Interior Design Select Works Summer 2019

Page 1

Merritt Heilman Select Works


Merritt Heilman 7265 Black Abbey Ct. Dublin, OH 43017 614 769 1976 | heilmamt@mail.uc.edu

Fogarty Finger New York, NY Co-op|January-April 2019

Responsible for modeling in Revit in DD and CD phases, material selection and visualization in Sketchup and Photoshop for DD presentations.

SHP Cincinnati, OH

Part-Time Intern|October 2018-December 2018 Assist with education projects by developing interior space options in Revit.

ZGF Architects Portland, OR Co-Op|May-August 2018

Responsible for translating design PDX TCORE sketches to Revit as well as preparing sheets for schematic design progress prints. Assist with presentations in InDesign, and generating content in Photoshop, Illustrator and SketchUp.

Chute Gerdeman Columbus, OH

Co-Op|January-April 2017, August-December 2017 Responsible for assisting designers with material selection and specification. Ensuring the scheduling of materials is accurate and complete. Assist with design documentation in Revit of architecture and fixture details.

University of Cincinnati, Cincinnati, OH

College of Design, Architecture, Art, and Planning Bachelor’s of Science in Interior Design Deans List|2015-Present University Chapter of IIDA Member|2015-Present DAAP SAID Instagram Contributor|2018-Present Expected Graduation|2020

Dublin Coffman High School, Dublin, OH AP Scholar with Honors|2014-2015 Graduated with Honors Diploma|2015 Graduated Summa Cum Laude|2015 Adobe InDesign Adobe Illustrator Adobe Photoshop Auto CAD Bluebeam Enscape

Hand Rendering SketchUp Lumion Microsoft Office Revit


Contents

Academic Thinx Corporate Office World of Beer Changi Home Depot Learning Lab

Professional SNKRS Office Space PDX Terminal Core Chili’s Restaurant Fairborn Intermediate


1. Thinx Corporate Office


Objective: THINX has grown out of the existing office space and is moving to a new location. Their concerns are a need for a prototyping center and a demand for more collaborative spaces.


1

THINX CORPORATE OFFICE

INDIVIDUAL SUMMER 2017

building corridor

adjacent tenant

conference

1

reception

adjacent tenant

3

quiet office

communal kitchen

collaboration maker’s space

2

0

2

5

10ft

The space is broken up into three areas: quiet work, collaborative space, and communal space.


THINX CORPORATE OFFICE

1

INDIVIDUAL SUMMER 2017

Materials are simple, yet graphic, much like the illustrations on the company’s blog. The space is sophisticatedly playful.


THINX CORPORATE OFFICE

1

INDIVIDUAL SUMMER 2017

Spaces are divided by either storage, or acoustical sitting and pin up panels. The collaboration and communal spaces maintain a visual connection overhead.


THINX CORPORATE OFFICE

1

INDIVIDUAL SUMMER 2017

visible connection

audible connection

The quiet work space contains traditional work stations and small breakout areas for one-on-one work sessions.


2. World of Beer Changi


Objective: Adapt an existing brand to a duty free format for Singapore Changi Airport.


WORLD OF BEER CHANGI

2

GROUP FALL 2018

The design is intended to embrace the craft beer community, highlight locality, and celebrate the tavern atmosphere.


WORLD OF BEER CHANGI

2

GROUP FALL 2018

The space is intended for a quick flight tasting of four beers. No seating is provided in order to keep customers moving in and out of the store. The store offers exclusive customizable coolers that are not available at any other WOB location.


WORLD OF BEER CHANGI

2

GROUP FALL 2018

The space includes a wall of illuminated beer bottles for an added layer of contemporary moodiness that blends with some of the more traditional tavern materials.


2

WORLD OF BEER CHANGI

GROUP FALL 2018

2 1

3

ADJACENT TENANT

ADJACENT TENANT

FLOOR PLAN

4

+

Kat Hoff

|

1

BAR/ TASTING EXPERIENCE

2

DRINK RAIL

3

BUILD YOUR OWN COOLER

4

FEATURE WALL/ PHOTO OPPORTUNITY

Erin Hershberger

|

The space serves three key functions plus a social media photo opportunity. Another team member focused on the development of customizable coolers which were the key product at the store.

Merritt Heilman


3. Home Depot Learning Lab


PAVE 2018 Competition Objective: Develop a single space that inspires, enables, and educates customers.


HOME DEPOT LEARNING LAB

3

INDIVIDUAL FALL 2018

The Home Depot Learning Lab is intended to be approachable, curated, flexible, relaxed, and transparent. Everything is intended to empower the general customer.


