TUOLUMNE ELEMENTARY SCHOOL
FAST FACTS: •
620 Total Students = 520 Current Students + 22 Transitional Kindergarten Students + 60 to 70 CDP Students
•
Site = 10.0 Acres
•
Buildings = 44,123 Square Feet
•
54 Parking Spaces
•
47% of Classrooms are in Portable Classroom Buildings
“IF I COULD ONLY DO ONE THING”: •
More Shade Areas/Trees
•
Kindergarten Close to Main Office
Original front entry of Tuolumne Elementary School leading into the administration offices.
TUOLUMNE ELEMENTARY SCHOOL
81
TUOLUMNE ELEMENTARY SCHOOL
EXISTING SITE INVENTORY
OVERVIEW
The assessment process begins with an understanding of the existing campus, including uses of existing spaces. The site plan to the right defines those uses at a fixed point in time and assigns the use of those spaces as classroom, specialty rooms, and core support facilities. The matrix below summarizes building areas, as well as the assumed number of available classrooms. GROSS AREAS SCHOOL BUILDINGS
AREA
A Administration & Classroom Building
LOADED CR
!
NON-LOADED
1,790 SF
B Classroom Building
5,798 SF
5
C Classroom Building
5,303 SF
3
1
D Classroom Building
3,776 SF
3
1
E Classroom Building
3,776 SF
4
F Library Building
1,500 SF
P1 Portable Classrooms & Offices
2,880 SF
2
P2 Portable Classroom & Restrooms & Resource Room
2,400 SF
1
1
P3 Portable Classrooms
1,920 SF
1
1
P4 Portable Classrooms
2,040 SF
1
1
1
P5 Portable Multi-Purpose Building
2,880 SF
P6 Portable Classrooms
1,920 SF
2
P7 Portable Classrooms
2,880 SF
2
P8 Portable Head Start Classroom
1,420 SF
1
P9 Portable Head Start/Pre-School Classroom
1,920 SF
1
P10 Portable Classrooms Total
1,920 SF 44,123 SF
2 24
10
LEGEND Administration/Support Services/Restrooms ASES Multi-Purpose Space Classroom Kindergarten/TK/Pre-School/Head Start/ECE Library/Computer Lab Music Special Education Classroom
82
TUOLUMNE ELEMENTARY SCHOOL
HERNDON ROAD
Tuolumne Elementary School was originally built in 1949 and included the administration building and one five-classroom wing. Three years later three additional classrooms and a kindergarten building were added. Two four-classroom buildings were added at a later date, and there is a total of seventeen portable buildings scattered across campus. The site is bordered to the north by the quieter, residential Sonora Avenue, and to the east by the busier Herndon Road. Two alleys run on the south and west of the site, one of which supplies the only entrance to the staff parking lot. Although the staff parking lot is separate from student and visitor access, it relies on alley access, which the District cannot control. Student drop off occurs on Herndon Road and the front parking lot backs directly out into the same road, which is notorious for traffic incidents. Staff offices are spread throughout campus since the administration building was built in 1949 for that era’s staff population. Offices have been created by infilling hallways and specialty staff services, such as mental health and the clinician share a portable building with the custodial staff. The kindergartners and transitional kindergartners are also spread out in aging portables, and will require more permanent space as the District moves towards full day kindergarten. Although the multi-purpose space is not original to the school - it is a portable building - it is undersized for the current student enrollment. Separate lunch periods and assemblies are served for each grade level because of space constraints, and ideally the campus would have a stage and outdoor covered eating areas. The two northern classroom wings need many repairs, including new roofing, flooring, and plumbing.
EXISTING SITE INVENTORY SONORA AVENUE
Drop-Off Loop 18,270 sf 3,775 sf
P1
P2
D 3,748 sf
P3
E
PLAYGROUND !
PARKING
A FIELDS
C
P4 P6
F P9
P5
P10
HERNDON ROAD HERNDON ROAD
B
Relocated Portables Classroom P7 PARKING 11,682 sf
Bldg
P8 83
EXISTING SITE INVENTORY SONORA AVENUE
Drop-Off Loop 3,775 sf
P1
P2
30,725 sf
D 3,748 sf
P3
E
PLAYGROUND !
8,732 sf MP
PARKING
A
FIELDS
C
P4 P6
F P9
P5
P10
HERNDON ROAD HERNDON ROAD
B
Relocated Portables PARKING
P7
P8 83
CONDITION ASSESSMENT
84
The undersized multi-purpose space at Tuolumne holds four lunch periods per day and needs an outdoor shaded eating area.
Longitudinal and cross slopes across the site exceed accessibility requirements and often times lead to ponding and drainage problems, as seen here near the multi-purpose building.
The covered walkways unite the original classroom wings and the library.
The front parking lot is a safety concern as it backs directly into traffic, and the asphalt is uneven and in poor condition.
One of two portable Head Start classrooms buildings with the playground beyond.
The portable classrooms that house music and ASES back directly to the alley and staff parking lot
TUOLUMNE ELEMENTARY SCHOOL
TUOLUMNE ELEMENTARY SCHOOL CONSULTANT FINDINGS: SONORA AVENUE
D
- Accessibility: Longitudinal and cross slopes exceed accessible percentages across campus; uneven asphalt is in poor condition at the parking lot
P5
E
- Facility Upgrades/Expansions: Asphalt is cracking and in poor condition around campus; ponding issues need to be addressed near multi-purpose building
B A
PARKING
C
FIELDS
Civil
- Utility Improvements: Additional storm drain inlets are necessary; the domestic water and sewer systems appear to be acceptable
P1
PLAYGROUND
•
P2
•
Electrical
•
Mechanical & Plumbing - Site domestic water pressure is in good condition - Administration roof units and ductwork should be replaced with a flexible variable flow system - Rooftop AC units should be replaced
P6 P8
F P11
P7 P12 PARKING
P9
HERNDON ROAD
Note: Please see the appendix for full consultant reports
P10
Aging portable classrooms at Tuolumne are in need of replacement.
