Interior Design Select Works - 2020

Page 1

Merritt Heilman Select Works


Merritt Heilman 7265 Black Abbey Ct. Dublin, OH 43017 614 769 1976 | merrittheilman@gmail.com

TPG Architecture New York, NY Co-op|August-December 2019

Fogarty Finger New York, NY Co-op|January-April 2019

SHP Cincinnati, OH

Part-Time Intern|October 2018-December 2018

ZGF Architects Portland, OR Co-Op|May-August 2018

Chute Gerdeman Columbus, OH

Co-Op|January-April 2017, August-December 2017

University of Cincinnati Cincinnati, OH

College of Design, Architecture, Art, and Planning Bachelor’s of Science in Interior Design Deans List|2015-Present University Chapter of IIDA Member|2015-Present DAAP SAID Instagram Contributor|2018-Present Expected Graduation|April 2020

Dublin Coffman High School Dublin, OH AP Scholar with Honors|2014-2015 Graduated with Honors Diploma|2015 Graduated Summa Cum Laude|2015

Adobe InDesign Adobe Illustrator Adobe Photoshop Auto CAD Bluebeam Enscape

Hand Rendering SketchUp Lumion Microsoft Office Revit


Contents

Academic

Thinx Corporate Office

Corporate Workplace

World of Beer Changi

Retail

Home Depot Learning Lab

Retail

Professional

FINRA

Corporate Workplace

Huntsworth

Corporate Workplace

SNKRS

Corporate Workplace

PDX Terminal Core Chili’s Fairborn Intermediate

Transit

Restaurant

Education


1. Thinx Corporate Office


Objective: THINX has grown out of the existing office space and is moving to a new location. Their concerns are a need for a prototyping center and a demand for more collaborative spaces.


1

THINX CORPORATE OFFICE

building corridor

adjacent tenant

conference

1

reception

adjacent tenant

3

quiet office

collaboration maker’s space

communal kitchen

2

The space is broken up into three areas: quiet work, collaborative space, and communal space.


1

INDIVIDUAL SUMMER 2017

Materials are simple, yet graphic, much like the illustrations on the company’s blog. The space is sophisticatedly playful.


THINX CORPORATE OFFICE

1

Spaces are divided by either storage, or acoustical sitting and pin up panels. The collaboration and communal spaces maintain a visual connection overhead.


1

INDIVIDUAL SUMMER 2017

The quiet work space contains traditional work stations and breakout areas for small group work sessions. Vertical wood dividers are present for visual privacy, and plants are integrated throughout to add softness and brightness to the work spaces.


2. World of Beer Changi


Objective: Adapt an existing brand to a duty free format for Singapore Changi Airport.


WORLD OF BEER CHANGI

2

The design is intended to embrace the craft beer community, highlight locality, and celebrate the tavern atmosphere.


2

GROUP FALL 2018

The space is intended for a quick flight tasting of four beers. No seating is provided in order to keep customers moving in and out of the store. The store offers exclusive customizable coolers, which are not available at any other WOB location.


WORLD OF BEER CHANGI

2

The space includes a wall of illuminated beer bottles for an added layer of contemporary moodiness that blends with some of the more traditional tavern materials.


2

Adjacent Tenant

2 1 3

4 1

Tasting Experience

3

Build Your Own Cooler

2

Drink Rail

4

Feature Wall/Photo Opportunity

The space serves three key functions plus a social media photo opportunity. Another team member focused on the development of customizable coolers which were the key product at the store.

Adjacent Tenant

GROUP FALL 2018


3. Home Depot Learning Lab


PAVE 2018 Competition Objective: Develop a single space that inspires, enables, and educates customers.


HOME DEPOT LEARNING LAB

3

The Home Depot Learning Lab is intended to be approachable, curated, flexible, relaxed, and transparent. Everything is intended to empower the general customer.


3

An interchangeable display system allows for shelving to be clipped in place.

INDIVIDUAL FALL 2018

Digital tablets provide information to customers about featured products.

At the New Product Test Center DIY-ers will find the best product for their job. Here, the Pro can also see how they can reduce client costs and increase productivity.


HOME DEPOT LEARNING LAB

3

Configuration A

Configuration B

During most store hours this space will feature seasonal or new products on roll-away displays. During workshops, tables can be moved in and the space becomes a classroom for Pro-led courses.


3

INDIVIDUAL FALL 2018

The Independent Discovery Center inspires customers by offering digital tablets to brows ideation tabs. There are also pamphlets and magazines for users to take home.