HOME DEPOT LEARNING LAB

An interchangeable display system allows for shelving to be clipped in place.

3

INDIVIDUAL FALL 2018

Digital tablets provide information to customers about featured products.

At the New Product Test Center DIY-ers will find the best product for their job. Here, the Pro can also see how they can reduce client costs and increase productivity.


HOME DEPOT LEARNING LAB

3

INDIVIDUAL FALL 2018

Configuration A

Configuration B

During most store hours this space will feature seasonal or new products on roll-away displays. During workshops, tables can be moved in and the space becomes a classroom for Pro-led courses.


HOME DEPOT LEARNING LAB

3

INDIVIDUAL FALL 2018

The Independent Discovery Center inspires customers by offering digital tablets to brows ideation tabs. There are also pamphlets and magazines for users to take home.


4. SNKRS Office Pier 17 New York, NY Fogarty Finger Spring 2019 Co-op Semester


Much of my role on the SNKRS office space was concentrated in Revit where I assisted in the development of the firm’s Revit library. During the DD phase, I also was responsible for sourcing a wide variety of traditional and non-traditional materials.


SNKRS OFFICE

4

GENERAL NOTES

LEGEND

CO-OP SPRING 2019 (FOR FULL LEGEND SEE SHEET A-003.00) FEC1

FEC2

1. 2. 3. 4. 5. 6.

FIRE EXTINGUISHER CABINET MANUF: LARSEN MFG STYLE: ARCHITECTURAL SERIES VERTICAL DUO FINISH: WHITE MOUNT: FEC = RECESSED MODELS: FEC = 2409-R1

SEE A-001 FOR ADDITIONAL CONSTRUCTION N SEE A-002 FOR STANDARD MOUNTING HEIGHT REFER TO A-010.00 AND A-011.00 FOR PARTITI REFER TO A-030.00 FOR DOORS AND HARDWA ALL DIMENSIONS ARE FROM FINISH TO FINISH VERIFY ALL DIMENSIONS IN FIELD. CONTACT DISCREPANCY BETWEEN THESE DRAWINGS A GC TO FLASHPATCH SUBSTRATE TO PROVIDE REQUIRED. NO MECHANICAL ATTACHMENT TO CURTAINW PROVIDE PORTABLE FIRE EXTINGUISHERS, IN STANDARD. CONFIRM FINAL LOCATION DURIN PROVIDE WATERPROOFING UNDER FINISH FL MANUFACTURER'S RECOMMENDATION IN SHO SEAL AND FIRE PROOF ALL EXISTING FLOOR O ALL EXPOSED STEEL COLUMN WITH SPRAY-O CONSTRUCTION. PATCH AS REQUIRED PER A FINISH PLAN FOR FINISH COLOR. PATCH, SKIM, AND PAINT EXISTING WALLS OR SURFACE FOR NEW FINISHES. LAMINATE LAY PERIMETER WALLS, AND COLUMNS WHERE R FOR NEW FINISHES. FIREPROOF WHERE REQ GC TO REVIEW WALL LAYOUT WITH ARCHITEC

7. 8. 9.

FIRE EXTINGUISHER CABINET MANUF: LARSEN MFG STYLE: ARCHITECTURAL SERIES VERTICAL DUO FINISH: WHITE MOUNT: FEC = SURFACE MOUNTED MODELS: FEC = 2409-R1

10. 11. 12. 13.

14.

1

2

3

MAKER SPACE 308

IDF 344

FOCUS 309

1 A-606

A 9 7

7

4

4

4

11 TYP. 4

9 7

2B

TYP.

FEC1

12 7 15

7

7 2

B

308A

308C 344

14

7B

A-503

4

9 5

7B

14

4

ALIGN

14

2

1

2B 310

309

9

10 8

2B 11 A-502

308B

A-502

7

9'-0"

6

7

1

5

4 4

A-502

4

C

4

3 1

4

5 A-709

4

15

1

10'-0"

1

2

15

13

D

XL CONF. 307

1

CONSTRUCTION PLAN - 3RD FLOOR 1/8" = 1'-0"

Project Pallete

Key responsibilities on this corporate design project were material sourcing and Revit modeling. The project has a sophisticated urban aesthetic, which lended to some unique materials blended with traditional.

M


KEY NOTES

NOTES TS ION TYPES AND DETAILS ARE SCHEDULE H, UNO. ARCHITECT SHOULD THERE BE ANY AND FIELD CONDITIONS. E LEVEL FLOOR AT ALL DOORS & FRAMES AS

SNKRS OFFICE

1.

