Rental brochure Logistics IV - UK

Page 1

LOGISTIC S IV

16.831 SQM DISTRIBUTIO N CENTRE FOR RENT


Green Square Logistics IV - a state-of-the-art logistics commercial building - is currently being developed at this very central location in Aalsmeer.

Logistics IV

At barely 10 minutes driving distance from Amsterdam Airport Schiphol, just 5 minutes from the Royal FloraHolland flower auction and less than 20 minutes from Central Amsterdam, you will find the Green Park Aalsmeer development location, an area formerly used for greenhouses, that is currently being transformed into a high-quality business campus. Green Square Business Campus is at the heart of Green Park Aalsmeer, and is being developed as an internationally attractive, highquality mixed-use work location in the heart of Aalsmeer’s business district, in the centre of the Amsterdam Metropolitan Area, with a perfect location close to Schiphol, one of Europe’s busiest airports.

LOGISTICS IV

2


3

Ideal location with excellent connections


N196 N231

WESTEINDERPLASSEN

UITHOORN KUDELSTAART

CALSLAGEN

LEIMUIDEN

Internationaal aantrekkelijke mixed-use werklocatie GROENZONE

in het hart van ondernemend Aalsmeer

N

Midden in de Metropoolregio Amsterdam en ideaal gelegen naast Schiphol. Green Square Busine

At the heart of the Amsterdam Metropolitan Area and ideally close

Campus is direct gelegen aan de N201 en heeft een uitstekende verbinding met de snelwegen A

to Schiphol, Green Square Business Campus is located immediately

(Amsterdam - Utrecht) en A4 (Amsterdam – Den Haag).

adjacent to the N201 trunk road and has excellent connections to the A2 (Amsterdam - Utrecht) and A4 (Amsterdam - The Hague) motorways.

A10 AMSTERDAM

A5 HET AMSTERDAMSE BOS

N201 AMSTELVEEN

SCHIPHOL AIRPORT

HOOFDDORP

A2

N232

A9 N201 N196

N231

N201

ORANJEWIJK

LOGISTIEK

A4

NIEUW VENNEP

FLORA HOLLAND BLOEMENVEILING

AALSMEER RIJSENHOUT

N201

GROENZONE

N196

WESTEINDERPLASSEN

N231 UITHOORN

An internationally attractive mixed-use work location at the Internationaal werklocatie heart ofaantrekkelijke Aalsmeer’smixed-use business district KUDELSTAART

CALSLAGEN

LEIMUIDEN

GROENZONE

N201

in het hart van ondernemend Aalsmeer Midden in de Metropoolregio Amsterdam en ideaal gelegen naast Schiphol. Green Square Business Campus is direct gelegen aan de N201 en heeft een uitstekende verbinding met de snelwegen A2

4


5

Situation drawing and floor plans


Green Square Business Campus is the up-and-coming location in Green Park Aalsmeer for work, business, learning, overnight accommodation, and recreation.

Amsterdam/Schiphol Airport

4

5

2

9

Logistics IV

3

4

6

9

10

6

12

13

14

11

8 1

7

N201

4

1

Logistics I

6

Hotel & hospitality

11

Home, gift & garden centre

2

Logistics II

7

Services & facilities

12

Knowledge & innovation centre

3

Logistics III

8

Sports & medical centre

13

Pavilion (hospitality)

4

Parking

9

Manufacturing industry

14

Zwanenwater

5

Office space

10

Short stay & leisure

Master plan

6


114.600

105.360

12.700

22.800

E

Office space: 439.27 sqm GFA Warehouse: 11,992.36 sqm GFA

Ground floor 7


K0-1

25.200

14.400

Office space: 439.27 sqm GFA Warehouse: 11,992.36 sqm GFA

Ground floor Detail floor plan office 8


16.260

kantelhek

RENVOOI

102.900

1ste Verdieping - Kantoor & mezzanine

25.200

SITUATIE

kantelhek

REVISIE A B C D E

ALGEMEEN

14.400

Alle maten in m

Constructies e

Sparingen en o

Voorzieningen

Office space: 437.59 sqm GFA Mezzanine: 1,820.84 sqm GFA 2de Verdieping - Kantoor & mezannine

