚ ŽŶĚŝƟŽŶ

WŽŽƌ ŽŶĚŝƟŽŶ

Not in Scope


C%&'()(%& A**+**,+&)

The outdated front entrance to East Avenue Middle School. The entry is not secure so visitors can walk into campus without checking in with the administra!on office. You’ll also no!ce the classroom doors that open directly onto the busy drop off area.

The drab inters!!al space between the classroom wings needs to be livened up.

The portable classroom buildings at the back of campus that are beyond the secured fence line.

Many updates are necessary for the campus to become ADA compliant.

The typical classroom at East Avenue Middle School. Spaces like these need integrated technology and flexible furnishings to foster 21st century learners.

The mul!-purpose space in Building K. Renova!ons are necessary here to bring the space up to current code for ADA compliance.

East Avenue Middle School 69


C#$%&'()*+ P-*/3$4 P+*$ NEW EXERCISE ROOM

ONLY RENOVATE PERMANENT BUILDINGS: Building K & J: Mid range renova"on All others: High range renova"on NEW CLASSROOM

G C

A

H J

D E

B K F

L

M N

1 EXISTING

2a NEW CLASSROOM BLDG AND EXERCISE ROOM

The following represents one scenario for phasing and implementa"on of the improvements an"cipated at East Avenue Middle School. It is expected that a par"cipatory design process may yield a revised approach within the parameters established here. In addi"on to the projects shown here, the following basic infrastructure needs must be met: • • • • • 70

Site electrical upgrade Fire alarm replacement A/C for MPR/Gym Roofing replacement Underground u"lity repair/replace

• • • • •

Major ADA compliance 10GB Data infrastructure Paving Exterior paint Security cameras

The first phase of the implementa"on plan includes two new buildings, an exercise room near the old gym and a new wing of classrooms.

2b RENOVATE ONLY OPTION This op"on, in lieu of all previous phasing plans, keeps the portable buildings and renovates all current campus buildings. No new buildings would be added with this op"on.


C#$%'()*+P/+02$5 P-+$ RENOVATE ALL PERMANENT BUILDINGS: Building K & J: Mid range renova"on All others: High range renova"on NEW HARDCOURTS

3 RENOVATE ALL BUILDINGS AND ADD NEW HARDCOURTS We propose to extensively renovate all permanent campus buildings in order to achieve ADA compliance, code, safety, and security needs. All campus restrooms need to be renovated to meet ADA compliance as well. A new hardcourt will be added to offset the loss of the exis"ng basketball courts from the addi"on of the new classroom building.

REMOVE PORTABLES

4 REMOVE PORTABLES The new classroom building provides enough new spaces that the portables at the rear of the campus can now be removed.

ZĞŶŽǀĂƟŽŶ Ͳ >Žǁ

EĞǁ ŽŶƐƚƌƵĐƟŽŶ

ZĞŶŽǀĂƟŽŶ Ͳ DĞĚŝƵŵ

EĞǁ ,ĂƌĚĐŽƵƌƚƐ

ZĞŶŽǀĂƟŽŶ Ͳ ,ŝŐŚ

EŽƚ ŝŶ ^ĐŽƉĞ East Avenue Middle School 71


S"##$%& This page summarizes the implementa!on plan, highligh!ng new construc!on, renova!on as well as site and infrastructure projects. As previously established, 33 loaded and non loaded classroom/lab spaces are required to meet the desired long term capacity of 765 students. The assumed classroom count, per building, is shown on the diagram adjacent to each building. These numbers should guide the future development and/or renova!on of campus buildings throughout the implementa!on phase.

1

The following represents the project list as proposed and priori!zed for East Avenue Middle School.

3 ( 3

!

"# $ % &' ( !

$

- $- - - &- 3- - - :

8

4

5

5 ) *

;

) * (+

%

4

4

3

%

52 !

4

&

!

+

4

) * &' ) *

(

$

5$

)

# $

72 East Avenue Middle School

džŝƐƟŶŐ ƚŽ ZĞŵĂŝŶ

ZĞŶŽǀĂƟŽŶ Ͳ DĞĚŝƵŵ

EĞǁ ŽŶƐƚƌƵĐƟŽŶ

ZĞŶŽǀĂƟŽŶ Ͳ >Žǁ

ZĞŶŽǀĂƟŽŶ Ͳ ,ŝŐŚ

EĞǁ ,ĂƌĚĐŽƵƌƚƐ

dĂƌŐĞƚ ůĂƐƐƌŽŽŵ ŽƵŶƚ

EŽƚ ŝŶ ^ĐŽƉĞ


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.