3.

WALL PERMITTED. N QUANTITY & CAPACITY AS PER NFPA 10 NG CONSTRUCTION. LOOR AND CONTINUE IT UP THE WALL AS PER OWER ROOMS, 337 AND 341. OPENINGS, TYP. FIRE PROOF AS REQUIRED. ON FIRE PROOFING TO BE PROTECTED DURING APPLICABLE FIRE CODE REQUIRED. REFERENCE

4. 5. 6.

7.

R COLUMNS TO PROVIDE SMOOTH EVEN YER OF GWB AT EXISTING CORE WALLS, REQUIRED TO PROVIDE SMOOTH EVEN SURFACE QUIRED, TYP. CT PRIOR TO FRAMING.

10.

PROVIDE WATERPROOFING UNDERLAYMENT BELOW FINISHED FLOORING IN ENTIRETY OF SHOWER ROOM. PROVIDE WATER & MOISTURE RESISTANT (PURPLE BOARD) SHEATHING AT PANTRY, RESTROOM VANITY, MAKERS SPACE WASH SINK, JANITOR CLOSET AND RESTROOM. PROVIDE CEMENTBOARD IN SHOWER ROOM. COORDINATE FINAL FLOOR DRAIN LOCATION IN FIELD WITH PLUMBING ENGINEER AND ARCHITECT. PROVIDE METAL BLOCKING BEHIND WALLS FOR FUTURE BRANDING, AV EQUIPMENT, ARTWORK, MILLWORK, ETC. PROVIDE WASH SINK (PF-04) AT MAKERS SPACE. REFERENCE PLUMBING FIXTURE SCHEDULE AND P-DWGS FOR ADDITIONAL SPEC INFORMATION. ELEVATED WF-01 PLATFORM/STAGE. REFERENCE FINISH PLAN FOR ADDITONAL INFORMATION. GC TO PROVIDE SUFFICIENT STRUCTURAL SUPPORT FOR ENTIRE AREA OF STAGE. REF. ELEVATIONS AND DETAILS ON A-713.00. REFERENCE EQUIPMENT SCHEDULE, ELEVATION AND DETAILS FOR ADDITIONAL INFORMATION. DEMOLISH TEMPORARY DOOR AND FRAME. FILL IN AND REPAIR WALL, MATCH CURRENT FIRE RATING AS REQ. HALLWAY FINISHES TO MATCH EXISTING. GC TO COORDINATE WIH BUILDING AS REQ. FURR OUT WALL WHERE REQUIRED TO FULLY RECESS FIRE EXTINGUISHER CABINET.

2.

8. 9.

CLIENT:

4

SEE NUMBER BELOW FOR DESIGNATED BY KEYNOTE

X

CO-OP SPRING 2019

PROVIDE FULL WIDTH SHELF, PL-0X, 18" DEEP AND 1" DIAMETER POLISHED CHROME HANGER ROD AT COAT CLOSET. PROVIDE INTERMEDIATE VERTICAL DIVIDERS AS REQUIRED FOR LONGER SPAN. SEE 4/A-708.00 FOR DETAILS. REF. WINDOW WALL BUILD-OUT DETAIL ON 9/A-708.00. INSTALL GYP. WALL AS PER DETAIL. LANDLORD GC WILL PROVIDE FRAMING AND TIE BACKS AS REQUIRED. PROVIDE ADJUSTABLE SHELVING, EQ-09. PROVIDE BLOCKING BEHIND WALL AS REQUIRED. SHELVING TO RUN WIDTH OF CLOSET OR NICHE OPENING. PROVIDE FIRE RESISTANT PLYWOOD BOARD AT ELEC. PANELS. SPECIFIED PARTITION TO BE HELD TIGHT TO COLUMN. REF. GENERAL DETAILS ON A-708.00. LAMINATE AN ADDITIONAL LAYER OF 5/8" THICK GYPSUM WALL BOARD AT THIS LOCATION. FIRE EXTINGUISHER TO BE BLACK AT THIS LOCATION. INSTALL GYP AND INSULATION ONTO EXISTING, EXPOSED STOP WALL. WALL TO BE 1 HR FIRE RATED.

11. 12. 13. 14. 15. 16. 17.