LEGEND Permanent Construction Portable Building
EXISTING SITE PLAN TUOLUMNE ELEMENTARY SCHOOL
85
PHASING
Improved Field, Track & Baseball Diamond P1
New Student Drop Off Loop New Multi-Purpose Building
P3 New Administration Building
P2
D E P10
B
P5
A
P6
C
P7
P9
P8
F
EXISTING CAMPUS The following images represent one scenario for phasing and implementation of the improvements anticipated at Tuolumne Elementary School. It is expected that a participatory design process may yield a revised approach within the parameters established here. The buildings highlighted in red will be demolished or relocated in Phase 1.
86
Updated Hardcourts & Playgrounds Highlighted Portables to be Relocated During Phase 2
PHASE 1 MULTI-PURPOSE & ADMINISTRATION BUILDINGS Phase 1 begins with the demolition or relocation offsite of two of the three portable classrooms highlighted on the existing campus image. Classes held in these can infill open classroom space in the existing buildings, while the staff offices and custodial portable will be relocated next to the music classroom. A new student drop off loop will begin the transformational change of the front of the school to the north. New multi-purpose and administration buildings greet students upon arrival, and the stage/music classrooms opens to a new quad with covered eating area and outdoor amphitheater.
TUOLUMNE ELEMENTARY SCHOOL
PHASING Highlighted Portables & Buildings in Red to be Removed or Relocated
Relocated Portable Classrooms
Highlighted Portables in Red to be Removed or Relocated New Classroom Buildings Highlighted Portables & Buildings in Red to be Removed or Relocated
PHASE 2
PHASE 3
PORTABLE RELOCATION
CLASSROOM BUILDINGS & PORTABLE REMOVAL
The existing multi-purpose portable can now be removed or relocated offsite since the new multi-purpose building is in place. The remaining five portables highlighted in red in Phase 1 are relocated to align with the music classroom and act as interim housing.
Phase 3 focuses on two new double loaded classroom buildings. With the increased classroom capacity afforded by the new buildings, the remaining portables and two classroom wings can be demolished or relocated offsite. This will allow a clearing in the southeast corner of the site for the final phase of construction.
TUOLUMNE ELEMENTARY SCHOOL
87
PHASING
Modernize Existing Buildings New Staff Parking Lot
PHASE 4
Improved Head Start Parking Lot
KINDERGARTEN COMPLEX & MODERNIZATION The final phase includes a new kindergarten and Head Start complex including separated playgrounds for each. The existing front parking lot will be updated to only include parking for Head Start and kindergarten parents, while a new secured staff parking lot will take over the northeast corner of the site. To complete the master plan the original classroom wings will be modernized to bring them up to 21st century standards.
Kindergarten/Head Start Complex LEGEND New Building Modernized Building Relocated Building Building to be Relocated or Demolished
TUOLUMNE ELEMENTARY SCHOOL
89
PROPOSED SITE PLAN OVERVIEW The proposed master plan for Tuolumne Elementary School transforms the front face of the school to the north along Sonora Avenue. Students can now be safely dropped off to school in the two-lane drop off loop located directly to the north of the new administration building. The administration and reconfigured secure fenceline allows students to freely enter campus before school begins, while all students and visitors arriving after school starts must be first filtered through the administration office. Once onto campus, students can enter the multi-purpose building, which bookends the existing quad and acts as a backdrop for the new outdoor covered eating area and amphitheater. The larger quad and eating area spills out onto the improved hardcourts. Two new classroom buildings, aligning with the western edge of the existing wings, allow for the removal of the portable classrooms and the aging wings. In their place on the northeast corner of the site is the new secured staff parking lot. The new kindergarten building forms a safe and cohesive area for transitional kindergartners, kindergartners, and Head Start students. The original front parking lot is updated to accommodate Head Start parents, with direct access into their classrooms. Shade structures and covered eating areas are shown as dashed in the quad and over playgrounds. Areas for future growth are shown dashed in blue.
LEGEND Administration/Support Services/Restrooms ASES Classroom Kindergarten/TK/Pre-School/Head Start/ECE Library/Computer Lab Multi-Purpose Special Education Classroom Modernized Existing Building Secured Fenceline Future Growth Overhead Shade Structure
90
TUOLUMNE ELEMENTARY SCHOOL
SONORA AVENUE
HERNDON ROAD
!
TUOLUMNE ELEMENTARY SCHOOL
91
BUILDING PROTOTYPES SECURED CAMPUS
PUBLIC SPACE
ADMINISTRATION BUILDINGS
SAMPLE ADMINISTRATION PROGRAM SPACE
Conference Room
200 SF
Custodial
70 SF
Electrical Room
70 SF
Fire Riser Room
50 SF
Front Office
700 SF
IDF Room
75 SF
Nurse’s Station
120 SF
Office
100 SF
Office
120 SF
Principal’s Office
200 SF
Staff Lounge
220 SF
Staff Work Room
200 SF
Toilet
65 SF
Toilet
65 SF
Vice Principal’s Office
130 SF
Total
PRINCIPAL
AREA
OFFICE
OFFICE
VICE PRINCIPAL
NURSE
STAFF WORK ROOM
FRONT OFFICE TLT
2,385 SF
STAFF LOUNGE TLT
CUST.
ELECT.
IDF
FIRE
CONF.
SECURED CAMPUS
94