4. FINRA Downtown Manhattan New York, NY TPG Architecture Fall 2019 Co-op Semester


I was primarily responsible for 3D modeling the existing conditions of the site in SketchUp based on survey drawings and photos, then later modeling the design based on client and senior designers’ feedback.


FINRA

4

Elevator Lobby

Elevator Lobby with Hertiage Artwork

This space is the HQ for the company where exective decisions will be made. The client wanted a sense of sophistication, seriousness, and appreciation for the company’s history integrated into the office.


4

CO-OP FALL 2019

Main Corridor

Main Corridor with Hertiage Artwork

Here is an option I put together as to how the office may integrate history into the space with impressions of images and text into a trowelled concrete wall finish.


FINRA

4

Board Room The client wanted a great deal of flexibility in their main board room where training and executive meetings are to take place. They asked that there be room for catering and recessed TVs in the wood banding, as well as a retractable glass wall system into reception.


4

CO-OP FALL 2019

Executive Suite Lobby

Executive Office

The executive offices have their own reception area and custom millwork. Rich walnut and brass are used throughout the project to portray the sophistication requested by the client.


5. Huntsworth 300 Vesey St New York, NY TPG Architecture Fall 2019 Co-op Semester


I was primarily responsible for 3D modeling the existing conditions of the site in SketchUp based on survey drawings and photos, then later modeling the design based on client and senior designers’ feedback.


HUNTSWORTH

5

Reception Lounge

Reception

I 3D modeled the existing space and the additional design elements for the project over the course of my internship at TPG.


5

CO-OP FALL 2019

Executive Board Room

These are DD “sketch� renderings for a client presentation. I used SketchUp exported views and Photoshop for the final result.


HUNTSWORTH

5

Workstations and Meeting Pavillion

The space floor to ceiling is about 22’ tall, so the client wanted to insert meeting room pavillions throughout the expansive open work area.


5

CO-OP FALL 2019

Executive Conference Beyond Workstations

The existing space had never been occupied, so the client wanted to keep the existing light fixtures and many of the neutral finishes.


HUNTSWORTH

Floor Finishes - Option 1

5 Existing

Existing C

Floor Finishes - Option 1

Existing T

Existing

New

Existing Carpet

New Carpe Existing W

on 1 on 1 Existing

New

Existing

New

New Accen

New Accen

New Accen

New Vinyl F Existing Carpet

New Carpet

Existing Carpet

New Carpet

Existing Tile

New Accent Carpets New Accent Carpets New Accent Carpets New Accent Carpets New Accent Carpets New Accent Carpets New Vinyl Flooring Existing Tile

New Vinyl Flooring

Existing Wood Tile

Existing Tile

Two flooring options were provided, one which the client keeps some of the existing carpet and implemented Existing Wood Tile colored carpeted accent areas. Existing Wood Tile

1519509-00 | 11.26.19 | PAGE 5


Floor Finishes - Option A

5

CO-OP FALL 2019

New Ca

or Finishes - Option A

New Vin

Existing T

Existing W New Carpet

New Carpet

New Vinyl Flooring

New Accent Carpets

oor Finishes - Option A

or Finishes - Option A

Existing Tile Existing Wood Tile New Carpet

New Carpet

New Accent Carpets

New Carpet New Vinyl Flooring

New Accent Carpets New Carpet

Existing Tile Existing Wood Tile

New Vinyl Flooring

New Accent Carpets New Accent Carpets | 12.10.19 | PAGE 1 1519509-00

Existing Tile Existing Wood Tile

The other option suggested replacing the carpet throughout and incorporating black and white accent New Accent Carpets carpets with bold patterns. I created both of these floor finish diagrams to explain these to the client. 1519509-00 | 12.10.19 | PAGE 1


6. SNKRS Office Pier 17 New York, NY Fogarty Finger Spring 2019 Co-op Semester


Much of my role on the SNKRS office space was concentrated in Revit where I assisted in the development of the firm’s Revit library. During the DD & CD phase, I also was responsible for sourcing a wide variety of traditional and non-traditional materials.


SNKRS OFFICE

6

Project Palette

Key responsibilities on this corporate design project were material sourcing and Revit modeling. The project has a sophisticated urban aesthetic, which lent to some unique materials blended with traditional.