DESIGN ARCHITECT - INTERIORS:

Owner: NIKE One Bowerman Drive, Beaverton, OR 97005

MEP: AMA CONSULTING E 825 8th Avenue, F18 New York, NY, 10018 TEL: 212 404 5812

Lighting Designer: BOLD 227 West Street, 8th F New York, NY, 10001, TEL: 212 674 6500

Acoustical Consultant: LSTN CONSULTANT 76 Beaver Street New York, NY 10005 TEL: 347 788 0810

4

5

6

OPEN OFFICE 311

PH 310

7

8

COLLAB LOUNGE 313

SUPERTABLE 312

HUB/STAGE 314

9

PANTRY 315

MED. CONF. 316

10 COPY 318

MED. CONF. 317

11

12

OPEN OFFICE 320

FOCUS 319

13 COLLAB LOUNGE 322

PH 321

14

AV Installation: TBD XX XX XX

OPEN OFFICE 324

PH 323

AV Design: ROOM READY 200 North Main Street Normal, IL 6176 TEL: 309 451 3999

Security Design + Insta ASG (ARONSON SEC 9350 South West Nim Beaverton, OR 97008 TEL: 800 547 9988

4 14

2B

8

MER #1 306

11 10 12 9

7

1 A-608

3 7

5

7A

6

8 5

4

7

3

12

ALIGN

7

4

A-508

3 1

4

3

343B

7

340

12 2 8 7 9 6 7

11'-2 1/2"

A-504 A-504

ALIGN

3

3

4

A-504 4

4

5

8

ELEC 329

13

3

1 2

7

12

337

3 2 12

12 12 3 2

338

12

3 2

12

12

2 3 14

12 7

7

16 9

4

329A 7

7

EX02

1 A-603

12 12

12

12

5

336

ALIGN

7

3 1

2B

335

11'-11 1/2"

2

2B

3 1

1

4

328

327

17 18 16 15

10

332

2B

22 24 21 17

4

2B

6

7 5

15

8 10

331

16 17

334

BOH PANTRY 304

PH GALLERY 303 302

ENTRY 301

JAN 343

SHOWER 341

1 325B

13 12 14 11

2

2B

4 4

4

13

EQ

5

7

4

MEDIUM CONF. 325

345 9

4

15

18 20 17 1

16 14 13

17

16 1

17

11

10 12 9

9 9

FOCUS 327 MDF 332

STORAGE 331

12'-1"

MER #2 345

05

04.02.2019

10

04

02.28.2019

60

03

02.18.2019

02

02.01.2019

30

10

01

01.24.2019

90

NO.

MM.DD.YYYY

ISS

KEY PLAN:

15

15

N

COAT CLOSET 342 LARGE CONF. 305

4

4

RECREATION/COLLAB 330

ALIGN

2B

333

6'-6"

EQ

19

1

7

FOCUS 328

5

4

EQ

23

7

2

4

7

3

5 6

EQ

7

3B

FEC1

1 2

5

SMALL CONF. 326 EQ

5

4

329B

3

7

5

7

4

2B

4

1

ALIGN

4

12

341

12

14

3B

4

1

7

6

3B

6

7

4 7

COLLAB

4

11'-9 1/2"

12

12

342

3B 3

3

16 9 FEC1

7

4 2

5

4

ALIGN

5

3 A-602

4 3

343A 10

4

EX01

301

A-507

16 3B

ALIGN

2B 5

3

2

323

10

4

11'-0"

5 8

303

7

9

325A

ALIGN

2

5

ALIGN

ALIGN

1

4

2B

16

5

326

8

EQ

A-506

1 306A

3

4

2B

A-506

1

4

4

7

304

A-501

1

FEC1

1

A-608

306C

ELEC. 13

15 14 16 13

4'-0"

13

11'-5 1/2"

4 1

11'-9 1/2"

12

3B

DN

319

6'-2"

ALIGN

14

A-507

4 A-709

4'-0"

A-501

1

ELEC. 13

7

7

A-508

3B

305A

ALIGN

2B 305B

1'-0"

7

7

A-501

306B

11 10 12 9

1

2B

317

ALIGN

ALIGN

14

4

ALIGN

A-501

7

2 A-711

ALIGN

10 11 9

ALIGN

316

1

4

3 Sim A-711

5

16'-0"

7

EX05

5

2

321 4

7

A-505

4

14 16 13

4

3

COLLAB

3 Sim A-705

EQ

2B

7

A-506

2

4

3A

2B 12'-0"

3B

3

A-507

T.O. STAGE 1'-2''

6

DN

A-507

4

5 7

15

11'-2 1/2"

A-503

307

1

9

3

A-504

5 5

3A

7

A-505

4

1 A-601

2

ALIGN

ALIGN

7 DN EQ-06A

4'-11 1/2"

7

A-507

7

EQ

2B

ALIGN

7

16

ALIGN

12

A-505

7 4

A-609

7

DN

7

A-508

COLLAB 5

3 A-705

1 A-609

3B

1'-0"

7A

7A 7

7

A-505

4

16

12

TYP.