1st floor Office & mezzanine

Gree opdrachtgever

Green Square projectnummer

2021005

9


16.260

kantelhek

RENVOOI

102.900

2de Verdieping - Kantoor & mezannine

25.200

SITUATIE

REVISIE A B C D E

ALGEMEEN

14.400

Alle maten in m

Constructies e

Sparingen en o

Voorzieningen

Office space: 437.91 sqm GFA Mezzanine: 1,703.43 sqm GFA

2nd floor Office & mezzanine

Gree opdrachtgever

Green Square projectnummer

2021005

10


RENVOOI TERREIN

verharding hekwerk = 2.000 mm +mv

hekwerk = 2.000 mm +mv

hekwerk = 2.000 mm +mv

laad-/ loskuil, beton gravelpad

-600

groenstrook

P

parkeervak auto, 2500 x 5000

P1

parkeervak auto, 2500 x 7000

P

parkeervak auto met varkensrug, 2500 x 5000

P

hekwerk = 2.000 mm +mv

hekwerk = 2.000 mm +mv

naastgelegen terrein

parkeervak elektrische auto, 2500 x 5000 (>10 m

parkeervak MIVA, 3000 x 5000

boom met rooster incl. aanrijdbeveiliging perceelgrens hekwerk, 2000 mm hoog, spijlenhekwerk

perceelgrens met hekwerk, 2000 mm hoog, spijle F

fietsenstalling (>10 m van gesprinklerd gebouw)

E

elektriciteit/ trafo station

sleutelbuis voor de brandweer, uitvoering en loc alarmeringslicht primaire brandweeringang

primaire brandweeringang, ontsluiting automati aangeduid flitslicht

neveningang, ontsluiting met set sleutels in sleut

primaire opstelmogelijkheid brandweervoertuig

secundaire opstelmogelijkheid brandweervoertu

geboorde put, minimaal 60 m3/h bovengronds af aanrijdbeveiliging

-600

-600

RENVOOI RIOLERING

HWA dak HWA terrein incl. laadkuil DWA gebouw

hekwerk = 2.000 mm +mv

lijngoot pompput olie/ benzine-afscheider

o/b

kolken, regenwaterafvoer

K

hekwerk = 2.000 mm +mv

kavel van der Ban

P

5m

gebruiksrecht van der Ban

hekwerk = 2.000 mm +mv

K

1#

3#

10 m

K

-600

afschot

-550

afschot

F

P

LKT-1

6m

K

P

P

P

P

K

K

P

P

P

afschot

P

afschot

hekwerk = 2.000 mm +mv

-600 P

SITUATIE

-50

6m

7#

-600

7#

P

P

P

P

OHD: 4x4,2m

P o/b P

P

-10 K

-100

P1

P

P

P

P1 P

P

P

P

16200

P

P

P

afschot

P

afschot

P

P

K

-100

P

P

10 m

K

P

P

afschot

afschot

OHD: 4x4,2m

P

P

PROJECTGEGEVENS 6m

P

10 m

5m

9275, 9276, 9277, 9278, 9279, 9280, ged. 6546, ged. 9274 @ (nog nader te bepalen) 600mm + m.v.

P

REVISIE

DATUM

P P

peil t.o.v. maaiveld

perceelnummer

5m

P

P

P

P

P

33500

P

P

10#

3#

10#

13#

P

K

P

B C D

P

P

11800

-600

P

hekwerk = 2.000 mm +mv

6m

-600

P

P

P

P

P

P

P

P

P

P

P

P

P

P

K

P

K

K

P

P

P1

P1

P

van beide kanten toegankelijk, anders 2x uitvoeren

afschot

afschot

afschot

5m

P

5# P1

7#

5#

K

hekwerk = 2.000 mm +mv E

K

K

K

K schuifpoort: Heras, Altas delta

6m

schuifpoort: Heras, Altas delta

hekwerk = 2.000 mm +mv

K

K

K

E

K

K

ALGEMEEN hekwerk = 2.000 mm +mv

P

P

P

P

P

P

P

-600

P

P

15#

P

P

afschot

P

P

P

afschot

P

afschot

P

afschot

P

afschot

P

afschot

P

K

P

P

10 m

K

OPMERKINGEN

A P

P1

P

P

P

P

5500

P

P

P

7#

afschot

afschot

4#

P

maaiveld

P1

9#

3500

P

P

P

7m

K

Aalsmeer

sectie

P1

6m

gemeente/code

P

6m

-1200

P

-600

7#

Alle maten in mm, tenzij anders aangegeven. Niet meten van tekening.