15 7 1 8 14 16 A-60113

1

EX05

4

16

4

ALIGN

4'

7

2 75 77 7 4 3ADN ALIGN 4 1 3 5 4 EQ-06A 2 1 7 8

DN EQ-0

A-609 A-508

ALIGN

47 1 74 A-601 3 5 2 7

ALIGN

A-50

6 2B

16

A-609

15 1 16 14 13 A-601

71

A-507

T.O. STAGE 2 1'-2''

EQ-06A DN 5 4 3A 7 5

A-507

A-503

4

11'-2 1/2"

5 T.O. STAGE 5 1'-2''

4

A-507

EQ-06A DN

COLLAB

A-507 11'-2 1/2"

1 A-601

A-

COLLAB

CO-OP

T.O. STAGE

8'-0"

A-504

9'-2"

A-504

ALIGN 5'-7"

ALIGN

A-508

A-501

ALIGN

A-506

A-506A-506

A-506

ALIGN

A-508

A-501

ALIGN

A-508

A-501

A-501

A-508

ALIGN

A-508

A-508 A-501

ALIGN

A-507

A-507

A-507 1'-0"

1'-0"

A-501

A-501

A-501

A-508 ALIGN

ALIGN

A-508

A-508

A-501

A-507

11'-2 1/2"

9'-2"

ALIGN

A-504

A-507

11'-2 1/2" ALIGN

A-507

ALIGN

11'-2 1/2"

1'-0"

A-608

A-608

4'-0"

A-501

A-501 A-508

ALIGN

4'-0"

A-507

ALIGN

ALIGN

11'-9 1/2"

1'-0"

A-501

11'-9 1/2"

ALIGN

A-608

COAT CLOSET 342

A-507

6

A-504

2

8'-0"

4

11'-2 1/2"

2B ALIGN 1'-2''5 25 7 SPRING 2019 DN 15 ALIGN 4 316 2B 14 16 3 2B 13 2 316 4 5 3 T.O. STAGE 1 4 T.O. STAGE 2 2B 4 1'-2'' 6 1 1 317 319 2 1'-2'' 4DN 1 6 2 DN 6'-2" 4 317 319 1 4 14 4 11 3 6'-2" Sim 12'-0" 3 10 12 3 Sim 11 2B 9 7 326 A-711 A-711 10 12 ALIGN 2 6 8 2B 9 7 ALIGN 7 326 5 ALIGN A-711 1 3B ALIGN4 4 4 6 8 1 3 4 7 7 Sim 12'-0" 16 Sim 5 3B 3B 4 2B 12'-0" 2B 3B 11 43 7 3 4 5 A-711 10 12 16 14 7 A-711 2B 9 DN DN 2 305A ALIGN 5 ALIGN 5 5 ALIGN 4 7 ALIGN A-711 74 7 3B 7 3B 4 54 5 4 16 3B 7 7 ALIGN 3B 4 4 3B FEC1 4 13 ELEC 7 16 16 11'-5 1/2" 14 DN 5 3 3 14 16 ALIGN DN 305A 7 3B 5 Wall Type 329 Tag 7 5 133 A-602 1 7 5 3 3 15 6 7 3B 3B 3B 304 A-6 14 16 FEC1 ALIGN 329A A-602ALIGN 7ALIGN 3B4 FEC1 6 ALIGN 7 3B 7 11'-5 1/2"13 3B 3B 2B ALIGN 16 11'-5 1/2" 7 16 ALIGN 329A 303 4 7 1 43 3 ALIGN 4 4 4 3 3 5 5 3 ALIGN 7 3 EX023 7 7 2 3 3041 4 3 329B 3 ALIGN3 A-602 3 304 3 4 4 4 11 6 A-602 ALIGN 343A 7 3 7 3B ALIGN 7 3B 33B 7 3B 329B 3 7A 103 12 2B 7 ALIGN 3 Keynote Symbol 3 2B 343A 3 303 5 4 9 10 5 12 303 7A 4 343A 1 53 45 3 1637A 5 1 2 8 33 10 3 340 338 4 4 4 3 10 16 12 4 12 12 3 119 2 16 4 2 343 7 11 3 3 7 16 5 310 12 9 83B 3 9 3 1 340 338 4 16 10 12 35 341 337 343AFEC1 4 5 48 12 12 9FEC1 343A 6 7 7A 5 4 5 3 9 9 5 7A 6 7 5 33 3 5 1 9 3 4 3BFEC1 341 10 8 3 10 337 341 5 42 FEC1 FEC1 8 2 1 12 16 3 12 A-603340Fire Extinguisher 16 12 338 3 1 1 4 01 12 121340 A-608 8 4 343B 12 12 8 9 Model with Tag 122B 9 1 6 7 2 2 12 2 4 56 37 12 2 5 EX01 12 53363 12335 343B A-603 12 3 341 33 1 1 5 4 12 FEC1 4 EX01 3 12 12 5 2 4 FEC1 341 12 343B 7 3 12 3 2 2 12 1 5 3 1 ALIGN12 7 336 42 12 1212 2 A-608 ALIGN 2 7 7 A-608 2 3 12 342 112 12 3 2 12 4 EX01 1 7 11'-11 1/2" 12 12 4 EX01 12 12 343B 343B 342EQ 7 2 12 14 14 301 7 2 12 Elevation Marker 2 3 12 342 12 12 7 12 12 1212 3 2 14 301 7 7 12 12 ALIGN 11'-11 1/2" 12 12 12 12 7 7 23 19 ALIGN 12 7 14 2 14 7 8 22 24 18 20 12 7 7 7 9 21 17 2 3 7 4 7 34212 8 16 2 7342 23 7 6 3 2 301 7 2 7 12 717 4 12 17 9 7 12 12 8 7324 2 12 1 22 301 7 6 7 7 7 9 21 114 1 14 3 7 14 77 12 7 12 7 6 2 4 12 17 3 21 7 4 8 2 4 2 1 4 8 7 7 7 9 1 7 7 7 9 7 6 6 3 3 7 2 4 7 2 4 1 100% CD Construction Key 1 Plan 6