A-506

3 A-711

7

7

4

2

A-602

3 A-704

2B

5

TYP.

7A

ALIGN

EX04

A-506

A-503

3 A-710

B

11

6

EX03

ALIGN

ALIGN

A-506

7

3B

3

8'-0"

1 A-602

TYP.

9'-2"

7

5'-7"

TYP.

A-503

11

VIF

FEC1

4'-5 1/2"

ALIGN

5'-4"

VIF

A-503

4'-11"

WOMENS 340

COLLAB MENS 339 338

SHOWER 337

WELLNESS 336

SMALL CONF. 335

SMALL CONF. 334

SMALL CONF. 333

BLOCK: 73 LOT: 10 PROJECT:

NIKE PIER 1

100% CD Construction Plan

DRAWING TITLE:

3RD CONSTR SEAL & SIGNATURE:

The firm was new to Revit, I assisted in the development of important tags and schedules along-side documentation.


5. PDX Terminal Core Portland International Airport Portland, OR ZGF Architects Summer 2018 Co-op Semester


Contributions to the schematic design phase of the Portland airport’s expansion by supporting the design process through 3D modeling, SD drawing sets and predominately confidential presentation creation.


PDX TERMINAL CORE

5

CO-OP SUMMER 2018

Enplaning

Overall figure-ground plan studies reflect the solid and transparent masses throughout the airport. The enplaning level has to service many of the security areas and the most trafficked restrooms in the airport.


PDX TERMINAL CORE

5

CO-OP SUMMER 2018

Mezzanine

The mezzanine level houses more private offices and a conference center. The more public areas host seating and lounge areas.


PDX TERMINAL CORE

W

5

CO-OP SUMMER 2018

M

This elevation study of the bag claim area was done to express an artful approach to the space. The current bag claim space is dark and has low ceilings.


PDX TERMINAL CORE

5

CO-OP SUMMER 2018

W

A digital art wall was an effort to bring more light and information to the passengers waiting for their bags upon arrival.

M


6. Chili’s Restaurant Clinton International Airport Little Rock, AR Chute Gerdeman Fall 2017 Co-op Semester


Develop the design intent set to 90% to issue to the contractor and architect of record. Drawings range from plans, elevations, and reflected ceiling plans to casework, section details, and transition details.


CHILI’S RESTAURANT

6

CO-OP FALL 2017

Fixture Drawings

Fixture Drawings: I helped to develop a new detail for the attachment of a brand fixture. The client asked if the detail could be shared with the brand to potentially become the millwork standard.


CHILI’S RESTAURANT

6

CO-OP FALL 2017

Elevations

Design Intent Drawings: This was the first project in which I was completely responsible for documenting in Revit at Chute Gerdeman. I was responsible for the entire drawing set under the ADS project lead.


CHILI’S RESTAURANT

6

CO-OP FALL 2017

Fixture & Equipment Plan

Plans would be approved following the RFP process, but I was responsible for coordinating with an equipment consultant and adjusting the plan to ensure clearances.


CHILI’S RESTAURANT

6

CO-OP FALL 2017

Finish Plan

A portion of my role at the firm included material selection and specification. The finish plans were to represent these finishes listed on the schedule that I assisted in putting together.


7. Fairborn Intermediate Fairborn, OH SHP Fall 2018 Semester Internship


Fairborn School District’s new Intermediate school for grades 3-6 is a state funded school with a limited budget, but enthusiastic board members. During the SD phase, I assisted in the creation of graphic concepts and Enscape visualization from Revit.


FAIRBORN INTERMEDIATE

Alternate

7

INTERNSHIP FALL 2018

Base Bid

Enscape views of the cafeteria and commons showing how the addition of graphics and colorful acoustic panels can enhance the space.


FAIRBORN INTERMEDIATE

Alternate

7

INTERNSHIP FALL 2018

Base Bid

Enscape views of the corridor intersection at the western stair showing an option with graphics and without. To see the full walk through, visit https:// vimeo.com/330380854.


Thank you.

614 769 1976 | heilmamt@mail.uc.edu https://issuu.com/merrittheilman


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.