Constructies en gebouwdilataties volgens tekeningen en berekeningen constructeur

Sparingen en overige voorzieningen t.b.v. W- en E-installaties volgens opgave van de

Voorzieningen t.b.v. brandwerendheid en brandveiligheid volgens rapport adviseur b

Green Square Logistics IV

hekwerk = 2.000 mm +mv opdrachtgever

projectlocatie

Green Square Development

Beugelweg, Aalsmeer

projectnummer

onderdeel en fase

2021005

Terrein Overzicht opties

10 m

aansluiting op gemeente riool

Schijfstraat 12

5061KB Oisterwijk

013-202 19 00 www.quadrant4.nl

Site layout Hall & carpark 11


12

Highlights of sustainability & more


Main entrance with green facade

BREEAM Very Good

Large windows for excellent daylight

Rooftop terrace

13 loading docks with insulated overhead doors (3 x 3 m)

Concrete building skeleton

1

2

3

113 parking spaces

4

1

CO² neutral / solar panels

2

Spacious facilities for (electric) bikes

Strong focus on sustainability

Green zones seeded with butterfly mix as food supply

3

Rich planting with shrubs, trees and flowers

4

13


14

Completion level rental prices


General

Site/exterior

• B REEAM - Very Good

•R ooftop terrace on the second floor

(Sustainable building with minimal environmental impact)

•T ruck court measuring approx. 35 m¹

• C oncrete building skeleton

• 2 .0 m¹ high fencing around the entire site

• Insulation value Rc = 4.7 sqm K/W for the wall construction

• 3 exits and entrances for passenger cars and trucks

and an Rc = 6.3 sqm K/W for the roof

• Fire alarm installation (alarm and evacuation installation)

Warehouse • Load-bearing capacity of warehouse concrete floor 5,000 kg/sqm, dispatch area 2,500 kg/sqm, office area 500 kg/sqm and mezzanine 750 kg/sqm

with electronic gate opening

•T ruck entrance and exit fitted with intercom system •T ruck paving in D400 bricks • S ite lighting

Available space

• Flatness of warehouse floor Zeile 1 (DIN 15185)

The available space at GSL IV is approx. 16,831 sqm GFA

• Flatness for dispatch and office area class 4 (NEN 2747)

and breaks down as follows:

• Storage rack foot load of 8,000 kg/sqm in the warehouse • Warehouse fire safety guaranteed with ESRF sprinkler K25

Warehouse:

11,992 sqm GFA

• Column span in warehouse 22.8 m¹

Office:

1,315 sqm GFA

• 13 loading docks

Mezzanine:

3,524 sqm GFA

• Warehouse headroom approx. 12.30 m¹ (rear 7.0 m¹)

Total:

16,831 sqm GFA

• 2 insulated overhead doors at ground level

Parking:

113 parking spaces

(4,000 x 4,200 mm) • 13 insulated overhead doors at the docks (3,000 x 3,000 mm)

Rent price

• Dock shelters equipped with impact bumpers and wheel guides

This development is available for the following rent prices:

• Battery charging points

Warehouse:

€75.00 per sqm GFA per year

• LED lighting

Office:

€130.00 per sqm GFA per year

Mezzanine:

€35.00 per sqm GFA per year

Office

Parking:

€500.00 per space per year

• Central heating system (underfloor heating)

Rental period

• Mechanical ventilation

10 years with extension in 5 years increments. Period of notice 12 months.

• LED lighting • Cable ducts for data cabling

These rent prices are excluding VAT.

Completion date Currently forecast on May 1st 2023.

15


16

Contact & rental information


Rental information For more information, please contact:

Gert Jan de Rooij

Rob Smits

M. +31 (0)6 53 16 06 34

M. +31 (0)6 27 09 39 83

g.derooij@dcdprojects.nl

r.smits@dcdprojects.nl

Jelle de Boer

Joost Merkx

M. +31 (0)6 31 75 24 27

M. +31 (0)6 31 94 07 72

jelle.de-boer@realestate.bnpparibas

joost.merkx@realestate.bnpparibas

Area developer Dutch City Development (DCD) is a nationally operating and risk-bearing real estate developer. We create clear development visions based on knowledge of the location and accommodation needs of the users. DCD is acting as area developer for the new Green Square Business Campus to be developed in Aalsmeer.

www.dutchcitydevelopment.nl/en info@dcdprojects.nl

17


Disclaimer: The information in this publication has been prepared with the greatest possible care. Nonetheless, no rights may be derived from that information. The pictures and floor plans serve only as a source of inspiration to give an impression of the possibilities. No part of this publication may be reproduced or copied without the permission of the developer.

Copyright May 2022 Branding and realisation: MASC Company


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.