COAT CLOSET 342

COAT CLOSET COAT SMA 342 LARGE JAN SHOWER BOH WOMENS COLLAB MENSCLOSET WELLNESS SHOWER COAT CON ENTRY JAN WO GALLERY CONF. 343 341 PANTRY 339toPH 338 336 SHOWER 337 inCLOSET The 340 firm was new Revit, I342 assisted the 33 342 301 343 341 303 302 305 304 JAN SHOWERof important WOMENS tags COLLAB WELL MENS LERY ENTRY SHOWER development and schedules H 301 BOH 343 341 340documentation. 339 33 338 302 337 along-side CD ENTRY JAN SHOWER WOMENS COLLAB MENS PH GALLERY RY JAN SHOWER WOMENS PH GALLERY ENTRY PANTRY 301 339 340338 302 343 340 341 303 302 343 301 341 304 303


7. PDX Terminal Core Portland International Airport Portland, OR ZGF Architects Summer 2018 Co-op Semester


Contributions to the schematic design phase of the Portland airport’s expansion by supporting the design process through 3D modeling, SD drawing sets and predominately confidential presentation creation.


PDX TERMINAL CORE

W

M

W

M

7

These elevation studies of the bag claim area were done to express an artful approach to the space. The current bag claim space is dark and has low ceilings.


7

CO-OP SUMMER 2018

W

M

W

M

A digital art wall was an effort to bring more light and information to the passengers waiting for their bags upon arrival.


8. Chili’s Restaurant Clinton International Airport Little Rock, AR Chute Gerdeman Fall 2017 Co-op Semester


Develop the design intent set to 90% to issue to the contractor and architect of record. Drawings range from plans, elevations, and reflected ceiling plans to casework, section details, and transition details.


CHILI’S RESTAURANT

8

Fixture Drawings

Fixture Drawings: I helped to develop a new detail for the attachment of a brand fixture. The client asked if the detail could be shared with the brand to potentially become the millwork standard.


8

CO-OP FALL 2017

Elevations

Design Intent Drawings: This was the first project in which I was completely responsible for documenting in Revit at Chute Gerdeman. I was responsible for the entire drawing set under the ADS project lead.


CHILI’S RESTAURANT

8

Fixture & Equipment Plan

Plans would be approved following the RFP process, but I was responsible for coordinating with an equipment consultant and adjusting the plan to ensure clearances.


8

CO-OP FALL 2017

Finish Plan

A portion of my role at the firm included material selection and specification. The finish plans were to represent these finishes listed on the schedule that I assisted in putting together.


9. Fairborn Intermediate Fairborn, OH SHP Fall 2018 Semester Internship


Fairborn School District’s new Intermediate school for grades 3-6 is a state funded school with a limited budget, but enthusiastic board members. During the SD phase, I assisted in the creation of graphic concepts and Enscape visualization from Revit.


FAIRBORN INTERMEDIATE

Alternate

9

Base Bid

Enscape views of the cafeteria and commons showing how the addition of graphics and colorful acoustic panels can enhance the space.


9

Alternate

INTERNSHIP FALL 2018

Base Bid

Enscape views of the corridor intersection at the western stair showing an option with graphics and without. To see the full walk through, visit https:// vimeo.com/330380854.


Thank you.

614 769 1976 | merrittheilman@gmail.com https://issuu.com/merrittheilman


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.